Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
—� PROJECT NOTES: SYSTEM INFORMATION TABLE OF CONTENTS 1..3.64 KW DC,2.795 KW AC SOLAR PHOTOVOLTAIC SYSTEM MAGNETIC TRUE 2. 1 STORY COMP SHINGLE ROOF AT 23°PITCH. ARRAY PITCH ORIENTATION ORIENTATION Q 1 PAGE DESCRIPTION 3 CONSTRUCTION FOREMAN TO CONFIRM FINAL CONDUIT RUN PLACEMENT _ 0 S I S C 3 04. V . 1 # WITH CUSTOMER. AR-01 23° 150° 135° ��+4 CONTACT:SERGE KILLINGSWORTH RECBV PV-01 SITE PLAN&MECHANICAL 5. DESIGN CRITERIA: 5.1. SYSTEM WEIGHT:3LBS/SQFT. _ _ TOTAL PV ARRAY AREA: 238 FT2 PV-02 RACKING LAYOUT 5.2. EFFECTIVE WIND SPEED: 85 MPH 3-SEC GUST. SP g 2014 LARGEST PV SECTION: 28 FT PV-04 SINGLE LINE DIAGRAM 5.3. 1MND EXPOSURE CATEGORY:B — t ROOF SLOPE: 23° 5.4. SNOWLOAD: 15 PSF ROOF AREA MEASURED IN PLAN VIEW: 3042T2 5.5. OCCUPANCY CATEGORY: II �11 nt4 r PV ARRAY/ROOF AREA: 7.82 % BUILDWIC"I ELECTRICAL EQUIPMENT LOCATIONS: NTS ft; SITE PLAN -SCALE= 0.003556 PROPERTY LAYOUT PL PL PL PL PL PL PL Q\1 Qv ATTACHMENTS SHALL OF SPACED NO GREATER THAN 24 INCHES ON CENTER � ^ IN ANY DIRECTION WHERE ARRAY IS r - T LOCATED WITHIN 3 FEET OF A ROOF 4 EDGE,HIP,EAVE OR RIDGE. )) , OSISC 305.4.3(B) Q`• 4'" (.(,. ,,,_..0 -J 0 RIDGE SETBACKS (1'TYP) *ft/ / (E) ROOF V TYP CITY OF TIGARD (N) SOLADECK FOR CODE COMPLIANCE 45, *Ak COMBINER/DISCONNECT 42/Approved: t y---- OTC: [ l Vt, Permit#: bClT`2 ( --00 I/ 0 \ � Address: I 1A6-Siz)%TA ES , '_ � !, (N)ARRAY AR 01 l `S1L y .� A�i. ` Q Suite #: �.S,� Date:ti �/�� .7:4.1 :;';? tq `4". /j-�1 B : : :twi--.:4= .Fro.. ' r ^) ^ =^� �� > OFFICE COPY (E) MAIN PANEL c' '' �, (INTERIOR WALL) 4 �f 1 ' Ir (N) PV PRODUCTION ) METER • (EXTERIOR WALL) �` (E) SERVICE ENTRANCE&UTILITY METER (EXTERIOR WALL) IX30 ELEMENTAL ENERGY DRA TER ENGINEER: COAYLE GH A. OR CCB#A195N4 RGY 11855 SW JAMES CT,TIGARDOOR 97223 MECHANICAL ANICAL PV-01 gnE 014 RACKING LAYOUT BUILDING SOUTH FACING ELEVATION: \44414444444,,14111% STAND OFF 8" MAX HEIGHT OF MODULES ` ` \ /\ I 2'-10" MANUFACTURED TRUSSES I 2"X6" 26' 24"O.C. /0 0 o — o _ e- - � — � — � o 17'-0" //e — e- e- — $ — $ — —0 0 / c 0 — o — e- — -e- — _e_ — - c —Q — o — - - C ___ 0- ___ -e__ ___ _e. _____ o - -o- -o — o e— $ $ $ O -e O € 0 O—o O O MOUNTING DETAIL: '' 39'-0" SNAPNRACK FLASHED P RO IL-FOOT KIT TO STE STANDOFF 3: SECU BASE E L F TO OT (MIN)5/16"-18 x 4"SS HLS 5/16"SS SPLIT I (MIN 2.5"THREADED SHANK SECURE FLASHING AND MOUNTING RAILS LOCK WASHER EMBEDMENT INTO STRUCTURAL I I SNAPNRACK L-FOOT ROOFING MEMBER) STEP 2: SLIP FLASHING OVER L-FOOT BASE 5/16"x 3/4"FLAT WASHER 8" 6" SNAPNRACK CHANNEL NUT I TOEROO BOLT WITH LAG BOLT SE ifIMItIM 5/16"-18 x 3/4"SS HCS `I SNAPNRACK STANDARD RAIL i — UR 5/16" 18 SS FLAT HEX NUT SNAPNRACK L-FOOT BASE \ � 5/16"SS SPLIT LOCK WASHER\ ROOF DECKING Allowable Rail Locations ,a�� �� Solar Module SEAL PENETRATION AND ��017 ` typ.40"x 66"(Including Clamp Spacing) UNDER BASE (OR ��0� ' RAINBUSTER(OR EQUIVALENT)SEALANT (E)ROOF Ms* DECKING SNAPNRACK ,� v.-i COMPOSITION 6 NS� al" • FLASHING COMPIESED I (E)RAFTER SNAPNRACK RACKING SYSTEM SERIES 100: L-FOOT MOUNTING DETAIL --al) ELEMENTAL ENERGY DRA TER . JOHN AYLEIGH A. ELEMENTAL ENERGY 1SERGE& NANCYKILLINGSWORTH OR CCB#: 195141 LAYOUT 9/7/014 RACKING 11855 SW JAMES CT, TIGARD, OR 97223 PV 02 REV: A l — LINE•DIAGRAM: 120/240 VAC SINGLE PHASE SERVICE VOLTAGE DROP CALCS PORTLAND GENERAL ELECTRIC DC- MODULES TO COMBINER; ' VOLTAGE DROP FOR 240 VAC, 4 WIRE. 1.0M PORTRAIT M METER#: ENGAGE CABLES AND M215S, END FED (FROM SPEC. UTILITY SHEET) IS 0.29% GRID b EXISTING COMBINER TO MAIN PANEL; 100ft. MAX: C200A MAIN %VD = (2 x 100 x 11.25 x1.26/1000 )/240 = 1.18% Q BREAKER I --WALL PENETRATION ENPHASE: M215 TOTAL V.D. = 0.29% + 1.18= 1.47% EXISTING SOME PAIRS MICROINVERTER < ^ 200A MAIN (N) SOLADECK - NOT SHOWN PV MODULES PANEL ETO PROGRAM COMBINER & FOR CLARITY FACILITY y PRODUCTION METER DISCONNECT ..._/-• \_-__ ci1 +(�/fl 3 3 2 2 v -`f' CI © owe- = - 0 0 INVERTER OUTPUTS CONNECT ENPHASE ENGAGE CABLE SOLARWORLD: SW280 CONNECTED TO OUTPUT CABLE TO END TRUNK (13) MODULE/INVERTER PAIRS 30A PV BREAKER 250V METER SOCKET ENGAGE CABLE ENGAGE CABLE TERMINATION KIT (13) CIRCUITS OF (1) PAIRS EACH OPPOSITE SIDE OF 240V METER BUSBAR 200A. FORM 2S UTILITY TO LOAD SIDE PV TO LINE SIDE ' NOTES TO INSTALLER: CONDUIT SCHEDULE SOLAR PAYMENT PROGRAM PROJECT # CONDUIT CONDUCTOR NEUTRAL GROUND 1. UTILITY CONDUCTORS TO LOAD SIDE, BOTTOM • 2. PV CONDUCTORS TO LINE SIDE,TOP 1 NONE (2) 10 AWG PV WIRE NONE (1) 6 AWG BARE COPPER 3. AC/DC VOLTAGE DROP MAXIMUM AT 2% RESPECTIVELY 2 3/4" EMT OR EQUIV. ENPHASE ENGAGE CABLE NONE (1) 6 AWG THHN/THWN-2 3 3/4" EMT OR EQUIV. (2) 10 AWG THHN/THWN-2 (1) 10 AWG THHN/THWN-2 (1) 6 AWG THHN/THWN-2 POINT OF INTERCONNECTION: MODULE CHARACTERISTICS SYSTEM CHARACTERISTICS BACKFED BREAKER ON MAIN PANEL SOLARWORLD: SW280 280 W SYSTEM SIZE 3.64 kW 1. ADD 30 AMP PV BREAKER TO MAIN PANEL 2. MAIN PANEL RATING:200 A OPEN CIRCUIT VOLTAGE 39.5 V SYSTEM OPEN CIRCUIT VOLTAGE 39.5 V 3. MAIN PANEL MAIN BREAKER RATING: 200 A OPEN CIRCUIT VOLTAGE: (690.7) 43.2 V SYSTEM OPERATING VOLTAGE(690.7) 43.17 V MAX POWER VOLTAGE 31.2 V MAX ALLOWABLE DC VOLTAGE 45 V SHORT CIRCUIT CURRENT 9.71 A SYSTEM OPERATING CURRENT 9.07 A ELECTRICAL NOTES: SHORT CIRCUIT CURRENT(690.8(A)(1)) 12.14 A SYSTEM SHORT CIRCUIT CURRENT 9.71 A 1. PHOTOVOLTAIC SYSTEM WILL COMPLY WITH 2011 NEC. LABEL PLACEMENT AC BREAKER 2. ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH 2011 NEC. (INSIDE OR FRONT OF PANEL) 3. MODULES CONFORM TO AND ARE LISTED UNDER UL 1703. e 4. INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. 5. ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. 9.71 AMPS MODULE SHORT CIRCUIT CURRENT. • 15.15 AMPS DERATED SHORT CIRCUIT CIRCUIT (690.8(a)&690.8 (b)). ELEMENT--E3E3 ELEMENTAL ENERGY ERAF"ER: : COAYNE GH A OR CCB#A19 ENERGY 11SERGE & NANCY SW JAMES CT,LT GARDOOR 97223 DIAGRAM LINE PV 04 9/7/2014 014