Permit 1,1111 q CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2014-00296
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/23/2015
Parcel: 1S1260000300
Jurisdiction: TIGARD
Site address: 9530 SW WASHINGTON SQUARE RD H10
Project: Athlete Subdivision:VASHINGTON SQUARE ESTATES NO. Lot: S
Project Description: Tenant improvement for new retail store
Contractor: ICE BUILDERS Owner: PPR WASHINGTON SQUARE LLC
421 E CERRITOS AVE PO BOX 847
ANAHEIM, CA 97805 CARLSBAD,CA 92018
PHONE: 541-459-5253 PHONE:
FAX: 714-333-9756
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 02/23/2015 $3,419.27
Demolition
Occupancy Grp: M Occupancy Load: 12%State Surcharge-Building 02/23/2015 $410.31
Dwelling Units: 0 Plan Review 12/16/2014 $2,222.53
Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 02/23/2015 $1,367.71
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 02/23/2015 $299.00
Value: $482,493 DC Provision Review,COM TI-LRP 02/23/2015 $44.00
Info Process/Archiving-Lg$2.00(over 02/23/2015 $114.00
11x17)
Floor Areas: Info Process/Archiving-Sm$0.50(up to 02/23/2015 $150.00
11x17)
Total Area 4304 Metro Const. Excise Tax-Commercial 02/23/2015 $578.99
Accessory Struct: 0 Use
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $8,605.81
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952- - 10 throug- ::R 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
sued By: I Q,, Aiii.`; Permittee Signature: i '=
Call 503.639.4175 by 7:00 a.m.for the next available inspectio• date.
This permit card shall be kept in a conspicuous place on the job site until •mpletion of the project.
Approved plans are required on the job site at the time of e, h inspection.
at It
Building Permit Application
Commercial RECEIVED i.OR OFFICE USE ONIX
City of Tigard Bed i ®� Permit No.: ;u� / ' -.L`; 1
Ili • 13125 SW Hall Blvd.,Tigard,OR }20 015 2014 Plan Review 1
I Phone: 503.718.2439 Fax: 503.5 Date/0 : ��t mili other Permit:
1 I(, \h I Inspection Line: 503.639.4175 Date Ready 77- l Juris: ® See Page 2 for
Internet: www.tigard-or.gov CITY OFTIGARD Notified/Method: .2 5 13.-
,977- Supplemental Information
��ii11ii,,nn����T 'L1 Nu
TYI 'J WO REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑ Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial
Valuation: $ "e
`~
Number of bedrooms:
❑Accessory building ❑Multi-family .T
❑Master builder 111 Other: Number of bathrooms:
�?-) 3v JOB SITE INFORMATION AND LOCATION Total number of floors: 6
Job site addres • SW WASHINGTON SQUARE RD-WASHINGTON SQ.MALL New dwelling area: square feet 1
City/State/ZIP:PORTLAND,OR 97223 Garage/carport area: square feet
rt
Suite/bldg./apt.no.:#H-10 Project name:ATHLETA 4642 Covered porch area: square feet
Cross street/directions to job site:WASHINGTON SQUARE MALL Deck area: square feet
Other structure area: square feet {�
REQUIRED DATA:COMMERCIAL-USE CHECKLIST 1f r41
Subdivision: Lot no.: Permit fees*are based on the value of the work performed. C!
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all �/
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
TENANT IMPOVEMENT FOR NEW ATHLETA RETAIL STORE Valuation: $482493
Existing building area: 4304 square feet
New building area: 4304 square feet
❑ PROPERTY OWNER ® TENANT Number of stories: 1
Name:GAP INC. - RAY FUNG Type of construction: II-N
Address: 1 HARRISON ST Occupancy groups:
City/State/ZIP:SAN FRANCISCO,CA 94105 Existing: M
Phone:(415)427-2014 Fax:( ) New: M
® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES*
Business name:CHIPMAN DESIGN ARCHITECTURE,INC Bu�AiN6 (Ptease►ejerrofeescludule)
isonsionssa plan review fee(or deposit): $2,223.00
Contact name:NICK RIEDEL
FLS plan review fee(if applicable): 889.00
Address:2700 SOUTH RIVER RD.
City/State/ZIP:DES PLAINES,IL 60018 Total fees due upon application: $3,112.00
Phone:(847)298-6900 Fax::( ) Amount received:
E-mail:nriedel@chipman-design.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System.
Business name:131; 1� /Q �tt/L D t6 f 100.- Submit two(2)sets of roof plan with connection details
C q�nn and fire department access,along with the 2010 Oregon
Address: 4 Cam!7-65 A ue Solar Installation Specialty Code checklist.
City/State/ZIP: [' 4,( Q �7- Permit fee(includes plan review
�� IT ` 3� and administrative fees): $180.00
Phone:(7111) k?f —1311 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lic.: /J/ 33? `--/ 4 Total fee due upon application: $201.60
Authorized signature ..": This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:NICK RIEDEL Date:12/12/14 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Pemtits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(1 l/02/COM/WEB)
a •
IIICity of Tigard
r COMMUNITY DEVELOPMENT DEPARTMENT
Building Permit Review — Commercial - No Land Use
I II,ARU
Building Permit #: —7:=4-4-P.90/1-609--?co
X5.0
Site Address: Stn. Wash• 5 . RA Suite/Bldg#: H - 10
Project Name: il L s-rj�J' O
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: �e"10�f i r10-1 4-o ve.-one et+ ^G:f. rat,.(( 'a Cam.
Existing Business Activity: rem
Proposed Business Activity: 4-
kr Verify site address/suite #exists and active in permit system.
VI Zoning: M u
yi Permitted Use: ❑ Yes ❑ No ❑ Spec Space
XConfirm no land use required.
Notes:
Approved by Planning: eiltiy., CL Cam..-u-- Date: b2—/''E—/
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submitta ,
Original Submittal Date: / /S PI
Site Plans: # S
Building Plans: # 5
Building Permit#: ter building permit#above.
Workflow Routing: Planning ' PI rmit Coordinator 'Building
Workflow Sign-off: sign-off for Planning(include notes from planning review)
Route Application Documents: uilding original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technici n: _ 1 _ I' ,� Date: /9A,/5!
1:\Building\Forms\Bl dgPerm itRvw_COM_NoLandUse_071514.docx
• a
Permit Coordinator Review
❑ Conditions Met- Prior to Issuance of Building Permit
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
(((( OK to Issue Permit
/ 6
Approved by Permit Coordinator: / Date:
..22/ /;7z-
I:1Building\Forms\B ldgPermitRvw_COM_NoLandUse_071514.docx
August 3, 2010
RE: TENANT IMPROVEMENT
Project Information
Building Permit: BUP2014-00296 Construction Type: 2-B
Address: 9530 SW Washington Sq. Occupancy Type: M
Area: 4304 Sq. Ft. Stories: 1
Name: Athleta Sprinklers: Yes
The plan review was performed under the State of Oregon Structural Specialty Code
(OSSC) 2014 edition; 2014 Oregon Fire Code. Please respond to conditions below.
1) Construction requirements for suspended ceiling systems are found in the
Oregon Building Codes Division website under Statewide Code
Interpretations dated 4/20/2007. (see interpretations{structural) at
www.bcd.oregon.gov)
2) Provide calculations and construction details (including seismic bracing
details for non full height partitions) for all walls. Note: The roof structure
may be approximately 30' above the finished floor. Please note roof
structure height at wall details on plans. OSSC 106.1
3) Please provide calculations and construction details for the soffits and
storefront construction. Every structure, and portion thereof, including non
structural components that are permanently attached to structures and their
supports and attachments, shall be designed and constructed to resist the
effects of earthquake motions in accordance with ASCE 7 as modified by
Section 1613.7. The seismic design category for a structure is permitted to be
determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1
4) Please submit plans and calculations for steel storage racks that comply with
the design requirements of ASCE7 (15.5.3).
When responding, provide an itemized letter stating in what way each numbered
issue has been addressed in the revision.
When submitting revised drawings or additional information, please attach a copy of the
enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City
of Tigard in tracking and processing the documents.
Respectfully,
Dan Nelson
Senior Plans Examiner
(503) 718-2436
dann @tigard-or.gov
6UPdti -OO ,g4 Transmittal Letter
RECEier+4-0143V-2
Chipman Design Architecture, Inc.
2700 S. River Road, Suite 400
Des Plaines, IL 60018-4108 JAN 2 7 2015 GO
P. 847-298-6900 F. 847-298-6966
www.chipmandesianarch.com CITY OF TIGARD Chipman
Design
BUILDING DIVISION Arcniteoure In,
To: BUILDING DIVISION Attention: DAN NELSON
CITY OF TIGARD ATHLETA 4642 -
13125 SW HALL BLVD. Re: WASHINGTON SQUARE
TIGARD, OR 97223
TEL: 503-718-2439 Job Number: 14-7269
We are sending you
X Attached 0 Under Separate Cover via: [Type text here] the following:
0 Shop Drawings X Prints X Plans X Shipped via Fedex
0 Copy of Letter 0 Change Order 0 Samples
X Specification
Submittal Quantity Date DWG. # Description
2 1/22/15 2 SIGNED & SEALED REVISED DRAWING SHEETS
2 STRUCTURAL CALCULATIONS
2 HDS INSTALLATION GUIDE
1 RESPONSE LETTER
These are transmitted as checked below
1
X For Approval 0 Approved as Submitted 0 Resubmit [#] copies for approval
X For Your Use 0 Approved as Noted 0 Submit [#] copies for distribution
0 As Requested 0 Returned for Corrections 0 Return [#] corrected prints
0 For Review and Comment 0 Revise and Resubmit
0 FOR BIDS DUE: [Type text here] 0 PRINTS RETURNED AFTER LOAN
Comments: mar impipepw- ITIROMPIPPIllt7
[Type comments here]
Copy to:
[Type name here]
[Type name here]
Nick Riedel
[Type name here]
• Rk,„
V�
CD JAN C I272p15
Chipman BOIL'Jr 1164 1.1
Design NCDI i'ISIO
Architecture January 22, 2015 N
Athleta# 4642
Washington Square Mall
Corporate Office
2700 S.River Road 9585 SW Washington Square Rd.- Space#H-10
Suite 400 Portland, Oregon 97223
Des Plaines,IL 60018-4108
T 847.298.6900
F 847.298.6966
To whom it may concern;
CHICAGO
LOS ANGELES
NEW YORK
In regards to the comments received on December 23, 2014 for the new
chipmandesignarch.com Athleta at Washington Square Mall;
1. Construction requirements for suspended ceiling systems are found
in the Oregon Building Codes Division website under Statewide
Code Interpretations dated 4/20/2007. (see
interpretations{structural} at www.bcd.oregon.gov)
Please see revised suspended ceiling details that comply with the
Oregon Building Code on sheet A6-1.1
2. Provide calculations and construction details (including seismic
bracing details for non full height partitions) for all walls. Note: The
roof structure may be approximately 30' above the finished floor.
Please note roof structure height at wall details on plans. OSSC
106. 1
Please see attached calculations. Page 9-11 and page 13 for
bracing details. Please also refer to updated details on sheet GO-
2.2. Horizontal bracing has been removed from scope, see A3-0.
All partition walls are now braced from the structure above.
1
3. Please provide calculations and construction details for the soffits
and storefront construction. Every structure, and portion thereof,
including non structural components that are permanently
attached to structures and their supports and attachments, shall be
designed and constructed to resist the effects of earthquake
motions in accordance with ASCE 7 as modified by Section 1613.7.
The seismic design category for a structure is permitted to be
determined in accordance with Section 1613 or ASCE 7. OSSC
1613.1
Please see attached calculations, pages 13-18. Please also refer to
updated details on sheets A4-1 and A4-3.
4. Please submit plans and calculations for steel storage racks that
comply with the design requirements of ASCE7 (15.5.3).
Please refer to details on sheet A6-5 as well the attached
installation details.
Please let me know if you have any questions regarding the responses
listed above.
Sincerely,
Nick Rie I
Project Manager
Chipman Design Architecture
2
Eansmittal Letter
RECEIVED December 11, 2014
Chipman Design Architecture, Inc. corD
2700 S. River Road, Suite 400 DEC 15 2014
Des Plaines, IL 60018-4108
P. 847-298-6900 F. 847-298-6966 CITY OF TIGARD Chipman
www.chipmandesignarch.com BUILDING DIVISION. Design
Arrhitecture Inc.
To: BUILDING DIVISION Attention: BUILDING PLAN REVIEW
CITY OF TIGARD ATHLETA 4642 —
13125 SW HALL BLVD. Re: WASHINGTON SQUARE
TIGARD, OR 97223
TEL: 503-718-2439 Job Number: 14-7269
We are sending you
-
X Attached ❑ Under Separate Cover via: [Type text here] the following:
❑ Shop Drawings 1 X Prints X Plans X Shipped via Fedex
❑ Copy of Letter ❑ Change Order ❑ Samples
X Specification
',Submittal Quantity Date DWG. # Description
3 12/12/14 3 SIGNED & SEALED CONSTRUCTION DRAWING SETS
1 12/12/14 PLAN REVIEW FEE CHECK
1 12/12/14 BUILDING PERMIT APPLICATION
_■ -
3 12/12/14 PROJECT MANUAL - SPECIFICATIONS
3 12/12/14 LIGHTING COMCHECK FORMS
These are transmitted as checked below
X For Approval ❑ Approved as Submitted ❑ Resubmit [#] copies for approval
X For Your Use ❑ Approved as Noted ❑ Submit [#] copies for distribution
❑ As Requested ❑ Returned for Corrections ❑ Return [#] corrected prints
❑ For Review and Comment ❑ Revise and Resubmit
❑ FOR BIDS DUE: [Type text here] ❑ PRINTS RETURNED AFTER LOAN
Comments:
Copy to
Nick Riedel
Location:
Record Type:
Inspection Type:
Result:
Comments:
Inspection Date:
Record ID:
Inspector:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
9530 SW WASHINGTON SQUARE RD H10,
TIGARD, OR, 97223
Commercial - Building
299 Final inspection
PASS - C of O
BUP2014-00296
Jeff Grove
Violation Summary:
Inspector Contractor