Permit u CITY OF TIGARD BUILDING PERMIT
`- COMMUNITY DEVELOPMENT Permit#: BUP2014-00238
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/22/2014
Parcel: 25101 DC00200
Jurisdiction: Tigard
Site address: 13535 SW 72ND AVE 100
Project: Pacific NW Properties Subdivision: 72ND BUSINESS CENTER Lot: 13
Project Description: Solar photovoltaic system.
Contractor: NW PHOTON ENERGY Owner: PNWP LLC#2
10720 SW MOAPA ST BY PACIFIC NW PROP LTD PTNSP
PORTLAND, OR 97219 PO BOX 2206
BEAVERTON, OR 97075
PHONE: 503-793-6620 PHONE:
FAX: 503-244-1243
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: OTR T Permit Fee-Additions,Alterations, 10/22/2014 $1,148.23
ype of Const: Demolition
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Building 10/22/2014 $137.79
Dwelling Units: 0 ' Plan Review 10/22/2014 $746.35
Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 10/22/2014 $14.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $106,400 Info Process/Archiving-Sm$0.50(up to 10/22/2014 $10.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,056.37
Required:, Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all othe applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if wo is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification( nter. ose rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2 •.198 .r 1.8r e.332.2344.
Issued By: fj1 Permittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available ins.= "on date.
This permit card shall be kept in a conspicuous place on the job site until..mpletion of the project.
Approved plans are required on the job site at the time of eac inspection.
Building Permit Application
Commercial Mk()FFl( f: 1 tit: ()NI l
City of Tigard ■ Received t Permit No.: r . • `
I[�1 J ' ._I di_
• 13125 SW HaII Blvd.,Tigard,O �. —
i Phone: 503.718.2439 Fax: 503.598.1h1 ( 1 5 ?.Q14 Date/B : •i (V''I�� a���
T I G A R D Inspection Line: 503.639.4175 UU��'11 rate'ea.�l'': w WI Set Pale 2 for
Internet: www.tigard-or.gov ���(�� � Notified/Method: t al IRA Supplemental Information
Cv1 ' j rPe+ ( p,12.‘ Ktrk
TYPE' REQUIRED DATA:1-AND 2-FAMILY DWELLING
®New construction ❑Demolition Permit fees*are based on the value of the work performed.
--- Indicate the value(rounded to the nearest dollar)of all
❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 13535 SW 72nd Ave New dwelling area: square feet
City/State/ZIP:Tigard Oregon 97223 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name: PNWP Tigard Corp Center Covered porch area: square feet
Cross street/directions to job site:217/72nd Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
OIndicate the value(rounded to the nearest dollar)of all
Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the
M DESCRIPTION OF WORK work indicated on this application.
1 72kW Solar roof top mount Valuation: S (�'6 j,C� �
Existing building area: square feet
New building area: square feet
4 ® PROPERTY OWNER ❑ TENANT Number of stories:
Name:PNWP LLC#2 Type of construction:
Address:6600 SW 1056 Ave Occupancy groups:
LCity/State/ZIP:Beaverton Oregon 97008 Existing:
Phone:(503)6263500 Fax:(na) New:
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
▪ Business name:PNWP#2
(Please rejaanf�srhedrYt0
Structural plan review fee(or deposit):
Contact name:Brad Stern
v FLS plan review fee(if applicable):
'3 Address:6600 SW 105ht Ave
1� •City/State/ZIP: Beaverton Oregon 97008 Total fees due upon application:
Phone:(503)626 3500 Fax: :( )
Amount received:
• E-mail:Brad.Stern @pnwprop.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
go Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
;—.) Business name:NW Photon Energy Submit two(2)sets of roof plan with connection details
.\....), and fire department access,along with the 2010 Oregon
Address: 10720 SW Moapa Ave Solar Installation Specialty Code checklist.
City/State/ZIP:Portland Oregon 97219 Permit fee(includes plan review
$180.00
and administrative fees):
Phone:(503)697 4482 /F Fax:( )
/ State surcharge(12%of permit fee): $21.60
CCB Iic.:188056
/ Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Kirk Ca eron Date: 10-13-14 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB)
•
111111 ■ iiii
Building Division
Accessibility: Barrier Removal Improvement Plan
1 lc, Rn
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order.
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2]of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
III ■
• Building Division
Plan Submittal Requirements
I c, \It I, Commercial& Multi-Family-New,Additions or Alterations
1. SITE PLAN (fully dimensional,drawn to scale) labeled with:
A. ❑ map& tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. EXTRA SET OF THE FOLLOWING:
A. Two (2) copies of site plan to include vicinity map.
B. One (1) copy of erosion control plan with details.
C. Fire Department Building Survey,and full set of architecture drawings.
I:\Building\Permits\BUP-COM PcrmitApp.doc 03/03/2011
L
■ Building Division
Plan Submittal Requirement Matrix
TI G A R D Commercial& Multi-Family-New,Additions or Alterations
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing(site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Pemrits\BUP-COM PerrnitApp.doc 03/03/2011
Dan Nelson
From: Kirk Cameron <k.cameron @comcast.net>
Sent: Tuesday, October 21, 2014 10:42 AM
To: Dan Nelson
Subject: Fw: PNWProp 72nd Solar Project
Attachments: PNWPflier(2).docx
Hello Dan, to confirm project cost less solar panels total $106,400
We are anxious to begin so we can go live before year end.
THANKS FOR YOUR HELP!
Kirk
From: Kirk Cameron
Sent: Thursday, October 16, 2014 7:12 AM
To: Dan Nelson
Cc: Ryan Mayfield
Subject: PNWProp 72nd Solar Project
Hello Dan, I look forward to working with you again on our second solar project (within a year) located in
Tigard. As I mentioned to Branden Taggart, the solar checklist was difficult to complete because we are
using a ballast racking system, similar to our last Tigard installation. This time we are using Unirac Ballast
(which was installed at PNWP Corporate office located in Beaverton off 217, and going live tomorrow).
Anyway -that is the reason I had so many blanks in the document. I cc'd Ryan Mayfield who is our solar
designer and technical resource. Please contact either Ryan or myself as necessary.
Sincerely,
Kirk
Kirk Cameron
NW Photon Energy
www.nwphotonenergy.com
3C Solar LLC
W 503 697-4482
C 503 703-4046