❑ Conference Project Lyon Residence Addition
❑ Phone Client Orlando Construction Job No. 14-167
® Field Subject Strap Date September I I,2014
❑ Memo Distribution By RMM
❑ Job Observation Time
Jim, 44-r i'/ 0o l l'i
It was noted on the Lyon Residence Addition that the existing wall framing adjacent to the addition
is balloon framed. A strap was shown on the drawings which connected the new plates to the
existing plates to tie the systems together. The balloon framed wall does not allow for the strap to
establish a plate to plate connection. This strap may be omitted. The strap's only purpose is to tie
the systems together and is redundant. The systems are tied together at the foundation level and the
ledger which connects the new roof to the existing structure. Please feel free to contact our office
with any further questions.
Sincer ly, ,� I
Robert M. McClung,P.E.
BK Engineers Inc.
4110 SE Hawthorne Blvd. #446
/�', Portland, OR 97214
I.,
Office: (503) 777-1127
' Fax: (503) 777-7902
E-mail. Jim @OrlandoConstructionlnc.com
CONSTRUCTION INC. Website: www.orlandoconstructioninc.corn
OR CCB# LBPR187346
People You Can Depend On WA Lic#ORLANC1871D0
September 30, 2014 ,0/1 -r-gilo/y-x l 1 y
To: City of Tigard Building Official
Re: Installation of Tuff Form Shower Pan
To Whom It May Concern:
Heath Catching was trained by the Tuff Form Factory Representative in October 2012 to install the Tuff
Form Curbless Shower Pan and Mapei Waterproofing Systems provided by the Accessibility Resource
Center. We have successfully installed these systems in other local municipalities under building permit
oversight.
Let me know if you have any questions.
Sincerely,
James E. Wilburn IV, CGP
President