Loading...
Permit CITY OF TIGARD BUILDING PERMIT ° (1 " COMMUNITY DEVELOPMENT Permit#: BUP2014-00206 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/18/2014 Parcel: 25112C800900 Jurisdiction: TIGARD Site address: 8325 SW ROSS ST Project: Bonaventure of Tigard Subdivision: WILSON ACRES Lot: 8 Project Description: Demolition of(8)structures including a pool:(1)3,472 sq ft building,(1)2,416 sq ft building,(1) 1,761 sq ft residence,(1)1,026 sq ft building,(1)600 sq ft building,(1)570 sq ft pool,(1)128 sq ft outbuilding,and(1)60 sq ft outbuilding. Upon final inspection credit for SDC fees available for future construction. Contractor: MOUNTAIN WEST COMMUNITY CONSTRUCTION LLI Owner: SCHMIDT FARM LLC 3425 BOONE RD SE 25717 SW LABROUSSE RD SALEM,OR 97317 SHERWOOD, OR 97140 PHONE: 503-566-5715 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: SF Class of Work: DEM Type of Const: Erosion Control w/Permit-Eng 09/17/2014 $100.00 Occupancy Grp: Occupancy Load: Permit Fee-Additions,Alterations, 09/17/2014 $674.35 Demolition Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 09/17/2014 $3.00 Stories: 0 Height: 0 ft 11x17) Bedrooms: 0 Bathrooms: 0 Value: $45,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $777.35 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code. State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days NTION: . -.on law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 9 -001-0010 through OAR 152-0s -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: 1/Cib--/ /HGs"` Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Residential FOR OFFICE USE ONLY IECEt'JFD City of Tigard Received Date/By: I� �� Permit No.. 6�pad ih t,W • 13125 SW Hall Blvd.,Tigard,OR 97223�EP 2 2014 Dan Review Other Permit Phone: 503.718.2439 Fax: 503.598,19 Date/By: T t G n R D Inspection Line: 503.639.4175 C Of TIGARD Date Ready/By: Juris 0 See Page 2 for Internet: www.tigard-or.gov 17 l Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ®Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling VI Commercial/industrial Valuation: S45,000 ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:8325 SW Ross St New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldgJapt.no.: I Project name:Bonaventure of Tigard Covered porch area: square feet Cross street/directions to job site:Hall Blvd Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Demolish existing house,carport,pool and sheds Valuation: S Existing building area: square feet New building area: square feet ® PROPERTY OWNER I ❑ TENANT Number of stories: Name:MWSH Tigard LLC Type of construction: Address:3425 Boone Rd Occupancy groups: City/State/ZIP:Salem,OR 97317 Existing: Phone:(503)566-5715 Fax:( ) New: ® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name:Bonaventure Senior Housing (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Eric Rouse FLS plan review fee(if applicable): Address:3425 Boone Rd.SE — City/State/ZIP:Salem,OR 97317 Total fees due upon application: Amount received: Phone:(503)373-3162 Fax::( ) - E-mail:er ouse a�livebsl.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name:Mountain West Community Construction dba Bonaventure Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:3425 Boone Rd SE Solar Installation Specially Code checklist. City/State/ZIP:Salem,OR 97317 Permit Fee(includes plan review $180.00 and administrative fees): Phone:(503)566-5715 Fax:( ) State surcharge(12%of permit fee): $21.60.1 CCB lie.:186852 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained — within 180 days after it has been accepted as complete. I Print name:Eric Rouse Date:8/2872014 *Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-RESPennitApp.doc 02/24/2011 440-4613T(I 1/02/COM/WEB) City of Tigard IIIII COMMUNITY DEVELOPMENT DEPARTMENT a III T 1 G A R D Building Permit Review — Commercial - With Land Use Building Permit #: _ ,,,'I(j (}6 Site Address: 7&),5- 4.cS 37; Suite/Bldg#: Project Name: /q f k - (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Revle ,,� / Proposal: �'`L6 04/ ❑ Verify site address/suite #exists and active in permit system. ❑ Land Use Case#: FL2 O(3-ek�PXJ / ❑ Plans Match Approved Land Use: ❑ Site Plan ❑ Landscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan ❑ Building Height: Maximum Height Actual Height ❑ Condi;••: • - ./I r. = or to VII,' /' , ❑ Prior to Permit Issuance Note-. 4 0 / `l 4.4 # 'i ec 4 6 dal / "//d' r 42,lec . . a;wriz i rri... . ` . Approved by-Planning: -mate: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: (31,2//9 Site Plans: # Building Plans: # Building Permit#: g permit#above. �_�� Workflow Routing. Planning eering LT Yermtt Coordinator -- B• Ala -. Workflow Sign-off: ❑ Sign-off for Planning(include notes from planning review) Route Application Documents: ❑ Building. original permit application,site plans,building plans,engineer and 1 beam calculations and trust details,if applicable,etc. • � Notes: , ►'►ll/,/71JAI/kv/`n/ By Permit Technician: Date: L\Building\Forms\BldgPermitRvw_COM_WithLandUse 042914.docx L Engineering Review 4 Actual Slope: e /O PFI Permit#: .20/11---A06 y 2 ❑ Conditions Met Notes: Approved by Engineering: )4 .llaier Date: 9- .-14 Revisions (after Building Submittal only) Reviewer _94Date Revision 1: k Approved ❑ Not Approved Ift Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved liegeZti 16517,41z-il Permit Coordinator Review ❑ Conditions Met- Prior to Issuance of Building Permit Notes: Revisions (after Building Submittal only) p/ �� Cr/Y� /6W— Revision Notice 1: Date Sent to Applicant 9 I /-1j/ /YG�� 1/7116 Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: K to Issue Permit /f , ' Approved by Permit Coordinator: , Date: q/ �/ A/ Pp Y 1:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_042914.docx Albert Shields From: Albert Shields Sent: Monday, September 08, 2014 5:41 PM To: 'Eric Rouse'; Jim Clarkson; Tony Weller Cc: Dwight Wildeson; John Bosse; John Floyd; Al Dickman; Dan Nelson Subject: Bonaventure- SIT2014-00014- Conditions of Approval not met, BUP2014-00206 Demo- Tree Protection Not Installed. Attachments: Conditions- 09-08-2014.pdf Gentlemen: Planning and Engineering have reviewed your site permit application, SIT2014-00014, and find that it cannot yet be issued because: 1. The PFI permit has not yet been issued. Engineering tells me that their redlines were sent back to you on August 13 and that they are waiting to receive a complete set of corrected plans. 2. 22 of the Conditions of Approval for PDR2013-00001 have not yet been met. John noted a few of these Conditions in his email of August 12th but those Conditions remain unmet. Both Planning and Engineering advise me that most of what is needed to meet each of the outstanding Conditions has been done and that we are waiting for your submittals on the remaining issues. I've attached a copy of the Conditions of Approval on which I have highlighted the Conditions that are still "Not Met." When the required plan changes and corrections have been made, please send us a complete revised plan set rather than individual corrected sheets. In net, it seems that in this case the tail, representing the still incomplete details, is wagging the dog. Please review the status of each of the Conditions, particularly whatever elements are still needed for each one. Then we can meaningfully review them together at our meeting on Thursday morning. We understand your eagerness to get a demo permit, a grading permit, and the 1200-C and we are happy to work with you to get those permits issued as soon as possible, however, we cannot issue permits until the required Conditions have been met. 1. In the case of the 1200-C, once plans are correct and complete they will be forwarded to Cleanwater Services and DEQ for review and permit issuance. Please bear in mind, however,that CWS and DEQ have heavy workloads right now and may take as long as 4 to 6 weeks to complete their reviews and issue a permit. And we do not yet have complete and correct plans to submit. 2. Regarding a grading permit, grading permits have a somewhat different set of requirements than site permits and are generally less demanding, particularly because a 1200-C is not required. So a grading permit could be issued much sooner than a site permit. We will get back to you with the specific requirements for a grading permit but again, complete plans are needed. 3. And as for the demo permit, normally, we require the issuance of a site permit before a demo permit but we have waived this requirement in this case. Nonetheless, we can't issue this permit until we receive written certification from the project arborist that the required tree protection measures are properly installed. (Condition #7). Please let me know if you have any questions. Albert Shields Permit Coordinator 1 Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 8325 SW ROSS ST, TIGARD, OR, 97224 Residential - Building 299 Final inspection PASS - No C of O BUP2014-00206 Chip Barnett Violation Summary: Inspector Contractor