Job # LEN14252-Lot4, and LEN14253-Lot11
Date: 11/26/14
Project: Bellevue A 3-Car Master Reuse
Garage Left Lot 4 , and Garage Right for Lot 11
Lot 4, and 11, Sequoia Heights, Tigard, OR
Lennar Homes
Jeff;
As per our conversation and as per the attached plan the hanger at BM#6 was
called out as a USP HDQ610IF Hanger but a Simpson HUC610 hanger was
installed. The Simpson hanger is slightly under the capacity needed so to fix the
connection please add (2) Simpson LS50 angles, (1) on each side of BM#6 to
augment the connection. The angles should be placed at the top of the beam so
as not to interrupt the existing hanger.
Sincerely,
� GNFF �o 9421PE P
A
EGON
� Y22 '�°'U
PILIP `N
Expires: 06/30/2016
•
1 00
I%j ; 0 Ix
ea
lo ev
/0
iiND214-3 NNG FOR 2x14 OPTION
01 BM r1
0% - - - ir it it
�00 NDQ6IOIF NNGR ADD SOLID 2x14 BLKG Q°
� FOR GL OPTION \' WD UNDER WALL ABOVE �
9/� BM 6 L
y�� ir -tr �r �r -rr ,r...- ir - y,,
�/<iiii — .iii. ,0 I—
nsiiriiv. 14-3 g� y�i�iid
us�iis ;ri H-3
Q� QD Q 'i1'QO
i
24"OH.
NOTCH END OF BEAM +
TO MATCH ROOF SLOPE, EXTEND HEADER ACROSS 1
SEE DET 1/53.1 p
TOP OF GARAGE PIER, o
PER DET 11/59.1