Loading...
Certificate of Occupancy 11111 CITY OF TIGARD CERTIFICATE OF OCCUPANCY Perd: BUP24 COMMUNITY DEVELOPMENT Permit Issued: 11/12/2014 11"AR 1) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00800 Jurisdiction: Tigard Site address: 15995 SW 74TH AVE 100 Subdivision: COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30 Project Description: Remove existing fire damaged roof structure and interior partition walls. 11/25/14, reprinted to correct project description to 2,000 sq ft 2nd story addition. Class of Work: ALT Type of Use: COM Type of Constr: VB Occupancy Group: B Occupancy Load: 86 Fire Sprinkler Required: Project Name: Duncan-Dowdle Building Owner: DUNCAN,JOHN ARTHUR&JANICE LEE 1001 NW LOVEJOY#812 PORTLAND,OR 97209 Phone: Contractor: TOP DRAWER DEVELOPMENT 25252 SW MCCONNELL RD SHERWOOD, OR 97140 Phone: 971-404-8798 Fax: 503-625-0821 This Certificate issued 4/30/2015 grants occupancy of the above referenced building or portion thereof and confirms that the building has been inspected for compliance with the 2014 State of Oregon Specialty Codes for the group,occupancy,and use under which the referenced permit was issued. Mark VanDomelen Building Official City of Tigard POST IN CONSPICUOUS PLACE FOR OFFICE USE ONLY-SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. 1111 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Transmittal Letter 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 •www.tigard-or.gov TO: DATE ' CEIVED: DEPT: BUILDING DIVISION ECE1VED FROM: Joj JUN 1 5 2016 COMPANY: CITY OF TIGARD BUILDING DIVISION PHONE: 06 — 'tea ? • RE: / 3Aa Sw 76 Qom. P/57- 0 � /00 Id n (Site Address) (Permit Number) 4;bb (Project nam r subdivision name and lot n • I er) ATTACHED ARE THE FOLLO 'G IT ,. Additional set(s) o'pl. Revisions: Cross section(s) . d detat . Wall bracing and/or lateral analysis. Floor/roof fr. ' ing. Basement and retaining walls. Beam calcu .tions. 64__--E'ngineer's calculations. Other(ex .in): REMARKS: Corrcef ,\-.7J27$aw lTf s /rr_ Routed to Permit Tec ician: Date: I s^ Initials: Fees Due: El Yes P. No Fee Description: Amount Due: IaA $ ter-- Special e—Special Instructions: Reprint Permit(per PE): ❑ Yes El No l ❑ Done Applicant Notified: Z. Date: 67/4/6 !Q?, l Initials: fQ� I:\Building\Fonns\TransmittalLetter-Revisions.doc 05/25/2012 CITY OF TIGARD CERTIFICATE OF OCCUPANCY II Permit#: BUP2014-00234 COMMUNITY DEVELOPMENT OP ENT Permit Issued: 11/12/2014 T i 6 A ii 1) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00800 Jurisdiction: Tigard Site address: 15995 SW 74TH AVE 100 Subdivision: COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30 Project Description: Remove existing fire damaged roof structure and interior partition walls. 11/25/14, reprinted to correct project description to 2,000 sq ft 2nd story addition. Class of Work: ALT Type of Use: COM Type of Constr: VB Occupancy Group: B Occupancy Load: 86 Fire Sprinkler Required: Project Name: Duncan-Dowdle Building Owner: DUNCAN,JOHN ARTHUR&JANICE LEE 1001 NW LOVEJOY#812 PORTLAND,OR 97209 Phone: Contractor: TOP DRAWER DEVELOPMENT 25252 SW MCCONNELL RD SHERWOOD,OR 97140 Phone: 971-404-8798 Fax: 503-625-0821 This Certificate issued 4/30/2015 grants occupancy of the above referenced building or portion thereof and confirms that the building has been inspected for compliance with the 2014 State of Oregon Specialty Codes for the group,occupancy,and use under which the referenced permit was issued. Mark VanDomelen Building Official City of Tigard POST IN CONSPICUOUS PLACE a CITY OF TIGARD TEMPORARY CERTIFICATE OF OCCUPANCY Ill It Permit#: BUP2014-00234 COMMUNITY DEVELOPMENT Permit Issued: 11/12/2014 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113AB00800 Jurisdiction: Tigard Site address: 15995 SW 74TH AVE 100 Subdivision: COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30 Project Description: Remove existing fire damaged roof structure and interior partition walls. 11/25/14, reprinted to correct project description to 2,000 sq ft 2nd story addition. Class of Work: ALT Type of Use: COM Occupancy Group: B Occupancy Load: 86 Fire Sprinkler Required: Project Name: Duncan-Dowdle Building Remarks: Temporary occupancy for 30 days from 3/5/2015 Owner: DUNCAN,JOHN ARTHUR&JANICE LEE 1001 NW LOVEJOY#812 PORTLAND, OR 97209 Phone: Contractor: TOP DRAWER DEVELOPMENT 25252 SW MCCONNELL RD SHERWOOD, OR 97140 Phone: 971-404-8798 Fax: 503-625-0821 It is understood by the owner/tenant that the issuance of this Temporary Occupancy Permit by the City of Tigard for the use and/or occupancy of the structure located at the site address listed above (hereinafter "structure"), does not grant or convey to the owner or tenant any property right or other protectable property interest in the use and/or occupancy of the structure for any purpose. It is further understood that this Temporary Occupancy Permit shall only be valid for the number of days from the date of issuance listed above and that the owner/tenant will no longer be authorized to occupy the structure after the period specified, unless and until all the conditions of approval imposed under the City's or County's Notice of Decision for the project's land use case(s) issued by the City's Development Services Department or the County's Department of Land Use and Transportation and/or the Clean Water Services and all building and related code requirements and any other applicable requirements have been completely fulfilled and complied with to the City's or County's satisfaction. Mark VanDomelen Building Official City of Tigard POST IN CONSPICUOUS PLACE