Report (2) COMcheck Software Version 3.9.3
1 Envelope Compliance C '
AUG 2 8 2014
2010 Oregon Energy Efficiency Specialty Code BUl rIGARD
Section 1: Project Information � JlSION
Project Type:Alteration
Envelope Compliance Method:Prescriptive
Project Title :
Construction Site: Owner/Agent: Designer/Contractor:
11565 SW 67th Ave Joe Green,JR Brian Cobb
Tigard,OR 97223 Joe Green Investment Co Infinite Architecture
11560 SW 67th Ave,Suite 333 PO Box 664
Tigard Donald,OR 97020
OR,OR 97223 503-989-2992
503-806-3004 infinitearchitecture @wbcable.net
joe@joegreeninvestments.com
Section 2: General Information OPof,(4-�02c3
C� ity of Tigard
Building Location(for weather data): Tigard,Oregon A• • oved Plans
Climate Zone: 4c O, Q(
Building Space Conditioning Type(s): Nonresidential By 4`1�- Date `1(C
Vertical Glazing/Wall Area Pct.: 1 r'6� G.O
n^ 6
Activity Type(s) Floor Area 1
�
Unspecified 0 OFFICE COPY
Section 3: Requirements Checklist
Envelope PASSES
Climate-Specific Requirements:
R-Value Proposed Max.Allowed
Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
Exterior Wall-new Wd framing metal siding:Wood-Framed,24"a 19.0 4.0 0.050 --- 0.064 ---
.c.
Window 1 -Typical Curtain/storefront system:Metal Frame --- --- 0.290 0.360 0.450 0.400
Curtain Wall/Storefront,Pert.Type:Other testing/cert.Product
ID:Oldcastle-series fg3000t with solarban 60 azuria,SHGC
0.36
Door 1 -Sliding Glass Wall at Priv Office:Glass(>50% --- --- 0.420 0.230 0.550 0.400
glazing):Metal Frame,Non-Entrance Door,Pert.Type:Other
testing/cert. Product ID:Milgard Moving Glass Wall Alum
Stacking,SHGC 0.23
Door 2-Flush Insulated HM at Open Office&Roof Access: --- --- 0.500 --- 0.700 ---
Insulated Metal,Swinging
Door 3-Overhead Section Door at Receiving:Insulated Metal, --- --- 0.130 --- 0.500 ---
Non-Swinging
Floor 1 -New Slab on Grade at Lobby:Slab-On-Grade:Unheated --- 10.0 0.100 --- 0.550 ---
Roof 1 -New Roof at Penthouse/Roof Access(Sawn):Attic Roof 30.0 8.0 0.027 --- 0.027 ---
with Wood Joists
Roof 2-New Roof at East Side(I-joist):Attic Roof with Wood 38.0 0.0 0.027 --- 0.027 ---
Joists
I
(a)'Other'components require supporting documentation for proposed U-factors.
Project Title: Report date: 07/21/14
Data filename:C:\Temp\Office\Jurisdictional\67th Ave Office.cck Page 1 of 3
-
(b)Fe,estrations product performance must be certfied in accordance with NFRC and requires supporting documentation.
In the following requirements, blank checkboxes identify requirements that the applicant has not acknowledged as being met. Checkmarks
identify requirements that the applicant acknowledges are met or excepted from compliance. 'Plans reference page/section'identifies where in
the plans/specs the requirement can be verified as being satisfied.
Fenestration Product Rating:
1. U-factors of fenestration products(windows,doors and skylights)are determined in accordance with NFRC 100 by an accredited,
independent laboratory,and labeled and certified by the manufacturer or are determined using the commercial size category values
listed in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.4 and shall include the effects of the window frame.
The temporary label afixed to the fenestration products must not be removed prior to inspection.
Plans reference page/section: Spec 08 11_13,08 44 13, & 08 80 00
2. Solar heat gain coefficient(SHGC)of glazed fenestration products(windows,glazed doors and skylights)shall be determined in
accordance with NFRC 200 by an accredited,independent laboratory, and labeled and certified by the manufacturer or be determined
using the Solar Heat Gain Coefficients(SHGC)in Chapter 15 of the 2009 ASHRAE Handbook of Fundamentals,Table No.10.The
overall values must consider type of frame material and operator for the SHGC at normal incidence.
Plans reference page/section: Spec 08 11.1.13, 08 44 13, & 08 80 00
Air Leakage, Insulation, and Component Certification:
3. Sealing of the building envelope.Openings and penetrations in the building envelope are sealed with caulking materials or closed with
gasketing systems compatible with the construction materials and location.Joints and seams are sealed in the same manner or taped
or covered with a moisture vapor-permeable wrapping material.Sealing materials spanning joints between construction materials allow
for expansion and contraction of the construction materials.
Plans reference page/section: A701
4. Window and door assemblies.The air leakage of window and sliding or swinging door assemblies that are part of the building envelope
are determined in accordance with AAMA/WDMA/CSA 101/I.S.2/A440,or NFRC 400 by an accredited,independent laboratory,and
labeled and certified by the manufacturer.
Plans reference page/section: AI11, Spec 08-11 13
• 5. Curtain wall,storefront glazing and commercial entrance doors. Curtain wall,storefront glazing and commercial-glazed swinging
entrance doors and revolving doors are tested for air leakage in accordance with ASTM E 283.For curtain walls and storefront glazing.
the maximum air leakage rate is 0.3 cubic foot per minute per square foot of fenestration area. For commercial glazed swinging
entrance doors and revolving doors,the maximum air leakage rate is 1.00 cfm/ft2 of door area.
Plans reference page/section:A301,A302.A303 and spec 08 44 13
• 6. Building thermal envelope insulation.An R-value identification mark is applied(by manufacturer)to each piece of insulation 12
inches or greater in width.Alternately,the insulation installers have provided a signed,dated and posted certification listing the type,
manufacturer and R-value of insulation installed. Refer to code section for blown or sprayed insulation installation/settling depths and
marker requirements.
• 7. Insulation mark installation. Insulating materials are installed such that the manufacturer's R-value mark is readily observable upon
inspection.
• 8. Insulation product rating.The thermal resistance(R-value)of insulation has been determined in accordance with the U.S. FTC R-value
rule.
• 9. Installation.All material,systems and equipment are installed in accordance with the manufacturer's installation instructions and the
International Building Code.
• 10.Outdoor air intakes and exhaust openings. Stair and elevator shah vents and other outdoor air intakes and exhaust openings integral
to the building envelope shall be equipped with not less than a Class I motorized,leakage-rated damper with a maximum leakage rate
of 4 cfm per square foot at 1.0 inch water gauge when tested in accordance with AMCA 500D. Stair and shaft vent dampers shall be
capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection
systems.
Plans reference page/section: see mechanical drawings/hermit
• 1 1.Loading dock weatherseals.Cargo doors and loading dock doors are equipped with weather seals to restrict infiltration when vehicles
are parked in the doorway.
Plans reference page/section: A303& spec 08 36 13
• 12.Recessed lighting. Recessed luminaires installed in the building thermal envelope are sealed to limit air leakage between conditioned
and unconditioned spaces.All recessed luminaires are IC-rated and labeled as meeting ASTM E 283.All recessed luminaires are
sealed with a gasket or caulk between the housing and interior wall or ceiling covering.
Plans reference page/section: sew electrical drawings/spec
-
13.Vestibules. Doors that separate conditioned space from the exterior are protected with an enclosed vestibule,with all doors of the
vestibule equipped with self-closing devices.Vestibules are designed so interior and exterior doors to not operate simultaneously.
Exception applies:Doors that open directly from a space less than 3000 sq.ft. in area.
Project Title: Report date: 07/21/14
Data filename:C:\Temp\Office\Jurisdictional\67th Ave Office.cck Page 2 of 3
1Plans reference page/section: A101
14'Other components have supporting documentation for proposed U-Factors.
Requirement is not applicable.
Plans reference page/section:
Section 4: Compliance Statement
Compliance Statement The proposed envelope alteration project represented in this document is consistent with the building plans,
specifications and other calculations submitted with this permit application.The proposed envelope alteration project has been designed
to meet the 2010 Oregon Energy Efficiency Specialty Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory
requirements in the Requirements Checklist.
O<Ll/W F (066
ame-Title Signature D to
Report date: 07/21/14
Project Title: Page 3 of 3
Data filename: C:\Temp\Office\Jurisdictional\67th Ave Office.cck