Loading...
Permit Support Document y q CITY OF TIGARD ELECTRICAL PERMIT "'1I COMMUNITY DEVELOPMENT Permit#: ELC2014-00503 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/04/2014 Parcel: 1S134BC00200 Jurisdiction: Tigard Site address: 12186 SW SCHOLLS FERRY RD Project: Mud Bay-LL Work Subdivision: GREENWOOD TERRACE CONDO Lot: 17 Project Description: Relocating electrical panel,hook ups to RTUs,two restrooms,manager's office&breakroom. 10/9/14,reprinted to correct address from 12180 to 12186 SW Scholls Ferry Rd. Contractor: INDUSTRIAL COMMERCIAL ELECTRIC COMPANY Owner: ATLAS GREENWAY LLC PO BOX 21282 333 NW NINTH AVE, STE 1009 KEIZER, OR 97307 PORTLAND, OR 97209 PHONE: 503-981-2383 PHONE: FAX: 503-981-0053 FEES Quantity Description Date Amount 1 ea Services or Feeders-200 09/04/2014 $100.70 Specifics: amps or less 6 crt Branch Circuits w/Purchase 09/04/2014 $44.52 Type of Use: COM Service or Feeder Class of Work: ALT 1 ea 12%State Surcharge- 09/04/2014 $17.43 Electrical Type of Const: Occupancy Grp: Total $162.65 Required Items and Reports(Conditions) This permit is issued..subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law. All work will be done in ordance with a•• •ved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATT NTION: Oregon law equi•=- ou to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0 10 through OAR 952-001-It•0. Yo - obtain a copy of the rules or direct questions to OUNC by callin 232.1987 or 1.800.332 2344. Issued s Permittee Signatur ) �T� �c� " OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR.ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.