PFI2014-00041 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
= COMMUNITY DEVELOPMENT Permit#: PF12014-00041
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/30/2014
Parcel: SEG952
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Astound Broadband
Project Description: Adjacent to 9460 SW Tigard Street.Trench 5'and bore 44'to place(2)-4"&(1)-3"conduits a min of 36"
below grade and(1)-17"x 30"vault. SEG 952
Owner: FEES
Description Date Amount
PFI Permit Fee 07/28/2014 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
PETE ANDERSON
669 GLATT CIRCLE
WOODBURN, OR 97071
PHONE: 360-880-9660
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
PermSign tture: licant n(A
Signature: (J-r ,V
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12014-00041
Type: Condition Name: Status: Severity:
ROW 09-TRAF/NOISE CTRL-WORK HRS Continuing Notice
No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor
between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m.to 9:00 a.m.Sunday.
ROW 04-TRAF CTRL-CONTR RESPON FOR Continuing Notice
Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in
accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be
available at the work area.
ROW 10-TRAF CTRL-MIN LANE WIDTH Continuing Notice
Minimum travel lane width shall be eleven(11)feet; pedestrian travel shall also be provided for.
ROW 01-CUSTOM CONDITION Continuing Notice
<Custom Condition goes here>
ROW 15-EROSION CTRL REQ Continuing Notice
Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q.
requirements.The City may at any time order corrective action and stoppage of work to accomplish effective erosion
control.
ROW 26-MONUMENT PROTECTION REQ Continuing Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holders
expense.
ROW 16-REPAIRS-LIKE MATERIALS REQ Continuing Notice
Property disturbed by construction activity shall be seeded with a standard grass mix; shrubs,flowers, barkdust,existing
signs, pavement markings,mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material.
ROW 03-TRAF CTRL-SPECIF(CITY) Not Met Notice
The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways",
U.S. Dept. of Transportation, F.H.A., 1988 Ed.
ROW 05-TRAF CTRL-ROAD CLOSURE Continuing Notice
Public roadway shall not be closed to traffic,at any time,without having first obtained written approval from the City
Engineer.The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide
Emergency Services(Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District.
ROW 18-UTILITIES PRELOCATION REQ Continuing Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0010 through OAR 952-001-0080. Copies of the rules may be obtained from the Center by calling(503)232-1987.
If you have questions about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders
expense.
ROW 23-DAILY INSP REPORTS REQ Continuing Notice
The permit holders Engineer/Inspector shall submit daily inspection reports,on a weekly basis,to the City's Inspector. (see
Developer-Engineer Agreement note#5).
ROW 02-PERMIT&PLAN REQ ON SITE Continuing Notice
A copy of the permit and all attachments,and a copy of the approved construction plan and all amendments shall be
available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved
permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General
Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance.
ROW 07-TRAF CTRL-PRIV PROP ACCESS Continuing Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not,
shall be cause for work stoppage until effective access is established.
ROW 11-TRAF CTRL-CITY CAN MODIFY Continuing Notice
The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic
and to assure public safety.
ROW 17-DRAINAGE CONTROL REQ Continuing Notice
Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent
private property, public property and the receiving system is not adversely impacted.The City may,at any time, order
corrective action and stoppage of work to accomplish effective drainage control.
ROW 27-PROB SOLVING-RESPON PARTY Continuing Notice
The permit holder shall provide to the City Inspector, in writing,the names and 24-hour emergency telephone number of two
(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of an
emergency.The permit holder shall notify the City Inspector, in writing, of any/all assignment changes.
ROW 20-TRENCH-PATCH/SAFETY/LBILITY Continuing Notice
A temporary hard-surface patch(Cold mix A.C. or Hot mix A.C. base paving) shall be placed on trenches within roadways
at the end of each day's work. No trench, on site or off site,shall be left at any time in an unsafe condition.The permit
holder is responsible for and is liable for hazards or damage resulting from the work.
ROW 21-REPAIRS REQ-INSPTR OPINION Continuing Notice
Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, in the
City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the
permit. Corrective work shall be done at the permit holders expense.
ROW 19-UTILITY LOCATIONAL CONFLICT Continuing Notice
Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall
coordinate the work with affected utility agencies.
ROW 24-TESTS/REPTS TO VALIDT CLMS Continuing Notice
The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's
engineer or contractor to validate claims of material or construction adequacy/compliance. Such tests/reports shall be
provided at the permit holder's expense.
ROW 25-RELEASE-WAIVER REQ Continuing Notice
The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership
disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction.
ROW 06-TRAF CTRL-ADVANCE WARNING Continuing Notice
Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance
notification sign at each end of the construction area 72 hours(min.)before initiation of construction work.
ROW 29-ESMT/RT OF ENTRY-RESPON Continuing Notice
It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work.
Proof of right-of-entry, or properly executed easements,shall be provided to the City.The City shall in no way be construed
to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements.
ROW 22-AS-BUILT/ENGR CERTIF REQ Continuing Notice
At the end of each year, or an a mutually agreeable yearly date, any entity making changes to its facilities in the public
right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to
the previously approved construction plans and,also,any improvement which may impact an existing public system or
facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation
compliance(form attached).
ROW 13-HAZARDS-CERT OF INS Continuing Notice
Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach
roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate
of Insurance shall be available at the work area.
ROW 08-TRAF CTRL-DEVICES IN PLACE Continuing Notice
Traffic control devices,flagpersons,etc.,shall be in place prior to initiation of construction work and shall be effectively
maintained.
ROW 14-DEBRIS-MATERIALS Continuing Notice
The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly
prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate
cleanup and stoppage of work to accomplish cleanup.
ROW 12-INSP 24 HR NOTICE REQUIRED Continuing Notice
The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at
kenny@tigard-or.gov,twenty-four(24)hours prior to commencing work,twenty-four(24) hours prior to any staged
inspection,and after completing work covered by the permit.
ROW 28-CONSTR SAFETY-RESPON PARTY Continuing Notice
The permit holder shall cause his contractor to provide to the City Inspector, in writing,the name and 24 hr emergency
telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA, Chap.437,
Div. 3 Construction, Subdivision P-Excavations.The contractor shall notify the City Inspector of any/all assignment
changes.
City of Tigard RECEIVED
Application For Work In The Right�br- a
CITY OF TIGARD�'
PFT PLANNING/ENGINEERING
Property Address/Location(s):SW Tigard Ave—410'of SW Grant Ave FOR STAFF USE ONLY
Project: WB-3081-2418 S9Q 9�2_2_ 9LhV()( f
-rlydACL Right-of-Wer
Astound Broadband l75_ Case No.:
*Applicants Name: ,
669 Glatt Circe Application Accepted— 7:-2.,99 By:f4B—
1
Address: Application Reviewed:l By:
Ci /State:Woodburn, OR Zi 97071 t so
ry p Pete Anderson Application Fee Due: 300
Primary Contact: "�
Applicant Notified: �LA A-V-
Phone:(360)880-9660 Fax: eceipt No.: �C✓
Email:Panderson@wavebroadband.com
reciym11X44 vrni+-13� 14
REQUIRED SUBMITTAL
Contractor's Name:TBD INFORMATION
CCB# Expiration: . Application form,completed and signed
Address: • Submit one (1) copy of scaled sketch of
City/State: Zip: the proposed work to be done
Phone: Fax:
• Submit one (1) copy of traffic control
Email: plan
Professional Engineered Plans are required
Plans By:K&B Technical Solutions Attn: Jack Nygard for:
Address:PO Box 2529 • Street Widening
City/State:Clackamas, OR Zip:97015 • Subdivision Infrastructure
Phone:( ) Fax:
503 650-6041 (503)650-7390 • Main utility line extension
Ems.Jack_Nygard@kbmail.net Rev.6/23/2013
Izurpin\masters\land use applications\row app.d«x
Description of work:Astound Broadband proposes to trench 5'and bore 44'to place (2)-4"&(1)4"conduits a min of 36" below
grade and (1)-17"x30"vault.
Estimated value of work(within the public right-of-way): $
Is work related to a LAND-USE DECISION? YES ❑ NOF-01
If so, please specify (MLP,SDR,SUB,etc.)case#:
Is the work related to a BUILDING PERMIT? YES NOF
If so, please specify(BUILDING PERMIT)case#:
Signature of Applicant/Permittee:i4A" jWJiL_u_k A/r jw-fl ac{Fe4e-Ahkr.5G,I Date:7/23/14
el 61V FU
Print Name:Pete Anderson Title:Construction Manager
City of Tigard 1 13125 SXV Hall Blvd.,Tigard,OR 97223 1 503-718-2464 1 www.tigard-or.gov
M61tifink * 6 Bay OTN Cabinet
Applications:
An above ground housing to shelter
Environmentally sensitive equipment from
Rain, sleet, snow,dust, driving wind,hail,
Corrosion,and vandalism.
Specifications
Dimensions: 106 %s"W x36 %x"D x 62 %z"H(270.5cm x 92.7cm x 158.75cm)
Weight: 1200 Pounds(544.3 kg)
Construction:
Main Body: 1/8"Marine Grade Aluminum 5052-H32
Hardware: Type 304 Stainless Steel
Finish: Polyester Powder Coated
Racks: 3/16" Steel E.I.A./T.I.A. spacing(10-32 threads)
Doors: 3 point latch for maximum security
Cable Entrance Compartment:
Four slack storage brackets with heavy duty Velcro® straps to secure cables
Two entry holes for bringing cables into the main cabinet
Powering Compartment:
100 Amp Service
12,000 BTU Air conditioner with integrated heater
60 Amp Generator Hook-up with a manual transfer switch
AC Load Center:
4 GFI Outlets; 120V, 15 Amp
1 240V, 30 Amp Outlet
Separate battery compartment
Main Cabinet:
3 19"-23"Adjustable width racks, also adjustable front to rear position(43"tall)
3 19"23"Adjustable width racks,swing out for ease of rear equipment access(40"tall)
249"of total inches of rack space(142 RU)
4, 15 Watt Shatter-shield light fixtures
Grounding
All components are grounded to the main copper bus bar
Mounting:
Stainless steel frame structure is provided to be placed in wet concrete for mounting
I
109.38
51.75 25.00 33.50
OPENM OPENING OPENING
SLACK STORAGE ; •j
I i I CAMET
MAIN CHAMBER WITH
A/C A POWER I 1 1 I FRONT/REAR ACCESSAND PACK SYS
1 E
CABINET _ — -- — — ' — RACK SYSSYSTEMTEM I el
• o o • • !�'s •
rCAPACrrY TO HOLD 23
RACK UNITS.
11-13 54.0030.1 11.13 12.75
106.38 36.00 CABINET
BATTERY TRAY J HEIGHT
FRONT VIEW STORAGE CHAFER 44.00
END VIEW
o • • •
8
A/C RECEPTACLE
vi
N
BREAKER
a e o e PANEL
AIR
CONDITIONER
48.00 20.00
10.00 GENERATOR
TRANMOUNTING PATTERN SWITCH
MAIN BREAKER
E._T.. T_1 rT T-1 s s s • - -
GENERATOR
_ _ INLET
21.63 21,63 CONNECTOR
AVAILABLE AVAMABLE
BATTERY BATTERY
SPACE SPACE
BATTERY CHAMBER FRONT VIEW -
29.63 GROUND BAR
AVAMABLE
BATTERY SPACE 10.50 A/C & POWER CABINET LAYOUT
24.50
EXTENDED
BATTERY CHAMBER SIDE VIEW
Mesiti'Unk-N
582 Ternes Avenue
Elyria,OH 44035
Phone:(440)366-6966
Fax: (440)-366-6802
e-mail:engsupport@multilinkbuilt4u.com
Page 80 2011 Edition
5.3 Two-Lane, Two-Way Roads
Shoulder Work w/ Minor Road Encroachment Diag. 300
Use this detail for non-freeway work which extends into a travel lane and
maintains a minimum 10 foot travel lane. If a minimum 10 foot travel lane
can not be maintained, or when traffic can not safely pass by in both lanes
simultaneously, use the appropriate lane closure diagrams—for example,
Diagrams 310 through 350.
A lane closure may be appropriate for conditions such as high traffic
volumes, high speeds, and inadequate approach sight distance to the work
space, or heavy equipment adjacent to the travel lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3 — Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Cones shall be placed along the entire length of the work space. If a
protection vehicle is used and work is in place one hour or less, the
taper and tangent devices may be omitted.
4. If the speed is 45 mph or higher, volumes exceed 2000 ADT, or there
is limited sight distance, consider placing cones or tubular markers on
centerline.
5. An arrow board in caution mode or truck-mounted PCMS with
"SHOULDER WORK" or other appropriate message may be used for
higher visibility.
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs Buffer
Speed A B c Space
20 50
25 100 100 100 75
30 100
35 40 350 350 350 125
150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
I�
2011 Edition Page 81
Shoulder Work w/ Minor Road Encroachment Diag. 300
ROAD
WORK to
AHEAD
•
Initial
Warning A •
Sign
•
•
•
(OptionaQ •
gul
•
Protection Vehicle
w/TMA(both Optional)
See Chapter 4 - • Buffer
10'
minimum • U3
•
A ROAD
M NARROWS
•
(Optional)
B
ROAD
� WORK
AHEAD
Initial
Warning
Sign
December 2011 Chapter 5
i
\ N NOTES:
\ 1. ALL WORK AREAS TO BE
\ RESTORED TO LIKE OR BETTER
w E CONDITION.
\ 2.ALL OTHER UTILITIES ARE BASED
\ \ OFF EXISTING LOCATES OR UTILITY
S STRUCTURES.
\ AWaaOepMdby0nO«'nt7w�pl 'Plari 110110e 3. IT IS THE CONSTRUCTION
\ c.nt..Ttlea.w w«Lw rt�llrers>�
\ act,actor„a,,,y,t�oot,aaaY,,,s,�,.ew„ CONTRACTORS RESPONSIBILITY
TOS \ Owl-- the
Pkia TO CALL FOR LOCATES BEFORE
\ \ GN Ner11160w:MlYtbOW)2u•,rrTeret,l DIGGING.
\ NT AVF \
\ � \ 4. BORE/DRILL SYM. -
` 5. TRENCH SYMBOLOGY-
0A
YMBOLOGY-oo \ 6. REMOVE & REPLACE SYM. -\\ L J T FROM EOP
FROM ROW 3'\
TRENCH AND PLACE LO &(1)-3-CONDUITS A MIN OF 36”BELOW GRADDE ®'25
7
BEGIN UNDERGROUND CONSTRUCTION
IN CITY OF TIGARD ROW
UNIMPROVED AREAS —
BORE AND PLACE(2)-4"&(l)-3-
(TRENCHING) CONDUITS A MIN OF 36"BELOW GRADE
,z"NATIVE TOP SOIL IF Contact: Pete Anderson
TOP SOIL EXISTED \ 3, Title: Construction Manager
PRIOR TO EXCAVATION w \ \ Mobile-(360)880-9660
\ Email- panderson@wavebroadband.com
/ .GRANULAR' '
/ R k/ cable I Internet I pone
OR
95%COMPACTION ' NATIVE
300 7
BACKFILL
BACKFILL 3, \ \
astound.
' = 5 ;V 1 0'FROM WATER/ �,k
'^ 3,
VFROM ROW
� 669 Glatt CITCIe PROPOSED VAULT 2'FROM FOC \
FOR POWER �� \
Woodburn,OR 97071
REMOVE&REPLACE(1)-5'X5' .50 \ -
O
PIPE ZONE FLAG OF SIDEWALK
TRENCH AND PLACE(2}4"&(l)-2- i,, 40' PO BOX 2529
CONDUITS A MIN OF 36"BELOW GRADE \
CLACKAMAS,OR 97015
Design By:K&B(503)650-6041
/ EXIT CITY OF TIGARD ROW \ Email:kbeng@atLnet
HARD SURFACE / / / \ SITE ADDRESS:
BO�-� T T WAVE SEPROPO
EQUIPMENT 253TA VAULT FOR 5 TGSyy \ SW Tigard Ave
NCge3' Portland, OR 97223
,3' \ 2S1 W02
REV. DATE DESCRIPTION APPROVED
% GATE 1 7122/14 CITY OF TIGARD PERMIT DRAWING
'GRANULAR;/,'
95%COMPACTION OR
/ NATIVE ,
9460
SCALE: PROJECT NUMBER;-
1"=20'
UMBER:1"=20'
PIPE ZONE O SHEET NUMBER TITLE:
FIBER ENHANCEMENT
i PERMIT DRAWING
FILE NAME:
SHEET 1 OF 1 WB-3081-2418
i