Loading...
Permit r, CITY OF TIGARD MASTER PERMIT 111 ' ' COMMUNITY DEVELOPMENT Permit#: MST2015-00037 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 03/26/2015 Parcel: 1 S134CD02500 Jurisdiction: Tigard Site address: 11925 SW 118TH AVE Subdivision: LERON HEIGHTS NO.3 Lot: 52 Project: Harlan Project Description: Installation of solar photovoltaic system. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $5,200.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 Drains: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Drywell-Trench Drain: 0 Other Fixtures: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 1 0-200 amp: 0 W/Svc or Fdr: 0 Ea add'I 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio 8 Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: N Other Description: Ecompasing. N BUILDING INFO Class of Work: Type of Use: • Type of Constr: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: HARLAN,ROBIN SOLARCITY CORPORATION Required Items and Reports(Conditions) 11925 SW 118TH AVE 6132 NE 112TH AVE TIGARD,OR 97223 PORTLAND,OR 97220 PHONE: 503-521-8757 PHONE: 503-894-6903 FAX: 866-445-7459 Total Fees: $368.69 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain .copy of the • - or direct questions to OUNC by calling 50`23 1987 or�332.2 44. Issued By: Ii �_ ittee Signature: II, Ca• -ri75►..4175 by 7:00 a.m.for the next available inspection •, • - This permit card shall be kept in a conspicuous place on the job site until comple .. o'.roj Approved plans are required on the job site at the time of each inspection. Buildin;` Permit Application Residential IZECEIVEP 1 ult ()Hi( I 1'1/44' ()NI 1 City of Tigard De/B �`�I Permit No.: �►s, �lS�� 11111 13125 SW Hall Blvd.,Tigard,OR 97223 P Rcv c Phone: 503.718.2439 Fax: 543.598.1960 1 0 2015 Dlan ateJB , m um Other Permit. 1 1 t,a I,1, Inspection Line: 503.639.4175 / Date Ready-: : M See Pap2 for Internet: www.tigard-or.gov CITY OF 1 i(iAiu Notified/Method: ifirnliZiiii Suppteme.l Information TvpainitinntiVISIM REQUIRL L DATA:I-AND 2-FAMILY DWELLING ❑New construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ® 1-and 2-family dwelling ❑Commercial/industrial Valuation: S 5200 ❑Accessory building ❑Multi-Gamily Number of bedrooms: ❑ Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11925 SW 118th Ave New dwelling area: square feet City/State/ZIP: Tigard OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Harlan Covered porch area: square feet Cross street/directions to job site: Deck area: square feet __.__ Other structure arca: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit tees*arc based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. PV ROOF MOUNT Valuation: S Existing building area: square feet New building area: square feet 5 PROPERTY OWNER ❑ TENANT Number of stories: Name: Robin Harlan Type of construction: Address: 11925 SW 118th Ave Occupancy groups: City/State/ZIP: Tigard OR 97223 Existing: Phone:(503 ) 521-8757 Fax:( ) New: •c APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* eat refit,toffee sthed441 Business name:SOLAR CITY { Contact name:MELISSA BENTLEY Structural plan review fee(or deposit): Ty FLS plan review fee(if applicable): Address:6132 NE 112 AVE — Total fees due upon application: City/State/ZIP:PORTLAND OR 97220 Amount received:�- Phone:(503)894 6903 Fax::(1866)445-7459 l PHOTOVOLTAIC SOLAR PANEL SYSTEM M FEES* F-mail:ABENTLEY @SOLARCITY.COM _ Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:SOLAR CITY Submit two(2)sets of roof plan with connection details and fireril,ep. . cess,along with the 2010 Oregon Address:6132 NE 112r"AVE Solar Installation Specia . . ..e checklist. City/State/ZIP:PORTLAND OR 97220 Permit Fee(includes plan r•"• . S180.00 Phone:(503)894-6903 I Fax:(1866)445-7459 and administrative fees): State surcharge(12%of permit fee): 1.60 CCB lie.: 180498 _ Total fee due upon application: S201.6t '�Authorized signature: i f This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:A. MELISSA it 7" TLE ilk Date:3/5/15 *Fee methodology scat by Tri-County Building Industry Service Board. I:\Building 1 Permits 1BUP-R FS Perm itApp.doc 02/24/2011 440.4613T(I l/02/COM/WEB) R 1 CE!VE1) Electrical Permit Application 11W t 0l I( 11 ,I (1\1 1 City of Tigard MAR 1 0 2015 , 13125 SW Hall Blvd.,Tigard,OR 97223 plan Review Phone: $03.718.2439 Fax: 5 3� 1 ` T I u D elB : Other Pamir: Inspection Line: 503.639.4175 I vi I I V I�i�I� Date ReadyBy: /eds. B See Page 2 for ethod:Internet: www.tig�d-or. U L ING DNISION Ift � Supplemental information ❑New construction ®Additionlalteration/replacanent Pie all that apply(submit l,eu of plans w/items ohedced below): El Demolition ❑Other ❑Service or feeder 400 amps or more ❑Building over three stories. where the available fault current ❑Marinas and boatyards. piegisg.,a ►got ll lu+� y exceeds 10,000 amps at 150 volts or ❑Floating buildings. ® 1-and 2-family dwelling ❑CommerciaVindustrial ❑Accessory building amps for eat installations ons Oeatlrngciai u�asr;oulnaal artnps for all other inslalhaioas. buildings. ❑Multi-family ❑Master builder ❑Other: ❑Fire pump. ❑Installation of 150 KVA or ❑Emergency m. larger separately derived system.11 , ❑Additio n of new motor bad of ❑N 1 Job no.:9722445 I Job site address: 11925 SW 118th Ave 100HP at more. occupancy. ❑Six or more residential units. ❑Recreational vehicle perks. City/State/ZIP: Tigard OR 97223 ❑Health-sue facilities. ❑Supply voltage for more than ❑Hazardous locations. 600 volts nominal. Suite/bldg./apt.no.: Project name: HARLAN ❑Service or feeder 600 amps or more. P Cross street/directions to job site: Daerlaw. 1 otr. l roe. I Total I • New residential single-or multi-family dwelling unit. Includes attached garage. Subdivision: Lot no.: 1.000 sq.R.or less 168.54 4 Ea.add'I 500 sq.R.or portion 33.92 1 Tax map/parcel no.: Limited energy,residential 75.00 2 DESC*IP O !J (with above ail-ft.) Limited energy,multi-family 75.00 2 PV ROOF MOUNT residential(with above sq.ft.) Renewable Energy _ IR See Page 2 Services or feeders inatailation,alteration,and/or relocation MAMMY IS !I• 200 amps or less 100.70 2 201 amps to 400 nnrrlps 133.56 2 Name: Robin Harlan 401 amps to 600 amps 200.34 2 Address: 11925 SW 118th Ave 601 amps to 1,000 amps 301.04 2 Over 1,000 amps or volts 552.26 2 City/State/ZIP: Tigard OR 97223 Temporary services or feeders installation,alteration,and/or Phone:( 503)521-8757 I Fax:( ) relocation 200 amps or leas 59.36 1 1 Owner installation:This installation is being made on property that I own which is not 201 amps to 400 amps 1 I 125.08 2 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 401 amps to 599 amps 168.54 2 Owner signature: Date: Branch circuits—new,alteration,or extension, er panel A.Fee for branch circuits w h, : C*IIT 1 Ili? ' "iC above service er feeder fee, 7.42 2 Business name:SOLAR CITY CORD each branch circuit B.Fee for branch circuits wi honr Contact name:A. MELISSA BENTLEY service or feeder fee,first 56.18 2 branch circuit Address:6132 NE 112111 AVE Each add'/branch circuit 7.42 2 City/State/ZIP:PORTLAND OR 97220 Miscellaneous(service or feeder not included) Each manufactured or modular 6784 2 Phone:(503)894 6903 Fax::(1866)445 7459 dwelling,service and/or feeder Reconnect only 67.84 2 E-mail:ABENTLEYC3a SOLARCITY.COM Pump or irrigation circle 67.84 2 C i*A .`0 , Sign or outline lighting 67.84 2 Business name:SOLAR CITY CORP. Signal circuits)or limited energy See panel,alteration,or extension. Page 2 2 Address:6132 NE 112TH AVE Each additional inspection over allowable in any of the above Additional inspection(1 hr min) 66.25i hr City/State/ZIP:PORTLAND OR 97220 Investigation(I hr min) 66.25/hr Phone:(503)894 6903 I Fax:(1866)445 7459 Industrial plant(1 hr min) 78.18/hr Inspections for which no fee is CCB Lie.: 180498 I Electrical Lie.: C562 I Suprv.Lie.: 5873S 90.00/hr specifically hated l4 hr min "r " t Suprv.Electrician signature,required: Subtotal: Print name: NICHOLAS ARMSTRONG Date: 3/5/15 Plan review(25%of permit fee): - State surdarge(12%e of permit fee): Authorized signature: TOTAL PERMIT FEE: Print name: A. MELISSA BENTLEY Date: 3/5/15 This permit application expires If a permit Is not obtained within 188 days after it has been accepted as coarpkte. I l6uildisa4'amiinELC-PvmitApp_6IR ERE dot Rev 05121/2013 ww615(11ros,Caetrwea * Number of inspections allowed per permit. Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL' ! ONLY: =i::: 1w E sCHED[1LE Fee for all residential systems combined ... $75.00 Description I Qtr. I tree 1 'T«at 1 r • Renewable electrical energy systems: Check Type of Work Involved: 5 kva c r less 100.70 2 3.01 to 15 five 1 133.56 133.56 2 ❑ Audio and Stereo Systems* ;5.01 to 25 kva 200.34 2 Wind generation syslcws in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 ❑ G• arage Door Opener* 50.01 to 100 kva 552.26 2 >100 kva(fee in accordance with 553.26 OAR 918-309.0040) ❑ Heating,Ventilation and Air Conditioning System* Solar generation systems in excess of 25 kva: Each additional kva over 25 7.42 3 Vacuum Systems* >100 kva• no additional charge 0.0 3 Each additional inspection over allowable in any or the above: ❑ Other: Each additional inspection is charged at an hourly(1 hr min) 66.25/hr 1 Inspections for which no fee is 90 00/hr specifically listed(Y,hr min) cow ::EmoAL WORK ONLY :tt1 EGTRICAL PERMIT Fee for each commercial system $75.00 Subtotal: (SEE OAR 918-309-0000) Plan review,if required(25%of permit fee): State surcharge(12%ol'permit fee): Check Type of Work Involved: TOTAL PERMIT PEE: This permit application expires if a permit is not obtained within 150 ❑ Audio and Stereo Systems days shier it has been accepted as complete. • Number of inspections allowed per permit. ❑ Boiler Controls ❑ Clock Systems ❑ D• ata Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls n O• utdoor Landscape Lighting* ❑ Protective Signaling ❑ Other Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I ituildiaall'emii.a'•ELC PermitApp ELRBRE.doe Rent 05/Z1/2013 p1 e s e e:J-) 0\ ?-c-r- Lk- ) (DN) Fh7sit,kk, 3//d a. e. AdeL4 cOf , MR-eY d'"�-7\ -�i a City of Tigard RECEIVED Building Division P El 13125 SW Hall Blvd, Tigard, OR 97223 MAR 10 2015 ri Phone: 503.718.2439 Fax: 503.598.1960 TI G A R D Inspection Line: 503.639.4175 CITY OFTIGARD www.tigard-or.gov BUILDING DIVISION 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 11925 SW 118th Ave City: Tigard Zip: 97223 Owner's Name: Robin Harlan Date: 3/5/15 Contractor's Name: SOLAR CITY CCB #: 180498 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation 111 Yes qualify for the Located in a flood prescriptive path, follow Area plain/flood way? ® No OSSC or ORSC for design requirements. Wind Exposure Is the wind exposure ® Yes If"Yes", qualifies for "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow • ' single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes ® Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? structures other than If"Yes", qualifies for ® Yes the prescriptive path. above ❑ No 1 11Building/Forms/PhotoVoltai c-Checkl ist.docx Is the construction material wood and does Yes Type of the construction qualify If"Yes",qualifies for Construction as"conventional light 111 No the prescriptive path. frame"construction? Is the spacing 24 inches or less? Pre-engineered trusses. ® Yes If"Yes",qualifies for the prescriptive path. ® No Roof framing members Is the spacing 24 inches or less? Nominal lumber. If"Yes", qualifies for ® Yes the prescriptive path. ❑ No Is the combined weight ® Yes of the PV modules and If"Yes", qualifies for racking less than or I No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation El layout in accordance Yes with Section 305.4(3) of If"Yes", qualifies for the 2010 Oregon Solar 171 No the prescriptive path. Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types r material roofing material shingle/shake checked,qualifies for Max. two layers the prescriptive path. ® of composition shingle. Is the roof mounted ® Yes Connections of solar assembly the solar assembly connected to roof No If"Yes",qualifies for ❑ o the prescriptive path. to the roof framing or blocking directly? 2 11Building/Forms/PhotoVoltaic-Checkl ist.docx ❑ Yes If"Yes",qualifies for Is the gauge 26 or less? ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes",qualifies for ❑ Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ❑ Yes the prescriptive path. ❑ No Attachment of roof mounted Minimum 24 inches i If the spacing falls solar systems Spacing of clamps? within 24 inches and 60 directly to inches Maximum 60 inches inches, qualifies for the standing seam prescriptive path. metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of If"Yes", qualifies for fastener? CI Yes the prescriptive path. ❑ No Is the roof decking of WSP min. '/2"thickness, ❑ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12"o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof ® Yes the prescriptive path. surface. ❑ No 3 I:Building/Fonns/PhotoVoltaic-Checklist.docx Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing(rafter size, type, and spacing)and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: REC Model Number: REC 260PEZ Listing Agency: • 4 I:Building/Forms/Photo V oltaic-Checkl ist.docx