Certificate of Occupancy 11111 CITY OF TIGARD CERTIFICATE OF OCCUPANCY
Perd: BUP24
COMMUNITY DEVELOPMENT Permit Issued: 11/12/2014
11"AR 1) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00800
Jurisdiction: Tigard
Site address: 15995 SW 74TH AVE 100
Subdivision: COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30
Project Description: Remove existing fire damaged roof structure and interior partition walls. 11/25/14, reprinted to
correct project description to 2,000 sq ft 2nd story addition.
Class of Work: ALT
Type of Use: COM
Type of Constr: VB
Occupancy Group: B
Occupancy Load: 86
Fire Sprinkler Required:
Project Name: Duncan-Dowdle Building
Owner: DUNCAN,JOHN ARTHUR&JANICE LEE
1001 NW LOVEJOY#812
PORTLAND,OR 97209
Phone:
Contractor: TOP DRAWER DEVELOPMENT
25252 SW MCCONNELL RD
SHERWOOD, OR 97140
Phone: 971-404-8798
Fax: 503-625-0821
This Certificate issued 4/30/2015 grants occupancy of the above referenced building or portion thereof
and confirms that the building has been inspected for compliance with the 2014 State of Oregon Specialty
Codes for the group,occupancy,and use under which the referenced permit was issued.
Mark VanDomelen
Building Official
City of Tigard
POST IN CONSPICUOUS PLACE
FOR OFFICE USE ONLY-SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
1111
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal Letter
13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov
TO: DATE ' CEIVED:
DEPT: BUILDING DIVISION
ECE1VED
FROM: Joj JUN 1 5 2016
COMPANY: CITY OF TIGARD
BUILDING DIVISION
PHONE: 06 — 'tea ? •
RE: / 3Aa Sw 76 Qom. P/57- 0 � /00 Id n
(Site Address) (Permit Number)
4;bb
(Project nam r subdivision name and lot n • I er)
ATTACHED ARE THE FOLLO 'G IT ,.
Additional set(s) o'pl. Revisions:
Cross section(s) . d detat . Wall bracing and/or lateral analysis.
Floor/roof fr. ' ing. Basement and retaining walls.
Beam calcu .tions. 64__--E'ngineer's calculations.
Other(ex .in):
REMARKS: Corrcef ,\-.7J27$aw lTf s /rr_
Routed to Permit Tec ician: Date: I s^ Initials:
Fees Due: El Yes P. No Fee Description: Amount Due:
IaA $ ter--
Special
e—Special
Instructions:
Reprint Permit(per PE): ❑ Yes El No l ❑ Done
Applicant Notified: Z. Date: 67/4/6 !Q?, l Initials: fQ�
I:\Building\Fonns\TransmittalLetter-Revisions.doc 05/25/2012
CITY OF TIGARD CERTIFICATE OF OCCUPANCY
II Permit#: BUP2014-00234
COMMUNITY DEVELOPMENT OP ENT Permit Issued: 11/12/2014
T i 6 A ii 1) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00800
Jurisdiction: Tigard
Site address: 15995 SW 74TH AVE 100
Subdivision: COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30
Project Description: Remove existing fire damaged roof structure and interior partition walls. 11/25/14, reprinted to
correct project description to 2,000 sq ft 2nd story addition.
Class of Work: ALT
Type of Use: COM
Type of Constr: VB
Occupancy Group: B
Occupancy Load: 86
Fire Sprinkler Required:
Project Name: Duncan-Dowdle Building
Owner: DUNCAN,JOHN ARTHUR&JANICE LEE
1001 NW LOVEJOY#812
PORTLAND,OR 97209
Phone:
Contractor: TOP DRAWER DEVELOPMENT
25252 SW MCCONNELL RD
SHERWOOD,OR 97140
Phone: 971-404-8798
Fax: 503-625-0821
This Certificate issued 4/30/2015 grants occupancy of the above referenced building or portion thereof
and confirms that the building has been inspected for compliance with the 2014 State of Oregon Specialty
Codes for the group,occupancy,and use under which the referenced permit was issued.
Mark VanDomelen
Building Official
City of Tigard
POST IN CONSPICUOUS PLACE
a
CITY OF TIGARD TEMPORARY CERTIFICATE OF OCCUPANCY
Ill It Permit#: BUP2014-00234
COMMUNITY DEVELOPMENT Permit Issued: 11/12/2014
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00800
Jurisdiction: Tigard
Site address: 15995 SW 74TH AVE 100
Subdivision: COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30
Project Description: Remove existing fire damaged roof structure and interior partition walls. 11/25/14, reprinted to
correct project description to 2,000 sq ft 2nd story addition.
Class of Work: ALT
Type of Use: COM
Occupancy Group: B
Occupancy Load: 86
Fire Sprinkler Required:
Project Name: Duncan-Dowdle Building
Remarks: Temporary occupancy for 30 days from 3/5/2015
Owner: DUNCAN,JOHN ARTHUR&JANICE LEE
1001 NW LOVEJOY#812
PORTLAND, OR 97209
Phone:
Contractor: TOP DRAWER DEVELOPMENT
25252 SW MCCONNELL RD
SHERWOOD, OR 97140
Phone: 971-404-8798
Fax: 503-625-0821
It is understood by the owner/tenant that the issuance of this Temporary Occupancy Permit by the City of Tigard for the use
and/or occupancy of the structure located at the site address listed above (hereinafter "structure"), does not grant or convey
to the owner or tenant any property right or other protectable property interest in the use and/or occupancy of the structure for
any purpose. It is further understood that this Temporary Occupancy Permit shall only be valid for the number of days from
the date of issuance listed above and that the owner/tenant will no longer be authorized to occupy the structure after the
period specified, unless and until all the conditions of approval imposed under the City's or County's Notice of Decision for the
project's land use case(s) issued by the City's Development Services Department or the County's Department of Land Use
and Transportation and/or the Clean Water Services and all building and related code requirements and any other applicable
requirements have been completely fulfilled and complied with to the City's or County's satisfaction.
Mark VanDomelen
Building Official
City of Tigard
POST IN CONSPICUOUS PLACE