Loading...
Correspondence imir ■i�Iio ammusrmilsomen ffff F- -';� t _ �. i 2700 S.F:li'arrison St., Shiite B ▪UUI,C3 S I RUCTURAL .. .L.!. } Mil aukie, Oregon 97222 G Fax s ax 503607!0481 }.....�,.._.� f... Fax. 503.6.07.0486 ❑ Conference Project Lyon Residence Addition ❑ Phone Client Orlando Construction Job No. 14-167 ® Field Subject Strap Date September I I,2014 ❑ Memo Distribution By RMM ❑ Job Observation Time Jim, 44-r i'/ 0o l l'i It was noted on the Lyon Residence Addition that the existing wall framing adjacent to the addition is balloon framed. A strap was shown on the drawings which connected the new plates to the existing plates to tie the systems together. The balloon framed wall does not allow for the strap to establish a plate to plate connection. This strap may be omitted. The strap's only purpose is to tie the systems together and is redundant. The systems are tied together at the foundation level and the ledger which connects the new roof to the existing structure. Please feel free to contact our office with any further questions. Sincer ly, ,� I Robert M. McClung,P.E. BK Engineers Inc. 4110 SE Hawthorne Blvd. #446 /�', Portland, OR 97214 I., Office: (503) 777-1127 ' Fax: (503) 777-7902 E-mail. Jim @OrlandoConstructionlnc.com CONSTRUCTION INC. Website: www.orlandoconstructioninc.corn OR CCB# LBPR187346 People You Can Depend On WA Lic#ORLANC1871D0 September 30, 2014 ,0/1 -r-gilo/y-x l 1 y To: City of Tigard Building Official Re: Installation of Tuff Form Shower Pan To Whom It May Concern: Heath Catching was trained by the Tuff Form Factory Representative in October 2012 to install the Tuff Form Curbless Shower Pan and Mapei Waterproofing Systems provided by the Accessibility Resource Center. We have successfully installed these systems in other local municipalities under building permit oversight. Let me know if you have any questions. Sincerely, James E. Wilburn IV, CGP President h . r ADCERTIFIED THINK GREEN— THINK RECYCLE— THINK TOMORROW PROFESSIONAL" Established 1959 BBB. `=r.ESS ,