Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Seg-0956 20120618 Results
JAMAR Traffic Counter Installation Notes Count Number: S8 Counter Site#: v'.S • Counter: 04-77750 n 1104-77751 Location: SW (21,44-101.17- ,t/,aL 't 1 rj1-14 Between: SW //y & SW //G A V PGE Pole: MAP#: C.2/- 3 Pole#: a O I 4, Street Segment#: 0 /SC. - Traffic Counter Site#: ys Direction of Near Lane: (Al 6ST' Speed Limit: 25- MPH Date/Time Recorder Setup: (./1l/12_ /0 Date/Time Recorder Picked Up: hi/ l Z Date/Time Recording Ended: Study Period: To Installation Notes: Height: 7 '31 Approach Lane: / Recede Lane: Z 4' Voltage Reading: Retrieval Notes: Dump File: boo 0 G 9SG V o /.32.. Longitude: 122. 7 fl9 2- (122°1797.3S Z)West Latitude: 45.'/3 OG (450 ZS.$40) North Near Lane Weekday ADT 5 5 Far Lane Weekday ADT 5 `/yY Near Lane Weekend ADT 1 (. I -Frr-L- re-Wcek Combined Weekday ADT /0 4 'Me Co1i,b;,,cd Wcckcnd ADT 3.5-8 85th Percentile 17'0 Reverse 85th Percentile 3 JAMAR Traffic Counter Installation Notes-May 7, 2012