Re: Everest Project—Wastewater Tanks RCRA Compliance
Dear Eric.
Evergreen Engineering, Inc. (Evergreen)has evaluated the Resource Conservation and Recovery Act
(RCRA)requirements for the wastewater storage tanks at the Tigard facility; completed the wastewater
tank design; and inspected the completed tanks and secondary containment. Evergreen hereby certifies
that the tanks and secondary containment have been designed and constructed in conformance with the
following requirements of RCRA 40CFR Part 264— Standards for Owners and Operators of Hazardous
Waste Treatment. Storage. and Disposal Facilities, Subpart J Tank Systems:
1. 40 CFR 264/265.192 Design and Installation of New Tank Systems or Components
• Seismic Requirements
• Wind Load
• Chemical Compatibility of Tank and Component Materials
2. 40 CFR 264/265.192 Containment and Detection of Releases
• Secondary Containment Capacity
• Chemical Compatibility of the Liner Material
Thank you for the opportunity to provide this design and certification. Please do not hesitate to call if
you have any questions.
�E� PRO
�Y'
Sincerely, �a N , 0
0
/ • !l 2 O►
• Bill Ness. P.E. C/,�M N�SG'
Project Manager
P.O. Box 21530. Eugene,OR 97402-0409
15411 484-4771 FAX (541) 484-6759
www.evergreenengineermg.com
•
r :
• EVERGREEN ENGINEERING, INC.
_ .:f Engineering end Construction Services
J
July 14,2014 Project#2987.0
Steve Anderson
Plant Manager-Tigard
Agilyx
9600 SW Nimbus Avenue
Suite 260
Beaverton, OR 97008
Re: Tigard Wastewater Tanks RCRA Compliance Engineer's Inspection 2014
Dear Steve.
Evergreen Engineering, Inc. (Evergreen)performed a physical inspection of the tanks and secondary
containment on July 11.2014.
Evergreen hereby certifies that the existing tanks and secondary containment have been designed,
constructed,and installation is in conformance with the following requirements of RCRA 40CFR Part
264–Standards for Owners and Operators of Hazardous Waste Treatment. Storage. and Disposal
Facilities, Subpart J Tank Systems:
1. 40 CFR 264/265.191 Assessment of Existing Tank Systems Integrity
2. 40 CFR 264/265.192 Design and Installation of New Tank Systems or Components
a. Seismic Requirements
b. Wind Load
c. Chemical Compatibility of Tank and Component Materials
3. 40 CFR 264/265.192 Containment and Detection of Releases
a. Secondary Containment Capacity
b. Chemical Compatibility of the Liner Material
Thank you for the opportunity to perform the yearly inspection. Please do not hesitate to call if you have
any questions.
Sincerely. .40 RROfFS
GtNg cs/
i 84 E t�
1,1 Max P Frederick. PE R1 it Protect Manager �—
Evergreen Engineering, Inc.
PREDO..:
cc: Brian Moe,Agilyx; Aaron Leritz,Bridgewater Group, Inc. EXPIRES (213t/zdi5 I
P.O. Box 21530,Eugene,OR 97402-0409
(541) 484-4771 FAX (541) 484-6759
www.evergreenengineering.com
)BAKER Technical Information Manual 2.4.5
PRODUCT DATA SHEET 6500 GALLON LINED POLY TANK
July,2013
GENERAL INFORMATION CAUTION`
This tank is specifically designed to handle harsh applications including
hydrochloric acid.sulfuric acid and sodium hypochlorite(bleach).They are Acid/Alkaline _ Contact Baker with the specific application conditions
designed to sit on a pad which elevates the tank bottom to facilitate Storage when stonng acids (pHol and alkaline liquids
complete drainage using the bottom connections. storag to ensure all conditions are met for safe
WEIGHTS AND MEASURES storage.
Sulfuric Acid:Up to 98%concentration OK for no
more than six months storage
Capacity: _ 5500 gallons(nominal) s stora 9
n Height,: _ 10'-6"(to top tangent line) Specific Gravity: _ This tank is rated for liquids with a specific gravity of
.9 maximum at 100°F. Higher temperatures reduce
11'-11"(to top of dome) the maximum allowable liquid speafic gravity For
12'-4"(to highest pant on top lid) example, the max allowable liquid specific gravity
12'-7"(to top of vent pipe) that can be stored in this tank at 140°F is 1.0
n Diameter: _ 10'-0"(nominal) Contact Baker about applications ,f the storage
temperature is more than 100°F
u Weight: _ Tank:2300 lbs. FEATURES
Pad:400 lbs -450 lbs Top Vent: _ 2"PVC U-vent(two threaded street elbows)
T Does not include neight of pad. Add four inches for pad thickness to determine v Manway: _ Too mounted with 24' opening (34 nch diameter
heights from grade when pad is used l screw-on cover)
DESIGN PARAMETERS b Valves. _ 3` butterfly valve with PVC body and disc. Viton C-
. Tank _ High Density Polyethylene Ring seal and 316 SS stem
Material: Ladder: _ Top mounted bracket for)adder hook-up Ladder is
Design _ 6"water column(w.c.)maximum not permanently mounted to tank
Pressure n Piping _ inlet—3"with butterfly valve(IMFO')
Design _ Vacuum not allowed Connections: Outlet—3"with butterfly valve(IMFO"
Vacuum: Top—4"PVC adapter and PVC cap
'Integrally Molded Flanged Opening
v Spec.Gravity _ Up to 1.9(At 100°F. Higher temperatures lower the
Limit: s.g.limit.Consult your Baker rep.) ViSCLLLANE0U5
n Temp.Limit: _ Nominal limit is 100° F (For higher temperatures u Options: _ Secondary containment berm F
consult your Baker rep.) j�ECEIVED
Manufacturing _ ASTM D1998(not UL listed)
Standard:
NOV 1 0 2014
>BAKER CITY OF TIGARD
=3UILDING DIVISION
Rt
r
To the best of our knowledge the technical data contained herein are true and accurate at the date of issuance and are subject to change without prior notice. No guarantee of
accuracy is given or implied because variations can and do exist. NO WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY BAKERCORP, EITHER EXPRESSED OR
IMPLIED
3020 Old Ranch Parkway•Suite 220•Seal Beach,CA•562-430-6262