Loading...
Report 7650 SW Beveland Street,Suite 100 I'M TM RIPPEY Tigard,OR 97223 R CONSULTING ENGINEERCITY OF TIGARD Phone:(503)443-3900 Fax:(503)443-3700 REVIEWED FOR CODE COMPLIANCE Approved: [ L I March 2, 2015 OTC: [ OFFICE COPY Permit#: 4 6'X0(( `- No. _ • Address: ti iO4, at C OHI Construction Suite#t Attention: Jay Carey By Date! (0[( " 17255 Pilkington Road Lake Oswego, OR 97035 Re: Jansson Residence— 13928 SW Hillshire Dr.—Garage Stem Wall Evaluation Project Number: 15001.09 Dear Jay: At your request, a representative of T.M. Rippey Consulting Engineers performed a limited structural observation of a damaged concrete stem wall pier that is in between two 8'-0" garage door openings within the residence located at 13928 SW Hillshire Drive, Tigard, Oregon. The damage to the stem wall pier was caused by an impact from a car hitting the exterior face. The purpose of this visit was to observe the existing conditions and provide recommendations for repair. The existing garage is approximately 30'-6" wide and 24'-3" deep. The height of the garage from the floor slab to bottom of framing is 14'-6". The north side has three 8'-0" doors. Both the east and west walls are solid. Above the garage is a 2"" story with the floor framing running north and south. A continuous 4 x 12 header runs above the two west end garage doors. A concrete stem wall, 8" inches thick, runs around the perimeter of the garage and varies in height, depending on location. The stem wall that was damaged was 8" thick x 13" tall x 22 1/2" wide. See Detail 1/SKI for garage plan and location of damaged wall. Observations: The stem wall was completely sheared away from the plane of the north wall at the level of the slab on grade (See Figure 1). The stem wall pier had Simpson HD5A holdowns on each side. Damage appeared to be localized around the stem wall pier. The exterior brick veneer was also damaged from the impact with visible cracks (See Figure 2). Recommendations: T.M. Rippey Consulting Engineers recommends that the existing stem wall be chipped away to the top of the existing slab on grade, preserving the existing rebar and filled back in with a new concrete stem wall per Details 1/SK2 and 1/SK3. The brick veneer should also be repaired and properly tied back to the wall framing. Jansson Residence— 13928 SW Hillshire Dr.—Garage Stem Wall Evaluation Project Number: 15001.09 March 2, 2015 Page 2 If you have any further questions, please do not hesitate to contact our office. Sincerely, Kyle Kruger, P.E. Project Engineer %D PROF NG1NF4 Enclosures 5 9PE De KK/mdf REGO j� �r21,2 A 4OWAROO P1f2ES osaol • ., ... nt.471 y , . . .k X ,7. ''4. ' ' ' ■ • • t. W.,. ., ‘., 7 1 .. ' • 1 ' kltf l' ' ''.7 ' '\.• 4 \ 'ff.. ',1' 'A 1 k '4 I i .: ,.:. 1 , , ' N-„. 1■• :!114 . b,Y .-. . 4 Or,-,'\, i •••, ., ..... NN -.., 'r• I ' ....,: i'ier •:r:!,;...... ''', •• • t.=,. - ... '".4,,, , . Z . ..;• --` ,• ..- • 4,..i.e,. , •. e --,,,o_ill .• . : •-: 40 t,s.:.,..,,,iti fr • . - . -:. , tt•4 4....I. .4-, .. ..... . ,.. .. . -.1 , ‘ ., • wfte , Figure 1: Damaged Stem Wall. Figure 2: Cracked Veneer. 2cW\ lc.b -'ricnn ‘,,n.4.1.- 1 To NKto 1/Ac -t i To ( RcPfr\RAT-D 'to ,P -t k k1S't1►3(..7 , _r . 1/ La ' / bi-cl I (�^) Ge041. 4Al2,-, . ++mo0¢12- B1-bu---:-. ; 1. t I L L _,_, Viii r \ 5.,,,, f I cc) v- 5-;7191 ' I I 1 (5-1 (,ten 3 I I (Is\ Fa, ..1v I I (1n L G.f3 I I 8,,f9NLR1i'Z�- I 4 STCzM wM-1_ s. I I Rae c,, ‘4•31 W FF1,,p 4. 0 19 N �- C" GREG J1 .6s SCI ACV -Z PL FrJ FaWARDO 1 EXPIRES:06-30-/5r j 1 M M RIPPEY Ti›S U NJ fz i51 /J `A. BY KO' DATE CONSULTING ENGINEERS CHK BY / DATE 7650 S.W.Beveland St, Suite 100 JOB NO < e2d9` :;)(/ Tigard,Oregon 97223 L Phone(503)443-3900 SHEET 1 OF ■ • TEX 1"± AIRSPACE, 1! i d / _ MATCH (E) �� / \� HE Pd O'WARDO- i, (EA ` x12 6k0.C,s. 14e4 n%IZ I 10-MI -k-m kk ra BRICK VENEER TO S'T12�c(� ra MP<2.t1 �� � ra MATCH (E). I 11■.' PLY'WD TO MATCH (E) (1%2" MIN.) ATTACH W/ 8d NAILS AT ro O/G. AT �� EDGES AND 12" 0/C. I iii PROVIDE GRACE VYCOR FIELD. PROVIDE BLK'G % WEATHER BARRIER TO EXTERIOR (N) GYP BOARD /A FACE OF SHEATHING, TYP. TO MATCH EXIST'G / PROVIDE BRICK TIES SPACED (5�s" MIN. VERIFY) e 1'-4" O/C. VERT. AND HORIZ. W, AT OPENING TIES TO BE W/ 8" CAVITY DRAINING VA OF OPENING, ATTACH WI *10x1"2" MESH BY OTHERS - SCREWS N) ) + FLASHING BY OTHERS ANp hcrJaa-afrf.p A FAIL' 1 r// L r WEEP HOLES e 24" 0/C. - 1►;e�� MIP` l>�� p'�\ve,ky (4 G 5.0.(0 - i 001, gag • l •PcN"C c.-%P I WALL SECTION 5�3 SCALE: 1" = 1'-0" 15'00( Ocfi 513 , , fei a fL r -r, c5. rieI.`f t-I-1,1 C> PcYc NN1L.1a, -r,e, W 1?Ak 11.X'51'1.N-U (MN td NMI., kr 4"`` ROAMS h10 � i -- 1Jiti4 SIMP,e,)J INPIAS-5Dst,S) 5`#APS 'lb Ardok CF-) 1- al Q To itE (rte) W ti ft 5.‘"4 '?\ZITAIDZO two ( M,O DF 2) zMas.D ,f::,•` Pritr? 1Nrr14 __ e-/ O1 w 7 R-C, S\Lt.- R.kr1T-- ��r- P - '., L� MI m..Or (it.) �iE- ' Nr w � Z�T� � SS I rE - (-��='Scxz, P51 ORE d WARP A Z P= CPIRES:06-3030-1 -11 ' (i) ...)401. 0A.1 0/2" / d C AnKCA Co(2-"P tr., GHQ AkvciN(, i ,e5" I 3 M,e5"f7 I �� I I 1Yr, / It 1 , 1 I i I it—_ _. _ a __ I C�� ce_51-tom BMW urbrD 3" W 1-N izI1l.T■ ( .'1 -r)3 - Tp gtcMfrctA. D c--),e051c--),e0511--D w-GT WmegneePtotp hal ftkomato GY J a .WZOS i Po c.,ti r 0 S-r ,�. wkt� e.a.P-N\c2. Sk2 1 EA.C'L TM RIPPEY -S s 01..) +�1' .s)��nrLr� BY i< -- DATE CONSULTING ENGINEERS CHK BY DATE 7650 S.W. Beveland St, Suite 100 JOB NO I 5c,cp I. d--7 Tigard, Oregon 97223 Phone(503)443-3900 SHEET of