Loading...
Report 16928 Woodinville-Redmond Rd NE,Suite 210 Phone:(425)487-1732 COaf VERSTONE Woodinville,WA 98072 Fax:(425)487-1734 111111111."-. ENOINEERINQ, INC. Web's~'oorneratone-engr•com C7VIL•SIRUC77.IRAL#SURVEY' RECEI VE OCT 21 2014 Structural C , For Installation and Replacement of Telecommunications Equipment CITY OF TIGARD REVIEWED FOR CODE COMPLIANCE A (yam OTCs I Permit#* p 20 eaar 'c2__ce-4- c s suite#t Site Name: Greepwa a. Data ,(OC2J(4 Site Number: P003932 12394 SW Scholls Ferry RD OFFICE COPY Tigard, OR 97223 • Washington County vionsiumoir c �G1NEF,Q 83201 PE OF, Prepared By: Evan A. Underbrink, E.I.T. C� •-EGON co Checked By: Chris Bemards, P.E., S.E., LEED AP gyp, Prepared Date: August 19, 2014 ; `Ily s 14 V-NZ' Q� CEI Project No.: 14-06070 '1 lq N Oqfri egfats 12(3,f Comprehensive Design Solutions for Your Project Success! Project: P003932D Greenway Date: August 19,2014 • Client T-Mobile Prepared By: E.Underbrink CEI No.: 14-06070 Project Description The existing T-Mobile telecommunications site is located at 12394 Southwest Schoils Ferry Road in Tigard, Oregon. This is a three-sector site with(2)panel antennas per sector mounted on two stealth monopoles on the west side of the building. The site support equipment is located on the mezzanine inside of the building. The structural design and analysis of the proposed T-Mobile installation is for the replacement of the FRP canisters that currently enclose the existing panel antennas. Additionally,T-Mobile will replace all (6) panel antennas and add(3)twin Tower Mounted Amplifiers(TMA's)which will be mounted to existing monopoles beneath the panel antennas. The design of the FRP canisters will be by others and is not a scope of this project The additional gravity and lateral loads of the equipment will transfer into to the monopoles, then into the foundation and soil below. Design Procedure The analysis contained in this report is based on the provided as-built drawings, previous structural analysis, and recent site photographs that illustrate the existing structure appear to match the provided documentation. Our analysis is inclusive of the affected structural elements associated with the proposed equipment modifications and was prepared in conformance with the 2012 International Building Code(IBC), the 2014 Oregon Structural Specialty Code(OSSC), and their referenced documents. Design Criteria The design and analysis of the various structural components is based on the following site specific parameters: Gravity Loads Lateral Loads Antenna Dead: 35 lb each 120 mph(ULT) FRP Canister: 670 lb Wind: 40 mph(Ice Loading Only) Ice Loading: 2.058" Design Exp. B, Ice 1.0 Thickness Seismic: Sm.=0.718g, SDI=0.445g Conclusions and Recommendations We have determined that the existing monopoles are structurally adequate to support the proposed equipment described above. No upgrades are required to the existing steel structure. The installation will comply with OSSC requirements. Please refer to the following structural calculations, as well as the supporting documentation for additional reference. Our analysis is based on the assumption that the structure has been property installed and is maintained to the minimum standards required by code. We assume there is no known deterioration or damage to any structural component that may affect capacity. Table of Contents 1. Load Calculations 2. Monopole Analysis 3. Reference Documents 16928 Woodinville-Redmond Rd NE,Suite 210 Phonc:(425)487-1732 Woodinville,WA 98072 (Cm,. CONERSTONE Fax:(425)487-1734 CORNERSTONE N G I N r[R 1 N G, I N c. Web:www.corrtt'rstone-eBgr.com Project P003932D Greenway Date: August 19,2014 • Client T-Mobile Prepared By. E.Underbrink CE1 No.: 14-06070 1,0 1. Load Calculations 16928 Woodinville-Redmond Rd NE,Suite 210 Phone:(425)487-1732 Woodinville,WA 98072 -• �N•I N C iRM WONE Fax:(425)487-1734 Web:www.cornastone-engr.com Project: P003932D Greenway Date: August 19,2014 Client' T-Mobile Prepared By: E.Underbrink CEI No.: ;4.1160-n Y Design Maps Summary Report User-Specified Input Report Title P0039320 Greenway 0r1 August 15. 2014 20;46:19 UTC Building Code Reference Document 2012 International Suiting Code ;which utiltzos uSG5 hazard data available in 2008) Site Coordinates 45.443172N. 122.823177W Site Soil Classification Site Class D-"Stiff Soil" Risk Category I/Ii/III 1 0 -- I l • 0Aloha 28 \✓ t ().4 10 000 rden r a a Sl1riram eR MIlwaukie oKonor p• d N 0 R T H M.E.ey c A M RICA mapqueat 0/ VI4111, a •Mis*nr USGS-Provided Output S, = 0.968 g S.,r = 1.077 g S„ = 0.719 g S. = 0 ,24 , S,,, = 0.668 p Sp, = 0.445 g For information on how the SS and Si values above have been calculated from probabilistic(riek-targeted) and deterministic ground motions in the direction of maximum horizontal -es::-se :et_e retumtothe application and select tre "2CC: NEHRP"building :ace reference document. MCEr,Response Spectrum Design Response Spectrum 1.10 f 0.72 0.99 O.u 0.99 0.54 D.77 0.49 o.cc- 0.55 0.40 0.44 �j 0.72 0.33 U.24 0.22 0.10 011 0.00 0.00 4 I I 1 1 I 1 4 1 -1 0.00 0.00 0.20 0.40 0.40 0.90 1.00 1.20 1.40 1.40 1.90 2.00 0.00 0.20 0.40 0.00 0.90 1.00 1.20 1.40 1.00 1.90 2.00 Perms T(Esc) Period,T(sec) 16928 Woodinville-Redmond Rd NE,Suite 210 Phone:(425)487-1732 Woodinville;WA 98072 CORNERSTONE Fax; 425)487-1734 _• E N G I N E E R I N G. INC. Web:www.cornecstone-engr.com Site Name: P003932D Gwenway Date: 8/1W2014 �COFINEPtSTONE Client: T-Mobile CEI No.: 14-06070 �• ( N IS I N E E R I N O, I N C. By E.Underbrink Page: 1,Z Subject: Lateral Design Calculation Seismic Load Calculation for Components and System (Reference: IBC 2012,Section 1613&ASCE 7-10,Ch. 13,USGS Seismic Design Maps v3.0.1) Design Seismic Force: 0.2s Spectral Response Acceleration,Site Class B, Ss = 0.968 (ASCE 7-10 Figure 22-1) 1.0s Spectral Response Acceleration,Site Class B, Si = 0.424 (ASCE 7-10 Figure 22-2) Site Class = D (ASCE 7-10 Table 20.3-1) Risk Category = II (ASCE 7-10,Table 1.5-1) Site Coefficient per Ss&Site Class, F, = 1.113 (ASCE 7-10 Table 11.4-1) Site Coefficient per Si&Site Class, F. = 1.576 (ASCE 7-10 Table 11.4-2) Sms= F,S, = 1.077 (ASCE 7-10,Eq 11.4-1) Sul=F„S1 = 0.668 (ASCE 7-10,Eq 11.4-2) Sos=2/3 Skis = 0.718 (ASCE 7-10, Eq 11.4-3) S01 =2/3 SM1 = 0.445 (ASCE 7-10, Eq 11.4-4) Seismic Design Category per SDS = D (Per ASCE 7-10.Chanter 13) Component amplification factor,ap = 1.0 (ASCE 7-10,Table 13.6-1) Component Importance factor, 1, = 1.00 (ASCE 7-10, Section 13.1.3) Component operating weight,Wp = Wp lb Component response modification factor, Rp = 2.5 (ASCE 7-10,Table 13.6-1) Height in structure at point of attachment of component,z = 41 ft Average roof height of structure, h = 44 ft 0.4apSosW P Seismic Design Force,Fp = Rp/l (1+2z/h) (Eq. 13.3-1) P Min.Seismic Design Force.F9,1,,1,, = 0.3SoslpWp (Eq. 13.3-3) Max.Seismic Design Force,F,,,,,,,,, = 1.6S0slpWp (Eq. 13.3-2) Fp = 0.33 Wp (Ib) Fp,,,,i„ = 0.22 W, (Ib) Fp,r„s, = 1.15 Wp (Ib) Fp = 0.33 Wp (lb) (Strength Design) 0.7Fp = 0.23 Wp (Ib) (ASD) 18928 Woodinville-Redmond Rd NE,5210 WoodlnviNe,WA 98072 Tel:(425)487-1732 E-mail:cel @cornerstone-engr.com (208)250-7306 Web:www.cornerstwre-engr.com Fax:(425)487-1734 Project: P003932D Greenway Date: August 19,2014 • Client:' T-Mobile Prepared By E.Underbrink CE] No 14-06070 1-3 r'" 79 �'6W Off•,-- , v—x--7# 1 9G kf AloaC '10+.6)- r_U. 1(.0 ar sa :a -...wr n t ti-I (i.,.i' -- 'Fyn i_ .F.-...-,-7 - - 1.T tr.r j 1..r 31 Rr- - _Za- .. �,'r'X5+3,:.��A,:!..!A z.RyF i .w is -1 w - ' t, '.' .r ....„-A ��:• .r.". ,p '< : ".•ra t ..a. ` ,t , 0.4. nil__ k_ et 1, 5 IF f+I•- 1 -9' #":..-+ "e 1 '4 UCi fir- .� �,■ 1. L4,"...�• _ . _ 5.—.' \.-_ .a, � ;• !.. IP 6.41'....-.,+, s ('': t��,.: .a _ \.-, -+, �'1' ,• ► £ •fir, , L„ ► l9 1,. _.` 4 0-?f - � `_. ��.'_�-z -� ��� -'�t r ry; r, ..fr„�' . -.��+ -,5 AFC r• - rti r •c �t" t f .� •• '._ ,,, 7r �, R ` ,,,,7 .571�+_ -R,. 9..„ _ a��1 r N Tj� 1 /r•/ '��t-,7.16 R..1::: r tt-r—■∎ - ' 1.,f c .. •.. .• .i 1r,1,..,,, , --\w.R 1 w.1"—R I � {=7 C3 •-I-_----_.L--S — - _.__..___- _,_..-_ ID //y�1 S�1 arw dm. w•• �y m• l.w.. w. 'Tjrr•+all/ \,__\\7_,.."----- , ••••••,•. a.wv wr '! ! 12. .:ar...r r.w Ru. ma- ...\ ii, i.1a.. • ..,.� /MI 472111 .. a+..1....... ..a .iii #. Total Elevation Gain =30ft Therefore Kzt= 1.0 by Inspection 16928 Woodinville-Redmond Rd NE,Suitc 210 Phone:(425)487-1732 Woodinville,WA 98072 sw.,.. CORNERSTONE Fax (425)487-1734 Web: E N G I N E L R I ry G, I N C WWW.COrllerStOnCrengr.COm Site Name: P003932D Greenway Date: 8/19/2014 C"---- E.�STOfNfa Client: T-Mobils CE1 No.: 14-06070 � .Nola[.w,wa, ,rrF i By: E.Underbrink Page: 1,4 Suter Lateral Design Calculation Wind Load Calculation for Other Structure (Reference: IBC 2012 Section 1609&ASCE 7-10 Chapter 26-29) Wind Velocity Pressure: Basic Wind Speed,V,,. (mph) 120 (ASCE 7-10.Figure 28.5-1A,B,or C) Exposure Category = B (ASCE 7-10,Section 26.7.3) Risk Category = II (ASCE 7-10,Table 1.5-1) Velocity pressure exposure coefficient,K, = 0.78 (ASCE 7-10,Table 29.3-1) Velocity pressure exposure coefficient,K,, - 0.78 (ASCE 7-10,Table 29.3-1) Topographic Factor,Ku - 1.00 (ASCE 7-10,Figure 26.8-1) Wind Directionality Factor,Kd - 0.95 (ASCE 7-10,Table 26.6-1) Velocity Pressure,q, 0.00256K,K,KdV' = 27.32 psf (ASCE 7-10,Eq.29.3-1) Velocity Pressure,ql, 0.00258Ki,KuKdV2 = 27.32 psi (ASCE 7-10,Eq.29.3-1) Design Wind Force: For Open Structures&Equipment Gust effect factor,G = 0.85 (ASCE 7-10,Section 26.9.1) Net force coefficient,Cr = 0.70 (ASCE 7-10,Figure 29.5-1,3) Mean roof height,h<60ft (No) (GCr), = 1.00 (ASCE 7-10,Section 29.5) (GCr). - 1.00 (ASCE 7-10,Section 29.5) - Projected area normal to the wind,Ar = Ar ft2 Horizontal projected area of rooftop equipment,A, = A, ft2 Design Wind Force,F - q,GCy4r lb (ASCE 7-10,Eq.29.5-1) Design Lateral Force,Fn = gn(GCr),,A, lb (ASCE 7-10,Eq.29.5-2) Design Vertical Uplift Force,F„ = q,,(GC,),A,. lb (ASCE 7-10,Eq.29.5-3) 1.OF = 18.3 pef x Ar (Strength Design) 1.OF„ = WA Height ^ Koine K,, z(ft) Exposure B Exposure C Exposure D 0-15 0.57 0.85 1.03 20 0.62 0.90 1.08 25 0.66 0.94 1.12 30 0.70 0.98 1.18 _ 40 0.76 1.04 1.22 50 0.81 1.09 1.27 60 0.85 _ 1.13 1.31 70 0.89 1.17 1.34 80 0.93 1.21 1.38 90 0.96 1.24 1.40 100 0.99 1.26 _ 1.43 120 1.04 1.31 _ 1.48 140 1.09 1.36 1.52 160 1.13 1.39 1.55 180 1.17 1.43 1.58 200 _ 1.20 1.46 1.81 16928 Woodinville-Redmond Rd NE,#210 Woodinville.WA 98072 Tel:(425)487-1732 E-mail'cei@comerstone-engr.com (208)250-7306 Web:www.cornerstone eng-.corn Fax:(425)487-1734 Site Name: P003932D Greenway Date: 8/19/2014 `�� CGr�Nt STOfNt= Client: T-Mobile CEI No.: 14.06070 N B I M E[R M O, I N C. 8y: E.Underbrink Page: !► Subject: Lateral Design Calculation Ice Wind Load Calgulation for Other Structure (Reference: IBC 2012 Section 1609&ASCE 7-10 Chapter 26-29) Wind Velocity Pressure: Basic Wind Speed,V3. (mph) = 40 (ASCE 7-10,Figure 26.5-1A,B,or C) Exposure Category = B (ASCE 7-10,Section 26.7.3) Risk Category = II (ASCE 7-10,Table 1.5-1) Velocity pressure exposure coefficient,K. = 0.78 (ASCE 7-10,Table 29.3-1) Velocity pressure exposure coefficient,K,, = 0.78 (ASCE 7-10,Table 29.3-1) Topographic Factor,K,r = 1.00 (ASCE 7-10,Figure 26.8-1) Wind Directionality Factor,Kd = 0.95 (ASCE 7-10,Table 28.6-1) Velocity Pressure,q, 0.00256K.K1K,V2 = 3.04 pef (ASCE 7-10,Eq.29.3-1) Velocity Pressure,qh 0.00256KhKAKdV2 = 3.04 psi (ASCE 7-10,Eq.29.3-1) Desinn Wind Force: For Open Structures&Equipment Gust effect factor.G = 0.85 (ASCE 7-10,Section 28.9.1) Net force coefficient,Cf = 0.90 (ASCE 7-10,Figure 29.5-1,3) Mean roof height,h<60ft (No) (GCr)h = 1.00 (ASCE 7-10,Section 29.5) (GCr)„ = 1.00 (ASCE 7-10,Section 29.5) Projected area normal to the wind,Af = Ar ft2 Horizontal projected area of rooftop equipment,A = Ar ft2 Design Wind Force,F = q.GCfAr lb (ASCE 7-10,Eq.29.5-1) Design Lateral Force,Fh = gh(GC,),,A lb (ASCE 7-10,Eq.29.5-2) Design Vertical Uplift Force,F. = gh(GCj) r lb (ASCE 7-10,Eq.29.5-3) 1.0F = 2.3 pd x As (Strength Design) 1.0F. = N/A Height _ Kt and Kh z(ft) Exposure B Exposure C Exposure D 0-15 0.57 0.85 1.03 20 0.62 0.90 1.08 25 0.66 0.94 1.12 30 0.70 0.98 1.18 40 0.76 1.04 1.22 50 0.81 1.09 127 60 0.85 1.13 1.31 70 0.89 1.17 1.34 80 0.93 1.21 1.38 90 0.96 1.24 1.40 100 __ 0.99 1.26 1.43 120 1.04 1.31 1.48 140 1.09 _ 1.36 1.52 - 160 1.13 1.39 1.55 180 1.17 1.43 1.58 200 1.20 1.46 1.61 16928 Woodinville-Redmond Rd NE,#210 Woodinville,WA 98072 Tel:(426)487-1732 E-maa:ceecomerstone-engr.com (206)250-7306 Wets:www.cornerstone-engr.com Fax(425)487-1734 proled by EiCOPN.WIQN.- [N mil I .t l9' sheet no. 6 CEI ro, Chant checked ( date WVIIT Ea /PMEN7 1.•o4o S FRP CIJ/STE IGKT •` eps (7r4(3) C ►6e9 g WIN) M ' (32,1214)(/ ) L/1_ 7 FfL PA S trEt■ 14,9 ; DA/83(k`bS/6- R 2.1v) (TD rte- OP 3 GHr (EA.) : 35'16 woof) ,a-12,f/ ' — NotiE MIAs s ( rcr Mc F 6) via/&HT( to rb WIND AREA- : — NONE mod sheeth r•-• Ec°7r4 T°,^'! wnr°" deb ti'Li5Wllir client checked CEI Job no. dew 812411 14—%6?& IC - LAW /NG: ICE- T //C Ess : I • „ )a/ is ;7 2.0 E 20( i `" )(-‘ =- 2, oSS''" At- 'rt ( 01(11 )(2(3.fz) ' - .(4.s ' rt t.4( k -/2)".7+ (32444)06-4Y1� D(2•0W)CS 396 (172-4. 1 Z59 `ry 6s 39 2 = S530S V Li 9. y 4� Wc: -• ?Se - (s-6 p.F)(49.Li 443) 7 2. 7 k Project P003932D Greenway Date: August 19,2014 Client: T-Mobile Prepared By: E.Underbrink ('Fit No: 4-06070 2. Q 2. Monopole Analysis 16928 Woodinville-Redmond Rd NE,Suite 1 2 0 Phone:(425)487-1732 Woodinville,WA 98072 Web:www.cotnerstone-engr.com Fax:(425)487-1734 • f Z X 1.1"0 k-SrRoNc: P/I.D� {� ° 3 8. 2 � SASSED tv/ND ' Lig /� - /v1EfrigEg °e-,0 Q SEISMIC : 5 (6174- • -F- For%(r Lc' S Fc Eau/R V , ;,` HS 5 Pl x 0.375 W IND _ IP it (fFBovE Ow 16. I "Pc) STKE;SED CHASE 0A.)14 - r/lEryQE K 014 SrSMrc: IS. 21b/PE' -- _ 2O-5 "" ' Top o F cm() (b-(ASE vz -. a r C Lo' CO/v)go5.,,. i. D p+o.? Pt miti-s R E1KTxDN S 1 ( ) Axr4 L : 4.�5 " (LC � d•C' w k ) f SHEAR: Q. Go (LC 6 y. pto.'7(b tWc) D f 0'7 �{� Q•7��/ / ovE2TtiRNfNG: i7. 8 14-F6 (LC 3) CEI Monopole Analysis EAU _ P003932D Greenway Aug 19,2014 at 10:01 AM 14-06070 - - - Monopole Analysis.r3d Prof by GAO sheet no. ••• • !R I bcatbn deft N 11111 22 dent CEI boo na. date 81 o bf j 6°70 Chug M°NO POLE 8/9-,5r. (s Rl 6/►V p /. P -$I G/J Loos /9PPL/f1� Lo/ P$ pfe. vALfvuefur 0 E S/&N D/V MONO Poet-°' M ePlE tir' 23,76 it 17. vet- oK BY •7 7 r` 60 K e 1 NSPECT1oN CoMRRr0761u; 1 , 19 4. yS & arEgc h /4L L 1) (LSO �f rr CaNC RE 7E 64 PER K.J \ PAIR sp A ..tl1EEr (-i) ?et,. 61 0° 11.4 TIES C HEC k SOIL _ J3FA-P 1 NG e__. ys k + (A e • O )5 'C' 13, . ckgv FRrcrloN k Fo { ., (Cr 0) IL (},14)(2°S(1154)(°.y'fsl42.9' ) G2S = 9. 91k END 1hG : Q = 1500 =cZ = ?07 '� I 61ALLow Qp4" Qs = I b- 98 > G? /3,99 k Site Num P083S32D Greene/ay Data: 8/19/2014 F.‘9.71`. 4fFi>a>r't�aV Client T-Moblts CB No.: 14-08070 ........ . ..o- By:EAU P.8« 2.3 Subject Drilled Pier Check Drilled Pier Check-Circular Cross Section Aoopad Load,-Factiond Axial Gabon 2.8 kips UPl0 0 MP Applied Moment.M„ 15.4 bE-8 Diarrglsr of Pier,h 36 eches Modulus of Ek+strity,E. 29000 kW Gross Area.As 1018 Ir2 Yield Strength,fr = 60 kal Yield Strain.4 0.00207 rcgInarti Bar Sias No. . Compressive Strength,r. 3000 psi Mee of Bar 1.00 in' Uri weight,Y. 145 1618' Bar Diameter 1.13 inches Mo kaus of Elasticity,E. = 3156 Its! Bar Count E l*knete Concrete Strain.tw 0.003 Gear Cover 3 inches P - 0.85 ACI316-0810.2.7.3 Fit„ 8 .1r RNn rcernanl ratio,p2 0.0059 Confinement ;ed St IMP Reduction Factor.0 = 0.85 ACt 318-08 9.3.2 Reinforcing coordinates(In) Bar No. Re nfi X Y 1 1.00 722 -12.50 Reinforcement Placement 2 1.00 -7.22 -12.50 3 1.00 14.44 0.00 4 1.00 -14.44 0.00 5 1.00 7.22 12.50 6 1.00 .7.22 12.50 •. • 1 hi , . I . .1.- .. 1 1 1. i . • • iii . 1 1 angthamitaismarais sn • OPn(kips) 0Mln(kip-fl) 0.00207 0.65 1528.9 0.0 0.00041 0135 458.7 858.4 0.00000 0.66 442.9 898.9 -0.00062 0.65 -900.8 774.4 -0.00207 0.68 -178.0 819 -0.00478 0.88 ,273.8 60.5 -0.01034 0.90 -304.4 28.4 • 0.90 -324.0 0.0 *Prf,00nto = 17 kips a 2.8 bp. 3% 1t926 Woo Redmond Rd IrE,5210 Tel(428)487-1772 Wcwkwille WA M0072 ns[ ione-erpr.com (200)4627734 E n: Wee:`reM.oanssbrrwpr.00m Fe (426)487-1734 Prgject: P003932D Greenway Date: August 19,2014 Client: T-Mobile Prepared By. E.Underbrink }J No . 14-06(170 3. Reference Documents Reference Documents 1. Structural Drawings, Greenway SUV P003932D, Valmont Microflect, June 18, 2002 Codes /Standards 1. International Building Code (IBC 2012), International Code Council, 2012. 2. Minimum Design Loads for Buildings and Other Structures(ASCE 7-10), American Society of Civil Engineering, 2010. 3. Manual of Steel Construction, American Institute of Steel Construction Inc. (RISC), 14th Ed., 2011. 4. Building Code Requirements for Structural Concrete(AC!318-11), American Concrete Institute, 2011. 16928 Woodinville-Redmond Rd NE,Suite 210 Phone:(425)487-1732 Woodinville,WA 98072 �CORNERSTONE Fax:(425)487-1734 Web:www.com«stone-engr.com En,is E 0 1 N E E a .a a. INC. ( ) 09/20/2002 FRI 13:50 FAX 15037363014 3. I Q0113 09/20/02 FRi 12:39 FAX 503 Sin 2090 NICROPLECT al003 i -1 FOUNDATION NOTES: i 5011 parameters per gaoler:finical evaluation by Northwest Geolech. Inc. Pro). No, 1053.46.1. doled May 31, 2002. 2. All concrete shod have a minimum compressive sfrerlplh of 3000 psi i 26 days and shall cantata lo the AG standard building code for reinforced Cksvele. AU 310. the Le-steel edilan. 3. All reinforcing shah be Intermediate grade deformed bats conforming to ASTM 4615 grade 60 160.000 psi Fin yield) and shoe be provided by the foundation conlracior. 4. Pour concrete ogohsl undisturbed eat and farm portion above ground only 5. Anchor bon. to be ASTM F 1554 Grade 55. 6. Underground utilities should be located prior to excavation 7. Design based on the following reactions: Maximum averhrrne moment - 23.6 ft-klps, Accumulative .rear at base - 0.97 kips. Total weight - 199 kips It Estimated concrete volumt - 3.53 cu. yards. 9. Ore packing procedures: Ms 2 pane sand. one port cement, and arid just enough water to allow molding a Mope by hand. Restrict the water content to a renames (Ihts minimizes the possibility of skirt icoge when the mortar. dry-mixed for maxima density and strength le pocked In place.) The pocking shall be cone by hand, ramming with burs or caulking tools, or a combination thereof. 10. M wafer Is present in the excavation the use of drilling fluid nay be required to control flowing slits and sonde. The pier excavolion Mil need to be cased fo prevent caving and possible loss of support to odlacent building foundation during construction. See rererreneed geolechnical report. REBAR LAP SPLICE GRADE 60 REBAR lthicoofed mbar. normal wl.cohicrNst Ala 816-95 Reber Reber Specified Overtop finches) Size (Part no. Iw1/ft f 1OdD d. d.. Size Grade Concrete Vert e+3 11-97203 036 — 2 1/4• 1 1/2' Strength is4 11-97204 047 5' 3• 2' a3 60 3000 psi 13 i 55 11-97205 t04 --- 3 3/4' 2 1/2' of 60 3000 psi 17 146 11-97200 130 - 4 V2' 4 1/2' • sS 60 ' 3000 psi 22 .7 11-97207 2.04 - 5 1/4' 5 1/4' 246 60 3000 pet • 26 se 11-97206 2.67 ----- 6' 6' • 57 60 3000 psi 36 19 11-97209 3.40 - It VY e0 60 3000 pet 43 510 11-97210 430 - 10 314' e9 60 3000 psi 40 s e11 1 531 -, 12' _ tem 60 3000 psi 57 ham lard hook detail snort 511 60 3000 psi 71 L/y, e}ar '., rug hook detail chart Spiking Is an olterrtatiVe to specified �� �M a� • stater/al listed In robot schedule. I�t;F i eke di i�• • ai`. a ., 1 iotiv. REINFORCEMENT STEEL SCHEDULE I* 135a bend Sym Type Reber Reber 0Ytemelone Weight Oty II Site Spacing a b c h d ;node .dbel 10c11 1 A e9 - 13-0• 465 6 • 2 F rd, EQUAL 2'-6' •Y • -V . 88 15 } • . Total steel weight for camptate foundation Installation w " . 1--___' 353 l o -1 45 Opiton: May use w< spiral s 12' with 1 1/2 extra bum top and bottom 0• DR QED PiER FOUNDATION z VOICESTREAM WIRELESS ° Greenway SUV P0039320 Is AY 1s Y' i"' MICRORECT DATE ttiniia2 Ian.Sal.lxe[T SE 15.01 de Iran RN.g14100.r'7•,Mk ftlH1Vii. S.O. esroo-s2' ,Is'