Permit CITY OF TIGARD BUILDING PERMIT
11111 I COMMUNITY DEVELOPMENT Permit#: BUP2014-00277
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/07/2015
Parcel: 1S135BD00200
Jurisdiction: Tigard
Site address: 9785 SW SHADY LN
Project: Starbucks Subdivision: ASHBROOK FARM Lot: 5
Project Description: Building renovations-TI and accessories only
Contractor: TEAM CONSTRUCTION Owner: NORED, STANLEY D&AUDENE C
4201 NE 66TH AVE STE 105 511 NE 21ST PL
VANCOUVER,WA 98661 CANBY, OR 97013
PHONE: 360-699-1477 PHONE:
FAX: 360-699-1454
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Vg Permit Fee-Additions,Alterations, 01/07/2015 $1,287.15
Demolition
Occupancy Grp: A-2 Occupancy Load: 54 12%State Surcharge-Building 01/07/2015 $154.46
Dwelling Units: 0 Plan Review 01/07/2015 $836.65
Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 01/07/2015 $514.86
Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 01/07/2015 $187.00
Value: $130,000 DC Provision Review,COM TI-LRP 01/07/2015 $28.00
Info Process/Archiving-Lg$2.00(over 01/07/2015 $98.00
11x17)
Floor Areas: Info Process/Archiving-Sm$0.50(up to 01/07/2015 $7.50
11x17)
Total Area: 1780 Metro Const. Excise Tax-Commercial 01/07/2015 $156.00
Accessory Struct: 0 Use
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $3,269.62
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Yes Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: ermittee Signature: �__ f►tip
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
_Duilcling Permit Application
Commercial i OR Ol 1 It I t .til t)\1 1
City of Tigard 1ECFH/Ff, Received I Permit No.: �, ,
■ 13125 SW Hall Blvd.,Tigard,OR 97223 2 Plan Revie
Phone: 503.718.2439 Fax: 503.598.19044 2 4 2014 Date/B : +lwil,A. �. a
T 1 G A R D Inspection Line: 503.639.4175 Date Ready/By: 1 turns la See Page 2 for
Internet: www.tigard-or.gov CITY OF IICARD Notified/Method: / �t•( g�— Supplemental Information
�/ 1 �,f� 0 Ery c.'k-a4 ..›
TYPE OMi'"Pr REQUIRED DATA:I-AND 2-FAU.Y IDWIRJPID
❑New construction
❑Demolition Permit fees*are based on the value of the work performed.
- Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
El 1-and 2-family dwelling ®Commercial/industrial Valuation: S
Number of bedrooms: `.
❑Accessory building ❑Multi-family q;0
El Master builder El Other: Number of bathrooms: w
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:9785 SW Shady Lane New dwelling area: square feet .
City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet rt
Suite/bldg./apt.no.: Project name:Starbucks Coffee Company Covered porch area: square feet t a
Cross street/directions to job site:Corner of SW Greenburg Rd and SW Shady Deck area: square feet
Lane Other structure area: square feet
.1
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: 1 S135BD00200 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the 44
DESCRIPTION OF WORK work indicated on this application. '1/
The renovation of an existing building to install a coffee shop.The work will Valuation: $130,000.00
include new equipment,furniture,finishes,two restrooms,and mechanical Existing building area: 1,780 square feet
equipment. New building area: 1,780 square feet
•
❑ PROPERTY OWNER l 0 TENANT Number of stories: 1
Name:Starbucks Coffee Company-Ashley Blanton Type of construction: V-B
Address:2401 Utah Ave South Occupancy groups:
City/State/ZIP:Seattle,WA 98134 Existing: A-2
Phone:(206)318-2424 Fax:( ) New: A-2
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
Business name:Hoist Architecture ten1��IKShced+ J
Structural plan review fee(or deposit):
Contact name:Matthew Rusnac
FLS plan review fee(if applicable):
Address: 110 SE 81h Ave
City/State/ZIP:Portland,OR 97217 Total fees due upon application: 1 —
Amount received:
Phone:(503)233-9856 Fax::( )
E-mail:mrusnac @holstarc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Co. mercial and residential prescriptive installation o
CONTRACTOR roof- .• mounted PhotoVoltaic Solar Panel •m.
Business name:Out to Bid ��� Covia„[ N�f Submit tw. sets of roof plan wit •• nection details
/T and fire departmen •= -ss,a • with the 2010 Oregon
Address: y�/ N� / 6A- Cie. /h5' Solar Installation Spec'. .•.e checklist.
` Go Permit fe- . eludes plan r '-w
City/State/ZIP: az�co,t,��l 4.79 'it to / and administrative fees . $180'00
Phone:(34c) (vctq_/y,7) Fax:( ) . ate surcharge(12%of permit fee): $21.60
CCB lic.: '73 2.„1 3 Id pip 4 Total fee due upon application: $201.60
Authorized signature: (la/VA i -4.1__---------- This permit application expires if a permit is not obtained
iv/ within 180 days after it has been accepted as complete.
Print name: IkJ1� � `2UNPc — Date: II II I It * Fee methodology set by Tri-County Building Industry
1 tl Service Board.
I:\Building\Permits\BOP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
r . ..
III I
Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering. [1] $ 130,000
MULTIPLIER (25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 32,500
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $ 2,500
(c) An accessible route to the altered area: $ 10,000
(d) At least one accessible restroom for each sex or a single unisex
restroom: $ 20,000
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $ 32,500
I:\Building\Permits\BUP-COM PecmitApp.doc 03/03/2011
r
. ... ..
71 . Building Division
Plan Submittal Requirements
TI G A R D Commercial&Multi-Family- New,Additions or Alterations
1. SITE PLAN (fully dimensional,drawn to scale) labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans,details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey, and full set of architecture drawings.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
-
Building Division
1
Plan Submittal Requirement Matrix
T I G A R D Commercial & Multi-Family- New,Additions or Alterations
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
L
. •
71 City of Tigard
■
COMMUNITY DEVELOPMENT DEPARTMENT
T G Building Permit Review — Commercial - With Land Use
IARD
7
Building Permit #: 3 v A 2 0 /Y 490 . 7.--
Site Address: q 7 e 5 w_ sti1Dy i /c./ Suite/Bldg#:
Project Name: 5.Y' /.., �, R- F d/2 2 t Jve 7/7120-0,4 sfc• 6u c-k
(Name of commerci l business occupying the space. If vacant,enter Spec Space.)
•
Planning Review Q_ 7r
Proposal: /4 '�'t0/N d e u!t otl T/d7() -- Ti.� te Afic r.,0,,e eft-vz_y
i
❑ Verify site address/suite #exists and active in permit system.
❑ Land Use Case #: j VA 20 /lot ocee'3
,Plans Match Approved Land Use:
❑ Site Plan ❑ Landscape Plan ❑ Other:
❑ Urban Forestry Plan ❑ Elevation Plan
❑ Building Height: Maximum Height Actual Height
,kr Conditions Met: ❑ Prior to Submittal �' Prior to Permit Issuance
Notes: j3L'iL40/11)!i lk:hh Cv.�-Troy, 0/L
L.v€pc7'/cw 4 F 7/J1 54 EA-44i al v_Rt` v •d wese c'F_b
Approved by Planning: 64,' Date: //'24/—l/
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved _
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: El Approved El Not Approved
Building Permit Submitta
Original Submittal Date: // P V/1 9
Site Plans: # 3
Building Plans: #
Building Permit#: PV Enter building pe t#above. �t
Workflow Routing: }J Planning 4" Engineering aQ Permit Coordinator e�, uilding
Workflow Sign-off: r Sl off for Planning(include notes from planning review)
Route Application Documents: ding: original permit application, site plans,building plans,engineer and
r1 beam calculations and trust details,if applicable,etc.
Notes: v
Li
Notes: q-Do - 517 . ' C Sko Mu os_ c- —6-ELII_-%
By Permit Technician: _. �, , Date:
f/4 ir‘
I:\Building\Forms\BldgPennitRvw_COM_WithLandUse 042914.docx
Engineering Review
❑ Actual Slope:
❑ PFI Permit#:
❑ Conditions Met
Notes: AJ. j G,flc:-a4.1",C /sSue-S•
Approved by Engineering: 7 Date: a/ • z.,6 f <V
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions Met-Prior to Issuance of Building Permit
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
K to Issue Permit
Approved by Permit Coordinator: //P/Mt Date: 1//2.�If
I.\Building\Forms\BldgPermitRvw_COM_W ithLandUse_042914.docx