Loading...
Permit 11111 CITY OF TIGARD SITE WORK PERMIT s, COMMUNITY DEVELOPMENT Permit#: SIT2015-00002 Date Issued: 03/26/2015 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 2S114AA00500 Jurisdiction: Tigard Site address: 16375 SW 85TH AVE Project: Clean Water Services Subdivision: 1993-078 PARTITION PLAT Lot: 2 Project Description: Primary Treatment&Hydraulic Capacity Improvements Project. Construct new headworks effluent structure and new biofilter. • Contractor: 2KG CONTRACTORS INC Owner: CLEAN WATER SERVICES 4917 NE 185TH DR 2550 SW HILLSBORO HWY PORTLAND, OR 97230 HILLSBORO, OR 97123 PHONE: 503-489-2020 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 03/26/2015 $2,587.46 Plan Review 03/26/2015 $1,681.85 Type of Use: COM 12%State Surcharge-Building 03/26/2015 $310.50 Class of Work: NEW Erosion Control w/Development-Eng 03/26/2015 $461.40 Project Valuation: $495,696.00 Site Specifics: Excavation Volume: 595 cu.yd. Fill Volume: 145 cu.yd. Impervious Surface: 7000 sq.ft. Engineered Fill: Yes Soil Report Required: Yes Paving: Yes Grading: Yes Landscaping: Yes Site Prep: Yes Storn Drains: Retaining Wall: No Fire Underground: No Accessible Parking: No Fence: Total $5,041.21 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or iLwork is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility ification Ce -r. T •:e rules are set forth in OAR 952-001-0010 through OAR 952-001-0090 Y-u may obtain a copy of the rules or di ct questions to OU •y call • .43.232.1987 or 1.800.332.2344. Iss ed By: 410 ilia / ` Permittee Signature: i Call 503.639.4175 by 7:00 a.m.for the next available ins• n date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ' Building Permit Application Site Work RECEIVED I 111: I)1 1 1( I I ,i t 1.1 1 ce City of Tigard Re DateB ive:d "IMAM, Permit No.: .. r- 0 �40!/I • 13125 SW Hall Blvd.,Tigard,OR 97t ; a 1 O 2015 Plan Re e► F7� Phone: 503.718.2439 Fax: 503.59k. ':l 1 DateB : A`j70� ,�/���� Sher Permit: I"I c.. K u Inspection Line: 503.639.4175 Date Ready c y: IWIe ® See Page 2 for Internet: www.tigard-or.gov (,1T11 O} FIGAcRln�*' Notified/Method: 3 1,r B77- Supplemental Information TYPE OFLWORK DIVIJIlll,r // REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this implication. El 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ El Accessory building El Multi-family Number of bedrooms: El Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 1 G 3 7s- S L) g.-ti A ve New dwelling area: square feet 7 �City/State/ZIP: , ,e rea 04 7 70/(4 y Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Covered porch area square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rouided to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the �/ DESCRIPTION OF/WORK work indicated on this applicatio Cro'�Str.let //r JL ,r4s f41. -4 �tr4LbYG Valuation: $ 9 �pq� a H JExisting building area square feet ale r 46/0 f;ter. New building area: square feet ❑ PROPERTY OWNER ❑ TENANT Number of stories: • Name: (i/e4 n W, ter -SP r yr(r5 , Type of construction: Address: f 6666 's i4/ Q C44 ✓7/VL Occupancy groups: City/State/ZIP: ;it, o4 9 7c:7 a y Existing: Phone:(503) 54 '7— 9/ 7s— Fax:( ) New: ❑ APPLICANT ❑ CONTACT PERSON NOTICE Business name: All contractors and subcontractors are required to be Contact name: licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: jurisdiction in which work is being performed.If the City/State/ZIP: applicant is exempt from licensing,the following reasons apply: Phone:( ) Fax: :( ) E-mail: CONTRACTOR Business name: a k G 6 o,, tr./ to rs ,e, BUILDING PERMIT FEES* Address: // ,y - AP S" .�L (Please refer to tee schedule) Structural plan review fee(or deposit): City/State/ZIP: /104....77/9-A1/ 02 9va3d Phone:, Q3) 74 / -aG'a2 d Fax:( ) FLS plan review fee(if applicable): CCB lic.: cf; a 5. Total fees due upon application: � + Amount received: -�- Authorized signature: (� This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: T.e C 46 re 4rs Date: 3//Q -01.5 * Fee methodology set by Tri-County Building Industry Service Board. I:1Building\Permits\.SIT-PermitApp.doc 10/01/09 440-4613T(l1/02/COM/WEB) City of Tigard: Site Work Permit Checklist Page 2 - Supplemental Information Commercial.Multi-Family and One- and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads), or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain,drainage way,or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below, unless otherwise noted. Excavation Volume: _ cu.yds. Grading Volume: (Soils report required for>5,000 cu. yds.) cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU ❑ Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks, and paving: sq. ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application -Plan Submittal Requirements"attached. The following must accompany this application: ❑ Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting compliance Plan ❑ Grading Plan and details ❑ *Landscaping Plan ❑ Erosion Control Plan and details ❑ Soils Report(if required) ❑ Retaining Structures ❑ Fire Line *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee: (New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and $2.69 for each additional$100 or fraction Commercial 3 thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including $25,000.00. One-&Two-Family Dwelling 2 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:\Building\Permits\SIT-PermitApp.doc 05/25/2012 2 i 111111 ■ Site Work Permit Application Plan Submittal Requirements I I G A R l) Commercial, Multi-Family and One- &Two-Family Dwellings A site work permit is required for all commercial projects including new buildings, additions, accessory buildings larger than 120 square feet, modular structures and multi-family R-1 occupancies. A site work permit is required for excavation, fill,grading, paving, retaining walls, fire hydrants and fire department access on private property for work on individual lots not covered under the subdivision development. Note: A separate "plumbing" permit for site utility plumbing work is required for sanitary sewer, storm sewer and potable water systems on private property. Please see the Site Utilities - Plumbing Permit Application for plan submittal requirements. 1. SITE PLAN and vicinity map (fully dimensional, drawn to scale) showing the geographic location labeled with: A. ❑ map &tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ applicant phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Building pads (drawn to scale) with project location. 2. BUILDING PLAN submittal requirement: Two (2) complete sets, Civil only. All details listed below shall be incorporated into the plans: A. Site plan showing: 1) Required parking spaces and driveways. 2) A route, accessible to persons with disability, leading from the public way to an accessible building entrance. 3) Accessible parking spaces and adjacent access aisle connecting with the accessible route. 4) Curb ramps along the accessible route, curb, sidewalk and gutter. 5) Finish grade elevations along the accessible route. B. Topographic survey plan showing grade elevations crossing the entire site. C. Overall grading plan. D. Utilities plan showing: 1) Fire hydrant location and pipe size if on private property. 2) If the building is to be protected with an automatic fire sprinkler system, show location of the water service vault and the fire department connection (FDC) within 70 feet of a fire hydrant. 3) Size of underground water service for the sprinkler system. E. Erosion control plan complying with the requirements of the Clean Water Services (CWS) agency showing: 1 1) Silt fence locations. 2) Bio-filter bags/other approved barrier material surrounding catch basins. L\Building\Permits\SIT-PermitApp.doc 05/25/2012 3 3) Illustrations detailing the correct installation of the silt fencing and catch basin protection. 4) Any other measures to ensure compliance with CWS standards. F. Landscaping plan. 3. ADDITIONAL REQUIREMENTS: A. Soils (geotechnical) report. A soils report is required for new buildings and additions to contain the following: 1) The report shall address the potential of soil liquefaction and instability (OSSC Sec. 1804.2). 2) Fills to be uscd to support foundation of buildings (OSSC Sec. 3301.1). 3) Foundation and lateral pressures exceeding 1,500 lb./sq. ft. (OSSC Sec. 1805). B. Fire flow and hydrant worksheet. C. Plan review deposit based upon project valuation. 1:\Building\Permits\SIT-PermitApp.doc 05/25/2012 4 City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads),or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain, drainage way,or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below,unless otherwise noted. Excavation Volume: 595 cu.yds. Grading Volume: (Soils report required for>5,000 cu.yds.) cu. yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) 145 cu. yds. Retaining structure? (Check one) ❑ Rock ❑ CMU ❑ Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks, and paving: 7,000 sq. ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. The_following must accompany this application: ❑ Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting compliance Plan ❑ Grading Plan and details ❑ *Landscaping Plan ❑ Erosion Control Plan and details ❑ Soils Report(if required) ❑ Retaining Structures ❑ Fire Line *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee: (New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and $2.69 for each additional$100 or fraction Commercial 3 thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including $25,000.00. One-&Two-Family Dwelling 2 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:1Building\Permits\SIT-PermitApp.doc 05/25/2012 2 Joel Borchers From: Joshua.Koch @CH2M.com Sent: Wednesday, March 25, 2015 11:22 AM To: Randy Naef;Joel Borchers Cc: Lynne.Chicoine @CH2M.com;Janelle.Booth @CH2M.com Subject: RE: Second Page of the application Joel/Randy, I was able to track down most of this information in Janelle's absence. I'm unclear on what Tigard is looking for on "grading volume" and "retaining structure". If you know and need something more from me, let me know. For impervious area, I included all sidewalk, new paving(not overlay), HES, and biofilter fan structure (not biofilter). Excavation Volume: 595 yards Grading Volume: ? Fill Volume: 145 yards Retaining Structure: ? Added Impervious Area: 7,000 sf Thanks, Josh Original Message From: Randy Naef[mailto:NaefR @CleanWaterServices.org] Sent:Tuesday, March 24,2015 12:01 PM To: Koch,Joshua/CVO Subject: Re:Second Page of the application Yes we would like you to provide the earthwork quantities for the permit. Sent from my Verizon Wireless 4G LTE DROID Joshua.Koch @CH2M.com wrote: Randy, Just want to be sure you'd really like me/us to do this since CWS had us take permit work out of our scope. I think Steve might have helped with this on past projects in his CM role. I don't mean to be difficult, and I'm happy to do it, but I want to be sure that's really the intent. Note that earthwork quantities are from Janelle, and she's out this week, so I likely can't get those until next week. Thanks, Josh Original Message From:Joel Borchers [mailto:BorchersJ @CleanWaterServices.org] Sent:Tuesday, March 24, 2015 10:08 AM 1 d. STARLING O R K T O G I T H I R I S T A N D A P A R T Memorandum To: Randy Naef,Clean Water Services From: Basel H.Jurdy Date: February 23,2015 Subject: CWS 6491 The District's Project 6491 includes two pieces of equipment that have the potential to generate noise on the site. Mitigation measures have been taken as outlined below. The attached site plan shows location of the equipment and plan district boundaries. Odor Control Fans (350EF4101 and 350EF4102)) Odor Control Fans convey odorous air from head space at four primary clarifiers,the Primary Effluent Pump Station and the Effluent Flow Distribution Structure to a new biofilter for treatment. The specification for the fans requires a maximum overall A-Scale weighted sound pressure level of 72 dBA at a distance of three feet from operating equipment. The fans are housed in a three-sided covered enclosure. At the Owner's request,we have included sound absorptive materials on the wall behind and the underside of the canopy over the fans. The resulting noise level is anticipated to be 65 dBA at the adjacent roadway. The closest property line is approximately 440 feet to the northwest. The predicted noise levels from the Odor Control fans at this property line are less than 30 dBA. Therefore, the noise level from the fans at the nearest plan district boundary will be significantly below the standards outlined in Table 18.650.2 of the City of Tigard Code. Alum Dispersion Pump (220P0801) For this pump,the closest plan district boundary is to the north. The existing structure on which the pump will be mounted includes a parapet wall that will mitigate noise from the equipment. Given the anticipated noise level from the manufacturer, we anticipate a noise level of 35—40 dBA at the plan district boundary. Basel Jurdy e Principal Acoustical Consultant Sparling Cc: Lynne Chicoine,CH2M HILL Josh Koch,CH2M HILL Neal Forester,CH2M HILL 4100 194th St SW•Suite 400,Lynnwood,Washington 98036-4613 206-667-0555 800-667-0610 Fax:206-667-0554 www.spnrling.com Map 18.650.A: Plan District Boundaries and Subdistricts r. ai t� — at � , - -, :.fit, 'b .:;. .O , , _ J r ✓, ,1 i re.'�,1, Plan District Boundary �. .> r • . r K Tigard City Boundary CO 1 Y 2 . ,,t.v.firit';-!-_ . z -.-1,4tev- P. -gitti 111111111t - „„ j `E. i Administrative . ° ,s- MI r.�l � [ w Subdistrict i - CONTROL I - •FANS .Y• ► . a 01,- y fix~ f N • i• UM . ISPERSION - ' PUM- 4,111111:1_, (.. Ii‘ '41-'..erf . /14.,"101r,,„Hi.~. • 41;! 4-J.;,a∎ • • 4s.* *II - , 469,004-, 4IN-4' -4 ,e 1-4 — r : - - 4 w ..,t ` Floodplain .s— f .. • Subdistrict ` ]7 k' worlA .1 . . ,.. . dm - . . . 4, i 41 ' # - . '.."4444-,44.* ... ' 4 fliV:VO • ..#4.,r L %L.--,.. . . City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations T 1 G n R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map& tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. l:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations r 1 c;A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire & Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 16375 SW 85TH AVE, TIGARD, OR, 97224 Commercial - Site Work 499 Final inspection PASS - No C of O SIT2015-00002 Chip Barnett Violation Summary: Inspector Contractor