Capital Improvement Program FY2015-2019 L.
1.
•+ -N1414410t. r v + 4', •,AI,-d;, •x '7" r _., r"rr�l1 �I.. .. .,,ti 4 !!+.,"" '.. Y ir
��' N�,�" .J� w ; c w" 1 ' r
•jl� 'W' 'a �1' f °1y� .�h 4 •{",A� �- d ',d ` +Yr ■ ��-' 1. — • J am°..•
1 0". e.y.5' i t! j x � ',1 ., iSI��-Tip,' h ']�•
.�.' � _ •r0 M.NL'-,. `•.I,`�r.-• ' 1 . ,F , ` i, ru•'1h, 'h 1',• 7' ,'+,l :�✓hr._� dK.
t`dy�'' �+�1. r S ''. +,A' :'`.,.»rtt.r',•)'' _;.fir. !' l ,' r=,1g'tiL, a' _ ��. /
. , . F. It y t! s
.. i rf —_ . ..w".- , rctl '-1 �ti 4r _.,i•w: 77—rF` .C.: r�� " 1' r, Y -, T _� -(,)°)
Y( . . � r �" /'M1 ' 5' t L. .4x i ° }l 11: q. /•
� ;,...A.,_Lin y., :. rr r i ;r4 ►1 •,' aid r , r�` 1 A°, 4,. ,,_ .. OF' — ' '' '' .'. ' ••4441-1 :... -':',1''').-','\ '-''•:- ,- '-q` '' ,k° . , -,,–,,.
' ';'''''' ' .1,'-',2-S*A7177 E : .__ ''' , ,
.f• 4,/,.,„,...„ ... ,
,,,..,.
..„..,. . (IJ 4
wti - is 1. a �!I f .d " "4 t• /
.''r;k r kT i
C . • .
11
}' �' `,t, p ,,
`
r
�r � �s 1 y, r'
• I yam'' 1r 1• .�F ° r4 , ;" y '
•+ i; s.
�" r
xi P'
yy
Al, r al' II P4, 1.. .,
tai i. � Y �� r �� �`. ,hti, .- •
yj ti Ri: '. K . ,,r ..
- '' d. 1 I '
C • Tmli
O1 411 }
•
M ft. ' 17-4, • - -----4---•"
r r/ J,
N ,.. c:-.) U •'. " .fir ` y .i}'x, �`
• r, r k- ,. .- ivy w1, -, -y ~ ` � S I 1 '''
II `r"IN '" ii,'y r -1 -47 r ' + . l " x,'4- '1, 6 @'!r l \°I.
•
Y r�J l ,�r,,'� � 1. 44� .
v
TIGARD
City of Tigard
FINANCE &INFORMATION SERVICES DEPARTMENT
13125 SW Hall Boulevard I Tigard,OR 97223 I www.tigard-or.gov
Fiscal Year 2015—2019
2
Ca ital Im rovement Program p p
Executive Summary
The Capital Improvement Program(CIP)establishes Tigard's CIP DOCUMENT READER'S GUIDE
annual budget and five-year plan for capital improvements
to its public facility system.The city allocates funding The CIP document describes the city's plans for
for its major construction activities in six defined capital improvement of its infrastructure for the five-year
improvement categories such as General Capital Facilities, period. It is a resource that outlines the prioritization,
Streets,Water, Parks,Stormwater and Sanitary Sewer. selection,and funding of projects in the Streets,Water,
Parks,Stormwater and Sanitary Sewer systems.
A CIP project is any project that improves or adds value to the
city's infrastructure,costs$50,000 or more,and has a useful This document is divided into three main areas:
life or extends the useful life of infrastructure for five years or
more. Public facilities addressed by the CIP are roads, parks, 1. Projects funded during the five-year
sanitary sewer,storm drainage,water quality management, Capital Improvement Program(CIP)
domestic water,public buildings and operations facilities. These are found in the tabbed sections beginning
with a summary of each CIP system.
Adopted master plans,along with established prioritization
lists,are matched to available funding to identify projects to 2. Project Rankings
be budgeted in the current and later years. In addition,staffing This tabbed section documents the city's process for
capacity was considered when building the CIP.Total cost for selecting and funding its CIP including criterion and
the FY 2015-19 CIP is estimated to be$162.8 million over the prioritization.
next five years.Spending for the city's CIP in FY 2015 is$92.6
million across all capital funds. During the development of the 3. Unfunded Projects
five year capital improvement program,the city has a process This section provides cost summaries for all projects
in place for prioritization of all projects that includes input that were considered but were not funded.
from city staff and citizen members.
Prepared by the
Capital Improvement Program Project Team
Toby LaFrance Kenny Asher Brian Rager
Finance&Information Services Director Community Development Director Interim Public Works Director
Carissa Collins Michael Stone John Goodrich
Senior Management Analyst City Engineer Interim Assistant Public Works Director
Debbie Smith-Wagar Kim McMillan Meghan Verhey
Assistant Finance Director Assistant City Engineer Graphic Designer
2015-2019 Capital Improvement Plan I 1
KEY PROJECTS PROGRAMMED FOR FY 2015-19 Capital Improvement Program Process
Parks JULY • Kickoff meeting with departments.
• Dirksen Nature Park.
• Continued purchase of open spaces using proceeds • Public comment period(August—September)
obtained from the city's$17 million parks bond includes project nominations.
approved in FY 2010. AUGUST • Capital Needs Assessment developed from
Master Plans or existing CIP.
Streets
• Departments submit project lists to Engineering.
• 72nd Avenue/Dartmouth Street intersection improvement.
• 95th Avenue and North Dakota Street Sidewalks.
• Public comment period(August September)
• Main Street Green Street Retrofit Phase 1. includes project nominations.
Water SEPTEMBER • Public project nominations submitted to
Engineering.
• Continuation of the projects associated with the
Lake Oswego—Tigard Partnership. • Public Works evaluates project lists and prepares
• Aquifer Storage and Recovery Well#3. CIP project request forms.
• Barrows Road/Scholls Ferry Road Water Line
• Public Works prepares project list to be ranked.
Extension Phase 2. OCTOBER
• Pacific Highway/Gaarde Street Utility Casing Bore Crossing. • List prioritized by citizen committees.
Sewer • CIP team prioritizes projects on ranking criteria.
NOVEMBER
• Derry Dell Creek Sewer Interceptor Relocation. • Prioritized project list presented to city manager.
• Krueger Creek Slope Stabilization (Gallin Court).
• Barrows Road/Scholls Ferry Road Sewer Line • Public Works provides Finance with list of new
Extension Phase 2. DECEMBER CIP projects only.
• CIP team evaluates and ranks projects.
Stormwater
• Copper Creek Bank Stabilization (Durham Road and • Public Works provides final CIP project list to
Copper Creek Drive). Finance.
JANUARY
• First draft of CIP Plan is complete and posted on
General Capital Facilities city website.
• Replacement of exterior wall materials at the Permit
FEBRUARY • Meet with city manager on Proposed Budget/CIP.
Center/City Hall/Police buildings.
APRIL • Final revisions completed to CIP Plan.
JUNE • CIP adopted by City Council.
2 I 2015-2019 Capital Improvement Plan
Fiscal Year 2015—2019 I Capital Improvement Plan IIM
Table of Contents
PARKS SYSTEM 5 SANITARY SEWER SYSTEM 61
Parks System Development Charge Update 7 Citywide Sanitary Sewer Extension Program 63
Fanno Creek Remeander(City/CWS) 8 Sanitary Sewer Major Maintenance Program 64
Dirksen Nature Park(formerly Summer Creek Park) 9-10 Fanno Creek Slope Stabilization(Arthur Court) 65
Tree Canopy Replacement Program 11 Derry Dell Creek Sewer Interceptor Relocation 66
Park Land Acquisition 12 East Tigard Sewer Replacement 67
Park Land Development 13 Krueger Creek(Benchview)Slope Stabilization(Gallin Court) 68
Downtown Land Acquisition 14 Sewer Rehabilitation Program 69
Bull Mountain Park 15 72nd Avenue Sewer Modification(Bonita Road) 70
Tigard Street Trail and Public Space Barrows/Scholls Ferry Road Sewer Line Extension(Phase 2) 71
(Main Street to Tiedeman Avenue/Tigard Street) 16 Red Rock Creek Corridor Sewer Study 72
COT/Tigard-Tualatin School District Park Development 17 Sanitary Sewer System Project Locations 73
Damaged Tree Replacement Program 18
Senn Park 19 STORMWATER SYSTEM 75
Fanno Creek Trail Connection(RFFA Grant) 20 Storm Drainage Major Maintenance Program 77
Summerlake Park Restroom Improvements 21 Community Tree Planting Program 78
Parks System Project Locations 22 Derry Dell Bank Stabilization(118th Court) 79
Copper Creek Bank Stabilization
STREET SYSTEM 23 (Durham Road and Copper Creek Drrive) 80
Pavement Management Program(PMP) 25 Storm Facility Reconstruction(Greenfield Dr.near Pine View) 81
Walnut Street Improvements(116th Ave.to Tiedeman Ave.) 26 Main Street Storm Rehabilitation(Fanno Creek) 82
Pedestrian&Cyclist Connections 27 Pacific Highway Median WQF Project 83
Pacific Hwy/Gaarde/McDonald Intersection Improvements 28 Burlcrest Drive Stormwater Improvements
72nd Ave./Dartmouth St.Intersection Improvement 29-30 (Summer Crest Drive to 121st Avenue) 84
92nd Ave.Sidewalk Improvement(Waverly Dr.to Cook Park) 31 Canterbury Lane Storm Sewer Upgrade
Tiedeman Avenue Sidewalk(Tigard St. to Greenburg Rd.) 32 (106th Avenue to Pacific Highway) 85
Tigard Transportation System Development Charge 33 Ridgefield Lane Water Quality Facility Repair/Stabilization 86
Upper Boones Ferry/Durham Adaptive Signal Coordination 34 Stormwater System Project Locations 87
Commercial Street Sidewalk and Storm Detention Facility
(Main Street to Lincoln Avenue) 35-36 FACILITIES SYSTEM 89
Hall Blvd./McDonald St.Intersection Improvements 37 Permit Center/City Hall/Police Building Wall Repairs 91
Ash Avenue Design Application(Railroad Crossing) 38 Facilities System Project Locations 92
95th Avenue and North Dakota Street Sidewalks 39
Main Street Green Street Retrofit(Phase 1) 40 PROJECT SUMMARIES 93
Main Street Green Street Retrofit(Phase 2) 41
Street System Project Locations 42 PROJECT RANKINGS 97
CIP Ranking Worksheet 99
WATER SYSTEM 43 Final Ranking Scores 101-104
Water Meter Replacement Program 45
Water Main Line Oversizing Program 46 UNFUNDED PROJECTS 107-109
Aquifer Storage and Recovery Well#3 47
Lake Oswego—Tigard Water Partnership 48 APPENDIX 111
Water Line Replacement Program 49 Projects by Fund 113-116
Fire Hydrant Replacement Program 50 Glossary 117-118
Main Street Waterline Replacement(Pacific Hwy to Tigard St.) 51
Pipeline Connecting 550'Zone to 530'Zone(Bull Mountain) 52
Fire Flow Improvement Program 53
Well Abandonment(Tigard High School) 54
New Water Source Systemwide Improvements Program 55
Barrows/Scholls Ferry Road Water Line Extension(Phase 2) 56
Pacific Highway/Gaarde Street Utility Casing Bore Crossing 57
Cach Reservoir and Pump Station Design 58
Water System Project Locations 59
2015-2019 Capital Improvement Plan I 3
Fiscal Year 2015-2019 1 Capital Improvement Plan
Parks System
Page Project Project Name 2015 2016 2017 2018 2019 5-Year Total
7 92012 Parks System Development Charge Update 20,000 0 0 0 0 20,000
8 92013 Fanno Creek Remeander(City/CWS) 0 0 747,000 200,000 0 947,000
9-10 92016 Dirksen Nature Park 412,000 0 1,070,000 775,000 660,000 2,917,000
(formerly Summer Creek Park)
11 92017 Tree Canopy Replacement Program 100,000 100,000 100,000 100,000 100,000 500,000
12 92026 Park Land Acquisition 793,400 0 0 0 0 793,400
13 92027 Park Land Development 60,000 0 0 0 0 60,000
14 92028 Downtown Land Acquisition 1,332,501 0 0 0 0 1,332,501
15 92031 Bull Mountain Park 30,000 0 0 0 0 30,000
16 92034 Tigard Street Trail and Public Space 15,000 945,330 0 0 0 760,330
(Main Street to Tiedeman Avenue/Tigard Street)
17 92035 City of Tigard/Tigard-Tualatin School District 135,000 0 0 0 0 135,000
Park Development
18 92037 Damaged Tree Replacement Program 50,000 50,000 50,000 50,000 50,000 250,000
19 92045 Senn Park 45,000 0 0 0 0 45,000
20 92046 Fanno Creek Trail Construction(RFFA Grant) 0 615,000 2,000,000 1,419,628 0 4,034,628
21 92048 Summerlake Park Restroom Improvements 35,000 0 0 0 0 35,000
Total Funded 3,027,901 1,510,330 3,967,000 2,544,628 810,000 11,859,859
2015-2019 Capital Improvement Plan I 5
92012
Parks System Development
Charge Update
LOCATION N/A
PROJECT MANAGER Steve Martin,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS An updated and approved SDC methodology
including the River Terrace Planning Area.
PROJECT NEED
The last update of the Parks System Development Charge(SDC) methodology
occurred in FY 2011-12; it did not include the River Terrace Planning Area.
PROJECT DESCRIPTION
A rate study will be conducted to include the River Terrace Planning Area.Once completed,an updated SDC recommendation
will be presented to the City Council.
Parks System Development Charge Update
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
EXTERNAL EXPENSES
Design and Engineering 0 5,000 25,000 20,000 0 0 0 0 25,000
Total Tigard Project Expense 0 5,000 25,000 20,000 0 0 0 0 25,000
REVENUE FUNDING SOURCE
Parks SDC Fund 0 5,000 25,000 20,000 0 0 0 0 25,000
Total Tigard Project Revenues 0 5,000 25,000 20,000 0 0 0 0 25,000
2015-2019 Capital Improvement Plan I 7
92013
Fanno Creek Remeander .
(City/CWS)
_
LOCATION Main Street to Hall Boulevard
PROJECT MANAGER Kim McMillan,Public Works d
FUNDING STATUS Fully Funded T
PROJECT RESULTS The project will aid in the effort to restore Ir..'.#
the water quality of Fanno Creek.This
project supports the vision statement in : -
the City of Tigard's Strategic Plan: the
most walkable community in the Pacific ..
Northwest..." •° P
PROJECT NEED
Clean Water Services(CWS) has proposed a `historic stream remeander restoration'for a section of Fanno Creek near Ash Avenue.
PROJECT DESCRIPTION
Lengthening the stream channel is recommended in order to eliminate or lower the rate of incision or erosion by decreasing the
steepness/slope of the stream bed.This will require the removal and replacement of the Ash Avenue Pedestrian Bridge,as well as
reconstructing a segment of the Fanno Creek Trail.
PROJECT FUNDING
This is a part of Segment 2 from the Fanno Creek Trail Construction (92046).This project is funded in part from the$3.7 million
Regional Flexible Funds(RFFA)Active Transportation and Complete Streets grant.
Fanno Creek Remeander (City/CWS)
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 25,000 45,000 0 70,000
Construction Management 0 0 0 0 0 22,000 45,000 0 67,000
Total Irate--- 47,'00 1,000
EXTERNAL EXPENSES
Design and Engineering 0 0 0 0 0 100,000 10,000 0 110,000
Construction 0 0 0 0 0 600,000 100,000 0 700,000
xternal Expense- 0 700,0''
Total Tigard Project Expense 0 0 0 0 0 747,000 200,000 0 947,000
REVENUE FUNDING SOURCE
Parks Bond Fund 0 0 0 0 0 336,628 0 0 336,628
OTHER REVENUE SOURCE
Regional Flexible Funds(RFFA) 0 0 0 0 0 410,372 200,000 0 610,372
Total Tigard Project Revenues 0 0 0 0 0 747,000 200,000 0 947,000
8 I 2015-2019 Capital Improvement Plan
92016
Dirksen Nature Park
(formerly Summer Creek Park)
LOCATION Dirksen Nature Park t
PROJECT MANAGER Kim McMillan,Public Works
FUNDING STATUS Partially Funded
PROJECT RESULTS Priority will be balancing the expanded use .
of the park for public benefit while restoring
and maintaining the unique,historic
natural features of the site.This project
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable
community in the Pacific Northwest..."
PROJECT NEED
Provide environmental education,significant vegetation and habitat enhancements to re-establish and strengthen the qualities of various
wetland habitat types within the 48-acre Summer Creek Park(Fowler Property).This park has been renamed Dirksen Nature Park.
PROJECT DESCRIPTION
The majority of the property will remain a natural area,with approximately 35 acres being protected under a conservation easement.
The project will include improvements to the existing educational building(located in the northwest portion of the site), landscaping
around the building,trail connections throughout the property, upgrading the existing ball field,the addition of a restroom and an
interpretive shelter,street improvements along Tigard Street and an on-site parking area.
PROJECT FUNDING
The city has been awarded a$390,000 Nature in Neighborhoods Grant.The funding will be used for restoration of the forested
wetland and construction of an educational boardwalk, restoration of the oak savannah and construction of an overlook,and
construction of a nature play area.
Dirksen Nature Park
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 20,000 56,599 17,000 0 30,000 10,000 15,000 92,000
Construction Management 0 0 0 25,000 0 50,000 20,000 30,000 125,000
Total Internal Expenses 0 20,000 56,599 42,000 0 80,000 30,000 45,000 217,000
EXTERNAL EXPENSES
Land/Right of Way Acquisition 3,364,887 0 0 0 0 0 0 0 3,364,887
Design and Engineering 0 500,000 500,000 10,000 0 0 0 0 510,000
Construction 0 0 0 360,000 0 990,000 745,000 615,000 2,710,000
Prior Life-to-Date 324,240 0 0 0 0 0 0 0 324,240
en :9,127 500,000 500,000 370,000
Total Tigard Project Expense 3,689,127 520,000 556,599 412,000 0 1,070,000 775,000 660,000 7,126,127
Dirksen Nature Park continued on back...
2015-2019 Capital Improvement Plan I 9
92016
Dirksen Nature Park
(formerly Summer Creek Park)
Dirksen Nature Park (continued...)
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
REVENUE FUNDING SOURCE
Urban Forestry Fund 0 0 0 100,000 0 0 0 0 100,000
Parks Capital Fund 0 0 0 0 0 400,000 160,000 0 560,000
Parks Bond Fund 3,689,127 375,760 556,599 0 0 0 0 0 4,064,887
Parks SDC Fund 0 144,240 0 280,000 0 525,000 615,000 660,000 2,224,240
Sanitary Sewer Fund 0 0 0 20,000 0 0 0 0 20,000
Stormwater Fund 0 0 0 0 0 145,000 0 0 145,000
Water Fund 0 0 0 12,000 0 0 0 0 12,000
Total Revenue Funding 3,689,127 520,000 556,599 412,000 0 1,070,000 775,000 660,000 7,126,127
Total Tigard Project Revenues 3,689,127 520,000 556,599 412,000 0 1,070,000 775,000 660,000 7,126,127
10 I 2015-2019 Capital Improvement Plan
92017
Tree Canopy = � ' -: , , ,, - i -
Replacement Program , '~ 8 �, , ' '•
1.
LOCATION Various i ,i -
_ 5F_ e
PROJECT MANAGER Steve Martin,Public Works
FUNDING STATUS Fully Funded r 4
PROJECT RESULTS Maintaining a balance in the number of - _
- di, AI %
trees removed during development and „q"
improving the quality/quantity of trees in - .: �" ,.
neighborhoods and other suitable areas. -
- , s
s Y
PROJECT NEED y o- "'; `� _, r °_:
Replacing lost tree canopy along stream corridors,school grounds,highways -. -. 'w._
or where canopy replacement is necessary. 9 ; _
PROJECT DESCRIPTION
The Canopy Replacement Program is funded by developers who remove trees but are unable to meet tree replacement standards
or requirements.Tigard residents may request free tree(s)via the Free Street Tree Program,which is part of the Tree Canopy
Replacement Program.Throughout the fall and winter,the city will deliver and plant these trees. In the spring,after completion of the
program,the city will pursue planting opportunities in other areas.These funds can also be used to maintain prior plantings during the
establishment period when additional care is needed.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Tree Canopy Replacement Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
EXTERNAL EXPENSES
Construction 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 600,000
0 .. . r 100,000 100,000 100,000 100,000 100,000 10,.a` a
Total Tigard Project Expense 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 600,000
REVENUE FUNDING SOURCE
Urban Forestry Fund 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Total Tigard Project Revenues 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 600,000
2015-2019 Capital Improvement Plan I 11
92026
Park Land Acquisition
...
LOCATION To Be Determined ar
PROJECT MANAGER Steve Martin,Public Works , _f" ,,,Rm
FUNDING STATUS Fully Funded -- _ a . ."i
PROJECT RESULTS Parks and properties that have been ''. .,f
, � t '
purchased as a result of the bond include: '
Summer Creek#1 and#2(Dirksen Nature , . ,}s - `-..•
Park),Potso,Sunrise,Bull Mountain,Fields, -. "
Eiswerth,Bagan,Essex,Rockingham and - - -
Steve Street. .al 1 w k,
PROJECT NEED a -,
Identify and acquire park land. ' ,# , ;y''-.14 )'t _ 1`i'1,,',,'
PROJECT DESCRIPTION
As a result of the$17,000,000 Parks Bond,the Parks and Recreation Advisory
Board(PRAB) is continuing to identify potential park site acquisitions.
Park Land Acquisition
Actual Projected Revised Project
2015 2016 2017 2018 2019
2013 2014 2014 Total
EXTERNAL EXPENSES
Land/Right of Way Acquisition 0 260,000 1,970,576 793,400 0 0 0 0 1,053,400
Total Tigard Project Expense 0 260,000 1,970,576 793,400 0 0 0 0 1,053,400
REVENUE FUNDING SOURCE
Parks Bond Fund 0 260,000 100,405 493,400 0 0 0 0 753,400
Parks SDC Fund 0 0 970,171 300,000 0 0 0 0 300,000
Total Tigard Project Revenues 0 260,000 1,070,576 793,400 0 0 0 0 1,053,400
12 I 2015-2019 Capital Improvement Plan
92027
Park Land Development : ,
LOCATION To Be Determined i#t
PROJECT MANAGER Steve Martin,Public Works
FUNDING STATUS Fully Funded
Ai
PROJECT RESULTS Developed parks including necessary park
jeamenities such as restrooms.This project
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable
community in the Pacific Northwest..."
PROJECT NEED '-
The development of the land that has been purchased via the$17 million
Park Bond.
PROJECT DESCRIPTION
Locations for future development have yet to be determined. Park projects that are scheduled for development include Potso Dog
Park,Commercial,Summerlake, Derry Dell and various trail segments.
Park Land Development
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 82,950 0 0 0 0 0 0
Construction Management 0 0 82,950 0 0 0 0 0 0
at EInternal Expens 0 165,900 0
EXTERNAL EXPENSES
Public Involvement 0 0 12,482 0 0 0 0 0 0
Design and Engineering 0 0 143,543 60,000 0 0 0 0 60,000
Construction 0 0 38,075 0 0 0 0 0 0
Prior Life-to-Date 276 0 0 0 0 0 0 0 276
Total External Expenses 276 0 194,100 60,000 0 0 0 0
Total Tigard Project Expense 276 0 360,000 60,000 0 0 0 0 60,276
REVENUE FUNDING SOURCE
Parks Bond Fund 276 0 0 0 0 0 0 0 276
Parks SDC Fund 0 0 360,000 60,000 0 0 0 0 60,000
Total Tigard Project Revenues 276 0 360,000 60,000 0 0 0 0 60,276
2015-2019 Capital Improvement Plan I 13
92028
Downtown Land Acquisition 1 — - " _ ,L V r� 4� .4. •11_-
,tea .I, 47- `�'+�', �
{ r . ■..T
LOCATION To Be Determined °, ,_ li ;,,..—,r14'' •11 ih' -'�_ R ,
PROJECT MANAGER Steve Martin,Public Works o _c e +e 1•
FUNDING STATUS Fully Funded ,, '' -4-
PROJECT RESULTS Property which will be developed for park . ,, .�"y
purposes in downtown Tigard. - 4. "'N-7-1.'" ,
PROJECT NEED ' q * d F
Purchase park sites within the downtown Tigard area. 'r ti �`
PROJECT DESCRIPTION ! ..3�,�+i�i� .millril
Associated with the$17,000,000 Park Bond,a portion of the proceeds -
were set aside to purchase and develop property within the downtown . 9 +fir
area as parks. . .. -. y - .-
Downtown Land Acquisition
Actual Projected Revised Project
2015 2016 2017 2018 2019
2013 2014 2014 Total
EXTERNAL EXPENSES
Land/Right of Way Acquisition 0 2,000 1,335,000 1,332,501 0 0 0 0 1,334,501
Prior Life-to-Date 499 0 0 0 0 0 0 0 499
Total Tigard Project Expense 499 2,000 1,335,000 1,332,501 0 0 0 0 1,335,000
REVENUE FUNDING SOURCE
Parks Bond Fund 499 2,000 1,335,000 1,332,501 0 0 0 0 1,335,000
Total Tigard Project Revenues 499 2,000 1,335,000 1,332,501 0 0 0 0 1,335,000
14 I 2015-2019 Capital Improvement Plan
92031
Bull Mountain Park
� ,I _ " _tee r r t P a
LOCATION East Bull Mountain k
PROJECT MANAGER Steve Martin,Public Works 1
FUNDING STATUS Fully Funded f
PROJECT RESULTS A neighborhood park. °'y 4 ,yam
V k qtr J I, .
PROJECT NEED s ,�
The city purchased the 10-acre East Bull Mountain properties in two s -. ., d, r
transactions in Spring 2012 for a neighborhood park. o - i al
,_,; - - . :
PROJECT DESCRIPTION
Located approximately a quarter-mile north of Bull Mountain Road and west of Greenfield Drive,the properties are mostly wooded
and contain steep slopes along the eastern and western edges of the site.The largest of the properties includes a residence and small
open field.The parks division intends to conduct a site master plan to define and facilitate the future development of this property as
a neighborhood park. Potential master plan elements include pathways,shelters, playground, interpretive elements and the removal
or repurposing of the residential structure. Formal park entry points from Alpine Crest Way,Woodshire Lane and Ridgefield Lane will
be considered. In addition to the park elements,street,water and sewer improvements will be designed in accordance with the city's
Public Improvement Design Standards and corresponding design details and stormwater facilities and modifications to the vegetated
corridors will meet Clean Water Services'design standards.This will include removing an existing structure on the purchased property.
Bull Mountain Park
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 3,400 0 0 0 0 0 0 3,400
EXTERNAL EXPENSES
Land/Right of Way Acquisition 1,764,612 0 0 0 0 0 0 0 1,764,612
Design and Engineering 0 17,400 10,000 0 0 0 0 0 17,400
Construction 0 25,000 0 30,000 0 0 0 0 55,000
Prior Life-to-Date 38,830 0 0 0 0 0 0 0 38,830
Total Tigard Project Expense 1,803,442 45,800 10,000 30,000 0 0 0 0 1,879,242
REVENUE FUNDING SOURCE
Parks Bond Fund 1,803,442 6,170 10,000 0 0 0 0 0 1,809,612
Parks SDC Fund 0 39,630 0 30,000 0 0 0 0 69,630
Total Tigard Project Revenues 1,803,442 45,800 10,000 30,000 0 0 0 0 1,879,242
2015-2019 Capital Improvement Plan I 15
92034
Tigard Street Trail & Public Space
(Main Street to Tiedeman Ave./Tigard St.) -
rte.
LOCATION Tigard Street PROJECT MANAGER Kim McMillan,Public Works - i . j 1
,;
FUNDING STATUS Partially Funded '�PROJECT RESULTS Improved pedestrian and cycle access to
downtown Tigard,the Tigard Transit Center, .,the Fanno Creek and Summer Creek Trails -
and Dirksen Nature Park.This project - -
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable ._ bT.' • MAI
community in the Pacific Northwest..." a
PROJECT NEED
Repurpose an existing and inactive rail corridor to benefit a multi-modal public use.
PROJECT DESCRIPTION
The city is in negotiations with ODOT Rail and the Portland and Western Railroad to utilize an inactive railroad corridor from Tiedeman
Avenue to Main Street in order to link area trails and parks to downtown Tigard and the Tigard Transit Center.The corridor is currently
a 16-foot gravel rail bed (unsuitable for walking as it is constructed of railroad ballast rock)that will be developed to accommodate
a variety of mixed-use trail sections.The project corridor will extend from Main Street to an area near the intersection of Tiedeman
Avenue and Tigard Street.An entryway or plaza will be constructed near the Chamber of Commerce. Due to ODOT Rail restrictions on
pedestrian crossings within 250 feet of a rail crossing,trail users will be directed to the existing crossing of Main Street at Tigard Street.
A preliminary trail alignment has been prepared to explore site opportunities and alignment considerations.The trail alignment and
design will be advanced for land use review and approval.
PROJECT FUNDING
The city is pursuing grant opportunities for this project.
Tigard Street Trail & Public Space
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 10,500 15,000 10,000 0 0 0 25,000
Construction Management 0 10,500 10,500 0 15,000 0 0 0 25,500
Total Internal Expenses 0 10,500 21,000 15,000 25,000 0 0 0 50,500
EXTERNAL EXPENSES
Public Involvement 0 1,580 0 0 0 0 0 0 1,580
Design and Engineering 0 50,000 16,590 0 143,670 0 0 0 193,670
Construction 0 0 60,830 0 576,660 0 0 0 576,660
Prior Life-to-Date 4,690 0 0 0 0 0 0 0 4,690
Total Tigard Project Expense 4,690 62,080 10,000 15,000 745,330 0 0 0 827,100
REVENUE FUNDING SOURCE
Parks Capital Fund 0 0 0 0 445,800 0 0 0 445,800
Parks Bond Fund 4,690 62,080 100,000 14,442 0 0 0 0 81,212
Parks SDC Fund 0 0 0 558 299,530 0 0 0 300,088
Total Tigard Project Revenues 4,690 62,080 100,000 15,000 745,330 0 0 0 827,100
16 I 2015-2019 Capital Improvement Plan
92035
City of Tigard/Tigard-Tualatin
School District Park Development , °
LOCATION To Be Determined
PROJECT MANAGER Steve Martin,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Enhanced park amenities.
PROJECT NEED
Provide funding for enhanced park amenities on school district property.
PROJECT DESCRIPTION
This project provides funding for a partnership between the city and the
Tigard-Tualatin School District.
COT-TTSD Park Development Partnership
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
EXTERNAL EXPENSES
Public Involvement 0 0 10,800 10,800 0 0 0 0 10,800
Design and Engineering 0 0 21,600 21,600 0 0 0 0 21,600
Construction 0 0 102,600 102,600 0 0 0 0 102,600
Total External Expenses _0 11135,000 135,000 0 0 0 0 135)000
Total Tigard Project Expense 0 0 135,000 135,000 0 0 0 0 135,000
REVENUE FUNDING SOURCE
Parks Bond Fund 0 0 135,000 135,000 0 0 0 0 135,000
Total Tigard Project Revenues 0 0 135,000 135,000 0 0 0 0 135,000
2015—2019 Capital Improvement Plan I 17
92037
Damaged Tree l¢ " 4
Replacement Pr og ram
41 _ LL
,
LOCATION Various '9, , '
PROJECT MANAGER Steve Martin,Public Works , Pr
- _
FUNDING STATUS Fully Funded p,. y iii*. Wit^
PROJECT RESULTS Increased quality and quantity of � ,, . '#'
large trees and tree canopy.
PROJECT NEED
Increase the number of large trees missing due to damage,disease and
other circumstances. F W
PROJECT DESCRIPTION
Large trees are planted citywide where additional tree canopy is needed.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Damaged Tree Replacement Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
EXTERNAL EXPENSES
Construction 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
Total Tigard Project Expense 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
REVENUE FUNDING SOURCE
Urban Forestry Fund 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
Total Tigard Project Revenues 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
18 1 2015-2019 Capital Improvement Plan
92045
Senn Park .e. '`
1. 4,-
LOCATION Senn Park K_ ''L
PROJECT MANAGER Steve Martin,Public Works
a
FUNDING STATUS Fully Funded E .g. .J,
PROJECT RESULTS Parks will purchase and install play - IN
equipment for this small neighborhood park. '.
PROJECT NEED
Develop park land for residents to enjoy.
PROJECT DESCRIPTION
The Senn Park land was acquired along with the Senn open space in 2006. ' .w4{' *. F
Funding will provide land use as well as park amenities for this small park. "L' - _
Senn Park
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 5,500 0 0 0 0 0 0
Construction Management 0 0 5,500 0 0 0 0 0 0
Total Internal Expenses 0 0 11,000 0 0 0 0
EXTERNAL EXPENSES
Public Involvement 0 0 390 0 0 0 0 0 0
Design and Engineering 0 41,798 8,970 0 0 0 0 0 41,798
Construction 0 0 29,640 45,000 0 0 0 0 45,000
Prior Life-to-Date 8,202 0 0 0 0 0 0 0 8,202
Total External Expenses 8,202 41,798 39,000 45,000 0 0 0 0 95,000
Total Tigard Project Expense 8,202 41,798 50,000 45,000 0 0 0 0 95,000
REVENUE FUNDING SOURCE
Parks Bond Fund 8,202 41,798 50,000 0 0 0 0 0 50,000
Parks SDC Fund 0 0 0 45,000 0 0 0 0 45,000
Total Tigard Project Revenues 8,202 41,798 50,000 45,000 0 0 0 0 95,000
2015-2019 Capital Improvement Plan I 19
92046
Fanno Creek Trail Connection - r,
(RFFA Grant)
Lbw exrdwirrail Prryitet -:
LOCATION Multiple segments of the Fanno Creek Trail r
are involved. -
PROJECT MANAGER To Be Determined ' '' - III
FUNDING STATUS Partially Funded r - • ill
•-- :•sir._
PROJECT RESULTS All segments of the Fanno Creek Trail
•
within Tigard will be complete except ill . -.-
for the segment from Bonita Road to .,_9 ....° , !A
Durham Road at 85th Avenue.This project •
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable
community in the Pacific Northwest..." ,'
PROJECT NEED
Construct segments of the Fanno Creek Trail.
PROJECT DESCRIPTION
The city has received a Regional Flexible Funds(RFFA)Active Transportation and Complete Streets grant to construct 4 segments of the
Fanno Creek Trail.This project will include:Segment 1-Grant Avenue to Woodard Park,Segment 2-Main Street to Hall Boulevard,
Segment 3-City Library to Bonita Road,Segment 4-Durham Road at 85th Avenue to the Tualatin River.
Fanno Creek Trail Connection
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 60,000 0 25,000 60,000 20,000 0 105,000
Construction Management 0 0 60,000 0 0 60,000 30,000 0 90,000
i Total Internal Expenses i _ _
DO 120,000 50,000 1195,000 I
EXTERNAL EXPENSES
Public Involvement 0 0 5,000 0 0 0 0 0 0
Land/Right of Way Acquisition 0 0 25,000 0 0 80,000 0 0 80,000
Design and Engineering 0 0 156,000 0 590,000 300,000 0 0 890,000
Construction 0 0 730,000 0 0 1,500,000 1,369,628 0 2,869,628
Total External Expenses 0 0 916,000 0 590,000 1,880,000 1,369,628 0 3,839,628
Total Tigard Project Expense 0 0 1,036,000 0 615,000 2,000,000 1,419,628 0 4,034,628
REVENUE FUNDING SOURCE
Parks SDC Fund 0 0 217,560 0 365,000 330,000 0 0 695,000
Sanitary Sewer Fund 0 0 0 0 100,000 0 0 0 100,000
Stormwater Fund 0 0 217,560 0 150,000 0 0 0 150,000
I Total Revenue Funding 0 0 435,120 0 615,000 330,000 0 0 945,000
REVENUE FUNDING SOURCE
Regional Flexible Funds(RFFA) 0 0 0 0 0 1,670,000 1,419,628 0 3,089,628
Transportation Enhancement 0 0 600,880 0 0 0 0 0 0
Total Revenue Funding 0 0 600,880 0 0 1,670,000 1,419,628 0 3,089,628
Total Tigard Project Revenues 0 0 1,036,000 0 615,000 2,000,000 1,419,628 0 4,034,628
20 1 2015-2019 Capital Improvement Plan
92048
Summerlake Park
Restroom Improvements
LOCATION Winterlake Drive/South of Scholls
Ferry Road
PROJECT MANAGER Carla Staedter,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Provides public facilities and increases
overall maintenance savings due to
standardization.The project includes
treatment of stormwater runoff from
the installation of the restroom.Utilities
including water and sanitary sewer pipes
are required.
PROJECT NEED
Provide restroom facilities for Summerlake Park.
PROJECT DESCRIPTION
The project will install a prefabricated restroom matching similar installations in other parks. The restroom will be constructed on a
concrete slab that will connect to existing sanitary sewer and water lines.
Summer Lake Park Restroom Improvements
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 20,000 5,000 0 0 0 0 10,000
Construction Management 0 5,000 20,000 5,000 0 0 0 0 10,000
Total Internal Expenses 0 10,000 40,000 10,000 MIMI-_-_
immommorimm_ ii._
EXTERNAL EXPENSES
Design and Engineering 0 35,000 40,000 5,000 0 0 0 0 40,000
Construction 0 80,000 60,000 20,000 0 0 0 0 100,000
Total External Expenj or 115,000 100,000 25,000 AMA
Total Tigard Project Expense 0 125,000 140,000 35,000 0 0 0 0 160,000
REVENUE FUNDING SOURCE
General Fund 0 21,000 0 0 0 0 0 0 21,000
Parks Bond Fund 0 104,000 140,000 0 0 0 0 0 104,000
Sanitary Sewer Fund 0 0 0 12,500 0 0 0 0 12,500
Stormwater Fund 0 0 0 10,000 0 0 0 0 10,000
Water Fund 0 0 0 12,500 0 0 0 0 12,500
Total Tigard Project Revenues 0 125,000 140,000 35,000 0 0 0 0 160,000
2015-2019 Capital Improvement Plan I 21
Project Location Map I Parks Systems lea
Parks System Project Locations
CITYWIDE PROJECTS 92012,92017,92026,92027,92028,92035 and 92037
1
a
o
m
92045 I
/
perry goad _ �" 1 ��� 1
R
92048 == - '-
., _a a ,� - 1
a 92016 - - �;.G
__ ,:, // 92046 92034 - IPA Oartm oaa'
1-- 1 - - outh R
t 1', Walnut Street //
,_< -- i , 4k / ee""
0 4n?rker
I sr)Peet
92013 -2 i �
M
® m �
92031 i ; m
l�
Gaarde Street tires—-. s
a- -. � � McDonald Streets
L
luntain Road c — 1 I ---
Bonita Road
Bull Mountain
m
Q
oaf � Minimal' L 1 _
beef WOO. MI � �i
r.' —rtr—_. 1 —r — —
1
1 1 Durham Road I ■
N
Fiscal Year 2015—2019 I Capital Improvement Plan p
Street System
Page Project Project Name 2015 2016 2017 2018 2019 5-Year Total
i n I
25 95001 Pavement Management Program 1,900,000 1,950,000 2,025,000 2,100,000 2,170,000 10,145,000
26 95023 Walnut Street Improvements 152,000 104,000 114,000 0 0 370,000
(116th Ave.to Tiedeman Ave.and 135th Ave.)
27 95027 Pedestrian and Cyclist Connections 0 0 384,000 138,000 138,000 660,000
28 95033 Pacific Highway/Gaarde Street/McDonald Street 305,000 400,000 0 0 0 705,000
Intersection Improvements
29-30 95035 72nd Avenue/Dartmouth Street Intersection 1,561,350 0 0 0 0 1,561,350
31 95037 92nd Avenue Sidewalk 4,000 0 0 0 0 4,000
(Waverly Drive to Cook Park)
32 95038 Tiedeman Avenue Sidewalk 0 0 0 167,000 598,000 765,000
(Tigard Street to Greenburg Road)
33 95040 Tigard Transportation SDC 51,000 0 0 0 0 51,000
34 95041 Upper Boones Ferry Road/Durham Road 115,000 0 0 0 0 115,000
Adaptive Signal Coordination
35—36 95042 Commercial Street Sidewalk and Storm 0 0 365,000 790,000 0 1,155,000
Detention Facility(Main Street to Lincoln Street)
37 95043 Hall Boulevard/McDonald Street 0 0 2,910,000 5,990,000 0 8,900,000
Intersection Improvements
38 95044 Ash Avenue Design Application 0 440,000 0 0 0 440,000
(Railroad Crossing)
39 95045 95th Avenue and North Dakota Street Sidwalks 234,000 0 0 0 0 234,000
40 97003 Main Street Green Street Retrofit(Phase 1) 450,576 0 0 0 0 450,576
41 97017 Main Street Green Street Retrofit(Phase 2) 0 0 0 825,000 365,576 1,190,576
Total Funded 4,772,926 2,894,000 5,798,000 10,010,000 3,271,576 26,746,502
2015-2019 Capital Improvement Plan 1 23
95001
Pavement Management Program
(PMP)
24,IL---- , .
LOCATION Citywide ti
ti
PROJECT MANAGER Mike McCarthy,Public Works hi
-;. vFUNDING STATUS Fully Funded _ r• 1'
PROJECT RESULTS Extension of the useable service life of the _,, jw
asphaltic concrete.Duration of service life
depends on the method of preservation
chosen and traffic volumes. _ _ r
PROJECT NEED 1
This project is a continuation of the annual program to preserve or replace
p l p g p p
portions of one of the city's most valuable resources - its streets and roadways.
PROJECT DESCRIPTION
This project,funded by the Street Maintenance Fee,provides for the preservation or replacement of the asphaltic concrete by
overlays,crack sealing or slurry sealing.A pavement condition study is then used to determine future project needs.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Pavement Management Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Design and Engineering 0 40,000 0 0 0 0 0 0 40,000
Project Management 0 40,000 80,000 50,000 50,000 50,000 50,000 50,000 290,000
Construction Management 0 105,000 150,000 100,000 100,000 100,000 100,000 100,000 605,000
Total Internal Expenses 0 185,000 230,000 150,000 150,000 150,000 150,000 150,000 :5,000
EXTERNAL EXPENSES
Public Involvement 0 0 10,000 0 0 0 0 0 10,000
Design and Engineering 0 160,000 40,000 180,000 190,000 200,000 210,000 220,000 1,160,000
Construction 0 1,380,000 1,380,000 1,570,000 1,610,000 1,675,000 1,740,000 1,800,000 9,775,000
Total Tigard Project Expense 0 1,725,000 1,660,000 1,900,000 1,950,000 2,025,000 2,100,000 2,170,000 11,870,000
REVENUE FUNDING SOURCE
Street Maintenance Fee Fund 0 1,725,000 1,660,000 1,900,000 1,950,000 2,025,000 2,100,000 2,170,000 11,870,000
Total Tigard Project Revenues 0 1,725,000 1,660,000 1,900,000 1,950,000 2,025,000 2,100,000 2,170,000 11,870,000
2015-2019 Capital Improvement Plan 1 25
95023
Walnut Street Improvements . . T '.- -i ` "
(116th Avenue to Tiedeman Avenue ew
k
4 `„"7 9 - w
LOCATION Walnut Street from 116th Avenue to .,. _ h,
t ' a
Tiedeman Avenue and 135th Avenue ., -
PROJECT MANAGER Kim McMillan,Public Works i. =ii --",-
FUNDING STATUS Fully Funded '
PROJECT RESULTS Increased safety for:children traveling to
and from Fowler Middle School,motorists -- a-•• _1 4m -
making left turns,and pedestrians and
cyclists.Additional vehicular capacity will
be realized.This project supports the vision 'r -
statement in the City of Tigard's Strategic �- �-
Plan:"the most walkable community in the
Pacific Northwest..."
PROJECT NEED
The current section of Walnut Street fronting Fowler Middle School between 116th Avenue and Tiedeman Avenue is a narrow,two-lane
roadway which has not been widened to the Transportation Systems Plan(TSP)standards.This section lacks adequate sidewalks and bike
lanes.The all-way stop intersection at 135th Avenue experiences considerable vehicular delays during morning and evening commute times.
PROJECT DESCRIPTION
The project will reconstruct and widen the roadway section from 116th Avenue to Tiedeman Avenue. Road improvements include
through lanes,a center turn lane,sidewalks and bike lanes,and a traffic control signal will be installed at 135th Avenue.A new culvert
with adequate capacity will be constructed replacing the existing undersized culvert. In addition,there are currently 24 properties
along Walnut Street and 112th Avenue not being served by the city sewer system. New sanitary sewer lines will be added to provide
service to these currently unserved properties.The Water System Master Plan calls for a 24-inch pipe to be extended through this corridor.
PROJECT FUNDING
This is a $7,000,000 Washington County Street project.City of Tigard expenses are for staff time and utility work only.
Walnut Street Improvements
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 12,000 80,000 62,000 20,000 20,000 0 0 114,000
Construction Management 0 0 0 6,000 0 0 0 0 6,000
Prior Life-to-Date 8,481 0 0 0 0 0 0 0 8,481
-,_;Expend Aiii,2 12,0001 ;0,000 t 20,000 20,000
EXTERNAL EXPENSES
Construction 0 0 84,000 84,000 84,000 94,000 0 0 262,000
0 84,000 84,000 84,000 94,000 262,000
Total Tigard Project Expense 8,481 12,000 164,000 152,000 104,000 114,000 0 0 390,481
REVENUE FUNDING SOURCE
Gas Tax Fund 8,481 1,200 16,000 15,200 10,400 11,400 0 0 46,681
Underground Utility Fund 0 7,200 100,000 91,200 62,400 68,400 0 0 229,200
Sanitary Sewer Fund 0 1,200 16,000 15,200 10,400 11,400 0 0 38,200
Stormwater Fund 0 1,200 16,000 15,200 10,400 11,400 0 0 38,200
Water Fund 0 1,200 16,000 15,200 10,400 11,400 0 0 38,200
Total Tigard Project Revenues 8,481 12,000 164,000 152,000 I 104,000 114,000 0 0 390,481
26 I 2015-2019 Capital Improvement Plan
95027
Pedestrian & Cyclist Connections ;a jr
■
LOCATION Citywide , $` u
PROJECT MANAGER Mike McCarthy,Public Works %.,;
FUNDING STATUS Fully Funded - ' _et o, 'l
I a r
PROJECT RESULTS Contiguous facilities providing a much i 1
more pleasing and safer experience for 105
- .
pedestrians and cyclists.This project '_4 .1,1,
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable ,
community in the Pacific Northwest..." ,
i
PROJECT NEED
Incomplete sections of sidewalks and bike lanes are located citywide.
PROJECT DESCRIPTION
Projects may include fill in sidewalk/bike lane/pathway construction,crosswalk treatments and minor intersection modifications.
All projects will typically cost less than$50,000. Funds from this program can also be used to cover matching funds for eligible grant
projects benefitting pedestrians and cyclists.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Pedestrian & Cyclist Connections
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 2,000 10,000 0 0 18,000 6,000 6,000 32,000
Construction Management 0 0 0 0 0 18,000 6,000 6,000 30,000
i o'r o o i.i
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 15,000 5,000 5,000 25,000
Land/Right of Way Acquisition 0 0 0 0 0 30,000 10,000 10,000 50,000
Design and Engineering 0 20,000 20,000 0 0 78,000 26,000 26,000 150,000
Construction 0 0 0 0 0 225,000 85,000 85,000 395,000
126,0+;
Total Tigard Project Expense 0 22,000 30,000 0 0 384,000 138,000 138,000 682,000
REVENUE FUNDING SOURCE
Gas Tax Fund 0 22,000 30,000 0 0 384,000 138,000 138,000 682,000
Total Tigard Project Revenues 0 22,000 30,000 0 0 384,000 138,000 138,000 682,000
2015-2019 Capital Improvement Plan I 27
95033
Pacific Highway/Gaarde Street/
McDonald Street Intersection Improvements r
LOCATION Pacific Highway/Gaarde Street/ # vq}'_ F
McDonald Street Intersection
PROJECT MANAGER Michael Stone,Public Works - "
FUNDING STATUS Partially Funded
PROJECT RESULTS Increased safety for vehicles,pedestrians '
y
and cyclists;there will be a significant
increase in vehicular capacity.
did
PROJECT NEED
The intersection of Pacific Highway/Gaarde Street/McDonald Street currently experiences excessive vehicle delays during the morning
and evening commute hours,and weekends.Additionally,the intersection has one of the highest accident rates of any intersection
in Tigard.
PROJECT DESCRIPTION
The project will encompass new paving,storm drainage,through lanes and left-turn lanes at selected approaches to the intersection.
In addition, new traffic control signals,sidewalks, bike lanes,street trees and landscape islands are planned.
PROJECT FUNDING
The total project cost is estimated to be$9,840,097. Responsibilities at this time:Washington County$4,000,000;STIP(ODOT)
$3,000,000;OTIA$944,630;City of Tigard$1,500,000.There is a difference of$400,000;this amount has been added into the
construction expense in FY 2015-16 below.An alternate funding source is being researched. If an alternate funding source is not
found,the project will be put on hold.
Pacific Highway/Gaarde Street/McDonald Street Improvements
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 25,000 50,000 40,000 0 0 0 0 65,000
Construction Management 0 0 0 10,000 0 0 0 0 10,000
EXTERNAL EXPENSES
Construction 0 975,000 950,000 255,000 400,000 0 0 0 1,630,000
Prior Life-to-Date 221,939 0 0 0 0 0 0 0 221,939
Total Tigard Project Expense 221,939 1,000,000 1,000,000 305,000 400,000 0 0 0 1,926,939
REVENUE FUNDING SOURCE
Transportation Dev.Tax Fund 221,939 743,750 754,000 228,750 0 0 0 0 1,194,439
Traffic Impact Fee Fund 0 256,250 246,000 76,250 0 0 0 0 332,500
Transportation CIP Fund 0 0 0 0 400,000 0 0 0 400,000
Total Tigard Project Revenues 221,939 1,000,000 1,000,000 305,000 400,000 0 0 0 1,926,939
28 1 2015-2019 Capital Improvement Plan
95035
72nd Avenue/Dartmouth Street
Intersection Improvement
LOCATION 72nd Avenue and Dartmouth Street
PROJECT MANAGER Kim McMillan,Public Works
FUNDING STATUS Fully Funded .
PROJECT RESULTS In addition to increased safety for pedestrians
and cyclists,there will be a significant
increase in vehicular capacity.This project - — 7
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable
community in the Pacific Northwest..."
OM 01
PROJECT NEED
The intersection at 72nd Avenue and Dartmouth Street currently experiences excessive vehicle delays during the morning and evening
commute hours and weekends.There are severely limited facilities for pedestrians and cyclists on some approaches to the intersection
and further south on 72nd Avenue.
PROJECT DESCRIPTION
The Walmart development has been conditioned to add a new traffic control signal at the intersection matching the current
intersection configuration (number of lanes,etc.)and constructing some minor roadway improvements.This configuration does not
match that in the Transportation System Plan (TSP), under build-out conditions,which would necessitate relocation of the traffic
control signal (at substantial costs)sometime in the future.This project would widen the intersection to the widths indicated in the
TSP and locate the traffic control signal at the ultimate location.Additional widening would be undertaken south from the intersection
along 72nd Avenue adding sidewalks where none currently exist(thus forcing both pedestrians and cyclists into the street). Portions of
the existing overhead utilities will be placed underground.
72nd Avenue/Dartmouth Street Intersection Improvement
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 20,000 60,950 41,000 0 0 0 0 61,000
Construction Management 0 20,000 60,950 41,000 0 0 0 0 61,000
VI_° itI.,._ai:°. I j.,,,.,.iax_ A 140,000 121,900 82,000+ 6. ,e
EXTERNAL EXPENSES
Construction Management 0 0 0 190,000 0 0 0 0 190,000
Land/Right of Way Acquisition 0 250,000 450,000 0 0 0 0 0 250,000
Design and Engineering 0 302,000 0 0 0 0 0 0 302,000
Construction 0 517,050 1,723,500 1,289,350 0 0 0 0 1,806,400
Prior Life-to-Date 366,865 0 0 0 0 0 0 0 366,865
Total Tigard Project Expense 366,865 1,109,050 2,295,400 1,561,350 0 0 0 0 3,037,265
72nd Avenue/Dartmouth Street Intersection Improvement continued on back...
2015—2019 Capital Improvement Plan I 29
05035
72nd Avenue/Dartmouth Street
Intersection Improvement
72nd Avenue/Dartmouth Street Intersection Improvement (continued...)
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
REVENUE FUNDING SOURCE
Gas Tax Fund 308,328 0 0 0 0 0 0 0 308,328
City Gas Tax Fund 0 483,099 1,000,000 733,125 0 0 0 0 1,216,224
Transportation Dev.Tax Fund 0 302,233 625,400 437,177 0 0 0 0 739,410
Traffic Impact Fee Fund 58,537 251,244 520,000 277,366 0 0 0 0 587,147
Underground Utility Fund 0 72,474 150,000 113,682 0 0 0 0 186,156
Total Tigard Project Revenues 366,865 1,109,050 2,295,400 1,561,350 0 0 0 0 3,037,265
30 1 2015-2019 Capital Improvement Plan
95037
92nd Avenue
•
Sidewalk Improvement
(Waverly Drive to Cook Park)
LOCATION 92nd Avenue(Waverly Drive to Cook Park)
-
PROJECT MANAGER Mike McCarthy,Public Works
FUNDING STATUS Fully Funded ,ft-
.
PROJECT RESULTS The construction provided a safe,shared
use facility for pedestrians and cyclists .
entering and leaving the park.This project
supports the vision statement in the City of ' ,
Tigard's Strategic Plan:"the most walkable
community in the Pacific Northwest..."
PROJECT NEED
Pedestrians and cyclists are forced to'share the road'with vehicles along the east side of 92nd Avenue south of Waverly Drive leading
into Cook Park;this creates possible pedestrian/vehicle conflicts.This is especially an issue during the Tigard Festival of Balloons and
other major park events.
PROJECT DESCRIPTION
This project was completed in FY 2013-14; it consisted of constructing curb,an 8-foot concrete sidewalk, protective fencing,storm
drain improvements(to protect an adjacent wetland)and additional paving along the east side of 92nd Avenue.This side was chosen
due to the rather substantial State and Federal permitting issues if the west side was chosen for the worksite.Continued wetland
monitoring will be required through FY 2014-15.
92nd Avenue Sidewalk Improvement
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 15,000 25,000 0 0 0 0 0 15,000
Construction Management 0 45,000 25,000 4,000 0 0 0 0 49,000
EXTERNAL EXPENSES
Land/Right of Way Acquisition 0 25,000 60,000 0 0 0 0 0 25,000
Design and Engineering 0 490,000 495,000 0 0 0 0 0 490,000
Prior Life-to-Date 103,818 0 0 0 0 0 0 0 103,818
lir
0 0 0 0 618,818
Total Tigard Project Expense 103,818 575,000 605,000 4,000 0 0 0 0 682,818
REVENUE FUNDING SOURCE
Gas Tax Fund 103,818 460,000 482,000 4,000 0 0 0 0 567,818
Stormwater Fund 0 115,000 123,000 0 0 0 0 0 115,000
Total Tigard Project Revenues 103,818 575,000 605,000 4,000 0 0 0 0 682,818
2015-2019 Capital Improvement Plan I 31
95038
Tiedeman Avenue Sidewalk ` " ,.. ; .3 ..„
(Tigard Street to Greenburg Road) =:-
API;LOCATION Tiedeman Avenue to Greenburg Road ,-. ...` .-. 11 _'
PROJECT MANAGER To Be Determined '-- _.,r
FUNDING STATUS Partially Funded --
PROJECT RESULTS Pedestrians and cyclists will no longer be
forced to share the roadway in the vehicle
travel lane.This project supports the vision -...iiii- --- .4 r
statement in the City of Tigard's Strategic "
Plan:"the most walkable community in the r
Pacific Northwest..."
PROJECT NEED
There is currently a gap in the sidewalk and bike lane along Tiedeman Avenue south of Greenburg Road to Tigard Street.This forces
pedestrians and cyclists to compete with vehicles for space along the roadway.
PROJECT DESCRIPTION
The project will construct sidewalk and a bike lane from Tigard Street north along the east side of Tiedeman Avenue to Greenburg
Road.This project starts at the end of the improvements associated with the Tigard Street Trail (92034)and will complete sidewalk and
bike lane from Main Street to Greenburg Road.Associated stormwater infrastructure will be added to treat stormwater runoff.
Tiedeman Avenue Sidewalk
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 0 15,000 15,000 30,000
Construction Management 0 0 0 0 0 0 0 30,000 30,000
010 45,''s 60,000
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 0 2,000 3,000 5,000
Land/Right of Way Acquisition 0 0 0 0 0 0 50,000 0 50,000
Design and Engineering 0 0 0 0 0 0 100,000 50,000 150,000
Construction 0 0 0 0 0 0 0 500,000 500,000
Total Tigard Project Expense 0 0 0 0 0 0 167,000 598,000 765,000
REVENUE FUNDING SOURCE
Gas Tax Fund 0 0 0 0 0 0 80,160 287,040 367,200
Stormwater Fund 0 0 0 0 0 0 86,840 310,960 397,800
Total Tigard Project Revenues 0 0 0 0 0 0 167,000 598,000 765,000
32 I 2015-2019 Capital Improvement Plan
95040
J
Tigard Transportation System
Development Charge
LOCATION N/A
PROJECT MANAGER To Be Determined
FUNDING STATUS Fully Funded
PROJECT RESULTS A citywide transportation system
development charge.
PROJECT NEED
Additional funding source for roadway projects.
PROJECT DESCRIPTION
Completion of the River Terrace Community Plan will provide a list of roadway capacity improvement mitigation projects for
River Terrace and the city in general. Recommendations for an area-specific and/or citywide Systems Development Charge(SDC)
will be made and presented to Council.
Tigard Transportation SDC
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 5,000 9,000 0 0 0 0 9,000
EXTERNAL EXPENSES
Project Management 0 0 50,000 42,000 0 0 0 0 42,000
Total ExternalExpens-_
Total Tigard Project Expense 0 0 55,000 51,000 0 0 0 0 51,000
REVENUE FUNDING SOURCE
Gas Tax Fund 0 0 55,000 51,000 0 0 0 0 51,000
Total Tigard Project Revenues 0 0 55,000 51,000 0 0 0 0 51,000
2015-2019 Capital Improvement Plan I 33
95041
Upper Boones Ferry Road/ 1 ,_ . 12 '
F
�l i ,.;7 u i r....:1-.dg
Durham Road Adaptive ,.- fi ��, ' „ in ,t 7
Signal Coordination =,.;0. : t i41 , ,' ,'
is �` k" w
LOCATION Upper Boones Ferry Road and Durham Road a :.171 '-M� i+ i.„--.,t
PROJECT MANAGER To Be Determined t i+ �. . rI
FUNDING STATUS Fully Funded ,t ;{ ��". = � '
PROJECT RESULTS Signals will operate based on specific vehicular . e �- z
demands rather than on fixed timing programs.
If successful,other heavily congested corridors
could be similarly equipped.
PROJECT NEED
Address morning,evening and weekend traffic congestion.
PROJECT DESCRIPTION
With 13 traffic signals and two rail crossings,signal coordination could significantly increase vehicular flow and could possibly reduce
crash rates.The various types of traffic users: residential,school, major city park,office and retail make this corridor a particularly
good candidate for adaptive signal coordination.This project will install traffic signal coordination extending from Durham Road to
Pacific Highway.
PROJECT FUNDING
The City of Tigard's responsibility is the local match and oversight for this$1 million project funded from the Federal Surface
Transportation Program administered by ODOT and managed by Washington County. Notification of grant was received in May 2013.
Upper Boones Ferry Road/Durham Road Adaptive Signal Coordination
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 25,000 25,000 25,000 0 0 0 0 50,000
Construction Management 0 0 25,000 0 0 0 0 0 0
Total Internal Expenses 0 25,000 50,000 25,000 0 0 0 0 woo
EXTERNAL EXPENSES
Design and Engineering 0 25,000 65,000 0 0 0 0 0 25,000
Construction 0 0 0 90,000 0 0 0 0 90,000
I MI s a ...
Total Tigard Project Expense 0 50,000 115,000 115,000 0 0 0 0 165,000
REVENUE FUNDING SOURCE
Transportation Dev.Tax Fund 0 50,000 115,000 115,000 0 0 0 0 165,000
Total Tigard Project Revenues 0 50,000 115,000 115,000 0 0 0 0 165,000
34 I 2015-2019 Capital Improvement Plan
95042
J
Commercial Street Sidewalk "
and Storm Detention Facility i
(Main Street to Lincoln Avenue)
LOCATION Commercial Street I
PROJECT MANAGER To Be Determined
FUNDING STATUS Partially Funded
PROJECT RESULTS This project improves public safety and
access to downtown and the transit center.
This project also supports the vision
statement in the City of Tigard's Strategic --
Plan:"the most walkable community in the ' "
Pacific Northwest..."
PROJECT NEED
Commercial Street currently lacks sidewalks west of Main Street.This project would connect a large residential neighborhood to
downtown Tigard and the Tigard Transit Center. Rather high pedestrian volumes are observed despite the lack of adequate pedestrian
facilities.Commercial Street is particularly narrow under this reach of the Pacific Highway overcrossing.
PROJECT DESCRIPTION
This project will construct a sidewalk along one side of Commercial Street from Main Street under the Pacific Highway overcrossing to
Lincoln Avenue.The railroad and ODOT may dictate the location of the sidewalk which could result in the roadway being slightly shifted
to the southwest so that the sidewalk can be added on the northeast side of the roadway.While the street is under construction,
a stormwater vault will be added to treat over 47 acres of untreated stormwater discharging into Fanno Creek.This project meets
outfall retrofitting goals identified in the regional Healthy Streams Plan.
PROJECT FUNDING
This project has been submitted for state and federal funding via the STIP program as a cooperative`access to transit' project
with TriMet.
Commercial Street Sidewalk and Storm Detention Facility
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 90,000 0 0 90,000
Construction Management 0 0 0 0 0 0 90,000 0 90,000
Total Internal Expenses 0 0 0 0 0 90,000 0 180,000
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 25,000 0 0 25,000
Land/Right of Way Acquisition 0 0 0 0 0 50,000 0 0 50,000
Design and Engineering 0 0 0 0 0 200,000 0 0 200,000
Construction 0 0 0 0 0 0 700,000 0 700,000
Total External Expenses 0 0 0 0 0 275,000 700,000 0 975,000
Total Tigard Project Expense 0 0 0 0 0 365,000 790,000 0 1,155,000
Commercial Street Sidewalk and Storm Detention Facility continued on back...
2015-2019 Capital Improvement Plan I 35
95042
Commercial Street Sidewalk
and Storm Detention Facility
(Main Street to Lincoln Avenue)
Commercial Street Sidewalk and Storm Detention Facility (continued...)
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
REVENUE FUNDING SOURCE
Gas Tax Fund 0 0 0 0 0 108,000 0 0 108,000
Stormwater Fund 0 0 0 0 0 50,000 362,000 0 412,000
Total Revenue Funding 0 0 58,000 362,000 's'
OTHER REVENUE SOURCE
Statewide Transportation
Improvement Program 0 0 0 0 0 207,000 428,000 0 635,000
Total Other Revenue Funding 0 0
Total Tigard Project Revenues 0 0 0 0 0 365,000 790,000 0 1,155,000
36 1 2015-2019 Capital Improvement Plan
95043
Hall Boulevard/McDonald Street
Intersection Improvements :� '-r .
LOCATION Hall Boulevard and McDonald Street i °y1 Ida;
64 iF.
PROJECT MANAGER To Be Determined i•
FUNDING STATUS Partially Funded ••, T -s.
PROJECT RESULTS Significant reduction of the unsafe back-ups
that currently occur.
PROJECT NEED .> - . --. ..
Considerable morning,evening and weekend congestion exists at this .-
intersection resulting in significant vehicular delays. _ _
PROJECT DESCRIPTION
Project will include:a dedicated southbound right-turn lane from Hall Boulevard to McDonald Street,a second southbound through
lane to Bonita Road,extension of the eastbound right-turn lane on McDonald Street,and a second northbound left-turn lane on
Hall Boulevard with a corresponding receiving lane on McDonald Street.Traffic control signal and storm drain modifications will also
be necessary.
PROJECT FUNDING
The dedicated southbound right-turn lane from Hall Boulevard to McDonald Street was an ODOT imposed condition at the time the
new library facility was constructed.
Hall Boulevard/McDonald Street Intersection Improvements
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 250,000 100,000 0 350,000
Construction Management 0 0 0 0 0 0 350,000 0 350,000
MI Internal Expensi0 0 0 0r 450,000 0 700,000 I
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 10,000 40,000 0 50,000
Land/Right of Way Acquisition 0 0 0 0 0 1,000,000 0 0 1,000,000
Design and Engineering 0 0 0 0 0 1,650,000 0 0 1,650,000
Construction 0 0 0 0 0 0 5,500,000 0 5,500,000
Milliraligternal Expenses 0 0 0 0 0 2,660,000 5,540,000 0
Total Tigard Project Expense 0 0 0 0 0 2,910,000 5,990,000 0 8,900,000
REVENUE FUNDING SOURCE
City Gas Tax Fund 0 0 0 0 0 1,000,000 1,500,000 0 2,500,000
Transportation Dev.Tax Fund 0 0 0 0 0 1,677,200 960,800 0 2,638,000
Transportation CIP Fund 0 0 0 0 0 0 3,050,000 0 3,050,000
Sanitary Sewer Fund 0 0 0 0 0 43,650 89,850 0 133,500
Stormwater Fund 0 0 0 0 0 145,500 299,500 0 445,000
Water Fund 0 0 0 0 0 43,650 89,850 0 133,500
Total Tigard Project Revenues 0 0 0 0 0 2,910,000 5,990,000 0 8,900,000
2015-2019 Capital Improvement Plan I 37
95044
Ash Avenue Design Application II
IF
(Railroad Crossing) 1 ..91r '
LOCATION Ash Avenue/Railroad Crossing ,-I il — f�.-
PROJECT MANAGER Michael Stone,Public Works �1 _ ,I .1,
t
FUNDING STATUS Partially Funded 1 -
PROJECT RESULTS Improved connectivity and circulation in
the downtown area,providing a crossing for ={
vehicles,pedestrians and cyclists.
M1
PROJECT NEED
The existing rail lines act as a barrier to mobility in and around the downtown Tigard area.Adding this crossing should enhance circulation
patterns for vehicles and especially pedestrians and cyclists depending on the ultimate development pattern of downtown and could
possibly reduce traffic congestion on Hall Boulevard and Main Street.
PROJECT DESCRIPTION
The crossing has been previously studied as three possible alternatives:an overcrossing,an undercrossing and an at-grade crossing.
The at-grade crossing has been selected as the most viable option based on estimated construction costs and other design
considerations.The project would include facilities for vehicles,pedestrians and cyclists. On-going discussions are currently underway
with ODOT(who owns the right of way),TriMet(who operates WES under lease agreement with ODOT)and the Portland and Western
Railroad (who operates a freight line under lease agreement with ODOT and TriMet).These discussions have included the possibility of
closing another crossing within Tigard in order to meet ODOT's mandate of no'net' new crossings in the state.
PROJECT FUNDING
The project expenses are for design only. Design is required for the application to ODOT.
Ash Avenue Design Application
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 2,500 5,000 0 40,000 0 0 0 42,500
Total Internal Expe
EXTERNAL EXPENSES
Design and Engineering 0 8,490 45,000 0 400,000 0 0 0 408,490
0
Total Tigard Project Expense 0 10,090 50,000 0 440,000 0 0 0 450,990
REVENUE FUNDING SOURCE
Transportation Dev.Tax Fund 0 0 0 0 440,000 0 0 0 440,000
Traffic Impact Fee Fund 0 10,090 50,000 0 0 0 0 0 10,090
Total Tigard Project Revenues 0 10,090 50,000 0 440,000 0 0 0 450,990
38 1 2015-2019 Capital Improvement Plan
95045
95th Avenue and North Dakota
Street Sidewalks
LOCATION 95th Avenue and North Dakota Street
PROJECT MANAGER To Be Determined
FUNDING STATUS Fully Funded
PROJECT RESULTS Increased pedestrian safety.This project
supports the vision statement in the City of
Tigard's Strategic Plan:"the most walkable
community in the Pacific Northwest..."
PROJECT NEED
Currently there are short sections or'gaps'of missing sidewalks along 95th
Avenue north from Greenburg Road and along North Dakota Street east from
Greenburg Road necessitating pedestrians to either walk in the vehicular travel
lanes or across private property.
PROJECT DESCRIPTION
The project will fill in these'gaps'with sidewalks and provide curbing and storm drainage improvements as required.
95th Avenue and North Dakota Street Sidewalks
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 19,000 0 0 0 0 19,000
Construction Management 0 0 0 15,000 0 0 0 0 15,000
. L.:: aj Expenses 0 0 0 34,000 • a
EXTERNAL EXPENSES
Design and Engineering 0 0 0 60,000 0 0 0 0 60,000
Construction 0 0 0 140,000 0 0 0 0 140,000
Total Tigard Project Expense 0 0 0 234,000 0 0 0 0 234,000
REVENUE FUNDING SOURCE
Gas Tax Fund 0 0 0 34,000 0 0 0 0 34,000
I Revenue Funding
a
OTHER REVENUE SOURCE
Washington County 0 0 0 200,000 0 0 0 0 200,000
Total Tigard Project Revenues 0 0 0 234,000 0 0 0 0 234,000
2015-2019 Capital Improvement Plan I 39
97003
Main Street Green Street Retrofit
(Phase 1)
LOCATION Main Street from railroad tracks south to
Pacific Highway
PROJECT MANAGER Kim McMillan,Public Works
FUNDING STATUS Fully Funded - ,-
PROJECT RESULTS Improvements will transform this extremely _ ---- s
functional looking roadway to a more urban
open design encouraging pedestrians,bikes,
as well as vehicles into the area for shopping,
dining or perhaps,at a later time,living.
PROJECT NEED
The overall condition of Main Street has deteriorated since it was last reconstructed about 20 years ago.The pavement,sidewalks,storm
drainage and utility lines are all in need of upgrading and/or replacement.
PROJECT DESCRIPTION
The project involves reconstructive efforts of Main Street from Pacific Highway on the south to the Portland and Western Railroad
tracks on the north with an emphasis on green street design. Project Design has been based on the concept plans as approved in
the Downtown Streetscape Plan and is a key part of the implementation of the Downtown Urban Renewal Plan. Improvements will
include new sidewalks, new asphaltic concrete,the redirection of storm water runoff from the conventional piped system of disposal
to flow-through rain gardens,and planter boxes to improve water quality treatment prior to disposal into Fanno Creek as well as water
and sanitary sewer line upgrades.This project is mostly funded through a grant from the Metropolitan Transportation Improvement
Program (MTIP)for green streets.The disbursement and oversight of this grant is handled by ODOT.
Main Street/Green Street Retrofit-Phase 1
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 50,000 30,000 90,000 0 0 0 0 140,000
Construction Management 0 0 0 15,000 0 0 0 0 15,000
s
0,000 05,000 wier 0 ■ 155,010
EXTERNAL EXPENSES
Land/Right of Way Acquisition 0 50,000 70,000 0 0 0 0 0 50,000
Design and Engineering 0 25,000 25,000 25,000 0 0 0 0 50,000
Construction 0 1,089,492 1,089,492 320,576 0 0 0 0 1,410,068
Prior Life-to-Date 464,245 0 0 0 0 0 0 0 464,245
__ 2 1,184,492 345,576 0 0 1
Total Tigard Project Expense 464,245 1,214,492 1,214,492 450,576 0 0 0 0 2,129,313
REVENUE FUNDING SOURCE
Gas Tax Fund 442,386 1,016,528 1,020,868 373,978 0 0 0 0 1,832,892
Water Fund 8,668 197,964 193,624 76,598 0 0 0 0 283,230
Urban Renewal Capital Improv. 13,191 0 0 0 0 0 0 0 13,191
Total Tigard Project Revenues 464,245 1,214,492 1,214,492 450,576 0 0 0 0 2,129,313
40 I 2015-2019 Capital Improvement Plan
97017
Main Street Green Street Retrofit
(Phase 2)
LOCATION Main Street from railroad tracks north to
Scoffins Street . r :
PROJECT MANAGER Kim McMillan,Public Works '
FUNDING STATUS Fully Funded _ ,
PROJECT RESULTS With the completion of Phase 2,the entire
length of Main Street from Pacific Highway
on the south to Pacific Highway on the north
will have been reconstructed to green street {'
standards.
PROJECT NEED
Continue Phase 1 improvements from the railroad tracks north to Scoffins Street.
PROJECT DESCRIPTION
The project will extend the improvements constructed in conjunction with Phase 1 northward, providing a seamless extension to the
recent improvements at the intersection of Pacific Highway/Main Street/Greenburg Road. Like Phase 1, Phase 2 will largely be funded
through a grant from the Metropolitan Transportation Improvement Program (MTIP)for green streets.The disbursement and oversight
of this grant will be handled by ODOT.
PROJECT FUNDING
The total project estimate is$2,436,733.There is$1,234,424 remaining as part of the MTIP grant.This leaves the city's responsibility
at$1,202,309.
Main Street/Green Street Retrofit- Phase 2
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 0 75,000 75,000 150,000
Prior Life-to-Date 11,733 0 0 0 0 0 0 0 11,733
Total Internal Expenses 11,733 MAIIMUEM6._ 0 0 75,000 75000! 1161,733
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 0 25,000 25,000 50,000
Land/Right of Way Acquisition 0 0 0 0 0 0 75,000 75,000 150,000
Design and Engineering 0 0 0 0 0 0 650,000 0 650,000
Construction 0 0 0 0 0 0 0 190,576 190,576
ril II Total External Expenses 0 0 ii ll, 0 l A 0 l 0 70,000: 290;5:76" 1040,;576:
Total Tigard Project Expense 11,733 0 0 0 0 0 825,000 365,576 1,202,309
REVENUE FUNDING SOURCE
Gas Tax Fund 5,024 0 0 0 0 0 486,750 211,826 703,600
Sanitary Sewer Fund 1,388 0 0 0 0 0 115,500 52,500 169,388
Stormwater Fund 1,388 0 0 0 0 0 115,500 52,500 169,388
Water Fund 1,391 0 0 0 0 0 107,250 48,750 157,391
Urban Renewal Capital Improv. 2,542 0 0 0 0 0 0 0 2,542
Total Tigard Project Revenues 11,733 0 0 0 0 0 825,000 365,576 1,202,309
2015-2019 Capital Improvement Plan I 41
Project Location Map I Street Systems
Street System Project Locations
CITYWIDE PROJECTS 95001,95027 and 95040
a
m
0
be
4o
�\ro\\s Ferry Road
5
c
o
a
TBD 19 15 EEO
e� x,.@,
aeFD 95038 v =I
�e 95042 97017 44rtmouth Road
W a\nut Street // -ee: 95035
J- .c. yo/,r/k - Q
95023 97003 95044 ?
m \-
95033 95043 —
A
GaardeStre � x
Street -
_ _ McDonald
Street
Bull Mountain Road _ — ! Bonita Road
a
ad 1 J — -�i 1 Q' iII
oao
eet •
2`> .0- _ 95041
iDurham Road I
Ll LI ter- 95037 —1
N /
A
42 1 2015-2019 Capital Improvement Plan
Fiscal Year 2015-2019 I Capital Improvement Plan 112
Water System
Page Project Project Name 2015 2016 2017 2018 2019 5-Year Total
i
45 96003 Water Meter Replacement Program 170,000 200,000 200,000 200,000 200,000 970,000
46 96008 Water Main Line Oversizing Program 150,000 150,000 150,000 150,000 150,000 750,000
47 96010 Aquifer Storage and Recovery Well#3 268,000 3,205,000 0 0 0 3,473,000
48 96018 Lake Oswego-Tigard Water Partnership 78,714,460 18,804,200 1,186,560 0 0 98,705,220
49 96024 Water Line Replacement Program 143,000 140,000 140,000 140,000 140,000 703,000
50 96028 Fire Hydrant Replacement Program 170,000 100,000 100,000 100,000 100,000 570,000
51 96029 Main Street Waterline Replacement $106,340 0 0 0 0 $106,340
(Pacific Highway to Tigard Street)
52 96030 Pipeline Connecting 550 Zone to 530 Zone 0 0 0 0 2,260,000 2,260,000
(Bull Mountain Road)
53 96031 Fire Flow Improvement Program 90,000 90,000 90,000 90,000 90,000 450,000
54 96033 Well Abandonment(Tigard High School) 165,000 0 0 0 0 165,000
55 96034 New Water Source Systemwide 290,000 175,000 125,000 125,000 0 715,000
Improvements Program
56 96035 Barrows Road/Scholls Ferry Road 345,000 0 0 0 0 345,000
Water Line Extension(Phase 2)
57 96036 Pacific Highway/Gaarde Street Utility Casing 286,000 0 0 0 0 286,000
Bore Crossing
58 96040 Cach Reservoir and Pump Station Design 0 0 0 1,050,000 0 1,050,000
Total Funded 80,897,800 22,864,200 1,991,560 1,855,000 2,940,000 110,548,560
2015-2019 Capital Improvement Plan I 43
96003
Water Meter h ` - ,`
Replacement Program ` 9
i
LOCATION Tigard Water Service Area . I:-.
4O1
V W 'PROJECT MANAGER John Goodrich,Public Works r ,
FUNDING STATUS Fully Funded r : •
PROJECT RESULTS Newer meters more accurately measure the ,,i
volume of water consumed and require less a a ,
maintenance. a _-O 'V
•
PROJECT NEED
Water meters that are defective or at the end of their service life , . .
need replacement.
PROJECT DESCRIPTION
As required, meters are purchased and replaced by Public Works crews.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Water Meter Replacement Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 30,000 0 0 0 0 0 0
Total Internal Expe --r;' (0 30,000 0 0
EXTERNAL EXPENSES
Construction 0 170,000 170,000 170,000 200,000 200,000 200,000 200,000 1,140,000
170,000 170,000 200,000 200,000 200,000 200,000 1,140,000
Total Tigard Project Expense 0 170,000 200,000 170,000 200,000 200,000 200,000 200,000 1,140,000
REVENUE FUNDING SOURCE
Water Fund 0 170,000 170,000 170,000 200,000 200,000 200,000 200,000 1,140,000
Total Tigard Project Revenues 0 170,000 170,000 170,000 200,000 200,000 200,000 200,000 1,140,000
2015-2019 Capital Improvement Plan I 45
96008
Water Main Line . ' � ;# ; •
Oversizing Program . E ' ' _
su
LOCATION To Be Determined
i
iA
PROJECT MANAGER Rob Murchison,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS More efficient water flow,decreased
water age,increased water quality and + 1w
fire flow availability. i
PROJECT NEED
Upsize water distribution waterlines.
PROJECT DESCRIPTION
Waterlines that are in need of upsizing are identified in the city's Water System Master Plan.The city may elect to upsize water
transmission lines that are greater than 12 inches in diameter in conjunction with ongoing development.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Water Main Line Oversizing
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 5,000 0 0 0 0 0 5,000
w
EXTERNAL EXPENSES
Construction 0 150,000 150,000 150,000 150,000 150,000 150,000 150,000 900,000
Total Tigard Project Expense 0 155,000 155,000 150,000 150,000 150,000 150,000 150,000 905,000
REVENUE FUNDING SOURCE
Water Fund 0 0 0 150,000 150,000 150,000 150,000 150,000 750,000
Water CIP Fund 0 155,000 155,000 0 0 0 0 0 155,000
Total Tigard Project Revenues 0 155,000 155,000 150,000 150,000 150,000 150,000 150,000 905,000
46 1 2015-2019 Capital Improvement Plan
96010
Aquifer Storage and . "° I
r IIr -
Recovery Well #3 i� -1 •
0 i 1 _ A y
LOCATION 13001 SW Bull Mountain Road i
PROJECT MANAGER Rob Murchison,Public Works i"
FUNDING STATUS Fully Funded $ti „.e _ '„
PROJECT RESULTS Water can be stored during periods of low ' .. ,.! r"�
demand and withdrawn during periods of high ,.,, A- - -v -
demand,lessening the need to expand the 2 y a,
water treatment plant or purchase additional _ ={
water supplies. I - f■!
. i 11, 1110 "il
PROJECT NEED - ,
The Water System Master Plan has identified the need to expand the city's
Aquifer Storage and Recovery program to meet its long-term water demands. -
PROJECT DESCRIPTION
The project improvements include the construction of a well house containing pump, motor,various motor controls, power supply,
pipes and valves and a chlorination system all constructed to integrate with the existing well that was installed in FY 2007-08.
Once fully developed,the improvements could supply up to 2,500,000 gallons of water per day into the city's distribution system.
Aquifer Storage & Recovery Well #3
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 30,000 10,000 18,000 0 0 0 0 48,000
Construction Management 0 0 110,000 0 205,000 0 0 0 205,000
EXTERNAL EXPENSES
Design and Engineering 0 350,000 530,000 250,000 0 0 0 0 600,000
Construction 0 0 2,517,000 0 3,000,000 0 0 0 3,000,000
Prior Life-to-Date 790,779 0 0 0 0 0 0 0 790,799
Total External Expenses 790,799 350,000 3,047,000 250,000 3,000,000 0 0 0 4,390,799
Total Tigard Project Expense 790,799 380,000 3,167,000 268,000 3,205,000 0 0 0 4,643,799
REVENUE FUNDING SOURCE
Water CIP Fund 790,799 380,000 3,167,000 268,000 3,205,000 0 0 0 4,643,799
Total Tigard Project Revenues 790,799 380,000 3,167,000 268,000 3,205,000 0 0 0 4,643,799
2015—2019 Capital Improvement Plan I 47
96018
Lake Oswego — Tigard _ ;
Q IF
Water Partnership .0 4 F .0 m,.
411t "
LOCATION Tigard Water Service Area
PROJECT MANAGER Rob Murchison,Public Works � -
FUNDING STATUS Fully Funded �T �'=1 -== .-- a
PROJECT RESULTS Once completed,Tigard and Lake Oswego will a � ,.++
have constructed a facility through which they — .
can effectively manage their own water supply - i, jai
and rates. =1' 1
PROJECT NEED Ik Ik
In the desire to secure supply and rate certainty,Tigard entered into a partnership
agreement with the City of Lake Oswego in 2008 to secure water rights and
construct a water treatment plant sourced by the Clackamas River.
PROJECT DESCRIPTION
The project includes reconstruction and expansion of the raw water intake structure and water treatment plant, new transmission
piping,storage and pumping facilities.Construction is scheduled for completion in 2016.
Lake Oswego—Tigard Water Partnership
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 171,500 171,500 401,500 171,500 0 0 0 744,500
. .,'1,500
EXTERNAL EXPENSES
Project Management 0 4,201,915 4,201,915 3,270,915 266,826 0 0 0 7,739,656
Design and Engineering 0 2,055,575 2,055,575 286,723 23,106 0 0 0 2,665,404
Construction 0 32,756,687 61,588,310 74,455,322 18,342,768 1,186,560 0 0 126,741,337
Prior Life-to-Date 26,793,758 0 0 0 0 0 0 0 26,793,758
Total External Exoenses 26.7 39.014177 67.845.800 78.312.960 18.632.70r 0
Total Tigard Project Expense 26,793,758 39,185,677 68,017,300 78,714,460 18,804,200 1,186,560 0 0 164,684,655
REVENUE FUNDING SOURCE
Water CIP Fund 26,793,758 39,185,677 68,017,300 78,714,460 18,804,200 1,186,560 0 0 164,684,655
Total Tigard Project Revenues 26,793,758 39,185,677 68,017,300 78,714,460 18,804,200 1,186,560 0 0 164,684,655
48 I 2015-2019 Capital Improvement Plan
96024
J
Water Line Replacement Program
LOCATION To Be Determined
PROJECT MANAGER Rob Murchison,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Newer waterlines are less prone to failure -
and require less maintenance. In addition, , r
fewer leaking pipes will result in reduced
'unaccounted for'water loss. +t,
PROJECT NEED
Waterlines that are defective or at the end of their service life need replacement. . A I
PROJECT DESCRIPTION
As required,waterlines are replaced by Public Works crews or private contractors.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Water Line Replacement Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 5,000 8,000 5,000 5,000 5,000 5,000 33,000
Construction Management 0 5,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000
.., 0, 10i09b' lfa00'0 30000
v, f ua 63 iii 3'.•.__ 840
EXTERNAL EXPENSES
Public Involvement 0 5,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000
Design and Engineering 0 25,000 25,000 25,000 25,000 25,000 25,000 25,000 150,000
Construction 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 600,000
1130,000 139`J9'00 130,000 130;090 130;000 190,000 190;090 780,000
Total Tigard Project Expense 0 140,000 140,000 143,000 140,000 140,000 140,000 140,000 843,000
REVENUE FUNDING SOURCE
Water Fund 0 140,000 140,000 143,000 140,000 140,000 140,000 140,000 843,000
Total Tigard Project Revenues 0 140,000 140,000 143,000 140,000 140,000 140,000 140,000 843,000
2015-2019 Capital Improvement Plan I 49
96028
Fire Hydrant
it
Replacement Program .
LOCATION Citywide 'Oil
PROJECT MANAGER John Goodrich,Public Works p
FUNDING STATUS Fully Funded
PROJECT RESULTS Newer fire hydrants are less prone to leakage r
reducing'unaccounted for'water loss and they
require less maintenance.
PROJECT NEED ,r' _�"'
There are currently 2,041 fire hydrants located throughout the city.Of these, .
550 have been identified for replacement due to unavailable replacement or
service parts limiting the ability to adequately maintain them. r_ r
PROJECT DESCRIPTION
This project allows for the replacement of 50 hydrants per year. It is estimated that it will take approximately 11 years to replace all
550 hydrants.The city is currently in the third year of the program.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Fire Hydrant Replacements Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
EXTERNAL EXPENSES
Construction 0 100,000 100,000 170,000 100,000 100,000 100,000 100,000 670,000
Total Tigard Project Expense 0 100,000 100,000 170,000 100,000 100,000 100,000 100,000 670,000
REVENUE FUNDING SOURCE
Water Fund 0 100,000 100,000 170,000 100,000 100,000 100,000 100,000 670,000
Total Tigard Project Revenues 0 100,000 100,000 170,000 100,000 100,000 100,000 100,000 670,000
50 1 2015-2019 Capital Improvement Plan
96029
Main Street Waterline Replacement 'a;` N, t
(Pacific Highway to Tigard Street)
LOCATION Main Street(Downtown Tigard)
PROJECT MANAGER Kim McMillan,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Improve system reliability. -
PROJECT NEED '' r Y
Upsizing the waterlines is needed according to the Water System Master Plan -
to meet reliability and capacity needs.Since Main Street is currently under 1 •
construction, replacing these lines now provides an excellent economy of scale -
in reducing construction costs.
PROJECT DESCRIPTION
The project will replace an existing 8-inch line with a 16-inch line from Burnham Street to Tigard Street and a new 8-inch line from
Burnham Street south to Pacific Highway.
Main Street Waterline Replacement
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 35,000 35,000 7,000 0 0 0 0 42,000
Construction Management 0 28,000 35,000 0 0 0 0 0 28,000
9 .!;
EXTERNAL EXPENSES
Design and Engineering 0 55,000 55,000 0 0 0 0 0 55,000
Construction 0 397,360 496,700 99,340 0 0 0 0 496,700
Prior Life-to-Date 26,494 0 0 0 0 0 0 0 26,494
Total External Expenses 26,494 452,360 551,700 99,340 0 0
bar 0 578,194
Total Tigard Project Expense 26,494 515,360 621,700 106,340 0 0 0 0 648,194
REVENUE FUNDING SOURCE
Water Fund 0 46,382 56,000 9,571 0 0 0 0 55,953
Water CIP Fund 26,494 468,978 565,700 96,769 0 0 0 0 592,241
Total Tigard Project Revenues 26,494 515,360 621,700 106,340 0 0 0 0 648,194
2015-2019 Capital Improvement Plan I 51
96030
Pipeline Connecting
550' Zone to 530' Zone ;' _ ' .,
(Bull Mountain Road
LOCATION Bull Mountain Road
PROJECT MANAGER Rob Murchison,Public Works
FUNDING STATUS Fully Funded A
PROJECT RESULTS Deficiency will be eliminated providing *IF
adequate capacities to meet the area's
firefighting demands. 1
PROJECT NEED
Alleviate the largest firefighting water deficiency in the city's distribution system.
PROJECT DESCRIPTION
The project,as identified in the Water Master Plan,will connect the 530-foot and the 550-foot pressure zones.
Pipeline Connecting 550 Zone to 530 Zone
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 0 0 111,000 111,000
Construction Management 0 0 0 0 0 0 0 100,000 100,000
j Total Internal Expenses 6^ 1 211,000 211,000
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 0 0 11,100 11,100
Design and Engineering 0 0 0 0 0 0 0 437,900 437,900
Construction 0 0 0 0 0 0 0 1,600,000 1,600,000
Total External Expenses 0 0 0 0 0 0 0 2,049,000 Z049,000
Total Tigard Project Expense 0 0 0 0 0 0 0 2,260,000 2,260,000
REVENUE FUNDING SOURCE
Water CIP Fund 0 0 0 0 0 0 0 2,260,000 2,260,000
Total Tigard Project Revenues 0 0 0 0 0 0 0 2,260,000 2,260,000
52 I 2015-2019 Capital Improvement Plan
96031.
Fire Flow Improvement Program -
,,,',4,0„,e. i
LOCATION To Be Determined - 4
PROJECT MANAGER Rob Murchison,Public Works ,
orks ,
FUNDING STATUS Fully Funded -
PROJECT RESULTS Deficiency will be eliminated providing
adequate capacities to meet the area's /rt,•
irw '
firefighting demands. , ..
.0 ,PRht
OJECT NEED w
Improve firefighting flow capacity.
PROJECT DESCRIPTION '
The project works within identified areas of the city and provides the
necessary piping,etc.,to improve the water distribution system. Most of
this work is undertaken by Public Works crews as resources can be allocated.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Annual Fire Flow Improvement Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 5,000 0 0 0 0 0 5,000
Construction Management 0 5,000 5,000 0 0 0 0 0 5,000
Total Internal Expenses 0 10,000 10,000 0 0 0 0 0 10,000
EXTERNAL EXPENSES
Design and Engineering 0 15,000 15,000 15,000 15,000 15,000 15,000 15,000 90,000
Construction 0 75,000 75,000 75,000 75,000 75,000 75,000 75,000 450,000
Total External Expenses 0 90,000 90,000 90,000 90,000 90,000 90,000 90,000 540,000
Total Tigard Project Expense 0 100,000 100,000 90,000 90,000 90,000 90,000 90,000 550,000
REVENUE FUNDING SOURCE
Water Fund 0 0 0 90,000 90,000 90,000 90,000 90,000 450,000
Water CIP Fund 0 100,000 100,000 0 0 0 0 0 100,000
Total Tigard Project Revenues 0 100,000 100,000 90,000 90,000 90,000 90,000 90,000 550,000
2015-2019 Capital Improvement Plan I 53
96033
Well Abandonment
(Tigard High School)
r4
LOCATION Tigard High School , % II
PROJECT MANAGER Rob Murchison,Public Works � q
FUNDING STATUS Fully Funded ��'
w
PROJECT RESULTS The likelihood of contamination of ASR#3
., f
will be reduced. a "
PROJECT NEED . _ A.
The well water is suspected of seeping into the impact area of Aquifer Storage _
and Recovery(ASR)#3. In order to fully develop ASR#3, mitigation is necessary. t-_ • +
PROJECT DESCRIPTION
In order to meet the necessary regulatory approval,the project will include an engineering study and accompanying recommendations
meeting the necessary standards. Likely improvements will include removal of the pump,shaft and pump motor.
Tigard High School Well Abandonment
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 5,000 0 0 0 0 5,000
Construction Management 0 0 0 5,000 0 0 0 0 5,000
0 0 '0,000 0 Ali o' • t,00e
EXTERNAL EXPENSES
Public Involvement 0 0 0 5,000 0 0 0 0 5,000
Design and Engineering 0 0 0 25,000 0 0 0 0 25,000
Construction 0 0 0 125,000 0 0 0 0 125,000
0 0
Total Tigard Project Expense 0 0 0 165,000 0 0 0 0 165,000
REVENUE FUNDING SOURCE
Water CIP Fund 0 0 0 165,000 0 0 0 0 165,000
Total Tigard Project Revenues 0 0 0 165,000 0 0 0 0 165,000
54 I 2015—2019 Capital Improvement Plan
96034
.,
New Water Source Systemwide r
Improvements Program -
1
LOCATION To Be Determined a ,� I.%
PROJECT MANAGER Rob Murchison,Public Works -
FUNDING STATUS Fully Funded
PROJECT RESULTS Stable and reliable water system meeting ,� 1
all requirements. ?kid,
11(..
_ - I ,I.
PROJECT NEED �i
Improvements may be needed to Tigard's water system when the - ■
Lake Oswego-Tigard Water Partnership improvements are complete. p '�r .
PROJECT DESCRIPTION
Depending on needs determined by engineering analysis and modeling;various minor improvements to the distribution,storage and
pumping systems may be necessary.
New Water Source Systemwide Improvements
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 20,000 20,000 15,000 15,000 10,000 10,000 0 70,000
Construction Management 0 20,000 20,000 15,000 15,000 10,000 10,000 0 70,000
ii
Totals Internal Expenses 1 0 20,000 20,000 15,000 15,000 10,000 10,000 0 a 70,000
EXTERNAL EXPENSES
Public Involvement 0 0 20,000 20,000 20,000 5,000 5,000 0 50,000
Design and Engineering 0 170,000 25,000 25,000 0 0 0 0 195,000
Construction 0 0 125,000 215,000 125,000 100,000 100,000 0 540,000
'I 105,000 105,000 0 785,000
Total Tigard Project Expense 0 210,000 210,000 290,000 175,000 125,000 125,000 0 925,000
REVENUE FUNDING SOURCE
Water CIP Fund 0 210,000 210,000 290,000 175,000 125,000 125,000 0 925,000
Total Tigard Project Revenues 0 210,000 210,000 290,000 175,000 125,000 125,000 0 925,000
2015-2019 Capital Improvement Plan I 55
96035
Barrows Road/Scholls Ferry Road %` `-
Water Line Extension
(Phase 2)
LOCATION Barrows Road and Scholls Ferry Road
PROJECT MANAGER Rob Murchison,Public Works
FUNDING STATUS Fully Funded -
PROJECT RESULTS This project will be a part of the'back-bone' _
water supply and distribution system to serve -- -River Terrace. _ - -
PROJECT NEED
In conjunction with the development of the River Terrace Planning Area,
the city's water supply will need to be extended to meet requirements.
PROJECT DESCRIPTION
This project will extend an 18-inch waterline from existing facilities in Barrows Road to improvements completed in conjunction with
Phase 1 (FY 2013-14)at the intersection of Scholls Ferry Road and Roy Rogers Road.
Barrows Road/Scholls Ferry Road 16" Line Extensions
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 37,500 37,500 12,000 0 0 0 0 49,500
Construction Management 0 124,500 124,500 25,000 0 0 0 0 149,500
a01 V;ntgaie V xpen s 0 r 9.=,, 1000 0 0 0 0 X1,99,000 1
EXTERNAL EXPENSES
Design and Engineering 0 52,000 60,000 8,000 0 0 0 0 60,000
Construction 0 805,000 805,000 300,000 0 0 0 0 1,105,000
Prior Life-to-Date 68,212 0 0 0 0 0 0 0 68,212
Total Tigard Project Expense 68,212 1,019,000 1,027,000 345,000 0 0 0 0 1,432,212
REVENUE FUNDING SOURCE
Water SDC Fund 68,212 1,019,000 1,027,000 345,000 0 0 0 0 1,432,212
Total Tigard Project Revenues 68,212 1,019,000 1,027,000 345,000 0 0 0 0 1,432,212
56 I 2015-2019 Capital Improvement Plan
96036
y
Pacific Highway/Gaarde Street
Utility Casing Bore Crossing
LOCATION Pacific Highway/Gaarde Street
PROJECT MANAGER Rob Murchison,Public Works I , LI A 1
FUNDING STATUS Fully Funded
PROJECT RESULTS The casing will be in place and easily
incorporated into the future waterline Ap-;.,7 a
projects when needed. a
PROJECT NEED
There will be specific needs identified to integrate water from the Partnership
into Tigard's water supply system.
PROJECT DESCRIPTION
The project will install a 36-inch casing for a future waterline to cross Pacific Highway near the intersection of Pacific Highway/
Gaarde Street/McDonald Street.To take advantage of the economy of scale,it is proposed that this casing be installed as part of the
construction at the intersection (96030).
Pacific Highway/Gaarde Street Utility Casing Bore Crossing
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 11,000 0 0 0 0 11,000
• I /••,01: 1/1111111/1K I
EXTERNAL EXPENSES
Design and Engineering 0 0 0 75,000 0 0 0 0 75,000
Construction 0 0 0 200,000 0 0 0 0 200,000
Total Tigard Project Expense 0 0 0 286,000 0 0 0 0 286,000
REVENUE FUNDING SOURCE
Water Fund 0 0 0 143,000 0 0 0 0 143,000
Water CIP Fund 0 0 0 143,000 0 0 0 0 143,000
Total Tigard Project Revenues 0 0 0 286,000 0 0 0 0 286,000
2015-2019 Capital Improvement Plan I 57
96040
Cach Reservoir and
Pump Station Design
LOCATION Cach property on Bull Mountain
PROJECT MANAGER Rob Murchison,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS The project will provide additional storage
and pumping facilities addressing system
deficiencies and development demands.
PROJECT NEED
In conjunction with the development of the River Terrace Planning Area and to
address storage and pumping deficiencies identified in the River Terrace Updated
Water Master Plan,system improvements are required.
PROJECT DESCRIPTION
The project is for the design of a new water reservoir and the design for the replacement of a temporary pump station for the city's
550-foot service area.The reservoir will be constructed on the former Cach property.A new permanent pump station will replace an
existing temporary pump station on the Menlor Reservoir site to move water from the 410-foot to the 550-foot service areas.
Cach Reservoir and Pump Station Design
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 0 50,000 0 50,000
Total Internal Expen
EXTERNAL EXPENSES
Design and Engineering 0 0 0 0 0 0 1,000,000 0 1,000,000
Total Tigard Project Expense 0 0 0 0 0 0 1,050,000 0 1,050,000
REVENUE FUNDING SOURCE
Water Fund 0 0 0 0 0 0 1,050,000 0 1,050,000
Total Tigard Project Revenues 0 0 0 0 0 0 1,050,000 0 1,050,000
58 1 2015-2019 Capital Improvement Plan
Project Location Map I Water Systems
Water System Project Locations
CITYWIDE PROJECTS 96003,96008,96024,96028,96031 and 96034
---ffi_ 1
\A
Scpo\\sFecrVROad -.. '7\ �� J
IC I �
> iii .
® - H- 1 1 JP .
w • ,z it r�a�
1 0c
- r �� Dartmouth Road
"A 96029
i via\nut Street
9
a .........
6035 H\ J, ..se c
� ,,.. / o Sir.
2 eer
) _ jai iir .14.4
u / ,Oir ;77)‘ ifit, ,)
mow _,Y - H alr
1 2 \ — ( - e\ j
TBD 0115 r l F. . Gaarde Street l McDonald'Street,
)N,
Ti
I — E_ )1I_ 96036
Bull Mountain Road m -Bonita Road
96010 96030 96018 gI
v
ecta�oaa l, —,��,_ i
see
1
,AIN -way di _) 111_ ' ) 'Durham Road
) �%
96033 j
N /
A
2015-2019 Capital Improvement Plan I 59
Fiscal Year 2015—2019 I Capital Improvement Plan IM
Sanitar y System Sewer
Page Project Project Name 2015 2016 2017 2018 2019 5-Year Total
i
63 93002 Citywide Sanitary Sewer Extension Program 191,200 0 0 0 0 191,200
64 93003 Sanitary Sewer Major Maintenance Program 90,000 90,000 90,000 90,000 90,000 450,000
65 93009 Fanno Creek Slope Stabilization 0 800,000 0 0 0 800,000
(Arthur Court)
66 93010 Derry Dell Creek Sewer Interceptor Relocation 1,135,000 0 0 0 0 1,135,000
67 93013 East Tigard Sewer Replacement 0 1,185,000 0 0 0 1,185,000
68 93014 Krueger Creek(Benchview)Slope Stabilization 611,300 0 0 0 0 611,300
(Gatlin Court)
69 93016 Sewer Rehabilitation Program 495,000 495,000 495,000 495,000 495,000 2,475,000
70 93017 72nd Avenue Sewer Modification 0 0 0 400,000 400,000 800,000
(Bonita Road)
71 93035 Barrows Road/Scholls Ferry Road 390,000 0 0 0 0 390,000
Sewer Line Extension(Phase 2)
72 93053 Red Rock Creek Corridor Sewer Study 0 182,000 0 0 0 182,000
Total Funded 2,912,500 2,752,000 585,000 985,000 985,000 8,219,500
2015-2019 Capital Improvement Plan 1 61
93002
Citywide Sanitary Sewer ',, . ,, 1 •
4 :
Extension Program --
LOCATION Various - '0' y •ji- -,'.
PROJECT MANAGER Greg Berry,Public Works ,.., 07
FUNDING STATUS Fully Funded
PROJECT RESULTS Connection of properties not served by the Air • m _
sanitary sewer system. _
* 'i°
PROJECT NEED
Extension of sanitary sewer service.
PROJECT DESCRIPTION ."" _ ,,
The Sanitary Sewer Extension Program was started in FY 2001-02 in order
to extend sanitary sewer service to all developed but unserved residential
areas citywide.The city utilizes the formation of reimbursement districts to construct the sewers.The program allows residents to
connect to the sanitary sewer system using economy of scale thereby reducing individual construction costs.This is a program and
does not identify any specific projects at this time.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Citywide Sanitary Sewer Extension Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 20,000 8,900 0 0 0 0 8,900
Construction Management 0 10,000 20,000 9,800 0 0 0 0 19,800
EXTERNAL EXPENSES
Public Involvement 0 0 5,000 5,000 0 0 0 0 5,000
Land/Right of Way Acquisition 0 0 7,500 7,500 0 0 0 0 7,500
Design and Engineering 0 0 60,000 60,000 0 0 0 0 60,000
Construction 0 500 10,000 100,000 0 0 0 0 100,500
Total External Expenses 0 500 172,500 172,500 0 0 0 0 173,000
Total Tigard Project Expense 0 10,500 212,500 191,200 0 0 0 0 201,700
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 0 10,500 212,500 191,200 0 0 0 0 201,700
Total Tigard Project Revenues 0 10,500 212,500 191,200 0 0 0 0 201,700
2015-2019 Capital Improvement Plan I 63
93003
Sanitary Sewer ,f.
Major Maintenance Program -gin .
LOCATION Citywide M' ;;{
PROJECT MANAGER Rob Block,Public Works k
FUNDING STATUS Fully Funded '
PROJECT RESULTS Reduction in the possibilities of service
interruptions and spills.
PROJECT NEED
Provide major maintenance of the sanitary sewer system. . ,
PROJECT DESCRIPTION
This program is used for urgent projects to renew, repair or replace sections of the sanitary sewer system that have failed or are near
failure. Normal operations and maintenance includes work on the system to keep it functioning but does not result in renewing or
replacing the pipe or other appurtenances. Projects included in the Major Maintenance Program exceed normal maintenance and
operations and typically replace pipe and add a renewed service life.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Sanitary Sewer Major Maintenance Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 12,000 12,000 5,000 5,000 5,000 5,000 5,000 37,000
Construction Management 0 10,000 10,000 5,000 5,000 5,000 5,000 5,000 35,000
1
Total Internal Expenses 0 22,000 22,000 10,000 10,000 10;000 10,000 10,000 72,000
EXTERNAL EXPENSES
Public Involvement 0 5,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000
Construction 0 175,000 175,000 75,000 75,000 75,000 75,000 75,000 550,000
Total Tigard Project Expense 0 202,000 202,000 90,000 90,000 90,000 90,000 90,000 652,000
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 0 202,000 202,000 90,000 90,000 90,000 90,000 90,000 652,000
Total Tigard Project Revenues 0 202,000 202,000 90,000 90,000 90,000 90,000 90,000 652,000
64 I 2015-2019 Capital Improvement Plan
93009
J
Fanno Creek Slope Stabilization � } 'T�. -.
(Arthur Court 1 ;
LOCATION Fanno Creek near Arthur Court
PROJECT MANAGER Greg Berry,Public Works .=
FUNDING STATUS Fully Funded r` ,jL,: ` „
C -'6•1 - r{
PROJECT RESULTS A stabilized bank,providing protection of the A L ' -
sanitary sewer main and the Fanno Creek Trail. 4 0' +'i
it.2_
ti
PROJECT NEED ' 9 . , - b
Provide soil protection of sanitary sewer piping. i��r ! P.
j
PROJECT DESCRIPTION
A section of bank along the Fanno Creek near Arthur Court has eroded due to high water levels threatening a sanitary sewer main and
a portion of the Fanno Creek Trail.The project will restore the section of eroding bank and divert high flows from the impacted area.
Fanno Creek Slope Stabilization
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 35,000 90,000 0 35,000 0 0 0 70,000
Construction Management 0 0 70,000 0 10,000 0 0 0 10,000
EXTERNAL EXPENSES
Construction Management 0 0 0 0 40,000 0 0 0 40,000
Design and Engineering 0 58,000 0 0 15,000 0 0 0 73,000
Construction 0 0 527,000 0 700,000 0 0 0 700,000
Prior Life-to-Date 64,674 0 0 0 0 0 0 0 64,674
Total Tigard Project Expense 64,674 93,000 687,000 0 800,000 0 0 0 957,674
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 64,674 93,000 687,000 0 800,000 0 0 0 957,674
Total Tigard Project Revenues 64,674 93,000 687,000 0 800,000 0 0 0 957,674
2015-2019 Capital Improvement Plan I 65
93010
Derry Dell Creek i1
Sewer Interceptor Relocation Ao ! ....6-41e- .
LOCATION Derry Dell Creek w ' ' '
r •�
PROJECT MANAGER Kim McMillan,Public Works -. ,A
FUNDING STATUS Fully Funded sl �, ,.
PROJECT RESULTS New trail,boardwalk,storm culvert,waterline =R '
and roadbed widening,plus sanitary sewer
line replacement and creek realignment.This
project supports the vision statement in the City "r
of Tigard's Strategic Plan:"the most walkable -
community in the Pacific Northwest..." _ �-
f - _ ,• ' SL
PROJECT NEED " : _ -- :° •.
Replace sanitary sewer lines and prevent bank erosion. .m•
PROJECT DESCRIPTION
In a partnership with Clean Water Services(CWS),the project will replace existing sanitary sewer lines and reroute a section of Derry
Dell Creek to protect homes from bank erosion. It will replace the storm culverts under Walnut Street with a fish-friendly, large box
culvert, install a 6-inch waterline,construct trail and boardwalk connections from adjacent neighborhoods to Woodard Park and widen
the roadbed on a section of Walnut Street.
Derry Dell Creek and Sewer Interceptor Relocation
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 30,000 160,000 50,000 0 0 0 0 80,000
Construction Management 0 10,000 85,000 50,000 0 0 0 0 60,000
D
EXTERNAL EXPENSES
Public Involvement 0 5,000 5,000 5,000 0 0 0 0 10,000
Land/Right of Way Acquisition 0 155,000 0 0 0 0 0 0 155,000
Design and Engineering 0 30,000 30,000 0 0 0 0 0 30,000
Construction 0 100,000 430,000 1,030,000 0 0 0 0 1,130,000
Prior Life-to-Date 509,404 0 0 0 0 0 0 0 509,404
Total Tigard Project Expense 509,404 330,000 710,000 1,135,000 0 0 0 0 1,974,404
REVENUE FUNDING SOURCE
Gas Tax Fund 0 0 0 45,400 0 0 0 0 45,400
Parks Bond Fund 0 13,200 30,000 21,800 0 0 0 0 35,000
Parks SOC Fund 0 0 0 375,450 0 0 0 0 375,450
Sanitary Sewer Fund 496,356 128,700 275,000 204,300 0 0 0 0 829,356
Stormwater Fund 0 56,100 120,000 272,400 0 0 0 0 328,500
Water CIP Fund 13,048 132,000 285,000 215,650 0 0 0 0 360,698
Total Tigard Project Revenues 509,404 330,000 710,000 1,135,000 0 0 0 0 1,974,404
66 1 2015-2019 Capital Improvement Plan
93013
East Tigard Sewer Replacement .. :" •.' -
' "i • ?I
LOCATION From Hunziker Street to the Railroad 4' s +Y +-
N
PROJECT MANAGER Michael Stone,Public Works ', -4-• .,
FUNDING STATUS Fully Funded yr'
PROJECT RESULTS Additional sanitary sewer pipe capacity for r` r �i y` -.
development and improved maintenance access.
F .
PROJECT NEED ii
Upgrade line capacity to reduce higher than normal maintenance needs. „L- __ 1,,k -"' �:-
PROJECT DESCRIPTION l .?
This project is identified as#D-120 in the Sanitary Sewer Master Plan and '"101,7-,4 -i ''r f '�4- �C
0 ri
involves increasing the capacity of an existing sanitary sewer line(serving .� �+�"� -, . a �li, � ,, ,�1+.��-,
the area north of Hunziker Street)to prevent overflows and to improve the ? k i.e._ 4 ...4":;' '-
access for routine maintenance. It will also provide sanitary sewer service
for a portion of the undeveloped adjacent parcel (Fields property).
East Tigard Sewer Replacement
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 5,000 0 50,000 0 0 0 55,000
Construction Management 0 10,000 10,000 0 30,000 0 0 0 40,000
Prior Life-to-Date 5,524 0 0 0 0 0 0 0 5,524
Total Internal Expenses 5,527 15,000 15,000 0 80,000 0 0 0 100,524
EXTERNAL EXPENSES
Land/Right of Way Acquisition 0 25,000 0 0 0 0 0 0 25,000
Design and Engineering 0 305,000 0 0 5,000 0 0 0 310,000
Construction 0 0 330,000 0 1,100,000 0 0 0 1,100,000
2 1,105,000 0 0 0 1,435,000
Total Tigard Project Expense 5,524 345,000 345,000 0 1,185,000 0 0 0 1,535,524
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 5,524 345,000 345,000 0 1,185,000 0 0 0 1,535,524
Total Tigard Project Revenues 5,524 345,000 345,000 0 1,185,000 0 0 0 1,535,524
2015-2019 Capital Improvement Plan I 67
93014
Krueger Creek (Benchview)
Slope Stabilization (Gallin Court)
LOCATION Benchview Road
PROJECT MANAGER Michael Stone,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS A stabilized bank and protected pipe.
Once the project is complete,it will be
recommended that the residence be
sold to recoup the costs of the purchase.
PROJECT NEED
Provide bank stabilization to prevent additional erosion.
PROJECT DESCRIPTION
Krueger Creek has eroded a segment of its bank exposing a sanitary sewer line and endangering a single family residence,which
the city purchased in FY 2012-13.The city undertook a similar project just downstream of this site when only the sanitary sewer line
was endangered.
Krueger Creek Slope Stabilization
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 25,000 100,000 26,300 0 0 0 0 51,300
Construction Management 0 0 50,000 20,000 0 0 0 0 20,000
Prior Life-to-Date 26,253 0 0 0 0 0 0 0 26,253
Total Internal Expeitsf o-'u?• 1 °,°� 00 0 0 0 0 47A553
EXTERNAL EXPENSES
Construction Management 0 0 0 40,000 0 0 0 0 40,000
Land/Right of Way Acquisition 257,521 0 0 0 0 0 0 0 257,521
Design and Engineering 0 125,000 300,000 25,000 0 0 0 0 150,000
Construction 0 0 850,000 500,000 0 0 0 0 500,000
Total External Expenses 257,521 125,000 1,150,000 565,000 0 0 0 0 947,521
Total Tigard Project Expense 283,774 150,000 1,300,000 611,300 0 0 0 0 1,045,074
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 265,794 42,000 364,000 172,100 0 0 0 0 479,894
Water Quality/Quantity Fund 17,980 108,000 936,000 439,200 0 0 0 0 565,180
Total Tigard Project Revenues 283,774 150,000 1,300,000 611,300 0 0 0 0 1,045,074
68 I 2015-2019 Capital Improvement Plan
93016
Sewer Rehabilitation Program -4 4 � v•
LOCATION To Be Determined i,,_ -4F - . 7 A;
PROJECT MANAGER To Be Determined,Public Works v --#_ ,. FUNDING STATUS Fully Funded 4 '""�' ,, k
PROJECT RESULTS Less infiltration and inflow(in compliance ,IL._r
with local,state and federal regulations)thus
delaying the requirement of treatment plant _ O'�' ii
expansion and reducing maintenance costs. ��'•■
PROJECT NEED ° ,; -
Prevent infiltration and inflow into the city's sanitary sewer system. 4 --
PROJECT DESCRIPTION
The Sanitary Sewer Master Plan identified sections of the sanitary sewer system where water is leaking(infiltrating)into the system as a
result of older pipes, manholes and other appurtenances. In addition, rainwater is being directed into the system(inflow).This additional
water results in less usable treatment capacity at the waste water treatment plant.This program continues the process of replacing
identified older sections of the system piping,etc.,where infiltration and inflow has become an issue.Work will continue through other
identified problem areas where conditions warrant replacement.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Sewer Rehabilitation Program
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 30,500 30,500 20,000 20,000 20,000 20,000 20,000 130,500
Construction Management 0 30,500 30,500 20,000 20,000 20,000 20,000 20,000 130,500
EXTERNAL EXPENSES
Public Involvement 0 6,100 6,100 5,000 5,000 5,000 5,000 5,000 31,100
Design and Engineering 0 100,000 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Construction 0 233,900 233,900 350,000 350,000 350,000 350,000 350,000 1,983,900
Total Tigard Project Expense 0 401,000 401,000 495,000 495,000 495,000 495,000 495,000 2,876,000
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 0 148,500 148,500 242,500 242,500 242,500 242,500 242,500 1,361,000
OTHER FUNDING SOURCE
Clean Water Services 0 252,500 252,500 252,500 252,500 252,500 252,500 252,500 1,515,000
Total Tigard Project Revenues 0 401,000 401,000 495,000 495,000 495,000 495,000 495,000 2,876,000
2015-2019 Capital Improvement Plan 1 69
93017
72nd Avenue Sewer Modification _
(Bonita Road
1 , a ,;i,p
LOCATION 72nd Avenue at Bonita Road
PROJECT MANAGER Greg Berry,Public Works - z
FUNDING STATUS Fully Funded .--
PROJECT RESULTS Once completed,the potential to discharge —"c -
raw sewage during peak flow conditions
will be reduced.
PROJECT NEED
Correction of an existing capacity deficiency in the sanitary sewer system.
PROJECT DESCRIPTION
The project,as indicated in the Sanitary Sewer Master Plan,will correct a capacity deficiency along Bonita Road through the connection
of two existing parallel lines so the capacity of both lines can be utilized.
72nd Avenue Sewer Replacement at Bonita Road
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 0 40,000 40,000 80,000
Construction Management 0 0 0 0 0 0 40,000 40,000 80,000
1
.,-:- Expenses 0 0 0 0 0 0 :i i i i :o ,o 0' 160,000
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 0 5,000 5,000 10,000
Design and Engineering 0 0 0 0 0 0 65,000 65,000 130,000
Construction 0 0 0 0 0 0 250,000 250,000 500,000
Total Tigard Project Expense 0 0 0 0 0 0 400,000 400,000 800,000
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 0 0 0 0 0 0 400,000 400,000 800,000
Total Tigard Project Revenues 0 0 0 0 0 0 400,000 400,000 800,000
70 I 2015-2019 Capital Improvement Plan
93035
Barrows Road/Scholls Ferry Road
Sewer Line Extension
(Phase 2)
LOCATION Barrows Road and Scholls Ferry Road
PROJECT MANAGER Rob Murchison,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS This project will be a part of the'back-bone'
sanitary sewer system to serve River Terrace.
PROJECT NEED
In conjunction with the development of the River Terrace Planning Area,Tigard's sanitary sewer system will need to be extended to
meet increased demands.
PROJECT DESCRIPTION
This project will extend a 27-inch sanitary sewer trunk line from existing facilities in Barrows Road to the improvements completed
in conjunction with Phase 1(FY 2013-14).The line will terminate west of the Scholls Ferry Road and Roy Rogers Road intersection.
This is a cooperative effort with Clean Water Services(CWS)and the City of Beaverton.
Barrows Road/Scholls Ferry Road Sewer Line Extension (Phase 2)
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 37,500 37,500 20,000 0 0 0 0 57,500
Construction Management 0 72,500 72,500 20,000 0 0 0 0 92,500
150,000
EXTERNAL EXPENSES
Construction 0 410,000 410,000 350,000 0 0 0 0 760,000
1400
Total Tigard Project Expense 0 520,000 520,000 390,000 0 0 0 0 910,000
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 0 520,000 520,000 390,000 0 0 0 0 910,000
Total Tigard Project Revenues 0 520,000 520,000 390,000 0 0 0 0 910,000
2015-2019 Capital Improvement Plan I 71
93053
Red Rock Creek Corridor `b'
Sewer Study l ' a •
LOCATION Near Baby's R Us o~'
1/11 w
PROJECT MANAGER Greg Berry,Public Works --
FUNDING STATUS Fully Funded r 'i 1 'o r.
PROJECT RESULTS A more permanent solution to the •
4.
-1 Y
continued erosion problem. 4 r y
PROJECT NEED fly. yea 1
Eroding creek banks continue to endanger a sanitary sewer line. L� g
„ ,10 . ' i!
PROJECT DESCRIPTION
The city has made temporary repairs on two separate occasions,the last occurring in FY 2013-14. In an effort to develop a more
permanent solution,a study will be conducted to provide recommendations and cost estimates on the potential rerouting of the
sanitary sewer line or extensive restoration of the Red Rock Creek basin itself to stabilize the bank supporting the line.
Red Rock Creek/Slope Stabilization
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 10,000 0 12,000 0 0 0 17,000
Construction Management 0 0 10,000 0 0 0 0 0 0
iimk
EXTERNAL EXPENSES
Public Involvement 0 0 5,000 0 5,000 0 0 0 5,000
Design and Engineering 0 10,000 25,000 0 165,000 0 0 0 175,000
Construction 0 0 150,000 0 0 0 0 0 0
Total External Expert; 0 0 0 180,000
Total Tigard Project Expense 0 15,000 200,000 0 182,000 0 0 0 197,000
REVENUE FUNDING SOURCE
Sanitary Sewer Fund 0 15,000 200,000 0 182,000 0 0 0 197,000
Total Tigard Project Revenues 0 15,000 200,000 0 182,000 0 0 0 197,000
72 1 2015-2019 Capital Improvement Plan
Project Location Map I Sewer Systems U
Sanitary Sewer System Project Locations
CITYWIDE PROJECTS 93002,93003 and 93016
m
,,/ _ \ 3
pertV Road ��
U _
Scpo0s O`t. —��-
y
c
c
e �,
93010 1 ■�' �� Dartmouth Roa�
�� � �
Walnut Street 93053
�( J 5��e y
93035 ( I �a�� / .mike
rSr
1 "ef
1 1�� . � ( 93013
— . --A\i ,an ( it .... -f —�� del m 1, •A, (-I( -- a\
7GaardeStreetl McDonald _ ._
93014 l) ..� 'Street 93009
j � 93017
t-"c
Bull Mountain Road ___Bonita Road
1111.11rAll --I — , I \R r c
<
L—
doad i�Ci I N�
t�e�
0e 1F. R all ra
1
■ Ai /I 1111110 Mil di '-) - - - ' ) \ 'Durham Road 'I
Iliism 6 ) 1 /
1I
N
A
2015-2019 Capital Improvement Plan I 73
Fiscal Year 2015-2019 I Capital Improvement Plan rill
Stormwater System
Page Project Project Name 2015 2016 2017 2018 2019 5-Year Total
1
77 94001 Storm Drainage Major Maintenance Program 50,000 50,000 50,000 50,000 50,000 250,000
78 94013 Community Tree Planting Program 35,000 0 0 0 0 35,000
79 94016 Derry Dell Bank Stabilization 0 642,000 0 0 0 642,000
(118th Court)
80 94022 Copper Creek Bank Stabilization 174,000 0 0 0 0 174,000
(Durham Road and Copper Creek Drive)
81 94025 Storm Facility Reconstruction 0 358,000 0 0 0 358,000
(Greenfield Drive near Pine View)
82 94028 Main Street Storm Rehabilitation 0 0 600,000 125,000 0 725,000
(Fanno Creek)
83 94031 Pacific Highway Median WQF Project 67,850 0 0 0 0 67,850
84 94032 Burlcrest Drive Stormwater Improvements 0 0 180,000 545,000 0 725,000
(Summer Crest Drive to 121st Avenue)
85 94033 Canterbury Lane Storm Sewer Upgrade 0 110,000 335,000 0 0 445,000
(106th Avenue to Pacific Highway)
86 94034 Ridgefield Lane Water Quality Facility 0 85,000 280,000 0 0 365,000
Repair/Stabilization
Total Funded 326,850 1,245,000 1,445,000 720,000 50,000 3,786,850
2015-2019 Capital Improvement Plan I 75
94001
J
Storm Drainage Major _ f
Maintenance Program ' _ -
LOCATION Citywide ' 1 o rS .
•PROJECT MANAGER Greg Berry,Public Works _ •
FUNDING STATUS Fully Funded ! -
•
PROJECT RESULTS Repairs made prior to or just after is
failure reducing the possibilities of ijoii
service interruptions.
•
PROJECT NEED ' s . iu�
Provide major maintenance of the storm drainage system. ..-'- _ '
PROJECT DESCRIPTION
This program is used for urgent projects to renew, repair or replace sections of the storm system that have failed or are near failure.
Normal operations and maintenance includes work on the system to keep it functioning but does not result in renewing or replacing
the pipe or other appurtenances. Projects included in the Storm Drainage Major Maintenance Program exceed normal maintenance
and operations as they typically replace facilities and add a renewed service life.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Storm Drainage Major Maintenance
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 5,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000
Construction Management 0 5,000 5,000 5,000 5,000 5,000 5,000 5,000 30,000
10,000 60,000
EXTERNAL EXPENSES
Construction 0 40,000 40,000 40,000 40,000 40,000 40,000 40,000 240,000
Total Tigard Project Expense 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
Total Tigard Project Revenues 0 50,000 50,000 50,000 50,000 50,000 50,000 50,000 300,000
2015-2019 Capital Improvement Plan 1 77
94013
Community Tree
Planting Program 1 ' - s�
LOCATION Various
PROJECT MANAGER Carla Staedter,Public Works y- - l J 'r
F *
FUNDING STATUS Fully Funded i l I
PROJECT RESULTS Compliance with Healthy Streams _ 1.-'Ilfr,' ,, ''' A 1_ • - 4 C
Plan standards. j" J l'
ff
PROJECT NEED �F ,L.
Meet the community tree planting goals in the Healthy Streams Plan. ,
PROJECT DESCRIPTION
The project will plant native trees and shrubs along creeks and streams within the city. Environmental permitting agencies allow planting
along tributaries to cool storm water in lieu of mechanical cooling at sewage treatment plants.At this time,the program goals will be
met in FY 2015 and the program will transition to a phase for the maintenance of trees that have been planted by the program.
PROJECT FUNDING
Actual Through 2013 is not calculated on Programs.
Community Tree Planting Program
Actual Projected Revised Project
2015 2016 2017 2018 2019
2013 2014 2014 Total
EXTERNAL EXPENSES
Construction 0 35,000 35,000 35,000 0 0 0 0 70,000
Total Tigard Project Expense 0 35,000 35,000 35,000 0 0 0 0 70,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 35,000 35,000 35,000 0 0 0 0 70,000
Total Tigard Project Revenues 0 35,000 35,000 35,000 0 0 0 0 70,000
78 I 2015-2019 Capital Improvement Plan
94016
Derry Dell Bank Stabilization z - ''. "
(118th Court)
~ r
ril•
LOCATION Derry Dell Creek at 118th Court Pi. ,X r
PROJECT MANAGER Kim McMillan,Public Works ' ',
FUNDING STATUS Fully Funded _F *' �j
6S
PROJECT RESULTS Improvements include increased access, - 4 ar ° Y
improved water quality,reduced creek 7g 2 r 4' .+ +f
velocities and repaired storm water outfalls. '
PROJECT NEED '¢" _
Provide bank stabilization and creek rehabilitation along Derry Dell Creek.
PROJECT DESCRIPTION
In an effort to prevent damage to private property and stop silt/debris from entering the creek,the incised creek channel at the top
of the slope will be elevated to reconnect the creek to its flood plain elevation.The creek flow will be redirected to adjacent vegetative
areas to improve overall water quality. Erosion will be repaired and the public outfall extended to the creek.
Derry Dell Bank Stabilization
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 20,000 90,000 0 32,000 0 0 0 52,000
Construction Management 0 0 90,000 0 30,000 0 0 0 30,000
Total Internal Expenses 0 20,000 180,000 0
EXPENSES
Public Involvement 0 0 5,000 0 5,000 0 0 0 5,000
Design and Engineering 0 75,000 150,000 0 75,000 0 0 0 150,000
Construction 0 0 500,000 0 500,000 0 0 0 500,000
75,000 655,000 0 580,000 0 0 0 655,000
Total Tigard Project Expense 0 95,000 835,000 0 642,000 0 0 0 737,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 95,000 835,000 0 642,000 0 0 0 737,000
Total Tigard Project Revenues 0 95,000 835,000 0 642,000 0 0 0 737,000
2015-2019 Capital Improvement Plan I 79
94022
Copper Creek Bank Stabilization `-
TO(Durham Road and Copper Creek Drive) `
v I
LOCATION Southwest corner of Durham Road and ter"
is
Copper Creek Drive "
PROJECT MANAGER Greg Berry,Public Works
FUNDING STATUS Fully Funded - _ If
f j
PROJECT RESULTS Restored slope stability and improved
' IN storm drain outfall. •"-F'
;r
PROJECT NEED �. ' . kv }
Provide reconstructed storm drain outfall to protect the creek bank. - _
PROJECT DESCRIPTION
An existing public storm drain outfall is approximately 10 feet above a ravine causing erosion. If allowed to continue,it could result in
the failure of a slope supporting the storm drain piping and permit the transportation of eroded materials downstream.The project will
replace the existing outfall with an energy dissipater at the bottom of the ravine.
Copper Creek Bank Stabilization
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 24,000 6,000 12,000 0 0 0 0 36,000
Construction Management 0 0 6,000 12,000 0 0 0 0 12,000
Prior Life-to-Date 30,834 0 0 0 0 0 0 0 30,834
o a n erna`' xpenses `:,000 12,000 24,00 i I 0 0
EXTERNAL EXPENSES
Construction Management 0 0 0 20,000 0 0 0 0 20,000
Design and Engineering 0 30,000 0 10,000 0 0 0 0 40,000
Construction 0 0 160,000 120,000 0 0 0 0 120,000
Total Tigard Project Expense 30,834 54,000 172,000 174,000 0 0 0 0 258,834
REVENUE FUNDING SOURCE
Stormwater Fund 30,834 54,000 172,000 174,000 0 0 0 0 258,834
Total Tigard Project Revenues 30,834 54,000 172,000 174,000 0 0 0 0 258,834
80 I 2015-2019 Capital Improvement Plan
94025
Storm Facility Reconstruction
(Greenfield Drive near Pine View)
LOCATION Greenfield Drive near Pine View
PROJECT MANAGER To Be Determined,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Restored facility function.
PROJECT NEED
Restore stormwater facility function.
PROJECT DESCRIPTION
The project involves the reconstruction/retrofit of an existing stormwater quality facility that has failed.The project will reconstruct the
facility to meet original design intent and to improve maintenance.
Storm Facility Reconstruction
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 15,000 0 0 0 15,000
Construction Management 0 0 0 0 18,000 0 0 0 18,000
•ii .IN C 0 33,000
EXTERNAL EXPENSES
Design and Engineering 0 0 0 0 75,000 0 0 0 75,000
Construction 0 0 0 0 250,000 0 0 0 250,000
Total Tigard Project Expense 0 0 0 0 358,000 0 0 0 358,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 0 0 0 358,000 0 0 0 358,000
Total Tigard Project Revenues 0 0 0 0 358,000 0 0 0 358,000
2015-2019 Capital Improvement Plan I 81
94028
Main Street Storm Rehabilitation
(Fanno Creek)
LOCATION Main Street Bridge
PROJECT MANAGER To Be Determined,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Outfalls which meet BMPs and also
reduce maintenance costs.
PROJECT NEED
Upgrade multiple stormwater outfalls.
PROJECT DESCRIPTION
The project will upgrade functional stormwater outfalls along Fanno Creek to meet Best Management Practices(BMPs)and abandon
inactive stormwater outfalls.The city is partnering with CWS to provide slope beautification at the time this work is completed.
Main Street Storm Rehabilitation
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 25,000 10,000 0 35,000
Construction Management 0 0 0 0 0 25,000 10,000 0 35,000
EXTERNAL EXPENSES
Design and Engineering 0 0 0 0 0 150,000 5,000 0 155,000
Construction 0 0 0 0 0 400,000 100,000 0 500,000
ternal Expert')-
Total Tigard Project Expense 0 0 0 0 0 600,000 125,000 0 725,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 0 0 0 0 600,000 125,000 0 725,000
Total Tigard Project Revenues 0 0 0 0 0 600,000 125,000 0 725,000
82 i 2015-2019 Capital Improvement Plan
94031
Pacific Highway Median
WQF Project
LOCATION Pacific Highway near Royalty Parkway
PROJECT MANAGER Kim McMillan,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Reduction of negative impact from stormwater
runoff from 61 acres of currently untreated
residential and commercial areas into the
Tualatin River.It will also provide beautification
of the highway with added vegetation.
PROJECT NEED
Runoff from Pacific Highway requires stormwater treatment.
PROJECT DESCRIPTION
Clean Water Services is partnering with ODOT and the City of Tigard to create water quality treatment in the existing landscape medians
in Pacific Highway.
PROJECT FUNDING
The City of Tigard is sharing the construction costs with Clean Water Services.Clean Water Services will be directly paying their portion
of the project.
Pacific Highway Median WQF Project
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 5,000 0 0 0 0 5,000
n o,>
EXTERNAL EXPENSES
Construction 0 0 0 62,850 0 0 0 0 62,850
Total Tigard Project Expense 0 0 0 67,850 0 0 0 0 67,850
REVENUE FUNDING SOURCE
Stormwater Fund 0 0 0 67,850 0 0 0 0 67,850
Total Tigard Project Revenues 0 0 0 67,850 0 0 0 0 67,850
2015-2019 Capital Improvement Plan I 83
94032
Burlcrest Drive
Stormwater Improvements
(Summer Crest Drive to 121st Avenue)
LOCATION Burlcrest(Summer Crest Drive to 121st Avenue)
PROJECT MANAGER To Be Determined,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Elimination of excessive stormwater flows
into the street along Burlcrest Drive.
PROJECT NEED
Provide an adequate stormwater drainage system.
PROJECT DESCRIPTION
The project will construct a stormwater drainage system where none currently exists along Burlcrest Drive via a connection to the
existing stormwater system on 121st Avenue.
Burlcrest Drive Stormwater Improvements
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 0 15,000 15,000 0 30,000
Construction Management 0 0 0 0 0 0 30,000 0 30,000
15,000 45,000
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 0 15,000 0 0 15,000
Design and Engineering 0 0 0 0 0 150,000 0 0 150,000
Construction 0 0 0 0 0 0 500,000 0 500,000
Total Tigard Project Expense 0 0 0 0 0 180,000 545,000 0 725,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 0 0 0 0 180,000 545,000 0 725,000
Total Tigard Project Revenues 0 0 0 0 0 180,000 545,000 0 725,000
84 I 2015-2019 Capital Improvement Plan
94033
Canterbury Lane
Storm Sewer Upgrade
(106th Avenue to Pacific Highway)
LOCATION Greenfield Drive near Pine View
PROJECT MANAGER To Be Determined,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS Reduction of excessive stormwater flows.
PROJECT NEED
Provide a stormwater drainage system.
PROJECT DESCRIPTION
The project will upgrade the system along 106th Avenue to Pacific Highway.
Canterbury Lane Storm Sewer Upgrade
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 15,000 10,000 0 0 25,000
Construction Management 0 0 0 0 0 25,000 0 0 25,000
Total Internal Expenses 0 IF 0 0 15,000 35,000 0 0 50,000
EXTERNAL EXPENSES
Public Involvement 0 0 0 0 5,000 0 0 0 5,000
Design and Engineering 0 0 0 0 90,000 0 0 0 90,000
Construction 0 0 0 0 0 300,000 0 0 300,000
Total External Expenses 0 .11.1 0 0 95,000 300,000 0 0 395,000
Total Tigard Project Expense 0 0 0 0 110,000 335,000 0 0 445,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 0 0 0 110,000 335,000 0 0 445,000
Total Tigard Project Revenues 0 0 0 0 110,000 335,000 0 0 445,000
2015—2019 Capital Improvement Plan I 85
94034
Ridgefield Lane Water Quality
Facility Repair/Stabilization
LOCATION Ridgefield WQ Facility
PROJECT MANAGER To Be Determined,Public Works
FUNDING STATUS Fully Funded
PROJECT RESULTS A functional facility.
PROJECT NEED
Restore facility functionality.
PROJECT DESCRIPTION
This project will repair the facility to restore water quality treatment and rebuild a failing retaining wall.
Ridgefield Lane Water Quality Facility Repair/Stabilization
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 0 0 0 0 10,000 10,000 0 0 20,000
Construction Management 0 0 0 0 0 20,000 0 0 20,000
Total Internal Expenses 0 a' * 0 000. 4.!10 A.
EXTERNAL EXPENSES
Design and Engineering 0 0 0 0 75,000 0 0 0 75,000
Construction 0 0 0 0 0 250,000 0 0 250,000
0 0 75,000 250,000 0 0 1 ,825,000
1
Total Tigard Project Expense 0 0 0 0 85,000 280,000 0 0 365,000
REVENUE FUNDING SOURCE
Stormwater Fund 0 0 0 0 85,000 280,000 0 0 365,000
Total Tigard Project Revenues 0 0 0 0 85,000 280,000 0 0 365,000
86 1 2015-2019 Capital Improvement Plan
Project Location Map I Storm Systems
Stormwater System Project Locations
CITYWIDE PROJECTS 94001 and 94013
I
j
•
7_r-1
--Ta
a _ rl
rtV Road �� _
savfi Fe tl ) ��- I I
_H
�i c 94032 tee, ® f 1
e� �J± ik at
i
IN
Qa�M -I I � A, �
..a ,
�arhnouth Road
WatnUtStreet 94028 �� ti
ee
f. _, L ,4P o��4ect lir
1:2 • 1\
MI. ' 1--)i -Fs . r., .,. , _ \
94034 1 ig ♦ ,) 1 I/ ) / °o
Gaarde Street !—1 _ x
10
-- i McDonald Street, -
L _
94016 94033 - ;)I Bull Mountain Road __ - • -_--Bonita Road
-�' _I�
c
m
oaJ i l ¢L-
�eeEe 94031 I� ^'
94025 / L ) '' 1
�1
Durham Road y,
I
94022 '
- l 1 LI
N /
A
2015-2019 Capital Improvement Plan I 87
Fiscal Year 2015—2019 I Capital Improvement Plan IM
Facilities System
Page Project Project Name 2015 2016 2017 2018 2019 5-Year Total
91 91013 Permit Center/City Hall/Police 674,900 1,006,100 0 0 0 1,681,000
Building Exterior Wall Repairs
Subtotal 674,900 1,006,100 0 0 0 1,681,000
Total Funded 674,900 1,006,100 0 0 0 1,681,000
2015—2019 Capital Improvement Plan I 89
91013
Permit Center/City Hall/Police w..1 f.
Building Wall Repairs g a e a p r
- -
LOCATION 13125 SW Hall Boulevard 1.4 -
PROJECT MANAGER Karleen Aichele,Public Works e _
ay_.
FUNDING STATUS Fully Funded _. -
PROJECT RESULTS The exterior will no longer permit water I Y I -
intrusion,thus preventing further damage. . .�� ,K .' I -
PROJECT NEED
After reviewing the data from various tests, it is apparent that there are
numerous points of water intrusion resulting in interior and exterior wall
damage at the City of Tigard's Permit Center,City Hall and Police buildings. IMETIIII
PROJECT DESCRIPTION
The project requires the removal, repair and painting of the Exterior Insulation Finishing System (EIFS)stucco. During the Permit
Center renovations,a window will be added on the exterior wall of the Community Development Director's office. Design began
in FY 2013-14 and it is anticipated Permit Center construction will be completed in FY 2014-15 and City Hall and Police construction
will be completed in FY 2015-16.
Permit Center/City Hall/Police Building Wall Repairs
Actual Projected Revised Project
2013 2014 2014 2015 2016 2017 2018 2019 Total
INTERNAL EXPENSES
Project Management 3,840 15,000 10,000 12,000 18,000 0 0 0 45,000
Construction Management 0 0 9,167 0 0 0 0 0 0
IPI penses 3,840 15,000 19,167 ,..,a o" 0 0
EXTERNAL EXPENSES
Construction Management 0 20,000 0 20,000 20,000 0 0 0 60,000
Design and Engineering 1,813 30,000 0 7,500 10,000 0 0 0 47,500
Construction 2,335 0 724,714 635,400 958,100 0 0 0 1,593,500
Totalxternal Expen 4248 50.000 724.714 662.900, 988.100, 1 0 0 0
Total Tigard Project Expense 7,988 65,000 743,881 674,900 1,006,100 0 0 0 1,746,000
REVENUE FUNDING SOURCE
General Fund 7,988 65,000 743,881 674,900 1,006,100 0 0 0 1,746,000
Total Tigard Project Revenues 7,988 65,000 743,881 674,900 1,006,100 0 0 0 1,746,000
2015-2019 Capital Improvement Plan 1 91
Project Location Map I Facilities Systems p
Facilities System Project Locations
CITYWIDE PROJECTS none
I
1
1S
0
perry R oad i -I f
how, c�
Sc '
-- - - -
a �yaa� I
I
��---- � artmouthRoad
-4
. _N I atn
t ■ kik )\-
w ut Street
����ec 9 n r*eP
l r
tee(
I 91013 1
MI A
— A
CM) a
r
q
r�-
Gaarde Street x
a- -. � � McDonald cDonald Street
L
Bull Mountain Road c 11 _ 1 I
r 'Bonita Road
s,.
c
oaf ,� �l L a 1
ve% 1 �v
- n 2 � — ON
J Durham Road i —® ,
-j__1H
92 I 2015-2019 Capital Improvement Plan
Fiscal Year 2015—2019 I Capital Improvement Plan p
Project Summaries
95 Project Summaries
The Project Summaries table summarizes the various funding sources by system within the five-year
Capital Improvement Program(CIP).Some of the funds that have a significant contribution to the CIP
within the five-year period are as follows:
WATER CIP FUND The primary funding source for the Lake Oswego-Tigard
Water Partnership.
STREET MAINTENANCE FEE FUND One hundred percent of these proceeds are used
to fund the city's Pavement Management Program
including right-of-way maintenance.
CITY GAS TAX FUND Monies within this fund are used for planning and
construction of roads and bicycle and pedestrian
paths within the Street System including intersection
improvements at 72nd Avenue/Dartmouth Street,and
Hall Boulevard/McDonald Street.
2015-2019 Capital Improvement Plan I 93
Project Summaries
Fund Streets Water Parks General Sanitary Stormwater Total
Facilities Sewer by Fund
100—General Fund 0 0 20,000 1,681,000 0 0 1,701,000
200—Gas Tax Fund 2,333,754 0 0 0 45,400 0 2,379,154
260—City Gas Tax Fund 3,233,125 0 0 0 0 0 3,233,125
260—Urban Forestry Fund 0 0 850,000 0 0 0 850,000
400—Facilities Capital Projects Fund 0 0 0 0 0 0 0
405—Transportation Development Tax 3,858,927 0 0 0 0 0 3,858,927
410—Traffic Impact Fee Fund 353,616 0 0 0 0 0 353,616
411—Underground Utility Fund 335,682 0 0 0 0 0 335,682
412—Street Maintenance Fund 10,145,000 0 0 0 0 0 10,145,000
420—Parks Capital Fund 0 0 1,005,800 0 0 0 1,005,800
421—Parks Bond Fund 0 0 2,311,971 0 21,800 0 2,333,771
425—Parks SDC Fund 0 0 3,530,088 0 375,450 0 3,905,538
460—Transportation CIP Fund 3,450,000 0 0 0 0 0 3,450,000
500—Sanitary Sewer Fund 338,500 0 132,500 0 5,587,100 0 6,058,100
510—Stormwater Fund 1,459,800 0 305,000 0 272,400 3,786,850 5,824,050
511—Water Quality/Quantity Fund 0 0 0 0 439,200 0 439,200
530—Water Fund 403,098 4,645,571 24,500 0 0 0 5,073,169
531—Water SDC Fund 0 345,000 0 0 0 0 345,000
532—Water CIP Fund 0 105,557,989 0 0 215,650 0 105,773,639
940—Urban Renewal Capital Improvements 0 0 0 0 0 0 0
Other Agency Funding(Grants) 835,000 0 3,700,000 0 1,262,500 0 5,797,500
Total Costs by System 26,746,502 110,548,560 11,859,859 1,681,000 8,219,500 3,786,850 162,842,271
2015-2019 Capital Improvement Plan 1 95
Fiscal Year 2015—2019 I Capital Improvement Plan
Project Rankings
99 CIP Ranking Worksheet
101-104 Final Ranking Scores
The following matrix shows all of the projects within the five-year period that were scored and prioritized
by citizen member boards along with city staff.Citizen member boards including the Tigard Transportation
Advisory Committee(TTAC), Parks and Recreation Advisory Board (PRAB),and the City Center Advisory
Commission (CCAC) provided substantial input in the selection of those projects that were to be funded.
TTAC and CCAC scored all street projects. PRAB members scored those projects within the parks system.
Staff representatives from the CIP Management Team include Community Development, Public Works and
Finance. Each citizen member,along with staff from the CIP Management Team,score each project based
upon an agreed upon criterion.Total scores are then calculated for each project with all citizen members and
staff scores given equal weight.A final combined score is then calculated for each project and projects are
prioritized based on these scores.Available funding is assigned to those projects with the higher scores.
• Every year,the CIP project list is developed from the existing CIP, Master Plans,staff and citizen member
committee nominations.Note:Only those projects from Master Plans that fall within the five-year period
are included on the list.
• The list of projects is prioritized by the city's CIP Management Team along with citizen member boards.
All projects are prioritized using specific criterion pertinent to each system.These projects are ranked
based on criteria ranging from public health and safety to funding partnerships. Each criterion is rated
on a scale from 0 to 5 (see page 99). Project scores between the CIP Management Team and the citizen
member committee are each given equal weight and combined to arrive at a final score for each project
(see pages 101-104).
• Projects are ranked based on their individual scores and funding is applied to those with the highest
scores.Those projects that are already under construction are not ranked as it is known that they are
already funded and will continue.
2015-2019 Capital Improvement Plan I 97
CIP Ranking Worksheet
Rating Criteria High Medium Low
SCALE 5 4 3 2 1 0
The project eliminates Project reduces a Project mitigates Project has no Project degrades
Public Health a current and present current and present a potential public impact on public public health or N/A
and Safety public health or public health or
safety condition. safety condition. health or safety risk. health or safety. safety.
Cleans up past Has negative impacts
Environmental The project Alleviates an ongoing degradation or Has negative impact on the environment
substantially improves degradation to the on environment which N/A
Impact the city's environment. environment. prevents future that cannot be
is mitigated.
degradation. mitigated.
The project is required Is needed to bring a Does not make any Moves the system
to meet a state or No state or federal
Federal or State system component up progress toward further away from
Mandates federal permit or to federal or state standards apply to meeting state or state or federal N/A
other enforceable standards. this project. federal standards. requirements.
requirement.
The project improves Improves city wide Improves livability/ Improves livability/
Livability/Vitality city wide livability/ Does not improve
livability/vitality for vitality for some vitality for N/A
Enhancements vitality for most segments. segments. few segments. livability/vitality.
all segments.
The project is listed Is needed to reach
Council Goals Indirectly relates Does not relate to Is contrary to a
or Interest specifically as a at least one council goal. council goal. to one goal. any council goals. council goal. N/A
Has mixed support for Has mixed support with People do not have a
Community The project has wide Many people oppose
the project with most an even split of support opinion(do not care) N/A
Interest community support. in support. and opposition. about the project. the project.
The project will pay for Will pay for its self Adds to operational Adds operational cost Adds to operational
its self over less than in less than five years but the cost is paid
Cost Effectiveness five years in reduced in reduced cost cost but is the least life for with increased cost without N/A
cost to the city. to citizens. cycle cost alternative. revenue offset.
operational revenue.
Alleviate a risk that Alleviate a risk of Alleviate a risk of
Alleviate a risk that Alleviate a risk that
threatens life or system failure causing system failure causing
System Reliability would result in results in severe results in minor loss inconvenience to inconvenience to N/A
irreparable harm
property loss. of property. the public. city staff.
The project fully Does not implement
Fully implements
implements more than Makes progress a recommendation in Is not consistent
Implements a at least one
one recommendation recommendation in an toward meeting an adopted plan or with any adopted N/A
Master Plan in an adopted master plan goals. is not anticipated in system plan.
master plan. adopted master plan. a master plan.
STATUS
The project is fully Design is done,permits Is funded and ready to
Readiness to funded,is under
construction or bids and right of way has start but no work has Has partial funding. Is not funded. N/A
Proceed been secured. been completed.
have been received.
The project has grant Is listed for a grant Is funded by a low
interest loan that Has multiple funding
Funding funds awarded and and is likely to receive is time sensitive, sources which are not Is only funded from N/A
Partnerships will lose them if it does funding during the or is eligible for a time sensitive. city resources.
not proceed. budget cycle. future grant.
2015-2019 Capital Improvement Plan i 99
Final Ranking Scores
Priority Project Name Total F(Y/N)d Comments
Street Projects
Current Pavement Management Program 10,145,000 V In Progress
Walnut Street Improvements In Progress—awarded$7 million grant
Current (116th Avenue to Tiedeman Avenue and 135th Avenue) 370,000 Y through Washington County
Current Pedestrian and Cyclist Connections 660,000 Y In Progress
In Progress—Partially Funded;
Current Pacific Highway/Gaarde Street/McDonald Street Intersection Improvement 705,000 Y awarded$9.4 million grant through
STIP,ODOT,OTIA and WaCo
Current 72nd Avenue/Dartmouth Street Intersection Improvement 1,561,350 Y In Progress
Current 92nd Avenue Sidewalk(Waverly Drive to Cook Park) 4,000 V In Progress
Current Tiedeman Avenue Sidewalk(Tigard Street to Greenburg Road) 765,000 Y In Progress—Partially Funded
Current Tigard Transportation SDC 51,000 Y In Progress
In Progress—awarded$1 million
Current Upper Boones Ferry Road/Durham Road Adaptive Signal Coordination 115,000 V from Federal Surface Transportation
Program grant
In Progress—$3.4 million in MTIP
Current Main Street Green Street Retrofit(Phase 1) 450,576 Y
and MSTIP funding program grant
In Progress—$1.2 million in MTIP
Current Main Street Green Street Retrofit(Phase 2) 1,190,576 Y
funding
LARGE PROJECTS
Hall Boulevard/McDonald Street Intersection Improvements
1 (Left-Turn Lane;Right-Turn onto westbound McDonald Street; 8,900,000 Y Partially Funded
Extend left-turn lane northbound McDonald Street)
2 Tiedeman Avenue/Greenburg Road/North Dakota Street 6,930,000 N Unfunded
Intersection Improvements
3 72nd Avenue Improvements(Dartmouth Street to Pacific Highway) 11,400,000 N Unfunded
4 Tiedeman Avenue/North Dakota Street/Tigard Street 10,180,000 N Unfunded
Intersection Reconfiguration
5 Walnut Street (Tiedeman Avenue to Pacific Highway) 9,150,000 N Unfunded
6
121st Avenue(Walnut Street to Gaarde Street)and Complete 121st Avenue 0 N Unfunded
(Whistler Street to Tippitt Street)
7 North Dakota Street Bridge Replacement 0 N Unfunded
8 Wall Street(Hunziker Street to Tech Center Drive) 0 N Unfunded
9 Ash Avenue Design Application(Railroad Crossing) 440,000 Y Partially Funded
10 Main Street Bridge Painting/Rehabilitation 0 N Unfunded
SMALL PROJECTS
1 Commercial Street Extension(Lincoln Street to 95th Avenue)Phase 2 2,230,000 N Unfunded
2 Hall Boulevard Sidewalks(Bonita Road to Durham Road) 1,195,000 N Unfunded
3 Commercial Street Sidewalk and Storm Detention Facility 1,155,000 Y Partially Funded—pending TriMet
(Main Street to Lincoln Street) funding at 80/20 match
4 Hall Boulevard/Pfafe Street New Traffic Signal 1,020,000 N Unfunded
5 Murdock Street Sidewalk(103rd Avenue to Templeton School) 1,605,000 N Unfunded
6 Hall Boulevard Sidewalk(Burnham Street to south of Bonita Road) 0 N Unfunded
7 98th Avenue(Commercial Street to Greenburg Road) 0 N Unfunded
Final Ranking Scores continued on next page...
2015-2019 Capital Improvement Plan I 101
Final Scores(continued...)
Priority Project Name Total F(Y/N)d Comments
Street Projects
SMALL PROJECTS
8 Hunziker Street Sidewalk(Hall Boulevard to 72nd Avenue) 0 N Unfunded
9 98th Avenue Sidewalk(Murdock Street to Sattler Street) 0 N Unfunded
10 100th Avenue Sidewalk and/or Speed Humps 0 N Unfunded
(McDonald Street to Murdock Street)
11 95th Avenue and North Dakota Street Sidewalks 234,000 Y Fully Funded—awarded$200,000
CDBG grant
11 Tiedeman Avenue Sidewalk(Tigard Street to Greenburg Road) 0 N Unfunded
12 Tigard Street(Gallo Avenue to Fanno Creek Trail) 0 N Unfunded
13 Ash Avenue Sidewalk(Fanno Creek to McDonald Street) 0 N Unfunded
14 78th Avenue Sidewalk(Pfaffle Street to Spruce Street) 0 N Unkown
15 River Terrace Capital Improvement Projects—Transportation 0 N Unkown
Water Projects
Current Water Meter Replacement Program 970,000 Y In Progress
Current Water Main Line Oversizing Program 750,000 Y In Progress
Current Aquifer Storage and Recovery Well#3 3,473,000 Y In Progress
Current Lake Oswego—Tigard Water Partnership 89,674,245 Y In Progress
Current Water Line Replacement Program 703,000 Y In Progress
Current Fire Hydrant Replacements Program 570,000 Y In Progress
Current Main Street Waterline Replacement(Pacific Highway to Tigard Street) 106,340 Y In Progress
Current Pipeline Connecting 550 Zone to 530 Zone 2,260,000 Y In Progress
Current Fire Flow Improvement Program 450,000 Y In Progress
Current New Water Source Systemwide Improvements Program 715,000 Y In Progress
Current Barrows Road/Scholls Ferry Road 18"Water Line Extensions(Phase 2) 345,000 Y In Progress
Current Well Abandonment(Tigard High School) 165,000 Y In Progress
1 Red Rock Creek Relocation 12"Waterline 835,000 N Unfunded
Staff Pacific Highway/Gaarde Street Utility Casing Bore Crossing 286,000 Y Fully Funded
Staff Cach Reservoir and Pump Station Design 1,050,000 V Fully Funded
2 River Terrace Capital Improvement Projects—Water 0 N Unfunded
General Capital Facilities Projects MD
Current City Hall/Permit Center/Police Exterior Walls 1,681,000 Y In Progress
1 Facility Enhancement 590,000 N Unfunded
Staff Expand Red Rock Conference Room in City Hall 190,000 N Unfunded
Staff Expansion of CR-4 including closets and external entrance 105,000 N Unfunded
Parks Projects
Current East Butte Heritage Park Development 476,558 Y In Progress
Current Fanno Creek House 156,238 Y In Progress
Current Dirksen Nature Park(formerly Summer Creek Park) 2,917,000 Y In Progress—Partially Funded
Current Tree Canopy Replacement Program 500,000 Y In Progress
Final Ranking Scores continued on next page...
102 1 2015-2019 Capital Improvement Plan
Final Scores(continued...)
Priority Project Name Total F(Y/N)d Comments
Water Projects
Current Park Land Acquisition 793,400 Y In Progress
Current Park Land Development 60,000 V In Progress
Current Downtown Land Acquisition 1,332,501 V In Progress
Tigard Street Trail and Public Space
Current (Main Street to Tiedeman Street/Tigard Street) 760,330 V In Progress—Partially Funded
Current City of Tigard/Tigard-Tualatin School District Park Development 135,000 Y In Progress
Current Damaged Tree Replacement Program 250,000 Y In Progress
Current Fanno Creek Trail(Grant Avenue to Woodard Park) 250,000 Y In Progress
Current Update the Parks Master Plan for River Terrace 0 V In Progress
Current Parks System Development Charge Update 20,000 Y In Progress
Current Senn Park 45,000 V In Progress
Current Bull Mountain Park 30,000 Y In Progress
Current Summer Lake Park Restroom Improvements 35,000 V In Progress
1 Fanno Creek Remeander(City/CWS) 336,000 Y Partially Funded—awarded$3.7
million RFFA grant
2 Fanno Creek Trail(Library to Bonita Road) 0 V Fully Funded—part of the Fanno Creek
Trail Construction project
Staff Fanno Creek Trail Construction(RFFA Grant) 4,034,628 Y Partially Funded—awarded$3.7
million RFFA grant
3 Fanno Creek Trail(Bonita Road to Durham Road) 0 N Unfunded
4 Tigard Street Trail and Community Plaza 0 N Unfunded
5 River Terrace Capital Improvement Projects—Parks 0 N Unfunded
6 Bonneville Power/Westside Trail(Barrows Road to Bull Mountain Road) 0 N Unfunded
7 Area 64 Community Park 0 N Unfunded
8 Downtown Clock Tower 0 N Unfunded
9 Turf Fields at Community Parks 0 N Unfunded
10 Pacific Highway at Hall Boulevard Gateway(Flagpole) 0 N Unfunded
11 Expand the Tigard Trail System into the Tigard Triangle 0 N Unfunded
11 Tigard Triangle Area(P3) 0 N Unfunded
Stormwater Projects
Current Storm Drainage Major Maintenance 250,000 Y In Progress
Current Copper Creek Bank Stabilization 174,000 V In Progress
Current Stormwater Master Plan Update for River Terrace 0 Y In Progress
Current Derry Dell Bank Stabilization(118th Court) 642,000 V In Progress
Current Community Tree Planting Program 35,000 Y In Progress
1 Main Street Storm Rehabilitation(Fanno Creek) 725,000 V Fully Funded
2 Storm Facility Reconstruction(Greenfield Drive near Pine View) 358,000 V Fully Funded
3 Pacific Highway Median WQF Project 67,850 Y Fully Funded
4 Canterbury Lane Storm Sewer Upgrade(106th Avenue to Pacific Highway) 445,000 V Fully Funded
4 Burlcrest Drive(Summer Crest to 121st Avenue) 725,000 Y Fully Funded
Final Ranking Scores continued on next page...
2015-2019 Capital Improvement Plan i 103
Final Scores(continued...)
Priority Project Name Total Funded Comments
Stormwater Projects
Staff Ridgefield Lane Water Quality Facility Repair/Stabilization 365,000 Y Fully Funded
5 River Terrace Capital Improvement Projects—Stormwater 0 N Unfunded
Sanitary Sewer Projects
Current Citywide Sanitary Sewer Extension Program 191,200 Y In Progress
Current Sanitary Sewer Major Maintenance Program 450,000 Y In Progress
Current Fanno Creek Slope Stabilization(Arthur Court) 800,000 Y In Progress
Current Derry Dell Creek and Sewer Interceptor Relocation 1,135,000 Y In Progress
Current Main Street Sewer/Fanno Creek Crossing Elimination 0 Y In Progress
Current 128th Avenue/Shore Drive Sewer Replacement 0 Y In Progress
Current East Tigard Sewer Replacement 1,185,000 Y In Progress
Current Krueger Creek(Benchview)Slope Stabilization(Gatlin Court) 611,300 Y In Progress
Current Sewer Rehabilitation Program 2,475,000 Y In Progress
Current 72nd Avenue Sewer Modification(Bonita Road) 800,000 Y In Progress
Current Sewer Master Plan Update for River Terrace 0 V In Progress
Current Barrows Road/Scholls Ferry Road 21"to 24"Sanitary Sewer Line Extensions 390,000 Y In Progress
(River Rood)
Current Red Rock Creek Corridor Sewer Study 182,000 Y In Progress
1 Red Rock Creek/Slope Stabilization 200,000 Y Fully Funded
Staff River Terrace Capital Improvement Projects 0 N Unfunded
104 I 2015-2019 Capital Improvement Plan
Fiscal Year 2015—2019 I Capital Improvement Plan p
Unfunded Projects
107-109 Unfunded Projects
The Unfunded Projects section includes all projects that were part of the process for consideration and came
from master plans,and citizen and staff nominations.The list contains only those projects that are unfunded
due to limited resources and lower priority ranking.This list does not include those projects within a master
plan that fall outside of the five-year period and/or are too expensive for city resources.
2015-2019 Capital Improvement Plan I 105
Unfunded Projects
Priority Project Name Funding Source 2014-15 2015-16 2016-17 2017-18 2018-19 Total
Street Projects
LARGE PROJECTS
Tiedeman Avenue/Greenburg Road/
2 North Dakota Street Intersection Transportation 0 0 0 5,475,000 1,455,000 6,930,000
Improvements Development Tax
3 72nd Avenue Improvements Transportation 0 0 0 8,880,000 2,600,000 11,400,000
(Dartmouth Street to Pacific Highway) Development Tax
Tiedeman Avenue/North Dakota
4 Street/Tigard Street Intersection Gas Tax 0 0 7,830,000 2,350,000 0 10,180,000
Reconfiguration
Walnut Street
5 Gas Tax 0 7,700,000 1,450,000 0 0 9,150,000
(Tiedeman Avenue to Pacific Highway)
121st Avenue(Walnut Street to Gaarde Gas Tax,Sanitary
6 Street)and Complete 121st Avenue Sewer,Stormwater, 0 0 0 0 0 0
(Whistler Street to Tippitt Street) Water
7 North Dakota Street Bridge Unknown 0 0 0 0 0 0
Replacement
Wall Street
8 Unknown 0 0 0 0 0 0
(Hunziker Street to Tech Center Drive)
10 Main Street Bridge Painting/ Stormwater 0 0 0 0 0 0
Rehabilitation
SMALL PROJECTS
Commercial Street Extension
1 (Lincoln Street to 95th Avenue) Gas Tax 0 0 0 1,430,000 800,000 2,230,000
Phase 2
Hall Boulevard Sidewalks
2 Gas Tax 0 1,085,000 110,000 0 0 1,195,000
(Bonita Road to Durham Road)
4 Hall Boulevard/Pfaffle Street Gas Tax 0 40,000 980,000 0 0 1,020,000
New Traffic Signal
Murdock Street Sidewalk
5 Gas Tax 0 1,300,000 305,000 0 0 1,605,000
(103rd Avenue to Templeton School)
6 Hall Boulevard Sidewalk Gas Tax 0 0 0 0 0 0
(Burnham Street to S.of Bonita Road)
98th Avenue
7 Gas Tax 0 0 0 0 0 0
(Commercial Street to Greenburg Road)
8 Hunziker Street Sidewalk Gas Tax 0 0 0 0 0 0
(Hall Boulevard to 72nd Avenue)
Unfunded Projects continued on next page...
2015—2019 Capital Improvement Plan I 107
Unfunded Projects(continued...)
Priority Project Name Funding Source 2014-15 2015-16 2016-17 2017-18 2018-19 Total
Street Projects (continued...)
SMALL PROJECTS
9 98th Avenue Sidewalk Gas Tax 0 0 0 0 0 0
(Murdock Street to Sattler Street)
100th Avenue Sidewalk
10 and/or Speed Humps Gas Tax 0 0 0 0 0 0
(McDonald Street to Murdock Street)
Tiedeman Avenue Sidewalk
11 Gas Tax 0 0 0 0 0 0
(Tigard Street to Greenburg Road)
12 Tigard Street Gas Tax 0 0 0 0 0 0
(Gallo Avenue to Fanno Creek Trail)
13 Ash Avenue Sidewalk Gas Tax 0 0 0 0 0 0
(Fanno Creek to McDonald Street)
14 78th Avenue Sidewalk Gas Tax 0 0 0 0 0 0
(Pfaffle Street to Spruce Street)
15 River Terrace Capital Improvement Gas Tax 0 0 0 0 0 0
Projects—Transportation
Water Projects
1 Red Rock Creek Relocation Water 210,000 200,000 175,000 125,000 125,000 835,000
12"Waterline
2 River Terrace Capital Improvement Unknown 0 0 0 0 0 0
Projects—Water
General Capital Facilities Projects
General Fund,
1 Facility Enhancement Water,Sanitary 145,000 445,000 0 0 0 590,000
Sewer,Stormwater
and Gas Tax
Staff Expand Red Rock Conference Room General Fund 0 0 0 0 0 0
in City Hall
Staff Expansion of CR-4 including closets General Fund 0 0 0 0 0 0
and external entrance
Parks Projects
Fanno Creek Trail
3 Unknown 0 0 0 0 0 0
(Bonita Road to Durham Road)
4 Tigard Street Trail&Community Plaza Unknown 0 0 0 0 0 0
5 River Terrace Capital Improvement Unknown 0 0 0 0 0 0
Projects—Parks
Unfunded Projects continued on next page...
108 I 2015-2019 Capital Improvement Plan
Unfunded Projects(continued...)
Priority Project Name Funding Source 2014-15 2015-16 2016-17 2017-18 2018-19 Total
Parks Projects (continued...)
6 Bonneville Power/Westside Trail Unknown 0 0 0 0 0 0
(Barrows Road to Bull Mountain Road)
7 Area 64 Community Park Unknown 0 0 0 0 0 0
8 Downtown Clock Tower Unknown 0 0 0 0 0 0
9 Turf Fields at Community Parks Unknown 0 0 0 0 0 0
10 Pacific Highway at Hall Boulevard Unknown 0 0 0 0 0 0
Gateway(Flagpole)
11 Expand the Tigard Trail System Unknown 0 0 0 0 0 0
into the Tigard Triangle
11 Tigard Triangle Area(P3) Unknown 0 0 0 0 0 0
Stormwater Projects
NONE
Sanitary Projects
NONE
2015-2019 Capital Improvement Plan I 109
Fiscal Year 2015—2019 I Capital Improvement Plan D
Appendix
113—116 Projects by Fund
117—118 Glossary
2015-2019 Capital Improvement Plan I 111
Projects by Fund
Water Transportation Facilities Urban
Sanitary Quality/ Water City Gas Street Traffic Development Transportation Urban Underground Capital Parks Renewal Total
Project Name General Sewer Stormwater Water Water CIP Quantity SDC Tax Gas Tax Parks Bond Parks SDC Maintenance Impact Fee Tax CIP Forestry Utility Projects Capital Capital Grants Project Cost
Street Projects
Pavement Management 0 0 0 0 0 0 0 0 0 0 0 10,145,000 0 0 0 0 0 0 0 0 0 10,145,000
Program
Walnut Street Improvements
(116th Avenue to Tiedeman 0 37,000 37,000 37,000 0 0 0 0 37,000 0 0 0 0 0 0 0 222,000 0 0 0 0 370,000
Avenue and 135th Avenue)
Pedestrian and Cyclist 0 0 0 0 0 0 0 0 660,000 0 0 0 0 0 0 0 0 0 0 0 0 660,000
Connections
Pacific Highway/Gaarde Street/
McDonald Street Intersection 0 0 0 0 0 0 0 0 0 0 0 0 76,250 228,750 400,000 0 0 0 0 0 0 705,000
Improvement
72nd Avenue/Dartmouth
Street Intersection 0 0 0 0 0 0 0 733,125 0 0 0 0 277,366 437,177 0 0 113,682 0 0 0 0 1,561,350
Improvement
92nd Avenue Sidewalk 0 0 0 0 0 0 0 0 4,000 0 0 0 0 0 0 0 0 0 0 0 0 4,000
(Waverly Drive to Cook Park)
Main Street Green Street 0 0 0 76,598 0 0 0 0 373,978 0 0 0 0 0 0 0 0 0 0 0 0 450,576
Retrofit(Phase 1)
Main Street Green Street 0 168,000 168,000 156,000 0 0 0 0 698,576 0 0 0 0 0 0 0 0 0 0 0 0 1,190,576
Retrofit(Phase 2)
Tiedeman Avenue Sidewalk
(Tigard Street to Greenburg 0 0 397,800 0 0 0 0 0 367,200 0 0 0 0 0 0 0 0 0 0 0 0 765,000
Road)
Tigard Transportation System 0 0 0 0 0 0 0 0 51,000 0 0 0 0 0 0 0 0 0 0 0 0 51,000
Development Charge
Upper Boones Ferry/
Durham Road Adaptive Signal 0 0 0 0 0 0 0 0 0 0 0 0 0 115,000 0 0 0 0 0 0 0 115,000
Coordination System
Commercial Street Sidewalk
and Storm Detention Facility 0 0 412,000 0 0 0 0 0 108,000 0 0 0 0 0 0 0 0 0 0 0 635,000 1,155,000
(Main Street to Lincoln Avenue)
Hall Boulevard/McDonald
Street Intersection 0 133,500 445,000 133,500 0 0 0 2,500,000 0 0 0 0 0 2,638,000 3,050,000 0 0 0 0 0 0 8,900,000
Improvements
Ash Avenue Design Application 0 0 0 0 0 0 0 0 0 0 0 0 0 440,000 0 0 0 0 0 0 0 440,000
(Railroad Crossing)
95th Avenue and North Dakota 0 0 0 0 0 0 0 0 34,000 0 0 0 0 0 0 0 0 0 0 0 200,000 234,000
Street Sidewalks
Total Streets Funding 0 338,500 1,459,800 403,098 0 0 0 3,233,125 2,333,754 0 0 10,145,000 353,616 4,158,927 3,450,000 0 335,682 0 0 0 835,000 26,746,502
Parks Projects
Parks System Development 20,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20,000
Charge Update
Fanno Creek Remeander 0 0 0 0 0 0 0 0 0 336,628 0 0 0 0 0 0 0 0 0 0 610,372 947,000
(City/CWS)
Dirksen Nature Park 0 20,000 145,000 12,000 0 0 0 0 0 0 2,080,000 0 0 0 0 100,000 0 0 560,000 0 0 2,917,000
(formerly Summer Creek Park)
Tree Canopy Replacement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500,000 0 0 0 0 0 500,000
Program
Projects by Fund continued on next page...
2015-2019 Capital Improvement Plan I 113
Projects by Fund (continued...)
Water Transportation Facilities Urban
Sanitary Quality/ Water City Gas Street Traffic Development Transportation Urban Underground Capital Parks Renewal Total
Project Name General Sewer Stormwater Water Water CIP Quantity SDC Tax Gas Tax Parks Bond Parks SDC Maintenance Impact Fee Tax CIP Forestry Utility Projects Capital Capital Grants Project Cost
Parks Projects (continued...)
Park Land Acquisition 0 0 0 0 0 0 0 0 0 493,400 300,000 0 0 0 0 0 0 0 0 0 0 793,400
Park Land Development 0 0 0 0 0 0 0 0 0 0 60,000 0 0 0 0 0 0 0 0 0 0 60,000
Downtown Land Acquisition 0 0 0 0 0 0 0 0 0 1,332,501 0 0 0 0 0 0 0 0 0 0 0 1,332,501
Bull Mountain Park 0 0 0 0 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 30,000
Tigard Street Trail and
Public Space(Main Street to 0 0 0 0 0 0 0 0 0 14,442 300,088 0 0 0 0 0 0 0 445,800 0 0 760,330
Tiedeman Ave./Tigard St.)
City of Tigard/Tigard-Tualatin
School District Park 0 0 0 0 0 0 0 0 0 135,000 0 0 0 0 0 0 0 0 0 0 0 135,000
Development
Damaged Tree Replacement 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000 0 0 0 0 0 250,000
Program
Senn Park 0 0 0 0 0 0 0 0 0 0 45,000 0 0 0 0 0 0 0 0 0 0 45,000
Fanno Creek Trail Construction 0 100,000 150,000 0 0 0 0 0 0 0 695,000 0 0 0 0 0 0 0 0 0 3,089,628 4,034,628
(RFFA Grant)
Summer Lake Park Restroom 0 12,500 10,000 12,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35,000
Improvements
Total Parks Funding 20,000 132,500 305,000 24,500 0 0 0 0 0 2,311,971 3,510,088 0 0 0 0 850,000 0 0 1,005,800 0 3,700,000 11,859,859
General Capital Facilities Project
City Hall/Permit Center/Police 1,681,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,681,000
Exterior Walls
Total General Capital 1,681,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,681,000
Facilities Funding
Water Projects
Water Meter Replacement 0 0 0 970,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 970,000
Program
Water Main Line Oversizing 0 0 0 750,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 750,000
Program
Aquifer Storage and 0 0 0 0 3,473,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,473,000
Recovery Well#3
Lake Oswego-Tigard 0 0 0 0 98,705,220 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 98,705,220
Water Partnership
Water Line Replacement 0 0 0 703,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 703,000
Program
Fire Hydrant Replacement 0 0 0 570,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 570,000
Program
Main Street Waterline
Replacement(Pacific Highway 0 0 0 9,571 96,769 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106,340
to Tigard Street)
Pipeline Connecting
550 Zone to 530 Zone 0 0 0 0 2,260,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,260,000
(Bull Mountain Road)
Fire Flow Improvement 0 0 0 450,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 450,000
Program
Projects by Fund continued on next page...
2015-2019 Capital Improvement Plan 1 114
Projects by Fund (continued...)
Water Transportation Facilities Urban
Sanitary Quality/ Water City Gas Street Traffic Development Transportation Urban Underground Capital Parks Renewal Total
Project Name General Sewer Stormwater Water Water CIP Quantity SDC Tax Gas Tax Parks Bond Parks SDC Maintenance Impact Fee Tax CIP Forestry Utility Projects Capital Capital Grants Project Cost
Water Projects (continued...)
Well Abandonment 0 0 0 0 165,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 165,000
(Tigard High School)
New Water Source Systemwide 0 0 0 0 715,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 715,000
Improvements Program
Barrows Road/Scholls Ferry
Road Water Line Extension 0 0 0 0 0 0 345,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 345,000
(Phase 2)
Pacific Highway/Gaarde Street 0 0 0 143,000 143,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 286,000
Utility Casing Bore Crossing
Cach Reservoir and Pump 0 0 0 1,050,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,050,000
Station Design
Total Water Funding 0 0 0 4,645,571 105,557,989 0 345,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110,548,560
Stormwater Projects
Storm Drainage Major 0 0 250,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 250,000
Maintenance Program
Community Tree Planting 0 0 35,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 35,000
Program
Derry Dell Bank Stabilization 0 0 642,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 642,000
(118th Court)
Copper Creek Bank
Stabilization(Durham Road 0 0 174,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 174,000
and Copper Creek Drive)
Storm Facility Reconstruction
(Greenfield Drive near 0 0 358,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 358,000
Pine View)
Main Street Storm 0 0 725,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 725,000
Rehabilitation(Fanno Creek)
Pacific Highway Median 0 0 67,850 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67,850
WQF Project
Burlcrest Drive Stormwater
Improvements 0 0 725,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 725,000
(Summercrest to 121st Avenue)
Canterbury Lane Storm Sewer
Upgrade(106th Avenue to 0 0 445,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 445,000
Pacific Highway)
Ridgefield Lane Water Quality 0 0 365,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 365,000
Facility Repair/Stabilization
Total Stormwater Funding 0 0 3,786,850 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3,786,850
Sanitary Sewer Projects
Citywide Sanitary Sewer 0 191,200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 191,200
Extension Program
Sanitary Sewer Major 0 450,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 450,000
Maintenance Program
Fanno Creek Slope Stabilization 0 800,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800,000
(Arthur Court)
Projects by Fund continued on next page...
2015-2019 Capital Improvement Plan I 115
Projects by Fund (continued...)
Water Transportation Facilities Urban
Sanitary Quality/ Water City Gas Street Traffic Development Transportation Urban Underground Capital Parks Renewal Total
Project Name General Sewer Stormwater Water Water CIP Quantity SDC Tax Gas Tax Parks Bond Parks SDC Maintenance Impact Fee Tax CIP Forestry Utility Projects Capital Capital Grants Project Cost
Sanitary Sewer Projects (continued...)
Derry Dell Creek Sewer 0 204,300 272,400 0 215,650 0 0 0 45,400 21,800 375,450 0 0 0 0 0 0 0 0 0 0 1,135,000
Interceptor Relocation
East Tigard Sewer Replacement 0 1,185,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,185,000
Krueger Creek(Benchview)
Slope Stabilization(Gatlin 0 172,100 0 0 0 439,200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 611,300
Court)
Sewer Rehabilitation Program 0 1,212,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,262,500 2,475,000
72nd Avenue Sewer 0 800,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 800,000
Modification(Bonita Road)
Barrows Road/Scholls Ferry
Road Sewer Line Extension 0 390,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 390,000
(Phase 2)
Red Rock Creek Corridor 0 182,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 182,000
Sewer Study
Total Sanitary Sewer Funding 0 5,587,100 272,400 0 215,650 439,200 0 0 45,400 21,800 375,450 0 0 0 0 0 0 0 0 0 1,262,500 8,219,500
2015-2019 Capital Improvement Plan I 116
Glossary
Bond A written promise to pay a specified sum of money,called the face value or
principal amount,at a specified date or dates in the future,called the maturity
date(s),together with periodic interest at a specified rate.
Budget A plan of financial operation embodying an estimate of adopted revenue
and expenditures for a given year. The budget is the legal spending limit
for city activities.
Capital Improvement Projects(CIP) Expenditures which result in the acquisition of land, improvements to existing
facilities,and construction of streets,sewers,storm drains, park facilities,and
other public facilities.
Capital Improvement Program Long-range plan for city facilities and infrastructure.
Capital Outlay Expenditures equal to or greater than $5,000;for equipment,vehicles or
machinery that results in the acquisition or addition to fixed assets.
City Center Development Agency(CCDA) The Urban Renewal Agency approved by the voters in May 2006. The CCDA is
comprised of members of the Tigard City Council as its governing body.
Clean Water Services(CWS) A county-wide agency formerly named the Unified Sewerage Agency(USA).
Clean Water Services owns and operates all major sewage treatment plants within
Washington County. CWS establishes sewer rates and contracts with most cities
to collect monthly charges from residents and perform most sewer maintenance
and repair within city limits.
Expenditure Actual payment made by city check or wire transfer for services or goods received
or obligations extinguished.
Federal Intelligent Transportation System Intelligent transportation systems encompass a broad range of wireless and wire
(ITS) line communications-based information and electronics technologies. Familiar ITS
technologies include electronic toll collection, in-vehicle navigation systems; rear-
end collision avoidance systems and dynamic message signs.
Federal Surface Transportation Program The Surface Transportation Program provides flexible funding that may be used
by States and localities for projects on any Federal-aid highway, including the
NHS, bridge projects on any public road,transit capital projects,and intra-city
and intercity bus terminals and facilities.
Fees General term used for any charge levied by local government in connection with
providing a service, permitting an activity,or imposing a fine or penalty. Major
types of fees include building permits, business and non-business licenses,fines,
and user charges.
Fiscal Year(FY) Period used for accounting year.The City of Tigard has a fiscal year of July 1
through the following June 30.
Glossary continued on next page...
2015-2019 Capital Improvement Plan I 117
Fund A fiscal and accounting unit with a self-balancing set of accounts in which cash
and other financial resources, liabilities,equities and changes therein are recorded
to carry on specific activities and/or objectives.
General Facilities Capital Project An improvement to or construction of city-owned buildings and their
corresponding utilities,grounds,sidewalks,and parking lots.
General Fund The primary discretionary fund of the city,which accounts for general-purpose
revenues(such as property tax) and general-purpose operations.
Local Improvement District(LID) An LID is an entity formed by a group of property owners or the city to construct
public improvements(such as streets,sewers,storm drains,streetlights, etc.)
to benefit properties. Costs of such improvements are then assessed among
benefited properties.
Metropolitan Transportation The federally required documentation of transportation investments scheduled
Improvement Program(MTIP) for the Portland metro region during a four-year cycle.The MTIP comprises
projects and programs administered by Metro,ODOT,TriMet and SMART.
ODOT Oregon Department of Transportation.
Systems Development Charges(SDC) SDCs are paid by developers and builders to fund expansion of infrastructure
necessary due to increased usage.Such charges are collected for sewers,storm
drains,streets and parks.
Transportation Development Tax(TDT) The Countywide Transportation Development Tax(TDT) is a Washington County
Tax approved by the voters in November 2008,that is administered and collected
by the City of Tigard. It went into effect on July 1, 2009, replacing the Traffic
Impact Fee(TIF) program. Like TIF,TDT is assessed on new development to
help provide funds for the increased capacity transportation improvements
needed to accommodate the additional vehicle traffic and demand for transit
facilities generated by that development. It provides funds for these capacity
improvements to county and city arterials,certain collectors,and certain state
and transit facilities as listed in the County's Capital Improvements Project List.
The TDT is categorized as an Improvement Fee: revenue must be dedicated to
capital improvements that expand capacity and may not be used for maintenance,
repair,or other non-capital improvements.
Traffic Impact Fee(TIF) A TIF is a charge on new development assessed by Washington County, but
collected by cities.The TIF was replaced by the Transportation Development Tax
on July 1,2009 and will be phased out over an approximately three year period.
Fund revenues may only be used for highway and transit capital improvements
that provide additional capacity to major transportation systems and to pay the
costs of administering the program.
Urban Renewal District In May 2006,Tigard voters approved the formation of an Urban Renewal District
encompassing the downtown and surrounding areas.With the formation of
this district,future increases in property tax revenues from property within the
district,called tax increment,will provide an important source of funding for a
number of needed capital projects.
118 I 2015—2019 Capital Improvement Plan