Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (21)
lig City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ■ TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: `�ul(9.0/4—( pf Site Address: 7./5.0 ffSLi)• Dpita TM Suite/Bldg#: =13 Project Name: P4.0 12de--k 5.O k..b 1w,!? (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: GIia--Cr tit- S 'E L evofircAl our S1 S ❑ Verify site address/suite#exists and active in permit system. ❑ River Terrace Plan District: ❑ Yes ❑ No ❑ Land Use Case#: /MV 1 D ?0/S - O -P) 2_ ❑ Plans Match Approved Land Use: ❑ Site Plan ❑ Landscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan ❑ Building Height: Maximum Height Actual Height ,J -Conditions Met: 2'Prior to Submittal ❑ Prior to Permit Issuance ❑ Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license ❑ Public Facilities Improvement(PFI)Permit: Required: ❑ Yes,applicant was notified ❑ No Applied For: ICI Yes CI No, stop intake Notes: Cl - t i t"I'1 Wt-tri i/U 4£ z o( +o o o a Z Approved by Planning: (---61-t3) Date: 3 / _5— Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: �# Site Plans: # Building Plans: # Building Permit#: Enter building permit#above. Workflow Routing: a—P1 . g P F.ngineering 1:2'lermit Coordinator BTuilding Workflow Sign-off: S --ff for Planning(include notes from planning review) Route Application Documents: 2' uilding. original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: �dai' ...d_.....—.....4 / Date: I:1 Building\Forms\BldgPermitRvw_OOM_WithLandUse 031015.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit El Easements (encroachments)per engineering conditions of approval and p at ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes El No Assess Water Quantity Fee in-lieu: El Yes ❑ No LIDA Facility on lot: ❑ Yes El No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ N. Approved Revision 2: ❑ Approved ❑ ►'ot Approved Revision 3: ❑ Approved • Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: K to Issue Permit Approved by Permit Coordinator: � Date: )/c I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 031015.docx FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter tic. 4 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: DA DEPT: BUILDING DIVISION MAR 2 6 2015 CITY OFTIGA► FROM: Margaret Wilson BUILDING DIVISIr COMPANY: Anderson Dabrowski Architects, LLC PHONE: 503-239-7377 ext 113 RE: 7150 SW Dartmouth ---at-k.P O/h/6660 (Site Address) (Permit Number) Red Rock Center Building B (Project name or subdivision name and lot numbe ATTACHED ARE THE FOLLOWING ITE .: Copies: Description: Copies: Description: Additional set(s)o laps. 3 Revisions: Field Order#1 1 Cross section(s) an tat / 1 Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. \ 1 Engineer's calculations. Other(explain): \\(9 REMARKS: V 1 (1) FOR •FF CE USE ONLY Routed to Permit Tech MI Date: © 1aj •2 Fees Due: ❑ Yes is o Fee Description: Amount I)ue: Special Instructions: Re•rint Permit(s er PE): ❑ Yes / No Done A. .licant Notified: Date: 4/AMMEiif1rLali,. , ,, ,_j nitials: I:\Buil ding\Forms\TransmittalL.etter-Revisions.doc 05/25/2012