Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Seg-1618 20120716 Results
JAMAR Traffic Counter Installation Notes Count Number: Co Counter Site#: �p Counter: R1 t 04-77750 H 1104-77751 Location: SW 4/4,41KP 57 Between: _SW I/O 1-15 /v & SW //Z r4 AVG' PGE Pole: MAP#: C L/— 3 0 Pole#: /0 / tr Street Segment#: /G/8 Traffic Counter Site#: 4p Direction of Near Lane: /.4)&57-- Speed Limit: 3 j- MPH Date/Time Recorder Setup: 7/9/L g :/5-- Date/Time Recorder Picked Up: 7//401 EK 9r Date/Time Recording Ended: Study Period: To Installation Notes: Height: 7 %3 Approach Lane: 2/ Recede Lane: 3 5 Voltage Reading: 50 Retrieval Notes: Dump File: 0000 i4 I S111(7 14 Longitude: 122. (122° X17.Y3.Z')West Latitude: 45. (45°•Z S 1'(') North Near Lane Weekday ADT y�� Far Lane Weekday ADT 2 /O 32514/4 SS77 Near Lane Weekend ADT Far Lane Weekend ADT , Combined Weekday ADT /,Z '(0 7 Combined Weekend ADT //, y Z3 85th Percentile yam— Reverse 85th Percentile 4/3 JAMAR Traffic Counter Installation Notes—May 7, 2012