Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2014-00216 Date Issued: 09/16/2014 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S135AB01003 Jurisdiction: TIGARD Site address: 10300 SW GREENBURG RD 100 Project: CHASE Subdivision: METZGER,TOWN OF Lot: 9 Project Description: TI for existing tenant. Tenant is downsizing. Contractor: RUSSELL CONSTRUCTION INC Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 555 CALIFORNIA ST 49TH FL SAN FRANCISCO,CA 94104 PHONE: 503-692-9002 PHONE. FAX: 503-692-9008 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB DC Provision Review,COM TI-Ping 09/16/2014 $75.00 Occupancy Grp: B Occupancy Load: 31 DC Provision Review,COM TI-LRP 09/16/2014 $11.00 Permit Fee-Additions,Alterations, 09/16/2014 $256.22 Dwelling Units: 0 Demolition Stories: 6 Height: 0 ft 12%State Surcharge-Building 09/16/2014 $30.75 Bedrooms: 0 Bathrooms: 0 Plan Review 09/16/2014 $166.54 Value: $12,000 Info Process/Archiving-Lg$2.00(over 09/16/2014 $4.00 11x17) Plan Review-Fire Life Safety 09/16/2014 $102.49 Floor Areas: Misc Administration Fee 09/16/2014 $50.00 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $696.00 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Cen-r. Those les are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 51..:32.1•;7 0 1.800.332•344. '- Issued By: a ittee Signature: APPAL .-.J WO 4C8Th003.539.4175 by 7:00 a.m.for the next available inspe Ord te. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONLY City of Tigard J4JCE1VE1) Received, et Y g Date/B : / � ,' Permit No. �� i "�_ ' • 13125 SW Hall Blvd.,Tigard,OR 9722 Phone: 503.718.2439 Fax: 503.598.1960 Plan Review j �� ■m Date/B : �� �' Ti G A R D Inspection Line: 503.6394175 S E P 16 2 014 Date Ready :y: ® ® Page 2 for Internet: www.tigard-or.gov Notified/Method: 9/6j /y ��0 1, Supplemental Information TYPE OF W s ;•r x���l�rA�� REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑ 4 � 7 DIVISION Permit fees*are based on the value of the work performed. New construction r.1 o tt[on p Indicate the value(rounded to the nearest dollar)of all ® Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ID Accessory building El Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:1 Lincoln-10300 SW Greenburg Road New dwelling area: square feet City/State/ZIP:Portland,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:100 I Project name:JP Morgan Chase Bank Covered porch area: square feet Cross street/directions to job site:Project located north of SW oak street, Deck area: square feet south of SW Locust Street and east of Greenburg Road Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Downsize an existing tenant.Approx.1,172 SF to be returned to building as Valuation: $$12,000.00 vacant Ste 140.Remaining 3,020 SF will remain as existing Suite 100.Work Existing building area: 3.020 square feet includes minor demolition,new walls and doors. New building area: 3,020 square feet ® PROPERTY OWNER I ❑ TENANT Number of stories: 5 Name:Shorenstein Type of construction: I-B Address:One SW Columbia Street Suite 500 Occupancy groups: City/State/ZIP:Portland,OR 97258 Existing: B Phone:(503)412-4902 Fax:(503)412-4903 New: B ® APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name:Mackenzie (Pkase refer to fee aciFeduk) Structural plan review fee(or deposit): Contact name:Kim Ford FLS plan review fee(if applicable): Address:1515 SE Water Ave Suite 100 City/State/ZIP:Portland,OR 97214 Total fees due upon application: Phone:(503)224-9560 Fax::(503)228-1285 Amount received: E-mail:kford @mcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Russell Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:20915 SW 105th Ave Solar Installation Specialty Code checklist. City/State/ZIP:Tualatin,OR 97062 Permit fee(includes plan review and administrative fees): $180.00 Phone:(503)692-9002 Fax:(503)692-9008 State surcharge(12%of permit fee): $21.60 CCB lie.:58918 ■ Total fee due upon application: $201.60 Authorized signature: p - This permit application expires if a permit is not obtained ' lit•I — within 180 days after it has been accepted as complete. Print name:Kim Ford Date:09/11/2014 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-46131(11/02/COM/WEB) City of Tigard 7111 COMMUNITY DEVELOPMENT DEPARTMENT TI C;n R D Building Permit Review — Commercial - No Land Use Building Permit #: eL,pkv,1 -- 00 1(4, Site Address: 1o30p SVA Cxeen►hul Ki, Suite/Bldg#: 100 Project Name: JP Morgan Chase Plunk (Name of comrhhrcial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: re juce, tenant spaces by I,112 are, -feet; erect-, new yam.* SuiF'P- -From vacchrl space. Existing Business Activity: 04 i G2 Proposed Business Activity: same Verify site address/suite #exists and active in permit system. LrJ Zoning: AUE-1, M/Permitted Use: [YI{ Yes ❑ No ❑ Spec Space NI Confirm no land use required. Notes: Approved by Planning: i m LE i f OCac Date: el) ! 6 I t 1{ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: Cl Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: //(di� Site Plans: # !�// Building Plans: # . Building Permit#: n butlding permit#above. Workflow Routing: E' ng ❑ Permit Coordinator LR'I3uilding Workflow Sign-off: 2'Si f for Planning(include notes from planning review) Route Application Documents: g: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: OTC— By Permit Technician: , „,,, ,_—— Date: IsA4-- I,,,, I:\Building\Fortes\BIdgPermitRvw_COM_NoLandUse_071514.docx Permit Coordinator Review ❑ Conditions Met-Prior to Issuance of Building Permit Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ OK to Issue Permit Approved by Permit Coordinator: Date: 1:\Building\Fortes\Bl dgPermitRvw_COM_NoLandUse_071514.docx Eri ' Building Division Over-The-Counter (OTC) Building Permit TIGARD Check List Project Description: Ti APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work*: ATLr Occupancy Group: Type of Construction: Type of Use**: _27j1,,1 Occupancy Load: %- ( Oregon Specialty Code: 0 Q SPECIFICS Number of Stories: kj Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback—Right Sideyard Setback—Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: , N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: 00 Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: _ Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ 12-) FEES DUE $ 7'Qo DC Prov Rvw,COM TI—Ping $ DC Prov Rvw,COM TI—LRP DC Provision Review Fee for COM TI(effective 7/1/2014) $ _ r Permit Fee—Add,Alt,Demo Project Valuation Planning LRP $ 0 12%State Surcharge Up to$4,999 $0.00 $0.00 $ f'_16--j Plan Review,Structural $5,000-$74,999 $75.00 $11.00 $ 0 — Plan Review,Fire Life Safety $75,000-$149,999 $187.00 $28.00 $ ' rr Info Proc/Arch,Lg(over 11x17$2.00) $150,000 and over $299.00 $44.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: $ Other. Building Staff: $ Other: Date/Time: $ (4( COrOTAL FEES DUE *TYPE OF USE: COM=commercial;CMS=commercial manufactured structure. *CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit;ALT=alteration;DEM=demo;NEW=new; OTR=other(use for fences,decks,retaining walls,signs,awnings or canopies). I:\Building\Forms\OTC_BUP_070114.docx Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 10300 SW GREENBURG RD 100, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - No C of O BUP2014-00216 Chip Barnett Violation Summary: Inspector Contractor