Loading...
Report /v(.cr ,2 /2/- c2?03 ------ PWU ENGINEERING INC. Email: pwuenqineerinqcomcast.net Ph: (503) 810-8309 Field Revision Memo: Job # LEN14220 Date: 10/28/14 Project: Bellevue American Master Plan Reuse Garage Left Lot 14 Sequoia Heights, Tigard, OR Lennar Homes Jeff; As per our conversation on sheet S3.1 on the rear of the house if there is a top plate splice over a header add a USP RS20 coil strap at the splice. The strap should be a minimum of 4' long and centered on the splice. The strap may be nailed to the side of the splice plate. You may use an equivalent Simpson CS20 coil strap in lieu of the USP product either is fine. Sincerely, ili:V PROpen „cam vciNFe s12 c� k. 19421PE 9 2 ..o . r EGON Y22 ,,/,1 PH/LIP `I Expires: 46/30/201 6