Plans •
Q
VU c
• AEI V ED
WA JUN 19 20;4
\,� Demo the entire interior of the C01 ACERICH
FIo6t the entire floor with a space shown, including flooring down CITYOF(��fl11
thin layer of ardex or similar to exposed slab, all interior walls, ,
C 1 +� v I11 IS101�
�" -� C� Q to deliver smooth, level floor back to exposed studs CMU wall, HIDING ,
CS a This portion of the space does
�_ not exist today. We will be �� utility lines back to the source, all WASHINGTON
27 _ plumbing to under slab and patched, /�
C F-- N expanding the corner of the ,`, all roof top RTUs and curbs (include SQUARE TOO
9 building, but that is not part of �� roof patches)
a this scope. F, ••
e .._:: ... >-. 1cS,z 79. rote
Q CO -N. $.1 SPACE: CO1
S.F.: 8015
DATE: 03.06.14
w SCALE: 1 "= 20'
Po c
O ,-, 3/
U VERIFY
w COLUMNS
Vr
M"'4 p On the interior of all
w ,, ' existing exterior walls from C01
O slab to underside of deck DXL AI
above install new 5/8"
Type 'X' gyp board finished (PROPOSED) stub two 2"electrical LINE
to paint ready. Provide 8015 S.F. conduits with pull string KEY PLAN
r 2.5" clear from back face from above the Landlord's
/ r of gyp board to concrete electrical switchgear in the . NORTH
block walls. electrical room stubbed
' into C01 and one 3/4" PROPOSED
the bathroom at the end of telephone conduit with pull SPACE
the hall is to be part of the string from the demarc to include installation of a
demo and included as part a the Premises new 4'-0"x7'-0" hollow core
of the new C01 space metal door with tamper
proof hinges on back Wall required doors and frames shall
1%1 end installed by each tenant;any
final IOCatIOn TBD I in plans are suggested only;
final determination is by tenant). It is required
that the tenant,contractor,architect or
24' representative must visit the site and
r1
S familiarize and verify all dimensions and
�, /8%ii. C°Cetip sizes of major items such as structural
�' 4 ei C apn Of�ash elements,electrical runs,plumbing locations
r�r C tc'ie, and items not covered by this drawing. This
shall be done at Tenant's expense. When
Construct new metal stud demising m exit passageways are present to provide a
8' of Include in your bid any
secondary exit s
walls (shown in red lines)(6", 20 GA, required drawings and city ry space, doors
16" OC) from slab to deck above.
q y shall be one-hour fire doors. Such doors
submittals to obtain the shall be self-closing and be so maintained or
Perform demo as needed to install 23. / shall be automatic dosing by smoke detector
Install 5/8" board finished to ii required permits. Permit fee
the new wall. Patch back of finishes gyp ` +.., actuation. Prior to finalizing terms and
paint ready condition on both does not need to be conditions,Leasing and Center Management
or ceiling is not required. p v 80.-iv,
sides of new demising walls from " 8• included. must resolve exiting per applicable codes.
Service area,empty electrical conduit,
—Co. slab to deck and fire caulk. ate. /"
Prepared by sewer,water, and empty telephone conduit
located within the lease line.Tenant t must
conditions /
Aaron Pratt Drawn by:G2 T.C.:AP
Macerich J
3-11-14
• Rigetnith
•
REVt510NJ x
MAY 192014
BUILT Y°!TIGq
DINCDIV,SIROD N
•
' O
k_) r.
l 1 is
\IV/ C
a :._- X02.83'
- - _ - - - - -
Ili '8
d � ^c
'N
cusfiw �C
ICI
1 ...,r,:,,,, 7 ti
'•
j, to5o, °
_
_ New
EXISTING PATIO O v CZ 2x
HOUSe \ J
1 ' V/
; O V.I
1
'
N eusnuc: r.r
+ K't yt'E,kK
- - - - - 5[T∎ - - -
91.5 2'
0
H
Q
(L
SITE PLAN Z z
z
� Z
CITY OF TIGARD cL g ,
Approved by Planning j V
Date: S • i 9. 14 Date: 320.,+
Initials: Gam- 5.6. -0.=t0'
Drawn: Cca
j . CD+89
Sheet:
1
I of 7 sheets
1 3 � `I a �� Brad do.-i C4- .