Loading...
Permit r q CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2015-00005 T EGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/13/2015 Parcel: 2S 113AB00101 Jurisdiction: Tigard Site address: 16101 SW 72ND AVE 140 Project: Perlo Subdivision: ROSEWOOD ACRE TRACTS Lot: D Project Description: TI- demolition,new walls,doors,relites&cabinetry. Contractor: PERLO CONSTRUCTION LLC Owner: PACIFIC REALTY ASSOCIATES LP 16101 SW 72ND AVE SUITE 200 ATTN: N PIVEN TIGARD, OR 97224 15350 SE SEQUOIA PKWY#300 PORTLAND,OR 97224 PHONE: 503-624-2090 PHONE: FAX: 503-639-4134 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB DC Provision Review,COM TI-Ping 01/13/2015 $75.00 Occupancy Grp: B Occupancy Load: 41 DC Provision Review,COM TI-LRP 01/13/2015 $11.00 Permit Fee-Additions,Alterations, 01/13/2015 $674.35 Dwelling Units: 0 Demolition Stories: 2 Height: 0 ft 12%State Surcharge-Building 01/13/2015 $80.92 Bedrooms: 0 Bathrooms: 0 Plan Review 01/13/2015 $438.33 Value: $45,000 Plan Review-Fire Life Safety 01/13/2015 $269.74 Info Process/Archiving-Lg$2.00(over 01/13/2015 $8.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,557.34 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. • Issued By: Per -. '.nature: —. •/ L"'- 5 by 7:00 a.m.for the next availab spection date. • This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial RECEIVED I.Olt OFFICE USE ONLY City of Tigard Received n y Tigard A Permit No.: i • 13125 SW Hall Blvd.,Tigard,OR 97223 q Plan Review � � � r Phone: 503.718.2439 Fax: 503.598.1960JAN 13 2015 Date/B : l' ) `I% Other Permit: l I c lit 1 Inspection Line: 503.639.4175 Date Ready/By: Juris: ® See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: Supplemental Information BUILDING DIVISION TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑ New construction ®Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:16101 SW 72sd Ave New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.:140 Project name:Perlo Construction Covered porch area: square feet Cross street/directions to job site:Cross street:SW Upper Boones Ferry Road Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lit ne.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Work to include demolition,new walls,doors,relites and cabinetry. Valuation: $45,000.00 Existing building area: 1050 square feet New building area: 1050 square feet ❑ PROPERTY OWNER ® TENANT Number of stories: 2 Name:Elissa Looney Type of construction: II Address:16101 SW 72od Ave,Suite 200 Occupancy groups: City/State/ZIP:Tigard,OR 97224 Existing: B Phone:(503)264-2090 Fax:( ) New: B 0 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name:Mackenzie (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Lauren Rohde FLS plan review fee(if applicable): Address:1515 SE Water Ave Suite 100 City/State/ZIP:Portland,OR 97214 Total fees due upon application: Phone:(503)224-9560 Fax::(503)228-1285 Amount received: E-mail:Irohde @mcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name:Perlo Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:16101 SW 72vd Ave,Suite 200 Solar Installation Specialty Code checklist. City/State/ZIP:Tigard,OR 97224 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)624-2090 Fax:(503)639-4134 State surcharge(12%of permit fee): $21.60 CCB lic.:189245 Total fee due upon application: $201.60 Authorized signature �/V✓V`� # This permit application expires if a permit is not obtained Vl� within 180 days after it has been accepted as complete. Print name:Lau ohde f Date:01/13/2015 I * Fee methodology set by Tri-County Building Industry Service Board. l:1BuildingWermits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) I • Building Division Over-The-Counter (OTC) Building Permit !AGAR') Check List Project Description: 1 t APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work*: 2[ Occupancy Group: Type of Construction: 2 Type of Use**: r r7(, Occupancy Load: Oregon Specialty Code: SPECIFICS Number of Stories: `��/ Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: _ _ Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback—Right Sideyard Setback—Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: le, Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ 5/ FEES DUE $ , ° • DC Prov Rvw,COM TI—Ping $ at DC Prov Rvw,COM TI—LRP DC Provision Review Fee for COM TI (effective 7/1/2014) $ ap A al Permit Fee—Add,Alt,Demo Project Valuation Planning LRP $ I%rii 12%State Surcharge Up to$4,999 $0.00 $0.00 $ IV,I. ,�j "lan Review,Structural $5,000-$74,999 $75.00 $11.00 $ MI& Plan Review,Fire Life Safety $75,000-$149,999 $187.00 $28.00 $ r Info Proc/Arch,Lg(over 11x17$2.00) $150,000 and over $299.00 $44.00 $ _ Info Proc/Arch,Sm(up to 11x17$0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: $ Other: Building Staff: $ Other: Date/Time: $ TAL FEES DUE *TYPE OF USE: COM=commercial;CMS=commercial manufactured structure. **CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit;ALT=alteration;DEM=demo;NEW=new; 0.111.=other(use for fences,decks,retaining walls,signs,awnings or canopies). I:\Building\Forms\OTC_BUP_070114.docx City of Tigard 11114 • 0 COMMUNITY DEVELOPMENT DEPARTMENT TI G A R D Building Permit Review — Commercial - No Land Use Building Permit #: l Pc9_0 j 5 — V5 Site Address: /(?101 7Z Suite/Bldg#: /4/0 Project Name: Pevfo rj'?J 74i (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review m/_ + Proposal: ex��nsvii /� ,s-t r7 1K) tell')SX T 7 L7�7/Ge S/2/1 C_e -• Existing Business Activity: 6.-e--Proposed Business Activity: a �e- Verify site address/suite #exists and active in permit system. Zoning: 79 tted Use: �---Yes ❑ No ❑ Spec Space Confirm no land use required. Notes: Approved by Planning: /��/ Date: ///*204— Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /43/'r Site Plans: # 5 Building Plans: # 3 Building Permit#: OPEnter building permit#above. Workflow Routing: (Planning rilding Workflow Sign-off: ��' tgn-off for Planning(include notes from planning review) Route Application Documents: IEF Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technicia Date: //4/46P-- L\Building\Forms\BldgPermitRvw_COM_NoLandUse_071514.docx Permit Coordinator Review ❑ Conditions Mct-Prior to Issuance of Building Permit Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: El OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\B1 dgPermitRvw_COM_NoLandUse_071514.docx Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 16101 SW 72ND AVE 140, TIGARD, OR, 97224 Commercial - Building 299 Final inspection PASS - C of O February 25, 2015 at 8:50:55 AM BUP2015-00005 Chip Barnett Violation Summary: Inspector Contractor