PFI2015-00008 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT l: COMMUNITY DEVELOPMENT Permit#: PF12015-00008 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/05/2015 Parcel: SEG285 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Teleport Communications of America Project Description: Adjacent to SW North Dakota,Greenburg, Oak, and Tiedeman. Beginning on north side of North Dakota just west of the RR crossing will be installing UG fiber optic network connection. Then heading east across Tiedeman Ave to SW corner of Tiedeman and Greenburg,tie to existing fiber conduit. Then again from the west side of Greenburg just south of Cascade Ave, install UG FOC heading north to the Owner: FEES Description Date Amount PFI Permit Fee 02/05/2015 $800.00 PHONE: Contractor: STANDARD UTILITY CONTRACTORS, INC. P O. BOX 1008 SALEM, OR 97308 PHONE: 503-849-4828 FAX: Applicant: SHAWN DALBEC 10340 SW NIMBUS TIGARD, OR 97223 PHONE: 503-495-0112 Total $800.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant A� Signature: &Jc> ^!"C5e,- )4 � r Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12015-00008 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI Utilities 14-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector Kenny Fisher at 503-816-6146 or email at kenny@tigard-or.gov twenty-four (24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 19-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 21 -OTHER Applied Notice Proposed fee is$800. Application may choose to base fee on 7%of the cost of the public work by submitting a construction cost estimate. RECEIVED City of Tigard JAN 2 6 2015 : ' Application For Work In The Right-Of-Way ROW Permit Property Address/Location(s): FOR STAFF USE ONLY SW North Dakota,SW Tiedeman,SW Greenburg Rd.,&SW Oak St.(See Plan Detail) Right-of-Way Case No.: R F-Ta b IS c C<>C,f) *Applicant's Name: Teleport Communications of America,LLC Application Accepted: d'4K-' By: Address: 10340 SW Nimbus Application Reviewed:-'"" /5-Br.ACB City/State; Tigard,Oregon zip; 97223 Application Fee Due: Ts4)0.1 Primary Contact. Shawn Dalbec,Outside Plant Manager Applicant Notified: ��a 1✓t ' rat Phone: 503-495-0112 Fax; Receipt No.: Email; dalbecs@att.com REQUIRED SUBMITTAL INFORMATION Contractor's Name: Standard Utility Contractors,Inc. • Application form,completed and signed 6 6 94 8 5/29/15 • Submit one(1)copy of scaled sketch of CCB# Expiration: the proposed work to be done Address: PO Box 1008 City/State: Salem / Oregon gi97308 • Submit one(1)copy of traffic control p. plan Phone: 503-849-4828 Fax: 503-364-8844 Professional Engineered Plans are required Email: darrel@standardutility.com for. • Street Widening pis By: Commstructure Consulting,LLC • Subdivision Infrastructure Address. 811 Railroad Avenue • Main utility line extension Ci Oregon City, �P'Oregon 97045 Deliver application to rowpermits .tigard-or.Qov or to City/State: City of Tigard Planning/F44necring,13125 SW Hall Phone: 505-343-4423 Fax: Blvd.Tigard,OR 97223. Email: scottna,commstructureconsulting.com Rev.12/10/20t3 1ACURPI.N\M astern\Lod Use Appkari \Right-of-ray Pamrt A,ppieatiao.doa Description of work:Enter ROW beginning on Northside of SW North Dakota St just west of RR Xing wiN be installing UG Fiber Optic Network Connection heading east across SW Tiedeman Ave to SW comer of SW Tiedeman and Greenbrug Rd.,tie-in to existing fiber conduit Then again from Westside of SW Greenburg Rd.just south of SW Cascade Ave.install UG FOC heading north to the intersection Greenburg Rd and Cascade Ave.and tie-in to existing fiber. Set new utility vault along SW Oak St. Estimated value of work(within the public right-of-way): $ Is work related to a LAND-USE DECISION? YES [] NO If so, please specify(MLP,SDR,SUB,etc.)case#: Is the work related to a BUILDING PERMIT? YES E] NO If so, please specify(BUILDING PERMIT)case#: Signature of Applicant/Permittee: Date: 1/22/15 Print Name: Shawn Dalbec Title- Outside Plant Manager rL Cityof Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 D503-718-2464 1 www.tigud-or.gov '7� -�'r.�n''�`� �i�.. � '�ord�' ��O �` , � °�F Cvo��/Q r•�auv . ?0, zl Q �J hh3 , RECEIVED Letter of TransmiconnMs� L,cc DRV- JAN 2 6 2015 Date. January 22,2015 CITY OF TIGARD PLANNING/ENGINEERING To: From: City of Tigard Commstructure Consulting, LLC 13125 SW Hall Blvd. 811 Railroad Ave. Tigard,OR 97223 Oregon City,OR 97045 Attn:Scott Butler Re:Utility Permits Utility Coordinator/ Permit Specialist This Application is an addendum to the existing permit and invoice#tROW2014-00022 with updated drawing set and changes to occupy and perform operations within City of Tigard Rights of Way and being subadtted on behalf of: Permitee: Contact: Teleport Communications America,LLC Shawn Dalbec(503)495-0112 10340 SW Nimbus dalbecs0att.com Tigard,OR 97223 project Description:This project will create new underground fiber optic network connection to add diversity to the existing fiber network in the Tigard area of Washington Co.,Oregon. Scope: • Beginning at an existing aerial facilities location on NW North Dakota St,Place new conduit, cables,and vaults as shown on sheets BU62&BU63 east to SW Greenburg Rd intersection • Beginning at an existing aerial facilities location on SW Greenburg Rd,Place new conduit,cables, and vaults as shown on sheets BU65 Ar BU66 north/east to SW Cascade Ave intersection • At an existing underground facilities location on SW Oak St,Place new conduit,cables,and vault as shown on sheet BU72 near SW Greenburg Rd intersection Enclosed: -City of Tigard ROW Permit Application -Detail Drawings If you have any further questions please contact me at(971)266-4423 or scottOcommstructureconsulting.com.I appreciate your assistance with this request. Sincerely, Scott Butler Commstructure Consulting,LLC Planning I Design I Implementation 811 Railroad Ave . I Oregon City, OR 97045 I (503) 343-4134 www . commstructureconsulting.com Cheryl Caines From: Cheryl Caines Sent: Monday, February 02, 2015 4:39 PM To: Scott Butler Cc: Greg Berry; Zen Dutson; ROW Permits Subject: TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - City of Tigard ROW Permit -Addendum/Invoice #ROW2014-00022 Categories: Misc. Correspondence Hi Scott, Our Engineering department has reviewed the permit for areas south of Greenburg Road. The applicant may choose to pay a permit fee of$800 or 7%of the estimate for work in the right-of-way. If you choose to pay the 7%, the please submit an engineer's estimate for review in order to determine the fee. If you choose to pay the flat fee of$800.00, then I will enter the fee. Fees can be paid on-line by credit card. Thank you, Cheryl Caines Planner on Duty (503) 718-2421 DISCI E-fnaiis sent or received Iry City of Tigard employees are subject to public record laws- If requested, e-mail may bo to party lurdess exer�ipt from disclosure under Oregon Public Records haw_ E-mads are retained by the City of Tigard in ccmpiianue v.A the Oregon Administrative Rules "City General Records Retention Schedule." 1 SURFACE FEATURES/AERIAL UTILITIES-LINETYPES& SYMBOLS EXISTING PROPOSED AERIAL DESIGN EXSTING PROPOSED DESIGN DEyav EXISTING PROPOSED T_FI I F(_'OM__M_ CABLE CABLE 0 UTILITY POLE • UTILITY POLE CABLE MARKER CABLE MARKER STRAND 1.4 SPLICE H SPLICE CONDUIT STRAND LE/WCROUND MARKER CABLE MARKER LUGS GROUND LUGS RATED FLEX CONDUIT CONDUIT E� PLENUM /RISER �I MIO–SHEATH SPLICE � MID–SHEATH SPLICE (AS SPECIFIED) r VAULT/BUILDING S79RAGE 75 VAULT/BUILDING STORAGE CAN RISER PLENUM /RISER TELECOMM MANHOLE COMMUNICATIONS (OWNERS SPECIFIED ON PLANS) RATED FLEX CONDUIT FIBER SYMBOL L FIBER SYMBOL LOCATE WIRE ACCESS POINT q LOCATE WIRE ACCESS POINT —CATI CAN (AS SPECIFIED) O POS T - TELEPHONE POWER TRANSFORMER FIBER OPTIC AERIAL STORAGE •x AERIAL STORAGE (NTS) POWER METER POLE TO POLE GUY � FOR REFERENCE ONLY POWERILLECTRICAI (OWNERS SPECIFIED ON PLANS) E-- GUY ANCHOR & GUY TRAFRO PRIMARY o AUXILIARY ANCHOR/ - STREET LIGHT o S/W ANCHOR OR & GUY CROSS WALK SIGNAL TRAFFIC SIGNAL o— CENTERLINE DONNCUY TO EXISTING ANCHORn RA CROSSING SIGNAL VGR GROUND r S/W ANCHOR OR do GUY OTHER UTUT£S z ® JUNCTION BOX INTERIOR BOND AUXILIARY S/W ANCHOR/ TRAFFIC SIGNAL POLE m SIGNAL CONTROLLER GAS r� DOWNGUY TO EXISTING ANCHOR SANITARYVGR GROUND SIGNAL CONTROLLER STORM AUXILIARY ANCHOR/ RAILROAD ARM WATER DOWNGUY TO EXISTING ANCHOR INTERIOR BOND SIGN TOPO FEATURES izmRECEIVED❑ AREA DRgIN BOW Q' BACK OF WALK/SIDEWALK ' CATCH BASIN BUILDING FOOTPRINT DETAILS AND SECTIONS CALLOUT SYMBOLOGY STORM SEWER CULVECURB CURB RT SECTION LETTERS BLOW OFF JAN 2 6 2015 EOC EDGE OF CONCRETE FIRE CONNECTION EOG EDGE OF GRAVEL A A FIRE HYDRANT CIN OF TIGARD EOP EDGE OF PAVEMENT SCALE: N.T S IRRIGATION METER .. DWY DRIVEWAY IRRIGATION VALVE PIANNING,/ENGINEERIN TOB TOP OF BANK DRAWING NUMBER WATER METER FENCE SECTION IS WATER VAL VE STRIPING LOCATED ON WATER VAULT -- R/R TRACKS STREET NAME OR DETAIL DETAIL NUMBER TOPO CIL RIGHT—OF—WAY CENTERLINE PLAN NAME OR DETAIL LINE *E�01 BOLLARD R/W RIGHT—OF—WAY SCALE: I'-NTS GAS VALVE EASEMENT DRAWING NUMBER GAS METER WALL DETAIL IS LUMINAIRE VEGETATION LINE LOCATED ON FIBER SPLICE LEGEND: MAILBOX PROPERTY CORNER 5.2 SHEET NUMBER MONUMENT SURVEY 7 WORK STEP PARKING METER ABBREVIATIONS SANITARY SEWER STEEL PILING E/W EQUIPPED WITH N NORTH AB ABANDONED FOC FACE OF CURB RPL REPLACE TREE D/W DRIVEWAY S SOUTH BOC BACK OF CURB GRC GALVANIZED RIGID CONDUIT SCA SIDE CABLE ARM 0/S OFFSET E EAST BOW BACK OF SIDEWALK HT HEIGHT SLP STREET LIGHT PROTECTED R/W RIGHT OF WAY W NEST CATV CABLE TELEVISION HOG HOT DIPPED GALVANIZED SLU STREET LIGHT UNPROTECTED S/W SIDEWALK DG DOWNGUY to INNERDUCT SL STREET LIGHT FC FIBERGLASS CONDUIT MGN MULTI–GROUNDED NEUTRAL TEL TELEPHONE N/O NORTH OF FGA FIBERGLASS ARM M1N MINIMUM VGR VERTICAL GROUND ROD S/O SOUTH OF OD OUTSIDE DIAMETER WT WEIGHT E/O EAST OF DOC DEPTH OF COVER PL PLACE NT NO TAG W/O WEST OF FDC FIBER DUCT IN CONCRETE PWR POWER FO FIBER OPTIC PUE PUBLIC UTILITY EASEMENT 45'/4/D(T)–POLE HT/CLASS/DISTRIBUTON(TRANSMISSION) P.O.A. <–PROPOSED POINT OF ATTACHMENT P.O.A.= <–ACTUAL POINT OF ATTACHMENT TOTAL TRANSMISSION POLES_ _ — DESIGN BY.. R. RAPPE CHECKED BY: E. ORTON _ TIGARD BACKBONE OVERBUILD: Y FlELDED BY. R. RAPPE DRAWN BA. MEUUS TOTAL DISTRIBUTION POLES— _ — at D. McNEELY + �_--p-) �� SOUTH CONNECTION TO SW GREENBURG ROAD i 3 TOTAL NEW STRAND rc DATE: BY REVISION APP' 03/31/14 APM ORIGINAL ISSUE TOTAL AERLIL PLANT - _ TBLBPORT CO"EWCLTIONS TCA 1=0 S.W. NIMBUS TOTAL U.C. PLANT_ — — — — — _ CONSTRUCTION "ERICA, LLC TIGARD OR 97223 TOTAL SLACK_ _ _— _ _ — — COMM LIG E SET PLOT DATE: SCALE: FILENAME & SHEET NAME: v 811 Rail, d A-- mw.offKe 03131114 313112014 N.T.S. L GO 1 TOTAL UBM———————_ Omgor h•Z s smx3alx cwn�xyurecurnul PL EXTERIOR WALL MOUNT.A1NC71ON BOX � FACILITY ENTRANCE LOCATION SECURE TO VAULT WALL NEAR ULT OPENING R GROUND ROD (BOND METALLIC.AMCT)ON BOXES TO RE-SEAL OPENING WITH EPDXY OR GROUT AS REQUIRED SUITABLE GROUND S INTERIOR FIBER PATHWAY As REQUIRED) .'� PL CABLE rAcs = INSTALL DUCT PLUGSe FIBER CABLE /12 LOCATE MIRE SECURE Freim COOL CABLE TRAY SHOR77NG BAR OR JUMPER MOUNT TESTOX TEST STATION FACILITY ENTRANCE CONDUIT SHELTER WALT. TO INTERIOR VAULT WALL OR POLE BASE AS REQUIRED /I2 LOCATE MIRE /12 LOCATE MIRE i ALL LOCATE MIRE ENTERING A 571TUC1URE SMALL '. BE GROUNDED TO NEAREST SIN'fABE GROUNIO IN PROXWTY TO FACILITY E/VTRANCE. pSTANCE FROM BUILDING ENTRANCE TO GROUND 1--GROUND BUS BAR OR LOCATIONS SMALL NOT EXCEED SO FT. I! LE GROUND PLACE TWO (2) OR MORE GROUND WIRES PLACE /6 COPPER BOND/I2 LOCATE MIRE 7D AS REQUIRED AND GROUND WIRE FROM E�T�GROUND ItooOR PLACE � a WIRES TOBONGROUNDLUG ALL LOCATE GROUND ROD 717 AS REQUIRED ` TERMINAL BOARD EXTERIOR GROUNDING OPTION INTERIOR GROUNDING OPTION TESTOX TERMINAL BOARD FRONT VIEW UTILITY VAULT1HANDHOLE VAULT SMALL BE FREE OF DIRT AND DEWS FACH.ITI'ENTRANCE ^ TESTOX TEST STATION S GROUNDING DETAIL SCALE I'-N.TS BUrl6.2 SCALE: T.S.I'-N. BUIi2 RACK SAME ON OPP097E SIDE PL TRI-FLEX DUCT PLUG AT TDP OF RISER OR END /I2 ANC LOCATE IINf 3 OF CONDUIT AT VAULT ENTRY TO ORGANIZE t SECURE BLVD LOCATE IME TV- MGN FIBER NIEA7IY AND UNIFORMED INNERDUCT- TRAY NNERDI/C7 NITHN 8'FROM TOP MGN ON POLE UTILITY VAULT SECURE FIBER COAL TO RACKING OF RISER OR END OF CONDUIT A7 VAULT ENTRY. LOCATE WMRE 5 TRIPLEX PLUG AROUND DUCT IN SLEEVE /12 AMG ACCESS POINT 9MPLEX PLUG N DUCT WIN FIBER. LOCATE `"`���'"//// DUCT PLUGS N ALL VACANT DUCTS MING/6 MGN OR WIRE GROUT WALLS SMOOTH AROUND PLACE AS REQUIRED /12 AMG LOCATE NRE INCOMING DUCT~ PLALL CONDUfT/f*A)RDUCT SAMPLER DUCT PLUG AT PL LOCATE TERMINAL CABLE ENTRY TO PLACE FIBER TAGS SECURE TO VAULT WALL NEAR VAULT OPENING. PL/12 PL 012 SEAL OPEMING BETWEEN LOCATE LOCATE � CABLE AND CONOINTS 8' GROUND ROO EXISTING LENGTH/AS REQUIRED TO UTILITY POLE ACHIEVE ACCEPTABLE Nr AMG TAIL BETWEEN GRND EARTH GROUND ROD AND ACCESS POINT RESISTANCE. CONNECT ALL METAL STRAPS CHANNELS ETC. PL NEW RISER ROUTE LOCATE PL CABLE TAGS- LOCA IRONS -Fojj MIRE UP RISER AND BOND TO DRILL CONDUIT AS REWIRED MGM FOR LOCATE WINE DRILL CONDUIT UTIUIY VAULT AS REWIRED FOR LOCATE MIRE PROPOSED CONDUIT WIRSER AND Y±L f 4' CONDUIT WANNFRDUCT 2' CONDUIT AND INNERDUCT LOCATE WIRE EXISTING GROUND PL GROUND ROD MODIFY TOP OF RISER/CONDUIT AT VAULT ENTRY OR CONDUIT PLUG ROD k/6 MGN OR PLACE PL 6'MIN. DEPTH OF CRUSHED ROCK INSrALLr3-"\ INSTALL RODENT BARRIER AS REWIRED AS REQUIRED TO ACCOMMODATE LOCATE MIRE AT ENTRY AND EXIT AS REWIRED DUCT PLUGS SIMPLEX DUCT PLUG DETAIL AND TYPICAL BONDING DETAIL VAULT I HANDHOLE INTERIOR DETAIL(TYPICAL) TRI-FLEX DUCT PLUG DETAIL TRANSITION AERIAL TO UNDERGROUND - � 9 SCALE. 1' N.T.S. BUBE.2 SCALE: 1'-N.T.S. BU68.? SCALE: 1'-N.TS. BUEEI DESIGN BY., R. RAPPE CHECKED BY.- E. ORTON TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES— _ — FIELDED BY R. RAPPE DRAM BY A. MEUUS SOUTH CONNECTION TO SW GREENBURG ROAD D. McNEELY at&t TOTAL DISTRIBUTION POLES_ - — LOCATE WIRE AND BONDING/GROUNDING DETAILS TOTAL NEW STRAND_ — —— — — DATE: By RENSION APP cc 03/31 14 APM ORIGINAL ISSUE TOTAL AERLIlL PLANT_ — —— — _ TEMPORT CO"MUCMOXS TCA !0340 S.W. NIMBUS TOTAL U.G. PLANT_— —— —- _ CONSTRUCTION "MUCA' LLC rIGARD OR 97223 COMMllC E SET PLOT DATE: SCALE: FILENAME & SHEET NAME: TOTAL SLACK—— —— — — — — _- -- --- 03/31114 A- M-Off— 3/31/2014 N.T.S. BU66.2 r W 0ADLIFOreg-aty' 8- �AIN FRAME a COYER aALVAM®WAKI D PLATE Daws W/LL1306 ears FULL lea / DPDI ear-aa6t�LO�ic (2)-W DIA MEX-OMIS mAM x1F AMIDABLY 310 LIM RFQSSM 1Ir NAICLE 6' SUITARE 7011 USE N OW-411M LOCAIRM mm NOT SleAM1m 10 RJRI 11[0011rr WN 6• �\ tK MA.IBT N= (I -.._- (1 EAm>p4 1Y \\ J'-O'LOW GALVANM V OWfEL 1 O (4 EACH SWJ eA>E M0.2ee-eT IY VAX ACMM 7,00 L!K 2- MFT ANCHOR (e PLACES N TDP) v /•LD10 DALVAI®Y'QIANQ TOP 1-11 FRAME a COVER (2 EAt31!bq r� No.I87-TT-42C \ 6.620 LBS. DID) Ste` (2 LAM RMER UTILITY VAULT PRE-CAST 264-TA 2 6" SCALE: 1'-MTS DT01 d 0 RI/ER ° 0 6" 2'-O"LOW GLtAII@D.C.aNAMAEI (4 EACH ETD) a 0 \ t RR7l9P \ � � BASE No..*V-ff "-&Cp TOP 42'Dim, at Aaee ®� 4e10 LBS r-o' No 1.410 be. � (2)- 2-ran LM Anchor. VYj 3'-0'Long Galvanized ° 0 C'Channel 6- (1 Each Side) ° 3'-0'Long Galvanized C"Channel !° �d a. OALVANED gRi, X wO12•DIA (1 Each End) 6 (1 EACH 00 N USE) AJV �4,J6"DUL TA91M-A-OIICT T•DLO. Ground Rod Knockout (2 / 6'-,tY \ ,.-1K (��11 EACH E707 J ADNRpLK 5'-6" SYNERTECH HANDHOLE 817300ISAA 3C2 FAL>rl » A LOCA1ED BASE SCALE- I'-NTS DT01 Na 46J-7-n-s2c9►aEr TOP) AS REOLMM Na"4.6 S_6. OPflONAL 403-TA z,31) 3;270 I- BASE L TOP 12'Dlo.Acme ♦Z"DTA ACCESS r-6- IB'x 18'Knockout—**' 3•-2' vAl10M NLL 167-1r-42C ' • (2 Each SkN) 4620 LBS 1-Y VAULT 00 ' 1•-6" MAtOIgE 4 K r r O Iy S-,1Y Galtanized Pup/Litt iron-/ 0 6• 0 (i EachComr) B'Dia 0 p 6'-0• Steep MAIMNAL16pooLT /\' `12"x h Knockout n r 6'-1lY / a-TAAseL91N.o (2 Each End) » 6'-10- v Na e67-6077(9101tT BASE) \ _ / Na 167-BT\ 2670 LBS VV v 6.610 LBS UV644-LA 1 MH/HH PLACEMENT DETAIL 4 UV467-TA 5 SCALE: I'-MTs DT01 SCALE: 1'-NTS DTD1 SCALE: I'-NTS DT01 TOTAL TRLNSAfISSION POLES— DESIGN BY: R. RAPPE CHECKED Br. E ORTON `� TIGARD BACKBONE OVERBUILD: —— FIELDED BY: R. RAPPE DRANM BY. A MaM SOUTH CONNECTION TO SW GREENBURG ROAD D. McNEELY at&t TOTAL DISTRIBUTION POLES— —— TOTAL NEW STRAND DATE:-— — —— - BY REVISION APP TOTAL AERIAL PLANT- ————_ 03/31/14 AAM ORIGINAL �OR CATIONS TCA �S.. R72NLI SDS OR TOTAL U.C. PLANT - ---- - CONSTRUCTION COMM E SET PLOT DATE. SCALE: FILENAME & SHEET NAME: TOTAL SLACK_ — —————_ ��r 03/31/94 � mss------- 5,1eAma.tlAvaeteV «; 3/31/2014 N.r.s. DT01 Gr..d..d Dk—w Oat.o.. a�tpdi,s mdlp oplo,lfN.talp o-- r-s•t-w odr,m.d r DROP F,/1s0'ap- (I Fxh&4 \ m Illi Wirt SYNERTECH UD SYNERTECH UD \� / 4 w T°°) No.SYN2438T No.SYN3048T TOP \\ / 131 The 2141bs. No.23-2436P o � 24' 3013• 4w ea 4Ilf SYNERTECH BOX ® t ' 2•-0 T' a No.SYN243ST-18 SYNERTECH BOX (t Fn3 slr) (STRAIGHT WALL) No.3YN304ST-18si- so Abs. \/ ® (STRAIGHT BASE r-0. 3. 3- No.2334 206- 1,f00!a 37%" � 3213' •- Y-s 496' 3313 ts-a ,s'enod,e.f a DEPTH DEPTH2-1-41' e'ola scary Y-s' Gdlarh(I� _•� L,2•.,r 10-bed 1 (2 Fa3 sN.) -stM MKWM m t-ln II— -ro aOOar prr--o ern G—W A" -alo,r,o-o cr.l.cto. -rrlows oa.e-loon 339(3 -tMt ammw IRnM Comm otva xrn 45!(3 -No 00 wr PROM moac ova Iwo. OPTIONAL TOP -wx 1p,--nr- 2dii -a rw r 211%a' opwMFEATum COM FVA7l� -t1s roues-msaPo pry Uex4 -• r laM-ees lwwo MCI t-wo. -euaser-lOae--,L7r1 -ai-lotw-mIrAYCSOR •1 -lees Mr.R11M COapO[evc) -a-ww.P mals er.c) -ml,ple ll w --w tae Mi /iooaw •� AMM. Apm- Co Item Ordering � cod. ltwn w Descrbumn SYN2439TllD 131 Ud. bolt down( - d - r bdb SYN3048T LID 214 Ud Edt down order bdb SY112436TBOx/6D110 BOX SO Spa - But—/18" rn Wall ShoAbow- SYN3045TSDXlWW I BOX I too Bm - open Bottom 16' Wal CRiowm Abow SYN2436TB0%24DU0 BOX1 90 19. -Open Bottom 24'SbaloM Wdl SYN3046MX24DUO I BOX 1 122 IBM -OPOIN Sottan 24'SOMW WcN Ne.23-230 SYN2436MX36000 I BOX 1 112 lBox -Open B--/36-SVdqM Wall SYN3048(BOX36DW I BOX 1 235 Box -Open BoNpm 36' Wd 570 ba SYN 24MT-BOX DUO SYN 304ST-BOX DUO 2438 JUNCTION BOX ( 1 3048 JUNCTION BOX 2 W 233-LA 3 SCALE: 1'-NTS DT02 SCALE: ,'-NTS DT02 SCALE: 1'-NTS DT02 DESIGN BY. R. RAPPE CHECKED 8Y• E ORTON TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES—— — FlELDED Br R. RAPPE DRAW BY.• A. MEUUS D. McNEELY � at �� SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES— — — ; TOTAL NEW STRAND-— — — —- DATE: BY I REHSION APP 03/31/14 APM I ORIGINAL ISSUE awes TOTAL AERIAL PLANT_- -- -_ TaiaPORT CO1�liTMCLTIONS TCA 10340 S.W. 97223MNBUS TOTAL U.G. PLANT-— —— ——_ CONSTRUCTION A"��' LLC OR s7zxs COMM SET PLOT DATE: SCALE: FILENAME & SHEET NAME: TOTAL SLACK- - - -- -- - 03/31/14 3/31/2014 N.T.S. DT02 ell R.iWv.d Avenue Main Office: II"" �Ias.—..... 0-gon aty.Olesa,9m 5¢3343.4131 — ,vww .mm 41 O't TO CIL OF $ PROPOSEDBORE PIT NEW N SW TIEDMAN AVENUEN'°� 4'AERIAL PLAN'-SEE SHEET BA63 {, 3A TT 3 I._..'. —_— —_�' — — — b DRIVEWAY ACUTE AN ' FOGLIN£ s 3 _ 1 108.54'21- '�� SW NORTH DAKOTA STREET(CR 452) ' m PROPOSED 4 —+ \ NEW VAULT o PGE POLE({5020 ' o a $ m m --- - - - - - - ----- ---- - - — ---- FocLIN EOP -- -- -- - -- _�,.�- cn -- - - - - - - -- - - -- a �-- - - -- R - T W - - -- - - - y FMRELINE AD PERM T REQUIRED D& WESTERN RAILROAD MS. w PROPOSED PROPOSED NEW NEW VAULT BORE PIT 1.32 \ FOLDER# CONDUIT PLAN 3 SW NORTH DAKOTA STREET SCALE: 1'—30' 144' w–W-566' _ _ CONSTRUCTION NOTES ffl�P�42, 199' Ut PGE POLE /5020. FRONTIER POLE #501017.MAP IC11-350 3 1 PGE POLE#5020 45'/3/1971/b. MAKE READY REQUIRED, SEE NJUNS PT#18799923. SW NORTH DAKOTA STREET(CR 452) CONDUIT SCHEMATIC 2 P.O.A.-22-10- (DOUBLE DEAD-END). SCALE: 1--N.T.S. BU62 PL NEW 06 VERTICAL GROUNDWIRE ON POLE (AS REWIRED). —£oP BOND WIRE TO MGN ON POLE (SEE LOCATE WIRE/GROUND PLAN-SHT 1/BU66.1). o PL ONE (1) NEW 4' GRC RISER (SEE DETAIL 3113A63). 1 E/W THREE (3) 1.25' SDR11 HDPE INNERDUCTS & 012 AWG LOCATE WIRE. o c PL ONE (1) NEW 288F ARMORED CABLE IN NEW INNERDUCT. D m m 40 MIN r D0000 SEPARATION O2 SPACE PL ONE (1) NEW 4- GRC 90-BEND - (3'RX5'L).P.O.A.-AS SHOWN E/W THREE (3) 1.25' SDRIl HDPE INNERDUCTS & LOCATE WIRE PL ONE (1) NEW 288E ARMORED CABLE IN NEW INNERDUCT. COMMUNICATIONS 5' SPACE O3 PL THREE (3) NEW 1.25- SDRI1 HDPE CONDUITS & I12 AWG LOCATE WIRE. MAX. 20" ELEV SEE CONDUIT SCHEMATIC. MAX. 15 IDG O PL ONE (1) NEW 4- SCH-80 PVC CONDUIT. 1 POLE RISER E/W THREE (3) 1.25' SDRII HDPE INNERDUCTS do 012 AWG LOCATE WIRE STRUT T SEE CONDUIT SCHEMATIC. s'-o" MIN. T w/PApE CLAMP O PROPOSED NEW 3'x5' BORE PIT LOCATION. CONSTRUCTION NOTES: I. ALL NEW DUCTS TO BE THREE(3)SOR11 1.25-HOPE INNERDUCTS amEss EXISTING GROUND O4 PL ONE (1) NEW 288E ARMORED CABLE IN ONE OF THE NEW 1.25- CONDUIT. 07NERWSE SPECIFIED)k A COPPER LOCATING WIRE. ALL INNERDUCTS ARE 70 BE EQUIPPED MITN PULL—ROPE OR MULE TAPE AND PLUGGED W/JACK PLACED MOON PLUGS OR EQUIVALENT. RISER QUADRANT 2. A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM OTFER UTILITIES 2 OS PL NEW 444LA UTIUTY VAULT IN ASPHALT AREA WITH TRAFFIC RATED UD WITH MANHOLE COVER. UNLESS OTNERWSE SPECIM. DEWA77ON FROM THIS MINIMUM SEPARATION OR TERMINATE NEW CONDUITS IN NEW VAULT THE PLAN AS LAID OUT REQUIRES AUTHORIZATION FROM OWNER. RE--SEAL OPENING WITH CONDUIT SEAL OR EQUIVALENT. 3. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION, AS BUILT 3 PL LOCATE WIRE ACCESS POINT IN VAULT(SEE LOCATE WIRE / GROUND PLAN: SHT 1/BU66.1). DOCUMENT N FROM BE TAKENASg DEPTH of COVER BBOOTM�CIu�µ PROPOSED NEW RISER LEAVE 100' SLACK IN NEW 288F ARMORED CABLE COILED IN VAULT. 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNERDUCT PLACEMENT WILL PGE POLE#5020 3 RESTORE AREA TO CITY/COUNTY SPECIFICATIONS BE RECORDED AT THE TIME OF CONSTRUCTION. SCALE: 1'a N.T.S. BU62 1 PLACE CONDUIT 1N LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36' ON PUBLIC RIGHT—OF—WAY AND 36'ON PRIVATE PROPERTY. • UMINAIRE ✓BO% H SPLICE DESIGN BY R. RAPPE CHECKED BY: E ORTON TIGARD BACKBONE OVERBUILD. TOTAL TRANSMISSION POLES— _— . IRRIGATION VALVE FIELDED BY. R. RAPPE DRAWN BY. A MEMS CATCH BASIN ® FIBER SYMBOL o SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES—__ SIGN D. MCNEIIY© ® HATER METER FIBER SYMBOL �� a t&t TOTAL NEW STRAND_ —_——— mi m GAS WER VAULT SLE DATE: BY I REVISION APP LUMINAIRE CABLE 03 31 14 APM ORIGINAL ISSUE N BI.BPORT COYIRIIV ATIONS TCA T"�0 S.W. IMBUS � TOTAL AERIAL PLANT— T — _——_ o PEDESTAL �8��� �C TIG,dRD OR 97229 385' T WATER VALVE — — CONDUIT CONSTRUCTION n TOTAL U.G. PLANT_— —— —— _ � FIRE HYDRANT CONDUIT 100' m SEVER MANHOLE COMM G E SET PLOT DATE: SCALE: FILENAME & SHEET NAME: TOTAL SLACK_ — — ————— ESISTLNG OUST. VAULT ® STORAGE ODNS11 - 1, MTAL CjBjj __ Oto_——_ NEWVAULT ® sTolucE RlR.Ma�dA mw m i.off-: 03/31/14 12/12/2014 "=,30' BU62 LOCATE W7RR ACCERS PT ori ay,o�s Tool 503.3ii.41}S h CONSTRUC71ON NOTES: I. ALL NEW DUCTS TO BE THREE(3)SDRII 1.25'HOPE INNEROUCTS(UNLESS OTHERWISE SPECIFIED)&A COPPER LOCATING WIRE ALL INNEROUCTS ARE TO BE EQUIPPED WITH PULL-ROPE OR MULE TAPE AND PLUGGED W/JACK qTC MOON PLUGS OR EQUIVALENT. 6Y 2. A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM OTHER UTlIJ77ES t J N UNLESS OTHERWISE SPECIFIED. DEVIATION FROM THIS MINIMUM SEPARATION OR THE PLAN AS LAID OUT REQUIRES AUTHORIZATION FROM OWNER. BUILT 7 -` 3. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION, AS DOCUMENT SHOULD BE TAKEN AS TD THE UTILITY, AND THE ACTUAL V� SEPARATION FROM THE PLANT R DEPTH OF COVER BOTH FACILITIES. G �7 N 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNERDUCT PLACEMENT WILL i BE RECORDED AT THE TIME OF CONSTRUCTION. G♦ \ \ \ 5. PUCE CONDUIT IN LOCA77ON SHOW ON PRINTS WITH MINIMUM COVER OF 36' ON PUBLIC RIGHT--OF—WAY AND 36'ON PRIVATE PROPERTY. 2 � . 11 � _ SW TIEDMA AVENU \ Ery T/ED — — ——_— O I� (CR 2439) _ I� ---— -_ (R 2439 VENUE sHr sus2 PROPOSED VAULT LD 4JryNEW k EDP- DRIVEWAY O -- � 4 y , PGE POLE 111448 'k 7 CONDUIT SCHEMATIC PGE POLE ar48 4 4• 0 v 2 CONDUIT PLAN L. -J F c,��43P / SCALE: 1--N.T.S. 61J83 SW KIM DAKOTA STISW710 MV AVOW GREEWM � � SCALE. 1".30' 'AERIAL PLAN' / / / SEP40" AVON CONSTRUCTION NOTES 1 8 P O.A.-AS 94OW SPACE O1 PL THNiEE(3)NEW 1.23'SDRif HIOPE CONDIN75 /12 ANG LOCATE NIRS v T NEW VAULT fll // W per- �M SEE SCHEMA71G •�� 0/\t )� { 7 COMMUNICATIONS O2 �(1) NEW 26 ARAIORED CAME N ONE OF THE NEW 1.23'CON NAr O7 1 DUAN PLACED CABLE N ONE OF INE EM7MNi 1.23"PVC CONDUIT. eplvE Lb SPACE MAX. 20'ELEV O3 FEW BEND - MAINTAIN 38"ANNNNMAI RADIUS. 8 PL NEW 264TA UTILITY VAULT OVER DOSING TCA QUAD-OUCT(1.23"X 4). 15"HOG 5' 4 O REMOVE SECTION OF E)MING PVC CONDLNT TO FACILITATE CAME PLACEMENT. / POLE RISER MAX. O4 PGE POLE/48 7ERMNAW NEW 1.23'HPOE CO/M)LN75 N NEW VAULT. CANTILEVER MAP X11-35 RE-SEAL OPENING KITH CONIOLNT SEAL OR EOUIVALENT. STRUT BRACKET 4 PL LOCALE NNE ACLEI I PONT III VAULT(SEE LOCA7E WRE/GROUND ND PLAN. SHT 1/BU88.1). W/PIPE CLAMP 8'-0'MIN. P.0.A LEAVE 100'SLACK N NEW 28W ARMORED CAME CONED IN VAULT. ***NOTE.**� DOSING ANCHOR AND DONNOUY(NOTIlEAM RESTORE AREA TO CITY/COUNTY SPEC FICATONS USE CAUTION WHEN WORKING AROUND EXISTING GROUND I'-0'MIN. DOSING 4'INC RISER WIH IME7POUCIS(SEE DFTAL 3ARWI LIVE FIBERS AND PROTECT ALL WORKING DOSING 24F CAME IN ONE OF 7 E EVS7W O PL ONE NEW(1) 268E ARMORED CABLE M EXISTING VACANT 1.25'PVC DLIII. CABLES IN EXISTING CONDUIT. ADM PLAN'- SEE 57#ET BAU PLACED OS EXIS7WG ONE(1) 4'GRC!10'BEAD W7H MANDUCM ALL MANIPULATION N EXISTING FIBER RISER QUADRANT DQSTM 24F CABLE N ONE OF THE DOSiMVG MNIERDUCT WITH LIVE TRAFFIC,INCLUDING PULLING 5 BACK SLACK,IS TO BE SCHEDULED WITH EXISTING 4"RISER OB DOS7NG .ICA ONE(1) QUAD-OUCT(125•PVC x 41 TCA AND FOLLOW THE SCHEDULED TCA PGE POLE i48 8 S TWO(2) VACANT 123"PVC CONOLN75 SERVICE METHOD OF PROCEDURE(SMOP) SCALE. I'.N.T.S. BU83 SEE CONDUIT SCHEMATIC $ LUMINAIRE JBO% SPLICE DESIGN BY: S. ALLEN�R CHECKED BY: R. RAPPE TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES-- - e IRRIGATION VALVE RELDED BY: S. ADNK EN DRAW BY: A.FOX CATCH BASIN ® FIBER SYMBOL DAN MCNEMY JL SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES-- - - SIGN METER O A. MEUUS at t WATE (BEAVERTON LOOP) FIBER SYMBOL m TOTAL NEW STRAND- - -7- -- GAS VALVEPOWER VAULT CABLE DATE: I BY I REVISION APP LUMINALRE1220 98 AS I ANGINAL ISSUE AGORM TOTAL AERIAL PLANT- ----_ PEDESTAL CABLE 03/20/99 A,i I AS-BULTS TBLI MBf M MfIM017O YS CA 10340 S.W. MJIBUS 8 INTER VALVE — — CONDUIT 06/30/06 JL ADDED LocATE wIRE CONSTRUCTION A""C�' LW l TIGARD OR 97223 U) TOTAL U.G. PLANT- — 222— 99� - 03/31/14 APM 11GARD BACKBONE OB: GRNBRG CONN. FIRE MANHOLE CONDUIT PLOT DATE: SCALE: FILENAME & SHEET NAME 10o' o 1 SELLER MANHOLE COMM 6 SET 3/31/2014 1 "=,3 0'offim BV 63 n TOTAL SLACK- -- -��L - - E%ISTING CUST. VAULT ® STORAGE 03/31/14 A�� CABld 222_(22 NEW VAULT O STORAGE 611 Wi dA ^ gYplS 5LLT343A134 ° I (WHP II'S 04.1769.0602) p595' TO q OF " , VAU110N— 3 SW CASCADE AVE HIGH VOLTAGE \ POWER CROSSING \ 1 + 6RIVEWA7 2 — � _ -_ SIDEWALK GAS IN AREA -- —\ SW GREENBURG ROAD. _ 1i! oo 111 d ra: URB � �:..v ._"_ .' SIDEWALK . — D W f . _�� RIW— CONDUIT PLAN SCALE: 1'=30• BU64 3 f 2 , 271' CONSTRUCTION NOTES CONDUIT SCHEMATIC 2 O1 PL THREE (3) NEW 1.25' SDR11 HDPE CONDUITS do 112 AWG LOCATE WIRE SCALE. I•a N.T S. BU64 PL ONE (1) NEW FIBER CABLE IN 1.25' CONDUIT. CONSTRUCTION NOTES O FIELD BEND — MAINTAIN 36' MINIMUM RADIUS, 1. ALL NEW DUCTS TO BE THREE(3)SDRII 1.25•HDPE INNERDUCTS(UNLESS O EXISTING UTILITY VAULT OTHERWISE SPECIFIED)&A COPPER LOCATING WIRE. ALL INNERDUCTS ARE TO BE PED NTH CORE DRILL NEW HOLE IN EXISTING VAULT. MOON PLUGS OR EQUIVALENT.OPE OR MULE TAPE AND PLUGGED W/JACK IERMNATE NEW HOPE CONDUITS IN EXISTING VAULT AND RE—SEAL OPENING WITH CONDUIT SEAL OR EQUIVALENT. 2, A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM OTHER UTILITIES PL LOCATE WIRE ACCESS POINT IN VAULT, TDS 4 WAY TEST STATION AS REQUIRED. UNLESS OTHERWISE SPECIFIED. DEVIATION FROM THIS MINIMUM SEPARATION OR EXISTNG SLACK STORAGE IN FIBER CABLE COILED IN VAULT. THE PLAN AS LAO OUT REQUIRES AUTHORIZATION FROM OWNER. LEAVE SLACK STORAGE IN NEW FIBER CABLE COILED IN VAULT OR MATCH EXISTING 3. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION. AS BUILT DOCUMENT SHOULD BE TAKEN AS TO THE UTILITY, AND THE ACTUAL SEPARATION FROM THE PUNT&DEPTH OF COVER BOTH FACILITIES. 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNERDUCT PLACEMENT WILL BE RECORDED AT THE TIME OF CONSTRUCTION. 5. PLACE CONDUIT IN LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36' ON PUBLIC RK?IT--OF—WAY AND 36'ON PRIVATE PROPERTY. _ LUMINAIRE JBOX SPLICE DESIGN BY. RR/SB CHECKED BY S. BUTLER TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES SIGN FIELDED BY. D. MCNEELY DRAWN BY.• A. MELIUS COMM PEDESTAL R1 FIBER SYMBOL SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES — o, NATER VALVE M GAS VALVE FIBER SYMBOL TOTAL NEW STRAND__---_—_ CAS METER CABLE ——— = HATER METER er REVISION APP TOTAL AERIAL PLANT—___ HYDRANT = CABLE 03 20 75 APM PERMIT TZMPORT COYYUXIC4TI0IVS /J�/ry� �osfo s�r aiArgus LUMINAIRE 1 (, TICARD, OR 99'226 ——— CONDUIT "mUCA, ILC a TOTAL U.G. PLANT_—— ___ CATCH BASIN PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME S : STORM MANHOLE CONDUIT COMM L_tG z TOTAL SLACK___——_—___ SERER MANHOLE r,.,.z« _ 3/20/2015 POWYER TRANSFORMER ® STORAGE BIIC,1 811 Railroad Avenue Mein Office: 312012015 1"=30' U64 TOTAL C"La———= NEW VAULT - Oregon STORAGE on Irv,ores mas co 393.9139 —————— LOCATE WIRE ACCESS PT � www ro,nrrwrncturemreuei .ro 2 ***NOTE.+►** 1 3 USE CAUTION WHEN WORKING AROUND \ LIVE FIBERS AND PROTECT ALL WORKING PROPOSED NEW VAULT CABLES IN EXISTING CONDUIT. � ,r,rs 288E —� 3 g ALL MANIPULATION OF EXISTING FIBER �Q 4F ` WITH LIVE TRAFFIC,INCLUDING PULLING a� BACK SLACK,IS TO BE SCHEDULED WITH -- TCA AND FOLLOW THE SCHEDULED TCA R/W - - W y� SERVICE METHOD OF PROCEDURE(SMOP) BOW 1 SIDEWALK CURB J ® f =y � SW GREENBURG ROAD Ln (CR 2043) _ DRIW Wao _ _ I _ 'AERM�.P � 1� G S to N w DD C' = CURBco V SIDEWALK BOW Q R/W Rl W CONDUIT PLAN SW GREENBURG ROAD 1 (a SCALE: I 30' BU65 CONSTRUCTION NOTES \ - Of EXISTING TCA ONE(1) QUAD-DUCT(1.25"PVC x 4,X PROPOSED TM(2) VACANT 1.25"PVC ODADUITS SEE CONDUIT SCNEMATX) NEW VAULT 1 5 40' MIN O2 EVS71Nf 24F CABLE IN ONE OF THE EX157Ml' 1.Z3 PVC CONDUIT- SEPARATION PLACED 10/g8. 1 W llp' SPACEP.OLA.-AS SHONN O3 PL ONE NEW(1) 288F ARMORED CABLE W EMM VACANT 1.25"PVC CODUIT. W 215' 4%2jo AETUTAL PLMI=ST T BAlf7 PLACED W _yT BU64 5' TCOMMUNICA77ONS O4 PL NEW 204TA UTILITY VAULT OVER EXISTING 7CA QUAD-DUCT(1.25"X 4). SPACE REVIVE SEC71ON OF E70STMG PVC CONDUIT Td FACILITATE CABLE PLACME NT. MAX. L 7O MA7E NEW 1.25'NPOE CONDLM W NEW VAULT. W-P-8 20'ELEV RE-SEAL OPENNG W7H CONDUIT SEAL OREQUVALENT. PGE POLE#4618 5 I15' HDG PL LOCATE WRE ACCESS P01NT M VAUNT(SEE LOCATE WtE/GROINND RAM 5HT 2/iKMIX MAX. 1 POLE RISER LEAVE 100'SLACK M/NEW 288E ARMORED CABLE CO LED M VAULT. 2 7 CANTILEVER RES7GRE AREA TO CITY/COLINTY SPECF)CA710M CONDUIT SCHEMATIC STRUT BRACKET SCALE: I'-N.T.S. BU65 8'-0" MIN. 7 O _)W/PIPE CLAMP X11 HDPE CONDINTS&/12 ANG LOCATE IMI . SEE TSCMWAMCONSTRUCTION NOTES: i'-0" MI . EXISTING GROUND O PL ONE(1) NEW 288E ARMOtED CABLE IN ONE OF THE NEW 1.25" CONOW.. I. ALL NEW DUCTS TO BE THREE(3)SDR11 1.25'HDPE INNEROUCTS(UNLESS PLAN OTNERNISE SPEOWIED)Q A COPPER LOCATING VIRE. ALL INNERDUCTS ARE TV BE EQUIPPED BIKER QUADRANT O PGE POLE#MI& MOON �PULL- OPE OR MULE TAPE AND PLUGGED W/JACK 8 MAP XII-35 2 A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM 07HER U7XJTI S UNLESS OTHERN/SE SPECIFIED. DENA710N FROM THIS MINIMUM SEPARATION OR P.O.A. _ THE PLAN AS LAID OUT REQUIRES AUTHORIZATION FROM OWER. 1 EXISTING MIZIOR AND DOWNGUY(SOUTHMMn. 3. WHEN GROSSING OTHER UTILITIES AT THE 77AIE OF CONSTRUCTION. AS BUILT EXISTING 4'GRC RISER PITH INNERDUCIS SEE DETAIL 3 ). DOCUMENT SHOULD BE TAKEN AS TO THE UTILITY. AND THE ACTUAL EXISTING 24F CABLE W ONE OF 1HE EXISW W49WLCt SEPARATION FROM THE PLANT&DEPTH OF COVER BOTH FACILITIES. EXISTING 4"RISER AMAL PLAN'- SEE SHEET BA6Z 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNERDUcr PLACEMENT WILL PGE POLE#4618 3 BE RECORDED AT THE 77ME OF CONSTRUCTION. SCALE- 1'-N.T.S. 8U65 O EXISTING ONE(1) 4'GRC DO'BEND WITH MIGMUCTS. 5 PLACE CONDUIT IN LOCATION SHOW ON PRINTS WTH MINIMUM COVER OF 36' EXISTING 24F CABLE W ONE OF THE EXIS7WG NWARWUCT ON PUBLIC RIGHT-OF-WAY AND 36"ON PRIVATE PROPERTY. ■ LUMINAIRE JBOZ SPLICE DESIGN BY: S. A.EN/RR CHECKED BY: R. RAPPE 77GARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES___ . IRRIGATION VALVE FIELDED BY: S. ALLEN DRANK BY.., A. FOX CATCH BASIN ® FIBER SYMBOL DAH MC NEELY JL %MOO SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES—__ XL SIGN ® A. MELwS Qx� (BEAVERTON LOOP) EllINTER METER FIBER SYMBOL VVt� TOTAL NEW STRAND_ __ ___ m CAS VALID CABLE POWER VAULT F31 BY REVISION APP LUMINAIRE AJF ORIGINAL ISSUE Aooats TOTAL AERIAL PLANT_ —____ o PEDESTAL CABLE 03/20/99 AIF AS-BUILTS MMPOAT COMMMEJTIONS CA 10340 S.W. NJMBUS 06 JL ADDED LOCATE l (J TIGdRD OR 97223 110' 223 x WATER VALVE — — CONDUIT JL TIGARD BACKBONE CA GRNBRc CONN. CONSTRUCTION "MMA LLC TOTAL U.G. PLANT_— — -L_ r7 FLEE HYDRANT PLOT DATE: SCALE: FILENAME & SHEET NAME 100' SEWER MANHOLE CONDUIT COMM E SET TOTAL SLACK—_ _ — _ _ __ o��n� 'ells AM CUST. VAULT ® STORAGE roma cam__ 110_(248__ NEW VAULT ® STORAGE > - ve ,,v;,,�: 03/31/14 313112014 1 "=,30' BU65 OM""City�'•�g-�� SIXi.3lTA131 (WHP #'S 04.1769.0602) CONSTRUCTION NOTES J'Lla050J�� �� O SPL THREE EE CONDUIT S NEW 1.25- SOR11 HDPE CONDUITS &/12 ANG LOCATE WRE 3IFp�QOQ��6� O2 PL ONE(1)NEW 288F ARMORED CABLE IN ONE OF THE NEW 1.25• CONDUIT. �JVO�o�f'(iv� y, ♦\ t r►NOTE:*w* PLACfD USE CAUTION WHEN WORKING AROUNDO3 PROPOSED NEW MID-SHEATH SPUCE VAULT LOCATION. y�(G'�p���h \\ \ PL NEW 444LA unUTY VAULT IN ASPHALT AREA W7H TRAFFIC LIVE FIBERS AND PROTECT ALL WORKING RATED LD WTH MANHOLE COVER. �Q • .� ,. \ CABLES IN EXISTING CONDUIT. TERMMIATE NEW CONDUITS IN NEW VAULT GQ, � RE-SEAL OPENING WTH CONDUIT SEAL OR EQUIVALENT. ALL MANIPULATION OF EXISTING FIBER PL LOCATE WE ACCESS POINT IN VAULT' ..• \ WITH LIVE TRAFFIC,INCLUDING PULLING (SEE LOCATE HIRE/GROUND PLAN: SHT 210M 1).��•9 c BACK SLACK,IS TO BE SCHEDULED WITH DISTRIBUTE AND STORE REMAINING 75'RELOCATED SLACK OORLED IN VAULT' u+ opk �c - '•p TCA AND FOLLOW THE SCHEDULED TCA (EUS7MM 144F DIELECTRIC CABLE SLACK FROM DUSTING TCA SPLICE VAULTS \ SERVICE METHOD OF PROCEDURE(SMOP) M�/L.1 - . SEE SHT BU76). 0 LEAVE loo'SLACK IN NEW 288E ARMORED CABLE COILED IN VAULT OR MATCH DUSTING 5 PROPOSED NEW UG MID-SHEATH SPLICE VAULT LOCATION RESTORE AREA TO CITY/COUNTY SPECIFICATIONS + \\ DUSTING 144F DIELECTRIC CAVE(NORTHEASTO EMS71NG 7CA OWED 1.5'PVC CONDUIT LOCATED IV LEVEL 3 QUAD DUCT CONDUIT \ % t� 4 DUSTING 144E DIELECTRIC CABLE(SOl/THME5T7 KR,�pyT(SEE DETAIL 3/ U W G G, 'F 3 PROPOSED NEW 288E ARMORED CABLE(90U'MNESn \ t� DISTRIBUTE AND STORE REMAKING SLACK CONED IN VAULT OU7SDE OFTHE LEVEL NK 3 DUCT SA7CA CONDUIT IS DESIGNATED AS THE W 1.5'CONDUIT LOCATED ON THE TOP U66 I �. .� \ ♦ I (LEVO. 3 ROUTE- SFE nricrl 7b POR up crrycvt t• SHEETS 149 1NIRU 160) DUSTING TCA 144F DIEI.E'CTRIC CABLE IN DUSTING TCA 1.5'PVC CONDUIT. Z\\ 7 8 PLACED 03/11.♦ 1 3 4 U - OB PL ONE(1)NEW 1.5'PVC CONDUIT. c ♦ U66 _ - INTERCEPT AND CONNECT TO DUSTING TCA CONDUIT IN LEVEL 3 AUGMENT R/W •' ' • S L �.\ - - + SHEEP NEW CONDUIT OUT OF MAIN TRENCH AUGNMENT WTH 45 DEGREE BENDS AS REQUIRED AND EXTEND 7O NEW TCA VAULT LOCATION.T �G h SGNL_ o PL NEW 1.5'SPOT DUCT AND CONDUIT AS REQUIRED TO REPAIR COIDT OPENING--SGT. - U tp b DW _ RESTORE AREA TD CITY/COUNTY SPECIFICATIONS ':. - L`1I�9 _ 77 EXISTING TCA 144F DIELECTRIC CABLE IN EXISTING TCA 1.5'PVC CONDUIT. 288E m P -'�.� r ,i,f r„ ,� . ~ z Q 6 PLACED 03/11. W _ 65 G —G SS ,p — SSr G SS G G = •BACK PULL DUSTING 144E DJUEC70C CABLE SLACK (FROM DUS7IVG SPLICE VAULT Try SW GREEN URG ROAD �- ss o Z MTrA.3 O2-"�SEE SMT BU76) THRO" THE DUSTING TCA 1.5'WNW TO CREATE r NEW SLACK FOR PROPOSED NEW UNDERGROUND MD-SHEATH SPLICE ui (CR 2043) 0D m LOCATION AT SW GREENBURG Raw AND SW CASCADE AVEMIE. Lu ll� O8 REMOVE AND REPLACE DUSTING SDEWALK AS REOUIREO. ' m FLIT PANEL REIN ACEMENT ONLY. wo so — � — D f N 167' s0 so 13• m 1►.��. w w w w —w ITN W toctl -4 NEW .v - .y Fa —_- -.- --_Fa Fo C INTERCEPT VAULT 3 SIDEWALK DRIVEWAY CURE —FO FO FO r •+ rtt ter. CONDUIT PLAN I \ -- oDwsmucnoN N07M SW GREENBURG ROAD t— -- __ - I. ALL NEW DUCTS TO BE THREE(3)SMI 1.23'HDPE INNEROUCTS(UNLESS SCALE: 1 30' BU66 — 300 — — — 1 O O 07HUMSE SPECFW)&A COPPER LOCATING WIRE. ALL INNEROUCTS ARE f 70 BE EQUIPPED WITH PULL-ROPE OR MULE TAPE AND PLUGGED W/JACK MOON PLUGS OR EQUIVALENT. \\ 300• \ 2 A W NIMUM SEPARATION OF 36-SHOULD BE MAINTAINED FROM OTHER UMMES \ UNLESS OTHERWISE SPECIFIED. DENA71ON FROM THIS MINIMUM SEPARA71ON OR THE PLAN AS LAID OUT REQUIRES AUTHORIZATION FROM OWNER. •� �� ��•i 3. WHEN CROSSING 07HER UTILITIES AT 714E TIME OF CONSTRUCTION. AS BUILT DOCUMENT SHOULD BE TAKEN AS TO 714E UTILITY, AND THE ACTUAL 0. 00 • 00 4 4 SEPARATION FROM THE PLANT&DEPTH OF COVER BOTH FACILITIES MW 3 1QOM A0 WN 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNERDUCT PLACEMENT WILL BE RECORDED AT THE TIME OF CONSTRUCTION. LEVEL 3 PORTLAND METRO DUCT BANK 3 CONDUIT SCHEMATIC 2 S PLACE COFDUIT IN LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36' SCALE: 1•-N.T.S. BU66 SCALE., I'-N.T.S. BU66 ON PUBLIC RIGHT—OF—WAY AND 36'ON PRIVATE PROPERTY. ■ LUMINAIRE JBOX H SPLICE DESIGN BY: R. RAPPE CHECKED BY: E ORTON/RR TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES___ SIGN ® FIELDED BY., T. ZELIER DRAWN Or K. WALTERS %MOOSOUTH CONNECTION TO SW GREENBURG ROAD o CORM PEDESTAL FIBER SYMBOL D. McNEELY A. MEUUS Sm �� — -— w (LEVEL 3 ROUTE: TIGARD TO PORTLAND NODE-SEGMENT 1) TOTAL DISTRIBUTION POLESHATER VALT'E j— m GAS VALVE �� FIBER SYMBOL TOTAL NEW STRAND— ————— o GAS METER CABLE DATE: BYREw51QN APP LSI HATER METER 03/11 Kw L3 CA - AM%M CAIWE PLNCMNT .Loess TOTAL AERLIL PLANT— _ — — —_ C( HYDRANT CABLE 03/31/14 APM MGARD BACKBONE 08: GRNBRG CONN. TBI.BPORT COYYUNICATIONS TCA 10340 S.W. 1vIMBUS * LUMINAIRE 01/16/15 APM PERMIT IYa'RICL, LLC TIGARD OR 89223 TOTAL U.G. PLAINT— _320 (300'— ® CATCH BASIN ——— CONDUIT © STORM MANHOLE — — _ PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME: CONDUIT COMM G 6 TOTAL sLAcr_ — — — — — —_175' SEINER MANHOLE 111612015 LnJ POTTER TRANSFORMER ® STORAGE 1/16/2015 1"=30' BU66 495_(3O 1__ NEW VAULT B11ReUoadAvmue M.mo� LOCATE HIRE ACCESS PT O STORAGE °Ra°"cny,o s>as saR xTA1�N ++*NOTE:*** USE CAUTION WHEN WORKING AROUND \ LIVE FIBERS AND PROTECT ALL WORKING CABLES IN EXISTING CONDUIT. ALL MANIPULATION OF EXISTING FIBER \ WITH LIVE TRAFFIC,INCLUDING PULLING \ BACK SLACK,IS TO BE SCHEDULED WITH —TCA AND FOLLOW THE SCHEDULED TCA SERVICE METHOD OF PROCEDURE(SMOP PROPOSED NEW VAULT SOW_ R/W� ,r,r• 3 rt,r _ � _ � / CUR9 S/OEWALK - - 4 4 Sw0'41rS�-BEET 00 7 .e CURB BOW ID£ PGE POLE _ WICK u72 oR` NE v� 2NLI \ MP,�G PROPOSED NEW VAULT r'd 2 1 •••• •• • 10't 10't �� •• �• •• 'I1 4 4 ?41' O.O • 00 ,p'I6J X414' • CONDUIT PLAN 1 1 LEVEL 3 PORTLAND METRO DUCT BANK 3 SW OAK STREET/SW GREENBURG ROAD 1 `� SCALE: 1•-N.L S- BU72 SCALE: 1•�30' (BU72) CONSTRUCTION NOTES OPOSTING TCA OWNED 1.5' PVC CONDUIT LOCATED IN LEVEL 3 WAD DUCT CONDUIT ALIGNMENT(SEE DETAIL 3/MMB). O PL NEW 1.5'PVC CONDUIT. TCA CONDUIT IS DESIGNATED AS THE ORANGE 1.5" CONDUIT LOCATED ON THE TOP OUTSIDE OF THE LEVEL 3 DUCT BANK. INTERCEPT AND CONNECT TO POSTING TCA CONDUIT IN LEVU 3 ALIGNME7NT. (LEVO 3 ROUTE - SEE TIGARD TO PORTLAND NODE SFGM-ENT 1: SHEETS 149 THRU 180). PROTECT ALL MQRKNG CABLES IN E70STTNG PVC CONDUIT. PGE POLE B 5 P-W-15' SWEEP NEW CONDUXT OUT OF MAN TRENCH ALIGNMENT WITH 45 DEGREE BENDS AS AND EXTEND TO NEW TCA VAULT LOCATIONREWIRED- . O POSTING TCA 144E DIELECTRIC CABLE IN COSTING TCA 1.5'PVC CONDUIT. PL NEW 1.5' SPLIT DUCT AND CONDUIT AS REQUIRED TO REPAIR CONDUIT OPENING. CONDUIT SCHEMATIC 2 PLACED 03/11. RESTORE AREA TO CITY/COUNTY SPECIFlCATTOWS. SCALE: ,•_N.r.5. •BACK PULL COSTING 144E DIELECTRIC CABLE SLACK (FROM/ POS7INO SPLICE VAULT 04 Tr/L3-02-P-SEF SHT BU78)- •BACK PULL POSTING 144E DEIECTMC CABLE SLACK (FROM POSTING SPUCF- CONSTRUCTION NOTES- THROUGH THE POSTING TCA 1.5' CONDUIT TO CREATE NEW SLAG( FOR PROPOSED NEW UNDERGROUND MID-SHEATH SPLICE- LOCATION AT SW fR£PNOURC ROAD AND SW CASCADE AVENUE - SEE SHEET BU88. VAULT jATT/L3-W--P6 SEE SHIT BU78) THROUGH THE PROPOSED NEW CONDUIT TO CREATE NEW- SLACK FOR PROPOSED NEW UNDERGROUND MID-SHEATH SPLICE LOCATION AT SW GREENBURG ROAD- I. ALL NEW DUCTS TO BE THREE(3)SDRII 1.25'HDPE INNERDUCTS(UNLESS O PL NEW 463TA UTILITY VAULT 1N ASPHALT AREA WITH 7RAFPC RATED LID WITH MANHOLE COVER. AND SW CASCADE AVOME — SEE SHEET BU88. OTHERWISE SPECIFIED)&A COPPER LOCATING MIRE- ALL INNERDUCTS ARE TO BE EQUIPPED WITH PULL-ROPE OR MULE TAPE AND PLUGGED W/JACK TERMINATE NEW CONDUITS IN NEW VAULT. O MOON PLUGS OR EQUIVALENT RE-SEAL OPUR40 MRH CONDUIT SEAL OR EQUIVALENT. 5 PL ONE (1) NEW 4" SGI-40 PVC CONDUIT FROM PROPOSED NEW VAULT 70 POSING POKER POLE E/W THREE (J NEW 1.25" SDRII HDPE INNERDUCTS 2 AMG LOCATE MIRE FROM PROPOSED- 2. A MINIMUM SEPARATION OF D. SHOULD BE MAINTAINED FROM DRIER 77ON OR PL LC1C/17E IINE ACCESS POINT IN VAULT(SEE LOCATE MIRE/GROUND PLAN: SHT J/13U88.1). �W VAULT �)POSING POKER POLE. � UNLESS OTHERWISE SPECIFIED. DENARON FROM THIS MINIMUM SEPARARpJ OR RESTORE AREA 70 CRY/COUNTY.SPEGFlCATPO NS THE PLAN AS WD OUT REWIRES AUTHORIZATION FROM OWNER. SEE CONDUIT SCHEWA71C: 3. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION. AS BUILT DOCUMENT SHOULD BE TAKEN AS TO THE UTILITY, AND THE ACTUAL •LEAVE 75'RELOCATED SLACK COILED IN VAULT- S COSTING POKER PULE SEPARATION FROM THE PLANT&DEPTH OF COVER BOTH FApLIRES. (DUSTING 144F DIELECTRIC CABLE SLACK FROM COSTING TCA SPLICE VAULT j#ITT/L3-02-P: SEE SHT BU78). PL ONE (1) NEW 4' GRC 90•BEND - (31Rx51). 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED WNERDUCT PLACEMENT WILL •UP-ASSIST CABLE PULLING PONTE/W THREE (3) 1.25' SOR11 HDPE WVWUCTS & /12 ANG LOCATE WIRE BE RECORDED AT THE TIME OF CONSTRUCTION. BACK PULL D057WG 144F DIELECTRIC CABLE SLACK (FROM EXS7ING SPLICE VAULT NIT7'/L3-02-P:SEE 94T BU78)- CONTRACTOR TO 57UBB AND CAP 4' GRC AT BASE OF POLE 5. PLACE CONDUIT IN LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36• THROUGH PROPOSED NEW VAULT. ON PUBLIC RIGHT—OF—WAY AND 36'ON PRIVATE PROPERTY. LUMINAIRE JBOX 00�44 SPLICE DESIGN BY R. RAPPE CHECKED BY: E. ORTON/RR `� TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES— - — IRRIGATION VALVE FIELDED BY: T. 7R I FR DRAWN BY: K. WALTERS SOUTH CONNECTION TO SW GREENBURG ROAD CA TCH SIGN BASIN ® FIBER SYMBOL D. MCNEELY A. MELIUS at A TOTAL DISTRIBUTION POLES_ - — FIBER SYMBOL /VyV` LEVEL 3 ROUTE:TIGARD TO PORTLAND NODE-SEGMENT 1 INTER METER TOTAL NEW STRAND_ — _— _ _ GAS VALVE I! CABLE DATE: BY REVISION APP' & POWER VAULT LUMINAIREOJ 11 KW L3 A— ASBUILTS CABLE PLNCMt T aoaz TOTAL AERIAL PLANT— — —— — _ PEDESTAL CABLE 03/31/14 APM rnGARD BACKBONE OB: GRNBRG CONN. T SLJPORT COAaflWCA77ONS TCA 10340 S.W. NIMBUS 383' HATER VALVE — — CONDUIT CONSTRUCTION A"PJCI' LLC TIGARD OR 97E23 TOTAL U.G. PLANT_ — — — — FIRE HYDRANT — CONDUIT �JMM PLOT DATE: SCALE: FILENAME & SHEET NAME: SEVER MANHOLE E SET " TOTAL SLACK— — — 75' — — — ® STORAGE - 03/31114 1 "=3 0' e EXISTING GUST. VAULT TO L Wli —— 368' ——— NEI! VAULT a„R. �� IAv�«6 e: 3/31/2014 BV 72 STORAGE «�City,o,,W-mxs 5rox3.4134 cwmnstrucwrecomal P F T- Q W5 --ooaa a ReUi SfOns Cheryl Caines From: Scott Butler <scott@commstructureconsulting.com> Sent: Friday, March 27, 2015 12:04 PM To: Zen Dutson Cc: Betsy Galicia;John Groth (jg052B@att.com); Erik Orton; CASTLE, TRINT (ATTCORP); Shawn Dalbec (sd1461@att.com);Jeff Gallagher(Jeff @StandardUtility.com); Darrel Williams (darrel@standardutility.com); Tammy Munger,James Greenwood; Cheryl Caines; Greg Berry;Allan Melius Subject: RE:TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - City of Tigard ROW Permit# PFI2015-00008 Zen, Thank you for the all the information, Have a great Friday! Scott Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1 503343.4134 Main Communications Infrastructure Planning I Design I Implementation www.conmistructureconsulting.com From:Zen Dutson [mailto:zen@tigard-or.gov] Sent: Friday, March 27, 2015 11:57 AM To:Scott Butler Cc: Betsy Galicia;John Groth (jg052B@att.com); Erik Orton; CASTLE,TRINT(ATTCORP);Shawn Dalbec (sd1461@att.com);Jeff Gallagher(Jeff@StandardUtility.com); Darrel Williams(darrel@standardutility.com);Tammy Munger;lames Greenwood; Cheryl Caines; Greg Berry; Allan Melius Subject: RE:TCA-Tigard South to Greenburg Rd -GPM #2015POR07-18553 -City of Tigard ROW Permit# PF12015- 00008 The City considers this to be a revision that won't require a re-issue of the permit, &Standard Utility can continue to finish the job. Kenny's cell is 503-816-6146 Zen From: Scott Butler [ma iIto:scoff@commstructureconsulting.coml Sent: Friday, March 27, 2015 10:33 AM To: Zen Dutson Cc: Betsy Galicia; John Groth 0g052BC&att.com); Erik Orton; CASTLE, TRINT(ATTCORP); Shawn Dalbec (sd1461(-aatt.com); Jeff Gallagher(Jeff(&StandardUtility.com); Darrel Williams (darrel@standardutility.com); Tammy 1 Munger; James Greenwood; Cheryl Caines; Greg Berry; Allan Melius Subject: RE: TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - City of Tigard ROW Permit # PFI2015- 00008 Good Morning Zen, Will there be a reissue of the permit or can Standard Utility just continue with construction?Also can you please send Kenny Fisher's contact information over. Thank you SGOft Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1 503.343.4134 Main can�n� ,4Ktze Communications Infrastructure Planning I Design I Implementation www.conimstructureconsulting.com From:Zen Dutson [mailto:zen@tigard-or.gov] Sent: Friday, March 27, 2015 8:36 AM To: Scott Butler Cc: Betsy Galicia;John Groth (jg052B@att.com); Erik Orton; CASTLE, TRINT(ATTCORP); Shawn Dalbec (sd1461@att.com);Jeff Gallagher(Jeff@StandardUtility.com); Darrel Williams (darrel@standardutility.com);Tammy Munger;James Greenwood; Cheryl Caines; Greg Berry; Allan Melius Subject: RE:TCA-Tigard South to Greenburg Rd -GPM #2015POR07-18553 -City of Tigard ROW Permit#PF12015- 00008 Good morning Scott, This looks good &we will utilize the same permit [PF12015-00008]to accommodate these revisions to sheets BU63& BU64. • The duct run will be bored below the sidewalk on Greenburg Rd. • Existing lanes shall be maintained; although the 2 SB lanes may be shifted when necessary between 9:00am to 3:00pm. • All other permit conditions remain in force. Please keep Kenny Fisher informed of your work schedule. Thanks, Zen Dutson From: Scott Butler [mailto:scoff@commstructureconsulting.com] Sent: Thursday, March 26, 2015 3:23 PM To: Zen Dutson Cc: ROW Permits; Betsy Galicia; John Groth (i4052B@att.com); Erik Orton; CASTLE, TRINT(ATTCORP); Shawn Dalbec (sd14610att.com); Jeff Gallagher(Jeff@StandardUtility.com); Darrel Williams (darrel(&standardutility.com); Tammy Munger; James Greenwood; Cheryl Caines; Greg Berry; Allan Melius 2 Subject: RE: TCA - Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - City of Tigard ROW Permit # PFI2015- 00008 Good Afternoon Zen, Please see attached for approved changes to the drawings on sheet listed below as discussed on our site meet today. Also as discussed please send any records the City of Tigard has pertaining to the joint utility easement along the north side of SW Greenburg Rd in our project scope. • TCA REVISION BU64 PF12015-00008 • TCA REVISION BU63 PF12015-00008 Questions or concerns please feel free to contact me, Thank You Scott Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1 503.343.4134 Main CO I�Ktx6 Communications Infrastructure Planning I Design I Implementation www.commstructureconsulting.coni From:Zen Dutson [mailto:zen@tgard-or.gov] Sent:Tuesday, March 24, 2015 5:56 PM To:Scott Butler; Barrel Williams(darrel@standardutility.com) (darrel@standardutility.com) Subject: RE: TCA-Tigard South to Greenburg Rd -GPM#2015POR07-18553-City of Tigard ROW Permit#PF12015- 00008 Scott We will utilize the same PF12015-00008 to accommodate revisions to sheets BU63& BU64. • The duct run must be bored on Greenburg Rd • Night work hours [if approved] shall be within 8:00pm to 5:00am &will require the City Engineer's approval. • We also need to obtain approval from the City Manager to deal with the City's Noise Ordinance; being there are residents across the street from the work site, which may not be approved. I'd like to meet with you&Standard Utility Contractors'foreman tomorrow or Thursday to see what you think of the green line on the attached sheets. This would allow day time work. Thanks, Zen From: Scott Butler [mailto:Scott(a-ocommstructureconsulting.com] Sent: Monday, March 23, 2015 5:28 PM To: ROW Permits Cc: Betsy Galicia; Zen Dutson; John Groth (jg052B@att.com); Erik Orton; CASTLE, TRINT(ATTCORP); Shawn Dalbec 3 (sd1461@att.com); Jeff Gallagher(Jeff@StandardUtility.com); Darrel Williams (darrel@standardutility.com); Tammy Munger; James Greenwood; Cheryl Caines; Greg Berry Subject: TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - City of Tigard ROW Permit # PFI2015-00008 Importance: High Good Evening, We have found the existing TCA conduit and pathway has been crushed and unusable on SW Greenburg Rd near the SW Tiedeman Ave intersection during construction. We have redesigned for new underground conduit and pathway from an existing TCA vault shown on BU64 in the construction set TCA drawings that will tie into our original design for new underground pathway on sheet BU63 originally permitted on permit# PF12015-00008 for the City of Tigard. I have attached the original designed and permitted sheets showing the area of conduit collapse along with the new revision sheets and listed the detailed attachments below. Original Design Sheets- Permit# PF12015-00008 • TCA BU63 PF12015-00008 • TCA BU64 PF12015-00008 *Redesign/Revision Sheets* • TCA REVISION BU63 20150323 • TCA REVISION BU64 20150323 Please contact and inform me how to proceed from here and what will be required for these changes,Thank you again for your time and review. .sCOtt Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1 503.343.4134 Main -.� WOW Communications Infrastructure Planning I Design I Implementation www.commstructu reconsu lting.com From:Scott Butler Sent:Thursday,January 22, 2015 7:35 PM To: rowpermits@tigard-or.gov Cc: Betsy Galicia;Zen Dutson;John Groth Erik Orton; CASTLE,TRINT(ATTCORP); Shawn Dalbec (sd1461@att.com);Jeff Gallagher(Jeff @StandardUtility.com); Darrel Williams(darrel@standardutility.com);Tammy Munger;James Greenwood Subject:TCA-Tigard South to Greenburg Rd -GPM #2015POR07-18553 -City of Tigard ROW Permit-Addendum/ Invoice#ROW2014-00022 Importance: High Good Evening, Attached is an addendum and resubmittal to the existing permit and invoice#ROW2014-00022 (APPROVED 4/9/2014) with the changes and an updated drawing set to occupy and perform operations within City of Tigard Rights of Way and being submitted on behalf of Teleport Communications America, LLC. 4 Questions or concerns please feel free to contact me,thank you for your assistance with this review and process. Scott Scott Butler Commstructure Consulting,LLC 1811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1503.343.4134 Main GO ;IKR6 Communications Infrastructure Planning I Design I Implementation www.commstructureconsulting.com From:Zen Dutson [mailto:zen@tigard-or.gov] Sent:Tuesday,January 13, 2015 2:19 PM To:Scott Butler Cc: Betsy Galicia Subject: RE:TCA-Tigard South to Greenburg Rd-GPM #2015POR07-18553 - New Vault Placement-City of Tigard Scott The City will accept the vault location as proposed on sheet BU66 [2].Submit the design &apply for a new PFI Permit,as the old Permit has expired. Thanks, Zen From: Scott Butler [mailto:scottCa&commstructureconsulting.coml Sent: Tuesday, January 13, 2015 10:09 AM To: Zen Dutson Cc: Darrel Williams (darrelCdstandardutility.com); Jeff Gallagher (Jeff@StandardUtility.com); Shawn Dalbec (sd1461@att.com); Erik Orton; CASTLE, TRINT(ATTCORP); John Groth (ig052B(datt.com) Subject: RE: TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - New Vault Placement - City of Tigard Good Morning Zen, Unfortunately it is not possible to move the vault anywhere outside the existing conduit pathway,there is a live working cable we are trying to intercept and break out into a new vault,there is no way to accomplish this without placing a vault right next to the existing cable and conduit alignment.We are also limited on where this conduit and cable can be intercepted with the existing conduit package being too deep in some areas. Placing a vault in the middle of an intersection or in the road is never our first choice due to locating and future access, but it's really the only option at this location. Please feel free to contact me directly if you have further questions, Regards, Scott Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1 503.343.4134 Main 5 00J%4% ,itdR6 Communications Infrastructure Planning I Design I Implementation www.comnistructureconsulting.com From:Zen Dutson [mailto:zen@tigard-or.gov] Sent: Monday,January 12, 2015 4:42 PM To:Scott Butler Subject: RE:TCA-Tigard South to Greenburg Rd -GPM #2015POR07-18553 - New Vault Placement-City of Tigard Scott Our R/W Engineer is asking if you could locate the vault back of the curb so it's out of the street? Zen From: Scott Butler [maiIto:scott0commstructureconsulting.com] Sent: Monday, January 12, 2015 2:28 PM To: Zen Dutson Cc: John Groth (jg052B(&att.com); Erik Orton; CASTLE, TRINT(ATTCORP); Shawn Dalbec (sd1461(&att.com); Jeff Gallagher (Jeff@StandardUtility.com); Darrel Williams (darrelCa-Dstandardutility.com); Allan Melius Subject: RE: TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - New Vault Placement - City of Tigard Good Afternoon Zen, No, we will not need to excavate at the previous vault location,only at the new proposed vault location to intercept the existing conduit package. If the new vault location can be approved the old vault location will get thrown out with the redesign. Is it OK to proceed forward with CAD resources and redesign for new vault location shown on BU66 (2)? Thank you again for your review, Scott Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 1 503.343.4134 Main ze= _ COMM :1KWe Communications Infrastructure Planning I Design I Implementation www.coninistructureconsultinp.com From:Zen Dutson [mailto:zen@tipard-or.gov] Sent: Monday,January 12, 2015 1:56 PM To: Scott Butler Cc:John Groth (ig052B@att.com); Erik Orton; CASTLE,TRINT(ATTCORP); Shawn Dalbec (sd1461@att.com);Jeff Gallagher(Jeff@StandardUtility.com); Darrel Williams(darrel@standardutility.com);Allan Melius Subject: RE:TCA-Tigard South to Greenburg Rd -GPM #2015POR07-18553 - New Vault Placement-City of Tigard 6 Scott—sure looks like a better location for the new vault. Will you have an excavation at the previous vault location? If so, about what size opening? Thanks,Zen From: Scott Butler [mailto:scoff(&commstructureconsultin..com) Sent: Friday, January 09, 2015 7:16 PM To: Zen Dutson Ce: John Groth (jg052B0att.com); Erik Orton; CASTLE, TRINT(ATTCORP); Shawn Dalbec (sd1461(&att.com); Jeff Gallagher (Jeff(&StandardUtility.com); Darrel Williams (darreMstandardutility.com); Allan Melius Subject: TCA -Tigard South to Greenburg Rd - GPM # 2015POR07-18553 - New Vault Placement - City of Tigard Good Evening Zen, I have been tasked with taking over the design and permitting here at Commstructure Consulting concerning the approved Invoice#ROW2014-00022 with the City of Tigard attached above for AT&T. I have been with Commstructure Consulting for 6 years and I am up to date with this project, unfortunately Rick Rappe and Annette Dexter have moved on and are no longer here at Commstructure Consulting. Concerning the proposed new vault placement in the intersection of SW Cascade Ave and SW Greenburg Rd on our original design attached above on sheet#3.0,this was one of the very few locations we could intercept the existing conduit package (24 conduits) with depth of cover and location of the one (1) conduit we are trying to intercept. After further recon we have now found a more suitable location for the new vault placement east on SW Greenburg Rd shown on Sheet# BU66 (2), it will be adding more cost and footage to the project but it will keep the vault out of the middle of the intersection for future accessibility. Could you please review Sheet#BU66 (2)attached above for the new proposed vault location in the median on SW Greenburg Rd shown before the left hand turn lane to the Shilo Inn, we would like to seek your approval of location first before moving forward with CAD resources. Thank you in advance for your time and review, Feel free to contact me on my mobile for any questions and concerns. Hope you have a great weekend! Scott Scott Butler Commstructure Consulting,LLC 1 811 Railroad Ave. I Oregon City,OR 97045 971.266.4423 Direct 1 503.758.3975 Mobile 503.343.4134 Main L0 .,,.., ,IKR6 Communications Infrastructure Planning I Design I Implementation www.conunstructureconsulting.com DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested; e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 7 +•+CAUnONWf* 3 x595' TO � OF HIGH VOLTAGE SW CASCADE AVE \ POWER CROSSING \ TCA TCA TCA TCA •R.CI:.�.�`. . - h CA —G s 2 4 CA TCA G $W GREENBURG ROAD $ m _ vP £ � � W ul —G ,� m ul �y •! (n ss W l ul Re 9R�pc� A1� N _/ w 51WALKt BOW W 5° w QkIkfWAY a Z 12- I _� CONDUIT PLAN SCALE: I'-30' BU64 i 1 2 ' 268- -- � CONSTRUCTION NOTES CONDUIT SCHEMATIC � 2 Ot PL THREE (3) NEW 1.25" SDR11 HDPE CONDUITS do J12 AWG LOCATE WIRE SCALE: 1"-N.T.S. BU64 PL ONE (1) NEW FIBER CABLE IN 1.25" CONDUIT. SEE CONDUIT SCHEMATIC. CONSTRUCTION NOTES: O2 FIELD BEND - MAINTAIN 36' MINIMUM RADIUS. L ALL NEW DUCTS TO BE THREE(3) SDRII 1.25'HDPE INNEROUCTS(UNLESS OTHERWISE SPECTFlEO)h A COPPER LOCATING WIRE. ALL INNEROUCTS ARE O EXISTING UTILITY VAULT. TO BE EQUIPPED INTH PULL-ROPE OR MULE TAPE AND PLUGGED W/JACK MOON PLUGS OR EQUIVALENT. CORE DRILL NEW HOLE IN EXISTING VAULT. 2, A MINIMUM SEPARATION OF 36•SHOULD BE MAINTAINED FROM OTHER TERMINATE NEW HDPE CONDUITS IN EXISTING VAULT AND RE-SEAL OPENING WITH CONDUIT SEAL OR EQUIVALENTTION ES UNLESS OTHERWISE SPECIFIED. DENA TION FROM THIS MINIMUM SEPARATION OR PL LOCATE WIRE ACCESS POINT IN VAULT, IDS 4 WAY TEST STATION AS REQUIRED. _ sem THE PUN AS LAID OUT REQUIRES AUTHORIZATION FROM OWNER. EXISTING SLACK STORAGE IN FIBER CABLE COILED IN VAULT. T� ��� 3. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION. AS BUILT LEAVE SLACK STORAGE IN NEW FIBER CABLE COILED IN VAULT OR MATCH EXISTING. DOCUMENT SHOULD BE TAKEN AS TO THE U17UTX AND THE ACTUAL SEPARATION FROM THE PLANT&DEPTH OF COVER BOTH FACILITIES. O4 REMOVE ) ( BE RECORDED A7T THE REPLACE EXISTING SIDEWALK AS REQUIRED - THREE 3 FULL PANEL REPLACEMENTS. +. ALL DEPTHS OF HE r OR DIRECT BURIED INNEROUcr PLACEMENT WIu TIME OF CONSTRUCTION. 5. PLACE CONDUIT IN LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36- ON PUBLIC RIGHT-OF-WAY AND 36'ON PRIVATE PROPERTY. LUMINAIRE JBOX ►t SPLICE DESIGN BY.. RR/SO CHECKED BY: S. BUTLER TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES SIGN FIELDED BY., D. MCNEELY DRAWN BY: A. MEUUS SOUTH CONNECTION TO SW GREENBURG ROAD COMM PEDESTAL O FIBER SYMBOL TOTAL DISTRIBUTION POLES - WATER VALVE GAS VALVE FIBER SYMBOL TOTAL NEW STRAND— —-_ _— — GAS METER CABLEer RE09ON APP WATER METER 03 26 15 APM PERMIT .mass TOTAL AERIAL PLANT_ _____ HYDRANT CABLE TELEPORT COXM(UNICITIONS TCA 10340 S.W. NIMBUS n LUMINAIRE AMERICA, LLC 1 TIGARD, OR 97223 3 TOTAL U.C. PLANT— — — _ CATCH BASIN --- CONDUIT STORM MANHOLE CONDUIT COMM C PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME o TOTAL SLACK__ — ——_ — __ SEWER MANHOLE 5. ^l 3/26/2015 POWER TRANSFORMER Q STORAGE Main Office: 3/26/2015 1"=30' BU64 ,TOM CABLa_____ NEW VAULT 611Rai1road A,�g— 41 -- S wLOCATE WIRE ACCESS PTw STORAGE amtrutT�rccurouuin.vm �r cyC��F •�,�GF'� T ® `� `° a�/,,' / ,SEES 2 4 —R/WLE p 00 SW TIEDMAN AVENUE W T iEO MSA W � W OPSs ss Ss o T a. O T 1 stk— w cd �C9 ::.- W—W=370' -- �J –` SSSQL y p 2 1 3 c"b e o CONDUIT PLAN .t=.f SCALE: I*=30' BU63 ' IV." CONSTRUCTION NOTES00 rr / CONDUIT SCHEMATIC 2 Of PL THREE (3) NEW 1.25' SDR11 HDPE CONDUITS & /12 AWG LOCATE WIRE r:':. / SCALE: I'=N.T.s. BU63 PL ONE (1) NEW FIBER CABLE IN 1.25" CONDUIT. , SEE CONDUIT SCHEMATIC. / y~ CONSTRUCTION NOTES: O2 FIELD BEND — MAINTAIN 36' MINIMUM RADIUS 3 +. 1. ALL NEW DUCTS TO BE THREE(3) SORII 1.25-HOPE INNEROUCTS(UNLESS OTHERWISE SPECIFIED) h A COPPER LOCATING VIRE. ALL INNEROUCTS ARE O3 PL NEW SYN2436780X24DU0 (2436 J-80X) BOX IN DIRT AREA. TO BE EQUIPPED WITH PULL-ROPE OR MULE TAPE AND PLUGGED W/JACK PL LOCATE WIRE ACCESS POINT IN VAULT, IDS 2 WAY TEST STATION; MOON PLUGS OR EQUIVALENT (SEE LOCATE WIRE / GROUND PLAN: SHEET DTO3). 2. A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM OTHER UTILITIES LEAVE SLACK STORAGE IN NEW FIBER CABLE COILED IN VAULT. UNLESS OTHERWISE SPECIFIED. DE NATION FROM THISMINIMUM $EPARA TION OR THE PLAN AS LAID OUT REWIRES AUTHORIZATION FROM OMNER. 3. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION. AS BUILT O REMOVE / REPLACE EXISTING SIDEWALK AS REQUIRED — FULL PANEL REPLACEMENT ONLY. DOCUMENT SHOULD BE TAKEN AS TO THE UTILITY, AND THE ACTUAL SEPARATION FROM THE PLANT&DEPTH OF COVER BOTH FACILITIES. 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNEROUCT PLACEMENT VALL BE RECORDED AT THE TIME OF CONSTRUCTION. 5. PLACE CONDUIT IN LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36' ON PUBLIC RICHT-OF-WAY AND 36'ON PRIVATE PROPERTY. LUMINAIRE ✓BOX ►t SPLICE DESIGN BY: RR/SB CHECKED BY: S. BUTLER TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES— _ — SIGN FIELDED BY D. MCNEELY DRAWN BY: A. MELIUS COMM PEDESTAL �1 FIBER SYMBOL SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES_ _ _ a HATER VALVE sl GAS VALVE FIBER SYMBOL TOTAL NEW STRAND_ — _ _ — _ o GAS METER CABLE DATE: BY REVISION APP' FE HATER METER 03126115 APM PERMIT TOTAL AERIAL PLANT_ — = q HYDRANT CABLE — — - TWLEPORT COMMUNICATIONS TCA 10340 S.#' NIVBUS LUMINAIRE ® CONDUIT .IXBRICA, LLC 1 — 3 TOTAL U.C. PLANT_ _ _ _ — — _ CATCH BASIN —— T/CARD, OR 9223 ® STORM MANHOLE CONDUIT OMNI - E PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME TOTAL SLACK— — _ _—_ _ _ ® SEWER MANHOLE 312612015 POWER TRANSFORMER ® STORAGE 312612015 1"=30' BU63 TOTAL CABLE—— — — ———— NEW VAULT Or gonCity,Ao°.`i"m97045 �.413W LOCATE WIRE ACCESS PT STORAGE „ nt xu1t1n TF (,2 01 00C8 2 �. 3 2 /w-- 0 O - - IK f gW TIEDMAN AVENUE sw w " w _ NVE `-- p Q' ss ss J ———_ 'y 4,;t, µ 1 c / W-W=395' SGML U,4 F 2 1 3 CA3 ♦ �s CONDUIT PLAN ( ' _� , / / ???• •�` SCALE: 1'-30' BU63 - CONSTRUCTION NOTES00 ' 0 CONDUIT SCHEMATIC ? O1 PL THREE (3) NEW 1.25' SDR11 HDPE CONDUITS & #12 AWG LOCATE WIRE �p / scALE: f•=N.T.s BU63 PL ONE (1) NEW ABER CABLE IN 1.25' CONDUIT. ' � CONSTRUCTION NOTES: O2 FlELD BEND — MAINTAIN 36' MINIMUM RADIUS 3. I. ALL NEW DUCTS TO BE THREE(3) SDRff 1.25'NOPE/NNERDUC7S(UNLESS OTHO3 PL NEW Sm2436TBOX24DUO (2436 J-BOX) BOX IN DIRT AREA. /_ TO EQ SPECIFIED)P A COPPER LOCATING WIRE. ALL INNERWCJA ARE PL LOCATE WE ACCESS POINT IN BOX MS WAY TEST STATION. M N LUGS OR WITH PULL-ROPE OR MULE TAPE AND PLUGGED w/JACK MOON PLUGS OR EQUIVALENT. LEAVE SLAG( STORAGE IN NEW FlBER CABLE COILED IN BOX 2. A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM OTHER UTILITIES UNLESS OTHERWISE SPECIFIED. DEVIATION FROM THIS MINIMUM SEPARATION OR THE PLAN AS LAID OUT REQUIRES AUTHORIZATION FROM OWNER. J. WHEN CROSSING OTHER UTILITIES AT THE TIME OF CONSTRUCTION. AS BUILT DOCUMENT SHOULD BE TAKEN AS TO THE UTIUTY, AND THE ACTUAL SEPARATION FROM THE PLANT h DEPTH OF COVER BOTH FACILITIES. 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INNERDUCT PLACEMENT WILL BE RECORDED AT THE TIME OF CONSTRUCTION. 5. PLACE CONDUIT IN LOCATION SHOWN ON PRM/TS WITH MINIMUM COVER OF 36' ON PUBLIC RIGHT-OF-WAY AND 36'ON PRIVATE PROPERTY. LUMINAIRE JBOX 0-4 SPLICE DESIGN BY: RR/SB CHECKED BY.. S BUTLER TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES— - — SIGN �1 FIBER SYMBOL FIELDED BY' D. MCNEELY DRAWN Br. A. MELIUS SOUTH CONNECTION TO SW GREENBURG ROAD COMM PEDESTAL TOTAL DISTRIBUTION POLES— - — HATER VALVE FIBER SYMBOL GAS VALVE TOTAL NEW STRAND— — - — _ — GAS METER CABLE DATE: BY I REVISION APP HATER METER 03120115 APM I PERMIT ,onas TOTAL AERIAL PLANT_ — _ — — _ HYDRANT CABLE TZZBPORT COYYUIIFICIT101VS T/Y� 10340 sir. NiyBUS LUMINAIRE — CONDUIT "Mucl, LLC TCA TICARD, OR 97223 TOTAL U.G. PLANT_ — — - — — _ -- CATCH BASIN =_ STORM MANHOLE — CONDUIT COMM �C E PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME a TOTAL SLACK— — — — — — — — SERER MANHOLE = «""r�<< - '� 3/2012015 POIYER TRANSFORMER ® STORAGE3/20/2015 1 =30 BU63 811 RmaAvenue Alin Offr:b NEW VAULT o�atyy,o,.S-9Tas so3343.4131 rrAL CABLIr— ——————— Ow LOCATE DIRE ACCESS PT STORAGE .�. .� ra595' TO q OF HIGH IGH VOLTAGE E 3 SW CASCADE AVE HVOL \ \ PONER CROSSING 1 DRIVEWAY —— 2 SIDEWALK =� CURB — \ ————————aa��i ***CAUn f7f TCA' GAS IN AREA ��_ —,rc =_ - � SW GREENBURG ROAD S3-- ss— �\ m • CS = 8 fir_ goommlofmomommom SO s ^ 111 CURB Z to -- - : - n1 SIDEWALK + 1 __—=BbWt&MWWAY' t co WA DR co f CONDUIT PLAN SCALE: 1 30' BU64 1 Q ' 271' CONSTRUCTION NOTES CONDUIT SCHEMATIC _ 2 O PL THREE (3) NEW 1.25' SDR11 HDPE CONDUITS do /72 AWG LOCATE WIRE SCALE: 1'-N.T.S. BU64 PL ONE (1) NEW FIBER CABLE IN 1.25' CONDUIT. CONSTRUCTION NOTES- FIELD BEND — MAINTAIN 36_ MINIMUM RADIUS. I. ALL NEW DUCTS TO BE THREE(3) SDR11 1.25'HDPE INNERDUCTS(UNLESS O EXISTING UTILITY VAULT. OTHERWISE SPECIFIED)h A COPPER LOCATING WIRE. ALL INNERDUCTS ARE TO BE EQUIPPED WITH PULL-ROPE OR MULE TAPE AND PLUGGED W/JACK CORE DRILL NEW HOLE IN EXISTING VAULT. MOON PLUGS OR EQUIVALENT. TERMINATE NEW HDPE CONDUITS IN EXISTING VAULT AND RE—SEAL OPENING WITH CONDUIT SEAL OR EQUIVALENT. 2, A MINIMUM SEPARATION OF 36'SHOULD BE MAINTAINED FROM OTHER UTILITIES PL LOCATE WIRE ACCESS POINT IN VAULT, TDS 4 WAY TEST STATION AS REQUIRED. UNLESS OTHERWISE SPECIFIED. DEVIATION FROM THIS MINIMUM SEPARATION OR EXISTING SLACK STORAGE IN FIBER CABLE COILED IN VAULT. THE PLAN AS LAID OUT REQUIRES AUTHORIZATION FROM OWNER. LEAVE SLACK STORAGE IN NEW FIBER CABLE COILED IN VAULT OR MATCH EXISTING. 3. WHEN CROSSING OTHER UTILITIES AT THE TIME of CONSTRUCTION. AS BUILT DOCUMENT SHOULD BE TAKEN AS TO THE UTILITY, AND THE ACTUAL SEPARATION FROM THE PLANT h DEPTH OF COVER BOTH FACILITIES. 4. ALL DEPTHS OF CONDUIT OR DIRECT BURIED INN£RDUCT PLACEMENT WILL BE RECORDED AT THE TIME OF CON5TRUCTION. 5. PLACE CONDUIT IN LOCATION SHOWN ON PRINTS WITH MINIMUM COVER OF 36' ON PUBLIC RIGHT-OF-WAY AND 36'ON PRIVATE PROPERTY. LUMINAIRE JBOX ►I SPLICE DESIGN BY: RR/SB CHECKED BY: S. BUTLER TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES — SIGN FIELDED BY: D. McNEELY DRAWN BY: A. MELIUS COMM PEDESTAL tiL FIBER SYMBOL SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES — a NATER VALVE FIBER SYMBOL t CAS VALVE TOTAL NEW STRAND— _ -———— r CAS METER CABLEer REVISION APP' NATER METER 03120115 APM PERMIT TOTAL AERIAL PLANT—__— ——— L` HYDRANT CABLE TL'LF'PORT COIOfUNIClTIONS TCA Fo340 S.r.. NIMBUS LUMINAIRE TICARD, OR 97'223 3 TOTAL U.C. PLANT- - - -- — __ CATCH BASIN ——— CONDUIT ����• �C STORM MANHOLE CONDUIT ( G^1I�. LCC E 20 PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME TOTAL SLACK— _— — _- _ — __ SEVER MANHOLE �•,/ NEW VAULT POWER TANSFORMER ® STORAGE ellRan,o,an��,�� rAal�artt: 3�2O�ZO1J� � =3O BU64 TOTAL CABLE—————————_ STORAGE PngonYCit,Oregon n,9 w n1e 503..3"4134 LOCATE WIRE ACCESS PT