Plans RECEIVED
MAY 14 2013
CITY OF TIGARD
For the construction of the BUILDING DIVISION
Durham Advanced Wastewater
Treatment Facility
Cogeneration and Brown Grease
Receiving Facilities — Phase 5D2 City of Tigard Erosion Control
To Schedule Inspections:
Project 6471 Call (503) 639-4175
Initial inspection:
SPECIAL INSPECTION REQUIRED Prior to footing Inspection
State of Oregon Structural Specialty Code Prior to,�lbu I
❑ Concrete and Reinforcing Steel 90% Review Submittal
❑ Bolts Installed in Concrete CITY OF TIGARD
❑ Special Moment-Resisting Concrete Frame Approved.LlaC I2.1 liX .[
Conditionally Approved. [ ]
❑ Reinforcing Steel&Prestressing Steel Tendons See Letter to:Follow [ ]
El Structural Welding Permit Number_Attached O�-o l'�"Cb[l 7 ]
❑ High-Stren ht Bolting
9 9 Address:
❑ Structural Masonry (l:?f r
� C1ean\Vate r Services By:. � � Date: t�`�
El Reinforced Gypsum Concrete
❑ Insulating Concrete Fill
El Spray Applied Fire-Resistive Materials CITY OF TIGARD REVIEWED FOR
ID Pilings,Drilled Piers and Caissons A ved �� .. [ CODE COMPLIANCE
❑ Shotcrete
Volume V of VII Conditionally Approved
See Letter to:Follow [ ]
❑ Special Grading,Excavation and Filling - Attached [
Drawings ' (-C-2p( -c'Yxyl APPROVED PLANS
❑ Smoke Control Systems Permit Number: _ 11Csl UN-ATTACHED:Address: t 3�`� PECIFICATION BOOK
L;YOther Inspections R By: ')___Date: y1S1 RUCTURAL CALCS
GFOTECH REPORT
_LefOISC DOCUMENTS
CITY OF TIGARD
Approved.&.=t (CAE— Approved plans
Conditionally Approved [ ] shall be on job site.
See Letter to:Follow [ ]
CH2MHILL Permit Number:Attached OFFICE COPY
Ada -ss: I -
By: toga Date: +.
Portland, Oregon
May 2013