Loading...
Report Feb. 27. 2015 4: 15PM PGE TCC QUAD A No. 6837 P. 1/1 , Y Request to Energlize.an Electrical Installation '�„_V Zotc c '/o1 PC/ wo — _ REQUESTING SUPERVISING ELE TRICIAN INFORMATION Name of supervising electrician: "r , o . Date of request: A /7i in - Supervising electrician's license number. / Date installation was completed: a 4,ril L5-- Electrical permit no.: a,e 7-1 y x 'gilt a temporary permit is posted at the job site,please include a copy of it with(Wpm EMPLOYING ELECTRICAL CONTRACTOR INFORMATION Name of electrical contractor: /t'iUf[.�1jt .t/—r/�/ �— License no-: Business address:- Po. 5< l a 37 City os..;Ak1J1) state: 6 A_. ZIP: 7 9. Phone:5-03 -9131-irev( . Fax..O3-,23s"--4 300 E-mail: erc A _ 470 r i• , co CUSTOMER INFORMATION Customer's name: , ., ,T,4 AoLlEEJ&— _ Customer's address: 7•foo , a.) d -.tin e- / v ' City: ' r'./9-,2D state; (2A_ ZIP: J. 3 Address of installation if different than customer's address: City: State: ZIP: INSPECTING AUTHORITY.INFORMATION Authority having jurisdiction to inspect:; f/4 ) Phone:Tj 3-7/ 2 4 3 Address: / 3 1 . (-0 ail_ r. City: .1—'76 frith State: o,e ZIP: 5 7��3 ' RECEIVING ELECTRIC UTILITY INFORMATION r-- Name of electric utility receiving request: 1O' 15_ Phone: - - Address; - . City: -14 ter 'IL.", Std: el__ ZIP: REASON FOR REQUEST • A. Restoring electrical service that was interrupted or disconnected because of either a: 0 Service change or El Uncontrollable event,such as Ere,flood,or severe weather; or - B, Electrical service at a remote 1 tion needs to be: , ❑Initialized Cored __ COMPLETION INSTRUCTIONS AND SIGNATURE Supervising electrician Electrical contractor Note:After sending this fora►to the electric utility Note;By close of business nn the first business day following named above,you must send a copy of this form to: energizing of a completed installation in response to the above (1)the electrical contractor,(2)the custo er,and request,you must:(1)notify the authority having jurisdiction (3)the insp authority. that the installation has been energized,and(2)request that the V -a?j c authority inspect the completed installation. e electrl ti's signattue We Electric utility Note:Please consider notifying the inspecting authority identified in this request when an installation is energized - before inspection. i