Loading...
Permit n CITY OF TIGARD BUILDING PERMIT I'7 8 COMMUNITY DEVELOPMENT Permit#: BUP2015 00099 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/09/2015 Parcel: 1S136 DB02400 Jurisdiction: Tigard Site address: 11642 SW PACIFIC HWY 100 Project: Spec Retail Subdivision: 2000-025 PARTITION PLAT Lot: 2 Project Description: New walls and change doors for TI Contractor: OWNER Owner: CHAMPION, RONALD V&ROBERTA E RON AND ROBERTS CHAMPION 16449 LEXINGTON CT 16449 LEXINGTON CT LAKE OSWEGO, OR 97034 LAKE OSWEGO, OR 97034 PHONE: 503-484-3611 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Vg DC Provision Review,COM TI-Ping 04/09/2015 $75.00 Occupancy Grp: B Occupancy Load: 49 DC Provision Review,COM TI-LRP 04/09/2015 $11.00 Permit Fee-Additions,Alterations, 04/09/2015 $149.75 Dwelling Units: 0 Demolition Stories: 2 Height: 0 ft 12%State Surcharge-Building 04/09/2015 $17.97 Bedrooms: 0 Bathrooms: 0 Plan Review 04/09/2015 $97.34 Value: $5,000 Plan Review-Fire Life Safety 04/09/2015 $59.90 Info Process/Archiving-Lg$2.00(over 04/09/2015 $6.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $416.96 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTE : Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001 10 through•+R 952-0! •090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. / Issu d By: Permittee Signature: k 41 i J Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVE'). I (IR cll III I I `,I (►vI 1 City of Tigard De 9�11r 521 PcrmitNo.: 4 �//5� l� • 13125 SW Hall Blvd.,Tigard,OR 97 S r a Datem v%�� ./ � Phone:SW Hall Fax: 503.597 ': 9 2015 plug ocher Permit T I c.n R I) Inspection Line: 503.639.4175 Date R.2 '-: Jut el See Page 2 for Internet: www.tigard-or.gov CiTY Of Y I AHD Notified/Method: Supplemental Information TYPN MINN I( DIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ID Demolition 1, Permit fees'are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ta Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El 1-and 2-family dwelling laCommercial/industrial Valuation: $ ❑Accessory building El Multi-family Number of bedrooms: ❑Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 1 i to 4 2 Sw pA CI Fl C_ 1�0,t4 y New dwelling area: square feet City/State/ZIP: fl G A 2 t) OR. 97 12 3 Garage/carport area: square feet Suite/bldg./apt.no.: () j Project name: p 4W I NV ESTM ENT RgTAIL Covered porch area: square feet Cross street/directions to job site: FROM 1 NTE12.SEUl CJN f—IF Deck area: square feet 99W AND SW 72;4P Av E J C1 o w esr ON Other structure area: square feet 9 9 W An 0 gut up IN C is ON sro- N SIDE REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees'are based on the value of the work performed. 1 Si 3�DB 0 24-00 Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ 55'000 Con STR 1Cr TIEW WALLS AND CHAN6E - Existing building area: G ( 5 square feet 1DtO2S OIL NEW IZE_MI I_ T E.NAR 1 New building area: gr square feet PROPERTY OWNER ❑ TENANT Number of stories: 2, Name: Rom ANA 'Qo BER.TA at AMP 1 ON Type of construction: y- B Address: I Co 44,9 LElr+(N G T oN CT Occupancy groups: City/State/ZIP: LAKE OSW SGO l 0 R 9 7 03 4 Existing: g Phone:(503) 484 4_ 3c:.„ I I Fax:( ) New: M APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: (�referrto fau�&� Structural plan review fee(or deposit): Contact name: CASEY BE itm AIZo Address: FLS plan review fee(if applicable): (Ce 4 2, 5 P A CI F1 G Ii W Y SU I TE I co Total fees due upon application: City/State/ZIP: �I U ae D J ne 9. 7 2.2-7 qq Amount received: Phone:(550 3) ! / 7_ 1 td O g Fax::( ) PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: CASEYSBEKNAeI:)C' yAHOO. COM Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: 0 w N E� / �V`� Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: Solar Installation Specialty Code checklist. City/State/ZIP: Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: Total fee due upon application: $201.60 Authorized signature:(��^ This permit application expires if a permit is not obtained ----) g---\■/\---- . within 180 days after it has been accepted as complete. Print name: CA 5 ( E .,1`I �s1CD Date: 4 - - S • Fee methodology set by Tri-County Building Industry Service Board. CSE ATrAcI1ED PUTOP_.IZATION) I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) • Building Division Over-The-Counter (OTC) Plan Review & Permit Process I I(, %iz I) Commercial Projects For an OTC plan review,the applicant shall submit the following material and information: ✓1. Permit application must be completed,signed and must have the site address*and suite number,if applicable,and must provide contractor and current licensing information (Oregon Construction Contractors Board license and sub-trade license,if applicable)**. ✓ . Tri-County Commercial Application Checklist must be completed. 3. Applicant must submit two sets of plans that include: ✓(a) Scale (any standard architectural or engineering only). (}o) Site plan. Parking lot plan. 4 Floor plan showing existing walls,etc. Floor plan showing the revisions. (f) Sheet of details showing accessible parking stalls,access aisle,signage,curb ramp,interior wall / construction,etc. ✓ (g) Manufacture cut sheets for components in the system,i.e. fire alarm,sprinklers,mechanical equipment,etc. /(h) Accessibility(see item number 4 below). ✓4. An amount equal to 25%of the valuation of the work being done shall be budgeted for removal of existing architectural barriers within the site and building(tenant space). The requirement for accessibility upgrades is applicable to every permit,except for re-roofing and mechanical system alterations,unless they affect the usability of the building or facility. Submit the Barrier Removal Plan form showing the budget for bather removal. This form is included in the Commercial TI Building Permit Application packet. Start at the public way and describe each existing bather and the cost for its removal. The plans submitted must show the accessible route,building interior and construction details for: (a) Sidewalks,curb ramps,accessible parking with adjacent access aisle,signage,ramp,handrails and a building/facility accessible entrance,and; (b) Door hardware,doorway width,drinking fountain,sink accessibility in common use areas,i.e. stairways (lunch room or classrooms)when no elevator is provided,receptionist area,counter space,reach ranges and restroom facilities. /5. Applicant must have funds/pay for permit at plan submittal. "7* Address verification: It is recommended that applicant contact the building permit technicians at 503-718-2439 to verify site address prior t4 OTC appointment. If the site address and/or suite# do not exist in the City's parcel database the applicant must contact the City's engineering department for lassignment of a new address and/or suite#and pay$50.00 addressing fee prior I2 OTC appointment. 'olt License verification: Applicant may contact the building permit technicians at 503-718-2439 to verify license information prior to OTC appointment. I:\Building\Forms\OTC-COM-SubmittalCriteria.doc Rev.12/10/12 1 SERVICE AVAILABILITY: Over-the-counter plan review is by appointment only. This service is provided six times weekly and can be scheduled by calling the building permit technicians at 503-718-2439 for the next available time slot. Two 1- hour time slots are available each day on Tuesday,Wednesday and Thursday at 10:00 a.m.and 2:00 p.m. . Walk-in customers will be served with the next available appointment. APPLICATIONS QUALIFYING FOR OVER-THE-COUNTER REVIEW: Building. • Interior modifications that do not involve a change of occupancy All occupancies except H,I or facilities regulated by State Licensure • Non-structural alterations of existing elements only Mechanical: • Replacement of existing equipment. • Units weighing less than 400 pounds unless an engineer's calculations and plans for seismic restraint and members supporting the equipment are provided. Sprinklers: • Modifications to existing systems. Plan review not required for 10 heads or less. Fire Alarms: • Modifications of existing system,no additional elements unless battery calculations,element cut sheets including panel specifications,capacity rating and existing load are provided. PERMIT ISSUANCE: Permits will be issued over-the-counter if all work is found to be in conformance with applicable codes (minor red-lines allowed). If corrections are required,the applicant must obtain another appointment when all required corrections are completed. I:\Building\Forms\OTC-COM-SubmittalCriteria.doc Rev.12/10/12 2 SIGN ATURE_ APPV-O\1AL From: Ron Champion <ronchamp52 @yahoo.com> To: "caseysbernard @yahoo.com"<caseysbernard @yahoo.com>, "slaterarch @hotmail.com" <slaterarch @hotmail.corn> Sent: Fri, Mar 30, 2012 14:32:39 GMT+00:00 Subject: Re: Commercial building on Pacific in Tigard Good morning. If I understand your requirements, the following should be all you need. If not, please let me know and-I will provide whatever other info you require. I, as part owner of the commercial building on Pacific Highway in Tigard, authorize Casey Bernard to sign for me for permits that apply to this project. RON CHAMPION 25884 SW CANYON CREEK RD. #J302 WILSONVILLE, OR 97070 503/228-6868 ronchamp52@yahoo.com Have a great day, Ron `':� Commercial Application Checklist City of Tigard � ' 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503.718.2439,Fax:503.598.1960 `' I " Internet address:www.tigard-or.gov I'RO,H:( I I\FOR\1 I ION Project name: PNW INV E.STMENT RETAIL Date: 4- 8- ‘s Address: 11G4-2 SW PACIFIC- 1-1 W Y 1 City: T1 v AR,D State: pg. ZIP: 972,23 Scope of work: CONST1ZU CT NEW WALLS AND CHARGE DOORS FOR MEW TEt4ANT Reference no.: k 2851 Map and tax-lot no.: 1si 3 G b s 0 2 i-Od Contact person name: Lt SA S -r Company: SLP.—'o Phone: 3 coo- $17 37 Fax: P H ot-4E Cellular phone: 3Q - 903_ G88G E-mail: USA.,C° a.fts-re_ a.c1-1+TE .TUR.e -curl NOTES :ANI) I\STRt ( TIONS • The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. • This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. • For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. • It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. • In the checklist, "Required"means that the applicant must provide this information for plan review. • In the checklist, "P"means— • if checked by the applicant—the information is provided for the plan review. • if checked by the plans reviewer—this information is required for the plan review. • In the checklist, "NA"means that the information does not apply. • Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data,"must be included with each •ro'ect submitted. l'ItE-S1IINIFFI'Al. PROCESS An applicant may request a pre-submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in-progress phase, or when the applicant has completed plans. INDEX OF CHECKLIST SECTIONS 1.0 General project data Page 2 7.0 Mechanical data(Types I and II 2.0 Civil data Page 2 kitchen-hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data(new construction, tenant 10.0 Fire-suppression data Page 9 improvement, gas-piping permits) Page 5 11.0 Fire-detection and fire-alarm data Page 9 6.0 Mechanical data(additional or replacement 12.0 Re-roof installation data Page 10 rooftop-equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas,Multnomah,and Washington counties. 440-2734(8/01/WEB/COM) 1:\Building\Forms\COM-Checklist.doc 03/16/15 110\ 1.0 (:I NFlt 1. PKO.11:( I I).VF:s. Construction documents Location(sheet number or spec section) 1.1 ® Required No. of sets of plans: New: 1 TI: _2 J ✓ 1.2 ® Required Cover sheet title block A- I 1.3 ® Required Cover sheet vicinity map A- 1.4 ® Required Cover sheet plan index 1.5 ❑ P ❑ NA Code summary 1.6 ❑ P ❑ NA Deferred submittal summary 1.7 Ef P ❑ NA Professional stamp and signature 1.8 ❑ P ❑ NA Fire and life-safety plan 1.9 ❑ P ❑ NA Landscape plan 1.10 ❑ P ❑ NA Landscape specifications Supporting documents Notes 1.20 ❑ P ❑ NA Land-use or planning actions 1.21 ❑ P ❑ NA Required fire-flow calculations 1.22 ❑ P ❑ NA Fire-hydrant flow-test report 1.23 ❑ P ❑ NA Fire department or fire district building survey report 1.24 ❑ P ❑ NA Material safety data sheets (MSDS) SECTION 2.0 — CIVIL l);Vl':A Construction documents N /P+ Location(sheet number or spec section) 2.1 ® Required Site plan 2.2 ® Required Site utility plan 2.3 ® Required Grading plan 2.4 ® Required Erosion-control plan 2.5 ❑ P ❑ NA Utility-vault location and details Supporting documents Notes 2.20 ❑ P ❑ NA Geotechnical/soil engineer report 2.21 ❑ P El NA Storm-water calculations 2.22 El P ❑ NA Site retaining-wall structural calculations 2.23 ❑ P ❑ NA "Assurance of Compliance"with environmental rules .... 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:1Building\Forms\COM-Checklist.doc sE( i'ION 3.0 — :Alu HITI.:('i'I R L DATA Construction documents Location(sheet number or spec section) 3.1 ® Required Floor plan(s) _a-2 a-3 3.2 ® Required Transverse and longitudinal cross sections N/1A r.) 3.3 ® Required OSSC Chapter 11 accessibility requirements ✓ 3.4 ❑ P ❑ NA Interior elevations 3.5 ❑ P ❑ NA Exterior elevations 3.6 ❑ P ❑ NA Roof plans 3.7 El P El NA Exterior wall sections and details 3.8 ❑ P ❑ NA Reflected ceiling plan(s) 3.9 ❑ P ❑ NA Fire-rated construction details 3.10 ❑ P ❑ NA Energy code compliant construction details and specifications 3.11 ❑ P ❑ NA Door schedule 3.12 ❑ P ❑ NA Glazing schedule 3.13 ❑ P ❑ NA Furniture plan Supporting documents Notes 3.20 ❑ P ❑ NA Energy code compliance forms/calculations 3.21 ❑ P ❑ NA Material safety data sheets(MSDS) 3.22 ❑ P El NA Hazardous materials inventory statement(HMIS) 3.23 ❑ P El NA Hazardous materials management plan (HMMP) 3.24 El P ❑ NA Written fire and life-safety evacuation plan for area of rescue assistance 3.25 ❑ P ❑ NA Active and passive smoke-control information 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Check)ist.doc til:( TIO\ 4.1) — ti"I'IU C-FI I):vT. Construction documents N/4 Location(sheet number or spec section) 4.1 ® Required Structural cover sheet 4.2 ❑ P ❑ NA Foundation plan 4.3 ❑ P El NA Under-slab mechanical plan 4.4 ❑ P ❑ NA Under-slab electrical plan 4.5 El P ❑ NA Under-slab plumbing plan 4.6 El P ❑ NA Floor framing plan 4.7 ❑ P ❑ NA Roof framing plan 4.8 ❑ P ❑ NA Structural elevations 4.9 ❑ P ❑ NA Structural details and cross sections 4.10 El P ❑ NA Standpipe information 4.11 El P El NA Special inspector/structural observation matrix Supporting documents Notes 4.20 El P ❑ NA Geotechnical/soil engineer report 4.21 El P ❑ NA Site-specific seismic hazard report 4.22 El P ❑ NA Design narrative 4.23 ❑ P ❑ NA Structural calculations 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Building\Forms\COM-Checkl ist.doc SECTION 5.0 — MECHANICAL DATA (New construction, tenant improvement, gas piping permits) Construction documents N Location(sheet number or spec section) 5.1 ® Required Floor plan 5.2 ® Required Equipment schedule 5.3 ❑ P ❑ NA Site plan 5.4 ❑ P ❑ NA Under-slab mechanical plan 5.5 ❑ P ❑ NA Roof plan 5.6 ❑ P ❑ NA Fuel gas piping plan 5.7 ❑ P ❑ NA HVAC equipment and duct plan(s) 5.8 ❑ P ❑ NA Roof access details 5.9 ❑ P ❑ NA Duct smoke detector plans 5.10 ❑ P ❑ NA Fire/smoke damper locations 5.11 ❑ P ❑ NA Smoke control plan 5.12 ❑ P ❑ NA Outside air(OSA)table 5.13 ❑ P ❑ NA Refrigeration equipment and piping plan 5.14 ❑ P ❑ NA Kitchen equipment plan 5.15 ❑ P ❑ NA Type I and/or Type II kitchen hood plan (see Section 7.0—Mechanical Data) 5.16 ❑ P ❑ NA Fume/vapor hood plan 5.17 ❑ P ❑ NA Process piping/product and/or exhaust-conveying duct plan 5.18 ❑ P ❑ NA Fire-rated construction details 5.19 ❑ P ❑ NA Equipment hanger/fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 ❑ P ❑ NA Equipment manufacturers' catalog"cut sheets" or specifications 5.22 ❑ P ❑ NA Outside air(OSA) calculations 5.23 ❑ P ❑ NA Smoke-control calculations 5.24 ❑ P ❑ NA Combustion air calculations 5.25 ❑ P ❑ NA Fuel gas piping sizing calculations 5.26 ❑ P ❑ NA Make-up air calculations 5.27 ❑ P ❑ NA Energy code compliance forms 5.28 ❑ P ❑ NA Boiler information 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checkl ist.doc SECTION 6.0 — MECHANICAL DATA (Additional or replacement rooftop installation permits) Construction documents N Location(sheet number or spec section) 6.1 ® Required Roof plan 6.2 ❑ P ❑ NA Roof framing plan 6.3 ❑ P ❑ NA Fuel gas piping plan 6.4 ❑ P ❑ NA Roof access details Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 6.21 ❑ P ❑ NA Equipment manufacturers' catalog"cut sheets" or specifications 6.22 ❑ P ❑ NA Fuel gas piping sizing calculations 6.23 ❑ P ❑ NA Energy code compliance forms SECTION 7.0 — MECHANICAL DATA (Tv )e I and TN is II kitchen hood ermits) Construction documents N/A Location(sheet number or spec section) 7.1 ® Required Site plan 7.2 ® Required Floor plan(s) 7.3 ® Required Kitchen equipment plan 7.4 ® Required Kitchen equipment and hood elevations 7.5 ❑ P ❑ NA Roof plan 7.6 ❑ P ❑ NA Cross sections through hoods, ducts and shafts 7.7 ❑ P ❑ NA Fire-rated construction details 7.8 ❑ P ❑ NA Fire suppression details Supporting documents Notes 7.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Required Make-up air calculations 7.22 ❑ P ❑ NA Equipment manufacturers' catalog"cut sheets" or specifications 7.23 ❑ P ❑ NA Hood/grease extractor listing documentation 7.24 ❑ P ❑ NA Hood/grease duct sizing calculations 7.25 ❑ P ❑ NA Fire suppression information 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\Building\Forms\COM-Checkl ist.doc SE( .I ION 8.0 — PIT 11131\G DATA Construction documents N /A Location(sheet number or spec section) 8.1 ® Required Floor plan(s) 8.2 ® Required Piping and material schedule 8.3 ® Required Equipment layout plan 8.4 ® Required Fixture schedule 8.5 ❑ P ❑ NA Site utility plan 8.6 ❑ P El NA Building cross section 8.7 ❑ P ❑ NA Rise diagram 8.8 ❑ P El NA Roof plan 8.9 ❑ P ❑ NA Back flow prevention location 8.10 ❑ P ❑ NA Irrigation plan 8.11 ❑ P ❑ NA Fire-rated construction details 8.12 ❑ P ❑ NA Under-slab plumbing plan Supporting documents Notes 8.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 ❑ P ❑ NA Equipment manufacturers' catalog"cut sheets" or specifications 8.22 ❑ P ❑ NA Utility maintenance agreements 8.23 ❑ P ❑ NA Water supply calculations 8.24 ❑ P ❑ NA Sanitary system calculations 8.25 ❑ P ❑ NA Irrigation demand calculations 8.26 ❑ P ❑ NA Roof drain and storm water calculations 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checklist.doc sE('I'lO\ 9.0 — ELECTRICAL I).V1':■ Construction documents Location(sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) 9.3 ® Required Electrical load calculations 9.4 ® Required One line diagram 9.5 ® Required Feeder riser diagram 9.6 ® Required Available fault current information 9.7 ® Required Panel schedule(s) 9.8 ❑ P ❑ NA Site electrical plan 9.9 ❑ P ❑ NA Fire-rated construction details 9.10 ❑ P ❑ NA Lighting plan 9.11 ❑ P ❑ NA Emergency power system and emergency lighting plan 9.12 ❑ P ❑ NA Under-slab electrical plan Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 9.21 ❑ P ❑ NA Energy code compliance forms and calculations for lighting 9.22 ❑ P ❑ NA Emergency power system specifications 9.23 ❑ P ❑ NA Feeder riser information 9.24 ❑ P ❑ NA Lighting equipment manufacturers' catalog "cut sheets"or specifications 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\Building\Forms\COM-Checklist.doc SECTION 10.0-FIRE SUPPRESSION DATA Construction documents n//i‘ Location(sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information 10.6 ❑ P ❑ NA Reflected ceiling plan(s) 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections 10.8 ❑ P ❑ NA Fire-rated construction details 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog"cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 11.0-FIRE DETECTION AND ALARM DATA Construction documents NA Location(sheet number or spec section) 11.1 Required Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information 11.7 ❑ P ❑ NA Operational matrix 11.8 ❑ P ❑ NA Fire-rated construction details 11.9 ❑ P ❑ NA Standard electrical notes Supporting documents Notes 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ® Required Equipment manufacturers' catalog"cut sheets" 11.22 ® Required Installer certification information 11.23 ❑ P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building\Forms\COM-Checklist.doc SECTION 12.0 — RE-ROOF INSTALLATION^^ DATA Construction documents N�,A Location(sheet number or spec section) 12.1 ® Required Site plan or building location map 12.2 ® Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ® Required Pre-re-roof inspection report 12.21 ® Required Roofing system listing information 12.22 ® Required Roofing manufacturer's catalog"cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 El P ❑ NA Structural engineer's report SECTION 13.0 — JURISDICTIONAL–SPECIFIC REQUIREMENTS Construction documents Item N// Location(sheet number or spec section) 13.1 ❑ P ❑ NA ❑ Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 El P ❑ NA [' Required 13.6 ❑ P El NA ❑ Required 13.7 ❑ P ❑ NA El Required 13.8 ❑ P ❑ NA [' Required 13.9 ❑ P ❑ NA El Required 13.10 ❑ P ❑ NA ❑ Required 440-2734(8/01/WEB/COM) Tri-County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties 1:\Building\Forms\COM-Checkl ist.doc City of Tigard IIICOMMUNITY DEVELOPMENT DEPARTMENT ■ T 1 G A K n Building Permit Review — Commercial - With Land Use Building Permit #: ----F- LL 1" ao/ h - 9 Site Address: /11-i/j_ S l✓ R cInc itw< Suite/Bldg#: Project Name: li/U k/ 1/4 yes r en Project ,S (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: /4 Vic(c/ 7 i:3.Verify site address/suite# exists and active in permit s stem. CI River Terrace Plan District: ❑ Yes a No ❑ Land Use Case#: %/l/o,2 /S- 600/i ❑ Plans Match Approved Land Use: Site Plan an scape Plan ❑ Other: 1 rban Forestry Plan won Plan ❑ Building Height: Maximum Height Actual Height ❑ Conditions Met: /0/4 ❑ Prior to Submittal ❑ Prior to Permit Issuance El Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license ❑ Public Facilities Improvement(PFI) Permit: Required: ❑ Yes,applicant was notified \Z<No Applied For: ❑ Yes ❑ No, stop intake Notes: Approved by Planning: ' Date: 7_f-7_ Revisions (after Building Submitt. only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: y//C. Site Plans: # Building Plans: # 3 Building Permit#: I TEnter building permit#above. Workflow Routing: E-Planning g ❑-Perr ixLno]d+_na or a tuilding Workflow Sign-off: 0-Sign-off for Planning(include notes from planning review) Route Application Documents: 213uilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: - AL l c C0( t.e..- L-444.14-16-3 , °I. ...AU c;„1.4 6-6 4' %_ _ — A,, ,/L2 t�u1sJ 4 Evt '1 I (. � i By Permit echnician: ( )CeSa4/A & .42 Date: 1/ /c I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_040115.docx Engineering Review ❑ Slope at building pad: ❑ PH Permit#: ❑ Conditions "Met" or issuance of building permit ❑ Easements (encroachments) per engineering conditions of approval and plat(not -.ical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ■ cs ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: i Approved by Engineering: ID ate: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved / ❑ Not Approved Revision 2: ❑ Appr ed ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to ante of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Appli Revision Notice 2: Date Sent to A.. cant: Revision Notice 3: Date Sent to pplicant: ❑ OK to Issue Permit Approved by Permit Coordinator: Date: 1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse 0401 1 5.docx III I III Building Division Over-The-Counter (OTC) Building Permit TIGARD Check List Project Description: Ti APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION _ Class of Work*: ( Occupancy Group: '� Type of Construction: Type of Use**: Occupancy Load: Oregon Specialty Code: '20 SPECIFICS Number of Stories: '7j Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: _Covered Porch: Basement: Garage: Deck: Total Square Footage: _ Carport: Mezzanine: SETBACKS Sideyard Setback-Left Sideyard Setback-Front Sideyard Setback-Right Sideyard Setback-Back CONSTRUCTION Exterior Walls: ,Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: F■ ' Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ ) FEES DUE $ --2,5,60 DC Prov Rvw,COM TI-Ping $ 0 w DC Prov Rvw,COM TI-LRP DC Provision Review Fee for COM TI(effective 7/1/2014) $ AV . Permit Fee-Add,Alt,Demo Project Valuation Planning LRP $ s' 12%State Surcharge Up to$4,999 $0.00 $0.00 $ -4i Plan Review,Structural $5,000-$74,999 $75.00 $11.00 $ -e, Plan Review,Fire Life Safety $75,000-$149,999 $187.00 $28.00 $ dr Iff. Info Proc/Arch,Lg(over 11x17$2.00) $150,000 and over $299.00 $44.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: $ Other: Building Staff: $ Other: Date/Time: $ 9,6 TOTAL FEES DUE *TYPE OF USE: COM=commercial;CMS=commercial manufactured structure. **CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit;ALT=alteration;DEM=demo;NEW=new; OTR=other(use for fences,decks,retaining walls,signs,awnings or canopies). 1:\Building\Forms\OTC_BUP_070114.docx Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 11642 SW PACIFIC HWY 100, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - C of O BUP2015-00099 Chip Barnett Violation Summary: Inspector Contractor Dan Nelson From: Lisa Slater <lisa @slaterarchitecture.com> Sent: Thursday, April 09, 2015 11:59 AM To: Dan Nelson Cc: caseysbernard @yahoo.com Subject: PNW Investment Retail Attachments: 1202-A-02 (WITH RESTAURANT SF).pdf Hello Dan, Thank you again for your help this morning to get the permit approved for the owner. After I left the City, I went to the site and took measurements at George's Giant Hamburgers. I drew in the walls and counters on the plan and did some area calculations.There are three doors into the dining space, and counters with a salad bar and drink dispensers. As you will see, I have designated a 36"wide circulation path from the doors into the restaurant, and in front of the serving counters because in fact you could not provide seating in these areas.The remaining seating area plus the kitchen is less than 50 occupants,therefore the fire rated wall is not required. Please confirm your approval of this information so we can attach it to the approved plans for the inspector.Thank you again. Lisa Slater Slater Architecture 360-817-2737 V17)_en SL N ER ARCHITECTURE i < PROPOSED NO WORK e1)00 NE Livingston TENANT PROPOSED Rd c.m.. EASING GUARD RAL SPACE ,WA we Gee07 TO RENAN 1 I Pnon•: (360)817-2737 EXTERIOR COVERED WALK I F•` oe0) O 817-2733 ' 0 I•••• PROPOSED '►'•'.••••'.••OO`.`.`�%j.O��`.00`•'•'v'•`.'•'•! \S� �T LOBBY ►.•.•...•.♦ ♦........•••.•• 1•••....••� v ♦.Ii••.•♦• y`�' L5ASuTER < 4 ►..••.•.f•. ►•.•••• O TENANT RETAIL 1b•••.❖D.•••�r∎ DINIMG ' !0.•.O❖.•. VENDOR AND ►►•••••••••�••••, F•.�.••••�•� VANCOUVER.WA SPACE 1096 SF .....•• 609 sF •.•••• s EMPLOYEE AREA 1,P❖•••❖.•t OO••••••••! r)/ AT 30 SF/OCC 0 ►❖.••••••••- A T 1b SF/O CC ►.-.❖.•••! Epp 0� ■ 37 OCCUPANTS 0►.44:44•.�.��• = 41 OCCUPANTS''.4•Q�•�•! h v ►.•••••♦ ♦.•• 0 I.►•••••••••••❖i••••••♦ ♦••••.. . • w 4 +••••••••.•.••••••••.••...• HALL 0 / 1•••••••••.•••/i••••••.••..• \,,,,,..\\\:..,:a ►,.••••••••••••••••••••••••.�11•••.•�• ��e n b OFFICE / 10 O RECEPTION tr w . , 14) ♦•...•••• - a a b VAULT ROOM 0 0 0 I SERVI •••••••••••••••••••••••••••••••••••••••Oiiiiiiiiiiii 2 OC CO TER ••••••••••••••••••••••••, U \ •`•`•`•`•`�`�`•'•`••w'•`•`•`•`•• Z $ micilli N •••.•.171:••••••••• XI STI N G ••�i•i�����•�•�•�•�•�•�•�• 1 49'-O' ••.••••'►•••••••••••••••••• W 7 R:STAURAN STAURAN ��';:::::::::• O Y ' (VERIFY EXISTING) ERVING ••••••••••••• Z• SPACE C� NTER •.••❖.•••••••••••i NORTH ► KITCHEN / \ ••❖••••••••••••••• LL II) MI Ai MAIN FLOOR PLAN /IN 413 SF ` SCALE. 1/4'•I•-Cr Z Q AT 200 SF/OCC N 'I' A 2 OCCUPANT • •-A - Z / 2 0- D SYMBOL LEGEND FLOOR PLAN KEY NOTES / 11/4*....j6' R R OOK AN KEY NOTE EXISTS.*EXTERIOR DOOR TO REMAIN.COORCINIATE W0H OWNER FOG ••••••••••••••••••• NEW HARDWARE. 080.RRT LOCKS APD GLAZNG ALTERATIONS / ♦••.•••. t5ff NOTES THS 9EET1 0 A.••....•.. O PEW NON-LOAD-6EA5NG WALL CpSTRUCTIOW 2.4 STIRS AT IA'We / '� r ••❖.❖••I Tin To aE REenov® Iil-I 1 I LAYER 5/6'GWT3 EACH SEE ••••••REMOVE NOSING DOOR AND FRARrE. POVDE PEW DOOR N E(ISTNG / C ❑ •••••`•`•`•C •`•`•`•••`•!I IX6rNG WALL CpV5TRL1CTK7N TO RB.NN • GA I T,(TO EE 3 p8N NSL`'A Aw r-AvRING ArMAEE TA°r17 / ••••• •••••••••••! ISSUE DATE•JAMS.PROVDE LEVER-TYPE HPf.DLE AND SEOR1TY LOCK PBR OVNE •••••• 4-8-I'J d•••••PEW WALL COP6IRLIOTION PROVOE NEW 3008 SOLD CORE V.\'X70 DOOR NnTH TNBY FRM£ `•`` ' REVISION O (FIt45H P08 DWIERI.OOLY1 TO LWVE L6508-TYPE 1442065 7080 W. .•••••••••.•.•• COOGONATE VOTH OWPBR FOR DOORS THAT REQIE SECURTY LOCK / O O' ••••••••••••..♦ I.••••••••.••• •■ PROVIDE SEORITY BOPS ACROSS WNDOVV OPE.NG ON NSDE CF �.❖•••••••••❖.••••••••••' O VR•DOW. MOI.M TO SOLD FRAAAI.G NB.E>�5 IPROVOE F NEE]®f / � - u ���•��•�������� -IOe NO. 1206 O PEW dSRAT 00)41 7 AND CASH REGSTER LOCATION.EXACT DESIGN —_- 6 APD LOCATION OF FUR4ENINGS PER OV4 O Nov RECEPTION°e t BY OW94(6 PERMIT SET O REA008 PCRfgN OF WALL%cmm DASED.ROOK TO CENG OFELD VERIFY TIAZT DOOR DOES NOT HAVE A CLOSER.CLOSER NOT T6 "'ENT.AS AN gU,OA®FOR ADA ACfE5S TO RE5T000AR �s irE SOCWORTY MAIN FLOOR _ _ MI NGT, cocower gI EXSTF-G RESTAURANT - 1,644 SF As Ao RN PROPOSED RETAIL SPACE - 1.840 SF TOTAL MAIN FLOCK AREA • 3.484 SF LOWER FLOOR 1 f EXISTING AUTO DETAILING - 1,159 SF SHEET NOS EXSTING BARBER SHOP 184 SF EXISTING VACANT SPACE - 2.141 SF TOTAL LOWER FLOOR AREA • 3.484 SF 1A - 21 MAIN F,7r: