Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2015-00050
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12015-00050 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/13/2015 Parcel: SEG1627 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: ODOT Project Description: At intersection of Pacific Hwy., Gaarde St., and McDonald St., complete infrastructure improvements associated with Gaarde/McDonald intersection project. Portions of work are within COT ROW, SEG1627, 1629, 1632. Owner: FEES Description Date Amount PHONE: Contractor: KERR CONSTRACTORS OREGON, INC. 395 SHENANDOAH LANE NE WOODBURN, OR 97071 PHONE: 503-349-7812 FAX: Applicant: RONALDLARSON 123 NW FLANDERS ST. PORTLAND, OR 97209 PHONE: 503-731-8200 Total $0.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant t i Signature: 1 Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00050 Ty pe: Condition Name: Status: Severity: PFI—Street Imp 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Street Imp 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Street Imp 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Street Imp 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI—Street Imp 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Street Imp 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI—Street Imp 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI—Street Imp 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI—Street Imp 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI—Street Imp 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI—Street Imp 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI—Street Imp 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI—Street Imp 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI—Street Imp 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Street Imp 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI—Street Imp 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI—Street Imp 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI—Street Imp 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged inspection,and after completing work covered by the permit. PA—Street Imp 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI—Street Imp 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI—Street Imp 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI—Street Imp 24-VALIDATION OF MATERIAUCONSTRUCTION Applied Notice The City's Inspector may, at his discretion,require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI—Street Imp 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI—Street Imp 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements- PFI—Street Imp 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI—Street Imp 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Street Imp 29-PRIVATE WATER QUALITY FACILITY Applied Notice The Developer shall maintain the water quality facility and correct any defective work, and shall perform all scheduled maintenance to assure proper functioning of the facility. PFI Street Imp 30-PUBLIC WATER QUALITY FACILITY Applied Notice The Developer shall create and provide to the City a schedule for periodic(quarterly)maintenance of the water quality facility. The Developer shall maintain said facility for a period of three(3)years from the date of City Conditional Acceptance of the public improvements. On October 1st of each year during this three(3)years period,the Developer shall report, in writing, maintenance activities to the Director of Public Works. City crews should monitor proper removal and disposal of silt and debris. Prior to City final acceptance of the facility,the Developer shall provide a written evaluation of the operation and maintenance needs of the facility and correct any deficiencies identified in the evaluation. PFI—Street Imp 31 -OTHER Applied Notice City of Tigard PUBLIC WORKS— ENGINEERING Public Facility Improvement (PFI) Permit DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL Check one: ❑ Utilities ❑ Sidewalk/driveway approach ® Street improvements ELEMENTS Detailed description: See attached statement of WORK TO BE DONE ❑ Minor work in right-of-way (sidewalk repair,curb cut,street opening,etc.)requires: •Application form,completed and signed •Submit one(1)copy of scaled sketch Property address/location(s): OR99W in the vicinity of the inter- of the proposed work to be done section of Garde/McDonald in the City of Tigard. •Submit one(1)copy of traffic control plan –OR– Oregon Dept.of Transportation ❑ Substantial project work requires Applicant's name: above items and professional Address: 123 NW Flanders St engineered plans for: •Street widening City/state: Portland,OR Zip: 97209 •Subdivision infrastructure Phone: 503-731-8200 Email: Ronald.LARSON@odot.state.or.us •:Main utility line extension: - Storm Drain,Sanitary–Tigard - Water–Tigard Water Service Contractor's name: Kerr Contractors Oregon,Inc. area (includes Durham,King City CCB#: 195658 Expiration: 12/21/2015 and a portion of unincorporated Washington County) Address: 395 Shenandoah Lane,N.E. (ATTN: David Finnigan) City/state: Woodburn,OR Zip: 97071 DELIVER APPLICATION TO: City of Tigard Phone: 503-349-7812 Email: dfinnigan@kerrcontractors.com> Planning/Engineering 13125 SW Hall Blvd. Engineer's name: ODOT c/o Ronald G. Larson,PE,Proj. Mgr. Tigard,OR 97223 Applications for"minor work in right-of-way" Address: 5681 SW Arctic Dr. onh,mac be emailed to: City/state: Beaverton, OR Zip: 97005 rowpermits ktigar� d or Qgov Phone:503-641-8723x229Email: Ron ald.LARSONPodot.state.or.us Case No.:?FiZ0 15 lJ�-/���1�/ Estimated value of work (within the public right-of-way): $4,414,058 Application submittal fee: Is work related to a LAND-USE DECISION? ❑ les ® No Appliti ccepted: Pj �j If so, please specify (MLP, SDR, SUB,etc.) case #: By: Date: J Is work related to a BUILDING PERMIT? ❑ les ® No Application reviewed: If so,please specify(BUILDING PERMTT)case#: By: E G Date: y 13 Applicant notified: By: `— Date: r--- I:\CURPLN\Marten\land Use Applkatlons Rev.07/16/2014 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 w APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. WICo the rnvner and the applicant arc different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The mvner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above mQucst docs not violate any deed restrictions that may be attached to or imposed upon the subject prcpcm. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibit.-, transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGN/ATURES of each owner of the subject property required. f � Ronald G.Lai-son,PE, Proj.Mgr. Applicant/Authorized Agent' signature Punt name Date Ronald G. Larson,PE,Proj.Mgr. l� Owner's signature Print name Date Owner's signature Punt name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard • 13125 SXXI Hall Blvd. • Tigard,Oregon 97223 • w\vwtigard-or.gov 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES 1. Public Facility Improvement(PFI) Permit: Part 1: Required submittal fee$300.00 Part 2: All non-water system improvements Engineer's estimate X 5%(less$300.00 submittal fee) Engineer's estimate X 2%Plan Review Part 3: All public water system improvements Engineer's estimate X 12% Total Permit Fee = Part 2 + Part 3 PFI Permit Fee Exemptions: There will be no permit fee charged,or assurance required for the following types of work: • Sidewalk or driveway repair(less than 20 lineal feet) • Relocate or replace mailbox • Ditch cleaning that does not involve regrading • Weephole repair • Curb repair or replacement(less than 20 lineal feet) • Lawn sprinkler system installation or repair • Street tree pruning or planting • Planter strip landscape maintenance • Test wells PUBLIC FACILITY IMPROVEMENT PERMIT Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • xvww.tigard-or.gov 503-718-2421 Page 3 of 4 SAMPLE SKETCH: SW Edge of Pavement I t— Ditch Streetlight '— ----------- —r--- Rain� Ra 0 I 1 Existing House 1 I I : Existi n �� I g aI • Driveway 'si I 1 U CI ^ I 1 jam• (L l I I I rl I i I 'Co� i o I i Existing Shop t •�- 1 Power ole I o I ------- ---------- � -�roperiy Line , Ia I Fire Hydrant(F H) I � I Scale: I � � I I � � I I i � I MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street&street name(s) Existing building,structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 9 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 OR99W: Gaarde/McDonald Intersection Imprvmts Grading, Drainage, Structures, Paving, Signing, Illumination, Signals & Roadside Development SPECIAL PROVISIONS WORK TO BE DONE The Work to be done under this Contract consists of the following on the OR99W: Gaarde/McDonald Intersection Improvement Section of the Pacific Highway West in Washington County: 1. Construct MSE, modular block and CIP retaining walls. 2. Construct water quality facilities. 3. Install storm sewer pipes, manholes, and inlets. 4. Place aggregate base and HMAC pavement. 5. Install pavement markings. 6. Install permanent signs. 7. Install traffic signals and illumination systems. 8. Install landscape and irrigation systems. 9. Perform additional and incidental Work as called for by the Specifications and Plans. APPLICABLE SPECIFICATIONS The Specification that is applicable to the Work on this Project is the 2008 edition of the "Oregon Standard Specifications for Construction". All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications and Supplemental Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety. CLASS OF PROJECT This is a Federal-Aid Project. SPS_KN16968,OR99W:Gaarde/McDonald Intersection Imprvmts Section,Contract,November 10,2014 171/41 14758 Contract Plans �7 STA'V'E OF OREGON 47V-131 ETS 4EET M INDEX OF $NEEM. D]EIfsA�RTMlENT O F TRANSPORTATION — � ,,.,••. 1 Title shaef PLANS FOR PROPOSED PROJECT IA InMR Of ShWS 6 Std.Drg.NOS. GRADING, DRAINAGE, STRUCTURES, PAVING, SIGNING, ILLUMINATION, SIGNALS& ROADSIDE DEVELOPMENT _ OR99W: GAARDEIMCDONALD INTERSECTION IMPRVMTS prery/1 L englh OF Project- 0.44 Yiles PACIFIC HIGHWAY WEST ATTENTION: WASHINGTON COUNTY T. z S..R. I w..W.M. Adopted L—'A r«,To Tdlow Rohm NOVEMBER 2014 Adopted . me O e0on reedy XorInon Center.Thome I"Amm Are 7.r Forth-001 In OAR 952-001-0010 Copies OAR 972-00y Cdll. Toe Car .Obroln te, Th T The AVN By , in0 The Crag IXOM The ter Is 45 Nmber Tor J oro Or.gon u*"try[.nr.r la sso9212-roB r.i —0 b PLANS PREPARED FOR OREGON DEPARTMENT OF TRANSPORTATION BY: T WHPacific as"i ai' t,0.,M.O45,h 707.52A.07rS OORE"TRANSPORTATION COMMISSION corherse sore, aur P1 T—e LBoney cm.nslaw: rum,Bone, s,S5ides wean tarot ra"erlssl«a eando,L r Van- or twvca 9 � uorrnm.Ll:o-ren vis[csa or rvrPan,•rs Theme Plena were dmMWped using OOOT design vtend°rds. BEGINNING OF CONTRACT Exceptions to theme ml9rlderds.9 any,have been subrnhfed Q end approved by dTe ODOT Chief Engineer or their delagstmd STA. "A" 140+20(M.P. 10.26) °""°'" a .9.r�. q ow Im0O.t0 R END OF CONTRACT w w 8dd.,,,,r STA. "A" 163+54 (M.P. 10.70) ; P'" �� Con ChwEno w / f11.110 �suix �NeN Jr ORiiVI GAARDE/MCDONALD LET'S ALL f 0- WORK INTERSECTION IMPRVMTS WORA TOCETIIER f TO MAKE TXIS p ,-.-f 1 (s 1 PACIFIC NNY WEST JOB SAFE +� ` (--' 1 WASHINGTON C011lITT �f/�f{��f l�r� TEOU4 MOIAT Pausc,lme�m L[Li Awmssrm•na mu ir OREGON STP-7365(013) I DIVISION P:\ODOT\037609\Design\DrowintS\Civil\16968F.tsl:s Default 9/16/2014 1:17:01 PM tsater 14758 Contract Plans W 0.s-6 Y twaod to rook N w 1>r,ma of w 12000 perm&1Ne EV ane.wad sen Ran.hues tan de•.kcr to 1°W W mnpfvos Wb bor too I2D00 P-4 mela b mow d dbP.pcndw w is arw).la I2M perm rood kl"oar.°°r,gsiw t,of tea 11.. SHEET INDEX PROPERTY DESCRIPTION: 1 I ) STANDARD EROSION AND SEDIMENT CONTROL PLAN EROSION AND SEDIMENT CONTROL PLANS LOCATI'E°SECIN II TIC rx90(111`"snrwc�r a-it-'tea AR m DRAWING NOTES ECI EROSION CONTROL PLANS OF SECTION 100 AND w nc SDUDM 7 O'E-O:MR1101 OF 3C11a.02,Tai RIK I. M/wi,.00.0 rest i I as W.FsA o 10 erwwwl aR of w wa,a mumu v walker dor 1 b as ESOP i c.kbDw of w para&.^derew A a°) RR9a.a1W COUNTY,OREGON iR.DSa..w hr.w eb.a a,m m ors r e4 tr mti po e u .rum h d v w m a 9w.orad w�w...m«m e er m m COM ab r PROJECT LOCATION: ip9mbb lad I.ad Mad em ad adw.d anb ryddder (gdNd,b.A.i(1)(.)1CHM 3. 9b ds" W do-d r nto n✓,.Rri.l%A R1 el w F3V w'seu i Off utlw wvY..a6G°na Srf.N d Tuan,ram b CEO v Aq.,L ISd.sb•1t.J) AT 44AFW$7.b Be sbD'OMID ST. 4. shoo dm.a and"d,b Be wnsb+.err ro f s'm Pow,esso.a Tao,erw.ICO.D.m,.q a-of.mol.(xNrse.io;llxe;) BMP MATRIX FOR CONSTRUCTION PHASES naw at K 5 4a9p,_k atl road or le,eR a ere•,e.l vAr ripv'v,ase.od ryddim id"N imolai b.r etl®m1.d mdM re.s.sI r.pr•la a.r be Relbr be= Aases ne.Iok Awa easa,sbabN9 Ra of 9„b14 Ys, IARRxIC.d.T7S72471 MORK 172117.NIti _ P....d Ie.Wy.vEa•rR.>a..s1...I w so ..G.,a.m(eq-wIbWI.OLE odv vo to to Pmawi,soNdsal F I-a.. fw+u.Aae+(I) (2p NiS/rY 3w nut RE7 N MYv1 s. 1�..r.trona noaddw am perud ea n-rrpla•Dom am 1m-.md.b w"I a...aIm P.d�e eaa.me dla a,•Inq a�».eev<IdPwr w nes d..ane,. viuLunae eaanluenvt AwiiA 'WT r-wr JI) ..r mtr sed.(SaadAe A].Did(1)od A]b.(3)) ]. Loao ad-r-oonbd m a.w dabq hod for .tleM w19 mud tl e plea Mm,eedo4pn i eaaDr.d mol nM b Pea Ord M mehtla,r nodal.ver M pso,PN wge•erlee lobar paras.r) tor w ordbn a m.D,xdm.:waiy ad«tir Nr.cu.a•n.eran Hoe.tl Orr eal:s od oR...rbi mr-amn.°W DUST�PWSCONTROL R LI1RAl If127A x piRr m,.am (4l.sAI sTd: sd AAS) rwsT CONrROI a isswai .,lord.sten vera Dam..ghrk9 COPS.Dr1. (Siw1Y Aecy(sl) irwdRARr E/b - 4 s. AqR RIFT as/er Itrmed M eear.alir,...r.i,e,•.delal a r 4arGr ere a 9.9'9 peaty Ona b of rae.q.'•d.d'.5 a•'a�••re IRl.s.r dRtlt 10[slblr..eba ad.mm M..e vera,err ober s.len...1er.vra� (SrMm Aatl(n) SrA 11.N..a Da1wa d..a..d ad.pa•.er Pin.lea s O9N(S,.. A 1 ler per)rat me rosy a.r.P^w a a1w1d npr ywpa ase.a,...,d f. OLP4 mr a b P.r plat m lee-dantr,p edl.Pa..(Srn.Nh A Ta:(1)W A9.cl(q) LOCATION MAP 1: b Yana we hoe w db, v. er•a 4.m a a ad w r.(Li.Nd.A7d(31) scruh1mr_.nn n w m m Perad a Ir..da ra.wda.wane m I N h ssn.a:rb od aaeaa I,.bp.:,1.,a....d duese:.se«nav a.e m,:..mo arm:.:od smuwr4ET1a sox x x x )NEA7F PROTECTION -x srA,lE:N].s + .r.m ha,rly all.si. r,v rostab.,dud.w.AdsDr.nr,aId ah.eb Imm wlide.tl merhiry•m ed m nam know Ona sderea,ad dIo bon ca.ax9r Il F0--the beery CW.Gw ePAadb...tw i0e Pada,x Irapa®Pada's.n•PnR bv,aR w M pnwnan vd poor 3.rwY prar,er..19 H.m d Si2alplT TYPE 1 ••X If w1ld...nplb mdlvl.Ia rAr,Y b.did.ed,nd,i,,,,n.b1d dsh-N daese oelmd.,buil,ed t9m0.etl row.°dorop,am.b.ob ad.rpm(b A TJ.) I���. IS Lb..era..a-Diay oget a&W Mot oe.dd b°hdeo r ftl m Orr wok-0bw W.rry *A 7o.) 16 1M mp1Mb sere or MSe,owe b IaaDKd,,^p.Iaio^Toot Ida_&i.r.mrweda.m mliia nermn-b sofa,.def. heron COIF.avn urq M1w-rre.e 1vINIw..fn'n oil wb'•ol T.b^pI. (SWdb Ap ) ••X n.r.aan.aa G.e.wre won(b.,1n.el.r.n.a..o,blun aso, bn ra. ,ac)ler terra.uae plod.,..d b• ,od.No,os a epa„ss.M ndnb.e,e. doe(baby.r+e•se..r.a.mmsa d.Rasa mcda d a..bmRb a e.+.ve.d.v.'P dwdw art.eal,..e.wn1G.dart Ir.Rer.T)b.bn epwdry IN tma d wbni aaoa pd,oppad best-es,w.,rant yden. tpeae e.e amdc:,w trMmpd Rdm-.N m m.d«b.>'.sono ma. (sa.elr A+e) 19 rrlervN e1d9z.wb a h sed a w M Man.okN.a.edea.a I...w n.rel tr r.wardhr b ewwy ed.a.m dve.e Ory rpv,1.A,a a am. a w-.(sdedA..Tal la.soft- Is- w ere d ala•arsder.a aa.lpa re b bDRM a.owrla v Oma BYR noel De bpbneded b ve..a d'oDFver b wrbce wb,a ar•.)P,a,arae lova b wrlm..le.(Sa..J.A]..ij2)) 21 C�an.aa,•crdr r•ua ode v Indra ads 001 m.dim d bra good miry M rab,e. (•sMlb Al N) 21. so Ism:I.ww tIwo.I...."bdm.a nor a.ro A a,t.ee,.pod bow I I and baa.foo w•wwI (sarr A9 a Oo...noon lads,(.IOL er ada,)mew rda.r Dna.a Iwo. S.roe hsi d...prone cols.r ode,SIP slo.t (sass Aicw - u rete P abs IOM relaar P qs .m be.•I.o.r h pNT o.asi S.d sea aero ad arras boss,r,.w Impp.e eein•b bd°n dr�91.arDdr h.Gtr wot.1 ndER e sal a.rer,l as d ral,lbm,d pwj.d. (SdWa Ad.rP!b) 21.1Mb 71 loot r91.h,a.+.dna avl IOL i9 w m.mwan.a,.mm a me.da .Nea9e1.w rat.d w rvme,deme x,r1b..rd a.a b pa.ef a reeerarA OW"v.p are,w sem.N ia.e Anp a-.awn ober m d er.,wd rd d p.la,n.a amano m w Ovvw Dl.da a sa.lab,.eatl r ... lsabr SgnMn BwP tMt.L w intrNad Poor to my gcarwrA dAtur6irq dMNfY a n ul+.abr w++s a rd..a tae waw,..,a•.oy oq.COI.,d aa. ea. ,m a. .dam atl Bawd bbv w a w a.d b ewnr a.r rr eb. NARRATIVE DESCRIPTIONS (sd"A,10..1) 7G Th.edb r,rrl D.t_,.ap smbaaa_wpaor I a°r�.p w M..1•.w�ar a.sa.a ase mdno°Made d mrmellm mu+r am.tr n eo),a me.. E)OSTRrc SITE CONGInoNS (Sd,eab AI.0) •Paved rood.oy Wth mune tori,and fds,Wk,.agg,,Wt, V.Aolb loot-',saolok",tr w1 Wer d w.ls awn mmWdo,anon.,rax la 11 tyre v.,o.err,a r..av,d Mor as.and°bcVa.b Ora.v m w.aNder.. roes,a,aG,a-1.Indo ran.oG Testy.r IM pones a uN de. (sd.Mr AT.i n ••51x.d bµaarl,�vrm,o,e Pawnmt. za Neu osw.+.Olen mwa..p..e r d.aDNd aa..m r mar br pvlT.down m,.a Pads..dl paneea,.aloha a de i moa a op-I a.m ICnNTY VICINITY MAPS e.aer,b tyro d bwNer/err rand mewM w ew.,,e as°m w.bb err b 9 a mdad. d.Pin•N1 Reo.d d NA URE OF LT N51AUC hOW __ annldlr.dalde w w.4 bnlrE wbIIa11 raawe q tPz9eer MA pIMY ATA!(2)azd girl) Roodirvy S01•/L..TA ANO iMIE OF A(A"ACRNiIES O"M,,EKIRI OF q T-0,53N LOCAL AGENCY-SPECIFIC EROSION CONTROL NOTES: •CJearhq(J1e -Any) •Nan qrr.;"1(Jolty-Sept) 1. Dew a argon.prawn rod to.esev.-, tr paps eddoee,od romk.oa,a d ewer sod„O.eK Cama mwalw,m owad000.R,ICO+,.rah, •utafty rom,t;m(1,10,-Oct) as 1.6ea r.guldbonr. •Roodwoy cone Wclbn(Jule-Ott) 2 Rha to drR mfddmbinq a4rli r..,w ba.dd w rd. dmd g`mad,e,M o d b.Rn,and m,-01).Mem dr m ft pkr dal b,d-ly d~.d In __ .7 Do hobo h••b9 e.crewction pnlod.w dib` ,a pnnitlr bnor w demi,love.TI.Mewl/PN,,tbe"A ,oM Nes ddwpti.n la w d1orm of the Toto,alt.Oso�117.onto -Sept) 7W Otetarbed Mad-A9 uvea INSPECTION FREQUENCY: a Rio,b o R lad dnh.uN odirka,w%Pa Iha o.s t,..dNbe a,o 9sof mr.mx-..wee..Rinaor wdwers wn.L sed kb1 pvo a Thr.I#N SITEant APPLICATION TION w.sl Is nm,bt.d IOL w Manan d w sojsd Gen°rpny dm`s R on t df COto Sdff ANN e 0c 110ndf boo, as canna' sm.sr PREGuraev • r s",As s Mad NoN v<a bo r araoo and,ale.ba IID Ida bw sml.,,e.1:w AP•sed pervrbgo d>a b w nes,swat tr merdT.f w w Only arae God gram m.iM fN b.w0erlob 6y vary sort 1. ANw elrba carr.res,tar,ewter eR.wl4 f..bd,f rwd7 pba.b o OLP.srveq owe D.wlobpd,ed(>s-eox ma.)q Odebr 1>L to aNn Oar and nay and vary lovas to do dtY 9OM. Awn..p.e,r1.r so-kg. S Nl W,Wq a..d:owl Mw.der"I too d,aag•e mer w Inddumr,P f."w9adod am,wd thlwgh o..Mod cordal aP I.E(Gra hoq). RECO NNG WATER BOOZES z v,ta IOL err re. m' 031.m w..,. or r e. .wt.moa i Z 130 pity rata d bpd m ere.All metra awn w of pin moa b roam prperlp b slot M"claora a r.dr.ea bdw outer mm r.der° rrrb.1-y fa FDeb* ah ores>b wtkNRa e/F. .°I.n.p r mr. sea bn.D�r.y se«v.da Baan,Ime•q.v aO,a pnPetin ,nanewwa sed.wof now w a.ob era b 7, iM Es owN.o sro.n ao thi pw m,woan.n,"*-b fa atlaomw sit C.0-omhy m,ca st-lb.Price,lrww-so add a w9'r•d de ORE i/N DEPARTIAENT OF TRANSPORTATION r«rs en.rt. wr.e m.onwy.an d oppkabb bon,aa.,ma Word ermb,ooA of ngbtbns Omgm to ew a .l ESC yes..COR b..J7lieed b N mo.,a o,p bs, a load"`e.md,wares,9,rr s«'" MD..very^'°(2)oar` pan m DEO per w 12000°oma. 9735 S.W.Barnes Road Selte 300 (7)awe«vaw pplwry aye 6 In rm.N60d to.id erosion.oppophle SUPo owl be used nkh COOT bMde 90 apk Am of%.der Vmft pkmlk aw.tlog,mukMq,a odw oppered Ie.e.ma ia[l9nd,OR 97225 a ►abs nodes r,G.w Nr.rt.b N9r.oash...s«dlaw n.wl Goa.Mer a° 9. M.RI.se4 i rtua b,mead blbg Des ra.raker �Ep PROFf' l:505.626.0455 f:503.526.0775 bpm eIr m.,d,,.wl..era. ,r,.onl ase«mar.draw•Pob1 m �(, S DEVELOPER PLANNING/ENGINEERING/SURVEYING PERMITTEE'S SITE INSPECTOR ••• 1sA.�r..t b.ae.ap«wnNw..mmaw.n eba9..mer.r0ea.1,.w e.1eec.aaad,d.aN..via.ceb.r.ndh NGINffR Oy OR99WGAARDE MCDONALD 0 1" «b.EO .vo, "I pAG e oTCACAG P2. 48570PE INTERSECTION IMPROVEMENT S ro 1aawT G N . . . d =Oa N9 pNlr. AW121 NN rre,das AOGREss ate+Be A.cec O- PACIFIC HWY NEST • EJwrw orb sew.«Esc a w m a e.wamnl.e t.aro a rw sen.t w«da pa. .ONn w ere 97:00 rotnANC.a 1]2P9 9 ti RTGR,OR 0)9oe-wee usrNSTON cwrtr P11O.e(eap rn-.ser oNOW(wa)731-401 PPtmr:(wa)wI-Ona ATTENTION EXCAVATORS: rAs(soa)rn as31 FAN(Ma)7.31-I5gt FAx(w)see-- OREGON a*- a.aen b...grew oar,b rosy.Mw apeM br O,Onwm utl Ndaa.lbn cwt..M. RATIONALE STATEMENT IWu err.,t arra b OM rev-001-Oa0 nmr0,an 0-001-Ops rm COOT-1-1.- C11 '9r� ���� 0••ip,W ey-Jam Trv°"q rr Res..sew mw,O.Mem by.sty,!3-232-1997.O -ser w.I-west rN• A ms,I.h9,er ad of onloele 9r1 M.OR 004 Rodkm(MID)oplbm bored w DEOI allltloce o of ha Iwo,md..ed to 'L i5 2 O-rase By-J o Jab.11w rw.0 w mar-IV a 0o,do,res orae me�rr a.,cwl..'i m1 rA wr,•w Mer .rsplrD.GY me"sb.rdsood mall dm.Soot d 1%..boa Eked NIR.w,M draw be@ee Ibp.,.,dks orb to e.AP..aan.,rby w«,.wtrm.ea sea-296-9999. �i..mp.ereW Ilsr^da atl a.dlo od c 100 1.pored bond w spoor.a.<.aiom,la..On.0 eor73Pm 71' s a,ET r� ���,er dAer skAr wwPoos,m U.p*W p W-sed 1her.° IC te ^� EROSION CONTROL PLAN RENEWS: 12/31/201. COVER SHEET GA ns\ODOT\037609\Design\Drawings\Civil\037609-trcn-ecol.dwg 9/17/2014 2:22 PM JJENKINS 63/263 14758 Contract Plans 47V-131 Q Goleta sedlme)t .type J (5ee drq.na R0I0J5)10J51 QCoral. IS.dig.lna inr prORDI0Poalo101 n,type 3 -3 Q Canst.lnhf prdaa'an,type t-2 /See drq.na RO70151 D i I D 2 , 2 P �IHG �AY�ES A" Ir(0 99ACY) 3 3 ti a„ LEGEND ® WOHles RInlet profectfon \ x Intel to be removed \\ 2 F DirealiM of/law \ ....... Slope limit!Fill! Stupe rm;r rcull GENERAL NOTES: r ORM DEAR MOF MANS MAT ON The pans7rl.11M ad,(ualmenF.mantelonee,and upgroding of th65e Erosion Control measures Is the respansiNlYy OF the contractor for the STANDARD DRAWINGS durallon oWf fAe pro�eaf. 9735 SW Bunn Rd Ste 300 Erasion ConM I.P.Wea shown On Mid plan are for anNdpoMd$ite oond;Nons.Adjust r upgrode It..measures far unexpected storm ■ RD1000 Cottstrtaflon mtronce �U�(�� Portland,OR 97i25 drools Io ensure tear sedllroN oM sed:mvll-toxo welt does not+taro me site. ❑ R01005 meat dam ,`BRED PRO jil a t:503.626.0455 f:503.526.0735 e tort pbn 01 the Erosion Conlrolmeosures snare as re-ad 0y Sedton 00260,prem,,St=d Soedficalions Ir ■ RD7010 lnlef praeclim type 12.3 V� ..aOIN�9 spy ORIOW:GAARDE/MCDONALD I .�bnMnl/tris plan Ir al dedr;rq ond,grodln4 odirit;es d%,seanpnls oppl�ovDlb to each sloping place. ■ RD 015 l W protealm type 4 4r YT 7 INTERSECTION IMPRYMTS aneJlUcl In o manner so as to ensure Nal sediment and sediment-laden ova7er does ial enter Itp roadway or drainage Q r sysMar v gopllcnNe water slorMords. ❑ RD1020 !nletprolealon type 5 4667 PE PACIFIC N11T REST Instal measures w;Min the Rght-of-way unless directed otherwise. ❑ R01025 Sediment brrlr type I NASNINCTON COUNTY ❑ RD1030 Sediment brr;r type 2.4 OREGON o.dm Twui fnalgq s/ofiFied oonstrudian entractes of the bepinn;ng d"structlan and molntan for the duralon of the project. ■ 1701035 Sed'~t barrier type 3 ur, AOd,liond measures may Oe roup;rad ro insure IMI all paved areas are kept dean. IL ✓ a..q�.t eY-+a.en Y.vap Ce�sfrud sodlment tense 1S meters(Wet)downslgoe from /M foe aI fill sl ■ ROf000 Sedimsnl/Bose supporhd/vnsltppalrle0 'Il�t d er g S waterways r kovinq Me RIR'. slopes where sed;ment-loden wort hos a po+enNo! tC�� 15, ��. or.e�w eY-r.o�n.W- Mg O RD1050 Temprry slaps bran Pr~at 1nAMa dur; surface ❑ RDI050 Temprory aoalr bva;n FTH S•Ip Pindit+0'•pornp,enol errnwrk apsralNms ro prevent pdiu1an15 from entering a/rm water systems. ❑ R01055 YON;nq [NOTION CONTNOL /L ANPermalW1=Wing;s sta»n;n plant;rq plan&V& ❑ R01060 Tire wash type 1 RENEWS: 12.31.14 P:\ODOT\037609\Design\Draw Ings\Civil\16968F.ec l::Default 9/16/2014 6;41:48 PAI Tsoter 64/263 GA-2 14758 Contract Plans GP'l \v 47V-131 Q const.sed dent caro,lype 1 O const.inter prdedian.roe s - r I Q C0.5t.InM protection.type 4- 9 p3 G n 2 a �.• 2 P 3 'A" ine 3 z z P>6 - � o• f, 3 Cl w w OR P FI W LEGEND ® NON/ea -- rr ■ Intel ❑■ Inw pro/edion -- ----- y © ot Inletto be rannve0 z \ 9 0 Or'reefan of fear ..... - Shpe ilmlr IFigt so"AMt QW) P$• �,6 2 v •6`'a r OEM DEPARflBf f OF TiIANSPOiRM 3 \ Giwnlm su300 P.H.doR9m5 PRO fsw"TaLtCtS03.626.0499/:l03.S6.8 fTS z (O IN ORIM SAARDE/MCDONALD �a. INTERSECTION IMPRTMTS PE PACIFIC Nwr WEST `< •1 WASHINGTON CeUNT> OREGON y o.nv.�.a.u..r•..n w... o-.r...e>-r..w.s.... . EROSION CONTROL PLAN I GA-3 RENEWS: 12-91-14 P:,ODOT\037609,Desi�n\Drawi•igs\Civi'V6968F.eol Default 9/16/2014 4:42:06 PM tsater 651263 GA-3 14758 Contract Plans 47V-131 �t f Q Canst.aee'menl Osrrlr,two J � 1 I --- ----------- Cana).TMbl praMcNOn.lypeJ-5 s a ___ 0 Const.Inlet pro/ fw.hoe 4-6 r — - - - - QQ Conan.crostnmY*,entrance- 1 --- - --- - - (See 0rµna RDIODD 5 "A" ine 2 P9 iF� H1 PA AF1C HST S z 3 LEGEND ® Wow" 288 ft ■ Inlet tL16 —— ———-- — —— a IMet ordtw. ZB _ _ I X Inlet to to renow 284 ft =— 282 f f 2 Cb1811trCNdr OnlrotMe Bp f— Dlredian of lbw ....... So*OW?(FIN; O —— SApe NOVt W) SEE SHEET GA-6 �- MATCH LINE I r 0ff:mwARnw0FTPA0 WTA110f1 _ i c 9755 SW Sema Rd ka 300 ED PROF jE jElErdE�l/', t:WI.6..0 55 f: Fe:Su.uc.a5s f:$03.526.0775 �S pINFF9 �Oy ORIINI GAARDE/NCDONALD Q ! INTERSECTION INPRYNTS 4167 PE PACIFIC HWY HEST WASHINGTON COUNTY OREGON 5 arm T.—-.w.� R- -"I:, — —"I e9>-.wsm Tromp s<�,��TH S•P� ET EROSION CONTROL PLAN RENEWS: 12-91-14 GA-4 P:\ODOT\037609\Design\Drawings\Civil\16968F.ec111 Qefoult 9/19/2014 8150:31 AM Jenkins GA-4 14758 Contract Plans 47V-131 `✓f" (D Cons/.7nbt prohNla.type 3-8 / Q Const.Inlet pr~10n.type 4-4 Q Canal.sesimen/barrier.type 3 "A' in l j -- — — — CIFI IGHWA WEs — — — (OR W. 5 ACIFI HWY) 2 2 X99 X96 2 /r k 288 fT�290 fT 292 fT LEGEND 286 fT �� = ® IIOHb6 }} pWZ / ■ Inb/ inlet"em-on 3 I I C !nb/to be remove) aredion or rlow - - - - - --- Skpe 17m f(Full Slope Gmit(Cut) O 282 f r OFEMD&ARRTWOFTRANWI t ATO 1759 SW 8emee Rd SG 300 ppED PROF Pmtwd,OR 17225 �t`p FJ+f C t 503.626.005 f:503.526.0775 \5 OINORIM GAAROE/NCOONALO INTERSECTION INPRYNTS 4857OPE r PACIFIC HWY REST WASHINGTON COUNTY OREGON o..Nn Twe t.eav-•..er.+. 15,. �.j`�� gecr Na EROSION CONTROL PLAN GA-5 RENEWS: 12-91.14 P:\0007\037609\Desipn\Drcwings\Civil\16968F.ec1::Defouli 9/19/2014 9:05:03 AM jjenkins GA-5 14758 Contract Plans 4TV-131 QI Canst.AaOiment Domer.type J nn Q Const.inlet proled on,type 4- 2 D WE ` o � t0 99W1 Hf IAC FIC Nw N -- 706 ft 708 ft ]04 ft R CIC 1 CY EST W. P IC W 2 .r° ° LEGEND ...... •• ® Wattles 7,D ■ Inlet Inlet protection N E Y C _ _ _ m �30, Inlet to to removed \ \ Wre11,I%mior now y - - -- -l- ------- Slopel fFi17! xQ, Slope limit!Curl r01RIMMA9111MOFnUMMATO u�,,,., M5 sw lllW Ra sa X0 PRO fEs WH W.11 c t:96.6 .0455 U e:�n.su.R 97 I w�.si�.orn 9L 61NFF9 py ORION:GAARDE/MCDONALD (n Q INTERSECTION IMPRYMTB E PACIFIC HWY WEST WASHINGTON COUNTY OREOON T{`/.1N 1.�J �G�" Bron.a Bf-ireY4 Soar �1 f/f/FTH 4 � EROSION CONTROL PLAN GA-fi RENEWS: 12-91-11 P:\ODOT\037609\Design\Drowings\Civil\16968F.ecl::Default 9/17/2014 11,43:06 Au tatter 68/263 GA-6 14758 Contract Plans 4TV-131 x ] 2 Q Canal,inw promaien.t]pe J -P Q Cans(.!*W prole kn.qye e-J 2 1 N ] l"Wl�almvw ae07menl fence m eennyy x - I tsee Grp.na RO)'D I a z f— J "J Luuj = \ N GM' w Z Lu + N e LEGEND ■ Intel InAN pr~;bo \ x lnbl to be nvrlaea Onaspp fW seeimenl/&roe T V Olred;an W flow ....... stop anwr(Fill) —— skpe limit(CLI) � N 0 O T OORE_CI NDEPAWNWOFTRANSPORTAM ■t 111{il.A lll. ms sw OR V.Im sa mo PROParlWld,off�st2] EpINEFff`r�p ORION:OAARDEACDONALD t:503.a6.0455 r:w].s2c.ofr3 INTERSECTION INPRYNTS �Cv ¢ 4"&UG7 PE r PACIFIC HRY REST !_ WASHINGTON COUNTY �J OREGON y o..im Te-L. -.«.A— o..Iwa er-a.—11w EROSION CONTROL PLAN 1G RENEWS: 12.51.14 Pt\ODOT\037609\Design\Drawings\Civil\16968F.oc2 ::Default 9/17/2014 11x53:50 AIA tsoter 69/263 A-7 14758 Contract Plans Q 47V-131 ■ v, z g � ) Q Const.sediment Oorrler,type J U T O O Cans/.ink/Orolecfion,type J - 11 OConst.inlet protection,type 4- 8 D m s N i r l Q W Rr1Y 2 Z • w = 0 T U)Q 5 _ — _— W _ W In x LEGEND E565 O ® wanks Ln –4 ■ Inlet 2 D a Inlet protect/on G m Inlet to De rengve0 �— Direction of now Slope limit(Fill) Sipe limit(Cull r OREtiON DEPAAUM OF iAANWIMATIOU "T_ __ Port sw Ill 9 2 sn wo Q,ED PRO J iNll~LL1lAl..`1a1a171a11c Portland, "us r:sa3.etA.ass r.503.524.0775 \5 GINE �O RSSN� OOAARDE/NCDONALD INTERSECTION IYPRYSITS 857 PE PACIFIC HNY NEST 11.Sr KTON CauxTY OREGON y o.aa.T—..uar-..T—. •tF ✓qN 15,2 ��• o..rp:.e ee-sewn Tlw rVFTN S•P� 911T eJ. EROSION CONTROL PLAN RENEWS: 12-31-14 GA-8 P:\DDOT\037609\De sign\Drorings\Civil\16968F,eC2 a Default 9/)7/2014 11:54:04 AM tsotor 70/263 GA 8