Loading...
Permit rp CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit#: BUP2014-00173 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/29/2014 Parcel: 25101 DB00103 Jurisdiction: Tigard Site address: 7360 SW HUNZIKER RD 101 Project: MSP Accounting Subdivision:CONDO SUPPLEMENTAL PLAT NO 4- Lot: 22830-2 Project Description: TI for new tenant to Tigard. Contractor: ROBINSON CONSTRUCTION Owner: HILLTOP BUSINESS CENTER LLC 21360 NW AMBERWOOD DR HUNZIKER LLC HILLSBORO, OR 97124-9321 9430 NW KAISER RD PORTLAND, OR 97231 PHONE: 503-645-8531 PHONE. FAX: 503-645-5397 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIA DC Provision Review,COM TI-Ping 07/29/2014 $75.00 Occupancy Grp: B Occupancy Load: 7 DC Provision Review,COM TI-LRP 07/29/2014 $11 00 Permit Fee-Additions,Alterations. 07/29/2014 $195 38 Dwelling Units: 0 Demolition Stones: 3 Height: 0 ft 12%State Surcharge-Building 07/29/2014 $23.45 Bedrooms: 0 Bathrooms: 0 Plan Review 07/29/2014 $127.00 Value: $7,500 Plan Review-Fire Life Safety 07/29/2014 $78.15 Info Process/Archiving-Lg$2 00(over 07/29/2014 $4.00 11x17) Floor Areas: Total Area 0 Accessory Struct 0 Basement: 0 Carport- 0 Covered Porch 0 Deck: 0 Garage 0 Mezzanine 0 Total $513 98 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet Fire Alarm Protected Corridors: Smoke Detectors Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR Specialty Codes and all other applicable law All work will be done in accordance with approved plans This permit will expire if work is not started within 180 days of issuance. or if work is suspended for more the 180 days ATTENTION Oregon law requires you to follow the rules adopted by the Oregon Utility Notifi n Center I -.se rules are set forth in OAR 952-001-0010 through OAR 952-001-0090 You may obtain a copy of the rules or direct questions to OUNC by callin 23 .1987 0. 1 332 2344 Issued By: Permittee Signature: %jib I •.4175 by 7:00 a.m.for the next available inspection ate. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Commercial FOR OFFICE USE ONLY pirCity of Tigard Received -] ?gam Permit No.: IL .: j . ,41—, , 13125 SW Hall Blvd.,Tigard,OR 972 Plan Review �� Phone: 503.718.2439 Fax: 503.598. pang .4, Nal Other Permit.gis T 1 G A R D Inspection Line: 503.639.4175 ````1 9 2014 ' *' Supplemental See Page 2 for Internet: www.tigard-or.gov U� j Supplemental Information TYPE OF WO,�„\)k_..! -, , REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction '4. k. .x_.r Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all iiifAddition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling , Commercial/industrial Valuation: $ ❑Accessory building ❑ Multi-fainii. Number of bedrooms: ❑Master builder ❑Other. Number of bathrooms: /JJOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:'�31Y0 fJili .gip, . 10, New dwelling area: square feet City/State/ZIP:�(,��, c12— '�S7ZZ'3 Garage/carport area: square feet Suite/bldgJapt.no.: 'D( "` Project name: I �� �t em �)Aacok .PG- Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: 2 5 a , (p 3 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. 1 71JAtt$T (mFreV . Valuation: $7 C-e LJ Existing building area: J "square feet New building area: square feet ❑ PROPERTY OWNER I ❑ TENANT I Number of stories: Name: Type of construction: 11('/ Address: Occupancy groups: 13 City/State/ZIP: Existing: Phone:( 1 Fax:( 1 New ❑ APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEFS* (Please refer to fee schedule) Business name: CiDik. I�C... Structural plan review fee(or deposit): Contact name: /h�A ZIA/tif Address: ,IStJ ' �� FLS plan review fee(if applicable): Total fees due upon application: City/State/ZIP: C1/4:372.2-14 Phone:(�3)Z�y. (� Fax: :(�) Z?.lo 62-7C) Amount received: E-mail: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: v� � G C+'Jtv'1 Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: ' c C�s 4 :;l70r4 Submit two(2)sets of roof plan with connection details �1 and fire department access,along with the 2010 Oregon Address: '?,tea (316) Pievi 156e4.0000 i Solar Installation Specialty Code checklist. City/State/ZIP: {�,�Sn,r ) 2– '' .- ( Permit fee(includes plan fees):i $180.00 11++`' �s^^``�� ` , ,r ( and administrative Phone:(C ) Ll"l) . l Fax:(5 /�1�. State surcharge(12%of permit fee): $21.60 CCB lie.: /=3 7 G�� Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained jwithin 180 days after it has been accepted as complete. Print name: IA k �.t Date: 7.29.1 ,...\ * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\B P-CO Per itApp.doc 02/24/2011 440-4613T(1 I/02/COM/WEB) 7 Building Division Accessibility: Barrier Removal Improvement Plan TIGARI) REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] S ELEMENTS: In choosing which accessible elements to provide wider this section,priority shall be given to those elements that will provide the greatest access. Elements shall he provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: S TOTAL (shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 " Building Division Over-The-Counter (OTC) Building Permit T I G A R D Check List Project Description: APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work*: NT Occupancy Group: Type of Construction: Type of Use**: Occupancy Load: _ Oregon Specialty Code: 26 t SPECIFICS Number of Stories: Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback—Right Sideyard Setback—Back _ CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: _ E: _ W: _ Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: YeA Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor. Total Project Valuation: $ '7 5 I FEES DUE $ -2.S" oil DC Prov Rvw,COM TI—Ping $ 04.0 DC Prov Rvw,COM TI—LRP DC Provision Review Fee for COM TI(effective 7/1/2014) $ �l � Permit Fee—Add,Alt,Demo Project Valuation Planning LRP $ , . tj 12%State Surcharge Up to$4,999 $0.00 $0.00 $ f Plan Review,Structural $5,000-$74,999 $75.00 $11.00 $ O Plan Review,Fire Life Safety $75,000-$149,999 $187.00 $28.00 $ ,CO Info Proc/Arch,Lg(over 11x17$2.00) $150,000 and over $299.00 $44.00 $ Info Proc/Arch,Sm(up to 11x17$0.50) $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge S Misc.Admin Fee Other. S Other: Building Staff: _ $ Other: Date/Time: S I ; C( TOTAL FEES DUE *TYPE OF USE: COM=commercial;CMS=commercial manufactured structure. "CLASS OF WORK ACS=accessory;ADD=addition;ADU=accessory dwelling unit,ALT=alteration;DEM=demo;NEW=new; OTR=other(use for fences,decks,retaining walls,sums,awnings or canopies). IA Building 070114.docx City of Tigard 1114 - COMMUNITY DEVELOPMENT DEPARTMENT ■ Building Permit Review — Commercial - No Land Use TIGARD Building Permit #: eiipc2opi -00 1 73 Site Address: -1?(90 SVsJ 1-final ar 12c1 . Suite/Bldg#: 101 Project Name: MS 19 (Name of commercial busin occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: T- I Existing Business Activity: *CP()Proposed Business Activity: /Verify site address/suite #exists and active in permit system. L "ZZoning: C--p 4ermitted Use: EZes ❑ No ❑ Spec Space L&'Confirm no land use required. Notes: Approved by Planning: A7011,LA (Y0(14.-- Date: —] - 241• I --1 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 7ft-gill Site Plans: # Building Plans: # Building Permit#: 3! nt building permit #above. Workflow Routing: eilanning ❑ Permit Coordinator uilding Workflow Sign-off: F.7--S�ff for Planning(include notes from planning review) Route Application Documents: Ian-Wilding. original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: r F" -- Date: 2 t /�y f I:\Building\Forms\BldgpennitRvw_COM_NoLandUsc_071514.docx Permit Coordinator Review ❑ Conditions Met-Prior to Issuance of Building Permit Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BldgPennitRvw_WM_No I.and Use_071514.docx