Loading...
Permit q CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT "! s COMMUNITY DEVELOPMENT Permit#: FPS2014-00158 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/02/2014 Parcel: 1 S135AB01002 Jurisdiction: Tigard Site address: 10220 SW GREENBURG RD 245 Project: PMC Sierra Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Fire sprinklers,relocate(2)heads and add(3)heads. Contractor: MCKINSTRY COMPANY LLC Owner: LINCOLN CENTER LLC 16790 NE MASON ST., STE. 100 BY SHORENSTEIN PROPERTIES LLC PORTLAND,OR 97230 555 CALIFORNIA ST 49TH FL SAN FRANCISCO, CA 94104 PHONE: 503-331-0234 PHONE: FAX: 503-331-6907 FEES Description Date Amount Specifics: Permit Fee-COM 10/02/2014 $53.78 12%State Surcharge-Building 10/02/2014 $6.45 Type of Use: COM Plan Review-Fire Life Safety-COM 10/02/2014 $21.51 Class of Work: ALT Type of Const: Occupancy Grp: Height: ft Stories: Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Standpipe Required: Hazard: Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Cut Sheets Required: Total $81.74 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $600.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct• - • : •UNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspecti e. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Fire Protection System Qhaa4 raft D FOR OFFICE USE ONLY Received I �� City of Tigard ! Permit No.: si • 13125 SW Hall Blvd.,Tigard,OR 97223 2014 Date/By: C � f/LS�G/ _i / II g Plan Review Q Phone: 503.639.4171 Fax: 503.598.1960 E 1 D81e/B : Other Permit: [he����-�o A T 1 G A R D Inspection Line: 503.639.4175 • Date Ready/By: Juris: See Page 2 for tO 1 Internet: www.ti ard-or. ov n 9,`" 1? 1YIN Notifed/Method: Su PP lementalInformation TYPE OF"WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: ! ___ ❑Accessory building ❑Multi-family Number of bedrooms: El Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 10220 SW Greenburg Rd New dwelling area: square feet City/State/ZIP:Tigard,OR 97233 Garage/carport area: square feet Suite/bldg./apt.no.:245 Project name:PMC Sierra Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ ( (X).(31) Relocate two(2)and add three(F)fire sprinkler heads. Existing building area: square feet McKinstry Job#71570 New building area: square feet ❑ PROPERTY OWNER TENANT Number of stories: Name:PMC Sierra Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fa.x:( ) New: ® APPLICANT ® CONTACT PERSON NOTICE Business name:McKinstry Company,LLC All contractors and subcontractors are required to be Contact name:Antonija Krizanac licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 16790 NE Mason Street,Suite 100 jurisdiction in which work is being performed.If the City/State/ZIP:Portland,OR 97230 applicant is exempt from licensing,the following reasons apply: Phone:(503)278.3971 Fax::(503)331.6907 E-mail:antonijak@mckinstry.com CONTRACTOR BUILDING PERMIT FEES* Business name:McKinstry Company,LLC (Please refer rojea cliedule) Permit fee: Address:Same as applicant State surcharge(12%of permit fee): City/State/ZIP: FLS plan review(40%of permit fee): Phone:( ) Fax:( ) (Due upon application.) CCB lic.:172811 Total permit fees: Authorized signature=—� Amount received: This permit application expires if a pertnit is not obtained Print name:Antonija Krizanac Date: i 1 I f 1 Lf within 180 days after it has been accepted as complete. * Fee methodology set by Tri-County Building Industry Service Board. I.\Building\Permits\FPS-PermitApp.doc 03/23/06 440-4613T(11/02/COMJWEB) City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information Describe work to be done: 1.) ❑ New 2.) Modification to sprinkler heads only: ❑ Addition ® 1-10 heads: No plan review required. ® Alteration El 11+heads: Plan review required. ❑ Repair Number of sprinkler heads: 5 Additional description of work Type of System (Complete A, B, C or D as applicable): A.) Commercial Sprinkler (Xi Wet ❑ Dry Additional Standpipes _ Information: Hazard Group Light Density , Design Area S(370 K.Factor 5.6 Sprinkler Project Valuation: $ 600 B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component El Yes Cut Sheets Fire Alarm Project Valuation: $ D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $187.50 2,001 to 3,600 $232.50 3,601 to 7,200 $292.50 7,201 and greater $381.50 Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees Project valuation subtotal(see A,B &C above): $ Permit fee based on project valuation(see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12% of permit fee): $ FLS Plan Review(40% of permit fee): $ TOTAL: $ Plan review requires a completed application and 2 sets of plans at submittal. Plan review fees are required at submittal. "New" fire protection systems require that plans bear the original seal of an Oregon licensed fire suppression engineer,or NICET level"3" technicians. \\Mckinstry\ponland\Construction\Projects\705 OR SPG Hard Cards\2014\71570 PVC Sierra-Suite 245,3L\Permits\FiteProtection-PennitApp.doc L City of Tigard Permit No.: /P5 aO/41i / II 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 Date Received: ,�I� Inspection Line: 503.639.4175 'n Internet: www.tigard-or.gov By: CD �Y1ti0- FIRE SPRINKLER AFFIDAVIT FOR ALTERATION OR TENANT IMPROVEMENTS ECEIVED (1 to 10 SPRINKLER HEADS WITHOUT PLANS) OCT 2 2014 CITY OF f4GARD Q 1S(W!S1(W Project Name: ' ASL i e f Occupancy: J Job Address: t 02:7-0 S. D (-�i e�,.,b,,�r�1�� Type of Construction: Suite: Z`-tS Contractor: n.\ Cr . Phone: S U 3 2 -3`1-1 Number of Proposed or Altered Heads: .cj Type: \A.r_ • Hazard: LA-r Density: . I, NC's '/ \h Oregon Construction Contractors Board No. , I-7_61 certify the following is true and reasonably defines the scope of work for this project: a) All work is limited to drops and armovers in a light-hazard occupancy. b) Positions of sprinkler heads relative to architectural features such as soffits, beams, partitions, walls, etc. complies with current adopted edition of NFPA 13. c) The proposed work does not require hydraulic calculations. d) Only one sprinkler head will be installed from one drop (exception: up to two heads from one drop may be installed when each head is in a separate fire area). e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13. f) Tenant improvements in a new building shall be equipped with Quick Response heads(see 2002 NFPA 13, Section 8.3.3.1 for exceptions). g) The installation shall comply with the requirements of the current adopted edition of NPFA 13. h) Piping shall not be concealed until hangers and bracing are inspected. i) Final approval shall be subject to onsite tests and inspections. In addition, I understand the following is required: • Submit (3) copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. Signature: i■ IA Date: lt, 2,1 I Print Name: keN ,∎ c— I:\Buil ding\Forms\FireSprinklerAffidavit_071514.docx Page 1 of 1 •