Report 4 /1' I. „Till-—l (-..-' ' ---< PWU ENGINEERING INC. Email: pwuengineerinq(c�comcast.net Ph: (503) 810-8309 Field Memo: Job # LEN14252-Lot4, and LEN14253-Lot11 Date: 11/26/14 Project: Bellevue A 3-Car Master Reuse Garage Left Lot 4 , and Garage Right for Lot 11 Lot 4, and 11, Sequoia Heights, Tigard, OR Lennar Homes Jeff; As per our conversation and as per the attached plan the hanger at BM#6 was called out as a USP HDQ610IF Hanger but a Simpson HUC610 hanger was installed. The Simpson hanger is slightly under the capacity needed so to fix the connection please add (2) Simpson LS50 angles, (1) on each side of BM#6 to augment the connection. The angles should be placed at the top of the beam so as not to interrupt the existing hanger. Sincerely, � GNFF �o 9421PE P A EGON � Y22 '�°'U PILIP `N Expires: 06/30/2016 • 1 00 I%j ; 0 Ix ea lo ev /0 iiND214-3 NNG FOR 2x14 OPTION 01 BM r1 0% - - - ir it it �00 NDQ6IOIF NNGR ADD SOLID 2x14 BLKG Q° � FOR GL OPTION \' WD UNDER WALL ABOVE � 9/� BM 6 L y�� ir -tr �r �r -rr ,r...- ir - y,, �/<iiii — .iii. ,0 I— nsiiriiv. 14-3 g� y�i�iid us�iis ;ri H-3 Q� QD Q 'i1'QO i 24"OH. NOTCH END OF BEAM + TO MATCH ROOF SLOPE, EXTEND HEADER ACROSS 1 SEE DET 1/53.1 p TOP OF GARAGE PIER, o PER DET 11/59.1 v