Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
�J BUPLO 13 - 00178 I E) oM OFTI (L V01)J lT• NN Q .. W � t�i N •v �- �� A MEN9S WEARHOUSEMENS WE .A� R ]H[ OUSE � � � I V o (R , m z 0 o V i. ©2013 NICHOLAS J. TRIGAR.IGO THE GENERAL CONTRACTOR AND/OR ALL 50-GONTRAGTORS WORKING FROM THESE PLANS AND 5PEGIFIGATION5 ARE NOT TO 56ALE 5UCH INFORMATION HUT TO CONTACT THE ARCHITECT OR H15 REPRE5ENTATIYE REGARDING MEASUREMENTS,IF SUCH MEA5UREMENT5 DO NOT APPEAR CORRECT,ADD UP PROPERLY O OR SCALE CORRECTLY TO THE INDICATED 51ZE. W 4-1 DATE: I55UE nom`` W O�/01/13 PRELIMINARY REVIDN OVOCi/13 PERMIT / LL / SID •- RESFONSIBILIT�/ 5GHEDULE PROJEGT D I REGTOR�/ LIST OF DRANIN65 v LL T6C TENANT LL TOG TENANT 1. TENANT 4. PERMIT EXPEDITOR 5. MILLWORK SUPPLIER D I REGTV STANDARDS 4 METAL FIXTURES SHEET SHEET NAME P F REV151 ON � PRE-GON5TRUGTION E F I F I F I REMARK5 ELEGTRIGAL E F I F I F I REMARKS MEN'S WEARHOUSE 6PA, INC. IDX LOUISVILLE CONTACT: BRANDI PINO CONSTRUCTION PROCUREMENT NUMBER L PERMITS • 5ERVIGE TO PREM15E5 - CONDUIT • 40650 ENGYGLOPED I A G I RGLE 1308 POST AVENUE 101 RIVER RI D6E CIRCLE PHONE: 800.4g6.4q 15 MANAGER T1.0 TITLE PA6E • o FEES/TAXES • SERVICE TO PREMISES - WIRE • FREMONT, CA g4538 TORRANCE, GA g05OI JEFFERSONVILLE, IN 4-7130 EMAIL: MW, MW AND TUX, Ka 6 �'- GERTIFIGATE OF INSURANCE METER BASE AND METER • " : .: `;` ::::.:: -'".:';": ': _ I PHONE:510.123.8533 PHONE: 310.-781.8250 PHONE: 012)280-0000 Notionoloccount5@directv.com PHONE: 281 116-7241 DEMOLITION FLOOR PLAN, NOTES, <:.,>._.�.;, ..;;„.::.4•:';..,:.' TEL/DATA TO PREMISE CONDUIT � PULL STRING ® CONSTRUCTION PM: /� ( BJPino@DIREGTV.com GONTAGT:STEPHEN ZA60R5K1 DI.O LEGEND, AND KEY NOTES TELEPHONE/DATA TO PREMISE - WIRE • • • F X 510. 81. OS EXT. 88g3 TEMPORARY UTILITIES • • TED 6UILLERMO GONTAGT: KEITH GLA55MAN GONTAGT: GHUGK WA6NER EMAIL. 5jzogor5ki@tmw.com DEMOLITION REFLEGTED GEILIN6 PLAN IF REQUIRED. TELEPHONE/DATA IN PREM15E-GONOUIT HIR • • TGG TO INSTALL AND LABEL ALL D2.0 BARRIGADE ' • TGG TO CONFIRM N/GPM AND LL AS GATE60RY 5 LINES BY THE FRIDAY OF PHONE' 650.738.5 715 EMAIL: ke ithg@gpon.com LIGHT FIXTURE SUPPLIER NOTES, LEGEND, AND KEY NOTES ca PART OF BID SUBMITTAL TELEPHONE /DATA EQUIPMENT • THE FOURTH WEEK,SEE ELECTRICAL MOB1 LE: 6 50.516.6181 TARRANT LIGHTING PAINT ABBREVIATIONS, ROOM FINISH SCHEDULE; DEMOLITION • • DRANINGS. EMAIL: TE64@ tmW.com 6. VENDORS 2113 FRANKLIN DRIVE BENJAMIN MOORE FINISH LEGEND FIXTURE � ELECT. I ELECTRICAL EQUIPMENT • CU FORT WORTH, TX 76106 PHONE: 866.�108.g 180 AO.O LEGENDS HARDWARE NOTES � GROUP • LL TOG TENANT WIRING • • • 2. LANDLORD 5. SIGN SUPPLIER PRE55 EQUIPMENT PHONE: 817.626.0044 DOOR SCHEDULE, TYPE � FRAME F=LOOR CONSTRUCT I ON E F I F I F I REMARKS OUTLETS AND 5NIT6HE5 • HAMILTON PROPERTIES I NG. ADART 516N GOMPANY MGALL I STER CONTACT: L 15A GAHAK DALT I LE 4) GONGRETE SLAB • LIGHT FIXTURES AND P051TIONIN6 OF BEAM • ® ® ALL LIGHTING FIXTURES PROVIDED AS 3g3q NW 5t. He lens Road 120 AN6L I N DRIVE EMAIL: I iso@ torront I i ht in com PHONE #: 077) 556-5-128 EORE55 PLAN E6RE55 LEGEND EXITING SPECIFIED THROUGH AN ESTABLISHED 100 PARKER SQUARE, 5U I TE 205 g g• AO.I • , SLAB PREPARATION ® NATIONAL ACCOUNT PROGRAM WITH PORTLAND, OR. 81210 FLOWER MOUND, TX -15028 GUMM!N6, 6A 30040 EMAIL: ANALYSIS, AND EXITING SUMMARY FLOOR PENETRATION5/PATGHING • • NEED TO OBTAIN LL APPROVAL TARRANT LIGHTING SUPPLY. PHONE: 503.224.26-16 PHONE: -1-10.441.3000 CARPET notionol.account5@daltile.com FLOOR PLAN, 6ENERAL NOTES, FLOOR � LAMPS • ® PHONE: 800.65.6353 � T DD MGA I STER GONTAGT: O �'` •� �'�� �'�`��� '�°����� GONTAGT: 5T RT B 6SHAW I NDUSTR I E5 A I.O AND PARTITION LEGENDS, AND • • SIGN J-BOXS,CONDUIT, AND PULL STRING • ® • ., TENANT TO APPROVE ANY EQUIVALENTS FAX: 468.322.1 g I S (V LL T6G TENANT EMAIL: GONTAGT: DOUG HEAD PHONE: X706.532.746-7 KEYNOTES �-- + DEM 151 N6 PARTI TI ON5 E F I F i F I REMARKS FINAL 516N CONNECTION ® • • TGG TO COORDINATE WITH SIGN VENDOR MU51 G SYSTEM CONTACT: TAMMY 5TANDR I D6E REFLECTED GEILIN6 PLAN, GEILIN6 FIREPROOFING • AS REQUIRED BY GORE EXIT/EMERGENGY LIGHTS • • • 3. ARCHITECT MOOD MEDIA EMAIL: tammy.5tandridge@ A2.0 FIXTURE LEGEND NOTES LEGEND AND • • METAL STUDS W/GYP. ® SECURITY SYSTEM POWER ® ® ® STOG TO YSTEM VENDOR ANDyLIANDLORD. TRIGARIGO ARGH � DE516N PHONE: 512 583.8682 5hoNinc.com KEYNOTES INSULATION A5 REQUIRED BY CODE 5EGURITY 5Y5TEM ® ® 502 VALLEY ROAD CONTACT: 5HAINA SIMMONS SOUND SYSTEM • • ® • TGG TO GOORDINATE N/SOUND SYSTEM FLOORING A4.0 INTERIOR ELEVATIONS, LEGEND, KEY • • SERVICE DOOR(5) � • VENDOR(EXISTING) WAYNE, NJ 04-10 ARMSTRONG PLAN, AND DETAILS LL TGG TENANT 5PEAKER5 AND SPEAKER WIRE • • • PHONE: cil5-6q2-0222 GGTV � ALARMS INTERIOR PARTITIONS REMARKS PHONE: 240.422.1188 DATE: No. REVISIONS / BY: E F I F I F I LL TGG TENANT CONTACT: JOE AVALLONE PROTECTION ONE TOILET INTERIOR ELEVATIONS, TOILET � METAL STUDS/GYPSUM BOARD ® • ® FIRE PROTECTION E F I F I F I REMARKS EMAIL: JOEA@TRIGARIGO.GOM PHONE:510.723.8554 CONTACT: DAWN KEYERLEBER A4.1 AGGE55ORY SCHEDULE AND LED6END • • `- FIRE RETARDANT WOOD BLOGKING/BAGKING • • • A5 REQUIRED SPRINKLER MAIN TO PREMISES • GONTAGT: ROBYN WHITED (REF FIN. 5GHED. FOR OTHERS) STORE #: 2666 Z ENLARGED TYP. � AG6E551 BLE FITTING (� DOORS, FRAMES,HARDWARE • ® • 5PRINKLER BRANCH LINES/DROPS/ HEADS • A4.2 izOOM PLANS, INTERIOR ELEVATIONS, • •LL TOG TENANT MODIFICATION OF DROPS HEADS • ® V.I.F. < GE I L I N65 E rF I F I F I REMARK5 FIRE EXTIN6UI5HER5/CABINET • ® ® AND DETAILS MENS v GYPSUM BOARD FIRE ALARM 5Y5TEM • • • AS REQUIRED BY GODE - t-- A5.1 TRANSITION AND DOOR DETAILS • • WEAR O U S E • • • UNDER SEPARATE PERMIT GODE SUMMAR)/ oJ T I fi--o TIoAUDIO AND VISUAL ALARMS FIXTURE DETAILS L5 EXTERIOR/ INTERIOR ACCESS PANELS SMOKE DETECTORS • ® • A5.2 • • LOCATION: LL TGG TENANT APPLICABLE GORES MERCANTILE TENANT IMPROVEMENT PROJECT. FIXTURE AND FURNITURE PLAN, 16140 SY1t '721�ND AVENUE A6GOU5TIGAL GEILIN6 TILE OR GRID ® ® ® POST GONSTRUGTI ON E F I F i F I REMARKS BU I LD I NO: ORE60N STRUCTURAL SPECIALTY CODE ..................................... 2010 F1.0 • • MERGHAND15E SCHEDULE, AND LEGEND BRIDGEPORT RETAIL. LL TOG TENANT FINAL CLEANUP READY FOR OCCUPANCY • • PLUMB I N6: ORE60N PLUMBING SPECIALTY CODE ............................................ 2011 NO GHAN6E IN OGGUPANCY, AREA OR MEANS OF EGRESS. CENTER STOREFRONT E F I F I F I REMARKS GERTIFIGATE OF OCCUPANCY • • MECHANICAL: ORE60N MEGHAN I GAL 5PEG I ALTY CODE ..................................... 2010 6N 1.0 6ENERAL PRODUCT 5PEG I F I GATI ON5 • • TIGARD, OR FRAMING • PATCH HOLES AND POWER WASH PUNGHL15T • ® PUNCH LIST REVIEW AND INSPECTION/ ..,. 2010 EX 15T I N6 5PAGE HAS AN APPROVED CERT I F I GATE OF OGGUPANGY. .. .... . 6N I I 6ENERAL PRODUCT 5PEG I F I GATI ONS ® PROJECT o RAWN SY APPROVAL BY GPM. ENER6 OREGON ENERGY SPECIALTY GORE NOTE: ELEGTRIGAL: ORE60N ELEGTRIGAL SPEGIALTY CODE ...................................... 2011 DOORS) • • ® TGG TO REFURBISH STOREFRONT TO 1. THE 'RESPONSIBILITY 5GHEDULE 15 INTENDED TO BE USED A5 A GUIDE ONLY AND 15 NOT ALL-INGLU5IVE. ALL PER5ON5 FIRE: ORE60N PLUMB I N6 5PEG IALTY CODE ............................................ 2010 130364 ROH GLAZING SYSTEM ® LIKE GOOD CONDITION.CAULK BIDDING WORK OR CONTRACTED FOR WORK ARE TO REVIEW THESE DOCUMENTS,THE LANDLORD CRITERIA AND THE SCALE: 0HEGK BY: INTERIOR/EXTERIOR WINDOWS A5 EXEGUTED LEASE CONSTRUCTION EXHIBIT B IN THEIR ENTIRETY. ACCESSIBILITY: ORE60N STRUCTURAL SPECIALTY CODE - CHAPTER 10 ...... 2010 FINISHES • • REQUIRED AND REMOVE (E) PEELING 1/4" = 1'-0" J.D.A. PAINT,VIF. 2. TGG 15 TO ORDER ALL MATERIALS WITHIN THE FIRST MEEK OF GON5TRUGTION TO ALLON ENOUGH TIME FOR DELIVERY. DA G E515 O A iNU 65 y THE "+ BASE ® • ® OCCUPANCY 0-T/12113 DIRECT SUPERVISION OF: SAFETY/UV FILM • • TCG TO DETERMINE EXTENT OF USE AND OGGUPANGY GLA551FIGATION: M-MERGANTILE N`'T EXISTING NINDON FILM. PROVIDE AN ADD ALTERNATE BID FOR ANY CONSTRUCTION TYPE: 2B DEFERRED/SEPARATE SUBMITTAL NICHOLAS J. TRIGARIGO o NINDON5 M1551N6 FILM. SPRINKLED: YE5 ARCHITECT -� L FIRE PROTECTION SYSTEM _ TRIGARIGO ARGHITEGTURE SIGNAGE LL TGG TENANT REMARKS AREA CALCULATIONS . E F I F I F I AND DE5iGN PG EXTERIOR SIGNAGE � EXTERIOR 516NA6E • • UNDER 5EPERATE PERMIT. SALES AREA: 41545.4 5F INTERIOR SIGNAGE ® TGG TO COORDINATE KITH SIGN VENDOR TAILOR AREA / STOCK ROOM: 11240.5 5F E3ANNER ® • TGG TO COORDINATE KITH SIGN VENDOR. TOTAL: 5,�183.q 5F ALL LANDLORD WORK (SHELL BU I LD I N6, 51 TE WORK) TO BE FILED UNDER SEPARATE LL TGG TENANT APPLICATION. F=IN 15HE5 E F I F I FTI REMARKS l-- FLooR 6RO55 AREA: 51184.0 5F W CARPET • TGG TO INSTALL FIN15HE5 PRIOR TO V.G.T. - BACK OF HOUSE • ® ® INSTALLING FLOOR FIXTURES. Lu o TGG TO PROVIDE � INSTALL ADHESIVE Lu SHEET VINYL - TOILET ROOMS • • PER MANUFAGTURER'5 3 RECOMMENDATION. VIGINITN�/ MAP ARGHITEC/TURAL5�/MBOLSGOPE OF WORK. • Lu BA5ELu RUBBER h. :,: ROOM NAME A. 6ENERAL CONSTRUCTION WILL INVOLVE INTERIOR TENANT IMPROVEMENTS OF XXXX } ' XX THE EXI5TIN6 SPACE. THERE WILL BE NO MODIFICATIONS TO THE EXISTING WALL ����.�•�`` �:• ������� �>�:-� ELEVATION AX.X XXXX MEGHAN I GAL/HVAG SYSTEMS OR THE PLUMB I N6 L I NE5/FIXTURES. ` '..< �� ROOM NUMBER B. SELECTIVE DEMOLITION PAINT \t..}P �. •.+$;;�:� 4i�' �. �� PLA5TIG LAMINATE TGG TO COORDINATE WITH FIXTURE .h• Z 7- VENDOR VENDOR ,. �.., \ r�. ��: ,��t��>: � � 1. REMOVE THE EXI STI N6 FLOOR FINISH (IF CARPET 15 NOT SHAW PORTLAND DETAIL TA6 PLASTIC CORNER GUARDS \: `� ,.,.;;• ,•.,,ti, .} I 1 �;���>� w : ���.��.�.���..•,�; .-- -• ESPRESSO). "> $'?'`'' NUMBER FOR PLANS LL TOG TENANT " :h" XX I XX ENLARGED PLAN TA6 GENERAL CONSTRUCTION Q Q .. FIXTURE/ FURN!5H I N65 �'��:,'...�`� `'...� -'"�`�fY . E F I F I F I REMARKS =;` LETTER FOR •�����"��`•�F ��`}``� I. NEW FLOOR FINISHES (I F CARPET 15 NOT SHAW PORTLAND ESPRESSO). . �•.�>;;��`;•�� � �... � � ��.% IRM REGIST AX.X ELEVATIONS ` o AX X � R�+tTION NO lLV 2 NEW PARTITIONS, Lu STANDARDS/WALL SYSTEMS • • ALL 5TANDARD5 TO BE ATTACHED �� `::" '' :;''' OR - 0654AF TO METAL STUD OR HOOD BLOCKING ? �:.'� . �,, 5. NEW GEILIN6 TILE AS REQUIRED. � MIRROR5 ® • ® 5-WAY MIRROR PROVIDED BY 4 SHEET NUMBER INSTALLED BY TGG. THE MEN'S �� `: '. 4. PAINT EXISTING WALLS. MILLWORK/FIXTURE ® ® TGG TO INSTALL FLOOR FINISHES PRIOR WEARHOUSE G. FIRE PROTECTION/ SPRINKLER SYSTEM Lu TO IN5TALLING FLOOR FIXTURES. 1. MAINTAIN EX 15T1 N6 5Y5TEM/ MODIFY AS REQU I RED PER CODE. STORE 2666 : ` <` /ALL HARDWARE ® ® J .{fA�?:�;;. s`.' ;: . XX DETAIL - PARTITION TA6 `���:.�. •����� :��: XX D. ELECTRICAL SYSTEMS i- � � AX.X : ., . h ti ti `{ I. NO WORK TO EXI5TIN6 5ERVIGE OR PANELS. 1N I NDOW D 15PLAY5 ® ® :,�. r�:;, :.�4•; f. ,,�� • j : 2. RELAMP ENTIRE STORE. TOILET ROOM AGGE550RIE5 • ® ® TENANT TO APPROVE ANY :�:�'�.:� �:�;�,;�:«:•�� SUBSTITUTIONS. ''�' .`;;.�:.�`'���"��`�'". CHAIRS • • � z:� `:+:N44`` 't` 3K 5`v 5. MODIFY EXI5TIN6 FIRE ALARM AS REQUIRED PER CODE. r XX SECTION KEYED NOTE E -EXISTING `J X LL - LANDLORD ;�p AX. O CARD SEAL T.G.G. -TENANT GENERAL GONTRAGTOR r,,�;, \ : `w dr.rw...r r• ...rw..�r.......r�,r� � F -FURNISH shall :�e �: jobsite. ConditionallyApproved.............. DESG � 1 - INSTALL LEVEL DATUM XXX DOOR DE516NATI ON See Letter to:Fol low..............■r.■ q . Aidached■wrr... �n�! NICH0LA < NOTE: , , PerntNuer. t �W/') TRICAR CO FLAN 15 FOR REFERENCE ONLY. TH 15 15 AN APPROXIMATE LOCATION OF THE GEILIN6 HEI 6HT OFFICE ' . Address: No. 2 08 XX-XX FIN 15H TA6 XXXX Thr T)ate: PROJECT SPACE. KIN N El N, .J. �O CITY L7!) Q, n P �P 0L SEAL y.: ' i I I E)EMOLITION NOTES DEMOLITION PLAN LEC,7END <EY NOTES / DEMOLITION PLAN. o ALL WORK TO BE GONDUGTED BY THE TENANT GENERAL GONTRAGTOR, 4. ALL AREAS WHERE DEMOLITION 15 TO OGGUR 15 TO BE 11. ALL ELEGTRIGAL DEMOLITION TO BE COMPLETED BY A BONDED, D I.01 REMOVE EX I ST I N6 PARTITION UNLESS NOTED OTHERWISE. 5EGT1 ONED OFF FROM THE PURL I G AND ALL REOU I RED 5HOR I N6, L I LENSED ELEGTR I G I AN. THE ELEGTRIGAL 5UBGONTRAGTOR TO ADJAGENT TENANT SPACE - N.I.G. Q z BARR I GAD I N6 AND 5GAFFOLD I N6 TO BE THE RE5PON51 B I L I TY V 151 T THE 51 TE PRIOR TO B I DD I N6 ON DEMOLITION AND SHALL D1.02 REMOVE EX I ST I N6 PARTIAL HEI 6HT WALL 1. THE 6ENERAL GONTRAGTOR SHALL BE RESPONSIBLE FOR OF THE 6ENERAL GONTRAGTOR. REMOVE AND/OR RELOCATE ALL EXI5TIN6 ELEGTRIGAL j LEASE L I NE VERI FY I N6 ALL EX 1 ST I N6 FIELD CONDITIONS 50 A5 TO BECOME DEV I GE5, GONDU I T AND W I RI N6 WORK AS GALLED OUT IN THE D 1.03 REMOVE EX 15TN6 FLOOR E I N 15HE5 r FAMILIARIZED WITH THE DEMOLITION AND / OR REMOVAL WORK S. ALL WORK TO BE IN AGGORDANGE WITH 0.5.H.A. REQU I REMENT5. GONTRAGT DOCUMENTS AND AS NEGE55ARY WHETHER 5UGH N NO WORK 6 WH I GH MAY BE REQU I RED TO PRODUCE RESULTS INTENDED IN ITEMS ARE I ND I GATED IN THE GONTRAGT DOGUMENTS OR NOT, IN D 1.04 REMOVE ALL EX 1 ST I N6 5LATWALL / VI V.I.F.F EXTENT N 0 THE GONTRAGT DOGUMENT5. THE 5GOPE OF WORK DE5GR1 BED IN 6. ALL RUBB 15H AND DEBRI 5 TO BE REMOVED FROM THE PROJEGT ORDER TO AGGOMPL 15H THE INSTALLATION OF THE SPEG I F I ED D 1.03 =..:`:.:.:w `<.:.:.<> :r:..:: ;.::��.. �.; .:.,.; :" : :: : .:.:: ,:> :.�,.:,.. o ^. A THE GONTRAGT DOGUMENT5 ANTI G I PATES THE DEMOLITION OF 51 TE WITHIN A 24 HOUR PERIOD OR PLAGED IN PRE-APPROVED NEIN WORK EQUIPMENT. MATERIAL AND DEV I GE5 REMOVED ° °�' ' - cd EX I STI N6 GONSTRUGT I ON IN PART OR ITS ENTIRETY, AND THE DUMPSTER LOGAT I ONS. TH 15 GONTRAGTOR TO REGE I VE SHALL BECOME THE PROPERTY OF GONTRAGTOR (IF APPROVED D 106 REMOVE EX I ST I N6 I-fP�N6 BARS, SHELV I N6 1nl�LL STANDARDS A5 REQUIRED o j REMOVAL, RELOGATI ON AND REPOWER I N6 OF GERTA I N APPROVAL OF DUMPSTER LOGATI ON FROM BU I LD I N6 LANDLORD BY THE OWNER). SUCH ITEMS MAY ONLY BE REUSED IF NOTE: . H GONSTRUGTI ON MATERIALS AND EQUIPMENT, I NGLUD I N6 ITEMS REPRE5ENTATI VE. SPEG I F I GALLY DE516NATED IN THE GONTRAGT DOGUMENTS. TGG TO SALVAGE CUSTOM PULL-OUT RODS ON HANG RELATED TO BANQUET FAG I L I TY WH I GH MAY PASS THROUGH OR BARS FOR RE-INSTALLATION. D I.01 REMOVE EX 1ST I N6 SHIRT CUBES GONDU I T, W1 RE AND OUTLET BOXES REMOVED SHALL BE OCCUPY THIS TENANT'S SPACE. IT 15 THE INTENT THAT EACH 1. ALL DEBRIS REMOVED FROM THE PROJECT 51 TE TO BE DUMPED 5GRAPPED BY THE ELEGTRIGAL GONTRAGTOR. WHERE WALLS D 1.08 REMOVE EX 15T I N6 TUX STATION, WALL STANDARDS 4 SHELV I N6 AS REQU I RED PORTION OF THE DEMOLITION AND REMODEL I N6 WORK BE DONE IN ONLY APPROVED DUMP I N6 SITE. ANY ASBESTOS REMOVAL AND GE I L I N65 ARE TO BE REMOVED, BY THE SPEG I F I G TRADE INVOLVED IN THE INITIAL INSTALLATION, OR DEBRIS, DUMP I N6 TO BE GOMPLETED BY TH 15 GONTRAGTOR, DI.Oq____l REMOVE EX 15T i N6 GASH WRAP r THAT 15 - GARPENTRY WORK BY THE GARPENTRY TRADE, PER PROPER APPROVALS. 12. DEMOLITION WORK TO BE PHASED TO ALLOW PROPER E6RE5S MEGHANIGAL AND ELEGTRIGAL WORK BY THE MEGHANIGAL AND FOR ANY PERSON IN GA5E OF FIRE OR HAZARD AND NO D1 10 REMOVE EX15T1 16 1NALL MIRRORS / V.I.F. LOCATIONS ELEGTRIGAL TRADES RESPECTIVELY AND SO ON. THEREFORE, 8. 6ENERAL CONTRACTOR TO CONTACT BUILDING LANDLORD m DEMOLITION N W RW AN R W L O O G OGGU I F THE NOW JEOPARDIZES AXz DLII EAGH GONTRAGTOR AND 5UBGONTRAGTOR SHALL THOROU6HLY REPRESENTATIVE AND ALL UTILITY GOMPANY REPRESENTATIVES MEANS OF E6RE55 FOR THE PURL I G OR PROJECT EMPLOYEES. EXAMINE THE PROPOSED WORK AND MAKE ALLOWANGES IN H15 HAV I N6 JUR 15D I GTI ON OVER TH 15 PROJECT TO ASGERTA I N D 1.12 REMOVE EX I ST I N6 FLOOR FIXTURES WALL GRAPH I GS TYP. PROPOSAL FOR THE GOST OF ALL DEMOLITION AND/OR BU I LD I N6 AND UTILITY GOMPANY LINES ABOVE, WITHIN, OR 13. ALL LABOR TO BE COMPATIBLE WITH OTHER LABOR z REMOVAL WH I GH MAY BE REQU I RED TO PRODUGE THE END BELOW PREM I5E5 TO AVOID ANY P0551 B I L I TI E5 OF GUTTI N6 GOMPLET I N6 WORK IN THE BU I LD I N6. D1.15 REMOVE ALL EX 1ST I N6 F I TTI N6 ROOM WALL FINISHES, INS 1 DE AND OUT. REPAIR WALL5 RESULTS INTENDED BY THE GONTRAGT DOGUMENTS. SUCH LINES, GAUS I N6 EXPLOSIONS, ETG. AND PAINT PER PLAN. 14. ALL PART I T I ON I N6 AND F I N 15HE5 TO BE REMOVED, UNLESS o 2. 6ENERAL GONTRAGTOR TO COMPLETE ALL DEMOLITION A5 q. 6ENERAL GONTRAGTOR 15 RESPONSIBLE FOR THE BREAKOUT D1.14 NOTED OTHERWISE, EX{5T1 N6 FURRED WALLS AROUND PERIMETER "..:` : .. .. '.... ` :.'�`�..: :...::ON 0- e., .::' : ': ::....`.... : ....:�`. ::....' . '..::: .... ...:: :".`� [L NOTED IN GONTRAGT DOGUMENT5 AND REMOVE ALL DEBRIS AND REMOVAL OF GONGRETE SLAB AT ALL AREAS WHERE TO BE REMOVED A5 NOTED. D 1.13 SAW GUT SLAB FOR NEW GONDU I T FOR ELEGTR I G DATA / COMM. AND RUBBISH FROM THE PROJECT AND BU i LD I N6 SITE. UNDER SLAB MEGHANIGAL, PLUMB I N6 AND ELEGTRIGAL WORK (SEE A I.O FOR LOCATE I ON) OGGURS. REVIEW AND GOORD I NATE EXAGT LOGATI ON5 AND 13. ALL 5PR1 NWLER LINES, MAIN5, BRANGHES, AND HEADS TO 3. DEMOLITION WORK WILL REQUIRE APPROVAL FROM THE LOGAL SIZES WITHOUT WRITTEN APPROVAL FROM LANDLORD. REMAIN OR TO BE MODIFIED, RAISED, REP051 TI ONED BY THE DI-16 GUT EX 1 ST I N6 I N-SLAB CONDUIT TO BELOW FINISH SLAB SURFACE / PATG�-f - READY TO BU I LD I N6 DEPARTMENT, AND ALL I NSURANGE PAPERS A5 GENERAL GONTRAGTOR'S SPR I NWLER GONTRAGTOR, OR REGE I VE FIN 15H REQU I RED BY THE LANDLORD OF THE BU I LD I N6 TO BE 10, ALL WORW TO BE COMPLETED FOLLOWI N6 LANDLORD'S LANDLORD'S DESIGNATED SPRINKLER GONTRAGTOR (GENERAL D1.1-77I REMOVE EX 15T1 N6 SEGUR I TY GATE SUBMITTED WITH THE REOU I RED L I M I T5 OF LIABILITY AND GONSTRUGT 1 ON "RULES AND RE6ULAT I ON5". GONTRAGTOR TO VERIFY PRIOR TO BID). IF APPL I GABL E (JG 2013 NICHOLAS J. TRIC ARI INDICATION OF INSURED PRIOR TO STARTI N6 WORK. DI-I8DI-Ibj REMOVE EX 15T I N6 TOILET ROOM AGGE55OR I ES. PATGH a REPAIR A5 REQU I RED THE GENERAL GONTRAGTOR AND/OR ALL 51.6-GONTRAGTOR5 WORKING FROM THE5E PLANS AND 5PEGIFIGATION5 ARE.NOT TO 50ALE 5UGH INFORMATION BUT TO CONTACT THE ARCHITECT OR HI5 REPRE5ENTATIVE REGARDING MEASUREMENTS,IF%UGH T.6.G. TO REMOVE INTERIOR 516N AND ELEGTRIGAL A5 REQU I RED. OR 50ALE CORENTS NOT APPEAR INDICORCATED ADD UP PROPERLY OR 5GALE CORRECTLY TO THE INDICATED SIZE. DATE: ISSUE II W i 0-T/01/13 PRELIMINARY REVIDN 07/0q/13 PERMIT/ LL /SID •- 4A ( % i w N3 A W I ■ I O DATE: No. REVISIONS / BY: 111111, 1 IF 11,1111 LTc I STORE #: 2h66 II ------� --- O I I D1.04 D1.07 DI.O I II MEN' S DI.o4 i 1 I �.---------- �------------------------ ------------ W EAR H O U S E 0 I -I io i ! J D1.0 � D1. I I I LOCATION: I I I I IF D1.16 I I EUa �I a'-3" I J I IL-i I r--- ------� I r--- ------� ---� I I 16840 SY�I �12NI� , VEt�IUE -- _ -_ _-_ I I I 1 I I 1 I I I I I BRIIDGEPORT RF-TAIL 0 o D1.18 D 1 D1.12 I 1 I I I I I I I I I I I CENTER �..�.. �►. :: ::.:::.,.:.: .:..::::::;.::.:::,...:;> = I I I I •TIGRIS, OR I I I I I I I I I D1.07 LT-1- -1-1--7--T� I I I I I I I I I I DI.I-7 ---- - 0- Y: -a Aq . G O. 1�R�1NN S -'-(r�r-r-r-F -I -,1 '� D1.04 ---- ------ ----- ------) -----� Q I I F'ROJE T N _I-I- I 01.12 I I I D1.12 130364 RNiT ,-LL SCALE: GI-+ELK $Y: - D1.12 I I I I I I I I cO I I I I I 3/1611 _ 11-011 J.I .A. .... I I I I I I I I I I I I Det H INGS GOMPLt:I UI�VM THE S-3 ISION F• P V O . DIRECT 5U ER L----► I 07/12/13 NJT -'J-r T- T-r�_�I ,� -_---__� L_ I--_L_J I I I I ► I I I I NIGHOLA5 J. TRICARIGO O Ll---�---� I I I I I I I I I �-LL J_ -L -J J� r-n r r= D 1.12 I I I I I I I I D I.10 I I I ARCHITECT --11 01.0 i --JL--JL--J I I I I I I I I I I I L---� L----� L--- ----� TRIG,�RIGO , RGHITGTURE (U AND DESI&N PG D-1-.0-4 1 \ r---------------- ---------- I I I I 1 I I i I rJD1.02 D1.12 I I I I I I I ------ ------ I I I I I I Q'-D" 2-5 I I I I I I = 1 I L. .:...,...:0 1.15...,:�.:.... I '�' 01.12 I I- -I F-I-I I I i I I .::�.:::�:::...1...:::•:��. �:::•:�:1 I I I I--11 1 I I I I I 1 ® p � I i D1.Oa LLl � I I I i 1 i D1.13 I 1 L_ ___L_-J I i 01.16 II I I I i I l i 1 I � LU O ' . I I 01.03 I I I I I D1.04 D112 I I 1 1 01.04 i 1 D1.1a Lu IL D1.13 01.10 I I 1 01.02 D1.12 I I I I L I i LU \ � I I I i I I I < ® O D1.15 tu piZ r L----------- _4,... 0 .12 - 1 I I I I--I I I D1.04 II L-------- FIRM RE6I5TRATION NO. ',I D1.12 0 .2 I I I DI.O� k �a` �M/?,�.�.�.:•�;I L--------- 01.0 1 I tuOL i I I i t D 1.04 I I I I D 1.04 1 1 1 1 1 I ' I I I I I I O i I I I I i '; -_..- I I F-- ► In - L-----J-=---- -----J I L--- ------------------------------1 D1.I M1 1 1 I iL_------L_---------------------------- 1.06 I I SEAL < 1 v ',ems, T {.I? ®- I F DEMOLITION FLOOR FLAN � SEAL I i DEMOLITION GE � A� EGE�D <E",r oDE ' OL I TI OSNOTES C) 'tot N ALL WORK TO BE CONDUCTED BY THE TENANT GENERAL GONTRAGTOR, 4. ALL AREAS WHERE DEMOLITION 15 TO OCCUR 15 TO BE 11. ALL ELECTRICAL DEMOLITION TO BE COMPLETED BY A BONDED, N Cf� UNLESS NOTED OTHERWISE. 5EGTI ONED OFF FROM THE PUBLIC AND ALL REQU I RED SHORT N6, L I GEN5ED ELECTRICIAN. THE ELEGTRI GAL SUBCONTRACTOR TO ADJAGENT TENANT SPACE - N.I.G. D2.01 TGG TO REMOVE EX 15T1 N6 TRACK L I GHT I N6 AS REQUIRED. V.I.F. LOCATION OF ALL L 16HT I N6 M■■� A z BARR I GAD I N6 AND SGAFFOLD I N6 TO BE THE RESPONSIBILITY VI 51 T THE 51 TE PRIOR TO B I DD I N6 ON DEMOLITION AND SHALL ep, \ 1, THE GENERAL GONTRAGTOR SHALL BE RE5PONS 1 BLE FOR OF THE GENERAL CONTRACTOR. REMOVE AND/OR RELOCATE ALL EXI5T1 N6 ELECTRICAL 02.02 T6G TO REMOVE EXI5T1 N6 SUIT L 16HT1 N6 AS REQU I RED. 5ALVAOE � REPAIR TO LIKE NEW CONDITION t� � I VERI FY I N6 ALL EX 15T I N6 FIELD CONDITIONS 50 AS TO BECOME DEVICES, CONDUIT AND W I RI N6 WORK A5 GALLED OUT IN THE LEASE L I NE FOR RE-I N5TALLATI ON AT NEW SUIT WALLS A5 NEEDED. V.I.F. LOCATION OF ALL L 16HT1 N6 (, t..., FAMILIARIZED WITH THE DEMOLITION AND / OR REMOVAL WORK 5. ALL WORK TO BE IN AGGORDANCE WITH 0.5.H.A. REQUIREMENTS. CONTRACT DOCUMENTS AND A5 NEGE55ARY WHETHER SUCH 0 WH I GH MAY BE REQU I RED TO PRODUGE RESULTS INTENDED IN ITEMS ARE INDICATED I N THE CONTRACT DOCUMENTS OR NOT, IN T6G TO REMOVE EX I STI N6 2 X 4 L 16HT FIXTURES AS REQU I RED. SALVAGE � REPAIR TO LIKE o :.v. : ':.:�.::•.::,: (E) GYP. CEILING AT b'-O" A.F.F. 102.031NEW CONDITION FOR RE-INSTALLATION AS NEEDED. V.I.F. LOCATION OF ALL LIGHTING �,� � < THE CONTRACT DOCUMENTS. THE 5GOPE OF WORK DE5GRIBED IN 6. ALL RUBE15H AND DEBRI5 TO BE REMOVED FROM THE PROJECT ORDER TO AGGOMPLI5H THE INSTALLATION OF THE SPECIFIEDE"� o ,� Q THE CONTRACT DOCUMENTS ANTICIPATES THE DEMOLITION OF 51 TE WITHIN A 24 HOUR PERIOD OR PLACED I N PRE-APPROVED NEW WORK EQUIPMENT. MATERIAL AND DEV I GES REMOVED .0 c� �^*5. EX 15T I N6 GON5TRUGT I ON IN PART OR ITS ENTIRETY, AND THE DUMPSTER LOCATIONS. THIS CONTRACTOR TO RECEIVE SHALL BECOME THE PROPERTY OF CONTRACTOR (IF APPROVED .I D2.04 TOG TO REMOVE AND REPLACE DAMA6ED STAINED GE I L I N6 TILES A5 REQU I RED. N (E) ACT AT 12 O A.F.F. o REMOVAL, RELOCATION AND REPOWERI N6 OF CERTAIN APPROVAL OF DUMPSTER LOCATION FROM BU I LD I N6 LANDLORD B)' THE OWNER). 5UGH ITEMS MAY ONLY BE REUSED IF GON5TRUGTION MATERIALS AND EQUIPMENT, INGLUDIN6 ITEMS REPRESENTATIVE. 5PEGIFIGALLY DE516NATED IN THE CONTRACT DOCUMENTS. D2.03 T6G TO GLEAN EXI5TIN6 HVAG DIFFUSERS � RETURN 6RILLE5. RELATED TO BANQUET FAG I L I TY WH IGH MAY PA55 THROU6H OR CONDUIT, WIRE AND OUTLET BOXES REMOVED SHALL BE NO WORK OGGUPY THI5 TENANT'S SPACE. IT 15 THE INTENT THAT EACH 1 ALL DEBRIS REMOVED FROM THE PROJECT 51TE TO BE DUMPED SCRAPPED BY THE ELECTRICAL CONTRACTOR. WHERE WALLS PORTION OF THE DEMOLITION AND REMODEL I N6 WORK BE DONE IN ONLY APPROVED DUMP I N6 SITE. ANY ASBESTOS REMOVAL AND GE I L I N65 ARE TO BE REMOVED, 02.06 TGG TO REMOVE AND REPLACE DAMAGED L 16HT FIXTURES AS REQUIRED. - BY THE SPECIFIC TRADE INVOLVED IN THE INITIAL INSTALLATION, OR DEBRIS DUMP I N6 TO BE COMPLETED BY TH 15 CONTRACTOR, (D) DEMO (E) L 16HT FIXTURE, 5ALVA6E I$ STORE FOR FUTURE USE THAT 15 - CARPENTRY WORK BY THE GARPENTRY TRADE, PER PROPER APPROVALS. 12. DEMOLITION WORK TO BE PHASED TO ALLOW PROPER E6RE55 D2.01 T6G TO REMOVE OF EX I STI N6 GE I L I N6, I NGLUD I N6 L 16HT I N6 FIXTURES AND HVAG DIFFUSERS. MECHANICAL AND ELECTRICAL WORK BY THE MEGHAN I GAL AND FOR ANY PERSON IN CASE OF FIRE OR HAZARD AND NO ELEGTRI GAL TRADES RE5PEGTI VELY, AND 50 ON. THEREFORE, 8. 6ENERAL GONTRAGTOR TO GONTAGT BU I LD I N6 LANDLORD DEMOLITION WORK GAN OCCUR IF THE WORK JEOPARD I ZES A (RE) RELOCATED (E) L 16HT FIXTURE, SEE A2.0 D2.08 T6G TO REMOVE OF EX 15T1 N6 SPEAKERS AS REQU I RED. 5ALVA6E I$ REPAIR TO LIKE NEW m EACH CONTRACTOR AND 5UBGONTRAGTOR SHALL THOROUGHLY REPRESENTATIVE AND ALL UTILITY COMPANY REPRESENTATIVES MEANS OF E6RE55 FOR THE PUBLIC, OR PROJECT EMPLOYEES. CONDITION FOR RE-I N5TALLAT I ON PER SHEET A2.0 EXAMINE THE PROPOSED WORK AND MAKE ALLOWANGE5 IN H15 HAV I N6 JURISDICTION OVER TH 15 PROJECT TO ASCERTAIN _ O PROPOSAL FOR THE G05T OF ALL DEMOLITION AND/OR BU I LD I N6 AND UTILITY GOMPANY LINES ABOVE, WITHIN, OR 13. ALL LABOR TO BE COMPATIBLE WITH OTHER LABOR z REMOVAL WH I GH MAY BE REQU I RED TO PRODUCE THE END BELOW PREM 15ES TO AVOID ANY P0551 B I L I T I ES OF GUTTI N6 GOMPLET I NG WORK IN THE EU I LD I N6. RESULTS INTENDED BY THE GONTRAGT DOCUMENTS. 5UGH LINES, GAU51 N6 EXPLOSIONS, ETC. W 0 14. ALL PARTITIONING AND FINISHES TO BE REMOVED, UNLESS 2. GENERAL CONTRACTOR TO COMPLETE ALL DEMOLITION AS a. GENERAL CONTRACTOR 15 RESPONSIBLE FOR THE BREAKOUT NOTED OTHERWI5E, EXI5TIN6 FURRED WALLS AROUND PERIMETER NOTED IN CONTRACT DOGUMENT5 AND REMOVE ALL DEBRIS AND REMOVAL OF CONCRETE SLAB AT ALL AREAS WHERE TO BE REMOVED AS NOTED. I AND RUBBISH FROM THE PROJECT AND BU I LD I N6 SITE. UNDER SLAB MECHANICAL, PLUMB I N6 AND ELECTRICAL WORK OCCURS. REVIEW AND GOORD I NATE EXACT LOCATIONS AND 13. ALL SPRINKLER LINES, MA I N5, BRANCHES, AND HEADS TO 3. DEMOLITION WORK WILL REQUIRE APPROVAL FROM THE LOCAL SIZES WITHOUT WRITTEN APPROVAL FROM LANDLORD. REMAIN OR TO BE MODIFIED, RAISED, REPOSITIONED BY THE 0 BU I LD I N6 DEPARTMENT, AND ALL I N5URANGE PAPERS A5 GENERAL GONTRAGTOR'S SPRINKLER CONTRACTOR, OR REGU I RED BY THE LANDLORD OF THE BU I LD I N6 TO BE 10. ALL WORK TO BE GOMPLETED FOLLOWI N6 LANDLORD'5 LANDLORD'S DE516NATED SPRINKLER CONTRACTOR (6ENERAL SUBMITTED WITH THE REQU I RED L I M I T5 OF LIABILITY AND CONSTRUCTION "RULES AND REOULAT1 ONS". � CONTRACTOR TO VERIFY PRIOR TO BID). IF APPLICABLE 0 2013 NIGHOLA►s J. TRIG1hRIG0 � INDIGATION OF INSURED PRIOR TO STARTIN6 NOW. THE GENERAL.CONTRACTOR AND/OR ALL 5M-GONTRAGTOR5 ARE NOT TO 5GIALE 5UGH INFORMA ION BUT O GOINTAGTI THE ARGFQT 1 OR HI5 REPRESENTATIVE RE5ARD.IN67 MEA5UREMENT5,IF 5UGH MEA9UREMENT5 DO NOT APPEAR GORREGT,ADD UP PROPERLY 1 OR 5GALE CORRECTLY TO THE INDICATED 517E. S_ DATE: 155UE 07/01/13 PRELIMINARY REV15N 0-7/Oq/13 PERMIT/ LL /SID •- l� 4-% 1 I 1 1 I l } i 73 t 1 DATE: No. REV'1510N5 / BY: STORE #: 2666 z ' �1 Ire==== E-- I I 11 I I 4D2.o l II D2.o D2.o l 1L =J L==-- M E 1�T' S NEAR H O U S E 2.0 2.0 1 I D2.01 LOCATION: Ire>i,;»:•.,-::.,,,.:.,,:�>:-11 � 0;:.:� ::;C \`:; ` ti :\�i\ti\A \��\�� ♦ ��� _ 16840 51N72NV AVENUE _4J `"^`+ '::=4J . $RII7GEPOfi�T RETAIL J L _ J EX EX EX 20 (` E CENTER AI I 2.0 I i I TIGARD, OR 1 2.0 1 2.0 2.0 f I I PROJECT NO. DRA AN BY: 130364 RMT. 3 2.04 �X_- - Ex - - "- -- I SCALE: CHECKED SY: I12� ``:��`.:'Tc:;:�...� Z.y\'•`:'.:::;.,:;,::,.,,-:;:k:v,•:. 24,;x......::�:.,,.,•.,:•\,'`.,,,..v, .. _ P2. I 3/16 1 O J.D.A. p ;�::� �:::,-2i�J+i:fiJ'C::;�`:i•i:........ I......'i+vi�<�v'.>+}�;:2itii'>•jij�ii� I D2.01 I I 2.0� THESE nZAtwlH&s 1I X . ..;. ,.�. .:. D2o I D2.0 I ��M. 4 GOMPLe=UII THE DIRECT SUPERVISION OF :2.0 07/12/13 ` NIGHOLA5 J. TRIGARIGO O 2.0 I D2.01 I ARCHITECT -� D2.01 D2.01 D2.01 D2.01 _ _ I TRICARIGO ARCHITECTURE Ql ASND DE5516N PG I I 2.0 I Z __ __ _ __ 2.0zv- -71 Ex I� I t.;�:;io::; 21EX I lu 2.0 I :.:, 2.0lu 2.0 Ly: ti\4+?tiff{>= ,;`,'. 1-- 0.1..1 v � v EXul 111 Via;€ �: �T<:: 4 1.1..- LU EX D2.01 � 0 0 � rL • I =Z& < o z � � � z EX I D2.0 i I 0 ® !� .. ,>,,, IND D2.01 uj 7- 2.0 01 :iLu moi/ EX ::.. 2.0 1=1RM REGISTRATION NO. U.1 2.0OR - 06341= m � EXI NL 1 Ex 7- Mull, :. I D2.01 2.02 � D2.01 I Q .. .......::.. .,'.r^.�•.....:,...n. u ..•. ..•....•^^•.V^.[^:�T.. ••. r R^..^.T.^.v.'S^!+.e...v.^.S^..-:]C^• '.T.'.^:^.!^.\yr,{T.:^.^+..,^.^^ i^^•.v^..R•+,... •'l^C:.T.'S:. ..vC.^:^.vl^C•:.C^[-:.....-•^`SC-^C.':`.,R^.t�... ...,TT\,'^.SA".:CP.C!R^.,....,t'^^.•..S?!F..M1.^:S .'T'R^l^S .^•^'S1 - .,� ____ ____ __-_ w,r,��.:.m�,e.:em...mm:-. �-m;...,r.�..,,..,�..,.:.+sm.� +•.ms..+a^.\,•. �:.. ..•_+..,�.�.,..n❖.-.,..-...\C:T.•: ^:StC:,mmv.'!`.^:�. :}Iii. X X �I EX E E E II :���;:31 II �.�.. ..k;;.::;`� ..»�I II i•t;:a<':'ci::,ti� II ...\.\ ;, si�i+!yti,\'\�;;;;r;;:ti2;;::::'.'.3X11!,5'':'.....\`,;\;..;\`-:,-:,. 1;> ..,.�:::;<>•.::->,: i�; ;:;4•.,,\:�::::::: I' .O >:...:,...,"„..,:.:,..11 ff.:".••.4::.+,,,..,,:...�,,,.,..,.. 2.0 ,.. .,..n»:.\......;•..>.•:,... v.»:v..»�, .,v„:.:,,,, „•.v.ti»�,-\� vna.. „+,,:�`�,..,.Y., v.»v.•,.....,.,,.:. •n:.:::: '';v`.. \•.:. :•.�-.�:4\ via,,,�v:. ::-4v:•,..Liv^};�'' „•\•nw:.,i\i•...... ••.v:•::•::::::},.:....v........ .,..'-:::::.env:;•,;;v:n•.�:::.: G::;i•:,»:-.:++v.::,v::::. +:•\:\Tv:,y:. ^:U..,\\.:;.,»„.v „\ C:ti�»..v„v, y:•\i�:.»;.i},:vyvvi,+�:.>,,_::.�;.:=:J L,.=::,.-�.._,,�:,,J L:.,,�:>,.�•:;<+�.•::..••� i � L�'��:�•.-'�J L'�:,:�:.._::�:.;:=� I 5E4L. !U 4 NICHOLA J. J TRICAR - v 1 ® No. 2 0 e KI N N EL N, O I)EMOLITION REFLEGTED GEUN6 PLAN Of E L k ; I AE-35REV I AT I OZ.S FINISH LE6END ELEGTRIGAL LEGEND o C) U p cn N a AND EXT EXTERIOR OPP. OPPOSITE TA6 MATERIAL MFR. DESCRIPTION REMARKS TA6 SYMBOL DESCRIPTION TAO SYMBOL DE5GRIPTIONu .,..4 9b N m ANGLE F.E. FIRE EXTI N6U 15HER OPN6. OPEN I N6 AGGOU5T1 GAL ARMSTRONG (E) DUPLEX OUTLET AT BACK WRAPS, MOUNTING HE16HT TO BE q6" A.F.F. GENTERED 5AW-GUT AND TRENCH SLAB FOR (4) SEPARATE I" GONDU I T TO GASH GOUNTER. ~ Q z @ AT F.O. FACE OF P.LAM. PLASTID LAMINATE PATCH REPLAGE DAMAGED CENTER LINE F.R. FIRE RETARDANT PL. PLATE ACT-i GE i L I NG EL6 BEHIND ILLUMINATED 516N AND/ OR TELEVISION MONITOR ABOVE SHOE DISPLAY. ELI4 6.G. PROVIDE A I" GONDU I T FOR GONTAGTOR WIRE, DED I GATED QUADRUPLEX � TILES. CONFIRM WITH GPM. - 0 DIAMETER FIN. FINISH PLAS. PLASTER TILE REGEPTAGLE5, QUAD FLEX OUTLETS, � TEL. WIRE. G.G. TO COORDINATE WITH i w Q # POUND OR NUMBER FL. FLOOR PLYWD. PLYWOOD QUADPLEX OUTLET FOR T.V. ABOVE SHOE DISPLAY CABINET. MOUNTING HE16HT TO TENANT GOORDI NATOR FOR ANY SLAB GUTTIN6 OR PENETRATIONS. EL6A BE q6 AFF. ELEGTRIGIAN TO GONNEGT TO A GIRGUIT THAT 15 NOT GIRGUITED 3 v AGOU5. AGOUSTIGAL FLUOR. FLUORESCENT PR. PAIR THROUGH A GONTAGTOR. DVR MUST HAVE GONTINUOU5 POWER. EL14A 5AW-GUT AND TRE NGH SLAB FOR (2) SEPARATE /4 CONDUIT TO TUXEDO COUNTER. o AFF ABOVE FIN 1 SH FLOOR FOOT, FEET PT. POINT 6.G. PROVIDE A " GONDU I T FOR DEDICATED GATED QUADRUPLEX REGEPTAGLE5 ° `�' FT. O /4 x AL. ALUMINUM 6.8. GRAB BAR RAD. RADIUS EL6B TELEV 15I ON MONITOR 516NAL GABLE BY TENANTS VENDOR, T6G TO GOORD I NATE TELEPHONE WIRE. 6.G. TO GOORD I NATE WITH TENANT GOORD I NATOR FOR ANY �.I� o < cj ARCH. ARCH I TEGTURAL 6A. GAUGE RGP REFLECTED GE I L I N6 PLAN INSTALLATION. SLAB GUTTIN6 OR PENETRATIONS. M A BD. BOARD 6L. GLA55 REO'D REQUIRED FG-I CARPET SHAW STYLE: 60588 PORTLAND DUPLEX OUTLET AT S 1 DE WALL OF TUX 3-WAY MIRROR MDUNTI N6 HEIGHT TO BE 40" QUANTITY T.6.G. TO PROVIDE TELEPHONE BOXE5 MOUNTED I N TUXEDO PODIUM. (2) QUANTITY .� N BLDG. BUILDING GYP. GYPSUM R. RISER INDUSTRIES DOLOR: q(715 ESPRESSO EL6G (� 4-PAIR, GATE6ORY 5 FOR P051 (1) QUANTITY 4-PAIR, GATEGORY 5 FOR PHONE, AND BLK. BLOGK HC./HDGP HAND IGAPPED RM. ROOM AFF. ELIgB vp 4 LINES (I) QUANTITY 4-PAIR, CATEGORY 5 FOR SPARES. GABLES PULLED TO PHONE BOARD BLK6. BLOGKIN6 HDWD. HARDWOOD S.S. STAINLESS STEEL VGT ARM5TRON6 57001 PROVIDED AND WITH 20' LEAD @ BOTH ENDS. LINES TO BE LABELED AT EACH END. BM. BEAM HORIZ. HORIZONTAL SGHED. SCHEDULE SHALE 6RAY INSTALLED BY T.6.G. EL7 DUPLEX OUTLET +15" A.F.F. TYP. UNLESS NOTED OTHERWI5E. N NT IN GASH COUNTER A B.O. BOTTOM OF HT. HEIGHT SHT. SHEET T.6.G. TO PROVIDE TELEPHONE E BOXE5 MOU ED . (2) QU NTI TY GEM. GEMENT HR. HOUR SIM. SIMILAR EL20 8 LINES 4-PAIR, GATE60RY 5 FOR P05, (2) QUANTITY 4-PAIR, GATE6ORY 5 FOR PHONE, DUPLEX OUTLET. +12 A.F.F. TYP. UNLESS NOTED OTHERWISE. REGEPTAGLE FOR SHOE AND (4) QUANTITY 4-PAIR GATE6ORY 5 FOR SPARES. GABLES PULLED TO PHONE GL6. CEILING HVAC HEATI N6, VENTILATION, 5PEG. 5PEG I F I GATT ON ELBA FIXTURE L 16HT1 N6. REGEPTAGLE TO BE LOGATED BEHIND SHOE FIXTURE. G I RGU I T BOARD WITH I O LEAD @ BOTH ENDS. LINES TO BE LABELED AT EACH END. GLKG. CAULKING AIR GONDITIONIN6 5Q. SQUARE MATCH EXISTING --- VGT OR SHEET VINYL. 6G 6G TO PATCH AND REPAIR A5 REGEPTAGLE THROU6H L16HTIN6 GONTRAGTOR AS SHOWN. T.G.G. TO PROVIDE TELEPHONE BOX MOUNTED AT 54" A.F.F. FOR PODIUM. DLR. CLEAR INFO. INFORMATION STD. STUDS FG-4 NEEDS TO VERIFY IN FE I LD REQU I RED. IF FLOOR NEEDS TO BE P 2 LINES (1) 4-PAIR, GATE60RY 5 FOR PHONE AND (1) 4-PAIR, GATE6ORY 5 FOR SPARES. GPM. GONSTRUGT I ON I.D. I N51 DE DIAMETER DIM. 5TL. STEEL EL8 E FIN 15HED FLOOR EL2I (DIM.) REPLACE. REPLACE WITH FG-5 QUAD PLEX OUTLET +15 ABOV � TYP I GAL UNLESS NOTED OTHERN I5E GABLES PULLED TO PHONE BOARD WITH I O LEAD @BOTH ENDS. LINES TO BE PROJECT M GER INSUL. INSULATION STOR. STORA6E LABELED AT EACH END. .. GOL. COLUMN INT INTERIOR 5USP. SUSPENDED (E) J-BOXES AND SIGN G I RGU I T5. PROVIDE (1) ONE 20 AMP, ONE PHASE GONNEGTI ON TO GONG. CONCRETE JT. JOINT TGG TENANT GENERALS 1O/� TIMER WHERE INDIGATED. ELEGTRIGIAN RESPONSIBLE FOR 516N HOOKUP. FIELD TGG TO PROVIDE TELEPHONE BOX MOUNTED AT 40" AFF FOR TUX 3-WAY MIRRORS. VGT ARMSTRONG 518gg STAN ARD EX E ON PROVIDED AND INSTALLED BY TGG. O CONT. CONTINUOUS LAM. LAMINATE CONTRACTOR FG_5 D G L VERIFY HE16HT AND LOGATION. T3 4 LINES (2) 4-PAIR GATE6ORY 5 FOR P05, (1) QUANTITY 4-PAIR, GATE60RY 5 FOR PHONE, I- DBL. DOUBLE LL. LANDLORD TBD TO BE DETERMINED IMPERIAL TEXTURE, TGG TO TURN IN WARRANTY EL22 v AND I 4-PAIR GATE60RY 5 FOR SPARE. GABLES PULLED TO PHONE BDARD WITH DET. DETAIL T.D. TOP OF COOL WHITE INFORMATION AT PROJECT J-BOX FOR LIGHT FIXTURE XTURE TO BE MOUNTED FLUSH TO BOTTOM OF SOFFIT T OUT OF () T AT AGH EN0 w LT. L 16HT 1 O LEAD AT BOTH ENDS. LINES NES 0 BE LABELED E �► DIA. DIAMETER M M. MIRROR TEL. TELEPHONE (GOMMERG I AL GRADE) CLOSEOUT. EL I oB VIEW. p DIM. DIMENSION MAX. MAXIMUM THK. THICK . T6G TO PROVIDE TELEPHONE BOX MOUNTED AT MANA6ER5 DE5K(W5#4). ( 2) 4 - PAIR ILDN. DOWN TYP. TYPICAL CATEGORY 5 FOR P05, I QUANTITY 4-PAIR, GATE60RY 5 FOR PHONE, AND ()4 LiNES : � : : -PAIR GATE60RY 5 FOR SPARE GABLES PULLED TO PHONE BOARD WITH IOOOR MECH. MEGHANIGAL -BOX MOUNTED IN GEILIN6GONNEGT DR U.O.N. UNLESS DTHERWI5E CONNECT 5-WAY MIRROR LIGHT FIXTURES TO J 4MFR. MANUFAGTURER ... TO CIRCUIT. DWG. DRAINI N6M l N. MINIMUM NOTED . > LEAD AT BOTH ENDS. LINES TO BE LABELED AT EACH END. (E) EX 15T I N6 VERT. VERT I GAL M 156. M I SGELLANEOUS F I DED I GATED (D) QUADRUPLEX REGEPTAGLE5 AT GASH WRAP. LOCATE BELOW LIGHTS IN MIDDLE OF GASHWRAP FOR 5HOWGA5E SHOULD BE GONNEGTED TO THE O E.P. ELEGTRIGAL PANEL MTL. METAL V.I.F. VERIFY I N FIELD _I RUBBER WB ARMSTRON6 COLOR: BLAGK #60. ELI2 COUNTERTOP AT GROMMETS, ALL OTHER REGEPTAGLE5 TO BE MOUNTED ABOVE EL2a SAME CONTACTOR THAT I S FOR THE LIGHTS I N THAT AREA FURNISHED AND I BDARD W/ WITH B D 5G N.I.G. NOT IN CONTRACT GONTINUOU5 ROLL COUNTERTOP. INSTALLED BY THE T.6.G. 73 EA. EAGHN.T.S. NOT TO SCALE W/G WATER GL05ET ELEV. ELEVATION W/O WITHOUT � �� �� (N) NEW E665HELL BENJAMIN NO: 6274-IB T.G.G. TO PULL GABLE TO PHONE BOARD WITH I0 -O LEAD UNLESS OTHER W15E S REGESSED ELEGTRIGAL BOX FOR SPEAKER WIRE5 MOUNTED @ 54 A.F.F. T.6.G. TO 0 2013 NIGHOLA5 J. TRIC;ARIG0 ELEG. ELEGTRIGAL NO. NUMBER W/R WATER RESISTANT PT-I ELIC NOTED. ALL GATE60RY 5 LINES MUST BE INSTALLED AND LABELED BY THE FRIDAY EL31 RELOGATE / EXTEND SPEAKER WIRE5 AND REGONNEGT TO EXISTING SYSTEM EMER6. EMER6ENGY NaWOOD MOORE COLOR: GH I NA WHITE THE GENERAL CONTRACTOR AND/OR ALL SUB-GONTRAGTOR5 i O.G. ON CENTER OF THE FOURTH WEEK OF GONSTRUGTI ON WITHOUT EXGEPTI ON. WORKING FROM THESE PLANS AND SPECIFICATIONS ARE NOT EQ EQUAL O.D. OUT51 DE DIAMETER WT. WE 16HT E665HELL BENJAMIN NO: 274-2B-HG-34 TO 5GALE%UGH INFORMATION BUT TO CONTACT THE ARGHITEGT II T.6.G. TO INSTALL L 16HT 5W I TGH LOCATED NEAR CA5H WRAP AND WI RED TO NEW OR HI5 REPRESENTATIVE RE6ARDIN6 MEA%REMENT5,IF%UGH PT-2 MOORS COLOR: WI LMI N6TON TAN EL 13A T.6.G. TO PULL GONTAGTOR TO ELEGTRIGAL PANEL WITH 10 -O EL3� HEA%REHENT5 DO NOT APPEAR CORRECT,ADD UP PROPERLY L16HTIN6 GONTAGTOR5 ADJACENT TO ELEGTRIGAL EQUIPMENT. OR%GALECORRECTLYTOTHEINDICATED5IZE. LEAD. UNLESS OTHER W15E NOTED S_ PT-3 E665HELL BENJAMIN NO: 6274-3B-HG-41 T.6.G. TO FURNISH AND INSTALL L 16HTI N6 GONTAGTORS AND 5WI TGH NEAR EXISTING 4-%TOI .�ET AGGESSOR)"' SGHEDULE MOORE COLOR: R I GHMOND 6OLD FRAME T EL38 G ELEGTRIGAL PANELS. PATE: issv� � PT-4 E665HELL BENJAMIN NO: 6274-2B-AG-32 ALL WALL OUTLET AND OUTLET COVER PLATES SHALL MATCH THE ADJAGENT WALLS FINISH. 0-1/01/13 PRELIMINARY REVIEW M.► MIRROR. M.5 6RAB BARS MOORE DOLOR: PI5MO DUNES MANUFAGTURER. BOBRIGK MANUFACTURER. BOBRIGK SEE DETAILS 10, 11 12/A5.2 FOR REFERENGE OF THI5 LEGEND. 01/0q/13 PERMIT/ LL /SID •-- • _ E665HELL BENJAMIN NO: G214-3B-AG-33 -� STYLE: #8-166 202( STYLE: #B 1 O6 X 36 : .................................................... PT-5 :>:::................................................k:.:::.. : :...........................................:.. _6 106 X 42MOORE DOLOR: MESA VERDE TAN LON V GABLIN� N W/ SHELF #B v/ SIZE: 2011X26" TBD X 18" :.:.x.:. :,,*:.......................,,.. , :..,.,:.r. ,..,.,.,,:::....:.:.... :......:.............................:....... .,:...:......,.........................,...,.,.........,..r,..,.....,,..,.,.,.....................»,.............,... 5EM -6LO55 BENJAMIN NO: 6276-I B :.., ....... : ..,.............................r.:.........,. »»......»..,..».......»».,.,.... PT-7 ENAMEL MOORE DOLOR: GHINA NA WHITE 1. ALL OVER N 16HT I.T. WORK MUST BE 5GHEDULED 7 TO 10 DAYS IN ADVANCE L M.2 WASTE REGEPTAGLE M 6 TOILET Tl SSUE DISPENSER 2. ENSURE THAT- ALL PLENUM RATED GABLE 15 1 N5TALLED I N A 6000 WORKMAN5H I P MANNER, CLEAR O MANUFACTURER: BOER I GK MANUFACTURER: 6EOR6 I A PAG I F I G F I BER6LAS MARL I TE NO: P-151 OF LIGHT F I XTUES AND ELEGTRIGAL INTERFERENCE. STYLE: #8-277, SURFACE MOUNT STYLE: 6EP5gOOcC WC-I REINFORCED DOLOR: L 16HT GRAY 3. ALL LOW VOLTAGE GABLE MUST BE PULLED TO THE CORRECT PERMANENT LOGATI ON (WITH A MINIMUM COLOR: SMOKE PANEL (FRP) TEXTURE: PEBBLED � OF A 10 FT LEAD AT GASHWRAP AND TUX DESK), PRIOR TO THE I.T. TECH ARRIVIN6 ON SITE. _ M 3 PAPER TOWEL DISPENSER T E TONED AND LABELED PRIOR TO THE ARRIVAL OF THE I.T. TECH ON SITE. • MANUFACTURER: 6EOR61 A PACIFIC M SEAT DOVER DISPENSER WINDOW FILM MAD I GO CLEAR SAFETY FILM T6G TO ADD TO WI NDOW5 ONLY IF 4. ALL GABLES MUST B L L STYLE: 6EP54338 MANUFAGTURER: KRYSTAL WF-I STYLE: GL-700-X5R NOT EX 15T1 N6. VIF. COLOR: SMOKE RESTROOM PRODUCTS SIZE: 2 M I L SAFETY TH I GK. 51 NGE GODE5 VARY AGRO55 REGIONS, I T 15 THE GENERAL AND SUBGONTRAGTOR 5 RESPONSIBILITY TO REVIEW THE GON5TRUGTI ON DRAWI NOS DURING BIDD I N6 AND I NGLUDE IN THEIR BID ANY ALTERNATE GORE STYLE: #KR5-KD 100 RELATED REGOMMENDATI ONS / DETAILS OR 5PEG I F I GATI ONS. IF THERE ARE ANY PROPOSED ALTERATION SOAP D 15PEN5ER COLOR: SMOKE M.4 MANUFACTURER: 60J0 EQUIPMENT / INSTALLATION GHAN6E5, THEN THE COSTS FOR THESE GHAN6E5 ARE TO BE EQUAL TO OR STYLE: #60J515006 SANITARY NAPKIN DISPOSAL ! 6REATER IN VALUE TO THE ITEMS AND QUANTI TI E5 MENTIONED IN THE OR161 NAL GONSTRUGT I ON DRAWI N65 �J M'g DOLOR: 6RAY MANUFACTURER: BOBR I GK TYPE A TYPE B AND THE GHANOE5 SHALL BE SUBMITTED TO THE ARCH I TELT / ENG 1 NEER FOR REVIEW AND APPROVAL. STYLE: #B-270 GONTRAGTOR5 WHO DO NOT ADHERE TO THIS REQUIREMENT WILL BE RESPONSIBLE FOR I NGURRI N6 THE ADDED G05T5 REQUIRED FOR THE DESIGN TO COMPLY WITH LOCAL GODS. 73 ROOM FINISH SGHEDULE FIXTURE LE6END - FINISHES FOR REFERENGE ONL",r HARDNARE NOTES DOOR TYPE �- ROOM NAME AREA FLOOR BASE WALL GE I L I N6 TA6 MATERIAL MFR. DESCRIPTION REMARKS 1. ALL DOOR HARDWARE SHALL GOMPLY WITH FEDERAL AND STATE AGGE551 B I L I TY REQU I REMENT5. E ........................................................ 5ALE5 4,237.4 5Q F ( ) PLASTIC I G P I ONTE NO: SEIO1 .............::..........................;............:::.:ti: :.: ::.:ti:.::�:.::r::.: :: AREA G B- PT-1 PT-51 :..,,.:..,..,,::,.,.:::,,,::.................::•:::: �. PT-2 PL-6 LAMINATE DOLOR: BLAGK 2. ALL DOORS TO BE EQUIPPED W/ LEVER TYPE HANDLES OR PUSH BARS GAPABLE OF OPERATION W/ ONE �- D I FIN: SUEDE HAND SHALL NOT REQUIRE TIGHT GRASP I N6, TIGHT P I NGH i N6, 0R TWI STI N6 OF THE WRIST TO OPERATE. .. w PT-3 WF-I 6YP - PA I NT No: REV)510N5 / BY: DATE. PT-4 PLA5T1 G FORM I G NO. g 18 58 3. THE FORGE REQU I RED TO OPERATE ANY DOOR SHALL BE MAXIMUM 5 LB5 FOR EXTERIOR DOORS AND w.. LAMINATE COLOR: NEUTRAL WHITE 5 LBS FOR INTERIOR DOORS. STORE #: 2666 z (E) STORAGE 477.4 50 FT (E) O RE51 N PANE UM I COR ,: G 4 F : :: :.................................. ::::.. :...::::.................v,.:.:................: ..:..:,.,.., ::;:,:.:: : :.;::::: ::::..::.:::: AREA FG- B-I L L OLOR 72 R05T 4. MOUNTI N6 HE 16HT5 OF ALL HARDWARE SHALL COMPLY WITH THE LATEST REQU I REMENT5 OF THE ADA :: :_,,; ACT- : :: ...:.... :: V FMENS „ P I ATO ISM RE STRINGENT N ENT ITS E RE U ATI H RAP I N D 5 G OR 5 US . G ONS OR ANSI STANDARDS WHIG EVE L G L ...E�] ARHOU SE _ ti PLASTIC F R A L G O MIG NO: (827 NT - '4; E TAILOR LOR P L ( ) ( E E 5. ALL HARDWARE SHALL BE SUPPLIED BY TGG UNLESS NOTED OTHERW 5E. 488.8 5Q FT ( ) A5 REQU I RED ( ) LAMINATE DOLOR: WEN6E WOODL I NE AREA PT-7 B I ACT-I FIN: NATURELLE ' 104 6. IN CASE OF DEMOLITION ALL HARDWARE ON EXISTING DOORS TO REMAIN SHALL BE REPLACED A5 II D AT NEW WALLS 16Q40 SY4 "72ND AVENUE (E) MEN'S 5q.7 SQ FT (E) (E) PL-7 PLASTIC FORMICA NO: Gg26-NT SPECIFIED ON SCHEDULE OR ORAWIN65, UNLESS NOTED OTHERWISE. 5RII7GEPORT fi�'ET,�IL TOILET PT-7 A5 REQUIRED PT-7 AS REQUIRED LAMINATE DOLOR: SMOKY WALNUT TYPE A TYPE B FG- - 4 FG 4 CENTER OS WOODL I NE -7. ALL GOMPONENT5 OF FIRE RATED DR. ASSEMBLIES ES SHALL BEAR THE LABEL OF AN APPROVED TESTING T16ARD, OR D ( GOVED FIN: NATURELLE A6ENGY. LL PROJECT No. ORPtWN BY: (E) WOMEN'S 5q.-7 50 FT (E) (E) pT--� A5 REQUIRED PT-7 A5 REQUIRED �� �� 130364 ROH TOILET PLASTIC ARPA NO: 1864 8. ALL DOORS DE516NATED EXIT SHALL BE OPERABLE FROM THE IN51DE WITHOUT THE USE OF ANY .........:...:.........:::...............__................ FG-4 FG-4 PL-8 ................ ,w..., SCALE: CHECKED SY: LAMINATE PATT: WHITE HERR I N6BONE 5PEG I AL KNOWLEDGE OR EFFORT. 0 � N.T.S. J.D.A. 6 COVED FIN: GU5TOM ERRE D,h H DRAWING (�, �+ :i q. RATED DOORS SHALL BE A T16HT FITTIN6 SMOKE AND DRAFT CONTROL ASSEMBLY. :>`;::,>; DIRECTCOMFI5uF`mv ION OF: (E) EXIT 154.q 5Q FT (E) NJT i STAN SHERW I N X . .. ::`...:: ONY W STAIN 07/12/13 to CORRIDOR WS I .: .:`.... :R ATI , I F G3 BI PT C LL DURANAR GOAT �� 10. ALL EXPOSED DOOR AND FRAME REGE55E5 (I NGLUD I N6 STRIKE PLATE5) ARE TO BE F I NI SHED TO MATCH ' � �° �•-. NIGHOL,�S J. TRIG,�RIGO O j 107 # - , .. ,.. ... ................. .:•1 s 0 564XXR35g6 4364 _ DOOR OR FRAME F I N 15H NO UNF I N 15HED EXPOSED SURFAGE5 PERMITTED. ARCHITECT "MEN'S WEARHOUSE" .............................................. (� :. .. (E) D I SPLAY 305.8 5Q FT pT_1 GYP - PA I NT pT-I MAH06ANY �;, TRIG�RIGO ARCHITECTURE Q) 1. PROVIDE A 516N ABOVE ALL EX I T5 FROM THE PREM 15E5 TO READ THIS DOOR TO REMAIN UNLOGKED AREA FC-I B-i .*::,..... v GNU I7�51GN PG N f� AGG I T NA LL, N LL DURING H LETTERS SHA B AT EAST i H i GH AND SHA BE NHITE TE O A CONTRAST I NG `-•...: �� � ��` �".-�•:= , '�.. . �'�` :�� �� PT 4 DUR G BU51 NE55 OURS. L LL E L LL 108 � . .. ' . .. . .. .. ... .. ., .. ...� .............................. . •-, SEE PLAN BAGK6ROUND MOUNTED AT HEAD OF DOOR. \ :\y: - I NOTE: 4, • SEE INTERIOR ELEVATIONS FOR FURTHER INFORMATION. TYPE G TYPED � • THE FLAME SPREAD OF ALL INTERIOR FIN 15HES SHALL BE A MINIMUM OF GLA55 B. • TGG TO R Y 50 FT BEFORE ORDERING FLOOR MATERIAL. ORDER ADDITIONAL FLOOR I N6 MATERIAL A5 REQUIRED. ......................... U- • tL DOOR SGHEDULE HARDNARE 6ROUP w w � Lu DOOR FRAME DETAIL GROUP DESCRIPTION QUANTITY MANUFACTURER MODEL NO. FIN 15H REMARKS Lu HARDWARE DOOR # LOGATION (N) OR (E) 51 ZE MATERIAL TYPE FINISH TYPE FINISH HEAD JAMB SILL GROUP RATING BUTT HINGES 3 MGKINNEY TA2714-260 BRUSHED `• o ;... 3-1/2" x 3-1/2" NRP CHROME w Z T (N) FITTING (N) 3'-O" X ('-8" WD E pT-q. 5ALE5 51 DE WD PT-4 SALES 51DE 8a 10 8$ 10 - 6 NONE cD 5GHLA6E PASSAGE A-5ERIE5 Z Z ROOM A5.1 A5.I _ DOOR HANDLE I LATCH LEVON A105 626 CD (E) STOREFRONT (E) (E) 6 -O X 6 -8 (E) (E) (E) (E) (E) - - - (E) NONE 6 ; ' ENTRY CLEAR (VIF) _ - - SILENCER 3 IVES 20 BEIGE ) (E)STOR./TAILOR/ (E) (E) 3'-0"X 6'-8" (E) (E) PT-4 5ALE5 51DE pT-4 5ALE5 51DE - - - (E) NONE DOOR STOP I IVES 6GI HINGE PIN FIRM REGISTt T10N No. w OR - O6s4AF as CE) GORR. 103, 104, CLEAR (VIF) PT-� STORAGE AREA <2fl) STORAGE AREA _ _ _ TYPE E TYPE F a 107. TGG TO INSTALL DOOR LOUVERS SUCH THAT PERSON OUTSIDE CANNOT SEE INTO FITTIN6 ROOM. INSTALL ALL ACCESSORY MOUNTING Z (E) EXIT (E) (E) 3�-O" X �'-8" ( ) (E) (E) (E) (E) - - - (E) NONE HE16HT5 PER LATEST ADA/GABO/ANSI REGULATIONS A5 REQUIRED BY LOCAL BUILDING A6ENGIE5. w 104 v CLEAR (V I F) - - - O (E) MEN WOMEN (E) (E) 3 1-o'1 X 6 -8 E E (E) E (E) :... 106 ( ) ( ) ( ) - - - ,,,.:,:.........r,....,...:.:::............r....:.::.. � E NONE TOILET #105, #106 CLEAR (VIF) - - - ( ) io8 (E) F I TTI N6 (E) (E) 31-011 X 61-8)11 (E) (E) (E) - - _ E NONE ROOM (VIF) PT-4 BOTH 51 DE5 PT-4 BOTH 51 DES - - - ( ) CLEAR SEAL - - - - ' W - - - NICHOLAS J. .� TRICARICO l� _ No. 2608 A ' ® KINNELON, J. ~ : . O TGG TO INSPECT (E) DOOR HARDWARE a REFURB 15H TO LIKE NEW CONDITION, REPLAE ANY FAULTY HARDWARE A5 REQU I RED. TYPE 6 �IfP4 OF 5 L EGRESS LEGEND EXITING ANALYSIS o OGGUPAN(GY CROUP: M ADJA<GENT TENANT 5PAGE - N.I.G. �- SALES AREA: TOTAL BU I LD I NCS: 6RO55 AREA: 41543.4 5F TOTAL OGGUPANT LOAD: 151 + 4 = 155 5 -- -- -- --- LEASE LINE OGGUPANT LOAD FAGTOR: 30 EXITS REQUIRED: 2 � t o 1 OGGUPANT LOAD: 151 EXITS PROVIDED: 2 �/ o N o Lu EXITS REOUIRED: 2 EXITS PROVIDED: 2 `o •" Q •� > 5TOGK ROOM / TAILOR SHOP AREA: GRO55 AREA: 1,240.5 5F OGGUPANT LOAD FAGTOR: 300 OGGUPANT LOAD: 4 44" MINI. NIDE PATH OF TRAVEL EXITS REQUIRED: I EXITS PROVIDED: M O z EXITINC-,-� SUMMARY OGGUFANGY GROUP: M !L EXIT # 1: OGGUPANTS SERVED: 151 / 2 = -75 EXIT WIDTH REQUIRED: -75 X .15 - 11.25' EXIT WIDTH PROVIDED: (E) b8" • EXIT # 2: L �5 =A�NTS SERVED: 4 + 151 / 2 = ©2013 NICHOLAS J. TRIG,4RIG0 OGGUP � ( ) �� EXIT W I DTH REOU I RED: lq X .15 - 1 I.b" THE GENERAL M THESE LA AND/OR ALL IGATI ON ARE NOT WORKING FROM THESE PLANS AND SPEGIFIGA710N5 ARE NOT �--� To 50ALE TION CT THE j MEA5UREMENT5H DO NOT AAPPEARTGORREGT,TO AADD UP PRGHOPERLY nOTP EXIT W I DTH PROVIDED: (E) 34" OR HIS REPRESENTATIVE REGARDING MEASUREMENTS,IF SUCH OR SCALE CORRECTLY TO THE INDICATED SIZE. VATE: _ ISSUE Q� 4'7/01/13 PRELIMINARY REVIEJON 0 NOT USED 2 01/09/13 PERMIT/LL /SID 06 -1-1 �W/ O I ML 4u i EXI5TIN6 < EXIT #2 N EGRESS PITH GONTI NUE5 IN AGGORDA<NGE WITH SHELL BUILDING PLAN. REFER TO K SHELL BU I LD I NCS DOGUMENT5 AS REFERENGE FOR ROUTE TO PUBL I G WADY. DATE: No. REVISIONS /BY: - STORE #: 2666 z ' soon C> O O I O O �- MEN" S WEAR HODS LOCATION: a 1(og40 5)N '72ND AVENUE "",EaUE 1 BRIDGEPORT RETAIL w< I CENTER TIGARD, OR I I i PROJECT NO. 17RAY414 BY: --- - I 130564 KOH i 41 SCALE: GHEOK BY: I` I I ► 3/16" _ 1._0.. J.D J I IH D/8t COMPLETED UNDER THF= DIRECT 9UPERV1510N OF: 01 O?/12/13 N� � NICHOLAS J. TRICARIGORl O i ARCHITECT I iti\�?:���` »�:r�r??; :�:\�•t`.�`$.•.�`��''.''d 4ti:;\:a tii g`�+a�`,�'a,",.i�+.+`•."c I .�r� I i I TRICARIG0 ARCHITECTURE Q) I i i i .... ....; ... ....< � ,SND DESIGht PG ', I I III o �•�`.�_...��`�:a � I � � Q w MRI � p I ° I II IL0 I .. tL tSl III IIL '� j U.1 0 EXISTING < to z ul z I ... ...... ...... ..... ...... ..... I I I EXIT #1 � � Lu - ............. E6RE55 PATH DONT I NUE5 IN AGGORDArNGE A A (� q o WITH SHELL BU I LD I N6 PLAN. REFER TO SHELL BU I LD I N6 DOGUMENTS AS FIRM RECGISTRATION NO. Lu ................................... REFERENGE FOR ROUTE TO PUBL I G WADY. .. I OR - a654A� � II III ' III ....... ..... ..... I I II I I I 0 tu ................................................................................... IL———————— r,.....:...,:,, ,,......,..,,,,.......................... I ..::.....ti..... „MEN 01To I SES I NOTE: �� 6. MAXIMUM ALLONABLE PITH OF ul TRAVEL = 250 FEET N I C H RA 1. �"� < N TR!=,,A 0 v No. J8 KINNEcp O AN I A . E(�RESS P 5�L 1 i i 6ENERAL NOTES FLOOR E6END KED NOTES FLOOR PLAN. o O at- N 1. LANDLORD'S GENERAL GONTRAGTOR (LL6G) AND TENANT'S ENSURE ALL FIRE DEV I GE5 (I NGLUD I N6 SPRINKLERS), ALARM R - A I.OI INSTALL NEW GARPET (RUN GARPET 6RA I N PARALLEL TO STORE FRONT) c N 6ENERAL CONTRACTOR (T6G) TO REFER TO SHEET TI.O DEVICES, S 2 I. TGG 5HTROBES, BULL HORN TO BE INSTALLED PER GORE. ALL COORDINATE I NATE STUD SIZE, 6AU6E, SPAG I N6, AND ADJACENT TENANT 5PAGE N.I.G. RESPONSIBILITY SCHEDULE FOR. SCOPE OF WORK. GON5ULT WITH GPM GONGERN I N6 THE P051 TI ON I N6 OF THESE ITEMS PROVIDE BRI D61 N6 AND D I A60NAL BRAG I N6 BASED ON A 1.02 PATCH REPAIR ANY DAMAGED WALLS, FLOOR i NG, GE I L I N6, AND FLOOR BASE A5 REQUIRED z TO ENSURE THERE 15 NO GONFL I GT WITH STORE FIXTURES. MANUFACTURER RECOMMENDED LIMITING HE 16HTS TO COMPLY WITH 2. T6G SHALL REVIEW ALL DOGUMENT5 AND VERIFY ALL DIMEN51ON5 REQUIRED GORE. LEASE LINE A1.03 NEW PARTITIONS SEE SCHEDULE FOR TYPE AND FIELD GOND I TI DNS AND SHALL GONF I RM THAT WORK 15 11. ALL WORK SHALL BE PERFORMED IN 5TR I GT AGGORDANGE WITH XX-XXI A1.04 NEW DOOR FRAME V FEASIBLE A5 SHOWN PRIOR TO BID, ORDER I N6 MATERIALS OR THE PUBL I5HED INSTALLATION SPEC I F I GATI ON5 AND PROGEDURES 22. T6G TO PERFORM THE REMOVAL, GUTTI N6, DR I LL I N6, ETC. OF F I N 15H TA6, SEE SHEET AO.O FOR F I N I5H 5GHEDULE N c `'- DO I N6 ANY WORK. ANY D 15GREPANGY, GONFL I GT5 OR OMI 551 ONS, OF THE MANUFACTURER OF THE MATERIAL USED. EXI STI N6 WORK WITH MEANS AND METHODS THAT DO NOT " JEOPARDIZE THE I NTE6R I TY OF ANY STRUCTURAL MEMBERS OF THE FIXTURE STARTI N6 WORK POINT A I.OS PATCH � REPA I R EXI ST I N6 WALL WHERE FIXTURES HAVE BEEN REMOVED / VI V.I.F.F - TYP I GAL � � � cC; 1111 ETG., SHALL BE IMMEDIATELY REPORTED TO THE GPM / ARGH I TELT •cod , FOR GLAR I F I GAT I ON PRIOR TO PERFORMANCE OF ANY WORK I N 12. T6G TO PREPARE EXI STI N6 5URFAGES A5 REQU I RED TO RECEIVE BUILDING. I F STRUCTURAL MEMBERS ARE FOUND TO INTERFERE /�I.06 WHERE GONDU I T I N-SLAB HAS BEEN REMOVED/ PATCH REPAIR 5URFAGE 50 READY TO REGE I VE F I N 15H F• c ,� � o Q QUE5T I ON OR RELATED WORK. FAILURE TO OBTAIN GLAR I F I GATI ON NEW FIN 15HE5. REFER TO MANUFAGTURER'5 5PEG I F I GATI ON5 FOR WITH THE NEW NOW, THE ARGH I TELT/GPM SHALL BE NOTIFIED F E FIRE EXT I N6U 15HER - QUANTITY AND LOCATION TO BE MAY RESULT IN THE WORK BE I N6 REJEGTED AND GORREGTED AT REQU I REMENT5 PRIOR TO I N5TALL I N6 FINISHES. I F T6G CONSIDERS IMMEDIATELY. DETERMINED. T6G TO PROVIDE AND INSTALL FIRE A 1.07 NEW HAN6 BAR5, 5HELV I N6 a WALL STANDARDS, SEE F I.O c NO COST TO THE PROJECT AND DELAY I N THE PROJEGT SCHEDULE. ANY SURFACE UN-SUITABLE FOR A PROPER F i N 15H, T6G SHALL EXTI N6U I SHERS PER FIRE DEPARTMENT REQUIREMENTS. h k h NOTIFY TENANT AND ARCHITECT OF THE CONDITION AND STOP 23. DIMENSIONS ARE TO FACE OF FIN 15H UNLESS OTHERWISE NOTED. NEW GASH WRAP D 15PLAY FIXTURE I$ BAGKWRAP SUPPLIED BY TENANT, INSTALLED BY T.6.G. T.6.G. TO 3. T6G I S RE5PON51 BLE FOR GOORD I NAT I N6 THE WORK TO ENSURE WORK UNTIL D I REGTED BY TENANT AND/OR ARGH I TELT. HEAVY DUTY SURFACE MOUNTED STANDARDS PROVIDED [7��b PROV I DE INSTALL ALL ELECTRICAL REQUIRED FOR GASH RE6 I STERS, OUTLETS L I GHTI N6. SEE 24. DO NOT SCALE DRAWI N65. WRITTEN DIMENSIONS MENS I ON5 SHALL GOVERN. THAT REQU I RED GLEARANGE5 FOR INSTALLATION AND BY TENANT AND i NSTALLED BY TGG. REFER TO INTERIOR DETA I L 12G/A5.2 FOR ELECT. WORK. MAINTENANGE OF ALL EQUIPMENT AND FIXTURES ARE PROVIDED. 13. (E) DEMISIN6 WALL BY LANDLORD. IF (E) DEMI51N6 WALL FALLS ARCHITECTURAL DOCUMENTS SUPERCEDE OTHER DOCUMENTS. ELEVATIONS DETAILS FOR MOUNTING LOCATIONS. GRAND ENTRANCE - SSM-20N 2" SURFACE MOUNTED CORNER GUARD - 4'-0" LENGTH WITH TOP AND SHORT OF DECK, T6G TO NOTIFY GPM/ ARGH I TELT IMMEDIATELY NOTIFY ARCH I TELT OF ANY D I MEN51 OVAL I NG�ON51 STENG I E5 AND BOTTOM END GAPS - TO MATCH ADJACENT WALL COLOR. (GARAMEL TO MATCH PT-3, FAWN TO MATCH � 4. T6G SHALL PROVIDE PROTEGTI ON TO ALL EX I5T1 N6 GON5TRUGT I ON, FOR RESOLUTION. GONFL I GT. ALL D i MENS f ON5 MARKED CLEAR SHALL BE HEAVY DUTY REGE55ED STANDARDS PROVIDED BY /'`I Oq PT-4). INSTALLED WITH 5GREW5. PROVIDED BY TENANT VENDOR, INSTALLED BY T.G.G. SEE A4.0 FOR tU FINISH SURFAGE5, MERGHAND 15E, AND ANY OTHER WORK. T6G MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL FINISHES. v TENANT AND INSTALLED B GG I NSTA E Y TOG. REFER TO INTERIOR WALL F I N I5HE5. TYP. VERIFY EXACT LOCATIONS IN FIELD. ('() SHALL BE RESPONSIBLE FOR ANY DAMAGE GAU5ED THEREIN 14. WHEN NEW PARTITIONS AL16N WITH EXI5TIN6 ELEMENTS, THE + DURING CONSTRUCTION AND SHALL REPAIR/RESTORE ALL DAMAGE CONTRACTOR SHALL REMOVE EXISTING CORNER BEADS, ELEVATIONS DETAILS FOR MOUNTIN6 LOCATIONS. AI 10 NEW TUX'DESK, TUXEDO WORK STATION � 015PLAY CABINET PROVIDED BY FIXTURE MANUFACTURER, AT NO G05T TO THE PROJECT AND DELAY IN THE PROJECT REINFORCEMENT AND EXI5T1 N6 6YP5UM BOARD GOMPOUND TO 25. TYP. SHOULD MEAN THAT THE CONDITION 15 REPRESENTATIVE FOR INSTALLED BY T.G.G. SEE DETAIL. IIA / A5.2 FOR ELECT. WORK. i NO WORK SCHEDULE. ALLOW SURFACES TO BE TAPED AND FILLED SMOOTH. 51 M I LAR CONDITIONS TI ONS THROU6HOUT UNLE55 OTHERWISE NOTED. DETAILS ARE USUALLY KEYED AND NOTED "TYP." ONLY ONCE WHEN Al-11 NEW 5H I RT WALL, LINE OF SHIRT VALENCE MILLWORK, PROVIDED BY FIXTURE MANUFACTURER, � 5. T6G TD ORDER ALL MATERIALS WITHIN THE FIRST WEEK OF THEY FIRST OGGUR. INSTALLED BY T.6.G VERIFY LENGTH OF SHIRT BINS SHOP DRAW I N65 PRIOR TO I NSTALL I N6 WALLS � 15. T6G SHALL PROVIDE FRT BLOGK I N6/BAGK I N6 A5 REQU I RED TO CONSTRUCTION TO ALLOW ENOU6H TIME FOR DELIVERY. SUPPORT ALL GASEWORK, GOUNTER5, FIXTURES AND 5PEG I AL A1.12 NEW WALL M I RROR5, SEE F I.0 EQU I PMENT5. VERIFY AND COORDINATE MOUNT I N6 HE 16HT5 OF 26. ALL DIMENSIONS NOTED V.I.F. ARE TO BE VERIFIED IN FIELD BYtu 6. T6G 15 RE5PON51 BLE FOR GHEGK I N6 THE QUALITY OF ALL BLOCK I N6/BAGK I N6 AND INTERIOR WALL BRAG I N6 WITH SUPPLIERS THE GONTRAGTOR PRIOR TO GON5TRUGTI ON. ANY VARIANCES ARE A i.I 3 A: .....` _ :; ':..: : MATERIALS AND VERIFICATION OF ALL D I MEN51 ON5 PRIOR TO MANUFACTURER'S AND INSTALLERS. TO BE REPORTED TO THE GPM/ ARCHITECT FOR RESOLUTION. O PODIUM FIXTURE PHONE PROVIDED BY TENANT VENDOR, INSTALLED BY T.G.G. SEE DETAIL 12D/A5.2 0 INSTALLATION. A 1.I C FOR ELECT. WORK 1L 16. HEAVY DUTY SURFACE MOUNTED STANDARD PROVIDED BY TENANT. 2T "51M." SHALL MEAN COMPARABLE GHARAGTERI5T1G5 FOR THE --- -7. T6G TO ENSURE ALL WORK SHALL BE IN AGGORDANGE WITH ALL GOND I TI ON NOTED. VERIFY D I MEN51 ONS AND ORIENTATION ON PARTITION MOUNT I N6 SCREWS FOR ALL STANDARDS PROVIDED � INSTALLEDFA 1.i MODIFY EXI 5T1 N6 HANG BARS, SHELV I NG � WALL STANDARDS A5 REQUIRED FOR NEW LAYOUT 60VERNIN6 GODE5 AND RE6ULATION5. BY THE T6G. T6G TO ENSURE T16HT, 5EGURE AND PROPER PLANS AND ELEVATIONS. TA6 DESGRIPTIDN FA5T1 N6 OF ALL STANDARDS TO STUDS. T6G TO USE LINE I$ LINE AI.18 T.6.G. TO INSTALL TENANT PROVIDED HARDWOOD ED6E TRIM. 8. T6G SHALL MAINTAIN A CLEAR PASSAGEWAY TO THE REQU I RED LEVEL OR LASER LINE TO ENSURE GON515TENT MOUNTI N6 HE 16HT. 28. AL 16N MEANS AGGURATELY LOGATE FIN 15HED FACES IN SAME EXITS, EXIT L 16HT I N6, F I RE-PROTECT)ON DEV I GE5 AND ALARMS AND PLANE. EXI 5T1 N6 WALL/PARTITION A I.I q RE I NFORGE STANDARDS AND HAN6 BARS AS REQU I RED. PROVIDE LIFE SAFETY DEV I GE5 IN GONFORMANGE WITH ALL IT T6G TO COORDINATE WITH TENANT'S FIXTURE VENDOR TO ENSURE SHOE STORAGE / WALL STANDARDS / SURFACE MOUNTED. SEE DETAIL 4/A5.2. PROVIDED BY TENANT � APPLICABLE GODE5 AND ORD I NANGE5 FOR THE ENTIRE DURATION FINISHES MATCH. 2q. REFER TO SHEET AO.O FOR FINISH 5GHEDULE /LE6END. I NEW PARTITION A 1.20 INSTALLED BY T.G.G., PROVIDE AT NEW PARTITIONS PER F I.0 G 2013 NICHOLAS J. TRiGARIC.v OF GON5TRUGTION. 3 5/8 20 6A. METAL STUDS AT 16 O.G. WITH I LAYER 5/8 GYP. EACH SIDE FROM 18. FIXTURES PROVIDED BY VENDORS AND INSTALLED BY TOG, „ � EX I5T I N6 SUB FLOOR TO FINISHED GE I L I N6. T6G TO PROVIDE INSTALL FIRE RATED T.G.G. TO V.I.F. EXTENDS OF DAMA6ED VGT TILES IN (E) TAILOR/5TOGK ROOM. CONFIRM WITH GPM THE GENERAL CONTRACTOR AND/OR ALL 5M-GONTRACTOR5 •` q. T6G TO ENSURE DUCT CONDUIT AND P I P I N6 PENETRATIONS UNLE55 OTHERWISE NOTED OR SPED I F I DALLY D I REGTED BY GPM. `"� WORKING FROM THESE PLANS AND SPEGIFIGATIONS ARE NOT 30. ALL CONCRETE EXPAN51 ON JD I NT5 MUST BE F i LLED WITH SEALANT. \ \ WOOD BLOCKING A5 REQUIRED. SEE DETAIL C/A5.I. A 1.21 FOR REPLAG I N6 DAMAGED VGT TI LES. T.6.G. TO INCLUDE B 1 D FOR APPROX. 200 5F OF (N) VGT TO SCALE SUCH INFORMATION BUT TO CONTACT THE ARCHITECT '�I LE5 OR HI5 REPRE5ENTATIVE RE6ARDIN6 MEA%UREMENT5,IF%UGH e THROU6H FIRE RATED I$ AGOU5T I GAL GONSTRUGTI ON SHALL BE COORDINATE EXACT LOCATIONS OF FIXTURES WITH GPM. MEASUREMENT5 DO NOT APPEAR CORRECT,ADD UP PROPERLY 1 FIRE STOPPED AND SEALED AS REOU I RED TO MAINTAIN REQU I RED 31. EX 15T I N6 STOREFRONT DOORS AND MULLIONS MUST BE GLEANED OR SCALE CORRECTLY TO THE INDICATED SIZE. NEW PARTIAL HEIGHT PARTITION :.,: •.: , i .i RAT I N65. 1 q. F I TT I N6 ROOM PARTITIONS PROVIDED BY VENDOR AND INSTALLED AND REFURBISHED LIKE NEW. 2 A 1.22 3 5/8 20 6A. METAL STUDS AT IC O.G. WITH I LAYER 5/8 6YP. EACH 51DE FROM :.:..::.....y::' ............... ... BY T6G. __ 1 1 - EX 15T I N6 SUB FLOOR TO 8'-C" A.F.F. T6G TO PROVIDE a INSTALL WOOD BLOGK I N6 A5 NEW SHOE D 15PLAY, PROVIDED DED BY FIXTURE XTURE MANUFACTURER, INSTALLED BY T.6.G. SEE DETAIL IIB/A5.2 -� 32. T.6.G TO MOUNT FINAL DRAWING SET IN TUBE AND FRAMED �' ^�'�' A123 DATE: ISSUE � 2 T6 T N GERTI F I GATE OF OGGUPANGY ON WALL NEAR MANA6ER'S WORK `-" REQU I RED. FOR NEW ELECT. WORK. O. G O INSTALL FLOOR FINISHES THROUGHOUT STORE PRIOR TO 01/01/13 PRELIMINARY REVIEY�I 10. FIRE PROTECTION TO BE UNDER SEPARATE PERMIT. T6G TO INSTALLATION OF FIXTURES. STATION. NEW PARTITION A1.24 INSTALL NEW VGT, SEE F I N I5H 5GHEDULE, FLOOR AND BASE 3 :\ •�� t.• :\ BID ATT I AYR P P FROM -r/Oq/1 PERMIT/ / 20 GA. META STUDS 6 O.G.D I H E 8 6Y . EX 05ED 51 DE 0 3 � LL 3 5 8 L .0 L 5 \: 2 V : X IDE � INSTALL FIRE E 1ST I N6 SUB FLOOR TO FINISHED GE I I N6 SOFFIT.T. TGG TO PRO L5. L �� 4 L 4-3 RATED WOOD BLOGK I N6 A5 REQU I RED. SEE DETAIL 6/A5.1, SIM. tU A1.26 T.6.G. TO GLEAN ALL. WINDOWS (EXTERIOR AND INTERIOR) SURFAGES, TYP. Q� INSTALL NEW PREFABRICATED F I TTI N6 ROOMS PROVIDED BY TENANT, INSTALLED BY T.6.G. T.6.G. TO � A 1.27 VERIFY EXACT DIMENSION WITH MILLWORK VENDOR PRIOR TO I NSTALL I N6 WALLS. A 1.28 T.6.G. TO REPAINT, DEEP GLEAN (FLOOR a F I XTURE5), � REPLACE TOILET AGGE55OR1 E5 AS REQU I RED A 1.2q T.O.G. TO INCLUDE IN THEIR BIDS ELECTRICAL OUTLETS EVERY 25 FEET O.G. AROUND THE SALES � FLOOR/FITTIN6 ROOM PERIMETER. MOUNT 15 A.F.F. T.G.G. TO MOUNT FINAL DRAWIN6 5ET IN TUBE AND FRAMED GERTIFIGATE OF OCCUPANCY ON WALL A1.30 NEAR MANA6ER'5 WORK STATION. A131 ALL COLUMNS TO BE PAINTED <P�, TYP. A1.32 T.6.G. TO DEEP B.O.H. FLOOR. AI 33 EXI5TIN6 D161TAL T-5TAT5 TO BE RELOCATED. TURN OFF L16HT5 WITH SWITGHE5 AT THE FRONT 4, GA5HWRAP. } A1.34 8 PHONES NEEDED. K (E) MEN'5 (E) INOMEN'5 5ALE5 (E) 015PLAY (E) D 15PLAY ROOM CORRIDOR ROOM AREA AREA AREA 105 107 106 101 108 108 A1.02 A1.02 A1.02 AI.OI A1.24 A1.24 A1.24 A1.02 A11.02 A1102 � ,�; A1.28 A132 A1.28 AI.OS Al.o Al.os PATE: No. REVISIONS / B A1.2q Ai.lq AI.IQ 23'-10.. 15'-02" 16'-02" 3-I STORE #: 2660 Z O -------- ------------- -------- ----------- MENS iTG 7G 104 3�_32�� S,-o„ '-32' 1 I (5) 5TANDARD5 AI 12 O O Q � W E A R H ® V S E -� I _ ®2-O O.G. I -IN 102 LOG, TIO1�1: N .•. A 1.05 4. '-JAI.OS :... ...:. ....: .-, AI.OS.. 106 106 »„ ....: ..... .,... . IIA :,.,. ...,..,... - :.. ..:. ,.. ..,::: 16140 5JN '72ND AVENUE AI.O-r 141-01"- AI.O-1 15-0i" A1.o�....::.. i -" 22'-10" '�` ' 2 2 I A 1.26 � BRIDGEPORT fiZET,�II. (1)5TANDARD5 @4'-0" O.G. O 5TANDARD5 @4'-0" D.G. (5) STANDARDS®4'-0" O.G. 01 I o CENTER © 1 I TIGARD, OR 0 0 o PROJECT NO. IY�tN �3Y ::•, <' IO2 I AI.I o 1 Q o o< o o I +;� (E).P15PLAY H �►' 1 H H 1 �- H d- I 1 �;, AREA t 0 130364 X.X. I o I I A4.0 - 4.0 v �s% - �n 108 SG,hLE: A4.0 CHECKED B 1 _ 1 •floe �� .fl DIY �c� AI.OI ic d -•Q: < j 1 la' `o r�' ^o c� Ai.26 A1.02 D 5 DRAM G5 YSIERZ I FG-I Z z OPP. z: ` z z 1 COMPLE'T'ED UNDER THE 10 4-0 Q< t d DPP. Al.os O?/12/13 DIRECT SUPERVISION OF: 11! Nir ACT- AI.O-� I AI.o7 A .o� A1.0-r AI.O-7 I I NIGHOLA5 J. TRICARIGO O II ARCHITECT --------- FA-105 A1.05 A1.05 } AID AI.OS 1 (E)TAILOR 2�- 21-211 �n AREA Q I _ I - ---------- - - --- TRICARIGO ARCH ITEGTURE Q� I o Q� 6 - ( _ 1 AND DESIGN PG I04 I z :- 5 tion-,mow \� ': - • A1.02 I �i 4.O 1 - ALI A1.21 I A1.12 41_a;; I 10-82 A1.12 4._a.. I i II'-82" O 2'-2" A1.2G I vl I 4'_10" I l AI 2 OI � A1.16 - I 4-0 ; -IN 2 1 1 O Q A5.2 I 1 120 D 1 ', 0 ► i I Z - � S-- o = o �I A1.2-f I I 108 I Lu A4.0 I 'O 1- ® I'D (E) D15PLAY 111 QI wI I AREA 0 2 � 1 c� 1 v - 4 m 4 LWu z A4.2 FG-I I ry 1.03 I 108 r Q I I 4= - I ;�;� 1 PT-4 A .O Z p-- �/r • 1 A1.2� I 108 a- Mui l 1 B-i I ».... 41-611 A1.02LU AGT- Q 12'_0.10 . _ 4 5TANDARD5 I I 4.0 1 `; I d 1 7- 'tel I I A -I �� : _ (a �4'-0" O ..... .. ..... ...........,... 11 108 I I f; •� I O C F I A4.0 .�[ :. At i I AI.27 I 108 I ,': 1 _ '`- Z :\....,. _ 1 I I I d" 2 1 1 1 Z Z m I � 1 -� _ A4.o 1 I - z Z 31 A1.2-7 I I �� I 12G I (1 108 A1.31 Lrtgl- PT-S AI.O 1 AI.26 V o p (4) 5TANDARD5 v ! I �p d o @4'-o"_O.G. - - o - - 1 - - - - - - - - - - - - - I - Q Q , �_a;;(4 TANDARDS I I FIRM RE615TRATION NO. 111 A1.0ct I i i I AI.oQ OR - 0654AF A1.2 7 I I 108 o A1.03 CD, 111 5ALE5 m ZN to I I I A 1.18 1 FG_I I AREA z A1.16 4'-011 101 w (E) 5TORAH _ Q o (4) STANDARDS B I AREA Q= ®4'-O" O.G. ;; 12 AGT- 4.0 I I I I A11.02 O 103 -' z ° A5•I I-N 1 Al.os A1.2`1 I I AI.II IA .02 '-3' �.........:_.`n..� ..,,. ...... .�2�.-3"..,..:..:,,..,..:::.::...::....:......:. •......: -_ _____= I AI.IG (4) 5TANDARD5 III .... 1 A1.2q A1.2a m @4'-0" O.G. 0 102- II I I A1.26 NOTE: :...,. _ a'-1 02" 6-3 I I 3-0 211_�,� (E) D 15PLAY FOR ELEGTRIGAL WORK AT GASH WRAP TUX DESK AND SHOE -1011 1 �1 �� 51-611 - -O 12'-6" (3)STANDARDS 11141 -� (3) TANDARDS -3 :: II (7) 5TANDARD5 �4'-O" O.G. AREA �, A1.12 A1.12 I DISPLAY, SEE DETAIL5 11 12/ A5.2. S o Q_ (4)STANDARDS �� o I A I.O-i 108 z p @4'-0" O.G. O.G. , 4 @4-D O.G. 14'-0" - 61.11 AI.I �cv � �� _3.. .... .. .. .. .. .. .. ... ... ..... .......... ............... ......... ...... ...l�1.05 341-111 ,... - P4'-O" Lu .. T DO O 5 RD5O.G. 3 I t :i - - - - - - - - - - - AI.OS �+�� L - - - - - - - - - - - - - - - - - - - - -- - - � ate' NIGH J. -1 TRI AR Cd i AI.IQ 11'-I2" 6,-3" 22'-02" N . 2 08 • ljl V.I.F. W.F. J. � KI N N L N, 10 A& )' VC.• IL F FLOOR PLAN SEAL f i 11 1I - KE'-r NOTES GEILINCA PLAN o.� I CHT � { XTUR� G DETAI .� GEI � I �G � IXTU�.E ��S�ND I E�.�EGT�D G� I .� I NCS �.���. NOTES l ® a � N TAG DESCRIPTION I. ALL LIGHT FIXTURES AND LAMPS TO BE ORDERED THROUGH TARRANT L 16HTI N6. T.G.G. TO VERIFY ,42.01 L 16HT I N6 AT NEIN SHIRT CUBES / INSTALLED IN FIXTURE / 6.G. TO GONNEGT ALL EXISTING FIXTURES PRIOR TO BID. u GLC GL6-2 TO REMAIN. T.G.G. TO PAGTH AND REPAIR AS REQUIRED A2.02 T FIXTURE VE ASHWRAP OTTOM MOUNTED 6'-�" A.F.F. 2. INSTALL L 16HT I N6 FIXTURES PER MANUFAGTURER'5 REGOMMENDATI ON5 AND IN AGGORDANGE WITH INSTALL NEIN PENDANT L16HT U E BO C , B o �LG_3 NEIN GE I L I N6 ASSEMBLY BY T6G CODE REQUIREMENTS, SEE ELEGTRI GAL DRAW I NG5. CENTER PENDANT L16HT SEAM TOWARD INSIDE OF GASHINRAP V w 5EE PLAN NEW 5/8" TYPE 'X' 6YP5UM BOARD OVER METAL STUD @ I6" O.G. SUPPORTED BY M■*■� ? .� N o �" FT-1 A2.03 INSTALL NEW DOWN LIGHTING AT FITTING ROOMS. INSTALL IN 112 OF (E) 5EGOND LOOK AGT. o N o STANDARD HANGER KIT STANDARD HANGER KIT POWER FEED HAN6ER KIT ADJAGENT WALL5. T.6.G. TO PAINT GYP. BD. GE I L I N6 PT-I (SEE PLAN FOR HEIGHTS) 3 EMERGENCY FIXTURES AND DEV I GE5 SHALL BE PROVIDED W I TH A MINIMUM OF X10 MINUTE BATTERY o .� GANOPY WITH BACK-UP. SEE ELEGTRI GAL DRAWI N65. �,a, < PLAIN CANOPY PLAIN CANOPY POWER HOLE RELOGATED L16HT FIXTUREGRIDM A A2.04 INSTALL NEW DOWN LIGHTING AT 5-WAY MIRROR. CENTER WITHIN SPACE. I F A ° `O e e Q o POWER CORD EXISTING 2 x 4 LIGHT FIXTURE RELOCATED (87W) 4. ALL FLUORE5GENT LAMPS ARE H16H GOLOR RENDITION (82GR1). LINE INTERFERS, POSITION L16HT FIXTURE 2" FROM EDGE OF TILE. N I ANOPY �(GOUPLER ANOPYBUSH I N6 (RE) CCOUPLER OPY 5. L16HT FIXTURES SHALL BE SUPPORTED INDEPENDENT OF SUSPENDED GE I L I N6 OR THE SUSPENDED A2.05 INSTALL NEW / RELOGATED 2X4 L16HT FIXTURE �GA8UPLER _ TRAGK HEADS ABOVE B-(11-7) NEW L16HT FIXTURE SALES AREA a D I SPLAY AREA RACK TO HAVE GE I L I N6 SHALL BE SUPPORTED WITHIN SIX I NGHE5 OF EACH CORNER OF FIXTURE. IQ' GABLE 16' GABLE 16' GABLE 5x 15 POWER CORD a L-(16 4) TRAGK AND TRAGK HEADS WITH BEAD WITH BEAD FLOOD LAMPS A2.oe INSTALL NEW / RELOGATED SUIT L16HT FIXTURE I loll TH BEAD END GAP ASSEMBLI' o GON- TECH L 16HT NG 6. REPLAGE ALL 5TA I NED AND DAMAGED GE I L I N6 TILES. i GLIDER GLIDER DER PAR 21 W LED SOLA 15 LAMP WITH GIMBAL RI N6 TRAGK #GTL2838NP- 21 W A2.O� INSTALL NEW TRACK L16HT FIXTURE GLIDER DER -1. T.6.G. TO AL 16N FIXTURES AND OTHER MEGH/ ELEG. DEV I GES IN STRA 16HT RUNS WHEREVER GLIDER 6LIDER GLIDER NEIN LIGHTING - SUIT WALLS POSSIBLE. BOLT GOUPLER COUPLER COUPLER G2 2 3/4" I/8 ROUND CONTINUOUS DISPLAY LIGHT. ('(� QWAD ® �° G3 2' - (I) 2' TUBE / F2G01 UNV6Y KW/2 24Y�!) 4' - (I) 4' TUBE / F4G01 UNV6Y KW/24 A2.08 REPAIR / REPLACE DAMAGED L 16HT I N6 AS REQUIRED r-- 1/4"-20 NUT BOLT 1/4"-20 NUT BOLTc ® G4 ( 8. FIRE PROTEGTION SYSTEM UNDER SEPARATE PERMIT. SEE FP DRAWIN65 FOR FURTHER 1/L1 "- �a 3' - (I) 3' TUBE / F3GO I UNVGY KW/2 (4aIN) 8' - (2) 4' TUBE / FBGO I UNVGY KW/2 108W INFORMATION. - /� EXISTING LIGHT FIXTURES AND REPLAGE TRACK LAMPS. REPLACE A2.0� RE LAMP ALL EX S G L U L GLAMP GLAMP GLAMP 20 NUT BOTTOM MOUNTED AT + 7 -O A.F.F. z q. RELAMP ALL EXISTING LIGHT FIXTURES. BALLASTS A5 REQUIRED. v I F52 NEW. LIGHTING - SHIRT GUBE5 F53 BARTGO M I T8-1511-120-R4-EB81 I qW M I T8-1525-120-R4-EB81 261N A2.1 O REPLAGE DAMAGED / STAINED GE I L I N6 TI LE5 E=ND GAP _ _ _ F54 / �� / �-�/ O END GAP FIXTURE F I XTURE SUPPLIED WITH F55 MITE-1532-120-R4-EB81 30W / MITB-1540-120-R4-EB81 42W REFLEC/TED CEILIN6 PLE('_�END SUPPLIED IN I TH Il PoINER FEED A2.11 GLEAN EXI STN6 HVAG DIFFUSERS RETURN 6RI LLE5 END KIT ASSEMBLY tel- O ASSEMBLY �l O OR 8 -O LENGTH OR 6-0" LENGTH GDI NEW LIGHT FIXTURE - FITTING ROOM5 AND 5-WAY MIRROR 1�DJ/�GENT TENANT 5P1�GE - N.I.G. / (N) O INDY 6" T4 METAL LYTEGA5TER REGE55ED GFL DOWNLIOHT 1101 F26 42U- 1101 GL 461N -- - -- -- LEASE LINE j NEW L16HT FIXTURE - GA5HWRAP I II 0 (N) `� PENDANT GENTERED OVER GASH WRAP, MOUNT FIXTURE BOTTOM @ 6'-6" A.F.F. +X-X CEILING HEIGHT A.F.F. ©2013 NICD-IOUs J. TRIG�4RIG0 N10 ALFA/ P2 I O-MP-SQ-STN-FDO I IO4W THE GENERAL CONTRACTOR ANWOR ALL 50-GONTRACTOR5 �;; ;:;; ,;'...; ` ,. WORKING FROM THESE PLANS AND 5PECIFIGATION5 ARE NOT (E) GYP. GE i L I N6 AT U'-O" A.F.F. V.I.F. TO SCALE SUCH INFORMATION BUT TO CONTACT THE ARCHITECT N,�•`, :,':.;',_>,.;:d•;,•:; OR HIS REPRESENTATIVE REGARDING MEASUREMENTS,IF SUCH MEA9UREMENT5 DO NOT APPEAR CORRECT,ADD UP PROPERLY OR 50ALE GORREGTLY TO THE INDICATED SIZE. .3... t (E) EXISTING L16HT FIXTURE (E) AGT AT 12'-0" A.F.F. V.I.F. i 1 (RE) RELOGATED EXISTING L16HT FIXTURE 17ATE: ISSUE 41 NO WORK 0'1/01/13 PRELIMINARY REVIEW (N) NEW L16HT FIXTURES 01/01/13 PERMIT/LL /BID •- I 0 L 1 I I Q) X} ' 1 AREA MEN'S 1NOMEN'S 5ALE5 108 TO 1 L.ET TO I LET AREA GL6- 105 I OFA 101 EX5T'O GLG-2 GLG-2 GL6-I AGT-1 I EX57' EX57' EX57'& 2.0 - F7--T P7--7 A2.10 DATE: No. REVISIONS / BY: I mX , STORE #: 2666 RE NL -- I v B-8) B-( ) B (3) -3 t i I B- ) B-(3) _ of B- f 3 E EXI NL ® 2 4 - r• _ Lr•4 ?r? -� 4 ``' •` 2., 2=.�>< :.,,, i >,:.,.: A2.07 A2. �( 2.0 .07 2.0 A2.0� A2.07 2. MENSGORR I DOR B-(6) x x W E A R. H O U S E o 1 - ... - GL6-I ...... ..... I k - _ I i k 2 LOCATION: EXST'G t A G4 G2• Ali v,• ..,.:.... v....:,,....a...:...:.......:..:..:. :...:„:.., ..-,.. ii:5i t:ii•T.ii'i�Ai:•:ii• i EX E i a k 2 ,♦ i i RE RE r� 16140 5Y1I �f21�1I7 AVENUE } ,.: ...... :na.,...... ,\,»�,�::.., ;y.,A♦w:. .,v:::,•\.'::.,.. :.:.•\•:\s:•:\,:.2,:v:n»..�... } \ , -`i:•:2x2:::'2t : : ; ,i\\'i{,v�:.::.»: I 4, I >';::":= ::C•:...:::\. `.ti::Y2::'t'a`+::�:2}:•:422:`.: s4 �:4 4 :.: .: ;;2?1::x:4:: •,.::::.,-. :::.:........::.,. Y7 RETAIL A2. EX EX :M< < : EX lox 4011 tx CENTER L-4 i 4 t T 6R , OR EXI B-(3) PROJECT NO. DRAWN BY: A2.1 O 3 1 50 64 r A2.1i s t, RE GH GKED BY: E E EX EX `I"``''"" EX iy;, -- _ SCALE: -77 \ 2 Fe- Ex 1 =.� 'RE 'RE € 'R 'R f ;:iR1>. •1x22 '�:e:t•2az 3 ..n„ c. .:tit•: �:::.�• ,:.v' .::>.. :>:•;;;;.;•:i;:t `>�.�•�•.��: I INGS ti Ex I I IA2.0'1TF TH Y\.. .<�v` .::;\•2;2;:.5;ii:?ati 1::`};:y2. 17A =<4 4 COMPLETED UNDER THE t L-4 .:;;;:;z<>: a L-(4) AREA O�/12/13 NjT 1 D REGT raUPERV1510N OF: 1011 I 41011 2.Oy l ) 41T011 . 41'011 :., 4, 011 ---- EX 2 4 :: 108 EX 1 ICO 0 2<: HO1..A� J. TRIG,AeR NIG 5 Ex r B-4 GLG I ::::•:. :;•,22x1: .<.t: RE L-(4) 1 S ArRGF�ITEGT 4 >4 - T�41 LOR I I EXST L �4REI� IF I I .; ti.. : w SGT-I C� 104 I I I -(u B-r3J TRIG,ARIGO ARCH ITEGTURE EXI NL EX EX EXI N EX EX EXI NL EX -2 2.0 :;;:; \v }'::\ti;•?:-:ii: }4i:i;:•.-\\-!:i�Ltii::iiS:':. :[•\::��;•`:v ..\. , ;;i:>.ti\.\... _ ................ ,.,h:.:-::• ::v}h•n T;ti2ti;4.v. .:';�,:�a,., vi•................., , ..,.....:.::.._:::, tiff;\1Y?ti's:::::•::, t♦:\v:t\ 2.,......e.♦..:..,».,, 2:.:.. .,,,.,,.,.�,,, 2„v.... .....,n>� 2:;a. i 2 <<:>'i»�a'•.• 2:>>:>:,,:..,,-::-.}' 2;..,.::..., AN DI=51G1�t 'G 1 - ,....v-,,•.�„w:' w::}}11;;;2•}\.. 4 O 4.�::n...... a.,a.....•:,:;• :••'?;>;;1;411;;±�}':::�:•: EXST I t I ..4 `4 �`•4 A07-1 I I€ f I I L-(4) I41-511 ,k 11 Jill EX EX ill I >v 222` :; .�\• \,a:a i 2 ;:;i 2>::: B-(3) o (� x. <<< << ;:::.::;:>:> ;.,>:>;;::; ..:.::.::.:. s 0 ,42.07 z 11 ::;::' D! -4 2. 2.0 , A2.0 ,42.0 A2.07 2.0 �-1 G L ( J i I - I I II t 2.10 - >aa 0 4 :.4 - 1 - Ln 4 Q E 3 III I A2.1 I III O / 2.07 W B-(2) B- (� .. III , G I 1-42) L-(4) L-(4) 0 L-(4 1�- E EX EX EX EX i •.2 211 :.:..•:,:..a; 2zsa<2• =:\\t•` t�, 2z«<<��'<::>:....�.:. ">::: 2a. 2z'>::?M1i <>;: ,\i»,.. .. V ., :,•:t:4:;>.,.,;:.».:.,,,..;.».:-,;: ';,,>.:.,.:><:�;::}•.h,: :.t.2212.:;::;.:;;;i:::i,;2122<;2::;::� .?;?»,. ..:,..:.>. GDI ...;,;pc4:< '2.;•: P�2.0-f :........, :.::... \.,v.AC\1i1i,v\-.,,,• •'.;:\\` 241;•'.. •:ti•�}.\•ri;i2va\:. ...�.. ;:i:\t•:.-.», ..�,., _ :::..--.:.. xs: O a2•\22;'4: �'���i 2�:\�; . .;1;1•:\.to :2ii;` ..\::ii .,\\••<.2'1;1+4';22::t„ nkx2 • 11 ,..� ...:.; ;,�,a♦,:;•1„ ♦..•.:»a-.:;,.,,.:.a. ,v:,i2 ,�.k;;21x\4., ,.ti�,,,::..,v.,....»:,4 ,�j.�>::<;: L-(2) LU G I L (2) L-(4) 2.0 I Ex EXI NL 4€ A2.Oq I 2.0 -- B 3 sa? GDI [E3L (4) W V v A2.11 3 �\ A2.0 A2.07 1_ 111 L- ) I A2.0� 6 12 E EX EX EX EX EX k 2 - - > ;: B 3 B 3 :2 2s, ..\ 2.. 2>'•':;:-:<»'.<' a::;z:<: 2........ .\. .\. 2s<i? z>'> : 2:::z .M.. ...... .,», .. ,,....,,,.... •:.11:1 :. ...,<..: � ( ) 2L-W .,,.....,•n.•va,v.y.:...,,. , ,,,.. .»..,. ,.. ,i;;P: L-(4)?l:•:x. ..,,\» .?t-•.�';'2?.?; ,1i;i vnv.,... ^: ..... ,:.t;:.}-.\.::`?h........\♦:i}tv.. ......u:..\. ...,:.j::u}}h•n :}t}tt?.}.........:..•....... ';j; ,.:\tip\ih1j:•:v .;;.\vt ;�::l�ii�tii�n'•.:';tiyy��`�• \ i n 1.a \41:5::•:22. ' ;4n�v;::i2iit;:ii:}:itiv:J?�'h'• \»:•;'>••.,,.,",»,v1,», v n t � , -.-.-♦v.:�:.:�:'\iii}: -,.?..,,.�.v:;;•'+;-nw:.:nv::n � , ,;..,av+:•ii:': C� B 21 ;,;,,:•..,,..,,h...,.,,,.:::. ;>:,-.w..i:•:::,,•.::,• \•,,.•,:.. GDI JU lLI :;211:;•:. .? FA -n B-(3) Lu B-3 B-(2J ,42.0 L-(4) _I e5 L_(4) I A2.O T(4) A2.07 5ALE5 1343) AREA �.. lr1L i £ GDI A2 O » -~ 4_0 L-(4) I 1 FIRM REGISTRATION NO. STOR�46E t I EX NL EX E Exl X RE _..__ __._ .�...,4-_. - - w _. 1 �';'\'42'v: i:i:1:-.:i': •v!:i:;' �:+ti:i:? C�\`.:•::ti::;;�2::i'v;';;♦v:•i' GL 6 06 5 �`ti lti it i;:2+ti:2u .\., `:-`;:C i'\{:i::i25:\,: \: �.1.,:• .\• \, \... 0 2 221x:: 2:;>:;;:j; :..\a' 2: d A2.02 \\ h.,rx„a.tha...,♦,.\• 21:;r;{;, :,11„ =v\1„i5i; „�.2,h. 2.a..:.,:t\:...... 2„••, „\,,,,:,�.,.,,, \ ..,..... ...1,.,...... ,»..v.m....n,,...»„v.\♦♦h ..n,,.\\.n .,,\,.\,,,. ,4,.n.u.. .\v ,n♦,,..,»...............,... .,.....,\ .,v„n.v..,,.\.. ...h 4n ,. ;, ii\;�:�\. AREA ,vn••:.,,•.,w: •.vn•...»•.v.:vv:vvo.,-:.th•.P„ v.•.»♦,•n:•\.\»v::\v,•.i:\ .`v:?:}.vn,, ,• •`•.,vt'.,•.,,...,......v♦,-.-n♦w:::. A2.0 2 ...,., .. ...,,..,..... .............. .......-,.....,.,.. ......- ......-�........,.. -..... •'`x$�:>:..:.,. .,�"}iii}:a k A I . EX 105 EXI NL s k :•:•x».�� ...::; ::: 1 2.01 L (4) L-(4) 1_44) w I ti`s`' EX5T G :,.<<==:4:,:',':421,•.::;>::4 k �...t\., FA ..... .................................................... 4>,.:... I GT-I k 2 s cv A2. -h f ;� A2.01 ► B-(2) 2.0 A2 a .z I ,,,, RE I RE (4) L- I f EX I In. 2.0 a,"mai `.:'$: ;•-x:: }`-';;•: :.: ,,,,a.,,•:e•1,:` ::;:: ..,,.-:::::.,,•:�.,-\,♦.... :::,�..,,,»`:;;1,:;:2x::::,•:::;:: }:::>;i:iiiz..\:-::..:.; .:'s ._.\:.t,.::...::..a �- 0 E EX p X EXI NL .... ...... -..... :...:::.:...:....::::..::::-. :\:,,:.. RE + \\\...h,...\.,,.»„ :,ik:y.t,'.: :::.,.;:�•.,,•.,�.::: ,..ti•.:,;:,. :`t A2.01 A2.01 <r GL6-I ,•.moi?'>:: �;1:1,• .1;:;�iii:: a .�.- », .......\... .... .. ,.:.. ,..:.4 .>}•.}:•.>:,,,'.•,>:::;.,\„\•.�:.♦x:214 �,. ............... �l ` _ �4GT ILI- 2.o NOTE: A2.0 ALL EXISTING RE-LOGATED AND NEW A2I° L 16HTS WILL NOT I NGREASE THE �� ►Lu I O EX 15T I N6 TOTAL GALGULATED WATTA6E N I C H O rA, 1• � ,1 FOR THE 5PAGE. N TIT RI 0 „� 0 No M. 8 ® �- i KINN LQ1 , v I 40'e I L REFLEGTED GEILIN(5 FLANSEAL I FA5G I A BOARD FF32FL PENDANT L 16HT SEAM TO BE GENTERED, FAG I N6 I N51 DE OF GA5HWRAP TYP. 516N = � SUPPLIED BY TENANT, ASH LE6END � v o �, INSTALLED BY T.6.G. 516NA6E PROVIDED BY TENANT VENDOR, G ® � N INSTALLED BY T6G. WRAP PENDANT L 16HT SEAM TO U o N (1) PT-2 BE GENTERED, FAG I N6 XX-X) FINISH, o z � T_ T ' I N51 DE OF GASHWRAP, TYP. B.O. (E) GE I L I N6 SEE AO.O FOR FINISH SCHEDULE v I II " 1� —1 i_-oil ,' 1 I_O it I�.I � o :.. 4-O Qz , 2O � w TYP. TYP. ........ ........................... ...... _ c 4 is PT-I A i N AL i _;", PT-2 r~ N PT-2 s,`• PT-I ��; � .� o c o Ill PT-5It I :a NOT: [ 1 a, FILM l�F-I c rn I Ea Ea I 1�DJ/�GENTT STOREFRONT 6Ll�ZI N6. N i EXTERIOR 4: � Q- PT-4 PT-4 Q- TENANT [T 11 "11110 PT-4 tis i".4r- _ ` ;k,.: FINISHED FLOOR. 11 SURFAGE MOUNTED 2'_b" X 61_Oil FRAMED FF 16 PT-5 �_I OI_O GASH l�1RAP SUPPLIED TYP. m TYP. STANDARD PROVIDED MIRROR FURNISHED BY ALL THREE 51 DES BY TENANT INSTALLED TENANT AND INSTALLED BY TENANT AND OF WI N6 I�lALLS .. INSTALLED BY T.6.G. 0 BY T.6.G. SEE I/A5.2. BY T.6.G. z INTERIOR ELEVATION A LIA T.V. PROVIDED BY TENANT � INSTALLED FLUORE5GENT STRIP L 16HT BY T.O.G. DVR PROVIDED BY VENDOR. 3 FLUORE5GENT STRIP L 16HT SUPPLIED TENANT AND T6G TO PROVIDE ELEG. POKIER SUPPLIED TENANT AND I A5.2 INSTALLED BY T.6.G. (TYP.) GOORDI NATE Voll TH GABLE VENDOR INSTALLED BY T.6.G. (TYP.) :•: PT-2 FL-7 F'L-7 B.O. E GEILiN6 121_011 A.F.F. L �j I—D 11 PT-I `t PT-I PT-�f PT-4 L TYP. PT_4 2013 NICHOLAS J. TRICARIGO Nit PT-1 THE GENERAL CONTRACTOR AND10R ALL 50-CONTRACTOR-5 PL-6 _......-.....-......_......_..... ....._......_...._ II _ _^ - - B.D. FASG I A BD. WORKING FROM THESE PLANS AND SPEGIFIGATIONS ARE NOT LL 6 I TO 5GALE SUCH INFORMATION BUT TO CONTACT THE ARCHITECT PT 4 s :. ;,. P OR HI5 REPRE5ENTATIVE REGARDING MEA5URE %UGH 1 u :,:� MEASUREMENTS DO NOT APPEAR CORRECT,ADD UP PROPERLY 7I- — — -8 A.F.F.. .t OR 50ALE CORRECTLY TO THE INDICATED SIZE. Y t :•a 1 ..5 ———— ————————— ———————_— —————————— ————————— ————— —— 'I I — E ---------- --------- -- EQ .E IEQ� Eck Q i Q Qi EXTERIOR ,.,:,..::...,..:...:..,..,.:..:... ,,,.,..:... - : W DATE: I :. TE 55UE EQ. EQ. :. :s BOH � :•r : �l sl W : : • , • x o •.. 07/01/13 PRELIMINARY REYIEW V l.. 'I ._ q 1 PERMIT: 7/O / 3 / ID O E L /� ll :� L PT- . ....:::..::.:.::. ....::..:: 4-1 ..... L :+r FI F R \j F777= �, N I SHED LOD E3-I B-I E3.-I O'-oil TYP. 5URFAGE MOUNTED TYP. STANDARD PROVIDED SHIRT BINS, VALANGE, SHIRT WALL BEHIND TYP• % BY TENANT INSTALLED D 1 SPLAY � BASE PROVIDED BY FIXTURE O BY T.6.G. SEE WA5.2. TENANT, INSTALLED BY T.6.G. (TYP.) 41 INTERIOR ELEVATION B NOT USED J � B.O. (E) GE I L I N6 3 _OJ* � PREFABRICATED F I TTI N6 ROOMS 516N = :`:°i 12'-011 A.F.F. 21-711 > ► :::► PROVIDED BY TENANT, INSTALLED BY T.6.G• GASH NRAP . ; AL16N EQ. EQ.X. 1 11 I ::r 2 O T :• T.O. FITTIN6 ROOM I' TYP. 8'-0 1/2" A.F.F. TYP. ADJACENT _ � TENANT _ ::s k EQ. EQ. ::.:; PT-.4 m r>; 9 , JI s 1:•:•1 -.>:::, D,4TE• No. REY1510N5 / BY: I: .I , . . : • F I N I SHED FLOOR `° J y,," `' F I N I SHED FLOOR DI_O11 _ DI_D11 STORE #. 2(�h(� O B 1 TYP. SURFAGE MOUNTED STANDARDS �_I B-1 TYP. 1= PROVIDED BY TENANT, INSTALLED T'I'P. MEN'S BY T6G. SEE WA5.21 TYP. �VEARHOUSE 0 INTERIOR ELEVATION G SEC/TION ADA GASHNRAP LOCATION: 16840 SY4 2ND Y NU 5R1DGEP0RT RE IL FA5G I A BOARD FLUORE5GENT 5TR1 P L 16HT FLUORE5GENT STRIP L 16HT OF.NTIER FF32FL SUPPLIED SUPPLIED TENANT AND SUPPLIED TENANT AND TIGARD, OR BY TENANT, INSTALLED BY T.6.G. (TYP.) INSTALLED BY T.6.G. (TYP.) PROJECT NO. VRIA NtN By: 771 PT-2 INSTALLED B T.6.G.—.,�. PT-I PT-2 PT-2F<:E� F'T- 130364 X.X. 1 n q -O .;:7 PT-4 41_0il 41_O1� 41_0 /4 - 1 O H J.D.,�. R D • Eel TYP. PT-2 TYP. �°"' II I i I. NJT EK THE ::.s - <=> TYP TYP O�/12/13 DIRECT SUPERV SON OF: :y :-1 2 _0 TYP PL-6 PL-6 PL-6 NICHOLAS J. TRIGARIGO O - --- - ARCHITECT ''� -- -- - - --- S. O O CD PL-6 •: � SALES :•.:- ----- --------- ----------- -----_--_- -_-- - :, -1 =_______ __-____--- _--______ __________ __________ - - -_________ __________ _ _ _ ____________________ _ _ I, I O O O ' (� - f AREA 1 BOH `7 I 1= �- 1= PT-I �: i I::: :; ::::� �— AND DESIGN PG _ : _ EXTERIOR , ;,�: i .......... r .............................................................................................. <ti PTI Q PT- PTI tz I PT-I I - O a I tt}• W — � :• ::, F1 PT 4 � I TYP. '` i E3-I SURFACE MOUNTED B-I 5URFAGE MOUNTED E3-I B-I B-I _ v , OPP. ® w 5URFAGE MOUNTED SURFACE MOUNTED SURFACE MOUNTED I -� TYP. STANDARD PROVIDED TYP STANDARDS PROVIDED BY TYP. STANDARD PROVIDED TYP. STANDARD PROVIDED TYP• STANDARD PROVIDED TYP. I ~x til O i BY TENANT INSTALLED TENANT, INSTALLED BY T6G. BY TENANT INSTALLED BY TENANT INSTALLED BY TENANT INSTALLED _`�� n, I OPP• �� i } BY T.6.G. SEE �/A5.2. SEE I/A5.2, TYP. BY T.6.G. 5E-E 7/A5.2. BY T.6.G. SEE �/A5.2. BY T.6.G. SEE WA5.2. ' ; Lu V ELEVATE ON HINTERIORELEVATION � � ����:�:Y o1 � Lu lu INTERIOR ° I D o I II ' < O o I z REGE55ED STANDARDS @ 18 1 I1I i I i MRi '.......> Lu O.G. KEEP I N6 STANDARD A TELEPHONE PROVIDED BY TENANT �0 HARDI�NOOD EDGE TRIM STAINED 115-I AT ALL ED6E5 OF 40 MIN OF 6" O.G. FROM ED6E OF PT-4 INSTALLED BY T6G, TYP. 5-WAY MIRROR PROVIDED BY TENANT (FIXTURE ONE) I i {V n ' 1 II V I PT-4 PT-3 B.O. (E) GE I L I N6 L 16HT HOU51 N6. SEE 8/A5.2, B.O. (E) G E I L I N6 INSTALLED BY T.6•G, B.O. (E) GE I L I N611 Il V SIM. 12'-0" A.F.F. 12'-0" A.F.F. 12'-0" A.F.F. ;; G P MRI PT-4 PT-3 PT-3 " _ _ _ _ - - - - -- _ _ _ _ _ _ _ _ _ _ _ V I I_ I✓IRM REGI5TR}�TION NO. Lu TELEPHONE -- ] PT-4 P � 1 11 � . PROVIDED DED BY _ �� � � i ll OR - 0654,�� I 2 0 PT-4 EQ. `)' E_ I1� � 1_ 11)_ � 1 il� � 1_ 11C '00 k_j HARDWOOD ED6E TRI TENANT a INSTALLED 2 D 2 0 2 -O 2 O ; I z STAINED M BY T6G, TYP. TYP' TYP. TYP. TYP. TYP. i i Lu ... `' - O AT ALL ED6ES of 5-WAY HARDWooD ED6E TRIM ;; -------- ' , MIRROR PROVIDED DED BY WS- FR28 PODIUM 01 ` STAINED TENANT FIXTURE WR I TI E5K AT ALL ED6ES OF 5-MAY ( ONE) � N6 D � ..:.:::. INSTALLED BY T.G.G. PROVIDED BY z MIRROR PROVIDED BY I �--------- -------- .,, .,..,..,.,._..,_..,.,.,.,.....,.. ,.,.,w..........:....... 0 , TENANT I N5TA EDol — LL C) � TENANT FIXTURE ONE � SALES AREA BY T6G, TYP. fll IT, I I I I INSTALLED BY T.6.G. (TYP.) 5 FINISHED FLOOR FINISHED FLOOR FINISHED FLOOR tu O'-D" REGE55ED STANDARDS O -O 11 REGESSED STANDARDS O i-O II I I S J. �C PODIUM MRI T I N6 5-WAY MIRROR PROVIDED BY TENANT, �-I FR28 PODIUM WRI T I N6 DESK -1 PROVIDED BY TENANT, INSTALLED CO DESK BAY INSTALLED BY TOG. SEE TYP. PROVIDED BY TENANT, TYP. BY T6G. SEE 8/A5.2, TYP. ``' ` E �-- 8/A5.21 TYP. INSTALLED BY TOG, TYP. OL INTERIOR ELEVATION6 INTERIOR EIW ' ELEVATION F INTERIOR ELEVATION E 5GALE: NTS KEY PLAN L SEAL V, � TOILET AGGESSOR"'r SGHEDULE LE6END 0 a UN M.I (NOT USED) MOP SINK XX-XX FINISH, V m MANUFACTURER, FLORESTONE MODEL 20FM-1 20 SEE AO.O FOR F I N 15H SCHEDULE 1~ A z M M.2 WASTE REGEPTAGLE STYLE, a FAUCET. X 24 X 34 1/8 W/ MANUFACTURER: BOBRIGK MOLDED AND TERRAZZO MOP STYLE: #E3-2-7-7, SURFACE MOUNT RECEPTOR AND AGGE55ORI E5. M.3 PAPER TOWEL DISPENSER MANUFACTURER: OEOR6 I A PACIFIC O v STYLE: 6EP54338 o a, cd Q DOLOR: SMOKE 41.0611 51_011 31_011 31_011 31_011 1111 � M.4 SOAP D 15PEN5ER o H MANUFACTURER: 60JO STYLE: #60 515006 GOLOR GRAY IOC 106 M.5 (NOT USED) m m TOILET TI 5SUE DISPENSER ' M.6 MANUFACTURER: 6EOR61 A PACIFIC Lu ,,. 0 0 O OEP5gOOq -' 7-1 m STYLE: �Lu .� Lu DOLOR: SMOKE DPP. ` LAV LAV 6 CO M SEDT GONER DISPENSER A4..1 >_u Q MANUFACTURER: KRYSTAL RESTROOM PRODUCTS � � � . STYLE: #KR5-KD I DOLu z = - t ,44.1 A4.1= A4.1 ua DOLOR: WHITE Q i-- v - OPP. SANITARY NAPKIN D 15PO5AL �- vLu < Lu p✓ M.a MANUFAGTURER: BOBR I GK O }- A4.1 A4.1 � `• IL STYLE: #8-210 ;,, Lu WG WG i *4. Lu W � -� LAVATORY - MANUFAGTURER: AMERICAN STANDARD LUGERNE WDLL HUN6 LAVATORY O STYLE: #0355.012 WHITE; o = FAUCET: AMERICAN STANDARD 5402.112V.002 POL 15HED CHROME, 40" �- VANDAL PROOF WITH 4" WR15T BLADES. o Q Q ©z013 NIGHOL. S J. TRIG�RlGO WATER CLOSET 33 - �- (� m (`n O NOTE: E' THE GENERAL CONTRACTOR AND/OR ALL 505-CONTI�ACTORS • M.la MANUFACTURER: AMERI GAN STANDARD "YORKV I LLE R16HT HE 16HT ELON6ATED ELONGATED TOILET Q � CQ x Lu TOILETS URINAL SINKS, MIRROR WORKING FROM THESE PLANS AND SPECIFICATIONS ARE NOT �- 1 STYLE: #5105.016 (PRESSURE-ASSISTED), 16 I/2" RIM HE I6HT, I.6/GPF, �I (�] TO SCALE SUCH INFORMATIONAIVERE6 BUT TO CONTACT THE ARCHITECT In H CQ (� ° GRAB BARS I N TO I LET ROOMS ARE ME HIS EMENT5ENTATIVE REGARDING MEASUREMENTS,IF SUCH . 1 m < - - I G T P H MEASUREMENTS E NOT APPEAR CORRECT,ADD UP PROPERLY SEAT. OL50N I TE #q5 OPEN FRONT SEAT LESS DOVER. < o 11 _ 11 11 I EX 1ST N6. T6 O OWER W 5 OR SCALE CORRECTLY TO THE INDICATED 517E. t v d- Lu Lu 5-5 1/2 I 0 1/2 1'-0 1/2 3 5 1/2 STEAM GLEAN. TGG TO PROVIDE NEW 4) 6RAB BARS z- o o 0 o AGGE55DRI E5. 4-3 1-611 614911 DANE. 155UE R BRICK MANUFACTURE BO »... .. .::... 1 011 ...`,..,.k, ....,...\... ............ ......,......ti:..:. .ti. ... ...tia........,..t..........,.:.........................:.,..::::.:::::::........--'--...........4V:+a;::.,v.,,.. .;;.\:;:t:\;..,... \..,\..z\....:...,......:..:,,.:.:.:::.::::::::::._::::::•: STYLE: #3-IDC x 36" AND B-6106 x 42" JI � � - 0'7/01/13 PRELIMINARY REVIEW MIRRORS {C M.12 O?/09/13 PERMIT/ H /810 •� MANUFACTURER: BOBRIGK Lu CD STYLE: #8-166-2026 (20" x 26" MIRROR WITH SELF) M.13 URINAL MANUFAGTURER: AMERICAN STANDARD - MAYBROOK .5 - 1.0 6PF URINAL - WA5HOUT ACTION L STYLE: #6581.015 - WHITE (020) c_ „ 17- Lu O FLUSHER: SLOAN GONTL 186-0.5 EXP05ED CONTINENTAL MODEL URINAL FLU5HOMETER FOR 3/4 , TDP SPUD URINALS WITH 0.5 6PF ! THE MOUNTI N6 HE 16HT5 OF ALL AGGE55ORY ITEM AND HARDWARE SHALL COMPLY WITH NBHA "RECOMMENDED LOGATION5 FOR BUILDERS HARDWARE" AND/OR THE LATEST REQUIREMENTS OF THE A.D.A. REOULATION5, GABO/ANSI STANDARDS, LOGAL GORE, OR A6ENIGIE5 HAVIN6 JUR15DIGTION OVER TH15 LOCATION WHIGHEVER APPLICATION 15 MORE STRINGENT FOR ITS USE. TOILET AGGESSORIES MOUNTIN6 HE16HTS I TOILET ROOM ENLAR6ED FLOOR PLAN I GALE: I/2 = I-O i I I i B.D. GEILIN6 B.O. GEILIN6 B.O. GE B.O. GEILIN6 - - _ 1" - I II + �'-O" AFF + 81_011 AFF PSP RTO MOUNTED + 8'-O" AFF + 8 -D AFF E L PAPER TOWEL D 15PENSER DISPENSER BY T.6.G. 1_611 c�WASTE RECEPTACLE M.4 SOAP DISPENSER B PT-� 5URFAGE MOUNTED T.6.G. PAPER TOWEL 11-61'N X 21-611H j 1 I D 15PENSER BY T.6.G. PT-� MIRROR WITH MIRROR WITH SHELF- MIRROR 106 M.12 M.12 MOUNTED TO AT �16 I PATE: No. REV1510N5 / BY: � PT-� CHROME TRIM E BY T.6.G. A.F.F. BY T.G.G. ( SURFACE MOUNTED WA5TE REGEPTAGLE BY .. ck ' 1'-O" 31_611 T.G.G. STORE #: 2666 z SURFAGE MOUNTED EX'6 LAV TO EX 6 6RA8 BARS WATER HOLD (GRAB BAR PER CODE) M.2 O WASTE REGEPTAGLE REMAIN. T.6.G. TO ' ' 11 CLOSET TO REMAIN. T.G.G. EX'6 GRAB BARS WATER BY T.6.G. .:.' WG-I REFURE315H o TO REFURE315H AND REPLACE GL05ET TO REMAIN. T.O.G. = WC-I M E N' S v REPLACE AS GRAB BAR A5 NECESSARY TO REFURBISH AND REPLACE N z 5URFAGE MOUNTED O EX'6 LAV TO NECESSARY. AS NEGE55ARY - TOILET SEAT COVER M.7 W E A R H ® USE y�G_I REMAIN. T.6.G. TO NEW SANITARY NAPKIN � DISPENSER BY T.O.G. = X - REFURBISH - = X �' DISPOSAL AT WOMEN'S M.8 M 8 NEW SANITARY NAPKIN I1 o o I LOCATION: o .. REPLACE AS odQ) DISPOSAL AT WOMEN 5 °.. = NECESSARY. = TO I LET ONLY BY T.6.G. TOILET ONLY BY T.6.G. _ - _ I 16840 SY4 �2�1D , VENUE RUBBER BA5E ` cv RUBBER BASE N M.6 TOILET PAPER HOLDER cel _ BRID&F-FORT RETAIL. RUBBER BASE B-I RUBBER BASE 3_I _I TOILET PAPER HOLDERS BY T.6.G. -' 11 RUBBER BASE CENTER B-I FINISH FLOOR FIN 15H FLOOR B-I F I N I SH FLOOR = BY T.6.G. F I N 15H FLOOR B-i TI&ARD, OR O'-O" AFF O'-O" AFF 0'-011 AFF 01-0" AFF SEE PARTIAL PLAN PROJECT No. DR,4Y�11`t BY: 130364 X.X. i SCALE: 11 CHECKED BY: /16 = 1 -0 J.D.A. Dlat COWLtzI ESE llul DSM THE "r { 017/12/13 D�GT SUPERVI51ON OF; ELEVATIONS TYPICAL. SEE ELEVATIONS TYPIGAL. SEE ELEVATIONS TYPIGAL. SEE PLAN FOR EXAGT LOCATIONS. PLAN FOR EXACT LOCATIONS. PLAN FOR EXACT LOCATIONS. NICHOLAS J. TRIGRIGO O r ARCHITECT � L TOILET INTERIOR E � TOILET INTERIOR EG TOILET INTERIOR ELEVATION B TOILET INTERIOR EA � TRIG,4RiG0 ARCHITECTURE 4) ANP DESION PC, I q1 Lu 7- :3 4) ~ LU > v w B.O. GEILIN6 B.O. GEILIN6 B.O. GEILIN6 SURFACE MOUNTED B.O. GEILIN6 -A � O PAPER TOWEL � • p� + 11 - - - +. 8'-O" AFF 31-0" X 31-0" WALL - - + 8'-O" AFF DISPENSER BY T.G.G. + 8'-O" AFF Lu � !t 8 0 AFF PAPER TOWEL DISPENSER=� G�481 NET MOUNTED AT � 1L� � WASTE RECEPTACLE t 1_ 11 5 -O A.F.F. SUPPLIED BY PT_--� O O � 6 11-6 IIW X 21-611H TENANT INSTALL BY 50AP D 15PENSER BY MIRROR WITH T.G.G. (WOMEN'S ROOM T.G.G. M.4 3'_011 X 3'_011 WALL 1 I� .. - � � M.12 CHROME TRIM "�••��. ONLY) F'T 7 CABINET MOUNTED AT 5-o � � � � CED SUR FACE MOUNTED BY T.6.G. 2'-6 A.F.F. SUPPLIED BY TENANT tll MIRROR WITH SHED SURFACE MOUNTED INSTALL BY T.6.G. (WOMEN'S p PAPER. TOWEL ,T_-� 106 MOUNTED TO AT 76 M.12 WASTE RECEPTACLE BY ROOM ONLY) z Z v z D15PENSER BY T.6.G. PT-7 EX G GRAB BARS WATER A.F.F. BY T.G.G. T.G.G. IFRE35 V << GL05ET TO REMAIN. T.G.G. FR35 11 11 z 1 1 1- z EX'6 LAV TO O TO REFURBISH AND REPLACE _ M2 3-6 I -O -1 to REMAIN. T.G.G. TO AS NECESSARY (GRAB BAR PER GORE HOLD EX GRAB BARS WATER O =� SURFACE MOUNTED SURFACE MOUNTED REFURBISH WG_I 3" 3'-0" TOILET SEAT DOVER = GL05ET TO REMAIN. T.6.G. p N WASTE RECEPTACLE REPLACE A5 <� GRAB BAR ® D15PEN5ER BY T.G.G. WG-i N z TO REFURBISH AND REPLACE 1- BY T.6.G. NECESSARY. M.8 NEW SAN I TARP NAPKIN EX'6 LAV TO REMAIN. AS NECESSARY FIRM REGI5TRATION NO. tU WG-I D 15POSAL AT WOMEN 5 T.6.C. TO REFURB I5H M.7 � : = c- _ - TOILET ONLY BY T.G.G. REPLACE A5 OR - 0654 � cz < �? cz < NECESSARY. NEW SANITARY NAPKIN _- Nt _ �- - DISPOSAL AT WOMEN 5 RUBBER BA5E TOILET LET PAPER HOLDER - TD i LET ONLY BY T.O.G. M.6 cv - RUBBER BASE N - RUBBER BASE RUBBER BASE _I BY T.6.G. I RUBBER1/�1G-I B_I = -- TOILET PAPER HOLDER M.6 B - - <� RUBBER BASE 11 BY T.G.G. F I N I SH FLOOR <=> B-I FINISH FLOOR - FINISH FLOOR B-I - FINISH FLOOR 0'-011 AFF 01-0" AFF 0'-011 AFF 0'-0" AFF SEE PARTIAL PLAN SEAL D A .. to NI H� ..A v No. r'�:j8 ® O KINNELO , AA TOILET INTERIOR E � TOILET INTERIOR ELEVATION � TOILETINTERIOR ELEVATION F TOILETINTERIOR ELEVATION E e 0 F I I 0 OM A" 't N �C M M••� AZw a> cd00 O N O W A PARTITION A5 SCHEDULED I f o 'R � .� < E� .0 N ON I! _ I I s P � N v O Z H v W 3 -oil OC NEN NALL MIRROR PROVIDED BY TENANT, INSTALLED BY TOG. SEE INTERIOR ELEVATIONS FOR MOUNTIN6 HE16HT. 73 f ©2013 NIGHOL45 J. TRICARIGO THE GENERAL CONTRACTOR AND/OR ALL 50-GONTRAGTOR5 SCALE SUCH INFORMATION BUT TO CONTACT THE ARGHITEGT f WORKING FROM THE5E PLANS AND SPECIFICATIONS ARE NOT TO MEASUREMENTS DO NOT APPEAR GORREGT,ADD UP PROPERLY OR H15 REPRESENTATIVE REGARDING MEASUREMENTS,IF H OR SCALE CORRECTLY TO THE INDIGATED 51ZE. /w k i T VATE: 155UE 0-1/01/13 PRELIMINARY REVIEWA NOT USED 6 MIRROR POP OUT NALL PLAN 5 NOT USED 4 I NOT USED �3 0'7/0q/13 PERMIT/LL / E3ID •-- -t ��Q// HAN61 N6 RDD PROVIDED BY L TENANT, INSTALLED BY TOG Q DOOR AND NALL HOOKS B.O. GEILIN6 B.O. GEILIN6 BaGEILIN6 B.O. GEILIN6 PROVIDED BY TENANT + 12 -O AFF + 121-011 AFF + 12 -O' AFF + I2-0 AFF INSTALLED BY TGG TYP. 73 'I I� I NALL HOOKS PROVIDED L PT-4 TWO 8 X 10 F I TTI N6 � BY TENANT,HOOK= INSTALLED ROOM FRAMES DOORBY T6G, TYP. PROVIDED BY o GRAB BARS I EG 611 EG TENANT, INSTALLED � PT-4 BY TGG aJ T.O. FITTIN6 ROOM T.O. FITTING ROOM T.D. FITTIN6 ROOM = < + 51-011 AFF + 8 -O AFF + b'-O AFF E F 6 < .� t o 0 o H Q < j < ccm L PT-4 v T_ GRAB BAR A5 PT-4 ::..............................:::..:::I..... 8"X I O" FITTIN6 ROOM REQU I RED PER :.....,...,: ..:.::`. POL I GY FRAMES �1 CODE. HAN61N6 ROD ................. ::::::::::::::: : :::::::::: PROVIDED BY TENANT, -► o <—PT---4—> PROVIDED BY TENANT, :::.........: :::::.::::::::::::::: ` 0 INSTALLED BY TGG ::::::.::'..::::::::::::::::::::: DOOR HOOK :o INSTALLED BY TGG z _ �► t6 Eg- - - - : ::: SUPPLIED BY TENI�NT, cv ... ....... � � GRAB BAR AS REQU I RED ...::::: ::: :T:-........................::...... ::: INSTALLED BY T6G. PATE: No. REVISIONS / BY: EG. 2'-0 EG. PER GORE. » .....,...,,....::::::: _77 _I IfA EG 2 O EGZ STORE #: 2666 :: :::: O 5'-O" HG AGGE551 BLE BENCH WDLL HOOKS NALL HOOKS dPROVIDED BY TENANT, MENS '........K.,........ ................... INSTALLED AND ANGHORED DOOR AND NALL HOOKS, PROVIDEDWEARHOUSE � s w ti s � :.:::......:::::::........... :: BY TENANT, INSTALLED BY TGG, TYP. l�5 REQU i RED BY TGG �'' :::.. :.... : r- 4= - O � �.. ... . .. . ... .. ....... LOCATION: FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR \\:E3ENC,H o —0 0 0 0 o NOTE: 16140 SIN 72ND AVENUE FITTIN6 ROOM PARTITIONS AND DOORS ARE BRIDGEPORT RETAIL. B G PROVIDED BY PROVIDED BY GENTFER TENANT, INSTALLED TENANT, INSTALLED AND PROVIDED AND INSTALLED BY T.6.G. TI6ARD, OR AND ANGHORED A5 ANGHORED AS REQU I RED ALL AGGES50R I ES PROVIDED BY TENANT/ REQUIRED BY T6G BY T6G TENANT'S VENDOR AND INSTALLED BY T6G, TYP. M PROJECT NO. DRA;NN }3Y: 150364 KOH SCALE: GHEGKFD BY: /211 = 11-0" J.D.A. NTERIOR ELEVATION H INTERIOR E � INTERIOR E � F - I NTE OR ELEVATION E ENLAR6ED AGGESSIBLE F TT I NS ROOM PLAN D� THESF-GOMPLETEDIUNDERTHE 07 12/13 DIS GT 5UPERVISION OF: 0 f NIGHOL.AS J. TRICARIGO 0 ARCHITECT s S_ TRIGARIGO ARCHITECTURE Q) AND DES16N PG K B.O. GEILIN6 B.O. GEILIN6 B.D. GEILIN6 B.O. GEILIN6 + 12_0" AFF + 121_0" AFF + 12 -O AFF + I2-0" AFF DOOR AND NALL HOOKS LU PROVIDED BY TENANT, ® � INSTALLED BY T6G, TYP. PT-4 HOOK= v v DDDR DOOR HOOK PROVIDED BY BENCH PROV I DED BY w I TENANT, INSTALLED BY TGC. TENANT, INSTALLED AND 0 ROD HANGING ROD PROVIDED EG EG BY TENANT, Il INSTALLED BY EG 2'_0 EG ANGHORED A5 REQUIRED — Lu TOG EG 6IL EGJI BY TGG �' T.O. FITTIN6 ROOM T.O. F I TT I N6 ROOM T.O. F I TT I N6 ROOM DOOR AND NALL HOOKS u- } + b'-0" AFF o + g'-O" AFF �. Lu ,..0 + 8'-O" AFF PROVIDED BY TENANT, W � -1 � i z Lu o PT-4 0 o cz = INSTALLED BY TGG, TYP. � Lu\D -1 o TNO 8"X I O" FITTIN6 ROOM B z z z Q < -1 WALL HOOKS PROVIDED BY Q � m �t G A INSTALL DOOR BUMPER � QE 7- < � O FRAMES PROVIDED BY < % 11- K TENANT, INSTALLED BY TGG, D - - - - TENANT INSTALLED BY TGG ...................................... .... GUARD TO AVD I D I MPAGT z z TYP. ::::... BETWEEN DOOR HOOK AND 1L ::::::::::... :::::::::............:::::::::: HAN61 N6 ROD NHEN DOOR 1 S A.,...:,:.. :................:.,......... N :: :::::::_: IN OPEN POSITION. N/A FOR A A BENCH PROVIDED BY ... PT-4 ::::::::::::::::::::::::::::::::... ::::::: INSTALL DOOR BUMPER H.G. FITTIN6 ROOM DODR. FIRM REGISTRATION NO. W PT-4 TENANT PT-4 ........................................ 6UARD TO AVOID IMPACT HAN61 N6 ROD PROVIDED BY OR - 0654A�I+ �......::;:::: .: - BETNEEN DOOR HOOK AND 5 O _ _ _............................�.......,......:.... TENANT, INSTALLED BY T6G 0 o I I O BENGH PROVIDED BY HANGING ROD NHEN DOOR 15 W BENCH PROVIDED BY TENANT ......::........:.: .~:::::::.......... . IN OPEN POSITION. N/A FOR :::.: : H.G. FITTIN6 ROOM DOOR. 8"XIO" FITTIN6 ROOM POLIGY O TENANT ::::::: :::~A : :::::::::: FRAMES PROVIDED BY ::::::::: :::: .::::::::::::: TENANT, INSTALLED BY T6G 110, ,......,,............,� ....,..�.,,......�..,... :�:"• \` • .i>ti �\ NOTE: FINISH FLOOR FINISH FLOOR FINISH FLOOR FINISH FLOOR 0'-O" 0-0 0'-O" 0'-0" FITTIN6 ROOM PARTITIONS AND DOORS ARE PROVIDED AND INSTALLED BY L_CBD W ALL AGGESSORIE5 PROVIDED BY TENANT/ -t TENANT'S VENDOR AND INSTALLED BY T6G, TYP. NICH01 AS J. v R:.,ARI i N ® iw 26i 8 KINNELO fit INTERIOR ELEVATION INTERIOR EINTERIOR ELEVATION INTERIOR ELEVATION A ENLAR6ED T`rPICAL FITTINS ROOM PLAN 1 0 F L E) cq Q a c'-4 C> o nzjen C13 w OF DOOR PT-4 4-A tu 0 cd 5/86YP. BD. 0 0 Lu OVER 5 5/6METAL STUDS >,cc,"A 0 AS 5GHEDULED, T-T-P. UNDERSIDE OF (E) 5TRUGTURE cd C, > (E) TAILOR/ 1SALES AREA I 5 5/5" MTL. STUD BRAGES @ 5TOGK ROOM b'-O" O.G. UP TO BOTTOM OF STRUCTURE DOOR AS 5GHEDULED (E) GEILIN6 SUSPENSION SYSTEM VGT <FG-5 -NESTED STUD END POST � m 5GHLUTER 5GHIENE, ANODIZED ALUMINUM EDGE STRIP, b MM (E) T-BAR SYSTEM 7— B.O. AGT CARPET, DIREGT GLUE DOWN -7 LINE OF WOOD GAP ABOVE +12' 0 FG TOG TO FURNISH I$ INSTALL WHERE OCCURS METAL GORNER AT TOP OF IL ............ MEGHANIGAL FASTEN IN6 TO -VA-- STUD NALL USE 31b" TYPE 15' PANHEAD 5GREN AT 4'-0" O.G. TO T-BAR N3 DOOR HOOK FURNISHED BY TENANT INSTALLED BY PARTITION AS 5GHEDULED. a T.E2.G. © 6-0 A.F.F. BOTTOM TRACK. HILTI 0.145 2013 NICHOLAS J. TRICARIC-0 SHOT PINS AT 161, O.G. (E) FLOOR THE GENERAL CONTRACTOR ANWOR ALL SUB-CONTRACTORS WORKING FROM THESE PLAN5 AND 5PECIFICATION5 ARE NOT TO SCALE 5XH INFORMATION BUT TO CONTACT THE ARCHITECT OR H15 REPRESENTATIVE REGARDING MELT,ADD IF SUCH FLOOR FIN15H AS 5GHEDULED. ME 00 NOT APPEAR CORRECT,ADD UP PROPERLY NOTE: TLY TO THE INDICATED SIZE. OR SCALE CORRECTLY iti ALL EXP05ED SUB FLOOR PARTITIONS TO REGEIVE41 1A ............. WOOD CAP. DATE: 155ur- 0-T/01/15 PRELIMINARY REVIEW 0-1/0cf/15 PERMIT LL BID GHT NALL- PLAN VIEN PARTITION AT AGT/ AGT GEILIN6 b GARPET TO VGT TRANSITION 5NOT USED 12 5GALE: 6" 1'-0" PARTIAL HEISCALE: 3" 1'-0" 5GALE: FULL NOTE: 4-% ALL EXPOSED OF DOOR OF DOOR PARTITIONS TO REGEIVE SJL WOOD GAP. HALLWAY/ EXTERIOR STOCK ROOM POOR TO Y AREA EXTERIOR DISPLAY FRAME PARTITION A5 5GHEDULED LINE OF (E) DOOR FRAME 514"X6 112" STAIN GRADE NOOD BEYOND CLIN AP V45-1 E OF (E) DOOR FRAME GONGRETE BEYOND MTL. 5TUI?5 AT JAMB GARPET, DIREGT T.O. PARTITION GLUE DOWN x (E) THRESHOLD FIRE RATED WOOD STUDS AT + b'-6" A.F.F. V < Lu x7 < Lu (E) THRESHOLD JAMB A5 REQUIRED. 7- o K► D- 1/4 VGT PG-3 N 0 "XI12" STAIN GRADE WOOD ky) TRIMW5-I V4000 DOOR FRAME, 13/16" (E) GONGRETE 5EE 12/A5.1 e 212 EIMI . ...................... ....... No. REVISIONS / BY: -7, X , STORE #: 2666 MENS < WEAR HOUSEO 5/8" GYP. E31-). OVER 3 518" METAL STUDS NIII DOOR A5 5GHEDULED (E) FLOOR : AS 5GHEDULED, TVP. A (TO MATCH EXISTING) LOCATION V (E) FLOOR 164140 5N '72ND AVENUE E3R1V&Ef=0RT RETAIL CENTER TI&ARDO OR PROJECT NO. Pf;;?,,4Y�tN BY: 150564 KOH SCALE: CHECKED BY: VGT TO EXTERIOR TRANSITION 5 GARPET TO EXTERIOR TRANSITION. 2 AS NOTED D.D;A. 5GALE: 6" 1'-0" NOOD (��AF 50ALE: -oil NOOD DOOR FRAME HEAD/JAMB SIM. b 5CIALE: FULL 5GALE; FULLPATE: THESENCm5 POPE- COMPLETED UNDER THE O-T/12/13 r7IPTOT 5uFr:RvI5I0K OF: N-rr NICHOLAS J. TRICARICO VARIES AS 5GHEDULED ARCHITECT � OF DOOR WHERE OGGURS TRICARIC0 ARr.-.H1TF—C71Jf;ZE Iff:� OF TRANSITION STRIP AND DF-510N FC. DOUBLE MTL. STUDS AT JAMB I TO I LET5 I HALLWAYI < Lu II r 01 it METAL DOOR FRAME/ 1b SEE W- LINE OF DOOR FRAME BEYOND CL 2 4 1 2 I WHERE OGGUR5 DOOR AS 5GHEDULED ul SHEET VINYL FG-4 < Lu z z oNOTE, RE51LIENT TRAN51TION z < STRIP \Q cv I. WOOD FRAME < VGT 2. 1/2" WOOD TRIM NOTE: ..... ....... .. .... ....... ... 1/2 1/2 VARIES FIRM REC-715TRATION NO. Lu J* � e VIII... 3. 3/4" WOOD JAMB 1. 5 PIECE KNOG< DOWN OR - 0654Af= FRAME 4. PRIMER ALL wNOOD 2. 16 6AU6E (E) FLOOR 16 5. FIELD VERIFNr THROAT PIMEN51ON5. 3. .60 OZ./I 6ALVANIZED 4. PRIMER BAKED ON ZING CHROMATE SEAL 2 1 1/211 X# 5. FIELD VERIFY THROAT DIMENSIONS. 1) VARIES Lu 1 < METAL DOOR FRAME NTY01 AS SCALE:bil = -oil MOOD DOOR FRAME 10 SGALE: 69" 1'-0" METAL DOOR FRAME HEAD/JAMB SIM. 5GALE: (b` = 1'-0" VGT TO SHEET VINYL TRANSITION 4 NOT USED I KIN NEI 0 MERGHANDISIN6 SGHEDULE F I XTURE LE('_�_ END o C) a � N GODS MANUFAGTURER/ GATAL06 NUMBER CODE MANUFAGTURER/ GATAL06 NUMBER GODS MANUFAGTURER/ GATAL06 NUMBER c o m F12 MIRROR ISLAND UNIT FR24 SUITS a SPORT GOATS SALES HANGING DOUBLE HUNG SUIT STANDARDS AT 4'-0" O.G. EQg REMA VACUUM 120 VOLT, I PHASE. 2" BLACK PIPE VENTS FROM EXTERIOR FIXTURE STARTING WORK POINT, SEE A i.O. F14 GU5TOM GHA I R FR25 MANA6ER'S DESK WITH GHA I R E010 MANUAL 42" UTILITY PRESS (MR5-042M) cp w Fib TUXEDO MIRROR STORAGE FR26 FILE GAB I NET E011 SUPERGREASE ADJAGENT TENANT 5PAGE - N.I.G. cd �: -- : FF2 4'W X 5 DEEP FULL GONVERS I ON RAGK FR28A PODIUM E012 VAGUUM TABLE � IRON (RELIABLE 625 ) M..,� �? ,a cv o FF3 TIE / BELT FIXTURE ER28B PODIUM WITH PRINTER MEI 20 6AU6E 6ALVAN I ZED METAL EXHAUST HOOD MOUNTED AT 6'-8" PREF BY TCG. TGG TD LEASE L i NE � -� � © 0 FF4 DENIM NESTING TABLE FR2g BATHROOM GABINET WIRE I HOUR TIMER 5WITGH TO HOOD LI6HT, EXHAUST FAN, AND TO A 120 VOLT RELAY TO PI �, •� , AND P2 ON THE EGONOM I ZER IV N1212 GONTROLLER MODULE AFTER REMOV I N6 THE JUMPER. o -4 •o p FF5 GAPAG I TY TABLE FR2gA TAILOR 5TORA6E HAN61 N6 - DOUBLE HUNG SUIT STANDARDS AT 4'-0" O.G. SEE DETAIL 6/A5.2 TGG TO SET THE MIN. GONTROLLER MODULE AFTER REMOV I N6 THE JUMPER. TOG TO SET THE NO WORK � FR2gB SINGLE HUNG SUIT STANDARDS AT 4'-0" O.G. FF15 SHIRT VALENCE AND DISPLAY - BY VENDOR, INSTALLED BY TOG MIN. DAMPER POSITION SETTING TO 100% OR FULL OPEN WHEN THE SWITGI-1 15 ENERGIZED. r' SEE MEGHAN I GAL, ELEGTRI GAL AND PLUMB I N6 DRAWI N65 FF 16 TMW PARSON GA5H GOUNTER FR2gG TUX STORAGE HAN61 N6 - DOUBLE HUNG SUIT STANDARDS AT 4-O O.G. SEE DETAIL 5/A5.2 FFI6HBL TUX/RETAIL HYBRID GASHWRAP - LEFT TUX DESK FR2gD TAILOR 5HELVIN6 AT 4'-0" O.G. PLI J05AM 12" X 12" X 8" FLOOR SINK AT LOCATION DES16NATED BY TENANT FFI6HBR TUX/RETAIL HYBRID GASHWRAP - RIGHT TUX DESK FR30 H-RACKS - SUITS DHI DOOR HOOK FURNISHED BY TENANT AND INSTALLED BY 6.G. SEE PLANS FOR LOCATION. ALL FF I-7 TUXEDO WORK STATION FR31 TAILOR TABLES HAND I GAP AGGE55I BLE AREAS SHALL BE MOUNTED AT 48 AFF. �- FFIbA TUXEDO SIDE DISPLAY FR51A H-RAGKS - 5LAGK5 JOGKEY (N.I.G.) SUPPLIRD BY VENDOR AND IN5TALLED BY T.6.G. FF 18B TUXEDO SIDE D 15PLAY FR31 B H-RACKS - DOUBLE 5LAGK5 FF I g TUXEDO D 15PLAY DESK WITH GAB I NET (130 1/21 L x -72"H) FR52 H-RAGK5 - SPORT GOAT5 ('(� FF20 4 PIEGE NE5TIN6 TABLE - (1) 6-0" X 2'-6" LAR6E, (2) 5'-0" X 1'-3" MEDIUM (3) 2'-0" X 1'-3" SMALL FR33 H-RAGK5 - OUTERWEAR FF21 A LAYOUT TABLE FR54A HAND I GAP BENCH AT F I TT I N6 ROOM. SEE DETAIL I/A4.2 0 FF2 I B 6LA55 5HOWGASE SPREAD TABLE FR54B BENGH AT TYP I GAL F I TT I N6 ROOM z FF23A SHOE GAB I NET D 15PLAY FR46 MANNEQUIN v w FF23B SHOE BENGH FR52 MINI REFRIGERATOR FR55 M I GROWAVE FF24B 3 TIER OVAL TIE TABLE 61-011 X 41-211 FF25A SHIRT FLOOR FIXTURE - 5'-g 3/4" X 3'-2 3/4" FR54A 42" ROUND RAGK - SHIRTS FF26 SUIT DISPLAY FEATURE FR546 42" ROUND RAGK - OUTERWEAR " X " MIRROR OD TRIM. SEE DETAIL 5 A4.2 PR -FABRI GATED 4'-O" X '-0" F I TTI N6 ROOM BY TENANT I N5TA ED BY T.6. . FF2-7 2 � 6 0 MI W/ WO TR IL / FR63 E 5 LL G X 6 -O ASSEMBLED BY TGG. T.6.G. TO INSTALL GARPET PRIOR TO I NSTALL I N6 FIXTURE. FF31 WORK TABLE 3-0 I FF52FL WALL FASG I A ABOVE SUITS - SUPPLIED BY TENANT, INSTALLED BY T6G FR64 PRE-FABR I GATED g'-O" X 5'-O" HAND I GAP AGGE551 BLE F I TT I NO ROOM BY TENANT 73 INSTALLED BY T.G.G. T.G.G. TO INSTALL GARPET PRIOR TO IN5TALLIN6 FIXTURE. S` FF31 VERTIGAL L16HT E30X FOR 5-WAY MIRROR--BAY 5-WAY MIRROR BAY. SET BASE OF MIRROR ON CHROME CHANNEL. POLISH AND SILICON ©2013 NICHOLAS J. TRIG,�RIGO � FR3 CUSTOM ALTERATION CABINET - BY VENDOR INSTALLED BY TOG MRI ALL EDGES. SEE DETAIL 10/A5.1 •� THE GENERAL CONTRACTOR AND/OR ALL 50-CONTRACTOR5 FR4 GASHWRAP BAGKWRAP GOUNTER 1 INb FROM THESE PIANS AND SPEGINTA TION�a ARE NOT - 2'-6" X 6'-O" MIRROR SET I N CHROME CHANNEL ON ALL 51 DES SET 6" AFF ON DOOR. TOG TO SCALE SUCH INFORMATION BUT TO CONTACT THE ARCHITECT OR 14I5 REPRESENTATIVE REGARDING MEASUREMENT5,IF SUCH FRI 51 N6LE HUNG SUIT STANDARDS MR5 TO 51 L I GONE ALL EDGES, MEASUREMENTS DO NOT APPEAR CORRECT,ADD UP PROPERLY O OR SCALE CORRECTLY TO THE INDIGATED SIZE. FR8 BA661 N6 FIXTURE BY TENANT, 'I N5TALLED BY T6G EQ I STEAM GENERATOR PROVIDED B"r MGALL I STER RETAIL SERV I GES I NG. FRg 2-WAY STAND WITH ONE 5TRA 16HT ARM AND ONE SLANT ARM ON 8'-O" STANDARDS E02 BLIND STI TGH MACHINE _ 4-WAY STAND W/ 2 EAGH STRA16HT ARMS � 2 EAGH 5LANT ARMS. (2) FIXTURES TO BE DATE: 155UE FRIG SHIPPED FOR FUTURE USE. E05 STRAIGHT STITCH MAGH I NE +� FR22 5HELV I N6 FOR SHOE BACK STOCK. (1) 12" DEEP PLYWOOD SHELVES 5PAGED EVENLY. E04 BUTTON MACHINE NOTE: TGG TO INSTALL FLOOR FINISHES PRIOR TO I N5TALL I N6 FIXTURES. 07/01/13 PRELIMINARY REYIENt SEE DETAIL 4/A5.2 E05 5ER6E MACHINE 07/09/13 PERMIT/LL / S1D 4-3 l� 1 4-% O I W { r- DATE: No. REVISIONS /BY: 111110 __ -------------------------------- ------------------------------- STORE #: 2666 z cT5 I BOY'S DISPLAY I FF2-7FR46 FR46 FR46 I FR46 FR46 FR46 I � •l II MENS v ;n : W E 1`)► � H �J V � E � 1 FP-24 SUITS 21'-S" � FR24 SW TS 10'-4" � .•,.,,•,-,,.,-•,•FR24 SUITS II'-4"...............••.,__ .................... ........... z LOCATION: - - - - - aR2 - 16AQ40 5?4 -12ND \/ENUE m m m m `-• m I . 8 I F I F o I BRIDGEPORT RETAIL o I CENTER ` w . o o. o o. _ ► I TIC�,�RD, OR 4'-O" FF21A 4'-,2" 4'-O" -8" i,- i, L ILL LL VFAAN :,:.:. Fj FR31B R31B I' I PROJECT s FR33 FR30 303(04 RGH 1'1_I Eaq — ——I 711 R28 N I SCALE: CHECKED I3Y: U- LL E010 J ! Q I I Vy H DRAWINGS - a� m t,or PUNDM T DIRECT 5ER 1 IONOF-,0 MF1 Nrr —— FR31B.... FR31B EQI 6_O11 ` 51-011 =IN I NIGHOLAB J. TRIGARIGO O E04 L I W I I I S U- I cn I . I ,4RGH ITEGT FR54B imz� :ml 2\'?_ .:a;. EGI I N - - I I I W 4'-I 5'-62" 1=27 FF 7 ts, - I m V �` IN U- TRIOARIGO ARCHITECTURE Q) FR�6 I O Q I FR31B = FR3 B...' u_ I _try - I SND DESIGN I•'G AGGE550RI E5 -IN IN FR�5 I HI DHI iL FRcf FR�1 >>- r; . ``'' '' DHI DHI i_:u:_:=. I 1.0 I m I6-5I co _ I JOGKEY N.I.G. - t I W � 4_6 4 14 3 74 3'-8" 4'-O" 4'-6" U' LW I FF3 FF3 p .. E05 cv DHI tu - N m I HI DHI N m -1d O 1�-t 0 I m III W m � w a EQ5 I m I I v MRI m 3'-8" IO O ::.............> LL (ry V V+: u_- I I U- U- IL I W I DDH: PD HI (Y 4'-2" E02 I Lu Zk DHI :y dLu ................................ .................................................... I as III II _ U- m FRa FRq (E) FR2G�4 I II D � :::* I ; L r- U- I I I I p civ m = - � FRq m DHI -1'-0" FR34 4'-6" 4'-2" ,� L `o —�— I HI DHI .rZ ` Lu (E) FR2QB - I ........................ til I d I O j � III p MRI m m a FRa ,�' � Z U- 16 m 2'-�2�, -- -- I I �-- - — — — — — — — — — — g — — X IF-441 tV HI DHI O I I I Q III N _JLA n 1=F2 FF24B N. LL FIRM RE615TR4TION NO.� I I I 4'-6" -� 3'-O" ►4 " ��` DHI D 3'-O ..,_,,..:. :..:. / 3�_02 - 3'-8" 3'-8" II (E) FR2�fB = m m III 0R 0654 HI - _ DHI ry = LL U- I D I O O I O >s � I I ! Z 3'-8" 3'-O" `................ .......................................................................... III Fr-245FR�i I w (E) FR2cfB DHI I I % ,:... ,..... II FRCI PHI i" �- .:�.. < FF23B FF24B I _ DAG I {' ry m - In LL O FR22 FR22 FR22 , � N UU-- N N ~` IL 04 F- T `` " ` '` FR24 5UIT5 22'-O" 1; LL FF \ r FR22 ':10 23A `IO 1 I 10 t I . 1 ' `J SKI LO !';Law I I FIXTURE AND FURNITURE PLAN 3F y, A 6, ENERAL NOTES 6ENERAL PRODUCT SPECIFICATIONS u 0 m 0.4 t, 0 6. EXI5TIN6DEMI5IN6 NALL5 SEPARATING THO 5PAGE5 5EIN& JOINED INTO ONE SPACE. OPP051TE 51DE HILL BE EXPOSED TO VIEN OR HILL RECEIVE FIN15H MATERIAL5. MAKE FASTENINGS,REGE55ED FOR PUTTY-5TOPPIN6. 1. ALL NOR< AND MATERIALS DESCRIBED HEREIN ARE THE RESPONSIBILITY OF THE 32. THE GENERAL GONTRAGTOR AND OR ELEG,TRIGAL 5U5GONTRAGTOR 15 TO FURN15H 5r-i. GENERAL GONTRAGTOR AND ALL 5UE3GONTRAGTOR5 ARE REQUIRED TO FURN15H THE 6ENERAL (�ONDITIONS TIGHT GONNEGTION5 BETHEEN MEMBERS. INSTALL FA5TENER5 V41THOUT 5PLITTINC7 OF F. SECURE NORK TO 6ROUNO5,5TIPPIN6AND BLOCKING V41TH COUNTERSUNK,CONGEALED Cq TENANT. THE TERMS "GENERAL GONTRAGTOR", 'CONTRAGTOR",OR "SUBCONTRACTOR" AND INSTALL EMER6ENCY AND EXIT LIGHTING,AS REQUIRED BY LOGAL CODE OR FOLLONIN62 MINIMUM GOVERA6E AND LIMITS OF LIABILITY. IF TENANTS 1.02 SUBMITTALS HOOD;PREDRILL AS REQUIRED. FASTENERS AND BLIND NAILING AS REQUIRED FOR A COMPLETE INSTALLATION. REFER TO TH05E ENGAGED BY THE TENANT TO PERFORM THE NORK FOR THE AGENCIES HAVING JUR15OIGTION OVER THE PROJEGT UNLE55 NOTED OTHERN15E IN REQUIREMENTS ARE MORE STRINGENT GENERAL GONTRAGTOR 15 REQUIRED TO A. THE GENERAL GONOITION5 OF THE GONTRAGT 15 THE AMERICAN INSTITUTE OF A. SUBMIT DEMOLITION AND REMOVAL PROCEDURES AND SCHEDULE UNDER PROVISIONS OF B. PROVIDE 13LOGKIN6 ANO BACKBOAR05 OF51ZE5,AND NITH 5PAGINO AND ANCHORAGE, 6. GLEANING AND TOUGH-UP, TENANT. THE TENANT 15 NOT RELIEVED FROM THE RESPONSIBILITY FOR THE THE APPLICABLE "RESPONSIBILITY SCHEDULE". THE EXIT/EMERGENCY LIGHTING ADHERE TO THE M05T 5TRINCE)ENT RE6UIREMENTS. ARGHITEGT5' AlA DOGUMENT A201 V41TH client AMENDMENTS, "6ENERAL GONOITION5 OF 5EGTION 01300. SUBMIT REGORDED DRAY41NC75 UNDER PROVISIONS OF SECTION 01100. AS REQUIRED AND IN AGGORDANGE INITH RECOGNIZED STANDARDS. 1. GLEAN MILLV40RK ON EXP05ED AND 5EMI-EXP05ED 5URFAGE5. C4 PERFORMANGE OF SUCH GONTRAGTOR.5. SHOULD BE PROPERLY LABELED AND APPROVED TYPE LOGKOUT5 INSTALLED. GON5TRUCTION",200-7 EDITION,NHIGH 15 MADE PART OF THE GONTRAGT DOGUMENT5 NITH 2. INHEN ACCEPTABLE TO client, TOUGH-UP 5HOP AND FACTORY APPLIED FIN15HE5 TO C13 CIA A. THE C21VINC-7 OF OR FAILURE TO 61VE DIREGTION5 BY THE ARCHITECT/ENGINEER, ITS THE SAME FORGE AND EFFEGT AS THOUGH SET FORTH IN FULL AND SHALL APPLY TO ALL 1.03 PROTECTION END OF 5EGTION 5TORE DAMAGED AND 501LED ARE. Cd 2. ALL RULES AND REC7ULATION5,5GOPE OF NORK AND PROGEDURE5 INDICATED HILL 33. THE ELEGTRICAL 5UBGONTRAGTOR 15 TO PROVIDE A GIRGUIT DIRECTORY NITH GONSULTANT5, AND THE AGENTS AND EMPLOYEES OF ANY OF THEM,PROVIDED PORTIONS OF THE NORK. A. COMPLY NITH APPLICABLE LOCAL,STATE AND FEDERAL GODE5 AND REGULATIONS 3. TOUGH-UP HOW NOT AGGEPTABLE TO client SHALL BE REMOVED AND REPLACED AS BE PERFORHED BY THE GENERAL GONTRAGTOR,THEIR AGENTS, 5UBGONTRAGTOR5, PROPER PHA51NI5 AND BALANGIN6,INHIGH 15 TO CONFORM TO THE LATEST EDITION SUCH C71VINC-70R FAILURE TO GIVE 15 THE PRIMARY GAU5E OF LOSS. THE GENERAL B. THE GONTRAGTOR 15 HEREBY SPECIFICALLY OIREGTED,AS A CONDITION OF THE -7 TO SAFETY OF PERSONS,PROPERTY AND ENVIRONMENTAL PROTECTION. DIRECTED. PERTAININC AND SUPPLIERS TO PROVIDE A TOTAL AND COMPLETE PROJEGT FOR THE TENANT. OF THE NATIONAL ELEGTRIGAL CODE AND UNDERNRITER5 GOOE. THE 516N(5) GONTRACTOR 15 TO NAME THE ARGHITEGT/ENGINEER, IT5 A67ENT5 AND CONTRACT, TO OBTAIN THE NEGE55ARY NUMBER OF COPIES OF AIA DOGUMENT A201,NITH B. GONOUGT DEMOLITION TO MINIMIZE INTERFERENCE NITH ADJACENT BUILDING AREAS. 5EGTION 06400 H. AGGEPTABLE TOLERANCES: 0 N 0 5ENERAL GONTRAGTOR JUNGTION E30X PERMIT 15 TO BE INCLUDED IN THE NORK FOR THE ELECITRIGAL GONSULTANTS ON THE rONTRAGTOR'5 POLIGY OR POLIGIE5 OF GOMPREHEN51VE client AMENDMENTS NITH THE ARTIGLE5 CONTAINED HEREIN,AND TO NOTIFY AND MAINTAIN PROTEGTED EORE55 AND AGGE55 AT ALL TIMES. 1. VARIATION FROM TRUE P051TION: MAXIMUM 1/16"AT ANY P051TION AND MAXIMUM Ile) NORK 5HOHN IN THESE NOTES 15 TO BE PERFORMED BY THE C 0=4 N OR 5UBCON7RAGTOR5, A6ENT5 AND /OR 5UPPLIER5 ONLY,NFIETHER OR NOT THE ARGH17EG-TURAL NOODNORK 'r! 00 L6 5UBGONTRAGTOR AND THE E30X 15 TO BE SUPPLIED 13Y TH15 GONTRAGTOR AND OR GOMMERGIAL GENERAL LIAE31LITY INSURANGE. SUCH INSURANCE SHALL INGLUDE APPRA15E ALL 5UBGONTRAGTOR5 AND ANY OTHER PARTIES TO THE CONTRACT OF G. PROVIDE,ERECT,AND MAINTAIN TEMPORARY BARRIGADE5,5EGURITY DEVIGE5,GUARD IN ANY 10'-0 LENGTH. 0 C4 2 NORK 15 DELINEATED PROPERLY. PROPERLY LABELED. PRODUGT5 AND GOMPLETED OPERATIONS AND CONTRACTUAL LIABILITY INDIVIDUALS OR A6ENGIE5 ENGAGED ON THE NORK AS TO ITS CONTENTS. RAIL5 AND LIGHTING AS NECESSARY AND AS REQUIRED BY APPLICABLE REGULATORY 2. ADJOINING 5URFAGE5 OF SAME MATERIAL: NO VARIATION PERMITTED. GOVERA6E,SHALL BE PRIMARY AND NONGONTRIBUTIN6NITH ANY INSURANCE PART I GENERAL '1� >-,C., Cd A6ENGIE5,TO PROTEGT NORKER5 AND OGGUPANT5 OF BUILDING. 3. OFFSET INITH ABUTTING MATERIALS.. MAXIMUM 1/32". 3. THE NORK. (ONTAINED IN THESE GONTRAGT DOCUMENTS AND/OR 5FEGIFIGATIONS 15 34. THE GENERAL GONTRACTOR OR THE FIXTURE GONTRAGTOR5,TH05E GONTRAGTOR5 MAINTAINED BY THE ARGHITEGT/ENC-71NEER OR ITS AGENTS AND CONSULTANTS,AND END OF 5EGTION 0. PREVENT MOVEMENT OR SETTLEMENT OF 5TRUGTURE5,PROVIDE ENGINEERING-AND PLAGE 0 -4 1.01 NORK INCLUDED 0 -4 TO BE PERFORMED BY THE GENERAL GONTRAGTOR AND/OR ITS 5UBGONTRAGTOR5 PAID BY THE O.G., BASED ON THE 5PEGIFIG GONTRAGTOR SUPPLYING THE MILLHORK SHALL PROVIDE THAT THE ARGHITEGT-./ENGINEER BE C71VEN THIRTY DAYS, BRAGIN6 OR SHORING AND BE RESPONSIBLE FOR SAFETY AND SUPPORT OF 5TRUCTURE. 3.02 PREPARATION FOR FIELD FIN15HIN6 W NHETHER OR NOT 5PEGIFIGALLY NOTED OTHERN15E. OR FIXTURES, 15 TO PROVIDE SHOP DRANIN65 OF ALL MILLNORK AND FIXTURES, UNQUALIFIED WITTEN NOTIGE PRIOR TO ANY GANGELLATION THEREOF. IF THE GEA5E OPERATIONS IF SAFETY OF 5TRUGTURE APPEARS TO BE ENDANGERED. TAKE A. SHOP FABRICATED HOOD TRIM AND MOLDINGS,AND HOOD AND PLASTIC,LAMINATE A. SAND NORK SMOOTH AN05ET EXP05ED NAILS ANI?5GRE06.APPLY HOOD FILLER IN > GABINETNORK AND ARGHITEGTURAL NOOONORK ITEMS,COMPLETE NITH HARDNARE AND N PRIOR TO START OF GONSTRUGTION, FOR APPROVAL BY THE TENANTS ARCHITEGT. IT FORE60INC7REOUIREMENT5 ARE NOT MET BY THE GENERAL GONTRAGTOR, THAT PRECAUTIONS TO PROPERLY SUPPORT STRUCTURE. 00 NOT RESUME OPERATIONS UNTIL EXPOSED NAIL AND 56REIN INDENTATIONS AND LEAVE READY TO RECEIVE SITE-APPLIED C> 4. FOR GLARIFIGATION PURPOSES, TENANT,CLIENT AND ONNER ARE THEsAME PARTY, 15 NOT THE TENANTS ARCHITECT'S RESPONSIBILITY TO FOLLON UP ON THESE OR GENERAL GONTRAGTOR REMAINS OBLIGATED TO INDEMNIFY AND HOLD HARMLE55 SUFPLEMENTAR'� GONDITIONS SAFETY 15 RESTORED. ACCESSORIES,SHOP FINISHED. FINISHES. LANDLORD 15 THE PARTY LEASING THE 5FAGE TO THE TENANT, AND THE GENERAL ANY OTHER REQUIRED SHOP ORANIN65. THE AR.GHITEGT/ENGINEER, ITS GON5ULTANT5,EMPLOYEES,AGENTS AND ALL E. ARRANGE AND PAY FOR 915GONNEGTIN6,REMOVIN6AND GAPPING UTILITY SERVICES B. SEAL GONGEALED AND 5EMI-GONGEALED 5URFAGE5;BRUSH APPLY ONLY,USING PRIMER GONTRAGTOR, NHETHER NORKIN6 FOR THE LANDLORD OR THE TENANT, HILL BE OTHER STATED INSURERS,FROM AND A6AIN5T ANY AND ALL L055ES NHIGH ARTICLE I GENERAL: 1.02 QUALITY ASSURANCE V41THIN AREAS OF DEMOLITION. DISCONNECT AND 5TUB-OFF. NOTIFY ONNER AND THE GON515TENT INITH FIN15H GOATS 5PEGIFIED UNDER 5EGTION OqqOO PAINTING. REQUIRED TO HANDLE ALL NORK IN THESE DOGUMENT5 UNLE55 5PEGIFIGALLY NOTED 35. GENERAL GONTRAGTOR HILL PERFORM ALL LEASEHOLD IMPROVEMENT AND FURNISH NOULE? HAVE BEEN INDEMNIFIED AND INSURED AGAINST Bi' THE CONTRACTOR,BUT A. UN50LIGITED ALTERNATES,BY THE 5UGGE55FUL BIDDER,FOR PRODUCTS AND 5Y5TEM5 A. REFERENCE 5PEGIFIGATION5 AND STANDARDS: COMPLY NITH THE REGOMMENDATION5 OF OTHERN15E. NHIGH HILL RESULT IN THE REDUCTION OF THE G05T OF THE NORK HILL BE ENTERTAINED AFFEGTEO UTILITY COMPANY IN ADVANGE AND OBTAIN APPROVAL BEFORE STARTING THE ARGHITEGTURAL NOODNORK IN5TITUTE `ARGHITECTURAL HOOPHORK QUALITY AND INSTALL ALL FIXTURES, UTILIZING 5PEGIFIED FIXTURE GONTRAGTOR5, IF NOTED. HERE NOT. TH15 NORK. PLACE MARKERS TO INDICATE LOCATION OF P15GONNEGTED 5ERVIGE5. 3.03 NORKMAN5HIP BY THE ONNER. IDENTIFY 5ERVIGE LINES AND GAPPING LOGATION5 ON PROJECT RECORD DOGUMENT5. STANDARDS" A. GOMPLY Y41TH THE REQUIREMENTS OF THE REFERENCED STANDARDS.COMPLETED NORK 5. THE GENERAL GONTRAGTOR 15 REQUIRED TO HAVE ALL SUBGONTRAGTOR5 REVIEN 56. THE GENERAL CONTRACTOR SHALL SUPPLY ALL NEGE55ARY GROUNDS FOR ALL 60� IF A REAR EXIT DOOR EXISTS THEN THE GENERAL GONTRAGTOR 15 REQUIRED TO 5. THE GONTRAGTOR SHALL V151T THE 51TE PRIOR TO SUBMITTING A PRICE AND SHALL SHALL BE RIGID,PLUMB OR LEVEL,AS APPROPRIATE. HORK SHALL BE FREE FROM THESE NOTE5 PRIOR TO BIDDING AND TO FAMILIARIZE ALL PERSONS,AND MILLNORK AND FIXTURES, FITTIN65 AND EQUIPMENT AS REQUIRE[?. GONTAGT FIXTURE FURNISH AND INSTALL AN APPROVED AUDIBLE TYPE PANIC, BAR A55EM13LY FOR VERIFY THE EXISTING GONDITION5. NO GLAIM5 FOR EXTRA NORK,BASED ON EXISTING B. FABRIGATOR'5 OUALIFIGATION5 A FIRM HITH NOT LE55 THAN FIVE YEARS EXPERIENGE PART 2 - PRODUGT5 DAMAGE,FLAIN5,BLEMISHES OR OTHER DEFECTS. NORK SHALL BE UNIFORM IN COLOR 505GONTRACTOR5 INOR<IN6 ON TH15 PROJEGT V41TH THESE GENERAL NOTES AND THE GONTRAGTOR FOP, 5PEGIFIGS. REAR EXIT DOOR(5), PAINT OUT51DE OF DOOR AS PER LANDLORDS REQUIREMENTS CONDITIONS HILL BE ALLONED HHERESUGH CONDITIONS GOULD HAVE BEEN VERIFIED OR IN THE 5PEGIFIED UNIT RESPONSIBILITY AND PROVING A.BAGK6ROUNO OF NOT LE55 THAN AND FINISH. CONTRACT POGUMENT5 NOTED,LANDLORD5 DESIGN GRITERIA AND THE EXECUTED (UNLE55 NORK 15 PREVIOUSLY COMPLETED BY LANDLORD) AND GENERAL REA50NABLY INFERRED BEFORE THE GOMMENGEMENT OF THE HORK. CONTRACTOR THREE INSTALLATIONS OF COMPARABLE 51ZE AND SCOPE TO THAT HEREIN SPECIFIED. 2 02 MATERI AL5 0 R 5 LEASE AGREEMENT BET�\EEN LANDLORD AND TENANT. ANY 015GREPANGY BETNEEN 31. ALL EQUIPMENT, MILLNOI AND FIXTURES SUPPLIED BY THE TENANT TO BE GONTRAGTOR NILL PLAGE TENANTS NAME IN TYPE,SIZE AND LOCATION ON OUT51DE SHALL OBTAIN AND PAY FOR ALL PERMITS,LICENSES AND GERTIFIGATE5 AND PAY ALL EXGEPT INHERE NOTED OR SPECIFIED OTHERIN15E,MAINTAIN POSSESSION OF MATE IAL END OF 5EGTION THESE GONTRAGT DOGUMENT5 AND THE LEASE OR DESIGN GRITERIA INFORMATION 15 UNLOADED, ASSEMBLED AND INSTALLED BY THE GENERAL GONTRAGTOR. OF DOOR AS PEP,LANDLORDS TYPIGAL DE516N REQUIREMENTS. IF DOOR 15 IN NEED IN5PEGTIONS,AND LEGAL FEES REQUIRED FOR THE INORK,E30TH TEMPORARY AND BEING DEMOLISHED;IMMEDIATELY REMOVE FROM SITE. 1.04 SUBMITTALS TO BE REPORTED TO TENANTS ARGHITEGT PRIOR TO THE START OF ANY VqOf;Z<. THE OF REPAIR OR REPLAGEMENT,GENERAL GONTRACTOR TO COMPLETE 5UGH NORK, PERMANENT. 00 NOT 5GALE DRANIN65. IN THE EVENT OF ERRORS OR GONTRADIGTION5 A. SHOP DRAININC75: INDIGATE MATERIALS AND HOOD SPECIES,GOMPONENT5,PROFILES, GENERAL rONTRAGTOR SHALL BE RESPONSIBLE FOR FULLY AGWAINTIN6 3b. THE PROPER RECEIPT OF ALL NEN MATERIALS AND EQUIPMENT AT THE JOB 51TE 15 AND INGLUDE C,05TS, IN E31D TO TENANT, IN THE PRANIN65 OR BETHEEN THE PRAININC75 AND THE 5PEGIFIGATION5,THE ARGHITEGT FASTENING,JOINTING DETAILS,FIN15HE5,AND AGGE55ORIE5. INDICATE STEEL BAGKING SEGTION O�qOO PART 3 - EXECUTION THEMSELVES NITH THE GONTENT AND 5GOPE OF THESE 5PEGIFIGATION5,AND THE RESPONSIBILITY OF THE GENERAL GONTRAGTOR,AND /OR ITS HILL DETERMINE NHIGH HAS PREGEDENGE EASED UPON THE INTENT OF THE 00GUMENT5. PLATE5 OR HOOP LOCKING LOCATIONS REQUIRED FOR ANGHORIN6 OR SUPPORTING SPEGIAL ATTENTION SHOULD BE 61VEN THE 5PEGIFIGATION5 THROUGHOUT THE SPAN 5U1f3CONTRAGTOR5 (IF ANY). 5EGURE AND SAFE STORAGE OF ALL NEN AND EXISTING 61. ALL PAYMENTS MADE TO THE GENERAL GONTRACTOR FOR TH15 PROJEGT ARE TO BE IF THE CONTRACTOR D15GOVER5 ANY ERROR, INGON515TENGY OR OM155ION5 IN THESE NORK IN TH15 5EGTION INDICATE LOCATIONS OF CABINET LOG<5. GAUL<IN6 AND SEATANTS 3.01 PREPARATION OF TH15 PROJEGT BY TH15 GENERAL CONTRAGTOR, SUPERVISORS AND MATERIALS AND EQUIPMENT TO REMAIN (IF ANY) HILL BE PROVIDED BY THE GENERAL ALLOCATED FOR TH15 PROJECT ONLY, FOR PAYMENTS TO 50GONTRAGTORS, OOGUMENT5,THE GONTRAGTOR SHALL NOT PROGEED INITH ANY PORTION OF THE NORK B. VENEER LEAVES: PROVIDE INFORMATION REGARDING VENEERS BY FLITGH,BUNDLE,AND A. ERECT AND MAINTAIN HEATHERPROOF GL05URE5 FOR EXTERIOR OPENINGS. EREGT AND 5UIBCONTF_A(TOR5,AS THE STANDARD ESTABLISHED HEREIN SHALL BE APPLIED, NITH GONTRAGTOR. GENERAL GONTRAGTOR TO IMMEDIATELY ADV15E TENANT MATERIAL SUPPLIERS, AND AGENTS, AUTHORIZED BY THE 5PEGIFIC, CONTRACTOR TO AFFEGTEO UNTIL HAVIN67REOUE5TEO AND OBTAINED A CLARIFICATION FROM THE SEQUENCE NUMBER;5HON VENEERS FOP,EACH ITEM. PART I GENERAL EMPHAS15 TO ALL NORK. GHEGK "RESPONSIBILITY 5GHEDULE" FOR ALLOCATION OF GON57RUGTION DEPT. OR ARCHITECT OF ALL DAMAGED OR DEFIGIENT SHIPMENTS OF PERFORM NOW OR SUPPLY MATERIALS TO TH15 PROJEGT ONLY. PAYMENTS TO ARGHITEGT AND THE ONNER, GONTRAGTOR SHALL MAKE 5UB5TITUTION5 ONLY INITH THE MAINTAIN TEMPORARY PARTITIONS TO PREVENT SPREAD OF DUST,FUMES,NOISE,AND G. GLAZING: DETAILS FOR EAGH 6LA55 INSTALLATION INCLUDING IDENTIFICATION AND SPEGIFIC, NORK. ALL NORK 15 BY TENANT UNLE55 OTHERA15E NOTED. NORK MATERIALS AND EQUIPMENT, INHETHER SUPPLIED BY TENANT OR OIREGTLY BY GENERAL GONTRAGTOR BY TENANT,UNLE55 CONTRACT STATES OTHERIN15E, THE PRIOR WITTEN APPROVAL OF THE ARGHITEGT AND THE ONNER. SMOKE. ON COMPLETION, REMOVE PARTITIONS AND REPAIR DAMAGED 5URFAGE5. PLAGEMENT OF GLAZING TAPE OR CHANNELS,BLOGK5,5PAGER5,AND 6LAZIN6 SEALANT. 1.01 NORK INGLUDED PROTEGT EXISTING ITEMS NHIGH ARE NOT INDICATED TO BE ALTERED. DECLARED UNAGGEPTABLE BY THE TENANT AND LANDLORD SHALL BE CORRECTED IN GONTRAGTOR OR IT'55UPPLIER5. GENERAL GONTRAGTOR TO COMPLETE AND SUBMIT GENERAL GONTRAGTOR MUST PURGHA5E ALL MATERIALS FROM SPECIFIED VENDORS, B. 015GONNEGT,REMOVE,AND GAP DESIGNATED UTILITY SERVICES V41THIN DEMOLITION D. SAMPLES: 7- A MANNER AND TO A DEGREE OF QUALITY AS AGGEPTABLE BY THE TENANT AND ALL NECESSARY PAPERNORK AND ARRANGE IN5PEGTION5 OF DAMAGED GOODS A5 AND MUST DOGUMENT ALL PURGHA5E!5 FOR NHIGH A PAYMENT BY TENANT 15 MADE. ARTIGLE 2 - IN5URANGE: AREAS. MARK LOCATION OF DISCONNECTED UTILITIES. IDENTIFY AND INOIGATE GAPPING 1. SUBMIT FOUR SAMPLES,MINIMUM 69" SQUARE,OF SPECIFIED TRANSPARENT OR A. TH15 5EGTION CONTAINS 5PEGIFIGATION REQUIREMENTS PERTAINING TO ALL SEALANTS LANDLORD. PER TENANT GONSTRUGTION DEPT. REQUIREMENTS. NOTIFY ARCHITEGT, OR A. IN5URANGE GOVERA6E: CONTRACTOR SHALL GARRY THE MINIMUM IN5URANGE AS PER LOCATIONS ON PROJEGT REGORD DOGUMENT5. OPAOUE FINISHES ON HOOD,AND OF PLASTIC, LAMINATE FINISHES. AND GAULKIN&THROUGH THE PROJECT,AND BEGOME5 A PART OF ALL 5EGTION5 THE AGREEMENT NITH C LIENT TO COVER THE GONTRAGTOR,GLIENT AND ITS DIRECTORS, PRODUCERS,ADJUSTMENTS,TOUGH-UP AND GONTAININ6 REFERENCE TO TH15 5EGTION,OR INHERE MATERIALS OF THE TYPES ARGHITEGT'5 PROJECT ADMINISTRATOR OF ANY POSSIBLE DELAYS. INGOMPLETE THE GENERAL GONTRAGTOR 15 REQUIRED T05UBMIT PARTIAL HAIVER5 OF LIENS E. MAINTENANGE INSTRUCTIONS: COVER OLEANINC-7 THE GENERAL GONTRACTOR AND ALL 5UBGONTRAGTOR5 ARE REQUIRED TO GHEG< ORDERS AND DELAYS ARE TO 13E IMMEDIATELY BROUGHT TO THE ATTENTION OF THE FOP, ITS NORK AS NELL AS 5UBGONTRAGTOR5 OR MATERIAL SUPPLIERS, UPON THE AND THE ARGHITEGT. ALL THE POLIGIE5 SHALL INGLUDE THE ABOVE NAMES AND THE USE FOR SHOP FINISHES. IN5TRUGTION5 SHALL GONTAIN MANUFAGTURER'5 REGOMMENDED 5PEGIFIED IN TH15 5EGTION ARE REQUIRED BY THE DRANIN65. V41TH THE SAME FORGE ,ONOITIONS AT BUILDING 51TE AND SUPPLIER AND THE ARCHITECT. SUBMIT GONFIRMATION OF ALL ORDERS,DELIVERY REQUEST OF THE GLIENT OR THE GLIENTS ARGHITEGT AND THE REQUEST FOR THE LANDLORD AND H15 GENERAL GONTRAGTOR AS ADDITIONAL INSURED. GERTIFIGATE5 OF A. DEMOL15H IN AN ORDERLY AND CAREFUL MANNER AS REQUIRED TO AGGOMMODATE NEN GLEANING MATERIALS AND APPLICATION METHODS, INGLUDINO PREGAUTION5 IN USE OF AND EFFEGT AS IF WITTEN IN FULL IN EAGH 5EGTION. AND VERIFY ALL DIMENSIONS AND FIELD C 3.02 EXEGUTION PREMISES AND NOTIFY IN NRITIN6 IMMEDIATELY TO THE LANDLORD, THE LANDLORDS PATES,AND A FULL NRITTEN SCHEDULE TO TENANTS ARGHITEGT. FINAL 10% RETENTION ON TH15 PROJEGT MUST INCLUDE 516NED AND EXEGUTED IN5URANGE SHALL BE SUBMITTED TO TH05E NAMED ABOVE AND 5HOULD BE IN EFFECT NOW, INGLUOIN6 THAT REQUIRED FOR GONNEGTION TO THE EXISTING BUILDING. PROTECT GLEANING MATERIALS INHIGH MAY BE DETIRIMENTAL. AND TENANTS PROJECT AR6HITEGT AND TENANTS GON5TRUGTION REPRESENTATIVE PRIOR TO EXEGUTION OF TH15 GONTRAGT. 1.02 SUBMITTALS NAIVER5 OF LIEN INDICATING 100% GOMPLETION AND 100% PAYMENT IN FULL (NITH B. 5UGH IN5URANGE SHALL GOVER EXPLOSION,COLLAPSE,AND UNDERGROUND EXPOSURE, EXISTING SUPPORTING STRUCTURAL MEMBERS. PERFORM DEMOLITION IN AGGORDANGE A. SAMPLES: SUBMIT SAMPLES OF VARIOUS TYPE5 AND COLORS OF MATERIALS 5PEGIFIED ANY AND ALL D15GREPANGIE5 AND L15T ANY NORK NOT YET GOMPLETED BEFORE 3ci. THE GENERAL GONTRACTOR SHALL UNLOAD, PROTEGT AND INSTALL TENANTS FULL NARRANTY) BY' ALL 5UBGONTRAGTOR5 AND MATERIAL SUPPLIERS, INGLUDINC2 NITH APPLICABLE AUTHORITIES. 1.05 DELIVERY,STORAGE AND HANDLING STARTING NORK. ANY NOR< REQUIRED, DUE TO FAILURE OF THE BIDDING SPECIFIED EQUIPMENT, FIXTURE5 AND FURNISHINGS. GOMPLETION OF ALL PUNGH L15T ITEMS. SPRINKLER LEAKAGE AND HATER DAMAGE.ADDITIONALLY,GOVERAGE MUST BE IN OR INTENDED FOR USE ON TH15 PROJEGT. 7GONDITION5 AND THE PLAGE FOR VANDAL15M AND MALIGIOU5 M15GHIEF RESULTING IN DAMA6E5TO ALL PROTECT ITEMS FROM HEATHER INHILE IN TRANSIT,AND AGAINST M015TURE AND GONTRAGTOR TO REPORT 015GREPANGIE5 13ETIAEEN EXISTINC B. REMOVE MATERIALS TO BE REINSTALLED OR RETAINED IN MANNER TO PREVENT DAMAGE. A. 00 NOT DELIVER ITEMS UNTIL 51TE GONDITION5 ARE ADEQUATE TO REVIEN THE NORK. DRAININ65 PROVIDED BY THE MEN5 NEARHOU5E,SHALL BE PERFORMED AND PAID 40. ALL EXISTING TO REMAIN AND NEN BUILDING ENTRY GLASS AND DOORS, 62. ALL NORK, THAT NEEDS TO BE GOMPLETED BY THE GENERAL GONTRAGTOR BELON MATERIALS USED IN PERFORMANGE OF THE NORK DESCRIBED HERE UNDER AS INELL AS G. REPAIR ALL DEMOLITION PERFORMED IN EXCESS OF THAT REQUIRED,AT NO G05T TO THE ABRA51ON AFTER DELIVERY. STORE INDOORS, IN VENTILATED AREAS Y41TH GON5TANT 1.03 PRODUGT HANDLING ,T. IF THE STOREFRONT AND INTERIOR GLAZING, IF APPLICABLE, MUST GOMPLY NITH ALL OR ABOVE THE PREMISES MAY HAVE TO BE DONE IN OTHER TENANTS DEM15ED ON ALL FIXTURES IN THE PROGE55 OF MANUFAGTUREO,5TORED OR INHILE IN TRANSIT, BUT MINIMUM TEMPERATURE OF 690 DEGREES F AND MAXIMUM RELATIVE HUMIDITY OF 25% A. DELIVER MATERIALS TO THE PROJEGT OR PLACE OF APPLIGATION IN OR16INAL FOR BY THE GENERAL GONTRAGTOR THAT 15 ANARDED TH15 PROJEC ADE DURING APPLICABLE GOOE5, LANDLORDS CRITERIA, LANDLORDS AND T�NANT'5 GONTRAGT PREM15E5 AND 5UGH NORK NEEDS TO BE DONE IN COORDINATION INITH THE TENANTS REGARDLESS OF NHETHER AND REGARDLESS OF HHO HAS TITLE TO ANWOR POSSESSION ONNER. GENERAL CONTRAGTOR 15 REQUIRED TO INSTALL A STOREFRONT 13ARRIC D. REMOVE AND PROMPTLY DISPOSE OF CONTAMINATED,VERMIN INFESTED,OR DANGEROUS TO 55%.AT LEAST SEVEN DAYS PRIOR TO INSTALLATION ANL)DURING INSTALLATION, UNOPENED CONTAINERS BEARING MANUFAGTURERS NAME AND PRODUGT DE516NATION. THE GON5TRUGTION PHASE OF TH15 PROJECT, 5UGH BARRICADE TO MEET THE LATEST DOGUMENTS, AND SAFETY OLAZIN& STANDARDS. GENERAL GONTRAGTOR TO VERIFY BELON, OR ABOVE, INCLUDING ANY OVERTIME NORK OR PAYMENT FOR 5EGURITY OF 5UGH MATERIALS AND FIXTURES. THE MATERIALS AND FIXTURES MUST BE INSURED MATERIALS ENGOUNTERED. MAINTAIN-70 OE&REE5 F AND RELATIVE HUMIDITY OF 50%TO 55%. STORE MATERIALS IN Nr.GORD NITH MANUFACTURER'S INSTRUCTIONS.DO NOT USE BARRIGADE OE5167N REQUIREMENTS OF THE LANDLORD, INGLUDIN& THE PAINTING OF IN FIELD ALL EXISTING GLAZING TO REMAIN MEETS, OR EXGEED5 SUGH GOOE5, THAT MAY BE NECESSARY. THE G05T FOR THE NOR<, INGLUDINCY OVERTIME, MUST BE FOR FULL REPLACEMENT G05T. E. DO NOT BURN OR BURY MATERIALS ON SITE. REMOVE DEMOLISHED MATERIALS FROM MATERIALS UPON INHIGH THE SHELF LIFE DATE HAS EXPIRED.REMOVE THESE MATERIALS SUGH BARR16ADE AND ANY 516NA0E ALLONABLE BY LANDLORD AND UNDER LEASE G. ALL INSURANCE MUST INSURE THE GONTRACTOR AGAINST ANY AND ALL GLAIM5 FOR 51TE AS HOW PROGRESSES. UPON COMPLETION OF HORK,LEAVE AREAS OF NORK IN OBLIGATION.ADDITIONALLY, TH15 BARRICADE MUST BE MOVED OUT AS REQUIRED STANDARDS, ETG. INCLUDING BUT NOT LIMITED TO TYPE,SUPPORT, FRAMING METHODS, INCORPORATED IN THE FINAL 50 TO THE TENANT. THE GENERAL GONTRAGTOR TO GLEAN GONDITION. PART 2 - PRODUGT5 PROMPTLY FROM THE PROJEGT SITE. ETC. AND UPGRADE IF OR AS REQUIRED. ALL 5TOREFRONT5 TO BE INSTALLED BY INGLUDE IN ITS GUOTATIONOD, ALL COSTS IN GOMPLETIN6 DELON SLAB PqA5TE BODILY INJURY INGLUOIN6RE5ULTIN6 DEATH AS INELL AS DAMAGE TO THE PROPERTY OF A. O.G. TO BE RE5PON51BLE FOR VERIFIGATION OF QUANTITIES AND GONDITION5 AF A.T.L. FOR STOREFRONT NORK AND /OR REMOVED AT THE END OF THE GON5TRUGTION GLAZING 5Uf3GONTRACTOR5 CAREFULLY FOLLONIN& REOUIREMENTS AND DETAILS PIPING, OVERHEAD DOMESTIC LINES,VENT LOOPS OR PENETRATIONS THROUGH ROOF OTHERS, INCLUDING RE5ULTIN6 L055 OF USE,AND ARISING FROM THE OPERATIONS UNDER END OF 5EGTION SUPPLIED ITEMS INHIGH ARRIVE AT THE SITE.FAILURE TO DO 50 IMPLIES FULL LIABILITY PART 2 - PROOUGT5 TIME PERIOD. GHEGK NITH THE LANDLORD TO VERIFY IF A BARRIGADE HAS FOR DE516N AGAINST V41NO LOAD GON51DERATION5, EVEN THOUGH SUGH AS NELL AS ALL SECURITY COSTS,REPAIRS, TO HALLS, CLEANING, FLOORS IN TH15 GONTRAGT AID RELATIN6TO ANY ACTION, OR FAILURE TO ACT BY THE FOR G05T OF REPLAGEMENT AND 5HIPPIN6. PREVIOUSLY BEEN INSTALLED ON THESE PREMISES IN ANTIGIPATION OF INSTALLATION OF STOREFRONT GLAZING 15 IN AN ENGL05ED BUILDING. GENERAL TENANTS 5PAGE, LANDLORDS 5PAGE OR ADJOINING TENANTS SPACE. GONTRAGTOR,REGARDLESS OF INHETHER 5UGH OPERATIONS HERE PERFORMED BY THE 2.01 SEALANT MATERIALS CONSTRUCTION BY THE NEN TENANTS; IF TH15 15 THE CASE,00 NOT INGLUDE ANY CONTRACTOR TO VERIFY EX15TIN6 STRUCTURAL SUPPORT/HANGING GONDITION5 FOR GONTRACTOR OR BY ANYONE OIREGTLY OR INDIRECTLY EMPLOYED BY THEM. SEGTION OE3500 2.01 MATERIALS A. USE SEALANTS OF THE FOLLONING TYPES AND MANUFACTURE AS REQUIRED BY THE 2015 NICHOLAS J. TRICARIC-0 G05T FOR THE AGTUAL BARRICADE BUT 00 INCLUDE G05T5 FOR MOVING 5UGH 5TOREFRONT AND IF STRUCTURAL 5PAN5 AE30VE FOR SUCH HANGING EXGEED 63. THE GON5TRUGTION PRANIN65 L15TED IN THESE GONTRAGT DOGUMENT5 HAVE BEEN P. GOMPREHEN51VE AUTOMOBILE LIABILITY INSURAN(E INGLUDIN6 THE ONNER5HIP, A. M015TURE GONTENT OF LUMBER AND PLYHOOD (AT TIME OF INSTALLATION): IN DRANIN65 AND SPECIFICATIONS. BARRIGADE5 IN AND OUT,ANY OTHER 5FEGIFIC, LANDLORD REQUIREMENTS NORMAL HAN6IN6 SUPPORT DETAILS OR SPAN AND/OR NINO LOAD GALGULATION5 GEMENTITIOUS DEG<5 AND TOPPINC-25 THE(?ENERAL CONTRACTOR ANWOR ALL 9)f3-CONTRAr.TOR5 PREPARED BASED ON THE BEST INFORMATION AVAILABLE TO TENANT DURING MAINTENANGE,OPERATION ANWOR USE OF ANY AUTOMOTIVE EQUIPMENT AS PER THE AGGORDANGE HITH REQUIREMENTS OF REFERENGED STANDARDS A5 APPLIGABLE TO B. GOLOR!5 FOR ALL SEALANTS SHALL BE AS 5ELEGTED BY THE ARGHITEGT FROM V4ORKIN6 FROM THE5E PLAN5 AND 5PECIFICATION5 APE NOT RE6AROIN675UGH BARRIGADE5,AND THE PAINTING AND/OR REMOVAL OF 5UGH ARE REQUIRED DUE TO LOCAL BUILDINO DEPARTMENT REQUIREMENTS, TH15 PREPARATION OF THE CONTRACT DOCUMENTS. IN THE EVENT THAT PROBLEMS ARISE AGREEMENT NITH CLIENT. GEOGRAPHIC, LOGATION OF PROJECT;THE M05T RESTRICTIVE REQUIREMENTS SHALL MANUFAGTURER'S STOIC K COLORS. BARRIGADE5 AFTER C,ONSTRUGTION. TO 56ALE 5XH INFORMATION Wr TO CONTACT THE ARCHITECT GONTRAGTOR 15 TO HIRE A LOCAL STRUCTURAL GON5ULTANT TO DESIGN 5UGH DURING THE GOUR5E OF THE PROJECT,DUE TO UNKNONN 51TE GONDITION5 OR CODE AND E. BUILDERS R15K IN5URANGE. ALL R15K GOVERA6E ON A COMPLETED VALUE OR, TH15 SECTION ONLY APPLIES IF LEVELING 15 REQUIRED APPLY. G. THE GENERAL CONTRACTOR SHALL BE RE5PON515LE FOR COORDINATING THE 5EALANT5 OR H15 REPRE5ENTATIVE RE-6ARDIN6 MEA5UREMENT5,IF 5MH 5UPPORT5',r5TEM HANOER5 AND COMPLETE ALL 5TRUCTURAL GALGULATION5/ LANDLORD REQUIREMENTS (IF ANY) THAT GONFLIGT HITH THE GONTRAGT DOGUMENTS,THE COVERING THE NORK AT clent'5 PREMISES,AND AS IT RELATES TO THE BUILDING HITHIN B. LUMBER AND PLNOOD: GRADED IN NITH REFERENCED STANDARD FOR QUALITY PROPOSED BY VARIOUS INTERFACING TRADES AS REQUIRED TO A55URE AE35OLUTE MEA%*ZEMENT5 DO NOT APPEAR CORRECT,ADD UP PROPERLY 1. ALL GONTRAGTOR5 SHALL GHEGK AND VERIFY ALL FIELD GONDITION5 AND SHALL DRANINC75 IN TH05E AREAS INHERE 5UGH INFORMATION 15 REQUIRED AND TO INGLUDE GENERAL GONTRAGTOR SHALL INFORM THE TENANT'5 ARCHITECT IMMEDIATELY. ANY A RADIUS OF 10 FEET FROM THE DEM15ED PREMISE. THE IN5URANGE SHOULD CONTAIN A PARTI: GENERAL A55URANGE: THIGKNE55 AS 5PEGIFIED HEREIN AND 5HONN ON DRANIN65, FOR KALL OR GOMPATIE31LITY OF SEALANTS. OR%A[F r-oRREGTLY To THE INDIGATED 51ZE. HAVE 50LE RESPONSIBILITY FOR VERIFICATION OF GLEAR HEIGHTS NITHIN THE 5UGH COSTS IN THE E31D TO THE TENANT. GHAN67E5 THAT HILL BE REQUIRED,HILL BE DELINEATED BY TENANT ARGHITEGT. LIMIT OF 100% OF REPLACEMENT COST. GEILIN6 PANELING,PROVIDE FIRE-RETARDANT TREATED GORE TO ACHIEVE CLASS A PREMISES; ANY DISGREPANGIE5 SHALL BE REPORTED TO THE THE TENANT AND THE F. GERTIFIGATE5 OF IN5URANGE SHALL INDICATE THAT client, ING., ITS OIREGTOR5 AND 1.01 SUMMARY FLAME SPREAD RATING. FIRE RETARDANT SHALL NOT GAU5E STAINS IN FINISHED SYSTEM. 2.02 SEALANT TYPES ARCHITECT IMMEDIATELY. THE GENERAL GONTRAGTOR 15 TOTALLY RESPONSIBLE 41. ANY 50135TITUTION5 OF FIN15H MATERIALS MUST BE APPROVED BY THE TENANTS OFFIGER5, AND THE ARGHITEGT5 ARE NAMED AS ADDITIONAL ON ALL POLIGIE5. A. 5EGTION INGLUDE5: 5ELF-LEVELIN6 GEMENTITIOU5 TOPPING. A. FOR INTERIOR AND EXTERIOR HORIZONTAL APPLICATION 5UE3JEGT TO PEDESTRIAN OR (94. SHOULD AN EXPAN51ON JOINT OGGUR IN THE LEASED PREMISES,GENERAL GONTRAGTOR 15 1. GENERAL: MATIGH ARGHITEGT'5 GONTROL SAMPLE FOR ALL Y400D FINISHES,FOR FOR ALL "HOLD" DIMENSIONS, AND 15 TO GONTAGT THE ARGHITEGT, THE TENANT AND 4-% ARGHITEGT IN NRITIN6. THE GENERAL GONTRAGTOR 15 RESPONSIBLE FOR 5UE3MITTINC-7 RESPONSIBLE FOR ALL GON5TRUGTION AFFEGTED BY 5UGH JOINT, INCLUDING FURNISHING GERTIFIGATE5 MUST AL50 INSURED PROVIDE THAT NO GANGELLATION OR MATERIAL 1. PROVIDE A PORTLAND CEMENT EASED,5ELF-LEVELINC7,5ELF-DRYINC7,HEAR- RATED GRAINING,COLOR AND FIN15H TEXTURE. VEHICULAR TRAFFIG. DATE: 155UE THE TENANT'5 GONSTRUCTION REPRESENTATIVE OF ANYDISGREPANGIE5 VERBALLY TNO (2) 5AMPLE5 OF EAGH SUBSTITUTION. AND I N5TALL I N67A LEVEL,SLAB HEIGHT EXPAN51ON JOINT COVER, INCLUDING FLOOR, GRANGE IN GOVERA6E SHALL TAKE PLAGE NITHOUT FIFTEEN(15) WITTEN DAYS NOTICE GONGRETETOPPIN& IN AGGORDANGE NiTH THE CONTRACT DOGUMENT5. 2. PLYNOOP: NATURAL FIN15H: N-N,6-1, INT. NFPA P5-1-66. 1. SEALANT GOMPOUND SHALL BE THO PART POLYJRETHANE-f3A5E SEALANT OF AND AL50 IN NRITIN6,FIRST, PRIOR TO BUILDING HALL5, IF THERE 15 A QUESTION. NALL5 AND GEILIN6. GENERAL GONTRAGTOR SHALL MAINTAIN INTEGRITY OF ALL 5UGH TO ALL GERTIFIGATE HOLDERS. NORK SHALL NOT BEC71N UNTIL ALL CERTIFICATES ARE 2. PROVIDELABOR,MATERIAL,EQUIPMENT,FREIGHT,TAXES AND SERVICES NEGE55ARY 5. PLYNOOD: NFPA A-13 INT. SELF-LEVELINGPOUR-GRADE GON515TENGY AT SLOPES UP TO 1-112%,AND GUN TENANTS Fl>(TURE5 FIT INTO PLAGE NITH NO ROOM FOR ERROR. GONTRACTOR MUST 42. ALL GONGRETE FLOOR5LA65 AND /OR FILLING IN OF DEPRESSED FLOOR AREAS EXPAN51ON JOINTS IN A MANNER GON515TENT V41TH AGGEPTABLE CONSTRUCTION DESIGN ATTAINED AND REQUIRED IN5URANGE 15 IN PLAGE. TO 6OMPLET THE GEMENTITIOU5 TOPPING NORK AS HEREIN SPECIFIED. 4. PLYNOOD SUBSTRATE: NFPA B-5 INT GRADE FOR STEEPER SLOPES,MEETING FOLLOININ6 STANDARD: REVIEN ENTIRE SET OF GONTRACT DOGUMENT5 FOR CEILING HEIGHTS. LEVEL NITH CONCRETE OR OTHER APPROVED FINISHES HILL BE COMPLETED BY THE PRAGTIGE5. 3. THI55-T-5TEM CONSISTS OF THE USE OF PRIMER AND A MIX OF 5PEGIAL CEMENTS AND 5. VENEER- AS 5ELEGTED BY ARGHITEGT,NITH UNIFORM APPEARANCE. a. FEDERAL 5PEGIFIGATION TT-5-221E. 0'7/01/13 PRELIMINARY Rf_-vIEy4 b. DEMOLITION INORK (IF ANY) BY GENERAL GONTRAGTOR. GENERAL CONTRACTOR. THE GENERAL GONTRAGTOR TO INCLUDE M15GELLANEOUS ARTICLE 3 - INDEMNIFICATION: BINDERS NRI014,INHEN MIXED V41TH HATER BEGOME A H16HLY LIQUID GEMENT a. MINIMUM THIGKNE55 0.028 INGHE5. b. "SHORE A" HARDNE55 OF GURED SEALANT SHALL BE 40 + 5. STEEL FRAMIN67AND METAL PECK (IF APPLICABLE) AND CONCETE INSTALLATION. 65. THE GENERAL CONTRACTOR 15 REQUIRED TO ADHERE TO ALL NEN REQUIREMENTS, A. GONTRAGTOR AGREES TO INDEMNIFY AND HOLD HARMLE55 client AND ITS OIREGTOR5 GOMPOUND THAT,NITH THE APPLICATORS A5515TANGE SEEKS ITS ONN LEVEL AND b. VENEER MANUFAGTURE5 MAXIMUM STANDARD THICKNESS FOR EAGH 5PEGIE 2. FOR SELF LEVELING GRADE: 01/0q/15 PERMIT LL BID cf. THE GONTRACTOR SHALL BE 50LELY RESPONSIBLE FOP, AND HAVE GONTROL OVER ALL FLOOR SLAB PENETRATIONS SHALL HAVE NATERTI6HT5LEEVE5 EXTENDING A NHETHER STATED OR NOT ON THESE CONTRACT DOCUMENTS,FOR THE LATEST A.D.A. LAN AND THE ARGHITEGT5 ANWOR PROJECT GOORDINATOR.5 FROM LAIN5UIT5 BROUGHT BY PRODUGE5 A SMOOTH AND FLAT 5URFAGE. REQUIRED. a. 51KAFLEX 2G/5L. MINIMUM 4" A.F.F. AND MUST BE INSTALLED PER LANDLORDS GRITERIA. CONCRETE EFFECTIVE JANUARY 26, lqcf2. TH15 LAN 15 A GIVIL RIGHTS LAN AND THE EXGLU51ON OF TH05E PER50NAL INJURIES OR PROPERTY DAMAGE CAUSED BY AGT5 OR OM155ION5 OF 6. OAK- PREMIUM GRADE,RED OAK,PLAIN SLIGED VENEER AND 50LID STOCK. b. 50NOLASTIG PAVING JOINT SEALANT. CONSTRUCTION MEANS, METHODS,TECHNIQUES, 5EOUENGE5,AND PROGEOURE5 AND 4-1 SLABS MAY ONLY BE CORE DRILLED/SAN GUT, IF GONTRACTOR 15 REQUIRED TO REQUIREMENTS B*� THE LOGAL CODE OFFIGIAL5 DOES NOT RELIEVE THE TENANT OR THE THE GONTRAGTOR, THEIR 5UBGONTRAGTOR5 OR SUPPLIERS. 1.02 SUBMITTALS 1. MAPLE- PREMIUM GRADE,GLEAR SOLID INHITE MAPLE AND PLAIN 5LIGED 5ELEGT TREMGO THG qOO. FOR GOORDINATIN6 ALL PORTIONS OF THE NORK UNDER THE CONTRACT, INGLUDINO PENETRATE SUCH SLAB ABOVE,BELON OR ADJAGENT TO TENANTS 5PACr; GENERAL GONTRACTOR OF ADHERING TO THE NEGE55ARY HORK,EITHER DURING A. PROOUGT DATA: VENEER PL`(NOOO. VENEER GRAINING SHALL BE AS STRAIGHT AND GL05E AS d. VULKEM 245. ANY AND ALL 05HA REQUIREMENTS,UNLESS CONTRACT DOCUMENTS GIVE OTHER Q) 5PEGIFIC, IN5TRUGTION5 GONGERNIN& THESE MATTERS. SEE AIA DOCUMENT A201 GOORDINATION AND APPROVAL BY THE LANDLORD HILL BE NEGE55ARY PRIOR TO GONSTRUGTION OR AFTER OGGUPANG"r. ARTIGLE 4 - 6UARANTEE: 1. GONTRAGTOR SHALL SUBMIT MATERIALS L15T OF ITEMS PROP05ED TO BE PROVIDED P0551BLE NITH MINIMAL FIGURING, BIRDS'EYE AND FIDDLE BACKING.VENEER 3. FOR GUN GRADE: GORE DRILLING /SANGUTTIN6. IF TH15 15 A 5TRUGTURAL SLAB THEN ANY AND ALL A. THE CONTRACTOR SHALL REMOVE,REPAIR ANWOR REPLAGE AT THE(ONTRAGTOR'5 ONN UNDER TH15 SECTION TO MEN5 HEARHOUSE. FLITHGE5 AGRO55 A 4-5 FT. 51DE PANEL SHALL BE NO LE55 THAN W HIDE AND a. 51KAFLEX 2G/N5. GENERAL GONOITION5 OF THE CONTRACT FOR CON5TRUGTION,LATEST EDITION. PENETRATIONS THROUGH SLAB MUST BE GOORDINATED NITH THE LANDLORDS 66. QUALITY STANDARDS. ALL SUCH NORK SHALL BE PERFORMED IN A FIR5T-GLA55 EXPENSE ANY DEFEGT5 IN MATERIALS OR WINSHIP OGGURRIN6 IN OR TO THE NORK B. GERTIFIGATION: GL05ELY COLOR MATCHED.ADJOININC7PANEL5 SHALL BE COLOR MATGHEO 130TH IN b. 50NOLA5TIG NPIL 10. THE ARGHIT'EGT SHALL NOT HAVE CONTROL OVER OR CHARGE OF AND SHALL NOT REPRESENTATIVE PRIOR TO STARTING NOR<. GENERAL GONTRAGTOR AND /OR ITIS, NORKMANLIKE MANNER AND SHALL BE IN GOOD ANO USABLE CONDITION AT THE DATE OF GOVERED BY TH15 CONTRACT INITHIN A ONE(1) YEAR PERIOD FROM THE DATE OF FINAL 1. INSTALLATION OF THE GEMENT-13A5ED,SELF LEVELING,5ELF-DRYING,NEAR-RATED GRAIN AND COLOR SOLID HOOP SHALL MATGH VENEER. c. TREMG0 THG qOI. 4-1 BE RESPONSIBLE FOR GON5TRUGTION MEANS, METHODS,TECHNIQUES,5EGUENGE5,OR PLUMBING /ELEGTRIGAL 5UBGONTRAGTOR,NITH LANDLORD'5 PRIOR WITTEN COMPLETION THEREOF. GENERAL GONTRAGTOR SHALL REQUIRE ANY PER50N PERFORMING AGGEPTANGE OF THE NORK BY THE OINNER. AT PROJEGT COMPLETION AND ONNER GONGRETE TOPPING MUST BE BY AN APPLICATOR USING EQUIPMENT AND TOOLS 3. MAHOGANY: GLEAR PREMIUM 6RADE 50LID MAHOGANY. B. FOR AGOU5TIGAL SEALANT,COORDINATE NITH REQUIREMENTS OF 5EGTION Oq25O. -,RAM5, INCLUDING ANY AND APPROVED BY THE MANUFACTURER cl. 5PEGIE5 FOR PLASTIC, LAMINATE FINISH: PREMIUM GRADE PER AIN15TANDARD5, IN 1. INMONT COMPANY "PRE5TITE 57q.64". PROGEDURE5,OR FOR SAFETY PRECAUTIONS AND PROC APPROVAL, TO CORE DRILL /SAN GUT, (NHIGHEVER 15 APPLIGABLE) GONGRETE ANY 5UGH NORK TO GUARANTEE THE SAME TO BE FREE FROM ANY AND ALL OEFEGT5 IN DE WITTEN OPERATION AND MAINTENANGE INSTRUCTIONS/ ALL 05HA REQUIREMENTS, IN GONINECTION NITH THE NORK. SINGE THESE ARE 50LELY SLAB. IF SAN GUTTING, OGGUR5, INSTALL UNDER SLAB PLUMBING NASTE PIPING / NORKMAN5HIP AND MATERIALS FOR ONE (1)YEAR FROM THE DATE OF 155UANGE OF THE 6UARANTEE5 FOR ALL EQUIPMENT INSTALLED. GONFORMANGE NITH ARGHITEGT5 CONTROL SAMPLES. 2. TREMGO AGOU5TIGAL SEALANT. THE GONTRA(,TOR5 RESPONSIBILITY UNDER THE 6ONTRAGT FOR GONSTRUGTION. SEE ELECTRICAL CONDUIT. FURNISH AND INSTALL NEN GONGRETE 5LAE3 IN EXCAVATED GERTIFIGATE OF OGGUPANGY. TENANT SHALL AL50 REOUIRE ANY SUCH PER50N TO BE 1.05 PERFORMANCE REQUIREMENTS: 10. INALNUT; CLEAR PREMIUM GRADE 50LID NALNUT 3. UNITED 5TATE5 C7YP5UM AGOU5TIGAL SEALANT. AIA DOCUMENT E3141 STANDARD FORM OF AGREEMENT BETNEEN ONNER AND AREA TO MATCH EXISTIN67ADJAGENT SLAB IN THIGKNE55, 5TRE55 AND STRENGTH. RESPONSIBLE FOR THE REPLACEMENT OR REPAIR NITHOUT ADDITIONAL CHARGE,OF ANY ARTICLE 5 - HAIVER OF LIENS A. TEGHNIGAL DATA: ALL DATA 15 BASED ON A MIX RATIO OF 5 OUART5 OF HATER TO 50 G. PREFIN15HEO NALL PANELS: FIBERGLASS REINFORCED PANELS,REFER TO FIN15H 4. N.N. HENRY TYPE 315 AGOU5TIGAL SEALANT. ARC.HITEC,T, LATEST EDITION. PIN E30TH EX15TINC-2 51DE5 TO NEN SLAB NITH 112" OIAMETER5TEEL R005 12" O.G. AND ALL NORK DONE OR FURN15HED BY OR THROUGH 5UGH PERSON,NHIGH SHALL A. THE GONTRAGTOR SHALL EXECUTE AND FILE HITH THE PROTHONOTARY OR APPROPRIATE L55. OF PONDER(4.1L: 22.1K6). SCHEDULE ON DRAINING.PROVIDE RELATED AGGE55ORIE5 AND GOMPONENT5 AS G. FOR EXPAN51ON JOINT SEALER FOR USE INHEN THE 5EALER 15 CONGEALED IN THE STAGGERED. BEGOME DEFEGTIVE V41THIN ONE(1)YEAR AFTER SUE55TANTI AL GOMPLETION OF THE NORK. OTHER GOVERNMENT AGENCY,A STIPULATION AGAINST ANY LIENS CONTEMPORANEOUSLY 1. FLON TIME: 15 MINUTES AT-75F (246) REQUIRED. FIN15HED HORK SUCH AS AT TELE5GOPIN6 JOINTS IN HINDON FRAME5,6UTTER5,FA5GIA5, 11. THE GENERAL GONTRAGTOR AND THE 5UBGONTRAGTOR5 FOR THE GENERAL THE GORREGTION OF 5UGH NORK SHALL INGLUDE,V41THOUT ADDITIONAL CHARGE,ALL NITH THE EXEGUTION OF THIS AGREEMENT AND BEFORE ANY NORK 15 COMMENCED OR 2. FINAL 5ET= 2 HOURS 0. HOOD PARTIGLEBOARD. INDUSTRIAL GRADE,AN5L I-M-3,MINIMUM 45 P5F DENSITY, GRAVEL STOPS,ETC.,NON-DRYIN6 BUTYL:ZED FOP,THE NO ANY MATERIALS OR MAGHINERY 15 DELIVERED TO THE SITE. GOPIE5 SHALL BE SENT TO 3. APPLICATION TEMPERATURE RANGE: 41-q5F (535G) APPROVED FOR PLASTIC, LAMINATE FINISH: SANDED FAGE5;FIRE-RETARDANT TREATED GONTRAGTOR SHALL PAY FOR AND OBTAIN ALL PERMITS REOUIP RK 43. ALL THE FLOOR FINISHES, NITHIN THE PREMISES,OR AT THE TRANSITION BETNEEN EXPEN5E5 AND DAMAGES IN CONNECTION HITH 5UGH REMOVAL,REPLACEMENT OR REPAIR 1. PTI 101 S PS AND 5PEGIFIGATIONS. THIS INGLUDE5 C105T5 FOR ALL LANDLORD FLOOR FINISHES, AND TENANTS FLOOR FIN15HE5 (AT ENTRY OR/AND REAR OF ANY PART OF THE INORK INHIGH MAY BE DAMAGED OR DISTURBED THEREBY.ALL THE ARGHITEGT,ONNER AND LANDLORP'5 REPRESENTATIVE, 4. GOMPRE551VE STRENGTH. TO AGHIEVE GLASS A FLAME SPREAD RATING. 2. TREMGO CURTAIN NALL 5EALER. INSPECTIONS BY AUTHORITIES HAVING JUR15DIGTION,BUILDING DEPARTMENT AND DOOR) ARE TO BE SMOOTH AND LEVEL TO AVOID TRIPPING HAZARDS AND BE INITHIN INARRANTIE5 OR GUARANTEES AS TO MATERIALS OR NORKMAN5HIP ON OR V41TH RE5PEGT I DAY 2400 P5116.1 MPA 1. FOR FIRE RE515TIVE NORK.. 0. FOR JOINTS IN PREGA5T GONGRETE,PREFIN15HED METAL NALL PANELS;VULKEM C122. HEALTH DEPARTMENT PERMIT GO5T5, AND PERMIT GO5T5 FOR FIXTURING SUPPLIED THE REQUIREMENTS OF BARRIER FREE DESIGN. IF AN EXPANSION JOINT COVER 15 TO TENANT'5 NORK SHALL BE CONTAINED IN THE GONTRAGT OR 5UBGONTRAGT NHIGH ARTIGLE 6 - SUMMARY OF THE NORK- I DAYS 4400 P51 30.3 NA a PROVIDE "OURAFLAKE FR" AS 5UE35TRATE FOR PLASTIC, LAMINATE AND HOOD D NINGS IN EXTERIOR HALLS REWIRED TO BE POINTED NITH SEALANT, BY TENANT (IF APPLIGABLE). REQUIRED,SUCH GOVER 15 TO BE LEVEL AND SMOOTH NITH TENANTS FLOOR FIN15H SHALL INURE TO THE BENEFIT OF E30TH LANDLORD AND TENANT,AS THEIR RESPECTIVE A. THE NORK TO BE DONE UNDER TH15 GONTRACT GON515T5 OF PROVIDING, INSTALLING, 25 DAYS 5600 PSI 38.6 MPA VENEER FINISHES. USE DON GORNIN6 IqO. ELEVATION AND HILL NOT PROJEGT ABOVE 5UGH FLOOR FIN15H ELEVATION. IF THE INTERESTS APPEAR AND GAN BE DIRECTLY ENFORCED BY EITHER.GENERAL CONTRACTOR FURNISHING AND 5UPPLYIN& ALL MATERIALS EXCEPT AS NOTED,EQUIPMENT, LAE30R AND 5. FLEXURAL 5TREN6TH MOR: b. PROVIDE "DURAGOAT FR" FOR PAINTED AND OPAQUE LAGOUER FINISHES. E. FOR JOINTS IN GLASS A METAL 5URFAGE5 OF HALLS AND OTHER VERTICAL AND 12. ALL GLEARANGE5 OF PIPES AND OUGT NORK INSTALLED BY THE GENERAL EX15TING SLABS ARE NOT LEVEL,THE GENERAL GONTRAGTOR 15 REQUIRED TO TO HAVE TH15 CLAUSE IN EVERY 5UBGONTRAGTOR AGREEMENT FOR THE PROJEGT AND IF INGIDENTAL5 NECESSARY OR CONVENIENT FOR THE GON5TRUGTION OF A NEN client LOFT I DAY 620 P51 4.8 INA GONTAGT V41LLAMETTE INDUSTRIES,ALBANY,ORE60N (503) cl2q-3341. SLOPING 5URFAGE5 GONTRAGTOR OR 5U13GONTRAGTORS, MUST BE MAINTAINED FOR ADEQUATE HEIGHTS COMPLETE EXTEN51VE FLASH PATGHIN& THROUGHOUT TO OBTAIN A SMOOTH AND SUCH CLAUSE 15 NOT INGLUDED, IT V41LL NOT RELIEVE THE GENERAL GONTRAGTOR OF THE STORE. THE NORK INGLUDE5 THE EXECUTION OF ALL DUTIES AV OBLIGATIONS IMP05ED I DAYS l2bO P51 q.6 NA E. TRANSPARENT FIN15HED GA5ENORK: 1. GENERAL ELEGTRIG 1200. REQUIRED FOR GEILING SYSTEM AND LIGHT FIXTURES. CONTRACTOR,MUST REVIEN LEVEL GONGRETE SLAB. REQUIREMENTS OR NORK STATED HEREIN. UPON BY THE GONTRAGTOR AND THE 5UBGONTRAGTORS BY THE CONTRACT DOGUMENT5. 2b DAY51400 P51 11.0 MPA 1. ANL PREMIUM GRADE,TYPE KK SINGLE LEN6TH SECTIONS. 2. PON GORNIN6 1qO. ENTIRE SET OF GONTRAGT DOGUMENTS FOR CEILING HEIGHTS. GENERAL GONTRAGTOR B. COORDINATE ALL NORK OF THE VARIOUS TRADES AND 5UB- CONTRACTORS TO A55URE 6. COVERAGE-50-LB.,2450.FT. (2.2 M2) AT V4" 2. GON5TRUCTION STYLE AS INDICATED ON ORAININC-75. F. FOR JOINTS IN GYPSUM NALLBOARD,Y400D AND LAMINATED PLASTIC- ,ONTRAGTORS EXPENSE) EFFIGIENT AND ORDERLY INSTALLATION. PROVIDE AGGOMMODATION FOR ITEMS -7. TOPPING SHALL 13E NALKA13LE AFTER 2 HOURS AT 15F AND BE ABLE TO BE COATED 3. EXP05ED CNG VENEER AS SELECTED. (OR DE516NATED AUTHORIZED GONTRACTOR AT GENERAL C 44. ANY SCAFFOLDING, SAFETY FAILINGS,BARRIGADE5 AND/OR PROTEGTION DEVIGE5 6-7. TENANT'5 NORK SHALL BE COORDINATED NITH THAT OF LANDLORD AND OTHER TENANTS 1. GENERAL ELE(TRIG 5ILPRUF. TO REMOVE OR REPLACE AS REQUIRED ANY AND ALL EXISTING P.V.G. PIPING NITH REQUIRED FOR THE PROJECT HILL BE FURN15HED AND PAID FOR BY THE GENERAL IN THE BUILDING TO 5UGH EXTENT THAT TENANTS INORK HILL NOT INTERFERE V41TH OR INDIGATED TO BE INSTALLED AT A LATER DATE. VERIFY THAT GHARAGTER15TIG5 OF INITH INATER-BA5ED EPDXY IN 24 HOURS. F. PLASTIC, LAMINATE GOUNTER5 AND GA5ENORK: 2. DON CORNING 1q5. LOGAL GODE ALLONABLE MATERIALS THROUGHOUT LEASED PREMISES. GONTRAGTOR AS PART OF THE 13ASE BID. PROTEGTION OF NORK IN PLAGE - NORK DELAY GOMPLETION OF OTHER GON5TRUGTION V40RK IN THE BUILDING. ELEMENTS OF INTERRELATED OPERATION EQUIPMENT ARE COMPATIBLE,COORDINATE 1. AIAL PREMIUM GRADE,TYPE 11. IN PLACE THAT 15 5UBJEGT TO INJURY E3EGAU5E OF OPERATIONS BEING CARRIED ON NORK OF VARIOUS SECTIONS INHIGH HAVE RE5PIILITIES FOR INSTALLING, 1.04 DELIVERY STORAGE AND HANDLING 2. GON5TRUGTION5 STYLE A FLUSH OVERLAY TYPE. 2.03 INGIDENTAL MATERIALS > 15. ALL GONTRAGTOR5 SHALL BE BONDED,LIGEN5ED GONTRAGTOR5 POSSESSING GOOD ADJACENT THERETO SHALL BE GOVERED,BOARDED UP,OR SU65TANTIALLY (98. THE6ENERAL GONTRAGTOR AGREES THAT IN THE PERFORMANGE OF THE NORK CALLED GONNEGTIN& TO AND PLAGIN6 IN SERVICE,5UGH EQUIPMENT. A. DELIVER AND STORE PACKAGED MATERIALS IN OR16INAL GONTAINER5 V41TH SEALS, 5. E06E5 HARDIHOOD A. STAINING CHARAGTER15TIC,5: 00 NOT USE JOINT FILLER,PRIMER OR OTHER MATERIALS LAE30R RELATIONS AND MUST BE GAPAE3LE OF QUALITY NORKMAN5HIP, IN HARMONY ENGL05ED NITH ADEQUATE PROTECTION. ALL FORMS OF PROTEGTION SHALL BE FOR BY TH15 GONTRACT,THEY HILL EMPLOY ONLY 5UGH LABOR AS INILL NOT DELAY OR G. COORDINATE 5PAGE REQUIREMENTS AND INSTALLATION OF MECHANIGAL AND UNBROKEN AND LABELS INTACT UNTIL TIME OF USE.PREVENT DAMAGE OR 4, VENEER: NHIGH NOULD STAIN THE SEALANT AND THE MATERIALS TO NHIGH THEY ARE APPLIED. < NITH OTHER 6ONTRACTOR5 NORKIN6 ON THE PROJEGT. THE TENANT AND TENANTS GON5TRUGTED IN A MANNER 5UGH THAT, UPON COMPLETION, THE ENTIRE NORK HILL INTERFERE V41TH THE PR06RE55 OF THE PROJECT,AND A5 HILL BE AGGEPTABLE TO AND ELEGTRICAL NORK AND FIRE SPRINKLER SYSTEM NHIGH ARE INDIGATED,DETAILED,OR CONTAMINATION OF MATERIALS BY HATER,FREEZINO,FORE16N MATTER OR OTHER a. HORIZONTAL SURFACES: GENERAL PURP05E TYPE,PL MENA LD-3,NOMINAL 0.050" B. GOMPRE55IBLE JOINT FILLER: TAYLOR FOAM,OPEN CELL POLYETHYLENE,OR OTHER ARGHITEGT ARE TO 5ENOTIFIED IN' NRITINO OF TUE NAMES,ADDRESSES,DATIME BE DELIVERED TO THE ONNER IN PROPER,INHOLE, AND UNBLEM15HED GONDITION. ALL NORK IN HARMONY NITH ALL OTHER CONTRACTORS EMPLOYED ON THE CONSTRUCTION IMPLIED DIAGRAMMATICALLY ON ORAININ65. CAUSES. DELIVER,STORE AND PECONDITION MATERIAL ON-51TE AT LEAT24 H U TH I GK GOMPATIBLE RESILIENT MATERIAL. REGOMMENDED BY THE SEALANT MANUFACTURER FOR I I I- I 51TE OR ON ANY OTHER BUILDING,STRUCTURE,OR OTHER !MPROVEMENTINHETHER PUBLIC 51 0 R5 USE IN GONJUNGTION WIM THE SEALANT.00 NOT USE JOINT FILLERS INHIGH ARE 5UE3JEG'rl PHONE, FA�, AND EMERGENCY PHONE NUMBER5 01�"_ALL 5UBGONTRAGTOR5 AND 5UGH NORK SHALL BE COORDINATED NITH THE TENANTS REPRESENTATIVE. THE L_ 0. GOORDNATE ALL REQUIRED TEMPORARY FAGILITIE5 AND ALL TEMPORARY UTILITIES BEFORE NORK BEGINS.PROVIDE HEATED AND DRY STORAGE FAGILITY ON-51TE. b. VERTICAL SURFA(E5: VERTIGAL 5URFAGE TYPE,PL,NEMA LO-5,NOMINAL 0.050" SUPPLIERS NORKIN6 ON TH15 PROJECT. GENERAL GONTRAGTOR MUST ATTEST THAT TENANTS Af:ZCHITEGT 15 NOT RESPONSIBLE FOR JOB 51TE SAFETY OR EX15TIN6 OR PRIVATE INHIGH THE GENERAL CONTRACTOR MAY THEN BE ERECTING OR ALTERING IN IMMEDIATELY AFTER RECEIPT OF NOTICE TO PR06EED FOR USE OF ALL TH05E ENGAGED THIGK. TO DETERIORATION THROUGH GONTAGT V41TH THE SEALANT OR REQUIRED PR[MER5. NO PROOUCT5 CONTAINING A5BE5TO5 OR HAZARDOUS MATERIAL NERE KNOININ&Lr CONDITIONS, AT THE JOB 51TE AND SINGE ALL NORK 15 BY GENERAL GONTRAGTOR OTHER LOGATION5. IN THE PROJEGT. PART 2: PRODUGT5 BASE: 5PEGIFIG PURP05E TYPE, PL NEMA LD-3.NOMINAL 0.125" THICK G. BOND-BREAKER TAPE: HRINKLED OR SMOOTH FAGED MA5QN6 TAPE,OR OTHER USED ON TH15 PROEGT. FOR THE TENANT "FIT-OUT", THEIR REPRESENTATIVES HILL BE REQUIRED TO 00 ALL E. COORDINATE ALL GON5TRUGTION AND SCHEDULING V41TH THE BUILDING MANAGER d. BAGKIN6 SHEET: HIC2H-PRE55URE PAPER-BA5E LAMINATE INITHOUT A DEGORATIVE ADHE51VE FAGED TAPE PRODUGT NHIGH 15 ADAPTA13LE TO INSTALLATION IN THE BOTTOM SUPERVISION,OBSERVATIONS, AND JOB SITE SAFETY. (9 q. GONTRAGTOR 15 TO VERIFY THAT TH15 5PAGE 15 A5E3E5TO5 FREE.NO ASBESTOS HORK 15 REVIENIN6 ALL SCHEDULED AGTIVITIE5 AT OUTSET OF CONSTRUCTION. 2.01 MANUFAGTURER5 FINISH;MINIMUM 0.020 THIGK. OF A 50LIP-5AGKED JOINT FOR THE PURP05E OF BREAKING BOND BETINEEN THE 14. PRIOR TO CGMMENGEMENT OF ANY NORK,THE GENERAL GONTRAGTOR SHALL TO BE COMPLETED BY TH15 GONTRAGTOR UNLE55 5PEGIFIGALL NOTED IN THESE F. ONNER FURNISHED ITEMS A. MAPEI CORPORATION: NORTH AMERICAN HEADGUARTER5,bbb-500-4422, 1144 EAST e. CABINET LINER. LON-PRE55URE POLYESTER OVERLAY;MINIMUM 0.020" THIGK AT SEALANT AND THE BACK OF THE JOINT. CONTACT AND MEET NITH LANDLORDS TENANT C 45. THE STRUGTURAL SYSTEM OF THE BUILDING HAS BEEN DESIGNED TO GARRY A GONTRAGT DOGUMENT5. IF A5BE5TO5 15 UNCOVERED,NOTIFY THE TENANT-5 0. PRIMERS: AS REGOMMENDED BY THE SEALANT MANUFACTURER FOR USE IN GONJUNCTION ,OOROINATOR AND TENANTS 1. OINNER FURN15HED ITEMS TO BE INSTALLED BY THE GENERAL CONTRACTOR SHALL NENPORT CENTER DRIVE,DEERFIELD BEACH,FL 53442 GONTRACTORS OPTION USE DORTRON ACRYLIC,COATED PANELS AS MAXIMUM LIVE LOAD AS SPECIFIED IN THE LANDLORDS GRITERIA,AND THE REPRESENTATIVE IMMEDIATELY AND STOP ALL HORK.LANDLORD 15 RESPONSIBLE FOR NITH THE SEALANT FOR APPLIGATION ONTO THE VARIOUS TYPES OF MATERIALS TO HHIG PROJECT MANAGEMENT REPRESENTATIVE FOR A PREGON5TRUGTION MEETING, AT BE AS 5PEGIFIED UNDER THE RESPONSIBILITY SCHEDULE L15TED ON THE TITLE SHEET MANUFAGTUREO BY INILLAMETTE INDUSTRIES.GOLOR AS 5ELEGTED BY ARC HITEGT. NHIGH TIME, HE /5HE HILL PRESENT TO ALL PARTIES A L15T OF NAMES, ADDRESSES, LANDLORDS OR TENANTS GENERAL GONTRAGTOR AND /OR THEIR 5UBGONTRAGTOR ALL ASBESTOS TESTING,FILING AND REMOVAL. AND ANY OTHER SHEET INCLUDED IN THE SET OF THESE GONSTRUGTION DOCUMENTS. 2.02 MATEpIALB f. INTERIOR OF CABINET DOORS: CABINET LINER MINIMUM 0,020"THICK. COLOR AS THE SEALANT 15 APPLIED. HHEN THE MANUFAC TURERS IN5TRUGTION5 MAKE REFERENGE BUSINESS PHONE,FAX AND EMERGENCY TELEPHONE NUMBERS OF THE AND / OR ANY AND ALL MATERIAL SUPPLY HANDLERS NOT TO IMP05E ANY LOADING 10. ALL NORK TO BE GOMPLETED FOLLONIN6 LANOLORD5 GON5TRUGTION "RULE5 AND 2. THE GENERAL GONTRAGTOR SHALL A55UME RESPONSIBILITY FOR THE ONNER5 A. SELF LEVELING,NEAR-RATED,5ELF-ORYIN6 CONCRETE TOPPING SHALL BE NOVO-TOP 5ELEGTED BY ARGHITEGT. TO USE OF PRIMERS OR 5PEGIAL SURFACE PREPARATIONS,COMPLY NITH THESE 5Uf3GONTRACTOR5 FOR TH15 PROJECT. THE GENERAL GONTRACTOR HILL COMPLETE FOR ANY OF THE TENANTS NORK ON A TEMPORARY OR PERMANENT BA515 INHIGH REGULATIONS", IF APPLICABLE.THE GENERAL GONTRAGTOR 15 RESPONSIBLE DURING THE FURN15HED ITEMS,DISTRIBUTION TO ITS PROPER LOGATION,AND ALLOCATION TO GRAY. HAROBOARD: TEMPERED GRADE,PRESSED HOOP FIBER V41TH BINDER,SMOOTH INSTRUCTIONS.GLEANER5,INHERE REQUIRED BY MANUFAGTURER'5 IN5TRUGTION5 IN LIEU OF GAN EXCEED SUCH 5PEGIFIED LOAD. PRIMER5,51HALL BE OF THE TYPE AND KIND RECOMMENDED BY THE MANUFACTURER. THE GHEG<Ll5T FORM (GONTRAGTOR INFORMATION FORM) REQUIRED FOR EAGH TRADE, PROTECTION AND SETTING IN PLAGE, AND A55UME THE COST OF HANDLING IF 13. PRIMER FOR STANDARD ABSORBENT GONGRETE 5UB-FLOOR55HALL BE NOVO PRIME. SURFACE. TENANTS SPAGE THAT CONTRACTOR HILL BE NORKIN6 ON AS REQUIRED UNDER BIDDING PROCEDURES,FOR CONTACTING THE LANDLORDS REPRESENTATIVE FOR A GOPY GLAIMED BY ANY OF H15/HER5 CONTRACTORS HAVING JURISDICTION. G. PRIMER FOR NON-A55ORE3ENT SURFAGE5 SHALL BE EPO-PRIME AS APPROVED 13Y h. ADHESIVE. CONTACT TYPE,F5 MM-A-130;AS APPROVED 13Y AINL TO SUIT E. LEAD NOOL. FINE GAUGE 5TRAND5 OF LEAD ADAPTABLE TO PAGKIN6 IN REC7LET TO 46. ANY ALTERATIONSI ADDITIONS, DRILLING,NELDIN6 OR OTHER ATTAGHMENT OR OF THESE "RULE5 AND REGULATIONS" AND TO INGLUDE ANY COSTS IN THE NORK QUOTED FORM ANCHORAGE FOR SHEET METAL EXTENDED INTO RE6LET. LEASE OBLIGATION. THE GHE6KLI5T FORM INGLUOIN6 5GHEDULE INFORMATION AS THE GENERAL GONTRAGTOR SHALL COORDINATE THE NORK OF ALL SECTIONS FOR THE MANUFACTURER. GONTAGT MANUFAGTURER FOR ADDITIONAL INFORMATION. APPLIGATION. PROVIDE NON-P16MENTED APHE51VE NITH SOLIO-COLOR TYPE NELL AS GENERAL GONTRAGTOR AND 5UBGONTRACTOR5 INFORMATION 15 TO BE REINFORGEMENT5 TO LANDLORDS 5TRU6TURE TO AGGOMMODATE TENANT5 NORK TO THE LANDLORD. INSTALLATION OF THE ONNER FURN15HED ITEMS. P. DEEP TOPPIN&PLAGEMENT(2" TO 575IMM TO 121MM) OVER LARGE AREAS MAY REQUIRE PLASTIC, LAMINATES. F. PREFORMED GOMPRE551BLE JOINT FILLERi STANDARD 13RAND GONFORMIN67 TO A5TM PATE: No. RF-\/1510NS B*,(: SUBMITTED TO THE LANDLORDS REPRESENTATIVE UPON ARRIVAL AT THE JOB SITE. SHALL NOT BE PERFORMED NITHOUT, IN EAGH INSTANCE,GENERAL GONTRA6TOR P1152,TYPE 11 OR 11,OR HOMEX EXPAN51ON JOINT. MANUFACTURED BY HOMA50TE GO. OBTAININC 11. GENERAL GONTRAGTOR AGREES THAT IN THE PERFORMANGE OF TENANITS NOR<AT THE MULTIPLE LIFTS OR THE ADDITION OF NELL-6RADED,ROUND,HASHED AND DRIED (55D) 1. ANGHOR5,NAILS AND 5GRENS: SELECT MATERIAL,TYPE,51ZE AND FINISH ? LANDLORDS PRIOR INRITTEN APPROVAL, AND TH15 GONTRAGTOR SHALL ARTICLE I - 51TE REOUIREMENT5 REQUIRED BY EAGH 5UB5TRATE FOR SECURE ANGHORA6E;PROVIDE TOOTHED 15. NHEN BIODINC7 TH15 PROJECT, EAGH CONTRACTOR SHALL BE RESPONSIBLE FOR LEAVE LANDLORDS 5TRUGTURE AS STRONG AS, OR 5TRONC-7ER THAN, THE ORIC71NAL PREMISES, ALL V40RK SHALL BE PERFORMED IN A MANNER INHIGH HILL NOT CREATE ANY A. GENERAL: GONTRAGTOR SHALL AT ALL TIMES GONDUGT ITS OPERATIONS TO ENSURE THE PEA-&RAVEL (SIZED - 1/5' TO 3/8V 3.2MM TO qhMM). CONTACT MANUFAGTURER FOR PART 3 - EXECUTION V151TINC-7 THE 51TE PRIOR TO BIDDING AND VERIFYINC DESIGN AND NITH FINISHES, UNIMPAIRED. ONLY UTILIZE LANDLORDS DESIGNATED NORK STOPPAGE,PICKETING,LABOR P15RUPTION OR P15PUTE OR VIOLATE LANDLORDS ADDITIONAL INFORMATION. STEEL OR LEAD EXPAN51ON E30LT 5GREN5 FOR PRILLED-IN-PLAGE ANCHORS. 7 EXISTING GONDITION5 AS ROOFING CONTRACTOR FOR ALL ROOF PENETRATIONS, FLA5HINGAND C LABOR GONTRAGT5 AFFEGTIN6 THE BUILDING OR INTERFERE INITH THE BU51NE55 OF LEAST INGONVENIENGE TO THE GENERAL PUBLIG AND COMPLY INITH APPLICABLE CODES E, HATER SHALL BE GLEAN,POTABLE,AND 5UFFIGIENTLY COOL j. NOOD FILLER: FILLER COMPATIBLE V41TH FIN15H 5Y5TEM 5PEGIFIED, GOLOR TO z REFLEGTEP IN THESE GONTRAGT DOGUMENT5. ANY EXTRA NOR< REQUIRED BUT NOT OUNTER LANDLORD. IN THE EVENT OF THE 0(GURRENGE OF ANY NORK STOPPAGE,PIGKETINC-2, AND ORDINANGE5 FOR SAFETY. INHERE STANDARDS GONFLIGT,THE HIGHER RATING/ MATCH NOOD BEING USED. 3.01 PREPARATION STORE #: 266(b INGLUDED IN THE DOC FLASHING. UMENT5 SHALL BE REPORTED TO THE TENANT OR TENANT,5 GREATER QUANTITY/MORE STRINGENT REQUIREMENT SHALL GOVERN. LIMIT USE OF k. ALL NOOONORK PROVIDED UNDER TH15 SECTION SHALL GOMPLY HITH CLASS I A. GUT OUT DEFECTIVE EXISTING SEALANTS AND EX15TINC75EALANT5 NOT GOMPLYIN6 V41TH ARCHITECT IMMEDIATELY. LANDLORD DOES NOT PAY ANY GOST5 FOR JOB LABOR 015RUPTION OR 015PUTE RESULTING FROM AGTION5 OR OMISSIONS OF GENERAL PREM15E5 FOR CONSTRUCTION AND STORAGE TO AREAS DESIGNATED IN HRITING BY THE PART 3- EXEGUTION MANUFAGTURERS REGOMMENDATION FOR THIGKNE55, INCLUDING EX15TINGBACKIN6. GONDITION SITUATIONS,UNLE55 5FEGIFIGALL--� NOTED IN THE LEASE. 41. SPRINKLER SYSTEM DESIGN AND/OR LAYOUT MODIFIGATION,(IF APPLICABLE) TO GONTRAGTOR OR 5UBGONTRAGTOR5 OR ANY 5UBTENANT OR GONOE5510NAIRE,OR THEIR BUILDING ONNER. ALLON FOR NORK BY OTHER GONTRAGTOR5 ANDPUBLIG AGGE55 FIRE RATING HHEN TESTED IN AGGORDANGE HITH A5TM Eb4. PROVIDE FIRE GLEAN METALS AT JOINTS NITH SOLVENTS AS REQUIRED TO PRODUGE AE35OLUTELY BE PROVIDED BY THE DESIGNATED SPRINKLER 5UBGONTRAGTOR AND ALL RESPECTIVE EMPLOYEES,GONTRACTOR5 OR 5UE3GONTRAGTOR5,GENERAL GONTRAGTOR 3.01 PREPARATION RETARDANT TREATMENT FOR ALL HOOD PROOUGT5. PROVIDE FIRE RETARDANT GLEAN SUBSTRATES. INHERE NEIN SEALANT 15 TO ADJOIN,NITH REMAINING GUT ED GE5 OF < SUBMISSIONS TO THE FIRE MARSHALL AND BUILOINO IN5PEGTOR FOR THE NEGE55ARY SHALL, IMMEDIATELY UPON NOTIGE FROM TENANT,CEASE THE CONDUCT GIVING RISE TO INHERE APPLIGABLE. THE GONTRAGTOR SHALL 60ORDINATE AGGE55 TO THE SITE, A. IN ADDITION TO THE GENERAL PROGEDURE5 DESCRIBED HEREIN,REFER TO LABEL5 ON ALL PRODUGT5. EXISTING CURED SEALANT NITH ME<. MENS 16. IF THE LANDLORD, LANOLOR05 REPRESENTATIVE OR LANOLORD5 ARGHITE(T, TOR. 6ENERAL DELIVERY AND STORAGE OF MATERIALS,PARKING AND HOWIN&HOUR5 V41TH THE TENANT, TENANT-5 REPRESENTATIVE OR TENANTS ARGHITEGT DO NOT MAKE APPROVAL ARE THE RESPONSIBILITY OF THE SPRINKLER 5UBCONTRAC 5UGH CONDITION.TH15 CLAUSE MUST BE PART OF ALL GENERAL GONTRAGTOR BUILDING ONNERS REPRESENTATIVE. A55UME FULL RESPONSIBILITY FOR THE MANUFAGTURERS CURRENT PUBLISHED PRODUGT LITERATURE FOP,COMPLETE 5URFAGE 2.02 GA5EINORK HARDINARE WEARHOUSE REPEATED 51TE VISIT5 CONTINUALL OR AT ALL, THE GENERAL r GONTRAGTOR TO VERIFY NITH THE LANDLORD OR LANDLORDS CRITERIA IF 5UBGONTRAGTOR AGREEMENTS AND IF 5UGH GLAU5E 15 NOT INGLUDED, IT VqILL NOT PREPARATION,PRIMIN6AND INSTALLATION DETAILS FOR THE TOPPING 5Y5TEMBEI N6-7 ONTR.AGTOR 15 NOT PROTEGTION AND 5AFEKEEPINC70F PRODUCTS UNDER TH15 GONTRAGT,STORED ON THE A. PROVIDE GA5EINORK HARONARE ITEMS AS REQUIRED FOR A COMPLETE INSTALLATION 3.02 APPLIGATION RELIEVED OF ANY RESPONSIBILITY OR DUTIES INVOLVED IN TH15 GON57RUGTION SPRINKLER CONTRACTOR 15 TO BE LANDLORDS APPROVED OR DESIGNATED RELIEVE THE GENERAL GONTRAGTOR OF THE REQUIREMENTS OR NORK 5TATED HEREIN. SITE. COORDINATE AGGE55 TO BUILDING NITH BUILDING ONNER AND PROVIDE FOP, INSTALLED. AS INDICATED. PROVIDE TYPES AS NOTED ON PRAININ65. A. AGGURATELY P051TION JOINT FILLER NITHIN THE JOINT TO ESTABLISH AND GONTROL THE NOR<. GONTRAGTOR. SPRINKLER HEAD SPACING TO GONFORM NITH THE LATEST N.F.P.A. B. ALL GONCRETE 5UB-FLOOR5 MUST BE STRUCTURALLY SOUND,STABLE,SOLID,GLEAN,DRY, 12. THE TENANT'5 GONTRAGTOR,AT THE POINT OF "SUBSTANTIAL COMPLETION" AV 5EGURITY AS REQUIRED. INORK AREAS SHALL REMAIN 5EGURE AND LOCKABLE. AT FREE OF DUST,OIL,NAX,GREASE,ASPHALT, PAINT,LATEX COMPOUNDS,CURING AND UNIFORM DE516NATED THIGKNE55 OF SEALANT.EXERG15E CARE IN THE INSTALLATION OF 5TANDARD5 (PAMPHLET 13) AND ALL CODES HAVING JURISOIGTION. SPRINKLER HEAD "TURNOVER" OF PREM15E5 TO TENANT,MUST GOMPLETE,AT GENERAL GONTRAGTOR-5 G05T COMPLETION OF THE PROJEGT,AND AS A GONDITION OF ONNER AGGEPTANGE,REMOVE SEALING COMPOUNDS AND ANY CONTAMINANT NH16H GOULD AGT AS A E30ND BREAKER. 2.03 MILLNOR<FABRIGATION. JOINT BACKING TO SEE THAT THE BAGKIN67 15 NOT 5ET TOO FAR BELON SURFACE, LOCATION: IT THE GENERAL GONTRAGTOR SHALL COMPLY AND CONFORM TO ALL OF THE BRANGH LINES, DROPS AND HEADS ARE THE RESPONSIBILITY OF THE SPRINKLER -2 ININOON5 HASHED. A. FABRIGATE GABINETNOR<AND ARGHITEGTURAL V4000HORK ITEMS IN AGGOROANGE NITH ALL REFUSE,GLEAN ALL 5URFACE5 IN APPROVED MANNER INGLUDINC THEREBY INCREASING THE DEPTH OF THE SEALANT. ,ACTOR AND THE DESIGN MUST BE BASED ON FLOOR LAYOUT AND REQUIREMENTS OF THE OGGUPATIONAL SAFETY AND HEALTH AGT(05HA),NO 5UBGONTF AND EXPENSE(FINAL PAYMENT CANNOT BE REQUESTED TO TENANT BY TH15GENERAL B. LANDLORD CRITERIA.- THE CONTRACTOR 15 TO OBTAIN THE LANDLORDS M05T REGENT MEGHANIGALLY GLEAN THE 5URFAGE BY SHOT.BLA5TIN(5,5GARIFYIN6 OR OTHER REGOMMENDATION5 OF THE FOLLONIN6 ANI REFERENGED STANDARDS.NHEN B. APPLY MATERIAL HITH 5UFFIGIENT PRE55URE TO COMPLETELY FILL THE VOID 5PAGE AND EXCEPTIONS HILL BE PERMITTED. THE PROVISION5 OF THE TENANT'5 LEASE SHALL REFLECTED GEILINIG PLANS. APPROVALS BY LANDLORD, LANDLORDS IN5URANGE GONTRAGTOR UNLE55 ALL OF TH15 NORK NOTED 15 COMPLETED): TENANT DESIGN AND CONSTRUCTION 6UIDELINE5 AND ALL 5UB5EOUENT REVISIONS AND MEGHANIGAL MEANS. NEGE55ARY TO GUT AND FIT ON SITE,MAKE MATERIAL HITH AMPLE ALLOINANGE FOR TO A55URE COMPLETE NETTING OF THE GONTAGT AREA TO OBTAIN UNIFORM ADHESION. lroq40 5YI -12ND AVENUE ,AUI OF ACTION OR UNI;)ERNR)TER AND THE BUILDING IN5PEGTOR AND FIRE MARSHALL INILL BE REQUIRED, DURING APPLICATION,DEEP TIP OF NOZZLE AT L30TTOM OF JOINT,FORCING SEALANT TO APPLY IN THE EVENT OF VIOLATION RESULTING, IN DAMAGES,r G. PRIMING: PRIMER FOR STANDARD ABSORBENT GONGRETE SUB FLOORS. 1. PRIME HITH ANY GLAIMS ARISING THEREFROM, IF GENERAL GONTRAGTOR AND /OR ITS A) FINAL IN5PEGTION5 BY ALL BODIES HAVING JUR15DIGTION NEGE55ARY FOR FINAL INGLUDE ALL NOTED REQUIREMENTS AS APPLIGABLE. IN THE EVENT OF DISCREPANCIES MAPEI NOVO-PRIME. TOPPING SHALL BE APPLIED UNTIL PRIMER 15 ALLOINED TO DRY TO GUTTIN6. PROVIDE TRIM FOR 5GRIBIN6 AND 51TE GUTTING. BRIM5EFORT RETAIL BETNEEN THE GONTRACT DOGUMENT5 AND THE LANOLORD,5 GfziTERIA,THE MORE 1. TRANSPARENT FINISHED ]NORK: PREMIUM GRADE. FILL FROM 130TTOM TO TOP. MOVE TIP ALONG JOINT TO COMPLETELY FILL THE JOINT. 5UE3GONTRAGTOR5 DO NOT COMPLY INITH TH15 ACT. 4b. THE MEGHANIGAL 5UBCONTRAGTOR 15 RESPONSIBLE FOR VISITING THE 51TE PRIOR TO COMPLETION,GERTIFIGATE OF OGGUPANGY OR GOMPLETION,INHIGHEVER 15 A GLEAR THIN FILM(MINIMUM 2 HOURS AND MAXIMUM 16 HOUR5). PRIMER MUST BE KEPT 7RAVE. FIN15H JOINTS SMOOTH FLUSH INITH ADJACENT 5URFAGE UNLE55 DETAILED OTHERIN15E. SUBMITTING A 510 FOR THE NORK ON TH15 PROJECT. THE GONTRAGTOR MUST APPLICABLE. STRINGENT REQUIREMENTS SHALL GOVERN. GLEAN AND FREE FROM CONTAMINATION. 2. PLA5TIG LAMINATE FIN15HED HORK.- PREMIUM 6 G. PERFORM JOINT PREPARATION, INCLUDING GLEANING AND PRIMING, IN AGGORD V41TH CENTER G. THE 6.G. SHALL MEET NITH AN AUTHORIZED REPRESENTATIVE OF THE LANDLORD AND B. APPLY PLASTIC, LAMINATE FIN15H IN FULL UNINTERRUPTED SHEETS GON515TENT NITH 13. THE GENERAL CONDITIONS OF THE "CONTRACT FOR GON5TRUGTION" DOGUMENT A-201, BECOME FAMILIARIZED INITH THE FIELD GONDITION5, AND THE 5GOPE OF HORK. SHALL REVIEN LANDLORD GON5TRUGTION.REQUIRE-MENT5. 6.G.SHALL COORDINATE ITS MANUFAGTURED SIZES. CORNERS AND JOINTS SHALL BE HAIRLINE, SLIGHTLY BEVEL MANUFAGTURER'5 IN5TRUGTION5.NHEN 5OLVENT5 ARE U5ED,HIPE THE D155OLVED TI&ARD, OR ISSUED BY THE AMERICAN INSTITUTE OF ARGHITEGT5, LATEST EDITION, RELATES TO GONTRAGTOR TO EN,51NEER (UNLESS A FIRE ALARM ORANIN6 15 SUBMITTED AS A B) THE GENERAL GONTRAGTOR TO FINALIZE ALL APPLIGABLE LANDLORD AND TENANT NORK INITH THE LANDLORD INITH REGARD TO TEMPORARY UTILITIES,ALLONABLE 3.02 INSTALLATION ARISES.INHERE APPLIGABLE,LOCATE COUNTER BUTT JOINTS AT LEAST 2'FROM GUT-OUT5. CONTAMINANT AND SOLVENT FROM THE SURFACE. THE NORK OF TH15 PROJECT AND 15 HEREBY MADE A PART OF THESE GONTRAGT PART OF THESE GONTRAGT OOGUMENT5),FURN15H AND INSTALL ANY /ALL REQUIRED PUNGH LISTS AND/OR REQUIREMENTS,PAY ALL APPLICABLE LANDLORD AND /OR MATERIAL,TRAFFIC ROUTES,STORAGE OF TOOLS AND MATERIALS,USE OF TOILET A. INSTALL TOPPING IN ACCORDANCE HITH MANUFAGTURER CURRENT PUBLISHED IN5TRUGTION5 APPLY LAMINATE BAGKINO SHEET TO REVERSE 51DE OF PLASTIC, LAMINATE FIN15HED 1). INSTALL BOND-BREAKER TAPE TO PREVENT BONDING OF THE SEALANT HITH THE DOCUMENTS AS THOUGH FULLY CONTAINED IN THESE GONTRAGT DOGUMENT5. FIRE ALARM, SMOKE EVAGUATION,SMOKE DETEGTION SYSTEMS, INGLUDIN6 ANY /ALL TENANT GHAR6E5 ALLOCATED TO T14E 5AT15FAGTION OF BOTH THE LANDLORD AND FAGILITIE5, HOURS IN NHIGH NORK 15 ALLOINED,N015E AND DUST CONTROL,GLEAN-UP INSTALLATION TO BE DONE BY INSTALLER CERTIFIED BY THE MANUFAGTURER,USING MIXING SURFACES. APPLY PLASTIC LAMINATE TO ALL PLASTIC LAMINATE GABINET BASES; BACKING OR BOTTOM OF THE JOINT. PROJECT NO. VIRAYiN BY: PARTS, AND LAE30R (OR MODIFY EXISTING AS REQUIRED), TO MEET LOGAL GOOE5, THE TENANT. AND OTHER MATTERS REGUIRIN6ADHERENGE TO LANDLORD REQUIREMENTS INHEN AND INSTALLATION METH005 AS 5PEGIFIED 13Y THE MANUFAGTURER. INSTALL EXPAN51ON SCRIBE PLASTIC, LAMINATE BASE TO FIT TIGHTLY AGAINST FLOOR FINISH. CAP EXPOSED E. 00 NOT ALLON SEALANTS TO REMAIN ON EXP05ED 5URFAGE5.REMOVE ALL 130364 O.R. Icl. THE GENERAL GONTRAGTOR5 AND ALL 5UBGONTRAGTOR5 SHALL BE RESPONSIBLE LANDLORD REQUIREMENTS, AND FIRE MARSHAL 51PEGIFIGATION, HHETHER 5UGH NORK AND CONTROL JOINTS IN AGGORDANGE NITH TGA METHOD EJIII. RECOMMENDATIONS. FOR OBTAINING THE NEGE55ARY NUMBER OF GOPIE5 OF DOGUMENT A-201,TO 15 OR 15 NOT 5HONN IN THE GON15TRUGTION OOGUMENT5. IF A SMOKE EVACUATION G) FINALIZE CHANGES ON PLANS AND 5PEGIFIGATION5 AND MARK ALL APPROVED APPLIGABLE. PLASTIC, LAMINATE EDGES INITH MATERIAL OF SAME FIN15H AND PATTERN,OR SPECIFIED 50ALF-: CHEOKED BY: 0. 015CREPANGIE5 OR UNFORESEEN GIRGUM5TANGE5 FOUND DURING GON5TRUGTION ARE TO TRIM AS DIRECTED OR INDIGATED.MEGHANIGALLY FASTEN f3AGK5PLA5H TO BECOME ACGUAINTED INITH THE ARTIGLE5 CONTAINED THEREIN AND TO REVIEN NITH AND / OR DETECTION SYSTEM OGGUR5 FOR TH15 5PAGE, IT SHALL BE LEFT INTACT LANDLORD,BUILDING DEPARTMENT,FIRE MARSHALL ANI? TENANT GHAN6ES ON A SET 3.03 FIELD QUALITY CONTROL END OF SECTION -011 BE IMMEDIATELY BROUGHT TO THE ATTENTION OF.THE ONNER AND ARGHITEGT IN NRITIN6 r ALL 5UE3GONTRAGTOR5, SUPPLIERS AND ANY OTHER PARTIES TO THE GONTRAGT OR DURIN6 GON5TRUIGTION AND ANY NEN NORK,MODIFIGATION AND P OF PRINTS FOR BOTH TENANT AND TENANTS ARGHITEGT AND FORNARD 5UGH - A. SURFACE SHALL BE TRUE TO PLANE Y41THIN 1/4" MAXIMUM GAP UNDER A TRAI HT EDGE IN- GOUNTERTOP5 NITH STEEL BRAGKET5 AT 16" ON GENTER. 1/4 = 1 J.P.A. INDIVIDUALS OR A6ENGIE5 EN6A6ED ON THE NOR< AS TO ITS GONTENT5. ENIRING TO BE INFORMATION TO BOTH PARTIES VIA OVER NIGHT DELIVERY. MARK SHALL 13E 6.G. TO SUBMIT TO THE ARGHITEGT SKETCHES HITH NOTES AND DIMENSIONS OR NOTATED ANY DIRECTION IN AGGORDANGE HITH AGI 302.1 R-bq.FLATNE55 TOLERANCE. G. SEAL GONGEALED AND 5EMI-GONGEALED HOOD 5URFAGE5.BRUSH APPLY ONLY,U51NO THME DiRMIN5 M-RZ GOMPLETED DURING CON5TRUGTION PHASE TO POINT OF NEN PANELS. IF SMOKE COPIES OF THE GON5TRUGTION DRAMIN6 IN PART OR IN HHOLE TO A5515T IN CLARIFYING LACQUER OR VARNISH. PRIME PAINT 5URFAGE5 TO BE IN GONTAGT V41TH GEMENTITIOU5 DATE: COMPLETW UNVM THE OETEGTORS, ARE REOUIRED TO BE HARD HIRED TO LANDLORD FIRE ALARM SYSTEM, GOMPLETED U5IN6A GLOUP PROGEOURE NITH A RED FELT TIP PEN TO EA51LY ISSUES TO BE RESOLVED. MATERIAL,USING CLEAR MATERIAL ON MEMBERS HAVING TRANSPARENT FINISHES. SEGTION 05111 -F R R EXTRA THEY ARE TO BE PER LANDLORDS SYSTEM . GONTRAGTOR TO GONTAGT LANDLORD DISTINGUISH CHANGES FROM ORIC71NAL NORK. NJT 20. THE TENANTS ARCHITEGT,NITHOUT INVALIOATIN6 THE GONT ACT, MAY OROE END OF 5EGTION 0. PROVIDE CUTOUTS FOR PLUMBING FIXTURES, INSERTS,APPLIANGE5,OUTLET BOXES,AND KN0GK-E)0hN STEEL DOOR FRAMES 0-7/1:2/13 vIRzc.T 5uf -IzvI5I0t4 of:: NORK,ALTER,ADD TO,OR DEDUCT FROM THE GONTRAGT INORK, IF THE INTENT 15 TO OR APPROVED A6ENT5 FOR PURGHA5E AND INSTALLATION OF OETEGTOR5 AT O.G. ARTIGLE ,5 - GENERAL STANDARDS- OTHER FIXTURES AND FITTINGS. VERIFY LOGATION5 OF GUTOUT5 FROM ON-51TE ADHERE TO A PREVIOUSLY AGREED UPON DE516N NITHOUT ANY G05T TO TENANT, ITS EXPENSE. O.G. AND /OR ITS FIRE ALARM 5UBGONTRAGTOR TO GONTAGT LANDLORD D) PREPARE AN OPERATING PROGEOURE FOR STORE MANAGEMENT FOR MEGHANIGAL CONGRETE UNLE55 OTHERN15E NOTED,APPLY THE FOLLOININ6 TOLERANGE5 TO ALL NORK: DIMENSIONS. PRIME PAINT CONTACT 5URFAGE5 OF CUTOUTS,USING CLEAR MATERIAL ON AGENTS OR TENANTS ARCHITEGT. FOR FINAL POINT OF GONNEGTION TO LANDLORDS FIRE ALARM JUNCTION BOX AND EQUIPMENT AND GHAN6E FILTERS FOR EQUIPMENT,ON DAY OF TURNOVER, IF A. ALL VERTIGAL 5URFAGE5 SHALL BE PLUMB OR GON5TRUGTEI?TO THE EXAGT SLOPES OR MEMBERS HAVING TRANSPARENT FINISHES. PART I GENERAL NICHOLAS J. TRICAR100 PERFORM NORK. AT GONTRAGTORS EXPENSE. APPLICABLE. ANGLES INDIGATED. 2.4 RELATED MATERIALS E. SHOP A55EMBLE GABINETINOR<AND ARGHITEGTURAL NOOONORK FOR DELIVERY TO CT 21. NO TENANT EXTRAS FOR GOST5 CAN BE AUTHORIZED UNLE55 APPROVED IN INRITING B. THE MAXIMUM DEVIATION FROM THE TRUE PLANE FOR VERTICAL AND HORIZONTAL A. EXPAN51ON AND 150LATION-JOINT-FILLER STRIPS: A5TM 0 1151,A5PHALT-5ATURATED 51TE IN 51ZE5 EA51LY HANDLED AND TO ENSURE PASSAGE THROUGH BUILDING OPENINGS. 1.01 NORK INCLUDED ARCHITE BY THE TENANT ARGHITEGT, THE TENANTS CON5TRUGTION REPRESENTATIVE OR THE 4(l. THE GENERAL GONTRAGTOR HILL FURN15H AND INSTALL A GOMPLETE MECHANIGAL E) PAY IN FULL ALL MATERIAL 5UPPLIER5 AND FIXTURE CONTRACTORS THAT TENANT 5URFAGE5 SHALL NOT BE GREATER THAN Ilb" IN 10"-0" AS MEASURED BIT, A 10"-0" GELLUL05IG FIBER. F. REVEALS GUT INTO HARDHOOD VENEERS SHALL BE BACKED BY SOLID HARDVqOOD 50 A. RATED AND NON-RATEO ADJUSTABLE OR 5IN6LE PIECE FACTORY PRIMED FIN15H TENANT. ANY 155UANGE OF GREDIT5 TO BE GALIGULATED BASED ON COMPETITIVE SYSTEM TO INGLUDE BUT NOT BE LIMITED TO MEGHANIGAL EQUIPMENT, INSTALLED PREVIOUSLY SELECTED OR INHO MAY BE SPECIFIED ON THESE CONTRACT DOGUMENT5 5TRA16HT EDGE PLAGED ANYINHERE ON THE 5URFAGE. 13. GRAGK,5PALL AND JOINT FILLER: EJF-100, FLORIC, POLYTEGH(c[O�) 453-1510 NO GORE MATERIALS ARE EXPOSED. INTERIOR USE 5TEEL ROLL-FORM OR BRAKE FRAMES FOR STEEL AND HOOD DOORS. ,ONNEGT AND HIRING, HANGERS AND DUNNAGE FOR SAME NITH REQUE5T5 FOR NARRANTIE5 GATHERED,FOR TURNOVER TO TENANT FOR RATES AND EQUIPMENT G05T5 APPROVED 13"r THE ARGHITEGT AND THE TENANT'S AND MOUNTED INITH DISC G. ALL HORIZONTAL 5URFAGE5 SHALL BE LEVEL OR GON5TRUGTED TO THE EXAGT ANGLE G. GRAGK AND JOINT FILLER FOR MOVING GRAGK5 AND EXPAN51ON JOINT5:EJF-200 OR 6. ALL VENEER FAGE5 SHALL BE BLUE 5PLIGED;5TITGHED FAGE5 HILL NOT BE HEDULED HARDNARE. TRICARICO ARCHITEOTURE 4.) C,ON5TRUC,TION REPRESENTATIVE FOR THE TENANT. (INGLUDIN& THE HIRIN6 OF A LOCAL 5TRUGTURAL ENC71NEER TO DESIGN SUCH REGORD PURPOSES. INDICATED OR INTENDED. EJF-300 (CONSULT MANUFACTURER BEFORE USE),FLORIG POLYTEGH(cl0q) 4&3-1810 AGGEPTABLE. ANP VE516N PC DUNNAGE HANOERS), DUGTNORK,COLLARS, DIFFUSERS,REGISTERS,GONTROL5, TIME 0. NALL AND SOFFIT INTERSECTIONS SHALL BE qO OE6REE5 OR THE EXAGT ANGLE 0. BONDING AGENT- A5TM G 105cl,TYPE 11,NON-REO15PER515LE,ACRYLIC,EMUL51ON OR H. ALL EXPOSED PLYNOOD EDGES SHALL 13E EDGE BANDED TO MATCH FAGE VENEER 1.02 QUALITY STANDARDS 22. THE GENERAL GONTRACTOR SHALL HAVE AT ALL TIMES,AT THE PREMISES, GLOGK5,ETC., NHETHER OR NOT SUGH NORK 15 OR 15 NOT 5HOHN OR DELINEATED IN F) TURN OVER ALL KEYS TO STORE MANAGEMENT. INDICATED OR INTENDED. STYRENE BUTADIENE. A. TO MEET INDUSTRY STANDARDS FOR KNOGK-DONN STEEL FRAMES. D GONTRAGT POGUMENT5, BUILDING DEPARTMENT AND HEALTH THE GONTRAGT OOGUMENT5. GENERAL.GONTRAGTOR'5 MEGHANIGAL CIONTPIAGTOR(5) E. ALL GORNER5 AND EDGES SHALL BE 5TRAIC-7HT AND TRUE NITHOUT DENTS,HAVES,OR E. EPDXY BONDING ADHESIVES: A57-M G bbl,TNO-GOMPONENT EPDXY RESIN,CAPABLE OF 2.04 FIN15HE5 DEPARTMENT(IF APPLICABLE) APPROVED PERMIT DRANIN65. -73. GUARANTEES FOR ALL HORK BY 5U5GONTRAGTOR5 SHALL BE FOP,A PERIOD OF ONE HUMID GURIN6 AND BONDING TO DAMP 5URFAGE5,OF GLA55 SUITABLE FOP,APPLIGATION B. UNDERNRITER51-ABORATORIE5 ING. (UL) OR FAGTORY MUTUAL(FM) STANDARDS AS ARE REQUIRED TO GOORDINATE NITH ALL OTHER GONTRAGTOR5 ON JOB TO BULGES,OR OTHER BLEMISHES. A. FINISHES SHALL GONFORM TO ARGHITEGTS GONTROL SAMPLES. APPLIGABLE TO FIRE RATED 50LID GORE V4009 DOORS AND KNOGK-DOINN ROLL-FORM YEAR,FROM THE DATE OF COMPLETION OR THE FINAL "SIGNED OFF" PUNCH L15T ITEMS TEMPERATURE AND OF GRDE TO SUIT REQUIREMENTS,AND A5 FOLLOH5: 23. THE GENERAL GONTRAGTOR 15 TO ARRANGE V41TH THE LANDLORD FOR THE BUILDING, MAINTAIN TENANTS GEILIN67 HEIGHT,LIGHT FIXTURE LOGATION,SPRINKLER BRANGH UNLE55 OTHERIN15E NOTED.AT THE TIME OF FINAL SUBMITTAL FOR ALL COSTS BY THE F. ALL JOINT55HALL BE TIGHT,STRAIGHT,EVEN AND SMOOTH. 1. TYPES IV AND V,LOAD BEARING,FOR BONDING HARDENED OR FRESHLY MIXED B. SHOP FIN15H ARGHITEGTURAL NOOONORK, INCLUDING AGGE550f;ZY MATERIALS 5UGH AS OF,BRAKE METAL DRYNALL FRAMES. NHERE BUILDING EQUIPMENT AND MATERIALS ARE TO BE LOCATED AND HON TRUG< LINES, ETG. GENERAL GONTRAGTOR TO THE LANDLORD, INGLUDING BASE BID,EXTRAS AND CREDITS, 6. ALL OPERABLE ITEMS SHALL OPERATE SMOOTHLY NITHOUT 5TIGKINC70R BINDING AND CONCRETE TO HARDEN CONCRETE. METAL NORK AND GLASS,TO MAXIMUM EXTENT POSSIBLE,AND SIZES EA51LY HANDLED G. KNOGK-OONN FRAMES ARE NOT TO BE GON51DERED LOAD BEARING FOR SUPPORT OF THE GENERAL GONTRAGTORS 5UBGONTRACTOR5 SHALL FURN15H TO THE TENANT A V41THOUT EXGE55 "PLAY" OR LOOSENESS. AND TO ENSURE PA55A67E THROUGH BUILDING OPENINC75 AND ELEVATOR.COORDINATE METAL OF,HOOD STUD HALLS ABOVE. HALLS AT HEADS OF DOOR OPENINC75 MUST BE TRAFFIC 15 TO BE ROUTED TO AND FROM THE BUILDING. 50. THE GENERAL CONTRACTOR 15 RESPONSIBLE FOR FURN15HINC7AND INSTALLING ALL NRITTEN GUARANTEE STIPULATING THAT,AT NO ADDITIONAL G05T TO THE TENANT,ANY 5.11 JOINT FILLING FIELD AND HOP FINISHING TO ASSURE IDENTIGAL MATGH.THE REQUIRED FIELD FIN15HINO FULLY SELF 5UPPORTINO FROM THE 5TRUGTURE ABOVE.DOUBLE JAMB METAL STUDS ARE 24. AN APPROVAL BY THE TENANT HILL ONLY BE VALID IF IN INRITIN6 AND 516NED BY TOILET AGGE55ORIE5, AS NELL AS THE NEN TOILET ROOM(S), DRINKING FOUNTAIN DEFEGTIVE NORK OR MATERIALS SHALL BE REPAIRED OR REPLAGED FOR A PERIOD OF ARTICLE 1-1 - GERTIFIGATE OF OGGUPANGY A. PREPARE,GLEAN,AND INSTALL JOINT FILLER ACCORDING TO MANUFAGTURERI5 WITTEN SHALL BE A PART OF THE INORK HEREUNDER.USE EXP05EL) FA5TENIN6 DEVIGE5 AND TO BE 50LIPLY ANGHORED TO THE GONGRETE FLOOR, NITH GALVANIZED STEEL 16 GA. THE TENANT OR BY THE TENANTS DE516NATED REPRESENTATIVE FOR 5UGH PURPOSE. AND SERVICE SINK. IF APPLIGABLE IN THESE PREM15I UNLE55 NOTED OTHERN15E OR ONE YEAR AFTER ACCEPTANCE OF NORK,UNLESS OTHERH15E NOTED. IF 5UGH NORK A. GONTRAICTOR SHALL ARRANGE FOR ALL REQUIRED IN5FEGTION5,5EGURE CERTIFICATE INSTRUCTIONS. NAILS ONLY HHEN UNAVOIDABLE AND REVIENED BY client. JAMB GLIP FLOOR KNEES. THE GENERAL GONTRAGTOR HILL BE RESPONSIBLE FOR OBTAINING APPROVAL FROM EXISTING. TOILET ACCESSORY ANU FIXTURE MOUNTING HEIGHTS TO BE THE HEIGHT AFFECTS,TENANTS OTHER INORK,TENANTS OTHER INORK 15 TO 13E COMPLETED BY THE OF OGGUPANGY AND PROVIDE client AND LANDLORD NITH GORES. THE ONNER OR THE B. DEFER JOINT FILLING UNTIL GONGRETE HAS AGED AT LEAST ONE MONTH. 00 NOT FILL G. PLASTIC, LAMINATE: AS SPECIFIED UNDER `MATERIALS"ABOVE AND AS 5GHEOULED ON NOTED ON THE LATEST A.D.A./GAE30 /AN51 REGULATIONS, AS REQUIRED BY LOCAL 5UBGONTRAGTOR AT NO COST TO THE LANDLORD OR TENANT. ONNERS SUB- GONTRAGTOR MAY OGGUPY PORTIONS OF THE PROJEGT DURING THE FINAL JOINTS UNTIL CONSTRUCTION TRAFFIC HAS PERMANENTLY GEA5ED. DRANIN65. 1.03 SUBMITTALS TENANTS ARGHITEGT ON ALL 5TRUGT7URAL C.HANOES DURING THE COURSE OF THE BUILDING AGENCIES, AND PLUMBING-GODE5. THE GENERAL GONTRAGTOR TO FURN15H STAGE OF GON5TRUGTION. COORDINATE AND GOOPERATE NITH THE ONNER TO MINIMIZE G. REMOVE DIRT,OEBRI5,5AN CUTTINGS,CURING COMPOUNDS,AND SEALERS FROM JOINTS- D. TRANSPARENT FINISH: A. SHOP DRANIN65- INDIGATE GENERAL GON5TRUGTION,GONRIOURATION,JOINTING METHODS, GONSTRUGTION PHASE OF PROJECT, AS NELL AS VERIFICATION OF GORREGT AND INSTALL NEN TOILET EXHAUST NITH A550GIATED OUGTNORK,ROOF GONFLIGT AND FACILITATE THE ONNERS OPERATION. GERTIFIGATE OF OGGUPANGY 1. V400D VENEERS: AS INDICATED;MATGH client SAMPLE. INSTALLATION AND 5PECIFIGATION FOR MISCELLANEOUS STEEL FOR MEGHANIGAL PENETRATIONS, OR HOOK UP TO GOMMON EXHAUST DUCT NITH BAGK DRAFT DAMPER 14. UPON GOMPLETION OF INORI<,THE GENERAL CONTRAGTOR AND ALL 5UBGONTRAGTOR5 LEAVE GONTAGT FACES OF JOINT CLEAN AND DRY. AND FRAME REINFORGING. SYSTEMS, STEEL FOR MEZZANINES (IF APPLICABLE), OUr ARE TO OBTAIN A GERTIFIGATE OF COMPLETION AND APPROVAL FROM THE BUILDING SHALL BE INSTALLED NITHIN A FRAME AT THE MANAGER OFFICE. 0. INSTALL SEMI RIGID JOINT FILLER FULL DEPTH IN 5AH-GUT JOINTS AND AT LEAST 2 INCHES 2. VENEER LAYOUT: SLIP MATGHED. B. PRODUCT DATA; 50MIT MANUFAGTURER'5 LITERATURE FOR ARGHITEGT5 REVIEN. SUBMIT ,T5,ETG. THE LANDLORD'5 ETC., INGLUDIN6 A550GIATED ELEGTRIGAL HOOKUP AND PANEL GONNEGTION5, OR ARCHITECT AND THE LANDLORD ARE NOT INVOLVED NOR HILL THEY TAKE ANY -7 JURISDICTION,AND SUBMIT SAME TO THE DEEP IN FORMED JOINTS. OVERFILL JOINT AND TRIM JOINT FILLER FLUSH INITH TOP OF 3. SHOP FIN15H TO GREATEST EXTENT POSSIBLE. MANUFAGTURER'5 INSTALLATION IN5TRUGTION5. REFURBISH EXISTING L16HT/FAN UNIT(5) TO LIKE NEN GONDITION,(NHERE NOTED ON DEPARTMENT,OR OTHER AUTHORITIES HAVINC ARTICLE 10 - LANDLORD APPROVALS 4. TRANSPARENT FINISH: AY41 OR Y41G PREMIUM QUALITY CLEAR FIN15H INITH U.V. G. SUBMIT COMPLETE COLOR GHIP5,AND FRAME SECTION SAMPLES. < RE5PON5IBILI7Y FOR TENANTS 5TRUCTURE. ANY STRUCTURAL NORK ON PROJEGT TO THE PLANS), NHETHER 5UGH NORK 15 5HONN OF,NOT 5HONN IN THE GON5TRUGTION TENANTS ARGHITEGT. FINAL PAYMENT HILL NOT BE 155UED BY THE TENANT PRIOR TO A. THE GONTRAGTOR SHALL NOT START HORK UNTIL LANDLORD APPROVAL HAS 13EEN JOINT AFTER HARDENING. INHIBITOR,AS REVIE�\EO AND AC,GEPTED BY client. D_ 0 INCLUDE BUT NOT BE LIMITED TO MEGHANIGAL EQUIPMENT SUPPORTS, HANGING RECEIPT OF SUCH CERTIFICATES. 0. PROTECT FRAMES NITH RE51LIENT PACKAGING SEALED NITH HEAT SHRUNK PLA5TIG. SYSTEMS, GONGRETE SLABS, COSTS, ETC. DOGUMENT5. THE TOILET ROOM 15 OF THE A.D.A. AND/OR GABO /AN51 TYPE AND OBTAINED IN NRITIN&. THE NOR<HILL BE EXEGUTED TO COMPLY Y41TH THE LANDLORD'5 END OF SEGTION FINISH. IN ALL PROJECT LOCATIONS: ARGHITEGTURALNOOPNORK INSTITUTE BREAK SEAL ON-51TE TO PERMIT VENTILATION. ALL PLUMBING FIXTURE5 AND TOILET AC,CE55ORIE5 ARE TO 13E FURNISHED AND 15. UPON GOMPLETION OF ALL GON5TRUGTION AV PRIOR TO TURNOVER OF THE 5PAGE,THE WITTEN CRITERIA. FINISH SYSTEM#5 PREMIUM GRADE V41TH MODIFICATIONS BELON. U- 25, THE GENERAL GONTRAGTOR HILL BE REQUIRED TO PROTEGT ALL NEUTRAL PIER5, INSTALLED B THE GENERAL GONTRAGTOR, BUT INITH 5FEGIFIGATION5 AND MOUNTING GENERAL GONTRAGTOR 15 RESPONSIBLE FOR HAVING THE SPACE GLEANED. ANY GLEANING 1) NATER-BA5ED 5TAIN,SPRAY APPLIED. NIPE-OFF TYPE STAINS HILL NOT BE PART 2 - PRODUCTS LANDLORDS AND ADJAGENT TENANT GON5TRUGTION IF ADJAGENT TO TH15 TENANT'5 `HEIGHTS HANDICAPPED AGGE5515LE,UTILIZING ABOVE 5PEGIFIGATION5 ONLY AS A NHIGH 15 NOT DONE AT THE TIME OF TURNOVER AND NEEDS TO BE DONE BY THE TENANT, ARTICLE 11 - SHOP PRANINC75 � 5AMPLE5 5EGTION 06100 ja < NORK, AND MAKE ANY AND ALL REQUIRED REPAIR5 TO THE 5AT15FAGTION OF THE GUIDELINE, HILL BE BAGK GHAR6EO TO THE GENERAL GONTRAGTOR. A. GONTRAGTOR SHALL PROVIDE THE ARGHITEGT AND ONE COPY TO ONNERS ROU6H GARPENTR)/ 2) NON-5EARATED SEALER 2.01 AGGEPTABLE MANUFAGTURER5 I V 0 LANDLORD AND /OR THE TENANT IF TH15 NORK 15 DAMAGED, 51. THE GENERAL CONTRACTOR SHALL GOORDINATE V41TH THE MEGHANIGAL REPRESENTATIVE NITH SHOP DRAKN65,5AMPLE5 AND TE6HNIGAL INFORMATION A5 REGUIRED 3) FILLER, IF REQUIRED. A. ALL INTERIOR ORNALL KNOGK-DONN STEEL ROLL FORM FRAMES,MANUFACTURED BY < uj 5UE3GONTRAGTOR TO ENC71NEER AND INSTALL ALL NEGE55ARY M15G. 5TRUGTURAL 16. ALL LANDLORD INORK TO BE FILED UNDER SEPARATE APPLICATION. BY THE INDIVIDUAL 5EGTION5 OF TH15 5PEGIFIGATION. PROVIDE A MINIMUM OF 3 COPIES PART I - GENERAL 4) SAND (220 GRIT NON-5EARATED PAPER). TIMELY INDUSTRIES,5TEELGRAFT,GEGO,OR APPROVED EQUAL. 7- 7 OL 2(b. ALL FIN15H AND EXPOSED HOOD SHALL BE KILN DRIED,MILL QUALITY FINISH AND STEEL SHAPES. SHAPES, TO BE INSTALLED INHERE DIREGTEO BY THE LANDLORDS OF EAGH ITEM SUBMITTED. EAGH ITEM(SHOP DRAINING,SAMPLE,TEGHNIGAL INFORMATION) 5) THO TOP GOATS OF CONVERSION VARNISH. b SHALL RECEIVE A FIRE RETARDANT C "7 THE GON5TRUGTION 51TE SHALL BE GLEANED AND TRASH REMOVED DAILY, SUBMITTED SHALL BEAR A STAMP INDICATING GONTRACTORS APPROVAL. ITEMS NOT b. TYPE: FULLER OBRIEN/FUH ERPLA5T GATALYZED ALKYO VARNISH SYSTEM, 2.02 FABRIGATION ,OATING, OR TREATMENT IF REQUIRED BY CODE REPRESENTATIVE FOR ADDITIONAL MEGHANIGAL UNIT ROOFTOP5UPPORT AND THE STAMPED V41LL NOT BE REVIENED OR OTHER 5U13MITTAL5 SHALL CONTAIN THE FOLLOININ6 1.01 ViORK INCLUDED A. ADJUSTABLE STEEL ROLL-FORM OR BREAK FRAMES TO BE FABRICATED TO STANDARD OR THE LOCAL FIRE MARSHALL. NO INOOD OR GOMBUSTIBLE MATERIAL SHALL BE GUARDSMAN GHEMVEER 531-00-75,OR EQUAL. USED AE30VE THE SUSPENDED GEILINC7 UNLE55 NONGOMBU5TIBLE LUMBER 15 USED AND SUPPORT OF INTERIOR MEGHANIGAL EQUIPMENT, DUGTNORK,GOLLARS, DIFFUSERS, -7b. BE ANARE, TENANT GENERAL GONTRAGTOR TO RECEIVE VIA OVERNIGHT DELIVERY THO INFORMATION: A. M15GELLANEOU5 FURRING,BLOGKIN6 AND BAGKIN6FOR SUPPORT AND ATTAGHMENT OF PROFILES INDICATED IN DRANIN65 AND AS 5HONN IN MANUFAGTURERS LITERATURE. 15 5PEGIFIGALLY ALLONED BY APPLIC GISTS TS, FANS,ETG. (2) BOXES,ONE V41TH RED TAPE AND THE OTHER HITH GREEN TAPE CONTAININ HALL MOUNTED ITEMS INGLUDIN6,BUT NOT LIMITED TO GA5ENORK AND ARGHITEGTURAL STAR COLOR TO MATCH ARGHITEGT'5 CONTROL 5AMPLE. EATED CLIPS FOP,CA5INGATTAGHMENT. ,ABLE BUILDING COOE5,THE FIRE MARSHALL & IMPORTANT 1. GONTRAGTORS NAME,ADDRESS AND TELEPHONE NUMBER NOOONORK. PLYNOOD BAGKBOARD5 FOR ELEGTRIGAL AND GOMMUNIGATION5 PANELS. d. EFFECT: 5EMI-OPEN PORE. B. PROVIDE PROOUGT5 AS FOLLOIA15: HEAT TF AND ALL A&ENCIE5 HAVING JURISDICTION. IF FIRE TREATED HOOD 15 REQUIRED FOR GON5TRUGTION OOGUMENT5 AND SUPPLIES. 2. SUBCONTRAGTORS NAME,ADDRE55 AND TELEPHONE NUMBER e. SHEEN: 30 OE6REE5 TO 45 DEGREES 5EMI-GLO55 TO MATGH client SAMPLE. OVAL AL16NMENT 5LOT5 FOP,TOOL INSERTION FOR FRAME ALIGNMENT. PRE-DRILLED FIXTURINO ITEMS, THE GENERAL CONTRACTOR 15 RESPONSIBLE FOR EXEGUTING TH15 52. ALL GYPSUM BOARD TO BE 5/5" THICK,FIRE GODE "X" E30TH SIDES,(HATER 5. SUPPLIER'S NAME,ADDRE55 AND TELEPHONE NUMBER 1.02 QUALITY A55URANGE E. FINISHING SHALL BE DONE BY MILLINORK MANUFAGTURER. HOLES IN FRAME PERIMETER FOR FA5TENER5. 146A.HINGE REINFORCEMENT PLATES NITH NORK AS PER BUILDINOOFF IGIAL5 REQU IREMENT5. RE515TANT IN TOILET ROOMS) AND ALL METAL 5TUD5 TO BE 5 5/5" METAL STUDS, - 1q. THE FIRST DAY OF GON5TRUGTION,TENANT GENERAL CONTRACTOR 4. PROJEGT TITLE PIERGED 5GREN HOLES FOR MINIMUM 31169" THREAD PENETRATION DEPTH. GORNER5 MINIMUM GAUGE AS PER GODE AT 16" O.G. TO UNDERSIDE OF OEGK ABOVE,UNLE55 CLARDY AT PHONE NUMBER(113) 5c[2-1338 TO ARRANGE FOP,THE INSTALLATION OF THE 5. REFERENGE TO PRIOR ACTION5 ON5UBMI55ION5 A. GOOE5 ANO STANDARDS: GOMPLY V41TH REQUIREMENTS OF THE FOLLONIN& GOPE5 AND PART 3 - EXECUTION AL16NER5 FOR GA5ING. ADJUSTABLE STRIKE(FOR CYLINDER LOGK5). 2-7. THE GENERAL GONTRAGTOR SHALL FURN15H AND INSTALL,AS REQUIRED, BEGINNING OTHERN15E NOTED. DEM15IN6 NALL FIRE RATING TO BE GONFIRMED BY GENERAL JOB 51TE PHONE. 6. L15T OF MATERIAL BEING SUBMITTED STANDARDS: GONTRAGTOR RESPONDING To LANDLORD AND CODE REQUIREMENTS. SEE GONTRAGT 1. P5 20 (US DEPARTMENT OF GOMMERGE): AMERIGAN 5OFTY400D LUMBER. NITH THE GON5TRUG,TION PHASE,HAND OPERATED FIRE EXTINGUISHERS,U.L. RATED, DOGUMENTS FOR NALL INDIGATION5. ALL PENETRATIONS FOR SUPPLY OR RETURN 1. NUMBER OF STANDARD (A5TM,U5A51) IF ANY INITH INHIGH 2. P5 1-14 (US DEPARTMENT OF GOMMERGE): PLYNOOD 3.01 INSTALLATION 2.05 INTERIOR FRAME TYPES. FIRM IRF-615TRATION NO. AS PER LOCAL CODE REQUIREMENTS: PLAGEMENT AS APPROVED BY TENANT. AIR, ETC., TO HAVE PROPERLY INSTALLED FIRE DAMPERS MEETING THE LATEST FIRE 50. THE FIRST DAY OF GON5TRUGTION,TENANT GENERAL GONTRAGTOR SHALL REPORT ALL 5. SAMPLE COMPLIES 5. INHERE INDIGATED ON ORANIN65 AND AS REQUIRED BY CODE,LUM13ER AND A. SET AND 5EGURE GAE31NETNORK AND ARGHITEGTURAL NOODNORK ITEMS IN PLACE,R161p, A. SERIES "A" FRAMES, 06A.FOR NON-RATED DOOR OPENING HIDTH5 5-011 TO 61-011. 54AF CD UTILITY SERVICES THAT SHALL BE TURNED OVER TO THE MEN'S IAEARHOU5E. GALL BUNN q. TRADE NAME PLUMB AND SQUARE,AND IN GOMPLIANGE NITH THE REFERENCED STANDARDS. B. SERIES `G" FRAMES, 156A. FOR NON-RATED PARTITIONS FITTIN675TANDARD OR Oro DEPARTMENT REQUIREMENTS,BASED ON SPECIFIC LOGATION OF TENANT'5 5PAGE IN PLYINOOD SHALL BE FIRE RETARDANT TREATED AND BEAR STAMP OF TESTING 25. THE GENERAL CONTRAGTOR SHALL BE RESPONSIBLE FOR DAILY REMOVAL,OR AS NIETO AT THE MENS NEARHOU5E(510) 123-8140. 10. OTHER PERTINENT INFORMATION 1. SHIM AS REQUIRED,U51NGGONGEALEO SHIMS. GONTRAGTOR SHALL USE 5HIM5 THAT PREFA5RIGATED FRAMES MAY BE ORDERED TO 51ZE REQUIRED. BUILDING THE GENERAL GONTRAGTOR 15 RESPONSIBLE FOR OBTAINING APPROVAL A6ENGY. REQUIRED BY LANDLORD,OF TRASH, RUBBISH AND 5URPLU5 MATERIALS RESULTING 11. ANY DEVIATION FROM GONTRAGT REQUIREMENTS CONFORM TO ALL STATE AND LOCAL GODE5 FOR MATERIAL COMPLIANCE. G. SERIES "S" FRAME5, 186A. FOR U.L. RATED DOOR OPENINGS. FROM THE BUILDING AND ELECTRICAL IN5PEGTOR5 FOR ALL GONGEALED NORK. 7- FROM GON5TRUCTION. THE GONTRAGTOR5 AND 5UBGONTRAGTOR5 PARTIGIPATIN6 IN bl. GON5TRUGTION 5HONN TO REMAIN AS EXISTING SHALL BE REPAIRED, IF NECESSARY, IN A 2. USE PURP05E-DE516NED FIXTURE ATTAGHMENT5 FOR HALL-MOUNTEO COMPONENTS. PRIOR TO CLOSING UP NALL5,FLOORS,GEILINC-75. PART 2 - PRODUGT5 THE PERFORMANCE OF TENANTS,NORK SHALL REMOVE AND DISPOSE OF,AT LEAST MANNER THAT V41LL BE GON51STENT V41TH THE NEN CONSTRUCTION,AND PAINTED TO MATGH ARTIGLE 12 - GOMMUNIGATION 5. USE THREADED STEEL GONGEALED JOINT FASTENERS TO ALIGN AND SECURE 2.04 FINISHES tu ONCE A INEEK AND MORE FREQUENTLY AS TENANT MAY DIRECT, ALL DEBR15 AND 53. ALL GYPSUM BOARD TO BE APPLIED VERTICALLY ON KALL5 UNLE55 OTHERN15E THE OVERALL GOLOR SCHEME,UNLE55 OTHERV415E NOTED. A. ALL GORRE5PONDENGE AND DIREGTIVE5 TO THE GENERAL GONTRAGTOR AND 2.01 MATERIALS ADJOINING UNITS.RUBBISH CAUSED BY OR RESULTING FROM THE PERFORMANGE OF TENANT's NORK NOTED. ALL GYPSUM NALL BOARD TO BE FIRE RE515TANT AND NONCOMBUSTIBLE AS 5UBGONTRAGTOR5 SHALL BE TRANSMITTED 5r THE CLIENT AND ARCHITECT THROUGH THE 4. PERMANENTLY FIX GAE31NET AND GOUNTER BA5E5 TO FLOOR U5INGAPPf;ZOPRIATE A. FAGTORY PRIMED FIN15H APPLIED TO STEEL IN COIL5,PRIOR TO ROLL FORMING FRAMES. AND,UPON COMPLETION THEREOF,REMOVE ALL TEMPORARY 5TRUCTURE5,5URPLU5 E32. TENANTS GENERAL GONTRAGTOR SHALL PROVIDE ALL AGGE55ORY 5115NA&E, INGLUDIN6, GENERAL GONTRAGTOR. AN6LE5 AND ANGHORAC?E5. AER050L PAINT GAN5 TO BE SUPPLIED FOR FIELD TOUGH-UP OF FAGTORY PRIMED MATERIAL5, DEBRIS AND RUBBISH OF NHATEVER KIND REMAINING IN THE BUILDING SPECIFIED BY LOGAL CODES. BUT NOT LIMITED TO: 1. MOISTURE GONTENT: lq% MAXIMUM AT TIME OF PERMANENT GL05IN6 IN OF BUILDING 5. GOUNTER51NK 5EMI-GONGEALED ANGHORAGE DEVICES USED TO HALL MOUNT FRAMES. NHIGH HAD BEEN BROUGHT IN OR GREATED BY THE GONTRAGTOR AND END OF SECTION FOR LUMBER 2 INGHE5 OR LE55 NOMINAL THIGKNE55. FOR LUMBER OF GREATER GOMPONENT5,AND CONGEAL HITH 50LID PLUC75 OF 5PEGIE5 TO MATGH SURROUNDING SUBGONTRAGTORS IN THE PERFORMANCE OF TENANTS NORK. TH15 GONTRAGTOR 54. ALL METAL FRAMING, GYPSUM BOARD,PARTITION5, 5OFFIT5 AND FACADES BY THE A. SUITE NUMBER ON ALL EXTERIOR DOORS. THIGIII GONFORM TO P5-20 REQUIREMENTS. HOOP. PLAGE FLUSH INITH SURROUNDING SURFACES. PART 5 - EXECUTION GENERAL CONTRACTOR,UNLE55 OTHERN15E NOTED. 2. GRAPES FOR FRAMING LUMBER,2 IN TO 4 IN. THIGK,2 IN.TO 4 IN. HIDE,DOUGLAS MUST MAINTAIN A GLEAR PATH OF EGRESS FROM THE PREMISES FREE FROM TRASH B. ALL A.D.A. APPLICABLE 5IGNA6E. (0. GAREFULLY SCRIBE GABINETHORK INHIGH 15 AGAINST OTHER BUILDINC-7MATERIAL5, FIR: G. NO 5MOKINC-7 516NA6E. 3.01 INSTALLATION AND RUBBISH AT ALL TIMES. ALL REMOVAL OF GONSTRUGTION DEBRIS TO AN SEGTION 02050 55, ALL GYPSUM E30ARD TO BE F I RE TAPED ANO 5PAGKLED THREE (3) GOATS,SANDED 3. BOARDS: GON5TRUGTION GRADE R15 OR INGLB,OR NO.2 BOARDS 5PIB OR MPA. LEAVING 6AP5 OF 1/32" MAXIMUM. 00 NOT USE ADDITIONAL OVERLAY TRIM FOR TH15 APPROVED DUMPING 51TE TO BE INCLUDED IN THE GENERAL GONTRAGTORS INORK. D. AT ALL EXTERIOR ENTRY POINTS. PURPOSE. A. VERIFY THAT ALL PARTITION NALL OPENIN65 ARE PROPERLY FRAMED,BRACED,AND AND READY TO RECEIVE PAINT OR NALL GOVERIN6. ALL EXISTING GYPSUM BOARD SELEGTIVE DEMOLITION 4. BLOGKINO: NON-LOADBEARINO STUD GRADE. TO BE REPAIRED TO "LIKE NEW GONDITION. 5. PLYNOOO: 5TRUGTURAL I GRADE;FIRE TREATED. -7. GAULK ALL EXP05ED EDGES OF OPAQUE FIN15HED TRIM AND MILLHORK,AT DRYNALL FULLY TAPED,BEDDED AND SANDED PRIOR TO INSTALLATION OF FRAMES. 2q. ALL EXITS SHALL BE UN065TRUGTED AT ALL TIMES DURING GON5TRUCTION AND b3. THE MENS INEARHOU5E 15 A GARRIER NATIONAL ACCOUNT. ALL EQUIPMENT HAS BEEN INTERSECTION NITH 6YP5UM BOARD FINISHES. AFTER FRAME INSTALLATION 15 COMPLETE,GOMPLETE INSTALLATION OF ANY'APPLIED OGGUPANGY. PRE-ORDERED AND 15 READY TO SHIP TNO INEEK5 AFTER GON5TRUGTION STARTS. S. ROUGH HARDNARE: 5IMP50N UNIVERSAL OR EQUAL. b. INSTALL AND ADJUST CABINET HARDHARE TO ENSURE SMOOTH AND GORREGT NALL FIN15HES OR HALL COVERINGS. AFTER FINISHES ARE APPLIED INSTALL THE SNAP 56. ALL DOORS, METAL BUCKS, TRIMMED OPENIN65 AND HARONARE, INGLUDINC-7 LOG<5, PART I GENERAL 1. BOLTS: F5 FF-5515 AND F-5 FF-5-584. ON GA5IN6 COVER TRIM. TO BE PROVIDED BY THE GENERAL GONTRAGTOR UNLE55 OTHERIN15E NOTED. CONTACT MARY BETH <OZLON5KI AT 1-315-452-46953 FOP,MORE INFORMATION. 2. NUTS: F5 FF-N-b3b. OPERATION. 50. THE GENERAL CONTRACTOR SHALL FURN15H AND PAY FOR ALL TEMPORARY UTILITY 5. INSTALL AND ADJUST CABINET HARDNARE TO ENSURE SMOOTH AND GORREGT 13. INSTALL DOOR FRAMES IN AGGOROANGE Y41TH MANUFACTURERS STANDARD 5ERVIGE5 DURING THE COURSE OF GON5TRUGTION, 1.01 NORK INCLUDED 5. LAG 5GREN5 AND BOLTS; F5 FF-13-5bl. OPERATION. INSTALLATION GUIDES. INSTALL PLUMB AND SQUARE. INSTALL FRAMES USING DOORS A5 51. ALL SNITGH / OUTLET PLATES /COVERS TO BE FIN15HED IN SAME COLOR/ HALL CARRIER NATIONAL CARRIER IN51DE SALES, A. REMOVE DESIGNATED BUILDING EQUIPMENT AND FIXTURES. REMOVE OE5IGNATED 4. INOOD 5GREN5: F5 FF-F-Ill G. ENSURE MEGHANICAL AND ELECTRICAL ITEMS AFFEGTINC7ARGHITECTURAL NOODHORK A TEMPLATE TO A55URE PERFECT ALIGNMENT. GOVERIN6 AS ADJACENT NALL FINISHES,UNLE55 NOTED OTHERN15E, FAGTORY AG60UNT MANAGER EN61NEERIN6 SUPPORT PARTITIONS AND GOMPONENT5. GAP AND IDENTIFY UTILITIES. PROVIDE TEMPORARY 5. NAIL5- F5 FF-N-105 31. THE GENERAL GONTRAGTOR AND/OR H15 ELECTRICAL 5UBGONTRAGTOR 15 TO ARE PROPERLY PLACED,COMPLETE,AND HAVE BEEN REVIENED BY client PRIOR TO AFTER INSTALLATION,TOUCH UP 5GRATGHED FRAME 5URFAGE5. MAKE ANY MINOR FIELD UA PAINTED GRILLES, DIFFU5ER5 METAL TRIM (BUCK5,ETC.),AGGE55ORIE5,5NITGH AND MARY' BETH KOZLOkq5<1 TIMOTHY CANNON PARTITIONS TO ALLON BUILDING OGGUPAN(Y. INCLUDING,BUT NOT LIMITED TO,THE 6. EXPAN51ON 5HIEL05: F5 FF-5-561, VERIFY ALL EQUIPMENT SPECIFIGATIONS, AND REQUIREMENTS NITH THE TENANT OR GOMMENGEMENT OF INSTALLATION. REPAIR5 ON FRAMES SLIGHTLY DAMAGED DURING INSTALLATION.REPLACE ANY FRAMES THE TENANT'S GON5TRUGTION REPRESENTATIVE PRIOR TO START OF GON5TRUGTION OUTLET PLATES, ETC., ARE f�d' BE PAINTED TO MATGH ADAGENT SURFACE IN AN P.O. E30X 400a TEL "704-4cl4-2866 FOLLONIN6: 0. INSTALL ARGHITEGTURAL HOOONORK UNDER SUPERVISION OF FAGTORY-TRAINEO SHONN TO BE DEFECTIVE OR DAMAGED PRIOR TO THE PROJECT GLO5E-OUT AS STATED 4Wr N MOM J. fe, < TH15 GONTRAGTOP E FINISH, OR AS 5PEGIFIED ON THE GONTRAGT DOCUMENTS. 5rRACU5E, NY` 15221 TIMOTHY.6.CANNON 1. REMOVAL OF INTERIOR FITTINGS,FIXTURES, HOOD PLATFORM5,5TOREFRONT5, PART 3 -EXEGUTION TO VERIFY AMPERAGE/VOLTAGE 5PEGIFIGATION5, HIRING SIZES MEGHANIG5. ATTAGH ARGHITEGTURAL NOODNORK SECURELY IN PLAGE NITH UNIFORM IN THE MANUFAGTURERS STANDARD INARRANTY. ,IFIGATION) HITH THE EQUIPMENT JOINTS PROVIDING FOR THERMAL AND BUILDING MOVEMENTS. 4C RIC QES SRVICE AND PANEL SPEC TEL 315-452-1054 @C,ARRIER.UTC,.G0M FIN15HE5 AND FLOORING EXCEPT AS NOTED.SUPPLIERS, AND CHECK THE CONTRACT DOGUMENTS, FOR M15GALGULATION5, IN 58. THE GENERAL CONTRACTOR 15 RESPONSIBLE TO GUT AND FRAME ALL OPENINGS FOR FAX 560-660-4655 2. FRAMING,DRYNALL AND HOOD TRIM. 3.01 INSTALLATION E. INSTALL ARGHITEGTURAL NOODNORK UNDER 5UPERV15ION OF FAGTORY-TRAINEO 5.02 ADJUSTING AND GLEANING GOORDINATION NITH EQUIPMENT 5PEGIFIGATIONS FOR EQUIPMENT SUPPLIED BY THE OTHER TRADES, SUCH AS MEGHANICAL,SPRINKLER, PLUMBING, ELEGTRIGAL, FIXTURE MAR`rE3ETH.K0ZLO1NSKI 3. AGOU5TIC, AND ORYNALL GEILIN6. A. SET CARPENTRY NORK AGGURATELY TO REQUIRED LEVELS AND LINES, HITH EMBER5 MEGHANIG5. ATTAGH ARCHITEGTURAL INOODINORK 5EGURELY IN PLACE V41TH UNIFORM A. MAKE ANY REQUIRED FINAL ADJUSTMENTS OF THE DOOR FRAME,THE DOOR FIT, 2 7H PARTITIONS AND 5TRUGTURAL HALLS.ALL PENETRATIONS @rARRIER.UTC,.GOM 4. ELEGTRIGAL SYSTEMS AND FIXTURES,HVAG RELATED NORK,PLUMBING FIXTURES, PLUM13 AND TRUE AND ACCURATELY GUT AND FITTED. 5EGURELY ATTAGH CARPENTRY TENANT, THE GONTRAGTOR5 OR OTHER 5OURGE5 (AS 5PEGIFIED BY THE ARGHITECT) GONTRAGTOR,THROUr JOINTS PROVIDING FOR THERMAL AND BUILDING MOVEMENTS. BALANGE AND SMOOTH MOVEMENT. N, N.J AS A DOUBLE GHEGK TO A5GERTAIN PROPER INSTALLATION OF EQUIPMENT AT THE THROUGH RATED HALLS, NITH DUGT5 OR PIPING, TO BE FILLED AT OPENING NITH SPRINKLER SYSTEM DISTRIBUTION PIPING AS REQUIRED OR ILLUSTRATED,OR IMPLIED HORK TO SUBSTRATES BY ANCHORING AND FASTENING AS REQUIRED BY REGOCAIZED"FIRE STOPPING" MATERIALS TO MAINTAIN THE INTEGRITY OF THE 5PEGIFIED RATING BY ENGINEERING DOGUMENT5. STANDARDS. PROVIDE 51ZE5 AND 5PAGING AS 5HONN ON THE DRANIN65.USE COMMON 1. USE LONG LENGTHS. FIT JOINTS TIGHTLY TOGETHER,MITERED AT IN51DE AND OUT51DE GORREGT AMPERAGE /VOLTAGE AND NIRIN67 SIZE. NO LIGHT FIXTURES ARE TO BE GORNER5. ENE) OF 5EGTION ORDERED UNTIL TH15 "DOUBLE GHEGK" TAKES PLAGE. OF THE NALL. 5. ALL OTHER NORK AS REQUIRED 13Y THE OOGUMENT5 IN PREPARATION FOR NEN HIRE NAILS,EXCEPT AS OTHERN15E INOI(ATED.USE GALVANIZED NAIL5 INHERE 5UBJEGT 2. PROVIDE ATTAGHMENT To HALL Y41TH FIN15HINC7 NAILS OR OTHER APPROVED OL NORK. OT MOISTURE.ELECT FA5TENER5 OF 51ZE THAT HILL NOT PENETRATE MEMBERS INHERE 6ENERA�L PRODUGT SPEGIFIGATIONS U 0 cn G. PLACE AGOU5TIGAL SEALANT AS 5HOHN ON PRAY41NC75 AND IN AGGORDANGE NITH MANUFAGTURER'5 B. SUBMIT THO SAMPLES OF LG DIEGO PLANK FLOORING IN THE COLOR,THICKNESS,AND PATTERN 51ZE AS 5ELEGTED 13Y G. HHEN APPLYING CARPET ADHESIVE,USE SPREAD RATE REGOMMENDED BY ADHESIVE AND CARPET MANUFAGTURER5. t- CD 5EGTION ONIC SEGTION 05500 9b 0 1 RECOMMENDATIONS.INSTALL ACOU5TIC,AL SEALANT AS FOLLON5: THE ARGHITE(T. D. USE A 30 TO 50 POUND ROLLER TO A55URE TRANSFER TO THE CARPET BACKING. .,_4 6002 DOORS 6LAZIN6 1. SET FLOOR AND GEILIN6 RUNNERS IN THO GONTINUOU5 BEADS OF SEALANT. 0. INSTALLER CERTIFIGATION: SUBMIT A L15T OF AT LEAST THREE IN5TALLATION5 5UGGE55FULLY GOMPLETED NITHIN THE E. GRID AND PERIMETER APPLICATIONS OF ADHESIVE HILL NOT BE AGGEPTABLE. Z 2. INSTALL GONTINUOU5 BEADS OF ACOUSTICAL SEALANT TO PROPUGE AN AIR T16HT SOUND SEAL AT INTER5EGTION5 PAST YEAR HAVING THE SAME GENERAL DEGREE OF INSTALLATION DIFFICULTY. PART I-GENERAL PART I GENERAL OF ALL PARTITIONS AND SHAFTS INITH FLOOR5,(EILIN(75,INALL5,COLUMNS AND OTHER ABUTTING(ON5TRUGTION 50 3.04 ADJUST AND GLEAN THAT THE ENTIRE PERIMETER 15 SEALED. 1.05 QUALITY ASSURANCE A. UPON GOMPLETION OF THE INSTALLATION,REMOVE ALL KA5TE AND EX(E55 MATERIALS.GAREFULLY AND THOROUGHLY 1.01 NORK INGLUDED 1.01 NORK INCLUDED 3. AT OPENINC75 AND GUTOUT5,FILL OPEN 5PAGE5 5ETNEEN 6YP5UM 130ARD AND DUGT5,PIPES AND OTHER FLUSH OR A. MANUFAGTURER: LG FLOORS. VACUUM THE ENTIRE FLOOR 5URFAGE Y41TH AN UPRIGHT BEATER-5AR TYPE VACUUM GLEANER.PROVIDE 5U55TANTIAL A. STANDARD TYPE 50LID GORE HOOD DOORS NITH FLUSH FAGE5. A. THE FOLLONIN6 NORK SHALL BE INGLUDEP,BUT NOT NEGE55ARILY LIMITED TO: GLASS AND GLAZING OF EXTERIOR AND PENETRATING ITEMS. B� INSTALLER: SHALL BE EXPERIENCED IN THE RE51LIENT TILE FLOORING INDUSTRY AND SHALL HAVE A MINIMUM OF FIVE GOVERING5 AS NEGE55ARY TO PROTEGT INSTALLED PRODUGT5 FROM DAMAGE FROM TRAFFIC,AND SUBSEQUENT cd (u INTERIOR ENTRANCE DOOR5,REMOVAL OF EXTERIOR AND INTERIOR 51DEL16HT5 AND TRAN50M(STORE 6LA55 UNLE55 (5) YEARS EXPERIENCE IN THE INSTALLATION OF 51MILAR PRODUGT5. GON5TRUGTION 1.02 QUALITY A55URANGE 3.05 AGGE55 PANELS OPERATIONS.REMOVE ALL 5TAIN5. REU5ED),RE-6LAZIN(7 OF EXTERIOR AND INTERIOR SIDELIGHTS AND TRANSOM, � GLAZING AT DOORS. A. REFERENGE 5PECIFIGATION5 AND 5TANDAR95: GOMPLY V41TH MANUFAGTURER'5 RECOMMENDATIONS AND THE FOLLONIN6 A. RATED AND NON-RATED AGGE55 PANELS AS 5PEGIFIED HEREIN AND UNDER OTHER 5EGTION SHALL BE INSTALLED I.O(b DELIVERY,STORAGE,AND HANDLING 0 0 UNLE55 OTHERV415E 5PEGIFIED IN THIS 5EGTION: 1.02 SUBMITTALS UNDER TH15 5EGTION.PANELS SHALL BE LOCATED INHERE DIREGTED,REQUIRED OR 5HONK ON DRANIN65 AND A. DELIVER PRODUGT5 TO JOB 51TE 48 HOURS PRIOR TO INSTALLATION AND STORE IN ACICIORDANCIE V41TH SECTION END OF 5EGTION N 1, AINI--ARGHITEGTURAL NOOPNORK INSTITUTE AND HIG--HOODNORK PREMIUM GRADE PER ANI OR NIC,STANDARDS. A. PRODUCT DATA: SUBMIT MANUFACTURER5 TEOHNIGAL DATA FOR EACH 6LAZIN6 MATERIAL AND FABRIGATED GLASS INSTALLED PLUMB OR LEVEL AND SQUARE NITH ADJACENT GON5TRUCTION.013TAIN c1lentS REVIEN FOR AGGE55 PANEL (01(900)(01610)AND(016920). 0 '0 0 2. NNDA--NATIONAL HOOD NINDON AND DOOR A55OGIATION INDUSTRY STANDARD 1-5.1 SERIES FOR HOOD DOORS. U PRODUCT REQUIRED,INCLUDING INSTALLATION AND MAINTENANCE IN5TRUGTION5. TYPES AND LOGATION5 NOT 5HOHN ON THE PRANINC75 BUT NEGE55ARY DUE TO OTHER REQUIREMENTS. 5. GARTON5 OF FLOORING SHOULD BE STORED IN DRY,HELL-VENTILATED 5TORA6E AREAS OR NAREHOU5E5.NEVER 5EGTION OqqOO 1.05 5UBMITTAL5 B. 5AMPLE5: FOR VERIFICATION PURP05E5,12"SQUARE SAMPLES OF EACH TYPE OF C7LA55 INDIGATED(EXCEPT FOR STORE GARTON5 OF FLOOIN6 OUTDOORS.THE STORAGE AREA ENVIRONMENT SHOULD BE KEPT AT 25-50%RELATIVE PAINTIN6 < 3.06 ADJUST AID GLEAN 0 �,c U 1-4 1) A. SHOP DRANIN65: INDIGATE GENERAL GON5TRUGTION,5PEGIFIED RAIL 51ZE5 AND LOCATIONS,JOINTING METHODS, GLEAR 5IN6LE PANE FLOAT CLASS),AND MINIMUM 12"LONG CURED 5TRIP5 OF SEALANT OR GASKET EXP05ED TO NVIEN. A. FILL GRAGK5 NITH GOMPOUND AND FIN15H SMOOTH AND FLUSH. HUMIDITY AND 65-85 F(18-2c[G).DO NOT STORE GARTON5 OF FLOORING DIREGTLY ON INAREHOU5E FLOOR5. 0 -4 cd HARDHARE 5LOr.,KIN6 AND HARDNARE LOCATIONS. PART 1: GENERAL 5GOPE 1.05 QUALITY ASSURANCE 1.07 ENVIRONMENTAL REQUIREMENTS 13. 01RODUOT DATA: MANUFAGTURERS STANDARD LITERATURE AND 5PEGIFIGATION5. cd WO, r- ENE)OF SECTION A. REFERENCE 5PEGIFIGATION5 AND 5TANDAR05- GOMPLY NITH MANUFACTURERS RECOMMENDATIONS AND THE FOLLONIN6 A. MAINTAIN ROOM TEMPERATURE 5ETNEEN 65 F(15 G)MINIMUM AND 55 F(2q G)AND RELATIVE HUMIDITY BETNEEN 25% 1.01 SUMMARY PART 2-PRODUCT5 UNLESS OTHERN15E 5PEGIFIED IN TH15 SECTION. IN GA5E OF CONFLICT,GOMPLY NITH THE M05T STRINGENT. MINIMUM AND 50% MAXIMUM,BEFORE AND DURING THE INSTALLATION. 1. FLAT GLASS MARKETING A55OGIATION(F6MA) -GLAZING MANUAL AND SEALANT MANUAL FOR GLAZING STANDARDS. SEGTION Oq510 B. DO NOT INSTALL FLOORING UNTIL ALL OTHER 516NIF1 GANT GON5TRUGTION NORK 15 GOMPLETE. A. PROVIDE PAINT AS 5PEGIFIED AND INDICATED ON DRANIN65,INGLUDIN6 PAINTINC7 OF MILLNORK SUPPLIED BY OTHERS. 2.01 AGGEPTABLE MANUFAGTURER5 2. SAFETY GLASS: U5C,5EGTION 5406,UBG STANDARD 54-2 AND AN51 ZcI1.I NITH CERTIFYING LABEL ON EACH PIECE. AGOU5TIGAL GEILIN6 5�5TEM5 6. PROVIDE PERMANENT HVAG OPERATION(2 NEEK MINIMUM)AND PERMANENT LIGHTING PRIOR TO INSTALLATION, 1. NORK INGLUDED: PAINT ITEMS NOT 5PEGIFICALLY EXCLUDED UNDER FOLLONIN6 PARAGRAPH. A. BUELL,EGGERS,AL60MA OR INEYERHAEU5ER. 3. PRIME(FLOAT)GLASS: A5TM G1036. 2. ITEMS NOT TO BE PAINTED: 4. FIRE-RE515TANT GLASS: TESTED PEP,A5TM E163(UL 0)AND L15TED BY UL FOR"FIRE RE51STANGE". PART I GENERAL PART 2--PRODUGT5 a. DRYNALL 5URFAGE5 CONGEALED FROM VIEN. 2.02 DOORS 2.01 MANUFACTURER b. FACTORY FIN15HED EQUIPMENT AND OTHER MATERIALS NITH COMPLETE FAGTORY FINISH,INGLUDING PART 2 -PRODUGT5 A. PROVIDE RESILIENT FLOORING BY L6 FLOORS,KENILNORTH,NEIN JERSEY AND SUPPLIED BY THE PATTON GROUP,100 A. FLUSH INTERIOR DOOP5(TRANSPARENT FINISH). 1-5/4"THICK;50LID GORE 5 PLY NHEN GOMPLETED BY OTHERS,HOT 1.01 HORK INGLUDED MERGHAND15IN6 NORTH HILL DRIVE,SUITE 51,BRISBANE, GA G14005.415-325-4800 PRESS LAMINATED 6ON5TRUGTION NITH 5TILE5 AND RAILS 13ONDED TO GORE;PREMIUM GRADE PER ANI OR NIG A. EXP05ED SUSPENDED METAL GRIP SYSTEMS,AGOU5TIGAL UNITS,AGOU5TIGAL INSULATION BLANKET FOR N015E SHELVING AND NRAP GOUNTER. STANDARDS.VENEER: QUARTER SANN NHITE MAPLE. 2.01 MATERIALS CONTROL ON GEILIN65 ADJAGENT TO SOUND INSULATED PARTITIONS. 2.02 MATERIALS FIN15H HARDHARE EXCEPT NHERE PRIMED FOR PAINTED FINISH. B. FLUSH INTERIOR DOORS(PLASTIC,LAMINATE FINISH): 1-3/4"THIGK;SOLID GORE 5 PLY,HOT PRE55 LAMINATED d. AGOU5TIGAL TILE AND 51,15PEN51ON SYSTEMS. A. GLEAR FLOAT GLASS: A. FLOORING- L6 DEGO HOOD 50LID VINYL TILE IN PLANKS,GONFORMINCY LIGHTING FIXTURES. GON5TRUGTION NITH 5TILE5 AND RAILS BONDED TO CORE;GU5TOM 6RADE PER AV41 OR NIG STANDARDS;FACE 1.02 QUALITY A55URANGE 5. TO THE FOLLONINC7 GRITERIA! I. TYPE 1,QUALITY q�,GLA55 I CLEAR,1/4"THICK EXGEPT AS OTHERN15E REQUIRED TO COMPLY HITH APPLIGABLE VENEERS AND VERTIGAL EDGE BANDS SHALL BE PG BIRGH. A. REFERIENGE 5PECIFIGATION5 AND 5TANDAR05; GOMPLY NITH MANUFAGTURERS RECOMMENDATIONS AND THE f. PLUMIN6 FIXTURES AND TOILET ROOM AGGE55ORIE5. G. FLUSH INTERIOR DOORS(OPAQUE FINISH): 1-3/4"THICK;5 PLY,HOT PRESS LAMINATED GON5TRUGTION HITH STILES AND CODES AND RE6LATI%AUTHORITIES. LOIN-E GOATIN6 15 REQUIRED FOR ALL EXTERIOR 6LAON6,EXGEPT DOOR5. FOLLONIN6 UNLE55 OTHERN15E 5PEGIFIED IN TH15 SECTION.IN GA5E OF GONFLICT,GOMPLY INITH THE M05T STRINGENT. 1. MEETS OR EXGEE05 A5TM F-1100 STANDARD 5PEGIFIGATION FOR SOLID VINYL FLOOR TILE,GLASS III FOUR PLY RAILS E30NDED TO GORE;CUSTOM GRADE PER ANI OR HIG STANDARDS.FACE VENEER OF "50UND"GRADE 131ROH OR B. IME 6LA55 OF COLOR AND TYPE INDICATED,NHIGH HAS BEEN HEAT-TREATED TO STRENGTHEN GLASS IN BENDING To 1. A5TM G635-5TANDARD SPEGIFIGATION FOR METAL SUSPENSION SYSTEMS FOR AGOU5TIGAL TILE AND LAY-IN-PANEL LUXURY VINYL TILE(LVT)OVERALL THIGKNE5 0.12"(3MM)NITH 0,20"(O.5MM)CLEAR VINYL NEAR LAYER ABOVE OTHER DENSE GLO5E0 GRAIN HARDHOOD,OR A PAINTABLE MEDIUM DEN51TY PLA5TIG OVERLAY.FACE VENEER SHALL NOT LE55 THAN 4.5 TIMES ANNEALED 5TREN6HT.FULLY TEMPER GLASS BY HORIZONTALLY HEAT TREATING HITH MINIMAL CEILINGS. THE FILM LAYER. 1.02 SUBMITTALS BE AT LEAST 1/50"THICK BEFORE FILLED SANDING.AND BE UNIFORM IN PLANE,GOLOR AND FINISH. HAVINE55 OR 015TORTION AND NITH ALL AREAS FREE OF TON6 MARKS, 2. ASTM G636-RECOMMENDED PRALTICE FOR INSTALLATION OF METAL CEILING 5USPEN51ON SYSTEMS FOR 2. 51ZE: 2.C15"X 36.22"(75MM X C120MM),5.c14"X 36.22"(IOOMM X c120MM) 1. PROVIDE TEMPERED ANWOR LAMINATED GLA55 NHERE SAFETY 6LA55 15 INDIGATED OR HHERE REQUIRED BY 1 3. GOLOR: OPN5513 NATURAL AFRICAN NALNUT D. STILE AND RAIL INTERIOR DOORS HITH LOUVERED HOOD INSERTS: COMPLY INITH NNWA 1.5.6 "INDUSTRY STANDARD ACOUSTICAL TILE AND LAY-IN PANELS. PRODUCT DATA APPLIGABLE LAN5 AND SAFETY GODE5. 4. FIRE RATING: COMPLIE5 NITH A5TM E-64a RADIANT PANEL 1.03 INATT5/GM2 FOR HOOD 5TILE AND RAIL DOORS".PANEL DE516N UNDER NNHDA DESIGN GROUP,Y41TH MINIMUM DIMEN905 FOR G. MIRROR 6LA55: 3. A5TM A641-5TANDARD 5PEGIFIGATION FOR ZINO-GOATED(6ALVANIZED)GARBON 5TEEL HIRE. 5. SMOKE GENERATION: GOMPLIE5 HITH A5TM E(062 STILES AND RAIL5,GOMPLYIN6 NITH NNHDA STANDARD.MOLDING PROFILES AS INDIGATED PREMIUM 6RADE PER AN[ 4. A5TM G(965-5TANDARD 5PEGIFIGATION FOR MINERAL FIBER BLANKET T14ERMAL INSULATION FOR HOOE?FRAME AND A. MANUFAGTURER'5 DATA,5UGH AS TEGHNIGAL LITERATURE,BROGHURE5,5PEGIFICATION5,MATERIAL LISTS AND PRODUGT 1. GLEAR FLOAT 6LA55(A5TM G1056,TYPE 1,GLA55 1,QUALITY R?),1/4"THIG<EXCEPT AS OTHERN15E INDICATED. (9. TOTAL REGYGLEE?GONTENT: 1076 DE56NATION.INGLUDE MANUFAGTURER'5 REGOMMENDATION5 FOP,PREPARATION AND APPLIGATION. OF,NIG STANDARDS.HOOP 5PEGIE5 SHALL BE 50LID 5TOGK,QUARTER 5AViN HH.1-TE MAPLE 2. SILVER GOATING COPPER PROTEGTIVE COATING AND 2 MIL THICK PAINT GOATEN(5;COMPLY INITH G5 21 LIGHT GON5TRUGTION. T FLOOR5GORE GERTIFIEl?FOR INDOOR AIR QUALITY 5. STATE AND LOGAL SUPPLEMENTS. 2.03 FADRIGATION 6. G15GA-GELIN6 AND INTERIOR SYSTEMS CONTRACTORS A55001ATION STANDARDS. 5. 150 14001: ENVIRONMENTAL MANUFAGTURIN6 STANDARD OPERATION AND MAINTENANCE MANUALS AND IN5TRUGTION5. PART 3-EXECUTION 5. 5UBFLOOR FILLER: LATEX PORTLAND GEMENT PATGHIN6 GOMPOUND. A. FABRICATE DOORS IN AGGORDANGE NITH REQUIREMENTS OF ABOVE REFERENGED QUALITY STANDARDS AND AS T PROVIDE AND INSTALL FIRE-RE515TANT RATED ASSEMBLIES IN AGGORDANGE Y41TH UL REQUIREMENTS. 1. INDIC ATE SHELF LIFE OF MATERIALS. MODIFIED HEREIN.50LID CORE DOOR STILES AND RXI-5 b. THE HORK HERE UNDER SHALL BE PERFORMED BY A 5IN6LE ENTITY NITH UNIT RESPONSIBILITY FOR FIELD G. ADHE51VE: L6 GHEM 2100-SOLVENT FREE VINYL TILE AND SHEET ADHESIVE L6 GREM 3100 SOLVENT FREE VINYL 2. INDIGATE GLEANINGS METH005 REGOMMENDED. 1. 5TILE5: NOT LE55 THAN I"+ 1/16",MILL OPTION,EXGEPT GLEAR NHITE BIRCH INHERE OVER51ZE BOTTOM RAILS OCCUR 3.01 INSTALLATION MEASUREMENT,ENGINEERING,SUBMITTALS,FIELD INSTALLATION AND NARRANTY. IN5TALl ER SHALL BE A TILE AND SHEET EPDXY 3. INDICATE GLEANING METHODS TO AVOID. A. INSTALL C7LA55 AS DETAILED IN A6GORI?ANGE NITH FOMA STANDARDS FOR TYPE OF FRAME SYSTEM To BE USED,AND 2. RAILS: ALL E30TTOM AND TOP RAILS SHALL BE 6"+ MANUFAGTURER STANDARD HARDHOOD. Y41TH REGOMMENDATION5 OF DOOR AV FRAME MANUFACTURER5.HHENEVER POSSIBLE,USE GLASS SETTING MATERIALS MANUFAGTURER LICENSED APPLIGATOR OR A FIRM,APPROVED AS AN APPLICATOR 13Y THE AGOU5TIGAL MATERIAL 2.1 AGGE55ORIE5 3. 5TILES AND RAILS SHALL MEET PERFORMANGE CRITERIA AS REQUIRED BY ANL. PROVIDED BY FRAME MANUFAGTURER5.AT TOP AND BOTTOM OF BUTT GLAZED PANELS PROVIDE METAL GRANNEL5 OF MANUFACTURER'5 HITH NOT LE55 THAN FIVE YEARS EXPERIENCE IN THE 5PEGIFIED UNIT RE5PON51BILITY AND A. MOLDINC75 AND TRANSITION 5TRIP5 ARE TO BE(NATURAL HOOD)(RUBBER)(VINYL)V41TH COLOR/FIN15H AS 5ELEGTED B 1.03 QUALITY A55URANGE 13. BEVEL STRIKE EDGE OF 5IN6LE-AGTINC?DOOR5, Ilb" IN 2".RADIUS STRIKE EDGE OF DOUBLE AGTIN6 5NIN6 DOORS AS 51ZE REQUIRED TO SUPPORT GLASS,AND AS DETAILED. PROVING A BAGK6f;ZOUN1?OF NOT LE55 THAN THREE INSTALLATIONS OF GOMPARABLE 51ZE AND 5GOPE TO THAT OINNER TO MATGH/SLEND Y41TH THE FIN15HED FLOORING GOLOR,AS MANUFACTURED BY OTHERS. REGOMMENDEE?BY HARDHARE MANUFAGTURER. HEREIN 5PEGIFIED. A. GOATS,THE NUMBER OF GOATS 5PEGIFIG ARE THE MINIMUM REQUIRED.PROVIDE ADDITIONAL GOATS IF REQUIRED FOR G. HARDKARE REINFORCEMENT BLOGKIN6: IN ADDITION TO STILES AND RAILS AS 5PEGIFIED,PROVIDE B. No GLAZING SHALL BE DONE NHEN AMBIENT TEMPERATURE 15 DELON 400F. B. ALLONABLE TOLERANGE5. FULL GOVERAC7E. 50LID HOOD G. 6LAZIN6 SHALL BE PERFORMED IN AGGORDANGE NITH THE REQUIREMENTS OF THE "FLAT 6LA55 MANUFACTURER'S PART 3--EXEGUTION 1. IF NOT OTHERN15E INDICATED,THE MINIMUM FIN15H REOUIRE51 PRIMER OR PREP GOAT AND 2 FIN15H GOATS. BLOGKIN6 FOR MOUNTING ALL DOOR HARDINARE,INCLUDING 5PE61AL DOOR GLO5ER5 OR PIVOTS IF INDIGATED.NO A550GIATION GLAZING MANUAL",LATEST EDITION. 1. INSTALL CEILING 5Y5TEM5 IN A MANNER GAPABLE OF SUPPORTING ALL SUPERIMPOSED LOAP5,HITH MAXIMUM B. PROVIDE FIN15H GOATS AND VERIFY GOMPATIBILITY INITH PRIMER GOATS 5PEGIFIED IN OTHER 5EGTION5. THROU6HBOLT5 SHALL BE PERMITTED TO PERMANENTLY MOUNT HARDNARE ON DOOR.IF BLOGKIN6 15 NOT PRAGTIGAL, D. ALL GLASS SHALL BE INSTALLED FREE OF RATTLE.EXTERIOR 6LA55 SHALL BE NATERT16HT.ALL GLASS SHALL BE PERM1551BLE DEFLEGTION OF 1/360 OF SPAN AND MAXIMUM 5URFAGE DEVIATION OF 1/811 IN 121. 3.01 EXAMINATION G, PROVIDE READY-MIX GOATIN6.NHEN MOVIFIGATION5 TO READY-MIX GOATINC7 ARE REQUIRED,5UGH AS THINNING, PROVIDE 5TA\/E 5LUED LOH DENSITY LUMBER CORE OF,50LID PARTIGLE BOARD GORE NITH MINIMUM 32 PGF PEN51TY HELL BEDDED V41TH 6LAZING GOMPOUNDS,AND GASKETS FINISHED NEATLY AT 516HTLINE5.REMOVE 5ELVAGE ED6E A. VERIFY THE SUBSTRATE 15 GLEAN AND FEE OF DEBRIS,DIRT,L005E MATERIAL,GREASE,OIL AND OTHER GONFORMING To TYPE 1,OEN51TY G,GLASS I OF G5236,HOT PRE55 RE51N BONDED.REFER TO 5EGTION 05100 FOR 1.05 SUBMITTALS GOLORIN6 OR REINFORCING;COMPLY V41TH GOATIN6 MANUFACTURER'5 REGOMMENDATiON5. FROM HIRE GLASS. GONTAMINANT5 THAT HILL INTERFERE NITH THE BONDING OF THE ADHESIVE.CONCRETE 5URFAGE SEALERS MUST BE HARDNARE REQUIREMENT, E. MARK GLASS AFTER INSTALLATION BY GRO55ED STREAMERS ATTACHED TO FRAMING AND HELD ANAY FROM GLASS; A. 5AMPLE OF rg"X rb"SPECIFIED TII F AND INTERLOCKING T-BAR A55EMBLY. REMOVED IF PRESENT. D. COMPLY V41TH LOCAL,REGIONAL,STATE,PROVINGIAL AND OTHER FEDERAL AIR QUALITY STANDARDS. DO NOT APPLY MARKERS TO 5URFAGE OF GLASS. 13. VERIFY THAT NEN 5LAB GURE 15 A MINIMUM OF 60 DAYS. E.APPLIGATOR 5PEGIALIZINC7 IN PERFORMING THE NORK OF TH15 5EGTION Y41TH MINIMUM 5 YEARS DOGUMENTED PART 3-EXEGUTION 1.04 PRODUGT HANDLING EXPERIENGE. F. MIRROR ATTAGHMENT: INSTALL NHERE 5HONN USING MIRROR ADHESIVE. G. GONGRETE 5URFAGE5: VERIFY THE GONGRETE 15 VISUALLY SOUND AND DRY.TO DETERMINE IF A GONGRETE SLAB 15 A. DELIVER MATERIALS IN OR16INAL UNOPENED BUNDLES AND GONTAINER5 BEARING MANUFAGTURER'5 NAME,BRAND,TYPE, 1. SPOT APPLY MIRROR ADHE51VE TO HALL PER ADHE51VE MANUFACTURER'5 REGOMMENDATION. DRY,US A GALGIUM GHLORIDE TEST AND A RELATIVE HUM1011Y TEST.LE55 THAT 15%RH(RELATIVE HUMIDITY)AS 1.04 DELIVERY,STORAGE AND HANDLING 3.01 INSTALLATION 2. PLAGE MIRROR INTO POSITION,AND PRE55 FIRMLY INTO ADHESIVE FOR PROPER DOND. GLA551FIGATION AND DE516N.HANDLE IN MANNER TO AVOID DAMAGE.STORE MATERIALS IN DRY VENTILATED SPACE TESTED BY A5TM F 2110.GALLIUM GHLORIDE TE5T5 SHOULD BE LE55 THAN 5 POUNDS PEP, 1000 SQUARE FEET PER 24 A. INSTALL HOOD DOORS PLUMB AND SQUARE,NITH MAXIMUM DIAC70NAL 015TORTION OF AND IN GOMPLIANGE V41TH 3. INSTALL MOLDIN65 AND GHANNEL5 AS DETAILED.MITER CORNERS. INSTALL GOLUMN GORNER5 AT ALL MIRRORED OFF FLOOR PER MANUFAGTURER'5 DIRECTION.NEATLY 5TAGK ACOUSTICAL UNITS IN FLAT POSITION.AVOID EXPOSURE HOURS. A. DELIVER,STORE AND HANDLE IN AGGORDANGE JNITH MANUFAGTURER5 RECOMMENDATIONS.PROTEGT FROM ADVERSE THE REFERENGED STANDARDS. INSTALL HARDINARE IN AGGORDANGE NITH REQUIREMENTS OF 5EGTION Ob-700. GOLUMN.5.LINE MOLDIN65 AND(HANNEL5 V41TH PROTECTIVE TAPE. TO P�IEATHER BY USING PROTEGTIVE GOVER.PROTEGT FROM SOILING AND GON5TRUGTION DAMAGE. P. HOOD 5UE3FLOOR5: MUST 13E DRY,GLEAN,5TRUGTURALLY SOUND,AND FLAT TO HITHIN 1/5"IN 10 FEET(3MM PER 3M), EXPOSURE TO HEATHER AND TEMPERATURE EXTREME5.AVOID FREEZING. 13. UNDERGUT ALL DOORS AT JO55ITE TO GLEAR TOP OF FLOOR FIN15HED 1/4",UNLE55 OTHERNI515 NOTED. INSTALL DOORS HELL NAILED AND/OR GLUED,FREE OF VOIDS AND V41TH JOINTS THAT 90 NOT EXCEED I/ A EN U THAT ALL 6, DELIVER MATERIALS TO THE PROJEGT 51TE IN UNOPENED GONTAINER5 BEARING MANUFACTURER5 NAME AND PRODUGT NITH Ilb"GLEARANGE ALL AROUND,INCLUDING 1/5"A13OVE THRESHOLD. 1.05 51TE GONDITION5 I(b 1,6MM 5 RE C.. TOUGH UP SHOP FINISHES AS REQUIRED TO ASSURE COMPLETE INTEGRITY OF FIN15H SYSTEM.REPLAGE DOOR5 INHERE 3.02 GLEANING A. MAINTAIN TEMPERATURES OF 60 DEGREES TO b5 DEGREES F AND HUMIDITY OF NOT MORE THAN-70%PRIOR TO,DURING NAIL HEADS ARE SET FLUSH NITH OR DELON SURFACE.MUST BE SANDED SMOOTH TO REMOVE VARNISH,HIGH ED6E5, DESCRIPTIONS CORRESPONDING TO DIE516NATION ON MATERIAL L15T. DAMAGES ARE IN EXGE55 OF REPAIRS NHIGH MAY BE GORREGTEE?BY TOUGH UP PROGE55. A. IMMEDIATELY REMOVE PROPPINC75 FROM FINISHED 5URFAGE5.REMOVE NONPERMANENT LABELS AND EXGE55 SEALANT AND AFTER IN5TALLATION. CHIPS, G. STORE MATERIALS IN A DRY,GLEAN AND HELL VENTILATED AREA.STORE GONTAINER5 GLO5ED. .0. THE COMPLETED NORK SHALL BE R1610,PLUMB OR LEVEL AS APPROPRIATE;FREE FROM DAMAGE,FLAIN5,13LEM15HE5 IMMEDIATELY AFTER SEALANT GURE5;CURE SEALANT FOR H16H EARLY STRENGTH AND DURABILITY.REMOVE AND OR OTHER GONTAMINANT5.PARTIGLEBOAPP/FLAKEf3OAPD/GHIPBOARD/05f3 ARE NOT APPROVED 505TRATE5 AND (�):2013 NICHOLA5 J. TRICARICIO APPEARANCE REPLACE 6LA55 NHIGH 15 BROKEN,CHIPPED,GRAGKED,ABRADED OR DAMAGED DURING GON5TRUGTION PERIOD,, -AF -PRODUGT5 SHOULD 1.05 PROJECT GONDITION5 OR OTHER DEFEGT5 DETRIMENTAL To HAVE JOINTS IN PROPER P051TION AND ALIGNMENT AND BE iNGLUDIN6 NATURAL CAUSES,AGGIDENT5 AND VANDALISM.KASH AND CLEAN ALL 6LA55 SURFACES JUST PRIOR TO P T 2 NOT 13E USED.USE 5/5A(16MM)OR 1/44(IcIMM)APA-CDX GRADE UNDERLAYMENT PLYNOOD OR EQUIVALENT.ALLON UNIFORM IN PLANE,COLOR AND FINISH. TURNING OVER TO OHNER. 1/32A-1/16A(0.8-1.6MM)EXPAN51ON SPACE BETHEEN SHEETS NITH 5TAC76ERED JOINTS.LEAVE 1/44(ICIMM)MINIMUM A. GOMPLY HITH MANUFAGTURER5 REGOMMENDATION5 FOR APPLICATION GONVITION5. TIIE 6ENERAL CONTRACTOR ARWOR ALL 5IB-CONTRACTOR5 2.01 SUSPENSION SYSTEM HORKIN(5 FROM THE5E PLAN5 AND SPECIFICATION5 ARE NOT END OF 5EGTION A. SYSTEM CONFORMING TO A5TM-G-635,INTERMEDIATE DUTY,MAXIMUM DEFLECTION 1/3690 SPAN.EXPOSED TEE UNLE55 EXPAN51ON 5PAGE AT ALL VERTICAL 065TRUGTION5. B. DO NOT APPLY GOATIN&INHERE DUST 15 AIR-BORNE. TO 5GALE%rH INFORMATION 13UT To CONTACT THE ARCHITECT INDICATED OTHERH15E. E. EXPAN51ON JOINTS,GON5TRUGTION SEAMS,AND OTHER IRREC7ULARITIE5 ARE TO BE FILLED FLAT AND SMOOTH ONLY G. DO NOT APPLY GOATIN6 INHEN RAIN,FOG OR M15T 15 PRESENT,OR NHEN ANTIGIPATEI?PRIOR TO GURIN6,OR NHEN OR H15 REPRE5ENTATIVE R156ARDIN6 MEA5UREMENT5,IF%�-H A. THE FINISHED SURFACES SHALL BE FREE FROM DAMAGE,FLAH5,BLEMISHES OR OTHER DEFEGT5 DETRIMENTAL TO B. NON-RATED AND RATED- HOUR RATING AND LOGATION5 AS INDICATED. NITH 5URFAGE OR ROOM TEMPERATURE 15 DELON 50 DEGREES F. MEA%REMENT5 DO NOT APPEAR CORRECT,ADD UP PROPERLY 5EGTION 0e5100 APPEARANCE. G. STRUTS AND SHAY 5RAOIN6: PROVIDE ALL REQUIRED FOR GONFORMANGE NITH LOCAL GODE 5EI5MIG REQUIREMENTS UNDERLAYMENT5 APPROVED BY KNIGHT PREMIUM FLOORING QUARTZ.DO NOT SKIM(,OAT GONGRETE 5UBFLOOR5. D. MASK OFF AND PROTECT FLOORS,FIXT1JRE5,FURNITURE,EQUIPMENT,HARDNARE AND ADJACENT 5URFAGE5. OR 5CAI F CORRECTLY TO THE INDICATED 51ZE. HAREMARE END OF 5EGTION AND AS INDIGATED. F. VERIFY THAT 505TRATE 15 FLAT TO NITHIN I/bA IN 10'(3MM PER 3M). E. AGGLIMATE MATERIALS IN AGGORDANGE V41TH MANUFAGTURER'5 RECOMMENDATIONS. o. APPROVED MANUFAGTURER5: ARMSTRONG OR ARGHITEGT APPROVED EQUAL. C7. KNIORT PREMIUM FLOORING GAN BE INSTALLED ON,ABOVE,OR DELON GRADE. PART I -6ENERAL E. HANGER HIRE: PROVIDE NOT LE55 THAN 10 6A6E GALVANIZED,5OFT-ANNEALEI?STEEL HIRE FOR GEILING 5Y5TEM5 H. BE61NNINC7 OF INSTALLATION MEANS 5U135TRATE HAS BEEN AGGEPTED 5 5UITABLE. 1.06 HARRANTY 15EGTION OC1250 PROVIDING LATERAL SUPPORT FOR PARTITIONS AND NOT LE55 THAN 12 GAUGE FOR GEILIN65Y5TEM5 NOT INTENDED 4-1 1.01 5EGTION INGLUPE5 6YP5UM E30ARD SYSTEM5 TO LATERALLY SUPPORT PARTITIONS. 3.02 PREPARATION A. KARRANTY TERM: 5 YEARS. DATE: 155UE A. HARDINARE FOR STEEL FRAMES,ALUMINUM FRAMES,HOOD FRAME5,STEEL AND HOOD DOORS. F. PROTECTIVE GOATIN(55 AND FIN15HE5: PROVIDE ELECTROC7ALVANIZED STEEL GOMPONENT5 V41TH LOH--6LON GOATINC75 B. INCLUDE COVERAGE FOR SGRUB ABILITY FADING,(OLOR GHAN6E,GHALKING OR PEELING. B. METAL THRE5HOLD5,5EAL5,DOOR BOTTOMS,A5TRA6AL5 AND MUTES. PART I - GENERAL AND FINISHES TO MATGH AGOU15TIGAL PANELS AND IN GONFORMANGE Y41TH ARGHITEGT'5 GONTROL 5AMPLE5.THE FIN15H A. IF NEGE55ARY MEGHANIGALLY ABRADE ALL SUBSTRATES. G. CYLINDERS FOR DOORS FABRICATED V41TH LOOKING HARDNARE. SHALL BE ON ALL EXPOSED PORTIONS OF GRID. 5. SHEEP AND VACUUM SUBSTRATE,4 ENSURE THAT 5URFAGE 15 FREE OF OIL,GREASE,INAX,DUST,OR ANY OTHER PART 2t PRODUCTS 0-T/01/15 PRELIMINARY REVIBN D. HARDNARE GROUPS AS 5HONN ON AO.2 (5. PERIMETER MOLDINGS.PROVIDE STANDARD ANGLE MOLDIN65- MATERIAL AND FIN15H TO MATCH THE EXP05ED FOREIGN 1.01 NORK INGLUDED SUSPENSION GOMPONENT5,IN SIZES AND PROFILE AS 5HOINN. 5UB5TANGE5. 2.01 MANUFAGTURER.5 1.02 RELATED SECTIONS A. METAL FRAMING REQUIRED FOR GYPSUM BOARD,GYPSUM BOARD AND AGGE55ORIE5,JOINT TREATMENT,REPAIR OF H. M15GELLANEOU5 ACGE55ORIE5: SPLINES,SADDLES,GLIP5,FASTENERS,AND OTHER AGGE55ORIE5;GALVANIZED SHEET G. USE LATEX PORTLAND GEMENT FILLER TO PATGH GRAGK5,SMALL HOES,AND FOR LEVELING OF SMALL AREAS.DO NOT A. 5EGTION 06400: ARCHITECTURAL INOODNORK. EXISTING GYPSUM E30AFD 5URFAC,E5 NOTED TO RECEIVE NEIN APPLIED FIN15HE5. STEEL.PROVIDE AS REQUIRED TO GOMPLETE THE5U5PEN5ION SYSTEMS AND INSTALLATION OF LIGHTING AND HVAG SKIM A. PAINT: BENJAMIN MOORE.MS.DOROTHY HAZIN5KY(500-635-514-T). 0-TIOC1115 PERMIT LL BIV 5. 5EGTION 05110: 5TEEL DOORS � FRAME5. ELEMENTS. GOAT LARGE AREAS V41TH LATEX PATCHING GOMPOUND.SAND PATGHED AREAS SMOOTH AFTER MATERIAL 15 GURED. B. PATOHIN& FULLER O'BRIAN(bbe)-265-6753)OR GLIDDEN 000-clb4-5444). 1.02 QUALITY A55URANCE USE 4-1 1.03 SUBMITTALS A. REFERENCE 5PEGIFIGATION5 AND 5TANDARD5: GOMPLY NITH OTHERN15E 5PE61FIED IN TH15 5EGTION. IN GA5E OF 2.03 AGOU5TIGAL UNITS. ONLY QUALITY MATERIALS AND PRODUGT5,NHIGH 00 NOT GONTAIN GYPSUM. 2.02 MATERIALS A. SGHEOULE5: GONFLIOT,GOMPLY V41TH THE M05T STRINGENT. A. TILES: D. IF APPROVED 5ELF-LEVELING UNDERLAYMENT5 ARE USED,THEY MUST DRY 5UFFIGIENTLY(RUN M015TURE TEST)AND 13E 1. A5TM 6645-STANDARD 5PEGIF16ATION FOR NON-LOAD BEARING STEEL 5TUD5,RUNNER AND R1610 FURRING 1. SUBMIT 56HEOULE INDIOATIN6 EAC,14 TYPE OF HARDNARE FOR EAGH DOOR. GHANNEL5 FOR 5CREN APPLICATION OF GYPSUM BOARD. 1. MINERAL FIBER TILES AND PANELS,TYPE 111,GLASS A,PER FED.5PEG.55-5-M55,SIZE,FIRE RATIN6,AND LOCATION 5ANDEI?SMOOTH BEFORE IN5TALLING FLOOR.KN16HT PREMIUM FLOORING QUARTZ 15 NOT RE5PON51BLE FOR STRENGTH, A. PAINT: PROVIDE TOP GOMMERGIAL LINE PRODUGT5. 2. L15T MANUFA(TURER'5 NAME HITH EACH MANUFACTURER'5 HARDINARE NUMBER TOOETHER NITH FINISHES IN US 2. A5TM G754-STANDARD 5PEGIFIGATION FOR INSTALLATION OF STEEL FRAMING MEMBERS TO RECEIVE 5GREPq AS INDIGATED. APHE510N,OR GENERAL PERFORMANGE OF UNDERLAMENT5 AS PROPER GOMPOUNDIN6 AND PREPARATION OF 1. GOLOR PIGMENTS: PURE,NON-FAVIN6,TYPE5 TO SUIT 5UB5TRATE5 AND SERVICE INDIGATED NO LEAD GONTENT. STANDARDS. ATTAGHED GYPSUM NALLBOARD,BAGKIN(5 BOARD,OR MTER-RE515TANT BACKING BOARD. 2. APPROVED MANUFAOTURER- 5URFAGE 15 2. QUALITY: PROVIDE FIN15H GOATS CAPABLE OF BEING INA5HED NITH MILD DETERGENT NITHOUT L055 OF GOLOR, 4-3 3. MANUFACTURERS FIN15H DE516NATION5 HILL NOT BE AGGEPTABLE. ARMSTRONG THE RE5PON51BILITY OF THE INSTALLER.SUGGESTED PRODUCTS INGLUDE: ARDEX K-15 OR MAPEI PRP 110. SHEEN OR PIGMENTS. 3. A5TM G5(b -STANDARD 5PEGIFIGATION FOP,GYPSUM KALL50ARD. 0. SHOP PRANING75 (800)448-1405,EXT.3108 E. 5TRUGTURAL L16HTNE16HT GONGRETE MUST HAVE A GOMPRE551VE 5TREN6TH GREATER THAN 2000 P.5.1. 3. PROVIDE MATERIALS NITH NO VOG GONTENT. SI.- 1. INDIGATE LOCATIONS AND MOUNTING HE16HT5 OF EAGH TYPE OF HARDNARE. 4. A5TM G630-STANDARD 5PEGIFIGATION FOR HATER-RE51STANT GYPSUM BACKING BOARD. 3. PRODUCT: PER 5GHEDULE ON A2.0 B. REMOVE TEMPORARY PROTECTIVE HRAPPIN65 PRIOR TO OGGUPANGY. 5. A5TM C442 -STANDARD 5PEGIFIGATION FOR GYPSUM BAGKIN6 BOARD. 3.03 INSTALLATION G. SEALER: FULLER 0'13RIAN'5 "SPATE" HIGH BUILD FLAT LATEX 302-301,OR C7LIPPEN'5"5PREAD PATCH" 2. SUPPLY TEMPLATES TO DOOR AND FRAME MANUFAOTURER5(5p)TO ENABLE PROPER AND AGGURATE 51ZINC,AND 6. A5TM G665-STANDARD 5PEGIFICATION FOR MINERAL FIBER BLANKET THERMAL INSULATION FOR HOOD FRAME AND LOCATIONS,OF GUT-OUT5 FOR HARDINARE. L16HT GON5TRUGTION BUILDINGS. 2.04 AGOU5TCAL AGGE55ORIE5 A. FOLLON MANUFAC,TURER'5 INSTALLATION IN5TRUGTION5 SUPPLIED IN EAGH GARTON OF MATERIAL. D. MAINTENANGE STOCK 3. DETAIL ANY CONDITIONS REQUIRING CUSTOM EXTENDED LIP STRIKES,OR ANY OTHER 5PEGIAL OR C05TOM -1. A5TM Gb4O-STANDARD 5PEGIFIGATION FOR APPLIGATION AND FIN15HIN6 OF GYPSUM BOARD. A. AGOU5TICAL INSULATION: N015E BARRIER FIBERGLASS BATT INSULATION,FRIGTION FIT TYPE HITHOUT INTEGRAL VAPOR B. TO REDUGE TELEGRAPHING OF MINOR 5UBFLOOR IRREC7ULARITIE5 FILL,PATGH,AND SAND AS NEGE55AR . 1. PROVIDE ONE GALLON OF EAGH GOLOR,TYPE AND SHEEN OF PAINT FROM THE SAME COLOR LOT AS THE GONDITION5. 5. A5T G4-15-STANDARD 5PEGIFIGATION FOR JOINT TREATMENT MATERIALS FOR 6YP5UM KALLBOARD BARRIER MEMBRANE;3-1/2"THICK,UNLE55 OTHERA15E NOTED;NITH FLAME SPREAD OF 25 OR LE55 AND SMOKE G. APPLY MANUFAGTURERS ADHE51VE PER MANUFAGTURERS IN5TRUGTION5. APPLIED MATERIALS,IN 5EALED GONTAINER5.LABEL PROJECT NAME,SHEEN,TYPE OF PAINT,AND GOLOP, G. PRODUGT DATA: SUBMIT TY40 MANUFAGTURER'5 GATALO6 GUT5.OF EVERY ITEM FURN15HED FOR TH15 PROJEGT.5HON DEVELOPED RATING OF 50 OR LE55.AS MANUFAGTURED BY ONEN5-GORNIN(5,GERTAINTEED,MANVILLE,OR GELOTEX. FORMULA AND GOLOR NUMBER ON GONTAINER5.LABEL GONTAINERS NITH ARGHITEGTS GOLOR NUMBER OR GON5TRUGTION. 5.04 PROTECTION DE516NATION INDICATED ON DRANIN65 SUPPLEMENTED NITH DE516NATION FOR SHEEN. ALL FIN15HE5,51ZE5,GATALO6 NUMBERS AND PIGTURE5.EXPLAIN FULL ALL ABBREVIATIONS. q. A5TM Ellcf -FIRE TE5T5 OF BUILDING CONSTRUCTION MATERIALS. PART 5-EXEGUTION A. PROTEGT FIN15HED FLOOR FROM ABUSE BY OTHER TRADES USING HEAVY KRAFT PAPER OR EQUIVALENT. 2. DELIVER TO ONNER'5 PER50NNEL AT SUBSTANTIAL GOMPLETION. 10. 6YP5UM ASSOCIATION RECOMMENDED 5PEGIFIGATION5 FOR THE APPLICATION AND FINISHING OF GYPSUM BOARD. 1.04 QUALITY A55URANGE 5. PROVIDE FIRE-RE515TANT RATED ASSEMBLIES IDENTICAL TO TH05E INDIGATED BY REFERENGE TO THE GYPSUM A. ALL HARDNARE SHALL BE NEIN AND FREE FROM DEFEC,T5 AFFEGTINC7 5ERVIGEABILITY AND APPEARANGE.NORKIN6 A55OGIATION "FIRE RE515TANGE DESIGN MANUAL"CURRENT EDITION OR AS OTHERN15E APPROVED BY THE AUTHORITIES 3 01 INSTALLATION 3.05 CLEANING PART 3- EXEGUTION PARTS SHALL DE HELL FITTED,5MOOTH-HORKIN6 AND NITHOUT EXGE551VE PLAY. HAVING JUR15DIGTION. INSTALL ACOU5TIGAL GEILIN6 SYSTEMS IN AGGORDANGE V41TH THE REQUIREMENTS OF THE 5U5PEN51ON SYSTEM DESIGN A. INITIAL MAINTENANGE FOLLONIN6 INSTALLATION PER MANUFAOTURER'5 MAINTENANCE RECOMMENDATIONS FLOOR 5. ALL MATERIALS OR PRODUGT5 5PEGIFIEI?HEREIN ANWOR INDICATED ON THE DRANIN65 BY TRADE NAME, G, ALLONABLE TOLERANCES: INDIGATEP AND NITH THE REFERENGED STANDARDS. FIN15H 15 3.01 EXAMINATION CD MANUFAGTURER'5 NAME OR GATAL06 NUMBER SHALL BE PROVIDED AS 5PEGIFIED. B. 51,15PEN51ON 5Y5TEM5: INSTALL IN AGGORVANGE TO LOCAL GODE,A5TM G-636,AND MANUFAGTURER-5 OPTIONAL. A. VERIFY SUBSTRATES ARE AGGEPTABLE TO RECEIVE THE NORK OF TH15 5EGTION.EXAMINE SURFACES 5GHEDULED TO 1. GEILIN6 SUPPORT SYSTEM SHALL LIMIT DEFLEGTION OF THE FINISHED GEILIN6 TO LESS THAN 1/360 OF 5PAN. G. 5UPPLIER- REG06NIZED BUILDERS HARDHARE SUPPLIER HITH MINIMUM FIVE YEARS 5UGGE55FUL EXPERIENCE IN RECOMMENDATIONS.COORDINATE V41TH OTHER TRADES.SET NITH LASER EQUIPMENT. REGEIVE PAINT AND FIN15HE5 FOP,GONDITION5 THAT HILL ADVERSELY AFFEGT EXEGUTION,PERMANENGE AND QUALITY 5GHEOULINC7 AND FURN15HINC7 HARDNARE PRIOR TO OGGUPANCY.PROVIDE 5ERVIGE5 OF ARGHITEGTURAL HARDNARE 2. FOR FLAT 5URFAGE5,THE MAXIMUM DEVIATION FROM TRUE PLUMB OR LEVEL PLANE,1/5" IN 10-AS MEASURED UNDER G. HANGER-NIRE5: END OF 5EGTION OF NORK. STRAIGHT EDGE PLAGED AT ANY LOCATION ON 5URFAGE. GON5ULTANT TO 5UPERV15E HARDNARE SCHEDULING AND INSTALLATION. 5. LIVERY: DELIVER MATERIALS IN ORIC71NAL UNOPENED BUNDLES AND GONTAINER5 BEARING MANUFAGTURER NAME, 1. 6ENERAL 5PAGE HIRES NOT OVER 45"GENTER 130TH HAYS;00 NOT SUPPORT MORE THAN I(b 50.FT.OF GEILIN6 3.02 PREPARATION BRAND,TYPE,AND GRADE. HANDLE IN MANNER TO AVOID DAMAGE.STORE MATERIALS IN DRY VENTILATED 5PAGE PER HANGER.SUPPORT TERMINAL END OF EAGH GROSS RUNNER OR MAIN RUNNER INDEPENDENT OF AND Y41THIN 8" SEGTION Oq(gbO 1.05 REGULATORY REQUIREMENTS OFF FLOOR PER MANUFAGTURER'5 DIRECTIONS.NEATLY 5TAGK GYPSUM NALLBOARD IN FLAT POSITION.AVOID OF A HALL. INSTALL V41RE HANGERS V41THIN 5"OF EAGH CORNER OF LIGHT FIXTURE OPENING INHERE POSSIBLE; A. PREPARE SUBSTRATE IN ACGORDANGE NITH MANUFAGTURERS RECOMMENDATIONS. A. ALL HARDNARE LISTED OR FURN15HED SHALL MEET REQUIREMENTS OF FEDERAL,STATE AND LOGAL GODE5 HAVING EXP05URE TO HEATHER BY USING PROTECTIVE OOVER.PROTEGT FROM SOILING AND GON5TRUGTION I?AMA(5E. ATTAGH TO MAIN RUNNERS. GAIZ�E_ET B. VACUUM AND OLEAN SUBSTRATE. JUR15DIGTION OVER TH15 INSTALLATION.ANY ITEMS FURNISHED OR INSTALLED THAT 00 NOT MEET CODE REQUIREMENTS, 2. CONGRETE SUPPORTS: NRAP AROUND REINFORGIN6 STEEL NITH A TN15T OR LOOP AND EMBED AT LEAST 2" INTO G. PROTEGT ITEMS NOT TO BE PAINTED OR REMOVED PRIOR TO PAINTING: IF REQUIRED TO BE REMOVED,REP051TION SHALL BE REMOVED AND PROPER ITEMS SUBSTITUTED AT NO ADDITIONAL G05T.REQUIREMENTS INGLUDE,BUT ARE NOT 1.03 PROEGT GONVITION5 GONGRETE,OR ATTAGH TO APPROPRIATE TYPE PONDER DRIVEN FASTENERS OR INSERTS. PART I GENERAL AND REINSTALL AFTER PAINTING. LIMITED TO,THE FOLLONIN& 3. METAL DEGKIN6: ATTAGH BY PENETRATING THRU METAL DEGK,TN15T AND LOOP;OR APPROPRIATE TYPE PONDER 1.01 NORK INCLUDED D. GLEAN 5URFAGE5 TO BE PAINTED FREE OF ANYTHING INHIGH MAY INTERFERE NITH PROPER FUNGTIONIN6 OF PAINTING A. GOMPLY HITH REQUIREMENTS OF REFERENCED STANDARDS BEFORE,DURING AND AFTER APPLI(ATION,OF GYPSUM DRIVEN FASTENERS. A. 5URFAGE PREPARATION,GARPETIN6 MATERIALS,ACCESSORIES AND INSTALLATION FIN15H. > 1. A(GE55 FOR PER5ON5 NITH ID15ABILITIE5- FOR PROJECTS LOCATED IN GALIFORNIA, GOMPLY V41TH CALIFORNIA E30ARD SYSTEMS.MAINTAIN CONTINUOUS,UNIFORM,GOMFORTA5LE BUILDING INORKIN6 TEMPERATURES OF NOT LESS THAN GODE OF REWILATION5,TITLE 24;PROJECTS IN ALL LOGATION5. GOMPLY NITH THE RECOMMENDATIONS OF THE 55DEOREE5 F(13 DEGREES G)FOR A MINIMUM PERIOD OF 45 HOURS PRIOR TO,DURING AND FOLLOHIN&APPLIGATION 4. STEEL 5UPPORT5: NRAP AROUND,THRU STEEL,OR BY OTHER AGGEPTABLE METHODS. 1. FILL AND SAND PATGHE5,REPAIRS AND OTHER 5URFAGE BLEMISHES TO GONFORM HITH ADJACENT SURFACES. < AMERIGAN5 NITH DISABILITIES ACT AGGE55113ILITY GUIDELINES(ADA-A(7). OF 6YP5UM BOARD AND JOINT TREATMENT MATERIALS OR BONDING OF ADHESIVES.VENTILATE BUILDING 5PACE5 AS 0. PROV112E SUPPLEMENTAL HANGERS,SUPPORTS AND FASTENERS FOR LATERAL BRAGIN6 OF THE SUSPENSION SYSTEM IN 1.02 QUALITY ASSURANCE 2, 5EAL PATGHED AREAS TO RECEIVE PAINT. 2. AN51 AIITI--5PEGIFICATION5 FOP,MAKIN6 BUILDINGS AND FACILITIES AGGE5515LE TO AND USABLE B PHYSICALLY AGGORDANGE NITH THE REFERENGED STANDARDS. A. REFERENGE 5PEGIFIGATION5 � STANDARDS: GOMPLY NITH MFRS RECOMMENDATIONS THE FOLLOHINC7 UNLE55 3, APPLICATION OF PAINT OR PRIMER INDIGATE5 PAINTING CONTRACTOR AGGEPTANGE OF RE5PON51BILITY FOR HANDIGAPPED PEOPLE, REQUIRED FOR DRYING OF JOINT TREATMENT MATERIAL IMMEDIATELY AFTER ITS APPLIOATION.AVOID DRAFTS DURING E. INSTALL AFTER MAJOR ABOVE-GEILIN6 NORK 15 COMPLETE.COORDINATE THE LOCATION OF HANGERS NITH OTHER OTHERN15E SURFACE CONDITION AND APPEARANCE OF FINISHED PRODUCT RESULTANT FROM 5URFAGE GONDITION. 3. NFPA 101. DR ,HOT HEAT14ER TO PREVENT TOO RAPID DRYING. NORK.ENSURE HANGERS AND GARRYIN6 GHANNEL5 ARE LOCATED TO AGGOMMODATE FITTIN65 AND UNITS OF 5PEGIFIED IN TH15 5EGTION. IN GA5E OF GONFLIGT,GOMPLY INITH THE MOST STRINGENT. 4. AN51 AIITI. PART 2 -PRODUGT5 EQUIPMENT NHIGH ARE TO BE PLAGED AFTER THE INSTALLATION OF GEILIN6 GRID. 1. GRI -GOMMERGIAL GARPET MAINTENANGE MANUAL. 3.05 INSTALLATION 5. NFPA 252 F. INTERFIERENGE: INHERE HIDE AIR GONDITIONIN6 DUGT5 OR 51MILAR 065TRUGTION5 AE30VE AGOU5TIGAL GEILIN65 B. FLAMMABILITY; GARPET SHALL HAVE PASSED THE FOLLONIN6 TESTS. A. GENERAL 6. FIRE RATED DOORS: GOMPL NITH REQUIREMENTS OF NFPA 80 AND APPL16ABLE CODES FOP,FIRE RATED DOOR INTERFERE V41TH 5U5PEN5ION HANGERS,PROVIDE INDEPENDENT FRAMING DELON 055TRUGTION TO SUPPORT THE GEILING 1. DOG-FF-1-10(THE PILL TEST): PA55 1. APPLY PAINT IN AGGORDANGE NITH MANUFACTURER5 DIREGTION5,USE APPLIGATOR5 AND TEGHNIOUE5 L3E5T 2.01 FRAMING MATERIALS AS AN OBLIGATION UNDER TH15 5EOTION.SUPPORT FRAMING FROM FLOOR OR ROOF STRUCTURE ABOVE.00 NOT 2. NFPA 255(5MOKE DENSITY): 450 OR LESS. 5UITED FOR SUBSTRATE AND TYPE Or-MATERIAL BEING APPLIED. HARDNARE. PROVIDE HARDNARE BEARING UNDERNRITERS LABORATORY(UL)LABEL5. A. 5TU05: COMPLYING NITH REFEREINGE STANDARDS.5GRENI-TYPE,PUNGHED G-5HAPED ROLL-FORMED ATTACH FRAMING TO DUGTNORK. 3. A5TMI E64D(FLOOR RADIANT PANEL TEST): 0.22 OR HIGHER, 2. ALLON EACH GOAT TO DRY THOROU6HLrf3EFORE SUCCEEDING GOAT APPLICATION. -1. DOORS INDICATEP IN FIRE RATED PARTITIONS AND HALLS SHALL BE P051TIVE LATCHING AND SELF GL05IN6 V41TH ELEGTRO=6ALVANIZED STEEL SHEET. 6. HAN6 INDEPENDENTLY OF INALL5,60LUMN5,DUGT5,PIPES AND GONDUIT.INHERE OARRYING MEMBERS ARE 5PLIGED, G. IN5TALLER'5 GUALIFIGATION5: A MANUFACTURER LICEN5ED APPLICATOR OR A FIRM APPROVED AS AN INSTALLER BY 3. APPLY MATERIALS AT MANUFAGTURERS RECOMMENDATION SPREADING RATE,TO E5TA5LI5H A TOTAL DRY FILM SMOKE 67A5KET5. B. RUNNERS: MATGHIN6 5TUD5. THI(KNE55 AS INDIGATED. IF NOT INDIGATED,PROVIDE DR FILM THIGKNE55 AS RECOMMENDED BY THE COATING OR A G. STIFFENERS: 5/4"GR STEEL INE16HIN&NOT LESS THAN 500 LB5.PEP, 1,000 LF;RUST INHIBITIVE GOATING. H. LIGHTING FIXTURES SHALL NOT BE SUPPORTED FROM OR ON MAIN RUNNERS OR GRO55 RUNNERS IF HEIGHT OF THE CARPET MANUFAGTURER NITH NOT LE55 THAN FIVE YEARS EXPERIENCE IN THE SPECIFIED UNIT RESPONSIBILITY 4 MANUFAGTURER. E3. PRODUCTS REQUIRING ELECTRICAL GONNEGTION; L15TED AND GLA551FIED 13Y UNDERNRITER5-LABORATORIES,INC AVOID V15113LE 015PLAOEMENT OF THE LONC71TUDINAL AX15 OR FAGE PLANE OF ADJAGENT MEMBER5. THE TESTING FIRM AGCEPTABLE TO THE AUTHORITY HAVING JUR15DIGTION,AS 5UITA13LE FOR THE PURP05E SPEC IFIED AND P. GYPSUM BOARD FURRING GHANNEL5: 5GREIN-TYPE,HAT-5HAPED,2-5/4"X-7/cl"DEEP HITH 1/2"HIDE FLAN6E5,25 GAUGE FIXTURE CAU5E5 THE TOTAL DEAD LOAD TO EXCEED THE DEFLECTION CAPABILITY. IN 5UGH CASES,FIXTURE LOADS PROVIDING 5. PRIME COATS INDIGATED, ELEGTRO-6ALVANIZEr?STEEL SHEET,ROLL-FORMED. 1. APPLY TO ITEMS NOT PREVIOUSLY PRIMED. G. FIRE-RATED OPENINGS; PROVIDE HARDINARE FOR FIRE-RATED OPENINC75 IN GOMPLIANGE NITH REQUIREMENTS OF NFPA E. GHANNIEL5: HOT OR GOLD ROLLED,RUST INHIBITIVE PAINTED. S B SD SEMENTARY HANGERS LOCATED V41THIN 6"OF EACH CORNER,OR THE FIXTURES SHALL A BAGK67ROUND OF NOT LE55 THAN THREE IN5TALLATION5 OF GOMPARABLE 51ZE � 5GOPE TO THAT 5PEGIFIED HEREIN. 80. THIS REQUIREMENT TAKES PREGEVENGE OVER OTHER REQUIREMENTS FOR HARDNARE. BE SUPPORTED INDEPENDENTLY.FIXTURES SHALL NOT BE INSTALLED 50 THAT THE MAIN RUNNERS AND GROSS RUNNERS 2. RE-GOAT PRIMED AND 51EALED 5URFAGE5 NHERE THERE 15 EVIDENGE OF 5UGTION SPOTS OR UNSEALED AREAS IN F. FA5TENER5 AND ANGHORAGE5: PER REFERENGED STANDARDS. HILL BE ECCENTRICALLY LOADED. INHERE FIXTURE INSTALLATION INOULD PRODUCE ROTATION OF RUNNER5,5TABILIZER 1,05 SUBMITTALS THE FIRST GOAT. 1.06 DELIVERY,STORAGE,AND HANDLING (5. BACKING PLATE5/5TOGKROOM HORIZONTAL FURRING: MINIMUM 16 GAUGE X 611 NIDE. BARS SHALL 13E PROVIDED. A. SHOP DRAHIN65/51EAMIN6 DIAGRAMS: G. FIN15H GOATS 1. INSTALL EDGE MOLDINGS AT INTER51EGTION OF CEILING AND VERTICAL SURFACES,USING MAXIMUM LENGTH5,STRAIGHT, 1. GLEARLY INDIGATE METHOD OF JOINING SEAMS,TYPE,OF ADHE51VE TO BE USED,METHOD OF INTEGRATING E06E 1. PROVIDE SMOOTH EVEN TEXTURE AND GOVERA6E. A. DELIVER,5TORE,PROTEGT AND RANDLE PRODUGT5 TO SITE UNDER PROV15ION5 OF 5EGTION 01600.PAGKA6E 2.05 GYPSUM 130ARD AND AGGE55ORIE5 TRUE TO LINE AND LEVEL MITER GORNER5.PROVIDE EDGE MOLDINGS AT JUNGTION5 INITH OTHER 01551MILAR 5URFAGE5. 5MP5 V41TH GARPET AND INSTALLATION PROGEDURE5. 2, LEAVE NO LAPS,IRREGULARITY IN TEXTURE AND GOVERA6E. HARDHARE ITEMS INDIVIDUALLY;LA13EL AND IDENTIFY EAGH PAGKA6E INITH DOOR OPENING CODE TO MATCH A. GENERAL: COMPLYING HITH REFERENCE STANDARDS. PRODUCTS BY DOMITAR GYPSUM,OR EQUAL FIRE RATED GYPSUM D. INHERE GOVERAGE 15 INGOMPLETE OR NOT UNIFORM,PROVIDE AN ADDITIONAL COAT OR GOATS AS REQUIRED. HARDNARE 5GHEDULE. SECURE TO JAMB 5TUI?5. 2. SEAMING: SUBMIT GOMPLETE LAYOUT PLANS INGLUDIN6 LOGATION5 OF SEAMS � DETAILED METHOD OF SEAMING, IN E30ARD: TYPE X,UL RATED,MAXIMUM PERM1551BLE LENGTHS;ENDS SQUARE GUT,TAPERED E06E5,5/6' THICK UNLE55 J. FORM EXPAN51ON JOINTS TO ACCOMMODATE PLUS OR MINUS I INGH MOVEMENT � MAINTAIN VISUAL CIL05URE. AGGORDANGE HITH INSTALLATION SPEGIFIGATION5 LAYOUT � SEAM LOGATION5 SHALL GONFORM TO THE 1. PATGHEP AREAS: MATGH ADJACENT 5URFACE5. PATE: No. REVI51ONS 5*r: PART 2 -PRODUGT5 OTHERV415E NOTED.PROVIDE AGGE55ORIE5 IN AGGORDANGE V41TH REFERENGED STANDARDS. K. FIT AGOU5TIG UNITS IN PLAGE,FREE FROM DAMAGED EDGES OR OTHER DEFEGT5 DETRIMENTAL TO APPEARANGE AND FOLLONIN6- 2. LEAVE AREAS IN CLEAN ORDERLY GONDITION. JAE 1. GORNER BEA05: BEADEX DIN OR U5(7 "DURABEAD." FUNCTION.LAY DIREGTIONALLY PATTERNED UNITS ONE HAY V41TH PATTERN AS PREGTED.FIT BORDER UNITS NEATLY a.ALL GARPET SHALL BE LAID IN THE SAME DIREGTION UNLE55 SPECIFICALLY 5HONN OTHERN15E. 3, GORREGT NORK NHIGH DOES NOT MEET APPROVAL OF MEN'S ARHOU5E,ING.S REPRESENTATIVE. 2.01 HARDINARE ITEMS 2. EDGE TRIM: LE METAL DEAD,U56#200-b OR BEADEX B-4. AGAINST ABUTTIN6 5URFAGE5. INSTALL UNITS LEVEL,IN UNIFORM PLANE AND FREE FROM TH15T,HARP AND DENTS. b.NO SEAMS SHALL OGGUR PERPENDIGULAR TO DOORS ENTRIES OR INITHIN Ib"THEREOF. E. 5GHEI?ULE5: 5PEGIFIGATION5 E5TAE3LI5H MINIMUM PROGEDURE,QUALITY AND NUMBER OF GOATS;PROVIDE FOLLONIN6 SEE DRANIN65 FOR HARDNARE GROUPS,HARDNARE FIN15HE5,GROUP LOCATIONS AND DOOR TYPES. 3. GYPSUM E30ARD JOINT TREATMENT: JOINT REINFORGIN(5 TAPE AND JOINT ADHE51VE SHALL BE THE GYPSUM BOARD INSTALL HOL-DONN GLIPS ON ALL AGOU5TIGAL UNITS TO HOLD THEM T16HT TO GRID SYSTEM INHERE NITHIN 20"OF AN (,.SEAMS OGGURRIN6 PARALLEL TO DOORS SHALL BE CENTERED DIREGTL UNDER THE DOOR. PAINT FIN15H SYSTEMS,MANUFAGTURER5 AND GOLOR5 AS SCHEDULED. 5TORE #: .266(b MANUFAGTURER'5 STANDARD PRODUGT5. EXTERIOR DOOR, d.SEAMS OGGURRIN6 AT CORRIDOR GRANGE OF DIREGTION SHALL FOLLON HALL LINE PARALLEL TO GARPET 1.GYPSUM NALLBOARD; A. HINOE5: 51ZE AND TYPE: 4. SKIM 60AT GOMPOUN05: USE U56 READY MIXED JOINT COMPOUND ALL PURPOSE AT GYPSUM BOARD. L. INSTALL AGOU5TIGAL INSULATION BLANKET ON5U5PENDE1?GEILING AT SOUND INSULATED PARTITIONS AS 5HONN. DIREGTION. a. 15T GOAT: FLAT LATEX OR PVA 5EALER. 5. IMBEDDED METAL REVEAL5: BY FRY RE61LET, INC,.,OR EQUAL. PROVIDE GONTINUOU5 LAYER OF INSULATION 4'-0"HIDE,GENTERED ON PARTITIONS. CAREFULLY CHECK ALL PIMEN51ON5 4 OTHER CONDITIONS AFFEGTIN6 TH15 HORK IN THE FIELD, � BE b. 2ND OR 3RD GOAT: LATEX ENAMEL(5HEEN AS 5GHEOULED) 1. DOORS 1-3/4 INGHE5 THIGK AND UP TO 36 INGHE5 NIOE: 4-1/2 INCH HEAVY V�IE16HT TYPE. B. AGOU5TIGAL IN51)LATION� N015E BARRIER FIBERGLASS BATT INSULATION,FRIGTION FIT TYPE NITHOUT INTEGRAL VAPOR 2.TRANSPARENT FIN15HED INOOD/MDF, 2. DOORS 1-5/4 INGHE5 THICK AND 31 INGHE5 TO 45 INC,HE5 NIDE: 4-1/2 INGH HEAVY HEIGHT 13ALL OR OLITE BEARIN6 RESPONSIBLE FOR < TYPE. BARRIER MEMBRANE;3-1/2"THICK,UNLE55 OTHERM15E NOTED;V41TH FLAME SPREAD OF 25 OR LE55 AND SMOKE 3.02 NORKMAN5141P PROPER LAYOUT 4 INSTALLATION OF GARPET IN AREAS DESIGNATED. a. 15T GOAT: 5HER-INOOD VINYL 5EALER 24%,501-105 T67F3 MENS DEVELOPED RATING OF 50 OR LESS. AS MANUFAGTURED BY OHEN5-GORNIN6,GERTAINTEED,MANVILLE,OR GELOTEX. A. COMPLY NITH THE REQUIREMENTS OF THE REFERENCED STANDARDS. THE FIN15HE05URFAGE5 SHALL BE FREE FROM 3. GAREFULLY GHEC,K ALL DIMENSIONS AND OTHER CONDITIONS AFFEGTIN6 THIS NORK IN THE FIELD,AND BE b. 2ND AND 3RD GOAT; 5HER-HOOD HATER NHITE GONVER51ON VARN15H Ve4F b3-DRE. 3. DOORS 2 INCHES THIGK ANWOR OVER 4b INGHE5 V41PE: 6 INGH HEAVY NE16HT BALL OR OILITE DEARING. G. AGOUSTIGAL SEALANT:TYPE REGOMMENDED FOR USE IN GONJUNGTiON NiTH GYPSUM BOARD;NON-5HRINKING AND DAMAGE,FLAIN5,BLEM15HE5 OR OTHER DEFECTS DETRIMENTAL TO APPEARANGE;HAVE JOINTS AND EXP05ED GRID IN RESPONSIBLE FOR PROPER LAYOUT AND INSTALLATION OF GARPET5 IN AREA.5 DE516NATED. 3.OPAQUE FIN15HED NOOD: 4. PROVIDE BALL BEARING OR OILITE BEARIN6 HINGES AT DOORS NITH GL05ER5. NON-GRACKINO;AS MANUFAGTUREI?BY TREMGO OR U56, "AGOU5TIGAL SEALANT." REQUIRED PATTERN,P051TION AND AL16NMENT AND BE UNIFORM IN PLANE,GOLOR,TEXTURE AND FINISH.ADJUST ANY 5. SAMPLES a. 15T GOAT: ENAMEL UNDERCOAT. WEARHOUSE 5. PROVIDE NIDTH5 5UFFIOIENT TO GLEAR TRIM PROJECTIONS NHEN DOOR 5NING5 IbO DEGREES.PROVIDE HIPTH5 TO P. ACGE55 PANELS; MILGOR FRAMED TYPE,CONGEALED 1-15 DEGREE HINGES,LOGK5,FAOTORY PRIMED FOR PAINTING IN 5AC75 OR 1"NI5T5 AS REQUIRED. CARPET SUPPLIED BY MEN'S NEARHOU5E AND INSTALLED BY GONTRAGTOR. b. 2ND AND 3RD GOAT: 5EMI-6LO55 100%ACRYLIG LATEX ENAMEL. ALLON ALIONMENT NITH ARGHITEGTURAL FEATURES AT THE ANGLE INDIGATED,WERE DOORS 51NIN6 150 DEGREES FIELD.51ZE5 TO BE Ib"XIb"UNLE55 OTHERN15E NOTED OR REQUIRED. 4.FERROUS METAL: OR cI0 DEGREES,AND ARE INDIGATED ON THE DRANIN65. END OF SECTION G. PROPUGT DATA: SUBMIT MANUFAGTURERS STANDARD PRODUGT DATA FOR ALL ITEMS FURNISHED HEREUNDER. a 15T COAT-. RUST INHIBITIVE METAL PRIMER. 6. PROVIDE MINIMUM 3 HINGES TO L10 INGHE5 HIGH AND 4 HINGES TO 120 INGHE5 H16H FOR EAGH DOOR LEAF,UNLE55 PART 5-EXEC UTION 0. MAINTENANGE DATA: PRIOR TO FINAL AGGEPTANGE OF CARPET INSTALLATION,PROVIDE TNO COPIES OF GARPET LOCATION: OTHERN15E SPEGIFIGALLY INDIGATED. MANUFAGTURER'5 DETAILED MAINTENANGE REGOMMENDATION5 FOR THE GARE GLEANING,AND REPAIR OF GARPET5 b. 2ND AND 3RD GOAT: 5EMI-6LO55 100%AGRYLIG LATEX ENAMEL, B. BUTTS: INSTALLED. 5.ALUMINUM: 3.01 METAL FRAMIN6 ERECTION-GENERAL 5EGTION Oq650 E. GERTIFIGATE5 OF GOMPLIANGE: PROVIDE MANUFAOTURER'5 GERTIFIGATE OF COMPLIANGE STATING THAT EAGH a 15T GOAT: CHROMATE PRIMER. 1. PROVIDE NONFERROUS BUTTS NITH NON-REMOVABLIE PINS AT EXTERIOR DOORS AND LOOKED OUT5NINCANO 1?00f;Z5- A. EREGT METAL FRAMING IN AGGORDANGE NITH REFERENGED5TANDARD5. RE51LIENT MATERIALS b. 2ND AND 3RD 60AT: 5EMI-61-055 100%ACRLIC,LATEX ENAMEL. 1&q40 BN -72NP AVENUE 2. PROVIDE NON-RI5INC7 BUTTS AT INTERIOR DOOR. MATERIAL 3. PROVIDE STEEL BM5 AT LA13ELEP INTERIOR DOORS. 1. DO NOT EXCEED MAXIMUM UNBRACED HE16HT RECOMMENDED BY MANUFACTURER. DELIVERED GONFORM5 TO SPECIFIED REQUIREMENTS. ro.PLASTER: 5RIV6EFORT RETAIL 4. PROVIDE FLAT 13UTTON TIPS UNLE55 OTHERN15E INDIGATED. 2. 150LATE STUD SYSTEM FROM TRANSFER OF 5TRUGTURAL LOADING TO SYSTEM,50TH 5. HORIZONTALLY AND PART I GENERAL F. CARPET MANUFAGTURER SHALL AL50 PROVIDE A WITTEN CERTIFICATION THAT GAPIPET 15 INSTALLED IN a. 15T GOAT: ALKY1?HALL PRIMER SEALER AT INTERIOR LOGATION5,LATEX HALL PRIMER AT EXTERIOR VERTICALLY.PROVIDE SLIP OR CUSHIONED TYPE JOINTS TO ATTAIN LATERAL SUPPORT AND AVOID AXIAL LOADING. LOGATION5. G, LOGK5ET5 AND LATCH5ET5: PROVIDE GURVE UP STRIKES NITH HROU6HT BOXES FOR ALL LOOKS. AGGORDANGE INITH OENTER D. GLO5ER5: B. FLOOR RUNNERS, SECURE V41TH 114"DIAMETER EXPAN51ON DOLTS;PONDER DRIVEN FASTENERS AT LEAST I"LONG MAY 1.01 NORK INGLUDED THEIR INSTALLATION REGOMMENDATION5. b. 2NO AND 3RD COAT: EGGSHELL 100%AGRYLIG LATEX EMUL51ON 1. FURN15H PRODUGT5 OF ONE MANUFAGTURER.SUPPLY PARALLEL-ARM GL05ER5 AT REVERSE BEVEL DOORS AND BE USED,INHERE PERMITTED BY CODE. SPACE FA5TEN5 4"FROM EN05 OF EACH PIECE;MAXIMUM 24"ON CENTERS A. RE51LIENT FLOORING AND RESILIENT BASES TI&AR , OR NHERE DOORS 5HIN6 FULL 180 DEGREES.ARM TYPES SHALL SUIT INDIVIDUAL GONPITION5,AS APPROVED.MOUNT INTERMEDIATELY;MINIMUM OF TNO FA5TENER5 PER PIECE OF RUNNER. 1.04 51TE GONDITION5 3.04 GLEANING GL05ER5 ON PULL 51DE OF DOORS UNLE55 OTHERIN15E INDIGATED. G. CEILING RUNNERS AT OVERHEAD 5TRU(TURE: 1.02 QUALITY A55URANGE A. 90 NOT GOMMENGE NITH CARPET INSTALLATION UNTIL PAINTING AND FINISHING NORK 15 COMPLETE AND GEILIN6 AND A. DURING PROGRESS OF NORK REMOVE FROM 51TE P15GARDED PAINT MATERIALS,RUBBISH,GANS AND RAC75 AT END 2. SIZES AS RECOMMENDED BY MANUFACTURER EX(EPT INHERE 5GHEVULE GALLS FOR LARGER SIZE. 1. INSTALL OVER SHORT LENGTHS OF I INC H,22 GAGE 7"5PA(ED NOT OVER 4W ON GENTER AND AT RIGHT ANGLES A. REFERENCE 5PEGIFIGATION5 6 STANDARDS: COMPLY V41TH THE MFR'5 REGOMMENDATION5 4 THE FOLLOHIN6 UNLE55 OTHER OF EAGH HOK INHIGH 05/aRK DAY. PROJECT NO. PRA%kNN�BY: 3. THROUGH DOLTS AND GROMMET NUTS SHALL BE AVOIDED ON DOOR FACES IN ALL AREAS. TO RUNNER. OTHERN15E 5PE61FIED IN TH15 5EGTION.IN CASE OF GONFLIGT,COMPLY INITH THE M05T STRINGENT. OVERHEAD NORK HAS BEEN INSTALLED,TESTED,APPROVED AND GOMPLETED.PROVIDE 5UFFIGIENT LIGHTING FOR B. UPON GOMPLETION OF PAINTING NORK,REMOVE MASKING,GLEAN PAINT SPATTERED 5URFAGE5,REMOVE PAINT BY 4. ALL LABELED DOORS SHALL BE 5ELF-GLO5IN6. 2. AT(ONTRAGTORS OPTION,USE NOT LE55 THAN 2-1/2" IN TRACK. 1. F5 55-T-3125 TYPE IV--FEDERAL 5PEGIFICATION FOR VINYL GOMP051TION TILE INSTALLATION PROPER METHOD OF HASHING AND 5GRAPIN6,USING CARE NOT TO 5GRATGH OR OTHERN15E DAMAGE FIN15HED 130364 COR 5. SURFACE DOOR OL05ER5 SHALL BE HEAVY DUTY ANSI MODERN TYPE NITH FULL COVERS. 9. 5TU05: 3-5/8"5TU05. 2. F5 55-N4OA,TYPE 11 -FEDERAL 5PEGIFIGATION FOR GOMP051TION BASE. OPERATIONS. 5URFAGE5. 6. ALL GL05ERS SHALL HAVE SEPARATE VALVES FOR GLO5IN6 SPEED,LATGH SPEED AND BAG<-GHEGK ADJUSTMENT. 1. PROVIDE 20 6AU6E 5TUD5 AT 24"MAXIMUM GENTER5 TYPICALLY,UNLE55 OTHERH15E 5HONN,5PE61FIEt?OR B. IN5TALLFR'5 GUALIFIGATION5: AM MANUFAGTURER LIGEN5ED APPLIGATOR OR A FIRM APPROVED AS AN INSTALLER BY 13, VERIFY 5U55TRATE!5AT15FAGTORY FOR NORK OF TH15 5ECTION.DO NOT PROCEED UNTIL VEFEGT5 HAVE BEEN G. PERFORM FINAL DETAILED GLEANIN6 AND DU5TIN6,READY FOR OGGUPANGY. 50ALE: CHECKED 5Y: 1. GL05ER 5PRIN655HALL BE FULLY ADJUSTABLE, REQUIRED PEP,REFERENGE STANDARDS. THE RE51LIENT FLOORING MANUFACTURER HITH NOT LE55 THAN FIVE YEARS EXPERIENGE IN THE 5PEGIFIED UNIT GORREGTED. 11 1 -7 TEN51ON AT EAGH DOOR(51ZE5 I THROUGH 4 AT BARRIER FREE 2. STUDS AT NALL-MOUNTED ITEMS: INSTALL MINIMUM 16 GAUGE 5TUD5 AT 24"MAXIMUM GENTER5 AT NALL HUNG RESPONSIBILITY AND PROVING A BACK6ROUND OF NOT LE55 THAN THREE INSTALLATIONS OF GOMPARA13LE 51ZE AND INSTALL GARPET V41THIN ALLONABLE TEMPERATURE RANGE STATED BY MANUFAGTURER. 3.05 PROTECTION 8. INSTALLER SHALL INDIVIDUALLY SET 5PRINC 1/4 10 J.P.A. LAVATORIES,URINAL5,6RAB BAR5,NALL-HUN6 GA5ENORK,FIXTURES OR EQUIPMENT,IN ADDITION PROVIDE 16 SCOPE TO THAT HEREIN SPECIFIED. A.PROTEGT NORK OF OTHER TRADES,INHETHER TO BE PAINTED OR NOT,A6AIN5T DAMAGE AND FIN15HINC7 NORK. --- THESE 0-F-A-ATX-as YqERE GAUGE STUDS INHERE 5HONN ON DRAININ65. PART 2 -PROPUGT5 B. GORREGT DAMAGE 13Y GLEANING,REPAIRING OR REPLACING AND REPAINTING,AS AGGEPTABLE TO ONNERS PA-TE: COMf'Lt:I UNVM THE L1. FLOOR GL05ER SPRING TEN51ON SHALL BE PRESET AT THE FACTORY. 5. PROVIDE EXTRA 5TU95 AS REQUIRED TO MOUNT ELEGTRIGAL OR MEGHANIGAL CONTROLS INHERE 5HONN. INSURE 1.04 51TE GONDITION5 2.01 MATERIALS REPRE-51ENTATIVE. 017/12/13 121RECT SUPMVISION Of=- 10. GL05ER5 SHALL BE ADJUSTED BY FAGTORY REPRESENTATIVE. STUDS HILL REMAIN PLUMB;CRIMP OR 56REIN ATTAGH TO RUNNERS AS REQUIRED. INJT E. PIVOTS: PIVOTS SHALL BE SUPPLIED IN QUANTITY 51MILAR TO HIN6E5: A. ENSURE FLOOR 5URFAGE5 ARE SMOOTH AND FLAT INITH MAXIMUM VARIATION OF 1/8" IN 10'. PREPARE FLOOR AS A. INSTALLATION MATERIAL5: FLOOR AND 5EAM ADHESIVE,TAPE AND AGGE55ORIE5 AS REGOMMENVED BY GARIFET AND G. PROVIDE "NET PAINT"516%AS REQUIRED TO PROTECT NENLY PAINTED FIN15HE5. I. DOORS HUNG, ON OFFSET PIVOTS ONLY,PROVIDE TV40 PIVOTS FOR 60 INGHE5 OR LE55 IN HEIGHT.DOORS OVER 60 4. HALLS OVER 6"DEEP. INHERE PARTITIONS ARE MORE THAN 6"DEEP,INSTALL TV40 RON5 OF 2-1/2"(MINIMUM)KIDTH NECESSARY TO MEET THESE REQUIREMENTS.ENSURE GONGRETE FLOOR5 ARE DRY(MAXIMUM 196 M015TURE GONTENT) PAD INGHE5 TO 010 INGHE5 SHALL HAVE THREE PIVOTS.DOORS OVER clO INGHE5 TO HAVE ONE ADDITIONAL PIVOT FOR 5TUI?5,NITH 1-112"RUNNER GHANNEL GROSS TIES AT 24"GENTER5 VERTICALLY AND 24"CENTERS HORIZONTALLY ALL AND EXHIE31T NEGATIVE ALKALINITY,CARBONIZATION OR OU5TIN6.MAINTAIN MINIMUM-10 DEGREES F AIR TEMPERATURE MANUFACTURER. END OF SEC TION NICHOLA5 J. TRICAR100 EVERY 30 INCHES OR FRAGTION THEREOF. BOLTED OR 56REN FASTENED IN PLACE. AT FLOORING INSTALLATION AREA FOR 4b HOURS PRIOR TO,DURING,AND FOR 4b HOURS AFTER INSTALLATION. B. GOMPLY NITH THE REQUIREMENTS OF THE REFERENGED STANDARDS.CARPET: REFER TO FIN15H 5GHEDULE ON 2. DOORS HUN6 ON OFFSET PIVOTS HITH FLOOR GLO5ER5 SHALL HAVE AS MANY P160T POINTS AS MENTIONED ABOVE, 5. HALL BRI06IN6: PROVIDE 5/4"CHANNEL BRIDGING,OR MANUFAGTURER-5 STANDARD BRIDGING,AT MAXIMUM 60" MAINTAIN A MINIMUM OF 55 DEGREES F THEREAFTER.STORE FLOORING MATERIALS IN AREA OF APPLIGATION.ALLON DRANIN65. 5EGTION 10520 ARCHITECT GON519ERIN&THE TOP PIVOT AND FLOOR HINGE,EAGH BEING A PIVOT POINT. VERTICAL INTERVALS IN ALL NALL5.AT HEADS OF DOORS,AND HEADS AND 5ILL5 OF MILL OPENINGS,PROVIDE THREE DAYS FOR MATERIAL TO REACH SAME TEMPERATURE AS AREA. G. ADHE51VE5: AS REGOMMENDEI?BY CARPET MANUFAGTURER.INHERE PRIMER5/5EALER5/F11 LER5 ARE USED,THEIR PART I -GENERAL FIRE EXTIN6UI5HER5 AND GABINET5 sl_ 1-1/2"CHANNEL BRID61%EXTENDING TO THE 5EGONP STUD 13EYOND EACH 51DE OF JAMB5. GOMPATIBILITY V41TH APHE51VE5 SHALL BE VERIFIED. F. DOOR STOPS: HALL MOUNTED ST.5TL.FIN15H N/RUBBER GU5HION. 6. INSTALL STUDS PLUMB,SQUARE AND STRAIGHT.GUT 5TUD5 1/2"SHORT AND 5EGURE TO TOP TRAOK IN A MANNER PART 2-PRODUCTS 0. 5UB-FLOOR FILLER- PREMIXED LATEX,ARMSTRONG 5-IbO LATEX UNDERLAYMENT OR APPROVED EQUAL.VERIFY PORTA13LE FIRE EXTINGUISHERS AND CABINETS AND CABINET ACGE55ORIE5. 6. KIGK PLATE5: MOUNT ON PUSH SIDE ONLY 51ZE PER DOOR V41PTH BY 5PEGIFIED HEIGHT. THAT ALLONS,FOP,DEFLECTION OF STRUCTURE ABOVE. GOMPAT151LITY 1.01 5UBMITTAL5 7F10AR100 ARCH ITECTURE H. NEATHER-5TRIPPIN6 AND GASKETS- INHERE NOT PROVIDED EL5EINHERE,PROVIDE GONTIN005 HEATHER-5TRIPPIN6 AT ,ATED GASKETS AT TOP AND SIDES OF EXTERIOR AND SUBMIT FOP,APPROVAL PRODUGT DATA,AND 04M SUBMITTALS TOP AND 51DE5 OF EXTERIOR DOOR5,AND PROVIDE FIRE P E. 5TIFFENER5: PROVIDE 3/4"COLD ROLLED GHANNEL5: USE THO RON5 AT THIRD POINTS FOR 5TUf?5 NITH FIN15H ONE 2.01 MATERIALS NITH ADHESIVE.FILLER SHALL BE APPROVED NITH THE GARPET $ PAD MFR'5. INTERIOR FIRE RATED DOOR. 51PE ONLY;ONE RON AT MIDPOINT FOP,5TUD5 Y41TH FIN15H 130TH 511?E5,SHAPE INTO PUNGHED NE5 OF EAGH 5TUD;NEST A. COMPLY NITH THE REQUIREMENTS OF THE REFERENGED STANDARDS. PARt-2-PRODUGT5 AND DESIGN PC 1. M15GELLANEOU5 HARDHARE: LAPS AND HIRE TIE. 5. VINYL COMP051TION TILE- REFER TO FIN15H 5GHEDULE ON DRANIN6. 2.02 TRANSPORTATION AND HANDLING 1. MISCELLANEOUS HARDNARE ITEMS NEGE55ARY TO GOMPLETE THE V40RK SHALL BE L15TED IN THE HARDINARE SETS. F. DOOR AND OPENING FRAMINO: INSTALL DOUBLE 5TUD5 AT JAM85 AND EXTEND FROM FLOOR TO 5TRUGTURE ABOVE, G. BASE: REFER TO FIN15H 5GHEWLE ON DRANINO. A. ARRANGE DELIVERIES OF PRODUCT IN AGGORDANCE V41TH 6ON5TRUGTION SGHEDULE5.COORDINATE TO AVOID 2.01 GENERAL 5EGUIRELY ATTAGH TO EACR OTHER,FLOOR AND HEAD. INSTALL RUNNER AT HEAD(FOR JAGK 5TU05)AND SECURE TO D. E06E TRAN51TION STRIPS: RE51LIENT MOLDINGS FOR TRANSITION BETINEEN RE51LIENT FLOORING ANE?GARPET(REE?U(ER GONFLIGT NITH FIRE EXTINGUISHERS-ALL FIRE EXTINGUISHERS MUST BE UL APPROVED.FIRE EXTIN6UI5HER5 ARE TO BE RATED 2. FURN15H 51LENGER5 V401(f3BN-AT ALL HOLLON METAL FRAMES NOT REQUIRING 5EAL5 OR INEATHER-5TRIP. JAMB STUDS. NORK AND GONDITION5 AT THE SITE. A J. KEYING: CON5TRUGTION KEYING: PROVIDE GON5TRUGTION GYLINDER5 FOR DOORS REQUIRING LOOKS DURING C7. BLOGKIN& INSTALL METAL BACKING PLATES FOP,SUPPORT OF PLUMBING FIXTURES,MILLNORK,HANDRA15,HARDNARE TYPE),MANUFACTURED BY JOHN50NITE,COLORS AS 5ELEOTED BY ARGHITEGT FROM MANUFACTURERS STANDARD 1. DELIVER PRODUCT5 IN UNDAMAGED CONDITION,IN MANUFACTURERS OR16INAL CONTAINERS OR PAGKA6IN6,NITH 4A:6OB:G-I0 POUNDS GAPACITY UNLE550THERN15E NOTED. IF NOT ALREADY PROVIDED.A FIRE EXTINGUISHER 15 GON5TRUGTION. REPLACE HITH PERMANENT CYLINDERS JUST PRIOR TO OGGUPANGY. AND OTHER HALL MOUNTED ITEMS. GOLOR5. IDENTIFYING LABELS INTACT AND LEGIBLE. IMMEDIATELY ON DELIVERY,IN5PEGT SHIPMENT TO A55URE GOMPLIANGE TO BE MOUNTED ON A HALL MOUNTED BRACKET NITH A 5IGN IN ABOVE EACH FIRE EXTINGUISHER K. HARDINARE 5PEGIFIEP FOR STEEL FRAMES OR STEEL DOORS SHALL BE MADE TO PROPERLY FIT IN HOLLON MTL. H. GOORDINATE INSTALLATION OF BUGK5,ANGHOR5,BLOCKING,ELECTRICAL AND MEGHANIGAL NORK VqHIGH 15 TO BE NITH REQUIREMENTS OF GONTAGT DOGUMENT5 AND APPROVED SUBMITTALS,AND THAT PRODUGT5 ARE PROPERLY DOORS AND FRAMES AND ARE TO BE 5EGURED NITH MAGHINE 56REN5.TEMPLATES,OR PHY51GAL HARDNARE ITEMS, 2.03 AGC,E55ORIE5/ADHE5IVE5/5EALER5 SHALL BE FURN15HED TO MANUFAGTURER5 CONCERNED AND SHALL BE SUPPLIED 5UFFI(IENTLY IN ADVANCE TO AVOID PLACED BY OTHERS IN OF,BEHIND PARTITION FRAMING.ALLON 5UGH ITEMS TO BE INSTALLED AFTER FRAMING 15 A. 5UB-FLOOR FILLER: PREMIXED LATEX,ARM5TRONC7 5-180 LATEX UNDERLAYMENT,MIXED V41TH HATER TO PRODUCE PROTEOTED AND UNDAMAGED.NOTIFY ARGHITEGT IMMEDIATELY OF ANY 0156REPAN61155. B. FIRE EXTINGUISHER HALL BRACKET-ALL FIRE EXTIN6U15HER HALL 5RAGKET SHALL GOMPLY NITH ADA HEIGHT DELAY IN THE HORK. GOMPLETE GEMENTITIOU5 PAST. 5. PROVIDE EQUIPMENT AND PER-50NNEL TO HANDLE PRODUGT513Y METH005 TO PREVENT 5OILIN6 OR DAMAGE OT AND SIGN GRITERIA. L. HARDINARE 5PECIFIEl?FOR STEEL FRAMES OR STEEL DOORS SHALL BE MADE TO PROPERLY FIT IN HOLLON MTL. 1. EREGT NALL FURRING INHIGH 15 DIREGTLY ATTAOHED TO MASONRY OR GONGRETE HALLS BY MEANS OF FURRING B. PRIMERS AND ADHE51VE5: HATERPROOF;OF TYPE REGOMMENDEE?BY RESILIENT FLOORING MANUFACTURER FOR PRODUCTS PART 3-EXEGUTION DOORS AND FRAMES AND ARE TO BE 5ECUREl?Y41TH MAOHINE 56REN5.TEMPLATES,OF,PHY51GAL HARDNARE ITEMS, GHANNEL5 PLAGED HORIZONTALLY OR VERTIGALLY AS INDIGATED OR DIRECTED.SHIM AS REQUIRED TO PLUMB,LEVEL SPEGIFIG MATERIAL. OR PAGKA6IN6. 3.01 GENERAL )SHALL BE SUPPLIED 5UFFIGIENTLY IN ADVANGE TO AVOID SHALL BE FURN15HED TO MANUFAGTURER5 GONCERNED ANL OR STRAIGHTEN AND 5EGURE IN PLACE ON ALTERNATE GHANNEL FLANGES AT MAXIMUM 24"ON GENTER. DELAY IN THE NORK. J. LATERALLY BRACE SOFFITS AND PARTITIONS TO RE515T 5 P5F LATERAL LOAD AS REQUIRED BY APPLIGABLE GODE5. PART 3-EXEGUTION 2.03 STORAGE AND PROTECTION A. INSTALL FIRE EXTINGUISHERS IN ACGOFDANrE V41TH MANUFACTURER'5 RECOMMENDATIONS AND IN5TRU(TIONS.M. REINFORGIN6 REQUIRED FOR INSTALLATION OF HARDINARE IN HOLLON METAL JAM135 SHALL BE FURNISHED BY JAMB A. STORE PRODUGT5 IN GONFORMANGE Y41TH REFERENCED STANDARDS,NITH 5EAL5 AND LABELS INTACT AND LEGIBLE. �5k 02 CEILING FRAMING INSTALLATION 3.01 PREPARATION 1. STORE PRODUGT5 5UBJECT OT DAMAGE BY THE ELEMENTS IN 11�IEATHERTICWT ENGL05URE5. 5.02 60ORDINATION MANUFACTURER.,COORDINATED INITH HARDINARE MANUFACTURER AND PROVIDED IN TIME TO BE INSTALLED AND HELPED COORDINATE LOCATION OF HANGERS V41TH OTHER NORK. INSTALL CEILIN6 FRAMING INDEPENDENT OF ABOVE-GEILIN(5 2. MAINTAIN TEMPERATURE AND HUMIDITY NITHIN THE RANGES REQUIRED BY REFERENCED STANDARDS. HITHIN JAMB DURING FABRIOATION. ATED, A. REMOVE 5UB-FLOOR DIRT,GREASE,RIDGES AND BUMPS,GLEAN FLOOR AND FILL LOH SPOTS,GRAGK5,JOINTS,HOLES B. ARRANGE STORAGE IN A MANNER TO PROVIDE EASY AGGE55 FOP, IN5PEGTION.MAKE PERIODIC, IN5PEGTION5 OF THE GENERAL GONTRAC TOR 15 TO GONTACT THE LOCAL FIRE MARSHALL AND VERIFY THE NUMBER OF FIRE ,HOR5 AND OTHER FASTENERS OF SUITABLE TYPES AND OTHER DEFEGT5 NITH 5UB-FLOOR FILLER;APPLY,TONEL AND FLOAT FILLER TO LEAVE SMOOTH,FLAT HARD EXTIN605HER5 REQUIRED DURING GON5TRUGTION AS HELL AS DURING STORE OPERATION,AND LOCATION FOR N. FURN15H 5GREA5,DOLTS,NUTS,EXPAN51ON 5HIELI?5,5HIM PLATES,ANC NORK.SPACE MAIN CARRYING CHANNELS AND RANGERS AT MAXIMUM 45"ON GENTER,UNLE55 OTHEFJ1415E WIG A. AND WES REGOMMENDED BY MANUFACTURER AND AS REQUIRED TO INSTALL HARDINARE SEGURELY TO NITH5TAND AND NOT MORE THAN(b"FROM PERIMETER INALL5.LAP SPLICES MINIMUM 12"AND 5EGURE TOGETHER 2"FROM EAGH END 5URFAGE.APPLY FILLER TO Ilb" MAXIMUM THIGKNE55 AND ALLON.TO GURE PRIOR TO APPLIGATION OF 5UGGEEDIN6 STORED MOUNTIN6,13UT IN NO CASE TO ALLOIN LE55 THAN THREE(3)FIRE EXTINGUISHERS TO BE INSTALLED. HARI?USAGE OVER LONG LIFE. FIN15H SHALL MATGH HARPHARE. OF SPLICE.PLAGE GYPSUM BOARD FURRING GHANNEL5 PERPENDIGULAR TO OARRYIN6 GHANNEL5 AT 16"ON GENTER LAYERS. 00 NOT INSTALL LATEX TYPE FILLER IN EXCE55 OF 31e�" TOTAL THICKNESS.PROHIBIT TRAFFIC,UNTIL FILLER PRODUCT5 TO A55URE THAT PRODUGT5 ARE MAINTAINED UNDER 5PEGIFIED GONDITION5,AND FREE FROM DAMAGE OR END OF 5EGTION 0. SOREN FOR ITEMS APPLIED ON GYPSUM BOARD SHALL BE 5UFFIGIENTLY LONG TO PROVIDE SOLID GONNEGTION TO FOR EXTERIOR CEILING BOARD AND HR BOARD AND 24"ON GENTER FOR ALL OTHERS,NOT MORE THAN 2"FROM 15 CURED. INCLUDE FLOATED FILLER RAMPS,AT SLOPES NOT TO EXCEED 1: 56,AT DOORS AND OTHER LOCATIONS DETERIORATION, FRAMING OR BAGKIN6 BEHIND THE GYPSUM BOARD. PERIMETER INALL5.LAP 5PLIGE5 MINIMUM b" NHERE RE51LIENT FLOORING ADJOINS H16HER 1?1551MILAR FLOORING AS FOLLON15: 10.1 51 61\15: 5PEGIALTIE5 P. DO NOT USE THROUC7H DOLTS INHERE DOORS ARE 5PEGIFIED V41TH HARDINARE BLOCKING AND(9 INCH SOLID TOP RAIL5, B. REINFORGE OPENINC75 IN SUSPENSION 5Y5TEM5 NHIGH INTERRUPT MAIN GARRYING CHANNELS OR FURRING(HANNEL5,NITH 1. RE51LIENT FLOORING SHALL FIN15H Ilb"DELON ADJOINING CARPET PILE. PART 3-EXEC,UTION A)GENERAL: U- 5ENERAL GONTRAGTOR SHALL 0. FOR ALL HARDV4ARE GROUPS INHERE THERE ARE EXISTING DOORS AND HARDNARE,C LATERAL GRANNEL BRAGIN6.EXTEND BRAGIN&MINIMUM 24"PAST EAGH END OF OPENINGS. 2. UNLE55 OTHERN15E NOT-ED ON DRANIN65,RE51LIENT FLOORING SHALL FIN15H FLUSH V41TH ALL OTHER 01551MILAR 5.01 PREPARATION 1)T.&L. IS RE5PON5IDLE FOR ALL ELECTRIGAL HOOK UPS AND BLOGKIN&FOR 516NA&E < IN5PEC,T THE EXISTIN6 HARONARE, IT5'GONDITION AND TYPE,FOR GOMPLIANGE INITH THE HARDNARE GROUPS L15TED G. INTERFERENGE: INHERE HIDE AIR CONDITION DUGT5 ORSIMILAR OE35TRUGTION5 ABOVE GYPSUM BOARD GEILIN& FLOORIN(5,51LL5,ETG. lu DELON.ANY HARDHARE EQUAL TO THE PRODUGT5 5PEGIFIE1?SHALL BE ALLONED TO BE USED.ANY HARDINARE INTERFERE V41TH SUSPENSION HANGERS,PROVIDE INDEPENDENT FRAMING BELOIN DU(TNORK OR OBSTRUCTION TO A. IN5PEGT THE 5UB-FLOORINC7 BEFORE(OMMENOEMENT OF NORK,GORREGT GONDITION5 NHIGH HILL PREVENT PRODUrIN6 2)SEE TI.0 SHEET FOR 516N SUPPLIER INGLUDED IN THE SGHEDULE,BUT NOT EX15TINC SUPPORT THE GEILIN6 AS AN OBL16ATION UNDER TH15 5EGTION. 5.02 INSTALLATION-FLOOR 5AT15FAGTORILY FIN15HED NORK REMOVE 5UB-FLOOR DIRT,GREASE,R106E5 AND BUMPS.GLEAN FLOOR AND FILL AT THE PROJEGT 51TE OR VERIFIED TO BE INSTALLED BY THE LANDLORD, Ul Ul 1. SUPPORT FRAMING FROM FLOOR OR ROOF 5TRUGTURE ABOVE.DO NOT ATTACH FRAMING TO DUGT HORK OR A. OPEN FLOOR TILE CARTON5,ENOUGH TO GOVER EACH AREA,AND MIX TILE TO EN5URESHADE VARIATIONS 00 NOT LOH 10.2 TOILET ACGE55ORIE5: < SHALL BE PROVIDED FOR THE PROJEGT AND INSTALLED BY THE GENERAL CONTRACTOR PER 5PEGIFICATION5.REFER OBSTRUCTION. OOCUR NITHIN ANY ONE AREA. SPOTS,CRACKS,JOINTS,HOLES AND OTHER DEFEGT5 NITH 5U5,-FLOOR FILLER;APPLY TRONEL AND FLOAT FILLER TO ANY GUE5TION5 GONGERNINC7 REUSE OF EXISTING HARDINARE TO THE ARGHITEGT FOR RESOLUTION.EXISTING HARDNARE A)GENERAL: 7- Z OL 7- SHALL BE RE-KEYED TO BE GOMPATIBLE NITH ITEMS 5PEGIFIED IN THE HARDINARE SCHEDULE,ALL NEIN HARDINARE TO 2. PROVIDE LAYOUT OF PROPOSED SUPPORT SYSTEM FOR ARGHITEGTS REVIEN.PRIOR TO BEGINNING 5U6H NORK. 13. GLEAN SUBSTRATE.SPREAD GEMENT EVENLY IN QUANTITY REGOMMIENDED BY MANUFACTURER TO ENSURE ADHESION LEAVE 1) INSTALL ALL AGGE55ORIE5 TO GOMPLY NITH GOVERNING GOPE5. 5E KEYED ALIKE NITH(4)KEYS TO BE PROVIDED TO ONNER AT THE TIME OF SUBSTANTIAL GOMPLETION. D. LATERALLY BRAC,E ENTIRE 5U5PEN51ON SYSTEM TO MEET 5EI5MIG REQUIREMENTS AS REQUIRED BY LOCAL AND 5TATE OVER ENTIRE AREA OF INSTALLATION.SPREAD ONLY ENOUGH ADHESIVE TO PERMIT INSTALLATION OF FLOORING SMOOTH,FLAT,HARE)SURFACE.APPLY FILLER TO I/e,"K MAXIMUM THICKNESS AND ALLON TO GURE PRIOR TO LU R. M15GELLANEOU5 HARDNARE: GODE5. BEFORE INITIAL SET INSTALL NITH MINIMUM OF 112 FULL 51ZE TILE V419TH AT ROOM OR AREA PERIMETER TO PATTERN APPLIGATION B)MATERIALS: z 1. F-URN15H GONTRAGTOR: 51LEN6ER5/INSTALL GONTRAGTOR: IVES 20R REQUIRED.TERMINATE RE51LIENT FLOORING AT GENTERLINE OF DOOR HHERE ADJACENT FLOOR FIN15H 15 DISSIMILAR. OF 5UGGEEDIN(5 LAYERS.00 NOT INSTALL LATEX TYPE FILLER IN EXCESS OF 31W TOTAL THIGKNE55.PROHIBIT IAGGE550RIE5 SHALL BE SUPPLIED AS MANUFACTURED AS LISTED DELON. 5.05 GYPSUM BOARD INSTALLATION LAY FLOORING GONTINUOU5 THROUGH DOORS AND OPENINC75 INHERE ADJACENT AREAS OR ROOMS HAVE SAME FINISH. TRAFFIC, UNTIL W EQUIVALENT EQUIPMENT MAY BE PROP05ED BY 5UBMITTINC?CUTS OF 2.02 ELEGTRIGAL AND MEGHANIGAL A. INSTALL C7YP5UM E30ARD IN AGGORDANGE NITH REFERENGED STANDARDS.EXAMINE ALL SURFAGE5 TO RECEIVE INSTALL E06E 5TRIP5 AT UNPROTECTED OR EXP05ED El?6E5 HHERE FLOORING TERMINATES.5GRI13E FLOORING TO FILLER 15 GURED. INGLUDE FLOATED FILLER RAMPS,AT SLOPES NOT TO EXGEED 1:56,AT DOORS AND OTHER PIEGE5 FOR APPROVAL PRIOR TO DID SUBMISSION. DINATE REQUIREMENTS FOR MEGHANIGAL AND ELEGTRIGAL DEVICE5 IN GONNEGTION INITH A. MAKE PROVISIONS AND GOOR GYPSUM BOARD.MAKE GERTAIN THE FRAMING 15 PLUMB AND TRUE.THE FA5TENIN6 SURFACE OF ANY FRAMING OR HALLS,COLUMNS,GABINET5,FLOOR OUTLETS AND OTHER APPURTENANCES,TO PRODUCE TIGHT JOINTS. LOCATIONS I)GRAD BARS. 5-6106 5ERIE5 V41TH ANGHOR PLATES TO NITH5TANV 250 LB. HARDHARE. FURRING MEMBER SHALL NOT VARY MORE THAN I/b"ROM THE PLANE OF THE FAGE5 OF ADJAGENT FRAMING OR INHERE CARPETING ADJOINS HIGHER P1551MILAR FLOORING.UNLE55 OTHERH15E NOTED ON DRAININ65,CARPET PILE PRESSURE,VERTIGAL � HORIZONTAL.SEE DRANIN6 FOR LOCATION AND DIMENSIONS. FURRING MEMBERS. 3.03 INSTALLATION-BASE SHALL 11)FIXED MIRROR NITH 5ELF: B166-2026 2.03 HARDNARE FINISH B. EREGT 5IN6LE-LAYER STANDARD GYPSUM BOARD IN DIRECTION M05T PRAGTI(AL AND ECONOMICAL ALL EN05 AND A. FIT5 JOINTS TIGHT AND VERTIGAL. INSTALL BASE IN LONGEST LENGTHS P0551BLE.MITER INTERNAL CORNERS.USE FIN15H Ilb"H16HER THAN ADJOINING 01551MILAR FLOORING,5ILL5,ETG. ill) ROLL HAND PAPER TONEL HOLDER: 6EP 5433b SMOKE A. 5PEGIAL CARE SHALL BE TAKEN TO COORDINATE THE FIN15H OF THE VARIOUS MANUIFAGTURER5 TO INSURE A UNIFORM EDGES SHALL BE OVER FRAMING MEMBERS OR OTHER 50LID BACKIN6 EXGEPT HHERE TREATED JOINTS OGGUR AT PREMOLDED 5EGTION5 FOR EXTERNAL CORNERS AND EXP05ED ENDS. INSTALL BASE ON SOLID BACKING.ADHERE iv)TOILET SEAT GOVER DISPENSER: KR5 KPIOO SMOKE FIN15H THROUGHOUT THE INSTALLATION. PROVIDE FINISHES AS INDICATED ON THE DRANIN65. RIGHT ANGLES.MAXIMUM GAP AT FLOOR SHALL BE 1/2". T16HTLY TO HALL AV FLOOR 5URFAGE5.5GRIBE AND FIT To DOOR FRAMES AND OTHER 065TRU6TION5. INSTALL B. VERIFY THE FOLLONIN6 BEFORE INSTALLATION. v)ROLL TOILET PAPER HOLDER.- 6P 5bO5O5MOKE FIRM RE&I571;1,ATI0N NO. tu G. EREGT 5INGLE-LAYER FIRE RATED GYPSUM BOARD VERTIGALLY V41TH EDGES AND ENDS OGGURRIN(7 OVER FIRM STRAIGHT AND LEVEL TO VARIATION OF PLUS OR MINUS 1/5"OVER 10'. 1. THE FLOOR(5UB5TRATE) -FOR GLEANLINE55,FREE FROM DUST,6REA5E,OIL OR OTHER FOREIGN MATTER. v!) 50AP DISPENSER: C70J 515006 GRAY in PART 3- EXEGUTION BEARING.FOP,DOU13LE-LAYER APPLIGATION5,USE GYPSUM BAGKIN6 BOARD FOR FIRST LAYER.USE FIRE RATED 2. THE FLOOR(SUBSTRATE) -FOR PH-U51%LITMUS PAPER. OR 0654AF 6YP5UM BAGKIN6 130ARD FOR FIRST LAYER AT FIRE RATED PARTITIONS.ENSURE THAT THE JOINTS OF SECOND LAYER 5.04 GLEAN-UP AND PROTEGTION 3. THE FLOOR(505TRATE)-FOR M015TURE USING EITHER HATGH GLASS METHOD OVER THREE OR FOUR DAY PERIOD, vii) HASTE REGEPTAGLE: B-2-7q SURFACE MOUNTED 5TAINLES5 STEEL Y41TH SATIN FINISH.3.01 INSTALLATION OFFSET THE JOINTS OF FIRST LAYER A MINIMUM OF 10".FOR DOUBLE-LAYER APPLIGATION5,5E(URE E30TH LAYERS TO A. REMOVE EXGE55 ADHE51VE FROM FLOOR,BASE AND HALL 5URFAGE5 HITHOUT CAUSING DAMAGE. GLEAN FLOOR,AND 13Y ANHYDROUS GHLORIDE GR5TALS,OR 13Y HYGROMETER(MODIFIED FOR FLOOR READING. vill)SANITARY NAPKIN 015PO5AL: 5-210 A. GONTRAGTOR 5HALL INSTALL FIN15H HARDINARE AS REQUIRED.HARDINARE SHALL BE FITTED THEN REMOVED PRIOR TO FRAMING MEMBERS HITH 5GREN5. BASE IN ACGORDANGE NITH MANUFAGTURER'5 RErOMMENDATION5.PROHIBIT TRAFFIC,FROM FIN15HED FLOORS FOR 4b 4. THE 5PAGE5(ROOM,AREAS)-FOR TEMPERATURE.ALL AREAS TO REGEIVE GARPET ARE TO BE PREHEATED TO 60 Ix) TOILET ROOM PARTITION: 1540 GLA55IG SERIES PAINTING.REINSTALL HARDINARE AFTER PAINTING 15 GOMPLETE AND DRY.FIN15H HARDINARE MUST BE NEATLY AND D. PLACE GONTROL JOINTS AS REQUIRED BY REFERENCE STANDARDS,5HONN ON DRANIN65,CONSISTENT Y41TH LINES OF HOURS AFTER INSTALLATION.GLEAN AND HAX FLOOR PRIOR TO INSTALLATION. DEGREES F MINIMUM FOR AT LEAST-72 HOURS PRIOR TO INSTALLATION.ONCE THE INSTALLATION HAS BEGUN,THE X.)F-LOOR GLEANOUT: ADJUSTABLE GLEANOUIT,J05AM 5ERIE5 55560,HUB-140 HUB PROPERLY INSTALLED IN AGGORDANGE NITH BE5T PRACTIGE5 AS PRESCRIBED BY MANUFAGTURER5 AND AS REVIENED BUILDING 5PAGE5 AND AS DIRECTED BY ARGHITEGT. ABOVE GRITERIA 15 TO BE OBSERVED 24 HOURS A DAY,SEVEN DAYS A NEEK UNTIL COMPLETION OF THE x!) MILL GLEANOUT: CLEANOUT AND AGGE55 COVER,J05AM 5ERIE5 5b6OO-G0 uj BY ARGHITEGT,ALL HARDNARE MUST BE THOROUGHLY GLEANED PRIOR TO TURNING BUILDING OVER TO OINNER. E. PLACE GORNER BEADS AT EXTERNAL GORNER5.USE LONGEST PRAGTIGAL LEN6TH5.PLACE METAL EDGE TRIM WERE 3.05 NORKMAN5HiP INSTALLATION,AND FOR A MINIMUM OF 12 HOURS FOLLONINO COMPLETION.A MINIMUM TEMPERATURE OF 50 10.5 FIXTURES,HARDINARE � AGGE55ORIE5: B. MOUNTING HEIGHTS FOR HARDHARE: HEIGHTS 61VEN ARE CENTER LINE HE16HT5 UP FROM FLOOR UNLE55 OTHERIN15E GYPSUM 130ARD TERMINATE5,BUTT 01551MILAP,MATERIALS,AND AS INDICATED ON DRANIN65. A. GOMPL INITH THE REQUIREMENTS OF THE REFERENGED STANDARDS.THE FIN15HED 5URFAGE5 SHALL BE FULL`(BONDED DEGREES F SHALL 13E MAINTAINED THEREAFTER. A)GENERAL: ,ALIFORNIA ARCHITEGTURAL BARRIERS LAA AND THE AMERIGAN5 NITH 5. THE MATERIAL-FOR TEMPERATURE.ALL MATERIALS SHALL BE PRE-GONDITION5 AS ABOVE FOR A MINIMUM OF-13 STATED AND SHALL 13E SUBJECT TO THE r F. FIN15H GYPSUM BOARD JOINTS,BEADS,TRIM,ETO.,IN AGGORDANGE NITH REFERENGED STANDARDS TO PRODUCE TO THE SUBSTRATE;FREE FROM PAMA(5E,FLAN5,OR OTHER DEFEGT5 DETRIMENTAL TO APPEARANCE;HAVE TIGHTLY DISABILITIES AOT(ADA): HEIGHTS GIVEN INDICATE THAT ALL SHALL BE AT ONE HEIGHT INITHIN LIMITS GIVEN.HEIGHTS OF SURFACE READY TO RECEIVE FURTHER APPLIED FINISH.FEATHER COMPOUND GOATS ONTO ADJOINING 5URFAGE5 50 FITTED JOINTS � 5EAM5 BE UNIFORM IN PATTERN,5PA61NC7,MAR61N $ FINISH. HOURS PRIOR TO USE. 1)GU5TOM HALL HARDINARE,FREESTANDING FIXTURES,015PLAY FIXTURES,AND STANDARDS @ 5ALE5 AREA 4 ITEMS NOT L15TED HERE OR 5HOHN ON DRANIN65 SHALL BE IN AGGORDANGE INITH REGOMMENDATION5 OF BUILDERS THAT CAMBER 15 MAXIMUM 1132". 5TOGK ROOM TO BE PROVIDED DYTENANT AND INSTALLED BY TENANT 6ENRAL CONTRACTOR. HARDNARE A550GIATION;5UBJEGT OT REVIEN BY ARC HITEGT. 1. DO NOT 5GUFF PAPER 5URFAGE OF GYPSUM BOARD NHEN SANDING JOINTS. END OF SECTION 3.02 CARPET INSTALLATION: GENERAL 2) INSTALLATION OF HARDINARE AND FIXTURES BY GENERAL GONTRACTOR ,HE5. 55 INC HE5 FROM FIN15H FLOOR TO GENTER OF LEVER. A. ONLY ONE DYE LOT SHALL BE USED PER GORRIDOR OR SUITE OF OFFICES UNLE55 OTHERN15E APPROVED. INHERE THO 5) INSTALLATION: 1. LOOKS AND LATC OMI FLOOR TO CENTER OF 6RIP. 2. THE FIN15HED 5URFA(E5 SHALL BE FREE OF DAMAGE,FLAIN15,BLEM15HE5 OR OTHER DEFEGT5 DETRIMENTAL TO 5EGTION Ocib5l 1)USE ONLY CONGEALED FA5TENEF5 HHENEVER POSSIBLE. 2. DOOR PULLS: 45 INGHE5 FF APPEARANGE;BE SMOOTH,TRUE AND EVEN IN ALL RE5PEGT5;NITH JOINTS AND FASTENINGS 1WI51BLE AT DYE 3. PUSH PLATE: 45 INGHE5 FROM FLOOR TO GENTER OF PLATE.COORDINATE V41TH PULL LOGATION. APPLIGATION OF APPLIED FINISHES AS MAY FOLLON. LOTS ARE AGGEPTABLE,SAMPLES SHALL BE SUBMITTED FOR REVIEN. INSTALLATION SHALL BE IN FULL ROLL NIDTH15, 2) INSTALL EXP05ED MOUNTING DEVIGE5 AND FASTENERS TO MATCH THE AGE55ORIE5. 4. PU5H-PUILL BAR: 42 INGHE5 FROM FLOOR TO GENTER OF BAR. 3. GYPSUM BOARD CONGEALED ABOVE GEILIN65 SHALL BE FIRE TAPED ONLY. RESILIENT FLOOR TILE INITH 5. TOP HINGE: TO JAMB MANUFACTURERS STANDARD,BUT NOT GREATER THAN 10 INGHE5 FROM HEAD OF FRAME TO (7. REPAIR OF EX15TIN6 GYPSUM BOARD 5URFAGE5; ONLY ONE LE55ER NIDTH PERMITTED TO GOMPLETE AN AREA,UNLE55 OTHERN15E REVIENED NITH ARGHITEGT.LAY OUT 3)PROVIDE ALL ANGHOR5,DOLTS AND OTHER NEGE55ARY AND REQUIRED FASTENERS,AND ATTAGH GENTER LINE OF HINGE. 1. REPAIR ALL EXISTING GYPSUM BOARD HALL AND GEILIN6 5URFAGE5 NOTED TO REGEIVE NEIN APPLIED FIN15HE5. PART I--(7ENERAL ROLLS STANDARDS 5EGURELY TO HALL AND PARTITIONS IN LOCATIONS AS INVIOATED ON PLANS AND 5PEGIFIGATION5. 6. BOTTOM HINGE: TO JAM13 MANUFACTURERS STANDARD,BUT NOT GREATER THAN 12-112 INGRE5 FROM FLOOR TO 2. REMOVE AND REPLAGE GYPSUM 130AFD PANELS NITH FRAGTURE EXTENDING THROUGH THIGKNE55 OF PANEL. OF CARPET FOR AR(;HITECT'5 REVIEN.GHEGK MARGHIN6 OF GARPET BEFORE CUTTING AND ENSURE THERE 15 NO COMPLY NITH THE MANUFAGTURER'5 INSTRUCTIONS FOR EAGH TYPE OF SUBSTRATE CONSTRUCTION. L CENTER LINE OF HINGE. 3. SPACKLE ABRA51ON5 AND FLOAT IRREGULARITIES AND SAND AS REQUIRED TO PRODUCE SURFACE EQUAL TO NEN 1.01 SUMMARY V151BLE 1. INTERMEDIATE HIN6E5: EQUALLY 5PAGED BETINEEN TOP AMC)BOTTOM HINGES AND FROM EAGH OTHER. SURFACE 5PEGIFIED HEREIN, A. 5EGTION INGLUDE THE FOLLONIN& VARIATION BETNEEN DYE LOTS. 10.4 MU51G EQUIPMENT: 3. HINGE MORT15E ON POOP,LEAF- 1/4 INCH TO 5/16 INGH FROM STOP 51DE OF DOOR. H. SKIM GOAT: THE FOLLONIN6 SKIM GOAT REQUIREMENTS APPLY TO GONGRETE AND GYPSUM BOARD 5URFAGE5 NOTED 1. RESILIENT SOLID VINYL TILE FLOORING B. GUT GARPET,INHERE REQUIRED,IN A MANNER TO ALLOIN PROPER SEAM AND PATTERN MATGH.ENSURE GUTS ARE A)MATERIALS: cl. DEAD E30LT: NOT MORE THAN 45 INCHES FROM FLOOR TO OPERATING LEVER. AKE)TO ALL NEN GYPSUM BOARD 5URFAGE5 INHEREIN THE FLATNE55 15 IN EXGE55 OF Ilb" IN 10'A5 MEASURED UNDER A STRAIGHT 1)5OUND 5Y5TEM BY MUZAK 10. EXIT DEVIGE: 40 INGHE5 FROM FLOOR TO GENTER OF TOUGH BAR,35 INGHE5 FROM FLOOR TO CENTER OF GRO55 5TRAI6HT EDGE PLAGED AT AN LOGATION ON A SURFACE- 1.02 RELATED 5EGTION5 AND TRUE AND UNFRAYED. LOCATE SEAMS IN AGGORDANGE NITH APPROVED LAYOUT OF SEAMING PLANS.ENSURE 2) SPEAKERS: B06EN 586-1125P6DIN OR EQUIVALENT BY TENANT'5 GENERAL GONTRACTOR tu BAR. 1. APPLY SKIM COAT PER GOMPOUND MANUFAGTURER'5 REGOMMENPATION5 AND OF THIGKNE55 REQUIRED TO A. SECTION: 05100-GONGRETE FORMNORK-GONGRETE 5UB5TRATE FIN51H 5EAM5 Ic-a G. ADJUST HARDINARE FOR SMOOTH OPERATION AND FOR GOMPLIANG�NITH REGULATORY REQUIREMENTS AND GOMPLETELY COVER 5URFAGE5 NOTED. B. 5EGTION 3300 CAST IN PLACE GONGRETE ARE STRAIGHT,NOT OVERLAPPED OR PEAKED,AND FREE OF DEFORMITY. B) INSTALLATION:2. APPLY 5KIM COAT GOMPOUND TO FILL IRREGULARITIES OR SURFAGE5 BETINEEN RIDGES FORMED 13Y JOINT G. 5EGTION: 06001 -ROUGH GARPENTRY G. LAY CARPET ON FLOORS HITH RUN OF THE PILE IN DIREGTION OF ANTIGIPATED TRAFFIC,.00 NOT ORANGE RUN OF PILE 1)ALL SPEAKERS AND HIRE TO BE SUPPLIED AND INSTALLED BY GENERAL GONTRAGTOR AS INDIGATED ON A6GE551BILITY.PURIN6 THE INSTALLATION OF HARDHARE,A PERIODIC, INSPECTION AND ADJUSTMENT SHALL BE MADE TREATMENT AND AT OTHER DEPRESSIONS AND FLOAT INITH A STRAIGHT EDGE AS REQUIRED TO LEAVE FIN15H IN < BY THE ARGHITECTURAL HARDNARE SUPPLIER,OR THE AGENT.ANY HARDNARE IMPROPERLY INSTALLED OR 5URFAGE FLAT V41TH A MAXIMUM DEVIATION FROM A TRUE PLANE OF 1/5" IN IO'A5 MEASURED UNDER A STRAIGHT 1.03 REFFERENGE5 ANY ONE ROOM OR FROM ONE ROOM TO NEXT. PLANS AND 5PEGIFIGATION5. T C CO IMPROPERLY FUNGTIONIN6 SHALL BE REMOVED,REPAIRED OR REPLACED,AND REINSTALLED.AFTER INSTALLATION OF ED6E PLAGED AT ANY LOCATION ON 5URFACE. 2)THE GENERAL GONTRACTOR AS INDIGATED ON THE RE5PON515ILITY 56HEOULE 15 TO FURN15H AND INSTALL A HARDINARE AND AFTER AIR SUPPLY 15 TURNED ON,QUALIFIED HARDNARE 5UPPLIER-5 OR MANUFAGTURER 3. FINISH 5QM GOAT 5URFAGE SHALL BE SANDED SMOOTH AND BE FREE OF DAMAGE,FLAN5,BLEM15HE5 OR OTHER A. A5TM E64b-TE5T METHOD FOP,GRITIGAL RADIAN FLUX(RADIANT PANEL)OF FLOOR GOVERIN6 5Y5TEM5 U51N6 A P. FOLLOIN MANUFAGTURERS DIREGTION5. SLEEVE PER MANUFACTURE REQUIREMENT PENETRATING THE ROOF AT THE LOGATION DE516NATED BY TENANT 608 REPRE5ENTATIVES OF GLO5ER5,PANIC,BOLT5,LOOKS AND OTHER RADIANT HEAT ENER6Y 5OURCE. E. INSTALL TRAN51TION STRIPS AT TRAN51TION FROM CARPET TO HARD FLOOR 5URFAGE. rRITIGAL OPERATIONAL HARDNARE 5HAH IN5PEGT AND ADJUST THE INSTALLATION,AND DELIVER IN5TRUGTION5 FOR MAINTENANCE AND FUTURE ADJUSTMENTS TO THE DEFECTS DETRIMENTAL TO APPEARANGE OR NHIGH HILL TELEGRAPH THROUGH APPLIED FIN15HE5 AS MAY FOLLON. 5. A5TM E662-NB5 SMOKE GRAMBER TEST METHOD. F. PROTECT GARPET FROM DAMAGE V41TH PROTEGTIVE GOVERIN6 DURING ENTIRE GON5TRUGTION PERIOD. FOR THE 015H INSTALLED ON THE ROOF-5LED. KIN ON, N ONNER.ONE MONTH PRIOR TO EXPIRATION OF INARRANTY,PROVIDE INSPECTION AND ADJUSTMENT BY QUALIFIED 5.04 AGOU5TIGAL AGGE55ORIE5 INSTALLATION 1,04 SUBMITTALS 3)FURN15H AND INSTALL ALL HIRING,AS REQUIRED TO CONNECT 5PEAKER5 TO CLIENTS 5TEREO/TAPE DEGK, IN HARDNARE 5UPPLIER'5 OR MANUFAGTURER'5 REPRE5ENTATIVE5 OF GLO5ERS,PANIG DOLTS,AND LOOKS. 3.03 INSTALLATION DIRECT GLUE DOINN METHOD MINIMUM 51ZE 1/2"EMT. GONTRAGTOR SHALL PROVIDE HIRING AS PER PLAN EQUIPMENT IN MANUFAGTURER15 D. DO NOT PERMIT ADJACENT V40RK TO DAMAGE HARDNARE OR FINISH. A. EREGT RE51LIENT CRANNEL5 AT MAXIMUM 24"ON GENTER.MAKE JOINTS OGGUR OVER FRAMING MEMBERS, A. SUBMIT PRODUGT DATA IN AGGORDANGE NITH 5EGTION(01500)(01340).INGLUDIN6 MANUFACTURER5 INSTALLATION A. REFER TO DRANIN65 FOR AREAS REQUIRING GLUE PONN CARPET. MAINTAIN STEREO GHANNEL SEPARATION. HIRING TO TERMINATE AT LOGATION 5HONN ON (L 13. PLAGE ACOUSTICAL INSULATION FULL HEIGHT IN PARTITIONS,TIGHT NITHIN 5PAGE5,AROUND GUT OPENINGS,BEHIND AND AND MAINTENANCE(01"700)(01-730) INSTRUCTIONS. B. INSTALL ADHE51VE OVER ENTIRE AREA TO BE GARPETED,PER REFERENGED STANDARDS.APPLY APHE51VE U5ING THE AROUND ELEGTRIGAL AND MEGRANICAL ITEMS INITHIN OR BEHIND PARTITIONS,AND TIGHT TO ITEMS PA55IN6 THROUGH DRANIN65 AND GOVER OPENING HITH APPROPRIATE NHITE PLASTIC,PLATE. END OF 5EGTION 1. 50LID VINYL PLANK FLOOR GOVERIN6 TO BE ORDERED INITHIN(30)DAYS AFTER NOTIGE TO PROGEED. PROPER PARTITIONS. NOTCHED TRONEL AND LET DRY TO A TACKY STATE IN AGrORDANCE NITH MANUFACTURERS REGOMMENDATION5. END OF 5EGTION