Report Sherman Engineering, Inc. (503) 230-8876 Ph
3 15 I NE Sandy Blvd. Ste. 100, Portland, OR 97232 (503) 226-4745 Fax
MEMORANDUM ms-r �c�-DOl3
TO: Mr. Eric Hess
OH Architecture
3501 26th Place, W.
E120
Seattle, WA 98199
s
``
DATE: September 12, 2014 ���7'�
634CAi
FROM: Stig Widell, PE �g 13-8
�E oN
Associate jo �,?`��
O�p 1-Ic
RE: Epoxy Inspection
Mistry Residence EXPIRES: 6/30/ i
13697 SW Tracy Pl.
Tigard, OR 97223
NOTE:
This memo is intended to inform you of our site visit for the epoxy inspection. The
site visit was performed on 9-12-14 at 10:20am with Jesse Tissot. There were a
total of(5) locations where post installed anchors were required, (4)per the
approved plans and(1)as required per the memo "OH Arch 090814". Upon arrival
all of the holes had been predrilled and the appropriate threaded rods and epoxy
were on hand. A final brushing and blowout with compressed air was observed for
each hole and the cleanout was approved. The Epoxy was installed per the
manufacturer's specifications and the treaded rods were inserted. All of the post
installed epoxy anchors noted above were installed to our satisfaction and meet the
structural intent.
4
Please feel free to call if you have any questions.
CC: Jesse Tissot - heaver Dam Construction
File-OH ARCH 090814.doc