PFI2014-00084 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
--- aCOMMUNITY DEVELOPMENT Permit#: PF12014-00084
19 Date Issued: 10/15/2014
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421
Parcel: SEG561
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: Adjacent to 11850 SW Burlcrest Drive. Replace bad order cables and reestablish loop feed. SEG 561
Owner: FEES
Description Date Amount
PFI Permit Fee 10/15/2014 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
BRYAN SWAN
3700 SE 17TH AVE
PORTLAND, OR 97202
PHONE: 503-736-5411
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature:
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12014-00084
Type: Condition Name: Status: Severity:
ROW 16-REPAIRS-LIKE MATERIALS REQ Continuing Notice
Property disturbed by construction activity shall be seeded with a standard grass mix; shrubs,flowers, barkdust,existing
signs, pavement markings, mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material.
ROW 18-UTILITIES PRELOCATION REQ Continuing Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0010 through OAR 952-001-0080. Copies of the rules may be obtained from the Center by calling(503)232-1987.
If you have questions about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders
expense.
ROW 04-TRAF CTRL-CONTR RESPON FOR Continuing Notice
Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in
accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be
available at the work area.
ROW 23-DAILY INSP REPORTS REQ Continuing Notice
The permit holders Engineer/Inspector shall submit daily inspection reports, on a weekly basis,to the City's Inspector. (see
Developer-Engineer Agreement note#5).
ROW 01-CUSTOM CONDITION Continuing Notice
<Custom Condition goes here>
ROW 03-TRAF CTRL-SPECIF(CITY) Continuing Notice
The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways",
U.S. Dept.of Transportation, F.H.A., 1988 Ed.
ROW 07-TRAF CTRL-PRIV PROP ACCESS Continuing Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not,
shall be cause for work stoppage until effective access is established.
ROW 10-TRAF CTRL-MIN LANE WIDTH Continuing Notice
Minimum travel lane width shall be eleven(11)feet;pedestrian travel shall also be provided for.
ROW 08-TRAF CTRL-DEVICES IN PLACE Continuing Notice
Traffic control devices,flagpersons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
ROW 12-INSP 24 HR NOTICE REQUIRED Continuing Notice
The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at
kenny@tigard-or.gov,twenty-four(24)hours prior to commencing work,twenty-four(24)hours prior to any staged
inspection, and after completing work covered by the permit.
ROW 13-HAZARDS-CERT OF INS Continuing Notice
Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach
roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate
of Insurance shall be available at the work area.
ROW 21-REPAIRS REQ-INSPTR OPINION Continuing Notice
Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, in the
City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the
permit.Corrective work shall be done at the permit holders expense.
ROW 22-AS-BUILT/ENGR CERTIF REQ Continuing Notice
At the end of each year, or an a mutually agreeable yearly date, any entity making changes to its facilities in the public
right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to
the previously approved construction plans and, also, any improvement which may impact an existing public system or
facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation
compliance(form attached).
ROW 26-MONUMENT PROTECTION REQ Continuing Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holders
expense.
ROW 06-TRAF CTRL-ADVANCE WARNING Continuing Notice
Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance
notification sign at each end of the construction area 72 hours(min.)before initiation of construction work.
ROW 19-UTILITY LOCATIONAL CONFLICT Continuing Notice
Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the permit holders expense. Changes must be approved by the City in advance of work performance.Contractor shall
coordinate the work with affected utility agencies.
ROW 09-TRAF/NOISE CTRL-WORK HRS Continuing Notice
No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor
between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m.to 9:00 a.m. Sunday.
ROW 27-PROB SOLVING-RESPON PARTY Continuing Notice
The permit holder shall provide to the City Inspector, in writing,the names and 24-hour emergency telephone number of two
(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of an
emergency.The permit holder shall notify the City Inspector, in writing,of any/all assignment changes.
ROW 28-CONSTR SAFETY-RESPON PARTY Continuing Notice
The permit holder shall cause his contractor to provide to the City Inspector, in writing,the name and 24 hr emergency
telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA,Chap.437,
Div. 3 Construction, Subdivision P-Excavations.The contractor shall notify the City Inspector of any/all assignment
changes.
ROW 11-TRAF CTRL-CITY CAN MODIFY Continuing Notice
The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic
and to assure public safety.
ROW 02-PERMIT&PLAN REQ ON SITE Continuing Notice
A copy of the permit and all attachments, and a copy of the approved construction plan and all amendments shall be
available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved
permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General
Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance.
ROW 05-TRAF CTRL-ROAD CLOSURE Continuing Notice
Public roadway shall not be closed to traffic, at any time,without having first obtained written approval from the City
Engineer.The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide
Emergency Services(Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District.
ROW 17-DRAINAGE CONTROL REQ Continuing Notice
Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent
private property,public property and the receiving system is not adversely impacted.The City may,at any time,order
corrective action and stoppage of work to accomplish effective drainage control.
ROW 14-DEBRIS-MATERIALS Continuing Notice
The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly
prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate
cleanup and stoppage of work to accomplish cleanup.
ROW 15-EROSION CTRL REQ Continuing Notice
Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q.
requirements.The City may at any time order corrective action and stoppage of work to accomplish effective erosion
control.
ROW 20-TRENCH-PATCH/SAFETY/LBILITY Continuing Notice
A temporary hard-surface patch(Cold mix A.C.or Hot mix A.C. base paving) shall be placed on trenches within roadways
at the end of each day's work. No trench,on site or off site,shall be left at any time in an unsafe condition.The permit
holder is responsible for and is liable for hazards or damage resulting from the work.
ROW 24-TESTS/REPTS TO VALIDT CLMS Continuing Notice
The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's
engineer or contractor to validate claims of material or construction adequacy/compliance.Such tests/reports shall be
provided at the permit holder's expense.
ROW 25-RELEASE-WAIVER REQ Continuing Notice
The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership
disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction.
ROW 29-ESMT/RT OF ENTRY-RESPON Continuing Notice
It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work.
Proof of right-of-entry, or properly executed easements, shall be provided to the City.The City shall in no way be construed
to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements.
R E
VE
OCT O 1 2014
City of Tigard AGAR?
Public Facility Improvement PLAN NIN ,,-]:''`VGINEERING
s (PFI) Permit s D►�S
General Information: I FOR STAFF USE ONLY
EngProperty Address/Location(s): �- � Ski ItZY �C1�1'AT)C. CaseNo.:
�,.,r�y (�, Case No.: �('2.D1�}—�p�i{
1-6E Y Y IL A -1-1 4 IbQC' � S�l Fee: �3W
r Receipt No.: , 1
*Applicant's fN��ame:�``Y-t�}kU jA Ciwtr A � lPA6Com- Date: ,v ` td
Address: �1ILV � i 1 '_ _ Lt Ve Application Accepted: �J 1 By:Ar-_ 6l
City/State:—)t—+1[Am ,r L : "Lip: C12.C�L 'B/-j/)q,
Primary Contact: 4'O -J REQUIRED SUBMI'1-17 V`<'
INFORMATION
Phone: `iU' I Fax: )3 212-01"JL�
E-MaiL• �s � �t�4I U�_��•� L_ Professional Engineered Plans are required
' � for:
Tobe pie 1 e��►�in�el - a1 bid • Street Widening
Contractor's Name: • Subdivision Infrastructure
CCB# Expiration: • Main utility line extension:
0 Storm Drain,Sanitary-Tigard
Address: 0 Water-Tigard Water Service Area
City/State: Zip: (includes Durham,King City and a
portion of unincorporated Washington
Phone: Fax: County)
**Note:See Engineered Plan
Plans By: Submittal Checklist attached.
Address: ZZ I SIN � r j For all other work:Submit scaled sketch of the
City/State: 7]� lftr A F 01L Zip: COLD work to be done.(see attached minimum sketch
requirements and provided sketch area).
Phone: Fax:
Updated:6/24/2013
L\CURPLN\Masters\Land Use Applications\Public Facility
Impcocement.docx
Description of work:
COCA V Q.- kzk
Estimated value of work(within the public right-of-way):
Is work related to a LAND-USE DECISION? YES F-] NO
If so,please specify(MLP,SDR,SUB,etc.)case#:
Is the work related to a BUILDING PERMIT? YES FJ NO Eb
If so,please specify(BUILDING PERMIT)case#:
City of Tigard 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-718-2464 1 www.dgard-or.gov Page 1 of 5
APPLICANTS:
To consider an application complete,you will need to submit ALL of the REQUIRED SUBMITTAL ELEMENTS as described on
the front of this application in the"Required Submittal Elements"box.
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work.
*When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession wiili
written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided on the
back of this form or submit a written authorization with this application
(Detailed Submittal Requirement Information sheets can be obtained,upon request,for all types of Land Use Applications.)
BY SIGNING BELOW,THE APPLICANT(S)SHAT I.CERTIFY THAT:
♦ The above request does not violate any deed restrictions that may be attached to or imposed upon the subject property.
♦ If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions
and limitations of the approval.
♦ All of the above statements and the statements in the plot plan,attachments, and exhibits transmitted herewith,are true;and the
applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are
false.
♦ The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for
approving or denying the application.
SIGNATURES of each owner of the subject property.
DATED this day of � Y^ 20
Applicant/Authorized Agent's signature Owner's Signature
Owner's Signature Owner's Signature
City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 503-718-2464 1 www.tigard-or.gov I Page 2 of 5
AT P(n(o40
1N STALL I# MMAZY TMMJh107I0J4 I
VM STALL Z" RJ SER. DW.EXISTIN& BP-YT S. sw Manxanita s-t En
� WR CHECKLIST
ITEM YES COMMENT
L91 NDlfdfiGER
low
$lZ / :J1ZT-Z4E INSMAIA eAaoroE
FQU LT PCE TY84CH
INDICOTDfL *2 CU-D13 Dakota SI SW North Dakota St BORE X NOTAL
Jk7_AL-JKT--Z" tocu: x
STAKM
��— FLAGGING
Lni Budherghty 6�0T TRUM
``cue LAMSCAPE
LASEWW
SEE ss'0J P
PAGE W 13'LIRLCQ�ST-- pR ---_
JOB TDRX PUN
2- o � 5 -Z♦fS� - - DI �. -.� 16816 UGCLIcuff
SITE UG cut v8t
90IT110"N
L9 1-12� R LOCATION MAP ��T+
(W/LUaE) (W/WaI-) �: �i SIARDONLxI
i
1-2 A Nj CCdMAD
PD 06956 2-470 A` �I AW D MYN)N FROM TM DESIGN MUST
PD 06955 1-{4-L 4i K AMWWD fY PGE FROJECI ARANAGER MF Ct
DATE ttNE
t qO T M,
-O
C 00 3M7N i
IF RLbM P(n b 4 0 n, P D 69 5 S , (Z 1 S') 4 1 CALL 817 BEFORE YOU DIG
1' 1 �/�P� ATTENTION.
A.6dh1DOW EXISTING )XZ.CU! V43 PIZ.IECMLER OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED
THINK BY THE OREGON UTILITY NOTIFICATION CENTER. ,
BULL 1-2" PL- DU C."t. THOSE RULES ARE SET FORTH IN OAR 952-001-0010
/�/� SAFETY THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF
1NbTDLL 1-'lk Z JAL-JKT UG. PRT,BIZ. THE RULES BY CALLING THE IN
UTILITY
FIRSTI NOTIFICATION CENTER AQMINISTRATIQN ® (503-232-1987)
TO REQUEST UTILITY LOCATES CALL THE OREGON Know whore below.
L UTILITY NOTIFICATION CENTER 811 AT LEAST (;OII be}ore O d'
[•Erb Ii L'. .P 2 BUSINESS DAYS PRIOR TO EXCAVATION, Y 19,
1 PGE CONSTRUCTION DRAWING
ISDPM+ENG REWEW: I ASBLRLT BY DESIGNER:
LUaG CutL0 AS-BUILT VERIFICATION d NESC VIOLATIONS CORRECTED
-:document oc tely r.p—M,FIELD c-,I,-h-.
Foreman: Dela:
GF: Dote:
II I DATE: B2N71 SCALE: WA JACCOUNr: 1070001 AWO:14628 IOB� 771BOD
LU _ _ _ W __ (�7[>� �_ _ TITLE PGE-DIST.IMPROVEMENT
SIQQWALIL 1 4 I�L' 31TJ�VJJIL K 4 Lha 14' 17' N\ cRlcur PROGRESS-GREENBURG 5f2E11 17
PGE/ LOCATION 11580 SW BURLCREST DR, TIGARD
13' l 1
DFSCRIPrON
..E� REPL RIO CABLES&RE-ESTABLISH LOOP FEED
ON(SWILSONVILLE YASIVIGTQN Fes 'C11-34C,(T.G.#655-C3)IWOM� SHEET
LI''�� U:CREW CENTER DEIGN ey Er40NE(5031 DRAwN IY 1(,Z
PD Jo 5 55•�� Neo ewecrcwew n BRYAN SWAN 136-5411 BRYAN SWAN
WILSONVILLE.OR 97070 0 PORilANO GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
RZOM PD Lo)S5 To PDS9Sto
Aa&Noow EXITrING *7- ICU U(0I
O� - a Z CL)-D 13 SFS P>�E PP-11 G&IbLE R
COOP v 1 Q� BAIZE I- Z PL- DUCT.
�kl/�L-JKT Z" USTALL 1-6 Z AL-JKT U66,
I� PR 1. C&e L 9,
�Ilti I '! y! S1eL.@U@LG?€ST DR_S_ _
PD D6956 PO 06955 �R.UI�A PD 59 5L� To PD(o9Z£3 (38U�}
RE 1- 2" PL DULT".
CeD IWSTOLL I -'I 2AL. XWJ' ULD. PF.,I.
CbIaL.E .
Z AL-JA7- Z" S: i' nti 'o m
INSTALt-
tAUL1" ANY D M"ON FROM "0 DESIGN RAU
/ :'�y�l1� 11u D I c eiTO fL !"MOVED By PGE PROIEn MANAGERn
R�
ATTENTION: CALL 871 BEFORE YOU DIG
t' PD 06926.' OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED ,
BY THE OREGON UTILITY NOTIFICATION CENTER. ,
�,��� SAFETY THOSE RULES ARE SET FORTH IN OAR 957-001-0010
THROUGH 957-001-0090.YOU MAY OBTAIN COPIES OF
FIRSTI THE RULES BY CALLING THE OREGON UTILITY
y / TFICAnON CENTER ADMMTRA110N 6 (50.9-7]7-?987)
TO REQUEST UTILITY LOCATES CALL THE ORE(;,_: Rnpw whpYs bBIOW.
I UTILITY NOTIFICATION CENTER.BII AT LEAST
7 BUSINESS DAYS PRIOR TO EXCAVATION. CDII 6elp,e you dig.
' /\tiPGE CONSTRUCTION DRAWING
I VT 00055 /� Ov` SDPMENG REVIEW' ASBUILT BY DESIGNER:
AS-BUILT VERIFICATION d NESC VIOLATIONS CORRECTED
ti \ Thu,document accurate!
y represents FIELD cpnsHuclipn.
fwernan: Date:
I
/ \ \
.MT-D I DAR:GF 90!6110 SCALE: ACCOUNT
I WA 1070001 AWO:II6
28 Jb1 W.7715fM
r-- AUL LL / \ti \ \ 'In' PGE-DIST.IMPROVEMENT
/I-, CIRCUITPROGRESS-GREENBURG TE IR17
-gESS OR VJ 'S�O` w/ LST 11580 SW BURLCREST DR, TIGARD
-SW guM ERC 1 OEscNProN REPL BIO CABLES&RE-ESTABLISH LOOP FEED
A AL.ki"iRT PD LOJSLtl_ WILSONWLLE WASHINGTON `p�7C11-34C,(T.G.#655-C3) �"� I
DESIGN
0697 �OL•
LINE CREW CENTER DESIGN BY NIONE Ism) DRAWN Rr
wosweeEwWr ERYAN SWAN 7J&5111 BRYAN SWAN
WILSONVILLE.OR 87070 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
—��34CD12l�-- C'1 3 X01 1
4CM23 3. � NORTH-DAK07A.ST 34C01os 1�3462X
4G0126 �� 34C011 OD1
7_. 8 CIP ,
.—
,— — 1510
11000
117 34 G
:816
11590 S34C015 —
5S34C016 j I
--- SS34CO17
DIA:•8 � _ ,� 1�`isoo
11655i
,�' i
;
B U R L C R E S T DR SS34CD18 064 Q ss�4c
--6" CIPi I
— --- 4C0078 601197, = 340 024 C
- -- .—
{ , 340011 ~
1 3
j id
SS34C045 j
SS34C046 SS34008
i
119 (f N
11895
i
11945 /. 2SS34 — _
C, Cl 34CD319 34 3C
Feet
C 125
psi o -- f