Loading...
Plans (2) BUP2009 00141 6 60.2c09 - oc L.- _ __ - -- . ___ , ‹ .-000 1)1 #3082 ,�s', TENANT IMPROVEMENT for 1TIN HANSOM OI0000GENERALDATA ( C ) (, ) ( F ) �� _ � CLACKAMA , OREGON GENERAL REQUIR EMENT S � � � ,, , , ,1. ALL CONSTRUCTION WORK SHALL BE DONE IN COMPLIANCE WITH THE LATEST EDITION OF THE L _ _ _ _ ^ ` , � OF 0) INTERNATIONAL BUILDING CODE AS AMENDED BY THE STATE OF OREGON AND ALL OTHER STATE OR PROJ ECT NARRATIVE E LOCAL CODE REQUIREMENTS THAT APPLY. -y i �1 JUL 3 I PROJECT #09410 I-1 t--� 1 1-y t i f t--i 11 i l t i i i i if 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN ON DRAWINGS AND AT THE PROJECT CONSISTS OF SELECTIVE DEMOLITION WORK TO INTERIOR 1i t�,, C EXISTING OFFICE AND PRODUCTION AREAS TO RETURN CONDITIOIn �; ��"_ k , EXISTING BUILDING AND NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO STARTING THE WORK. { WARM LIT SHELL (MAKE READY FOR TI WORK UNDER SEPARATE PERMIT AT LAT in MON L UTILITY WORK LISTED BELOW AND SHORING AS 3. CONTRACTOR AND ALL SUBCONTRACTORS SHALL PERFORM DUE DILIGENCE INSPECTION OF ALL DATE). WORK SHALL INCLUDE ANY REQUIRED TO MAKE SAFE TO REMOVE EXISTING CONSTRUCTION. EXISTING CONDITIONS PRIOR TO SUBMITTAL OF A PROPOSAL. SUBMITTAL OF A PROPOSAL SHALL BE CONSIDERED CONFIRMATION THAT SUCH INSPECTION HAS BEEN MADE,AND NO FURTHER r ' DEMOLITION NOTES: COMPENSATION SHALL BE DUE THE CONTRACTOR FOR CLAIMS ARISING AS A RESULT OF FAILURE TO I , 1 u \ , 1 U \ II 4 PERFORM SUCH INSPECTION. ' ° ` �� I ° ` , '1 1` In all areas indicated with dashed lines, remove WORK INCLUDED BUT PERFORMED UNDER SEPARATE PERMIT ,._°� �� �� E== TF -�n-- -111 ,{ ' I . - ,I i ��, „,I all improvements and restore building to original I( )" condition (warm lit shell, roll-up doors 4. BY SUBMITTING A PROPOSAL,CONTRACTOR AND ALL SUBCONTRACTORS CERTIFY THAT THEY HAVE '\`, I,-. � ' ��iiI p FIRE PROTECTION SPRINKLERING EXAMINED THE SITE AND INCLUDED IN THEIR PROPOSAL ALL WORK NECESSARY TO COMPLETE THE - - °-� , _r ,, 1---, D1 ' ,--Iii operational, lighting, bare concrete floors). Item v WORK DESCRIBED OR REASONABLY IMPLIED IN THESE DOCUMENTS. THIS INCLUDES BUT MAY NOT BE `.� EXISTING SKYLIGINT �__ °" specific scope is identified by keynote below: PLUMBING WORK I TO REMAIN ,I�LIMITED TO ALL MATERIALS AND INSTALLATION, DISPOSAL OF EXCESS MATERIALS(USEABLE FINISH '" ` 1 a iii �'i MATERIALS SHALL BE LEFT IN THE TENANT SPACE AS DIRECTED BY PACTRUST), CLEANING AND ALL _� '� ��- �� I '' D1 Plumbing Fixture Removal -eve plumbing HEATING, VENTILATION &AIR CONDITIONING WORK • c*I PREPARATION OF SUBSTRATE SURFACES PRIOR TO INSTALLATION,AS WELL AS FINAL CLEAN UP. �� ii `� g noted� g ' �� �� fixture needs to be verified and noted on the ::� r n :�lj I4� plumbing permit for this work -remove ELECTRICAL WORK, BOTH LINE VOLTAGE AND LOW VOLTAGE 5. IT IS THE INTENT OF THESE CONTRACT DOCUMENTS TO MATCH AND MAINTAIN THE EXISTING BUILDING R° ., �-� - = -� � =�- ' ii . ,I,, I J , � I, existing plumbing fixtures and cap. d- STANDARDS FOR ALL EXISTING PRODUCTS AND SYSTEMS. UPON DISCOVERY OF A DISCREPANCY TO . i,_,' IU ,' D1 -, II ® a N SHALL NOTIFY THE ARCHITECT IMMEDIATELY. 1 "'„ Il- O �_, I I THIS INTENSION,THE CONTRACTOR S I +- DRAWING I N G INDEX © c ,r-,\ �L D2 Remove existing in-ground sewage ejection O o 6. FURNISH ALL NEW MATERIALS EXCEPT WHERE SPECIFICALLY NOTED OTHERWISE. ° `°°� =T system along with all piping to termination A-1 GENERAL INFORMATION /DEMOLITION & PLANS - MEZZANINE LEVEL c1 QUO P 1� pg `.`T and dispose of. W 7. CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES. PROVIDE CARPET"WALK-OFF MATS"TO ,I L , A-2 FIRST FLOOR PLAN - DEMOLITION = I ceiling grid this I D3 Leave existing suspended ce •�• PROTECT EXISTING CARPETS. ,f - ,� v° , O g p g g .� "-NCI')( 1 2 -�\ ;°'� L JL J L area. Remove ceiling tile. -a o 0 8. ALL ROOF PENETRATIONS FROM ABANDONED EQUIPMENT TO BE REMOVED. PATCH AND REPAIR ROOF / `,, A-3 FIRST FLOOR PLAN - CLEARED CI o �� AS NEEDED. D4 Leave epoxy flooring this area. a a w MEZZANINE , . L,-----k- -- 9. ALL ROOF WORK TO BE PERFORMED BY PACTRUST APPROVED ROOFING COMPANIES. APPROVED -'-' ,t' = `� D5 Leave existing suspended ceiling grid, tile & , COMPANIES INCLUDE: I lights this area. Remove power polies. A. ANDERSON ROOFING, (503)294-0202 _ _ OFFICE D8 - 11 1 g p p B. PACIFIC ROOFING, (503)640-3163 J 6,685 SF ��X/IIEXISTINC SKYLIGHT Remove existing load center back to >a TO REMAIN D6 g C. GRIFFITH ROOFING (503)643-1596 ---- ���� distribution panel. BUILDING INFORMATION law D. GARON ROOFING AND SHEET METAL, (360)254-0380 Rick Nikkila ----a h_ � >_ = I a sir a fil 5r F 13 F 1 1 I 0 1 BUILDING OWNER: PACIFIC REALTY ASSOCIATES, L.P.■ u I I I mu 10. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION TO ALL EXISTING IMPROVEMENTS -' �.,.; �`„ LL.'S LL-,� ����`', D7 Verify HVAC and remove any ducts back to 15350 SW SEQUOIA PKWY #300 BUT NOT LIMITED TO COMMON CORRIDORS AND STAIRS, BUILDING ENTRANCES,SUITE III drop cans. ORE 97224 INCLUDING III PORTLAND, R ENTRANCES, ETC. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGES TO HI .---. 0 EXISTING IMPROVEMENTS DUE TO CONSTRUCTION ACTIVITIES. 'I D8 Remove all ceilings at second floor office 7-1 a �� area w/exception of existing skylight shafts. (503) 624-6300 (PHONE) 11. CONTRACTOR TO PROVIDE TEMPORARY SANITARY FACILITIES. CONSTRUCTION N WORKERS SHALL NOT r (503) 624-7755 (FAX) °a a USE BUILDING RESTROOM FACILITIES. IL.'JI D1 pg Existing tele-com demark location. PacTrust o O utility providers and diiscuss 10 PTR110 0 law to verify with ut ty p BLDG. #: ( ) 12. STORAGE AND STAGING OF CONSTRUCTION MATERIALS SHALL BE LIMITED TO AREAS AS DEIGNATED AT - relocation options. Relocation part of future PRE-CONSTRUCTION MEETING. UNDER NO CIRCUMSTANCES SHALL BUILDING UTILITY AREAS OR ANY TI work. 1= #: N A 3 BLDG. PERMIT / OTHER COMMON BUILDING AREA BE USED FOR STORAGE. c n Q TYPE.: III-B (FULLY SPRINKLERED)CONTRACTOR SHALL KEEP THE ROOF FREE OF DEBRIS I.E. NAILS, SCREWS, BOTTLES, ETC.)AT ALL CONST. TY ) LI TIMES. MEZZANINE FLOOR PLAN -DEMOLITION d, ac,2 TENANT INFORMATION c/ 14. LEAVE THE PROJECT CLEAN AND READY FOR FUTURE TENANT IMPROVEMENT WORK. SCALE: 1" = 10' -0" TENANT. N/A 15. CONTRACTOR TO CLEAN ADJACENT EXTERIOR AREA, I.E.WALKS, EXTERIOR GLASS, ETC. el I - OCCUPANCY: N/A (B / S-2 / F-2) 16. PROVIDE"AS-BUILT"DRAWINGS OF THE WORK AT THE CONCLUSION OF CONSTRUCTION."AS-BUILT" I DRAWINGS MAY BE IN THE FORM OF TWO COPIES OF CONSTRUCTION DOCUMENTS MARKED-UP WITH RED PEN. DELIVER RECORD DRAWINGS TO THE ARCHITECT. PACTRUST MAY HOLD CONTRACTORS, FLOOR AREA: 45,013 SF FINAL PAYMENT UNTIL"AS-BUILT"DRAWINGS HAVE BEEN RECEIVED AND APPROVED. 0 17. IT IS THE INTENT OF THE CONTRACT DOCUMENTS THAT THE CONTRACTOR PROVIDES A COMPLETE, _ _ _ FUNCTIONING PROJECT INCLUDING ALL GENERAL, MECHANICAL AND ELECTRICAL CONSTRUCTION - REQUIRED TO FULFILL THAT INTENT. ALL ITEMS REQUIRED SHALL BE FURNISHED AND INSTALLED, REGARDLESS OF WHETHER OR NOT SHOWN ON THE DRAWINGS. 1 1--1 11-1 1-1 r--: 1--I 1-1 I--1 I--1 I-I = I---I I---I 1 TO PORTLAND CARMAN RD. PROJECT 18. ITEMS OR WORK NOT TO BE FURNISHED OR ACCOMPLISHED BY CONTRACTOR ARE NOTED"N.I.C.". _ EXIT 291 =s�, t=,,, BUILDI\TG ) �� tz,a> OREGON INTERSTATE 5 m r-,ta •1 I 1 I I I �. 16'"" BUSINESS - ,� i 19. "ALIGN"AS USED IN THESE DOCUMENTS,MEANS TO ALIGN THE FINISHED FACES OF ELEMENTS IN THE i' � �� 44 PARK II 4N 0 SAME PLANE, EITHER IMMEDIATELY ADJACENT TO ONE ANOTHER OR ACROSS AN OPENING. I:---I .141 I a 11 � j `4, ;"' �N `1". ®r 11 tzl, ...--r V/ M--..-'"{ 00 1 `. .� r �R..` E%ttE •zso S • m ° T'IjI v� I 111111-# .411:1'T t- � ���Pt NNd6 ! � - -s, O 20. DO NOT DISASSEMBLE SETS OF CONSTRUCTION DRAWINGS. DRAWINGS ARE INTERRELATED. °4 �� � `� � ""' `r � 'LEGEND. r li I ' P . 1_ OREGON I PACIFIC (233) 11= CENTER CORPORATE Ttsx`J I l 'l ___11._ 1 BUSINESS 0 21. THE DESIGN OF FIRE PROTECTION SYSTEMS IS THE RESPONSIBILITY OF THE FIRE PROTECTION C411 L1° I I tz)z)j .�� PARKI 18 Y� �,� _1_ SW 72ND AVENUE SYSTEMS CONTRACTOR.ALL FIRE PROTECTION SYSTEMS SHALL BE DESIGNED BY A PROFESSIONAL `� ® T ELECTRICAL EQUIPMENT _ , , , �, SW 72ND AVENUE -`-- 3 ,. (z ��J � 1'!"f"r!', '---u.. .„..�..� �' ENGINEER LICENSED BY THE APPROPRIATE JURISDICTION FOR THE DESIGN OF THIS TYPE OF SYSTEM. 1 _' , E ELECTRICAL MAIN DISTRIBUTION J-BOX , . i t=.9) j '� °' COORDINATE INTERFACE WITH EXISTING BUILDING SYSTEMS AND WITH ARCHITECT. ALL SPRINKLER J - :e `_'" T° 098) N intij)*(Tc, � a�11 age ��7/f4i,_,� �� �• r as !lc)HEADS SHALL BE CENTERED IN CEILING TILE(OR 2 x 2 MODULE OF A SECOND LOOK II TYPE OF CEILING So�NEA"PC�1)C - G p �, �` 1 t=16) (1 ��! 1iE TILE WHERE APPLICABLE). LOCATION OF THOSE IN GYPSUM BOARD CEILINGS SHALL BE PRE-APPROVED PLUMBING FIXTURE TO BE RECORDED ( i221> VN IN WRITING BY THE ARCHITECT PRIOR TO INSTALLATION. �! ON THE PLUMBING PERMIT FOR THE GURU a// .•� N H OREGON o 2 19�) �i�� �I �� ® ® ® DEMOLITION WORK FOR FUTURE - SW 74TH AVENUE N PACTRUST V N PARK III BUSINESS Uj 22. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION SEQUENCING WITH PACTRUST AND . ��=-�J S S S CREDITS. y3 CENTER O n ) '� �j O SCHEDULE ALL SERVICE INTERRUPTIONS OUTSIDE NORMAL BUSINESS HOURS TO MINIMIZE `''� � 'b INCONVENIENCE TO CURRENT TENANTS. I FIGURE AN ADDITIONAL 6-8 UNITS FOR TO : I & " W 0 0 UNACCOUNTED PLUMBING ITEMS a e� o GENERAL Mill INCLUDING BUT NOT LIMITED TO WATER 51 O `,'194" HEATERS, FLOOR DRAINS AND " 1. REMOVE ALL EXISTING VCT,SHEET VINYL, ETC. IN AREAS WHERE NEW FLOOR COVERING IS SPECIFIED PLUMBING ROUGH-INS ALREADY REVISION PRIOR TO INSTALLATION OF NEW FLOORING. ,',12 ) MEZZANINE CAPPED IN WALLS THAT ARE BEING 1 LOCATION MAP 2. ALL ROOF PENETRATIONS FOR ELECTRICAL, LOW VOLTAGE, GAS PIPING, ETC.SHALL BE SLEEVED �, OFFICE REMOVED. I A_1 NOT TO SCALE 1. THROUGH A LEAD ROOF JACK,CLAMPED WITH A STAINLESS STEEL CLAMP AND SEALED WITH VOLKUM �� ��,� 6,685 SF 2. CAULKING. SILICONE SEALANT NOT PERMITTED. u- 3• 4. ri- r-11 5. I 7. 8. -1\4)1 ® DATE: 7/31/09 PERMIT SET 1, , n n e , MEZZANINE FLOOR PLAN -CLEARED A . 1 SCALE: 1"= 10' -0" BUILDING DEPARTMENT USE I ,d.\- t) ''jp *Me #3082 ,� • ,— /--- „TIN W. HANSON C�, ,\ z ._i_).' ( A ) ( ) ( CLACKAMAS, OREGON FIRST FLOOR OFFICE I I I ' ' O� I � I I OF 7554 SF ' PROJECT #09410 1 1[ (- i r .....=7._ n , •Immo= — -----i■ DEMOLITION NOTES: In all areas indicated with dashed lines, remove D5 Leave existing suspended ceiling grid, tile 1 all improvements and restore building to original & lights this area. Remove power poles. ' .' condition (warm lit shell, roll-up doors ■SHELL AREA \_T CD' operational, lighting, bare concrete floors). Item D6 Remove existing load center back to 401 SF _ specific scope is identified by keynote below: distribution panel. 37, , � 1 CDIPlumbing Fixture Removal -every plumbing D7 Verify HVAC and remove any ducts back to o .: ,�=' fixture needs to be verified and noted on the drop cans. o plumbing permit for this work -remove �+ � `�6 F 1=11M I` �___r �� `� p g (�11 ii Ic ; existing plumbing fixtures and cap. D8 Remove all ceilings at second floor office L- CI II \ ii Di II m n` �i �I 1�,/1�,/I area w/exception of existing skylight shafts. d, D3 - 1,��_�; �� ; t� I D3 D2 Remove existing in-ground sewage ejection ®5: N n II I O o IL _II III X11 system along with all piping to termination D9 Existing tele-com demark location. PacTrust 4:==I I �� — 'r o-1 14-d' II vi and discuss�, , 1 1 and dispose of. to verify with utility providers IIII /J --\1 �' �� relocation options. Relocation part of future O o I o ^ ' ; III D1 �`� � � D3 Leave existing suspended ceiling grid this TI work. p p W d-�" I IL o 9 p 9 9 r� I r ceiling tile.area. Remove ce n� I 0 WAREHOUSE D Leave epoxy flooring this area. 1 I' I R. r:1-,4-, 29,847 SF J D _ 1 L I II \ r--) >s )I �� ` I' . d d ', d d. 7�—�—r 1 d d .............. Fa —, \ I I ■1 _ t__ L it _===j E----J-j / \-� �: __ ' '____�-- - F---- F----,r------R ,MM F==== r II _____, (---, _ JJ, 1 1 I \ 1 / / 1 1 1 c) 0 G \\ 1 1 ',/ \\ 1 1 �/ / 1$ 11 1 ,/ 1 ,/ \\ II 1 ,/ I �2 L� --J L- �/ I 1 Li Li y Li �i 0 a ET D3 D3 D3 (1) r D3 D3 D3 D3 F '�I o 0 0 . / i -: o 0 0 0 �- L I V I I r� U ! O F. 1 '-1 — 1 II II II t 1 ii u C. 3 u ci:' .7 CI3 (") °fi C5. 4 ri. 1 ...._ .._.. i---6-7-77-7- 1-7-=, -rw, C40 - I Q [G1 / T 0 H(UPS) I D1 Tel. n ❑_____(11") __ __ ] _ __ EXISTING ELECTRICAL r� � , .._ ._. � iii C PP 4 L � � 1 MAIN DISTRIBUTION J I i+i J 1 i. JUNCTION BOX TO RE- XFER$1 I' %>- D1 MAIN -REMOVE CON- II I / I 4 TUGTORS BACK TO THIS of ; I _, LOCATION 1 I z r = _ _ 1 F- �--� . F. I $ACnM I 1 1 n 1 uhI A ,.... . L, , II 1 11 1 0 LA 1 / / "l r T 0 J 1 1 I II I-1 3 { IF' --1 1 / 1 II - \ , 2$ WAREHOUSE L _, WAREHOU E 1 J „ 1t== H$ D6 �, 1 _ 7 1 H ;; ;, I 7 605 SF 5,10 SF �L TL.---_LL I L-' U � , If- I B [ r�,1 ; 1, II 1)-j CD*I I I (1-) I I' rt—d �_ J1 1_7-. C) • TEII•4 0 `,t rn o [r -11 .' 11 I 0 I I I I D D1 D5 ,� r CEICDOCIOC) ' °E' I 1 fr 1 cc3 d- __--, 1`\\ ,'emu ; ; �'�Ti < �'i �i n �i a �.� _ a N,.... y ‘ I 1 c.) 8 A 4:T - - - - - 1 ' 'EL:::-7. ::t- - - - - - - - 41;_:1 - \ 1- - - - 7 a F --, 0 B3-11-1 II 0— —3 I -E CA 'Ci N (,), 0 , o) oo J L_J / y I - iG2 D6 D6 D1 LL.y; // i `E--—9 ; i� u EXISTINCs ELECTRICAL O O 0 1 4.., U I D6 /�-� `"--p I h �'I ;_'/ \`,,', MAIN DISTRIBUTION W I I UB3 _L - \ JUNCTION BOX TO RE- o 00 g con 0 d==,---r---- C 4nC8 CD I, \, MAIN REMOVE CON- '1C7 / ,-r -d TUCTORS BACK TO THIS g O co, i I I U `° fl 1 LOCATION I itii R=\`O \ II 1 I I I E--9 ,E-=a REVISION i I L=, \ 1 1 1 r E.D � - \ 1. 1 1 r:T7 2. ! 4av=� I I I ri.IL 3. j /' [ _,\\ 4. WAREHOUSE I =�, WAREHOUSE ___ WAREHOUSE I 3 144 SF �' 9 318 SF 4,678 SF 5. 1 I I`, 6. L J I J, I L:,7 r I D XISt N F IS D7 I, ,; O E E R ER o I II o p v �,v 8. 1 / n I' �/ rr u$B5(2,4,6) II P==� \\ I ii ■ . ■ I 9T-l-1-1-rrrrrrTTTT- I �_- -- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DATE: 7/31/09 1 1 1 1 1 1 1 1 1 1 1 1 1 I I [ PERMIT SET 9 ) (2- E-p_( \ I JJ_I_I_LLLLL1111. ii_____________Er i 1,1-- I, FIRST FLOOR PLAN - DEMOLITION dI I ' SCALE: 1" = 10'-0" 1 S „,,, , , A4, , , , , , .,,, . . ,, ,_ 401) 00, _-- ,-- - /-- , ---- ---•-- __ _, , ,--- ------- \\ ,---- ,,, / \ 7 \ , , / , / ( A ( B ' , / / , C , ,„, , ( D ) ( , E ) ( \) F , , ( G ) \, //) (,/ 1 s . ) , \ \ / NARTIN W. HANSON \, / ___ F , ---3 , tp.j11CLACKA AS, OREGON FIRST FLOOR , & OFFICE % , 7,554 SF , OF 01 • PROJECT #09410 - _ - - n=l==m.••■.■..........m■m. ,__......•.=I.....=I= I U U I I I SHELL AREA 37,401 SF t LEGEND: C411 T ELECTRICAL EQUIPMENT te J ELECTRICAL MAIN DISTRIBUTION J-BOX c14 +.4 i .- PLUMBING FIXTURE TO BE RECORDED e_l cn 0 . jil D ti ON THE PLUMBING PERMIT FOR THE _ 1 11■11 DEMOLITION WORK FOR FUTURE immi = I MEW CREDITS. I•mou r,.i 7.I— . llIM © I MIMI & & & co) P _ FIGURE AN ADDITIONAL 6-8 UNITS FOR p4 o kr) - a a & & &,, a cl go 2 p UNACCOUNTED PLUMBING ITEMS 1.--------1 , INCLUDING BUT NOT LIMITED TO WATER DEYING ciq g c•1 CN1 imelimmil C WAREHOUSE CAPPED D 1 7r)1/44:1 0 0 PH LE t.JA MT EB RI NSI GN, F RL 00 Ou GRHDT_RI HNAAs1 TNASAL RAR:N ADB — a 29,847 SF 1 REMOVED. cjI)0 Z k , ■---, >1. ' / —,J I—Ls—I -----L—Lr--- --P11)1---LJ _ _) li D , ill ___Thiii -C r 0 0 - F D 0 Fal S /-•••I M I , ,_. ... 7-W 0 WI V o 7 ,.c_ fc,,o, 5 0 0 0 c40 , , -, T Zi d fp A 1 ) J a in , , a . r Tel. El 0 1 EXISTING ELECTRICAL J & LL MAIN DISTRIBUTION ( i (& JUNCTION BOX TO RE- ill I I - -- ii MAIN -AE3OVE WAREHOUSE & . PRODUCTION AREA 5,102 SF J I 7,605 SF SUSP. CLG. — AC CD • r...4 --) ,& • ,...0 1.---.1 I r 0 , . E ,s (L) 0 C3 .71- -z----- / \ eAIS 1S & & ril <4 (CI ri 1 ) 3 i o th 11 LI B3- 11j 1 cl 1 3 [] . ...--3 0 r2 0 EXISTING EL (L)ECTRICAL 4-4 vi '16 MAIN DISTRIBUTION J JUNCTION BOX TO IRE- 0 0 c) as MAIN -ABOVE <4 7-ON t1/5 1/4"-ii C5 si_. I I S REVISION 1. 2. 3. 3 WAREHOUSE I WAREHOUSE I WAREHOUSE _ 4. 3,144 SF 9,318 SF 4,678 SF I . 5. 6. o 7. EXISTING FIRE RISER 0 8. , DATE: 7/31/09 ( 9 '; / 3 1_1 t:U U PERMIT SET \ , FIRST FLOOR PLAN - CLEARED SCALE: 1„ = 10'-0' . vow_