Loading...
10/26/2005 - Packet Completeness Q Review for Boards, IN Commissions and Committee Records CITY OF TIGARD Planned Unit Development Committee Name of Board, Commission or Committee October 26,2005 Date of Meeting To the best of my knowledge these documents are a complete copy of the official record. A copy of the final approved minutes of this meeting was not on file. I have included the Draft meeting minutes which is the only copy of the October 26, 2005 minutes that is available. C.L. Wiley Print Name Signature 1/30/2013 Date CITY OF TIGARD OREGON - COMMUNITY DEVELOPMENT - CURRENT PLANNING DIVISION PLANNED DEVELOPMENT REVIEW COMMITTEE MEETING WEDNESDAY - OCTOBER 26, 2005 7:00 - 9:00 PM TIGARD PERMIT CENTER CONFERENCE ROOM #3 1. ROLL CALL 2. DISCUSSION: PROPOSED CODE CHANGES 3. ADDITIONAL AGENDA ITEMS ADJOURNMENT . Page 1 of 1 Planned Development Code Review Committee October 26, 2005 Draft Meeting Minutes 1. No roll call was taken or prior meeting minutes adopted. 2. Planning Manager Dick Bewersdorff opened the meeting by introducing James Richardson as the new staff liaison to the Committee. 3. An open discussion of planned developments in general and the current form of Option 2 ensued. Three definable directions were given to staff: • Refine the review process to reflect a progression from Concept Plan to Detail Plan to Overlay Zone. It was recommended that application of the Overlay Zone would lapse and not take effect if the Detail Plan were not implemented within specified time frames. This is a change under 18.350.020 B(1-3). • One member suggested that a one to one match be established between submittal criteria and approval criteria in order to establish consistency between Concept Plan and Detail Plan reviews. • The Committee requested that staff evaluate whether the Committee recommendations from May 2005 were implemented under the present draft of Option 2. A discussion of each of those recommendations followed. 4. Next meeting is tentatively scheduled for November 16, 2005 at 7:00 PM. The October meeting was adjourned at 9:30 PM. Meeting attendees: Committee Members Present: Bill McMonagle, Ron Ellis-Gaut, John Frewing, David Walsh. Committee Members Absent: Sue Beilke, Gretchen Buehner, Alice Ellis-Gaut, Charles Schwarz Staff Members Present: Dick Bewersdorff, James Richardson MEMORANDUM TO: PD Committee FROM: Dick Bewersdorff RE: Draft Chapter Reorganization and Tool Box DATE: October 18, 2005 After about 3 man days of work, I think I have pieced together the results of your July 20, 2005 meeting. Enclosed are copies of the reorganized PD chapter and the tool box. Please review. In my review of the chapter, I had a multitude of questions and want to make sure I understand what the committee has in mind before submitting to the Council. Morgan indicated some work was still necessary on the tool box but other than for solar { considerations, there is no specific information on what else was to be done. I want to be sure I understand what the intent was in the use of the present document so there are no legal hang-ups given the present wording. Finally, I will introduce to you new Associate Planner James Richardson who will be working on the final stages of this proposal. James has separate degrees in engineering and planning, has done development review as well as development design, in addition to developing code amendments specifically related to PD's. His background and experience should be very beneficial. OPTION 2 — Reorganize Chapter Summary of Major Changes Reorganization. The chapter was reorganized to consolidate several sections, and create a logical progression of the other sections. The committee expressed concern that in PD applications, there was not enough of a distinction between the concept and detailed plan. Upon closer examination of the existing code text, staff found that the code itself did not clearly distinguish the three parts of the process. Elements of approval criteria were dispersed throughout the chapter. The code has been reorganized, setting forth the overall purpose, an outline of the process, miscellaneous procedural requirements, followed by distinct sections for the three elements of the PD process: the overlay zone, the concept plan, and the detailed plan. Revised Purpose Statement. The committee spent considerable time drafting an updated purpose statement to reflect current trends in development and community desires. A greater balance between development opportunities and contributions to the community assets was sought. Environmental considerations were made more central to the purpose of the PD code. Mandatory Open Space Requirement. In addition to requiring a certain percentage of open space, the committee made deliberate distinctions in the types of open space (minimal use, passive use recreation, and active use recreation). Changes to the definition chapter were added. Submittal Requirements Significant additions were made to submittal requirements as well as approval criteria for overlay zones were created. Substantial Changes in the Approval Criteria for Detailed Development Plans. This section was reworked to create consistency between the purpose statement and the review criteria, as well as incorporate the recommendations of the committee. Explanation of Formatting These text amendments employ the following formatting: Stri'- gh- For text to be deleted [Bold and Italic[- For text to be added Boxed - For staff notes and comments related to specific amendments. These are not part of the proposed codified text. Chapter 18.120 DEFINITIONS [55. "Density bonus"-Additional dwelling units that can be earned as an incentive for providing undeveloPed oPen sPace landscaping, architectural character, or tree canopy as defined further in this code.] Page 1 of 25 June 29, 2005 187. "Landscaping"—Areas primarily devoted to plantings, trees,shrubs, lawn and other organic ground cover together with other natural or artificial supplements such as water courses,ponds,fountains, decorative lighting, benches, bridges, rock or stone arrangements, pathways, sculptures, trellises and screens.] 1104. Open Space Facility related definitions. Open Space Facilities may be privately or publicly owned. a. Minimal Use Facilities.Areas reserved for low-impact recreation, limited to soft surface trails which are minimally maintained No other improvements(apart from underground utilities) are allowed b. Passive Use Facilities.Areas reserved for medium-impact recreation and education uses related to the functions and values of a natural area that require limited and low impact site improvement, including soft surface trails, raised walkways,pedestrian bridges, seating areas, viewing blinds, observation decks informational signage, drinking fountains,picnic tables, interpretive centers, and other similar facilities. Accommodations for ADA access shall be provided where site considerations permit. c. Active Use Facilities. Areas reserved for high-impact recreation that require a greater degree of site development and/or ground disturbance;such as sports fields, playground equipment,group picnic shelters,swimming pools, hard and soft surface pathways, restrooms, and similar facilities.] [Renumber definitions after#55 according to the above amendments] Chapter 18.350 PLANNED DEVELOPMENTS Sections: 18.350.010 Purpose 18.350.020 The Process 18.350.030 Administrative Provisions 18.350.040 Noneomplionee., good 18.350.050 Appliesbilit-y in COMMeFeial and industrial Zones 18.350.060 Allowed Use-s 18.350.070 Applienbility of the Base Zone Development Standard 18.350.080 E*eeptions to Underlying Development Stolid 118.350.040 Overlay Zone Requirements] :99A[18.350.0501 Conceptual Development Plan Submission Requirements 118.350.060 Detailed Development Plan Requirementsl 18.350o 110 Shared Open Speee 18.350.010 Purpose A. Purpose. The purposes of the planned development overlay zone are: standar-ds, i.e.,zero lot lines,namewer-sfFeets, and etheF innevative planning pFaefiees 2. To faeiliWe the effleient use of , 3. To pr-eniete aft eeen Rent efland ebuildings, systems, open Spm, and- ies; Page 2 of 25 June 29, 2005 development to a paFtieulaF site;and divefsified ii ' Rents. [l. To provide promote development that is consistent with Tigard's Comprehensive Plan through the application offlexible standards which consider and mitigate for the potential impacts to the city;and] [2. To provide such increased benefits such as preserved wildlife habitat or open space, alternative building designs, walkable communities,preservation of significant natural resources,aesthetic appeal, and other types of assets that contribute to the larger community in lieu of strict adherence to some of the rules of the Tigard Community Development Code,and] [3. To achieve unique neighborhoods(by varying the housing styles through architectural accents, use of open space, innovative transportation facilities) which will retain their character and city benefits, while respecting the characteristics of existing neighborhoods through appropriate buffering and lot size transitioning; and] [4. To preserve to the greatest extent possible the existing landscape features and amenities(trees, water resources, ravines, etc.) through the use of a planning procedure(site design and analysis,presentation of alternatives, conceptual review, then detailed review) that can relate the type and design of a development to a particular site;and] [S. To consider an amount of development on a site which will provide a benefit to the owner and developer consistent with the degree of positive or negative impact to neighbors and to the public resources and facilities of Tigard; and] [6. To provide a means to better relate the built environment to the natural environment through sustainable and innovative building and public facility construction methods and materials.] 18.350.020 The Process A. Applicable in all zones.The planned development designation is an overlay zone applicable to all zones. [An applicant may elect to develop the project as a planned development, in compliance with the requirements of this chapter, or in the case of a commercial or industrial project an approval authority may apply the provisions of this chapter as a condition of approving any application for the development.] Staff note: The added text was moved to incorporate 18.350.050 Applicability in Commercial and Industrial Zones. B. Elements of approval process.There are three elements to the planned development approval process,as follows: 1. The approval of the planned development overlay zone; 2. The approval of the planned development concept plan; and Page 3 of 25 June 29, 2005 3. The approval of the detailed development plan[and/or preliminary subdivision plat]. Staff note: "preliminary subdivision"plat was added for clarification, as related to section D below. Staff note: Revisions to the fee schedule should be incorporated to relate to the three elements of the approval process. 1.e. Planned Development Overlay Zone $3,040(same as zone map change fee) Concept Plan Review$6,770 (current fee) Detailed Plan Review Applicable SDR or Subdivision Fee C. Decision-making process. 1. A new planned development overlay zone shall be processed by means of a Type I11-PC procedure, as governed by Section 18.390.050, using approval criteria contained in Section 18.350.100[18.350.040]. [2. The concept plan shall be processed by means of a Type III-PC procedure, as governed by Section 18.390.050, using approval criteria contained in Section 18.350.050.1 2:[3.1 The detailed development plan shall be reviewed by means of a[Type III-PC] procedure, as governed by 18.390.040,to ensure that it is substantially in compliance with the approved concept development plan. 3.[4.1 In the case of an existing planned development overlay zone for any other type of application,the application shall be reviewed under the provisions required in the chapters which apply to the particular land use application. D. Concurrent overlay zone,afid conceptual plan[, and detailed development plan] applications. The application for the overlay zone and for approval of the conceptual development plan may be heard concurrently if an application for each of the actions is submitted.[On residential or mixed use projects over 5 acres, the detailed plan shall be filed separately, unless the director waives this requirement. For commercial or industrial development, the detailed plan shall be filed separately. If the application involves subdivision of land, the applicant may also apply for preliminary plat approval and the applications shall be heard concurrently. All applicants are advised that the purpose of separating these applications is to provide them clear direction in developing the detailed plans. Rejection of the concept plan will result in a corresponding rejection of the detail plan.] Staff Note: The five acre threshold was added since these larger projects will typically have more issues in determining arrangement of uses, and other basic concepts of the planned development than smaller projects. It was noted that there may be instances where this distinct separation is not so essential, say for example a 5.02 acre single family development. It was also made clearer that the purpose of the separation of the concept from the detail plan is to assist the applicant. E. Gonetiffent aver-lay zone and subdivision appliea4iens. if the appheation ifivelves subdivision [E. In the case of concurrent applications for overlay, concept, and detailed plans including subdivision applications, the applicant shall clearly distinguish the concept from the Page 4 of 25 June 29, 2005 detailed plan. The Planning Commission shall take separate actions on each element of the Planned Development application (i.e. approval of the overlay must precede the concept approval, which shall precede the detailed development approval); however each required action may he made at the same hearing.] Staff note: The committee discussed separating the overlay and subdivision into two separate applications. The general consensus was to allow a joint filing of the application, but place greater emphasis on having the applicant clearly distinguish the two parts instead of merely "proposing a concept which is the detail' Additional text was added to clarify the three parts of the process and to require the Planning Commission to take distinct separate actions on each element of the PD. Staff note:A 5-acre threshold for requiring separate applications is recommended for larger residential and mixed use projects to afford time between developing the concept and the detail plan to offer the greatest flexibility to the decision makers during the very formative stages of the planning process for a site. Commercial-only and Industrial-only projects are required to submit separate applications for concept and detail plans. 18.350.030 Administrative Provisions A. Zoning map designation. Where a planned development overlay zone has been approved,the zoning map shall be amended to indicate the approved planned development designation for the subject development site. The approval of the planned development overlay zone shall not expire. [B. Prerequisite for filing of concept plan. If the applicant did not file for concurrent approval of the overlay and concept plan,prior to filing a detailed development plan, the owner shall prepare and file a conceptual development plan.Action on the conceptual development plan shall he taken by the Planning Commission by means of a Type III-PC procedure, as governed by Section 18.390.050, using approval criteria in 18.350.050.1 Staff note: The current code is inconsistent in its application of the three elements to the PD. To resolve this, a new section has been added to address applications that are developed following the overlay zone approval, when not done concurrently. 1-:[C.] Time limit on filing of detailed development plan.[If the overlay zone, concept, and detailed plan or preliminary plat were not heard concurrently, the owner shall prepare and file with the Director a detailed development plan]within 1-1/2 years after the date of Commission approval of the conceptual development plan.the ownef shall prepare and file with the P eeter a detailed aeveleHme^t^l�n. Action on the detailed development plan shall be[taken by the Planning Commission by means of a Type III-PC procedure, as governed by Section 18.390.050, using approval criteria in 18.350.060.1 fn iste.;.,1 and Wien by the Di.eete.by FAeans ec„ Type 11 r edur-e as geveme,1 by ce,etien 18.390.040, .1 ~l�belew� 1 The Di feete.-shall , e the detailed .1eyelepment plan upen finding that the final plan .f fms with the , eptu l deyel(..,..,e.,t plan ., ed, of appfeved with eenditions- by the Gemmission. The detailed plan shall he appr-eved unless the 11;. .eto,-f:n(lr a. The eha - . the residential densities, ifiereases the lot eever-age by btfildifigs- educes the ,t of p «king. h The eh . Te a 1., e�the . nt,. epe., and lafids..apifig v. f , e. The ehange ; elves a ehange ; e, Page 5 of 25 June 29, 2005 d. The el.ange e its land to development w1 ieh : .-.tally sensitive o e. The el.ange involves., major-shift in the Wa tion of buildings, pfoposed st..eet& par-king let > easements, E)r-other-site . 2 A .deersion by the Difvete..may be appealed by the ., .Bean.„ other-eff ete.dlap p-eyed ,..ties to the!''....mission and the Commission shell deeide whethe«the detailed based on the efiter-ia t 4..th in Subseetion 1 efthis seetion. This appeal shall be govemed by provisions of Seetion 18.390-.040&. Staff Note: This section was deleted because now the detailed development plan is required to be heard by the planning commission, and the review criteria apply to the detailed plan and not the concept plan. C-./D.1 Extension. The Director shall,upon written request by the applicant and payment of the required fee, grant an extension of the approval period not to exceed one year provided that: 1. No changes have been made on the original conceptual development plan as approved by the Commission; 2. The applicant can show intent of applying for detailed development plan[or preliminary plat)review within the one year extension period; and 3. There have been no changes to the applicable Comprehensive Plan policies and ordinance provisions on which the approval was based. DJE.J Phased development. 1. The Commission shall[may]approve a time schedule for developing a site in phases, but in no case shall the total time period for all phases be greater than seven years without reapplying for conceptual development plan review. 2. The criteria for approving a phased detail development plan proposal are that: a. The public facilities shall be constructed in conjunction with or prior to each phase; and b. The development and occupancy of any phase shall not be dependent on the use of temporary public facilities.A temporary public facility is any facility not constructed to the applicable City or district standard. €[P] Substantial modifications to conceptual plan.[If a detailed development plan or preliminary plat does not substantially conform to the conceptual plan, a new conceptual development plan shall be required.] [G. Noncompliance. Noncompliance with an approved detailed development plan by the developer, owner or successors and interests shall be a violation of this chapter.] Note: moved from 18.350.040.A [H. Issuance of occupancy permits. The development shall be completed in accordance with the approved detailed development plan including landscaping and recreation areas before any occupancy permits are issued However, when the Director determines that immediate execution of any feature of an approved detailed development plan is impractical due to climatic conditions, unavailability of materials, or other temporary condition,the Director shall, as a precondition of the issuance of a required permit, require the posting of a Page 6 of 25 June 29, 2005 performance bond or other surety to secure execution of the feature at a time certain not to exceed one year.] Note: moved from 18.350.040. 18.350.040 Neneemplianee, Bond A. Neneemplianee.Nefteemplianeewith an appr-eved detailed developmeiit plan shall be -a violation of this ehaptff. exeetifien of any fiaatufe of an appFON'ed detailed development plan is impffietieal due to elim. ie , n d:tions anavailability,.4'.,,..to..:ak OtheF teffi ,.aFy eandit;on the DiFeete 8?keee Note: moved to 18.350.03 18.350.050 Applieubilivy in Commereial and WUStFiftl Zones B. Aseenditiefiefappre,.,alineemmer-eialafidindustfialdeN,elopments. AfiappFON,alatitiief:it�, May apply th -f this..hapto as a n.d:tie of a anynl; at;,. Note: moved to 18.350.020.A 18.350.060 A'lowed Uses Note: moved to 18.350.05 A. inoidzones. residentialos, ., residential in all ..I: nt with a planned dee,ol «t appr-eval may develop the site to eantain a mixtum ef uses subjeet to the densit�,provisions of 1 All uses allowed eutright :n the . n,ded)':n,. g dist,-iet• , 2. Single family,det..ehe d and .,tt.,ehe d sident:al . nits• 3. Puple%residential ufiits-, 4. Multi family Fesidential units; 6 Aeeesse n leomfner-eial uses .d: e 1. sem,ing the planned development only ..,d Ayhi,.l. .. ,..t,..n.,...,,. ..to.d with, but..l0a.•1., : ..:aontal to,the.-e ;.ao..t:,,l , e peFmitted in the zone; > athlefie eitib, fitness eentff, Faraquetbak eouf4, swimming pool, tennis ,A O :1.. e� 9. OutdoOF Fee golf e golf dFiViRg e tefifliS , OF similar-ttse,-and 10. ReereatieRal vehiele storage area. Page 7 of 25 June 29, 2005 B. if, e8ffiffia .,1 ZORaS. i„ MI e e el ZORa afi fJ: ffr With a f,l., ed de elm, eN appFOVal may develop the site to eentain al i ef the uses pemioed outright IR the tlfldeF!)'iRg ZONe .,d, ifi .,dd:ti0 fi, fHa* MUMf 7501% fhoore tetel g S finer area , he used for- „lt: faFHil)'ElWelliRgS :H thE)Se eOffiffieFelal zones thm de net fist mtiki family dwellings as an G. in :f,d„stFial zenes. in all :f,d„str:.,l zenes, a planned development shall nt.,:f, of,l„these 18.350.070 ApplieebUity el:the Base—7 one Development Standards Note: moved to 18.350.06 1. Lot dimensional standards: The fninimtim lot size, lot depth and let width standar-ds shall fiet apply e*eept as Felmed to the density eemputation under-Chapter ; apply;2. Site e0l,'efage! The Site e8k'effige pr-evisieRs of the base zene shall 3. Building height: The building height pr-evisiefis shah fiat apply; ,f,d be the same as that r-eqUiFed by the base zone unless other-wise pr-evided by Chapte 18.360; b. The side yard Setbaek PFOVOSiORS Shall HOt appl)'eNeept that all detaehed stmetur-es shall ..feet the i nif;.m Building Code requirements.fef:fire walls; and e. Cr «t. rd fid «eaF rd setb eL e e ef,rs r,the base e setbara shell er (2) A minimum front�I-FI.rd-sw4th-me-li -of eight feet is required for an),gar-age ep feF afi attwhed single family dwelling faeifig a ffivate street as long as the B. OtheF pf:evisieas efthe base zene. All other-pr-evisiefis efthe base zene shail apply exeept a-s modified by this ehapteF. 18.350.080 Exeeptions to Underlying Development Stands Note: moved to 18.350.06 based en findings thm! 1 The m fieF e e f,ptioof greater-eterh than 10 fie e.,r of the_«ee,,:«ed par-king; 2 e«e • e „f, „ f,g r.erlig anTh : rt :tF r S .,r 2. The applieation is for-a use designed for-a speeifie puFpese whieh is intended te be h : L: d there:� «:ttef, a .:denee that the p petzty � OWReFS are willing te enter-into a legal affeement; eF 4. Pub!ie fr-aftspeFWieH is avaiiable to the ;i ie standaMs and will net adver-sely S. Thee iS a eOMMU„:t., ince«e..t :f, the f, e e .,tial, of paFt:e„ler natural foet„res efthe site „h:eh Make :t .,rhe f,..hl:e :f,teresr tee «,t afl «.tion to f.erL:f,,. standaMs. Page 8 of 25 June 29, 2005 dimensional in4l 6efie based en findings thm, s ; 7 The eye . .F adequate trate ide..«:4: io.,eatof the use n the p pef4y; and e ee 3. The Sign�,ill be eempatible with the ever-all site plan, the str-uetur-al impr-ovef:nefits and ,with the stfuetur-es and uses on adjoining pf:epef:ties. 0 18.350.040 Planned Development Overlay Zone Re uirements Staff Note: This is a totally new section developed to address the shortcomings of using the somewhat irrelevant zoning map and text amendment criteria of 18.380. The basis for determination of applying a PD should be particular site constraints or opportunities, and an evaluation of whether such an overlay zone is appropriate for a given site. [A. General submission requirements. The applicant shall submit an application containing all of the general information required for a Type III-PC procedure, as governed by Section 18.390.050.1 [B. Additional information. In addition to the general information described in Subsection A above, the application for a Planned Development Overlay Zone shall include the following information,the detailed content of which can be obtained from the Director. 1. Vicinity Map Z Tax Map identifying subject parcel 3. Survey Data.An aerial photograph and an accurate survey showing the following information: a. Scale,north arrow, benchmark, and date of survey b. Tract boundary lines c. Easements:location width, and purpose d Names and locations of existing road rights-of way on or adjacent or across streets to the tract, including bridges, curbs,gutters, driveways and culverts e. Position of buildings and other structures such as foundations, walls,fences,steps, and paved areas f. Utilities on or adjacent to the tract-location of gas lines,fire hydrants, electric and telephone pole& and street lights; and direction, distance to,and size of nearest water mains and sewers and invert elevation of sewers g. Location of wetlands,springs, streams, bodies of water, drainage ditches, watershed areas,flood plains, and other physical features h. Outline of wooded areas with names and condition of plant material i. General topographic information j. Additional information may be needed, depending on site complexities such as soil information and studies of the geological structure of the site. Requirements for additional information will be determined during the preapplication conference.) [4. Basic Site Analysis. The physical analysis of the site is developed primarily from field inspections. Using the survey, the aerial photograph, and where warranted, infrared Page 9 of 25 June 29, 2005 aerial photographs, the site designer, working in the field and in the office, verifies the survey and notes site design determinants. These should include, but not be limited to the following: m Areas of steep and moderate slopes b. Macro and microclimatic conditions, including sun angle during different seasons; prevailing breezes; wind shadows;frost pockets; and sectors where high or low points give protection from sun and wind c. Potential flood zone and routes of surface water runoff d. Possible road access to the site, including potential conflicts with existing road systems and carrying capacities of adjacent roadways. e. Pedestrian,bicycle and transit access f. Natural ecological and aesthetic areas as designated by Goal S. g. Significant wildlife habitats that would be affected by site modification according to a wildlife assessment together with a list of mitigation measures or limitations. h. Soil conditions relative to supporting plant material, areas suitable for construction, erosion potential and septic tanks, if relevant i. Geological considerations relative to supporting structures j. Exceptional views,objectionable views(use photographs) k. Adjacent existing and proposed land uses and zoning classifications within 500 feet with notations on compatibility and incompatibility 1. Potential noise sources,particularly noise generated from traffic that can be mitigated by using plants, berms, and walls and by increasing buffer distance between the source and the receiver.] [C. Approval Criteria. An application for approval of a Planned Development Overlay Zone must provide findings which shall be reviewed according to the following criteria and not the criteria of 18.380. In determining whether a site is appropriate for a Planned Development Overlay Zone, the Commission shall find that at least one of the following criteria is met. 1. The site is unusually constrained by parcel size or configuration. 2. Access to the site is constrained by preexisting development. 3. The site is constrained by the presence of sensitive lands. 4. There are other unique circumstances that prevent the site from being developed in conformance with the applicable standards in this Title. S. In the case of a consolidated application for overlay and concept plan approval, the applicant has demonstrated that the site lends itself to an innovative planning approach, that cannot be achieved through a standard application of the Development Code standards. 6. In the case where the approval authority has required a planned development review as a condition of approval for a commercial or industrial development 18.350.020.A, the overlay zone shall automatically be applied.] 18.350 118.350.050 Conceptual Development Plan Submission Requirements] A. General submission requirements. The applicant shall submit an application containing all of the general information required for a Type 11114[-PC]procedure, as governed by Section 18.390.050[and the additional information required by 18.350.040.B.]In addition,the applicant shall submit the following: 1. A statement of planning objectives to be achieved by the planned development through the particular approach proposed by the applicant. This statement should include a description of the character of the proposed development and the rationale behind the assumptions and choices made by the applicant. [The statement should be explicit in Page 10 of 25 June 29, 2005 defining the architectural style, and what sorts of innovative site planning principles are utilized including any innovations in building techniques that will be employed Furthermore,the statement should explain how the proposal relates to the purposes of the Planned Development Chapter as expressed in 18.350.010. Staff Note:A stronger tie-in with the purposes of the planned development principles is included here. While the purpose is not a review criteria, the burden of explaining how the proposal meets these goals should fall upon the applicant. 2. A general development schedule indicating the approximate dates when construction of the planned development and its various phases are expected to be initiated and completed. 3. A statement of the applicant's intentions with regard to the future selling or leasing of all or portions of the planned development.[In the case where a residential subdivision is proposed, the statement shall include the applicant's intentions whether the applicant will build the homes, or sell the lots to other builders.] B. Additional information. In addition to the general information described in Subsection A above,the conceptual development plan, data, and narrative shall include the following information the 1. Existing site conditions; 2. A site concept[including the types of proposed land uses and housing types, and their general arrangement on the site]; 3. A grading concept; 4. A landscape[vegetative cover]concept[indicating a percentage range for the amount of proposed open space and landscaping, and general location and types of proposed open space(s)]; [5. Parking concept] -5-.[6.] A sign concept;aPA 6-.[7.] A copy of all existing/and/]or proposed restrictions or covenants[,] [8. A streets and utility concept,and] [9. A Structure Setback and Development Standards concept, including the proposed residential density target if applicable] [10. The pedestrian,bicycle and access concept including routes to transit,schools and other neighborhood activity centers.] C. Allowable Uses Staff Note: these were moved from 18.350.060 [I. In residential zones. In all residential zones, an applicant with a planned development approval may develop the site to contain a mixture of uses subject to the density provisions of the underlying zone and the density bonus provisions of 18.350.100 B2. The following uses are allowed with planned development approval: a. All uses allowed outright in the underlying zoning district, b. Single-family detached and attached residential units, c. Duplex residential units; d. Multi family residential units; e. Manufactured homes; Page 11 of 25 June 29, 2005 f. Accessory services and commercial uses directly serving the planned development only and which are customary or associated with, but clearly incidental to the uses permitted in the zone,such as personal services,preschool or daycare, and retail uses less than 5,000 s f. in sum total, g. Community building; h. Indoor recreation facility;athletic club,fitness center, racquetball court,swimming pool, tennis court or similar use, L Outdoor recreation facility,golf course,golf driving range,swimming pool, tennis court,or similar use;and j. Recreational vehicle storage area.] 12. In commercial zones. In all commercial zones, an applicant with a planned development approval may develop the site to contain all of the uses permitted outright in the underlying zone and, in addition, a maximum of 25% of the total gross floor area may be used for multi family dwellings in those commercial zones that do not list multi family dwellings as an outright use.] [3. In industrial zones. In all industrial zones, a planned development shall contain only those uses allowed outright in the underlying zoning district.] [D. Approval Criteria. Application submittals must include findings to provide the Commission the basis to make findings that the following criteria are satisfied when approving or approving with conditions,the conceptual plan. The Commission shall make findings that the criteria are not satisfied when denying an application.] [l. The concept plan includes specific designations for areas of open space, their intended level of use, and how they relate to other proposed uses on the site] 12. The concept plan identifies areas of significant natural resources and identifies methods for their maximized protection,preservation, and/or management] [3. The concept plan identifies how the future development will integrate into the existing neighborhood,either through compatible street layout, architectural style, housing type, or by providing a transition between the existing neighborhood and the project with compatible development or open space buffers.] 14. The concept plan identifies methods for promoting walkability or transit ridership, such methods may include separated parking bays, off street walking paths, shorter pedestrian routes than vehicular routes, linkages to or other provisions for bus stops, etc.] 15. The concept plan identifies the proposed uses, and their general arrangement on site. In the case of projects that include a residential component, housing type, unit density, or generalized lot sizes shall be shown in relation to their proposed location on site.] [6. The concept plan identifies other amenities or innovations that would distinguish the project from other standard developments.] Staff Note: This section is entirely new. Conceptual plan criteria were previously the general approval criteria of 18.350.100, which have now been incorporated as approval criteria for the detailed plan. [18.350.060 Detailed Development Plan Requirements] Staff Note: This section is a combination/consolidation of 18.350.060 Allowed Uses, 18.350.070 Applicability of Base Zone Development Standards, 18.350.080 Exceptions to Underlying Page 12 of 25 June 29, 2005 Development Standards, and 18.350.100 Approval Criteria, as well as some additional changes. Where language has been carried forward from other sections, these are shown as unchanged text, even though the numbering may be different. This is to better distinguish where substantive language changes have been made to previous standards. A. General submission requirements. The applicant shall submit an application containing all of the general information required for a Type III-PC procedure, as governed by Section 18.390.050, the additional information required by 18.350.040.B and the information contained in 18.350.050A. B. Additional Information. In addition to the general information described in Subsection A above, the detailed development plan, data, and narrative shall include the following information, the detailed content of which can be obtained from the Director: 1. Contour intervals of 2 to 5 ft, depending on slope gradients, and spot elevations at breaks in grade, along drainage channels or swales, and at selected points, as needed 2. A specific development schedule indicating the approximate dates of construction activity, including demolition, tree protection installation,ground breaking,grading, public improvements, and building construction far each phase. 3. Contextual Analysis a. Building typology and hierarchy:An analysis of the particular building type (residential, commercial,public) relative to the hierarchy of the various building types in the city is useful in deciding the general design approach of a new building. For example,public buildings may be dominant in placement and design, while residential buildings are subordinate, it is important to maintain any existing hierarchy that reinforces visual order in the city.Any predominant architectural solutions and details characteristic of a building type incorporated in the new building's design can help maintain a recognizable building type. b. Regional character.An analysis of the city's regional architectural characteristics is appropriate in developing a design solution that responds to unique regional characteristics. Regional characteristics may be revealed through unique architectural types, through vernacular building resulting from local climatic and cultural characteristics, and from historically significant architecture. Historic structures should be saved by modifying them for the proposed new use or by incorporating parts of the existing structure{s) into the proposed design. c. Cityform: The delineation of cityform created by road layout, location of major open spaces,and architecture-created forms should be analyzed Elements that delineate cityform should be reinforced by architectural development solutions for a particular place within the city. For example, a building proposed for a corner site should be designed to reinforce the corner through building form, entrance, and design details.A building proposed for midblock may be a visually unifying element providing connection and continuity with adjacent buildings. Sites at the ends of important vistas or adjacent to major city squares probably should be reserved for important public buildings. d Building scale and fenestration: It is important to analyze building scale and fenestration of nearby structures. Reflecting, although not necessarily reproducing, such detailing in the proposed building can provide visual unity and continuity in the architectural character of the city. One example is the use and placement of cornice lines to define the building's lower floors in relation to adjacent buildings. Cornice lines also can define the building's relationship to pedestrians in terms of scale and use. e. Building transition:Sometimes it may be appropriate to use arcades and porches to Page 13 of 25 June 29, 2005 provide transition between the building's private interior and the public sidewalk. Including them may be especially worthy if adjacent buildings have these elements f. Views:Important city views of plazas, squares, monuments, and natural features such as waterfronts and parks should be considered. It is important to design the proposed structure to enhance and preserve such views for the public and for inhabitants of nearby buildings, as well as incorporating them as views from the proposed building. 4. Moderate to High Density Development Analysis. If proposing development in an area with an "urban context"9 the following additional information may be required. it. Air movement.Prevailing breezes characteristic of a region may be greatly modified by urban high-rise structures. Predominant air movement patterns in a city may be along roadways and between buildings. The placement,shape, and height of existing buildings can create air turbulence caused by micro air movement patterns. These patterns may influence the location of building elements such as outdoor areas and balconies.Also a building's design and placement can mitigate or increase local wind turbulence. b. Sun and shadow patterns: The sun and shadow patterns of existing structures should be studied to determine how they would affect the proposed building. This is particularly important for outdoor terraces and balconies where sunlight may be desirable. Sun and shadow pat-terns also should be considered as sources of internal heat gain or loss. Building orientation, window sizes and shading devices can modify internal heat gain or loss. Studies should include daily and seasonal patterns and the shadows the proposed building would cast on existing buildings and open spaces. c. Reflections:Reflections from adjacent structures such as glass-clad buildings may be a problem. The development should be designed to compensate for such glare or if possible, oriented away from it. C. Compliance with specific development standards. The Detailed Development Plan shall conform to the provisions of the base zone as follows: 1. Lot dimensional standards: The minimum let size, lot depth and lot width standards shall not apply ; There shall be no minimum lot size except that lots on the perimeter of the project shall not be less than 80% of the minimum size required in the base zone. Staff note: the provisions related to computation of density were moved to subsection E.2., below. To address the concern related to small lot sizes abutting larger parcels exterior to the PD, a method to transition lot sizes was added, so that perimeter lots could be no less than 80% of the base zone lot size, the same as would be allowed with a standard subdivision. 2. Site coverage: , The maximum site coverage is 80%, except in the IP zone where the maximum site coverage shall be 75%; Staff note: the previous standard required compliance with the underlying zone, which is in conflict with the PD standards that require 20% landscaping. 3. Building height: Any increase in the building height above the maximum in the base zone will require that the structure be setback from the perimeter of the site a distance of at least 1-1/2 times the height of the building. Page 14 of 25 June 29, 2005 Staff note: the previous standard was a blanket exemption on the height limits. 4. Structure setback provisions: a. Setbacks for structures on the perimeter of the project shall be the same as that required by the base zone unless otherwise provided by Chapter 18.360; Staff note: the previous standard only required front and rear yard setbacks to be maintained. should be replaced by something more explicit and clearer, such as a perimeter setback. Setbacks may be required from internal roads that are not designed to serve abutting parcels. le. Private streets. b. The side),afd setbaek pr-ovisions shall not apply e�keept that all detaelied stfuettwes shall meet the Unifefm Building Code r-equifements for-fire walls; and (l) n minimum font yard setb,,.L of 20 feet; fequif:ed f«., gafage s+m etur—e (2) A minimum ffoot 1 1 1 1 f eight feet is r-equifed for-any gafage 0. b. The setback provisions for all setbacks on the interior of the project shall not apply except that. i. All structures shall meet the Uniform Building and Fire Code requirements; ii. A minimum front yard setback of 20 feet is required for any garage structure which opens facing a street. This setback may be reduced for rear or side loaded garages, if specified on the detailed plan and proper clearances for backing movements are accounted for. iii. A minimum front yard setback of eight feet is required for any garage opening for an attached single-family dwelling facing a private street as long as the required off-street parking spaces are provided This setback may be reduced for rear or side loaded garages that do not access public streets, if specified on the detailed plan and proper clearances for backing movements are accounted for. c. If seeking to modify the base zone setbacks, the applicant shall specify the proposed setbacks, either on a lot by lot, or project wide basis. The applicant may propose, or the commission may require, actual structure footprints to be shown and adhered to. 5. Other provisions of the base zone. All other provisions of the base zone shall apply except as modified by this chapter. D. Conformance with the Conceptual Plan required The Difeetel Planning Commission shall approve the detailed development plan upon finding that the plan conforms with the conceptual development plan approved, or approved with conditions by the Commission. The detailed plan shall be appr-eved unless the Dif:eetef:finds.:A change from the conceptual plan may be acceptable unless: 1. The change increases the residential densities, increases the lot coverage by buildings or reduces the amount of parking; 2. The change reduces the amount of open space and landscaping; Page 15 of 25 June 29, 2005 3. The change involves a change in use; 4. The change commits land to development which is environmentally sensitive or subject to a potential hazard; and 5. The change involves a major shift in the location of buildings, proposed streets, parking lots , landscaping or other site improvements. E. Detailed Development Plan Approval Criteria. If the detailed plan is found to be in conformance with the conceptual plan, the following specific review criteria must additionally be satisfied Applications shall provide findings to provide the Commission with the basis to make findings that the following criteria are satisfied when approving or approving with conditions,the detailed plan. The Commission shall make findings that the criteria are not satisfied when denying an application. 1. All the provisions of the land division provisions, Chapters 18.41-0, 18.420 Partitions and 18.430 Subdivisions, shall be met; Staff Note: 18.410 was deleted since this chapter refers to lot line adjustments, not land division. 2. Except as noted,the provisions of the following chapters shall be utilized as guidelines. A planned development need not meet these requirements where a development plan provides alternative designs and methods, if acceptable to the Commission,that promote the purpose of this seetiee[chapter]. In each case,the applicant must provide findings to justify the modification of the standards in the chapters listed below. The applicant shall respond to all the applicable criteria of each chapter as part of these findings and clearly identify where their proposal is seeking a modification to the strict application of the standards. For those chapters not specifically exempted, the applicant bears the burden of fully complying with those standards, unless a variance or adjustment has been requested additional open spaee dedieation and/of:pr-evision of additional ameflities, 64dlse tr-ee planting, Staff note: this subsection is a combination of 18.350.070 and 18.350.080. The suggestion that the commission may require additional open space is replaced by a later criterion that stipulates a mandatory amount of open space. [a. Chapter 18.360,Site Development Review.] The provisions of Chapter 18.360, Site Development Review,are not applicable to Planned Development Reviews. The detailed development plan review is intended to address the same type of issues as the Site Development Review. Staff Note: The current PD chapter exempts PD projects from SDR criteria. The committee suggested that the SDR criteria should be applied, as there were some areas that were not addressed by the PD criteria. Staff compared the two sets of standards and found that only 18.360.090.3(Exterior Elevations) and 18.360.090.9 (Demarcation of semi public and private spaces) were omitted entirely. The other SDR criteria were substantially the same. The omitted sections have been added into this chapter. By having the review criteria in the PD chapter they can be tailored to specific PD issues. As a result, staff is recommending that the exemption from SDR criteria remain. b. Chapter 18.705,Access, Egress and Circulation. [The Commission may grant an exception to the access standards, upon a demonstration by a professional engineer Page 16 of 25 June 29, 2005 that the resulting access will not be detrimental to the public safety considering emergency vehicle needs,and provisions are provided for all modes of transportation using the site (vehicles, bicycles,pedestrians, and transit).] c. Chapter 18.715, Density Computation and Limitations. Unless authorized below, density shall be governed by the density established in the underlying zoning district, [using the minimum lot size established for that district. Where a project site encompasses more than one underlying zoning district, density shall be aggregated for each district, and may be allocated anywhere within the project site, as deemed appropriate by the commission.] The Commission may further authorize a density bonus[as defined in 18.1201 not to exceed 10%as an incentive to increase or enhance open space, architectural character and/or site variation incorporated into the development. These factors must make a substantial contribution to objectives of the planned development. The degree of distinctiveness and the desirability of variation achieved shall govern the amount of density increase which the Commission may approve according to the following: Staff note: This section has been slightly revised. First, a provision was added to allow density to be transferred within the PD. For example if a PD included an acre of R-12 and an acre of R-7 zoning a total of 19 units would be permissible. Rather than require 12 units on one acre and 7 on the other, the commission may allow a reallocation of density to either spread it out(an aggregate of about R-10) or concentrate it in one area of the site. i. [AM%bonus for each 5%of the gross site area set aside in open space, up to]a maximum of[5"o 310A, is allowed for the provision of active use recreational open space, exclusive of areas contained in floodplain, steep slopes, drainageways, or wetlands that would otherwise be precluded from development; Staff note: a formula of I%per 5% was added for more objective guidance. Also, since mandatory open space (in some fashion, either minimal use, passive use or active use) is a recommended requirement, and sensitive lands are typically reserved by other regulations for open space, this creates an incentive for providing active recreational area. ii. ° ; amenities; [A 1% bonus for each 1% of total project cost invested in development of pedestrian amenities,streetscape development, recreation areas,plazas, or other items from the "Planning Commission's Toolbox,"up to a maximum of 5%] Staff note: a formula of i% to 1%project cost was added for more objective guidance. iii. A ima*ifnufnef 3-% is allowed far-er-eation 4vistial feeal points; use E)f existing , Staff Note: aside from visual focal points, which is really tough to assign a value to, these other items are market driven and generally will be utilized by the developer to reduce project costs (less grading) or increase lot values (sun, view). This section should be deleted. Page 17 of 25 June 29, 2005 iv. A maximum E)f 30,46 quality of ar-ehiteetuful quality and style; hafmoRiOUS Use E) ma4erials; ; Wer-varied tise Staff Note: This is the stated purpose of PD's. Why should a bonus be provided for projects that do what they are supposed to do? Perhaps varied use of building types and/or pricing levels to meet affordable housing objectives would be something to consider, but as written, this bonus provision should be removed. Another consideration would be to grant density reductions, based on site specific criteria with a potential mitigation program (i.e. Transfer of Development Rights) d. Chapter 18.745, Landscaping and Screening. [The Commission may grant an exception to the landscape requirements of this title upon a finding that the overall landscape plan was prepared by a licensed landscape architect,provides for 20% of the gross site area to be professionally landscaped, and meets the intent of the specific standard being modified] Staff Note: The requirement for a licensed landscape architect was added to ensure that a greater understanding of plant types and their appropriate uses and placement is followed in the development of a landscape plan. A professionally prepared landscape plan should also be able to show how a specific standard may be met through an alternate means, e.g. a narrower buffer with a greater use of evergreen trees and shrubs, instead of a masonry wall. e. Chapter 18.765, Off-street Parking and Loading Requirements. [The Commission may grant an exception to the off-street parking dimensional and minimum number of space requirements in the applicable zone based on findings that: i. The minor exception is not greater than 10 percent of the required parking; and ii. The application is for a use designed for a specific purpose which is intended to be permanent in nature, e.g., a nursing home, and which has a low demand for off-street parking; or iii. There is an opportunity for sharing parking and there is written evidence that the property owners are willing to enter into a legal agreement; or iv. Public transportation is available to the site, and reducing the standards will not adversely affect adjoining uses; or v. There is a community interest in the preservation of particular natural features of the site which make it in the public interest to grant an exception to parking standards.] f. Chapter 18.780, Signs. The Commission may grant an exception to the sign dimensional requirements in the applicable zone based on findings that. i. The minor exception is not greater than 10 percent of the required applicable dimensional standard for signs; ii. The exception is necessary for adequate identification of the use on the property;and iii. The sign will be compatible with the overall site plan, the structural improvements and with the structures and uses on adjoining properties. g. Chapter 18.795,Visual Clearance Areas. [The Commission may grant an exception to the visual clearance requirements, when adequate sight distance is or can be met;] Page 18 of 25 June 29, 2005 [h. Chapter 18.810,Street and Utility Improvements, Sections 18.810.040,Blocks; and 18.810.060,Lots. In addition, deviations from street standards shall be made on a limited basis, and nothing in this section shall obligate the City Engineer to grant an exception. The Commission retains the ability to not allow an exception but may not grant an exception to street standards not sanctioned by the City Engineer, other than through the procedures in 18.370, Variances and Adjustments. The City Engineer may determine that certain exceptions to the street and utility standards are permissible when it can be shown that. L public safety will not be compromised ii. in the case of public streets, maintenance costs will not be greater than with a conforming design. iii. the design will improve stormwater conveyance either by reducing the rate or amount of runoff from present standards or increasing the amount of pollutant treatment.] Staff note:Adding Chapter 18.810 is new, but the exemptions are limited. The applicable sections from this chapter refer to specific site planning standards such as block length dimensions, general connectivity, and lot size and shape. There are certainly cases to be made where these standards do not fit a particular design concept that better meets the intent. An allowance for the city engineer has also been included for the other street and utility standards with a very narrow allowance for deviations. Public streets and utilities are the domain of the city engineer and public traffic circulation and safety are his charge. However, there may be instances where new technologies or design techniques are superior and have not been able to be codified in standards. This would permit use of such techniques or standards. 3. In addition,the following criteria shall be met: a. Relationship to the natural and physical environment: i. The streets,buildings and other site elements shall be designed and located to preserve the existing trees,topography and natural drainage to the greatest degree possible. [The commission may require the applicant to demonstrate why a particular alternate site plan that may result in greater preservation of trees, topography and natural drainage would either not be feasible or would result in a greater loss of those resources;] ii. Structures located on the site shall not be in areas subject to ground slumping and sliding[as demonstrated by the inclusion of a specific geotechnical evaluation,] (3) The fe shall be adequate .dist.nee between on site buildings and Otho f o site and eg site buildings an adjoining properties to p ;.do for-adequ4e light cmd ai Staff Note: the previous requirement "There shall be adequate distance between on-site buildings and other on-site and off-site buildings on adjoining properties to provide for adequate light and air circulation and for fire protection"was deleted since the perimeter setback requirement should account for offsite separation distance. Fire and building codes regulate on site building separation. If not attached, typical setbacks are three feet (6 feet between buildings.). [iii. Using the basic site analysis information from the conceptual plan submittal,] the structures shall be oriented with consideration for the sun and wind directions,where possible; and Page 19 of 25 June 29, 2005 Staff note: the previous requirement "Trees preserved to the extent possible." Was deleted as it repeated subsection (18.350.060.F.3.a.i.) above. In that standard, the commission may require the applicant to defend why their plan achieves greater protection than an alternative concept proposed by the commission or why the commission's plan is infeasible. b. Buffering, screening and compatibility between adjoining uses: i Buffering shall be provided between different types of land uses,e.g., between single-family and multi-family residential,and residential and commercial uses; ii In addition to the requirements of the buffer matrix(Table 18.745.1), the requirements of the buffer may be reduced if a landscape plan prepared by a registered Landscape Architect is submitted that attains the same level of buffering and screening with alternate materials or methods. The following factors shall be considered in determining the adequacy and extent of the buffer required under Chapter 18.745.: Staff note: a registered landscape architect is required to prepare a plan for requesting landscaping adjustments in order to ensure a greater level of appropriate plant type understanding to satisfy the following. (a) The purpose of the buffer, for example to decrease noise levels, absorb air pollution,filter dust,or to provide a visual barrier; (b) The size of the buffer needs in terms of width and height to achieve the purpose; (c) The direction(s)from which buffering is needed; (d) The required density of the buffering; and (e) Whether the viewer is stationary or mobile. iii. On-site screening from view from adjoining properties of such activities as service areas,storage areas,parking lots and mechanical devices on roof tops shall be provided and the following factors shall be considered in determining the adequacy of the type and extent of the screening: (a) What needs to be screened; (b) The direction from which it is needed; and (c) Whether the screening needs to be year- round. c. Privacy and noise: Non-residential structures which abut existing residential dwellings shall be located on the site or be designed in a manner,to the maximum degree possible,to protect the private areas on the adjoining properties from view and noise; [d Exterior elevations—residential use:Along the vertical face of single-family attached and multiple family structures, offsets shall occur at a minimum of every 30 feet by providing any two of the following: L Recesses,e.g., decks,patios, entrances,floor area, of a minimum depth of eight feet, ii. Extensions, e.g., decks,patios, entrances,floor area,of a minimum depth of eight feet, a maximum length of an overhang shall be 25 feet;and iii. Offsets or breaks in roof elevations of three or more feet in height.] Page 20 of 25 June 29, 2005 e. Private outdoor area—residential use: Staff note: These standards were revised to apply to all residential(single family and multi family) development. Previously, only multi family dwellings. L in addition to the requirements of subparagraph (3)[Exclusive of any other required open space facility,]each ground-level residential dwelling unit shall have an outdoor private area(patio,terrace, or porch)of not less than 48 square feet[with a minimum width dimension of four feet;J ii. Wherever possible,private outdoor open spaces should be oriented toward the sun; and iii. Private outdoor spaces shall be screened or designed to provide privacy for the use of the space. f. Shared outdoor recreation and open space facility areas—residential,,,..ltdtry use: i. in addition to s..1.....,.,,,.,..phs(2)and(3) of this seetiEff Exclusive of any other required open space facilities, each residential dwelling development shall incorporate shared usable outdoor recreation areas within the development plan as follows: (a) Studio units up to and including two bedroom units, 200 square feet per unit; (b) Three or more bedroom units, 300 square feet per unit. ii. Shared outdoor recreation and epen space shall be readily observable from adjacent units for reasons of crime prevention and safety; iii. The required recreation space may be provided as follows: (a) it may be all outdoer-spaee; o te. nis ,. ,,,4 and:.,,lee....e e ation F .r; (e) it may be all publie or-eammen spaee; E) (d) it may be paft eemmen spaee and paf4 pr-ivate; for-example, it eetild be an !e\ Where b lee«:es are added to , nirte the b leenies shall not be less than 48 'gAia"-e feet. [(a)Additional outdoor passive use open space facilities; (b) Additional outdoor active use open space facitilies; (c) Indoor recreation center;or d A combination of the above. Staff Note: The SDR standards permit balconies to be used for semi public outdoor area, but this seems a weak level of excellence to expect from a planned development project, therefore its recommended that this provision be deleted. [g. Demarcation of public,semi-public and private spaces for crime prevention: i. The structures and site improvements shall be designed so that public areas such as streets or public gathering places,semi-public areas and private outdoor areas are clearly defined to establish persons having a right to be in the space,to provide for crime prevention and to establish maintenance responsibility;and ii. These areas may be defined by, but not limited to: (a) A deck,patio, low wall, hedge, or draping vine; (b) A trellis or arbor; Page 21 of 25 June 29, 2005 (c) A change in elevation or grade, (d) A change in the texture of the path material, (e) Sign; or (/) Landscaping.] h. Access and circulation: i. The number of[required] allowed access points for a development shall be provided in Chapter 18.705; ii. All circulation patterns within a development must be designed to accommodate emergency [and service] vehicles; and iii. Provisions shall be made for pedestrian and bicycle ways [abutting and through a site] if such facilities are shown on an adopted plan[or terminate at the boundaries of the project site/. i. Landscaping and open space: i. Residential Development: In addition to the[buffering and screening requirements of paragraph h of this subsection, and any minimal use open space facilities]r e encs of subpar-ag...phs(4)and(5) of seetion., of this subseetion,a minimum of 20 percent of the site shall be landscaped. [This may he accomplished in improved open space tracts, or with landscaping on individual lots provided the developer includes a landscape plan and surety for such landscape installation]; ii. Gemmer-eial Development: A fninimum of 15 per-eent of the site shall be landseaped; and iii. hidustr4al Develepment! A minimum of 15 per-eent of the site shall be l-andsEaped; Staff note: These sections were deleted as they are repeated in and conflict with 18.350.060.D.2. Site Coverage. j. Public transit: i. Provisions for public transit may be required where the site abuts for is within a 1/mile of]a public transit route. The required facilities shall be based on: (a) The location of other transit facilities in the area; and (b) The size and type of the proposed development. ii. The required facilities[may include but are not necessarily limited to]skald be ate such facilities as: (a) A waiting shelter; (b) A turn-out area for loading and unloading; and (c) Hard surface paths connecting the development to the waiting area. i. Signs: i. la addition te the previsiens of Chapter- 18.780, Signs:(a) beeattion of all signs pcvpesed rofthe development site;; and Staff Note: the sign requirements were deleted as redundant and meaningless criteria. k. Parking: Page 22 of 25 June 29, 2005 i. All parking and loading areas shall be generally laid out in accordance with the requirements set forth in Chapter Chapter 18.765; ii. Up to 50%of required off-street parking spaces for single-family attached dwellings may be provided on one or more common parking lots within the planned development as long as each single-family lot contains one off-street parking space. 1. Drainage: All drainage provisions shall be generally laid out in accordance with the requirements set forth in Chapter 4$�5[18.810], and the er-iteFia in the adep plan.1981 master-dr-aiRage An applicant may propose an alternate means for stormwater conveyance on the basis that a reduction of stormwater runoff or an increase in the level of treatment will result from the use of such means as green streets,porous concrete,or eco roofs. m. Floodplain dedication: Where landfill and/or development is allowed within or adjacent to the 100-year floodplain,the City shall require consideration of the dedication of sufficient open land area for a greenway adjoining and within the floodplain. This area shall include portions of a suitable elevation for the construction of a pedestrianibicycle pathway with the floodplain in accordance with the adopted pedestrian bicycle pathway plan. n. '8�0 Shared Open Space[Facilities]. the plan as eemmen open spaee the fell 1. The open spaee area shall be shown on the fifial plan and feee With the DiFeratOF; afld following d a. By dedieation to the Gity as publiely owned and maintained must be aereeptable to it With FegaFd te the size, shape,, li itatio eenveyanee must inelude table to the C4ty (1) The eentiHued use E)f sueh land for-the inte (2) of pfepef4y maintenanee; (3) When appFOPFia4e, the availability of funds Feqtiir-ed (5) Ree sustained by easualty and Page 23 of 25 June 29, 2005 [Exclusive of any other required open space facilities or buffer areas, the detailed development plan shall designate a minimum of 20% of the gross site area as an open space facility. The open space facility may be comprised of any combination of the following: i. Minimal Use Facilities. Up to 75% of the open space requirement may be satisfied by reserving areas for minimal use. Typically these areas are designated around sensitive lands(steep slopes, wetlands, streams,or 100 year floodplain). ii. Passive Use Facilities. Up to 100%of the open space requirement may be satisfied by providing a detailed development plan for improvements(including landscaping, irrigation,pathway and other structural improvements)for passive recreational use. iii.Active Use Facilities. Up to 100%of the open space requirement may be satisfied by providing a detailed development plan for improvements(including landscaping, irrigation,pathway and other structural improvements)for active recreational use.] div. The open space area shall be shown on the final plan and recorded with the Director;-w1 [o. Open Space Conveyance. Where a proposed park,playground or other public use shown in a development plan adopted by the City is located in whole or in part in a subdivision,the Commission may require the dedication or reservation of such area within the subdivision,provided that the reservation or dedication is roughly proportional to the impact of the subdivision on the park system. Where considered desirable by the Commission in accordance with adopted comprehensive plan policies, and where a development plan of the City does not indicate proposed public use areas, the Commission may require the dedication or reservation of areas within the subdivision or sites of a character, extent and location suitable for the development of parks or other public use,provided that the reservation or dedication is roughly proportional to the impact of the subdivision on the park system. The open space shall be conveyed in accordance with one of the following methods.] [i Public Ownership.] By dedieatien to the City as publiely owned and maintained as epee spaepen space proposed for dedication to the City must be acceptable to it with regard to the size, shape, location, improvement and budgetary and maintenance limitations. [A determination of City acceptance shall be made in writing by the Parks& Facilities Division Manager prior to final approval. Dedications of open space may be eligible for Systems Development Charge credits. If deemed to be not acceptable, the open space shall be in private ownership as described below]; [ii. Private Ownership.]By leasing of: onveying title(including beneficial ownership)to a corporation, home association or other legal entity,with the City retaining the development rights to the property. The terms of such lease OF Othef: instrument of conveyance must include provisions suitable to the City Attorney for guaranteeing the following: (1) The continued use of such land for the intended purposes; Page 24 of 25 June 29, 2005 (2) Continuity of property maintenance; (3) When appropriate,the availability of funds required for such maintenance, (4) Adequate insurance protection;and (5) Recoveryfor loss sustained by casualty and condemnation or otherwise. Page 25 of 25 June 29, 2005 a : PF I The Planning Commissioners' Toolbox The following list and illustrations are intended to provide guidance to both the Planning Commission and the applicant in developing and reviewing applications for Planned Developments. A planned development approval should be reserved for situations where either the peculiarities of the developing parcel or the specific proposed design deserve special judgmental consideration outside the strict constraints of the subdivision ordinances. In evaluating a proposal, the commission should see evidence that the applicant has conducted a site analysis. SITE ANALYSIS - Survey Data(scale, north arrow, date, boundary, easements, abutting rights of way, existing buildings and paved areas, utilities, location of water features, tree data, contour intervals) Constraint Analysis (steep slopes, flood zones, surface water channels, road access, geologic soil constraints, adjacent land uses, major noise sources) Opportunities (sun angles,pedestrian linkages, exceptional views, wildlife habitat areas, tree groves) Solar energy considerations should be analyzed if capturing solar energy appears feasible ( detailed climatic analysis including factors such as detailed sun charts, daily averages of sunlight and cloud cover, daily rain averages, areas exposed to the sun at different seasons, solar radiation patterns and temperature patterns) CONVENTIONAL YIELD PLAN - This plan should show a conforming subdivision that has no special attributes. The basic premise is to just show how density can be achieved by meeting the standards. PROPOSED PLAN - This plan reflects the maximization of opportunities and avoidance of the constrained portions of the site. There should be no regard to what the typical development standards require. The objective here is design excellence. PLAN SUBMITTAL REQUIREMENTS Conceptual Plan Requirements: If applying for conceptual and detailed plan approval at the same time, the concept plan must be presented at the neighborhood meeting. The applicant and planning staff shall determine at the preapplication conference whether a joint conceptual/detail plan can be submitted or, based on the size or complexity of the project, whether the two approvals must remain separate. It is the express intention that the concept is entirely open for discussion. The applicant is responsible for soliciting input and documenting the ideas that are put forward during the meeting. There is no obligation to revise the plan based on this meeting, but the planning commission can examine and request defensive argument from the applicant on why a particular concept raised at the meeting was not further explored or if explored, why it was not chosen. If applying for concept plan approval prior to detail plan (i.e. separate actions), the same neighborhood meeting method shall be used, except that after the PC approves the concept, the detail plan that implements the concept is not open for discussion as far as changing the concept elements. For example if the PC approved a 3 and 4 unit attached product for 15 units, 80% max coverage, reduced front and rear setbacks, 22% open space, with an alpine flair, while certain aspects of the detail are alterable like building orientation and placement, street layout etc., the PC could not come back and require additional open space, limit the buildings to 3 units only, reduce lot coverage and require a cosmopolitan style design, without the applicant's consent. Concept Plan should identify the following: o Housing type (duplex, attached, detached, zero lot line, efficiency units, flats, apartments) o Use Type (Services and Commercial Uses for PD residents Community Building Indoor Rec Facility Outdoor Rec Facility RV Storage, Residential Living) o Should other uses be considered, such as neighborhood retail <5,OOOg.s.f.? Would require amending the list of allowable uses. o Number of units (or range, within the allowable densities of 18.715 and 18.350) o Lot coverage specs. o Setbacks (front, garage, rear, side, street side, any specific projections such as porches or decks) o Parking (where any additional is provided off street, except for in garages) o Percent of open space (range or ballpark estimate) o Other unique site design aspects that would be assisted by the PD process(such as rear loaded alley units, front yards out to open space, common courtyards between homes, unique street design, odd shaped lots, etc.) o Development theme-(e.g. English Park-tudor style architecture with old english park benches OR Northwest Forest—Craftsman with natural materials highlighted throughout, boulders in landscaping) o Schedule for construction/completion Detail Plan Requirements. There is a provision allowing an applicant to receive concept plan approval at PC and then through an SDR get detail plan approval at a staff level. This should not be permitted. There is too far a leap between the concept and detail to infer the PC's intent. In other words, the concept should be just that, a concept. Leave it loose, for public and PC discussion. The detail plan(which in all likelihood would be submitted simultaneously) needs to show how the concept is being implemented. The Detail Plan should include the following: o Site plan o Building Envelope Plan (setbacks which could also include specific allowances for porches, dormers, bay windows, lot coverage, height, other site development specs.) o Lot plan (i.e. preliminary plat) o Landscape plan o General Utility Plan(s) (sewer, water, streets, drainage, etc) o Preliminary street profiles o Architectural details or design controls (CC&R's) both for the structures and for other site amenities(benches, street lights, ped path lights, walkways, bike racks etc) FOR COMMISSIONER CONSIDERATION: These are not criteria for approval but are instead intended to be considered by the commission to help determine whether the project sustains the burden for granting variations to the other development standards in the code. -Open Space/Natural Area The degree of open space required should be commensurate with the intensity of the density within the development. In other words, if the homes are packed tight together with small lot sizes, more open space should be required. Mathematically, this could be expressed in percentages: if the average lot size of PD lots in the R-7 zone are 3,000 square feet, they are 40% smaller than required in the zone. Therefore, 40% open space or natural area should be provided. If there is unsuitable area for open space or natural areas on site, then the applicant may propose to pay a fee in lieu or an off site location, which the commission may accept or reject. There should be a baseline requirement for"Natural Areas or Open Space" with any PD. A minimum of 20%of the net buildable area should be reserved. This may be a combination of: Natural Area. An area of land and/or water that has a predominantly undeveloped character. Natural areas may be pristine,or may have been previously affected by human activity such as vegetation removal,agriculture, grading or drainage if such areas retain significant natural characteristics, or have recovered or been restored to the extent that they contribute to the City's natural systems including hydrology, vegetation, or wildlife habitat.Natural areas shall be permanently reserved by common ownership among the owners of a development, dedicated to the public, or by other appropriate means committed to the use for which it was intended. Open Space. Land to remain in natural or landscaped condition for the purpose of providing a scenic, aesthetic appearance and/or protecting natural processes, providing passive or active recreational uses, and/or maintaining natural vegetation. Open space shall be permanently reserved by common ownership among the owners of a development, dedicated to the public, or by other appropriate means committed to the use for which it was intended. a. Active Use Recreational Facilities: Facilities for recreational uses that tend to be more organized and/or that require a greater degree of site development and conversion of natural area, including sports fields,playground equipment,group picnic shelters,hard surfaced pathways,permanent restrooms,accessory parking lots and similar facilities. b. Passive Use Recreational Facilities: Facilities for recreational uses related to the functions and values of a natural area that require limited and low impact site improvement, including soft-surface trails, signs,pedestrian bridges, seating,viewing blinds,observation decks,handicapped facilities,drinking fountains,picnic tables, interpretive facilities,and similar facilities. If the amount of natural area does not meet or exceed 20%, then the applicant should provide additional area (either open space or created or enhanced natural area). With CWS's consent,buffer areas may be utilized for some passive recreational uses. If the development proposed a condo or multi family project(no lots, and therefore no lot size equation) then the minimum 20% would be required and then the formula in [18.350.100.B.3.e.] would be used to determine additional increases: usable outdoor recreation space shall be provided in residential developments for the shared or common use of all the residents in the following amounts: (1) Studio up to and including two- bedroom units, 200 square feet per unit; and (2) Three or more bedroom units, 300 square feet per unit. Unlike the similar SDR criteria which allows balconies and semi-public/private yards behind the units, this space would have to be in a consolidated form for all occupants of the development(See The Village at Washington Square for an example). -Lot Size Transition. Lots that abut existing single family lots which conform to the lot size standard in the zone should transition to smaller lot sizes interior to the subdivision. This should not apply to lots across a public street,open space, or significant natural resource from existing SFD's. (When exempting this requirement due to the presence of significant natural resources or open space,the commission shall determine that the width of the intervening area provides a suitable buffer. Typically this buffer would be the equivalent depth of a conforming lot) Since averaging lot sizes is permissible in standard subdivisions,the minimum size for lots abutting existing SFD's should be no less than 80%of the minimum size for that zone. An exception to this standard should be recognized for attached single family units (3 or more per building). In cases where attached units directly abut SFD's,the commission may consider limiting the number of contiguous units to break up the massing of the building, or change the orientation of the units, or require additional architectural design features to mitigate for the height and bulk of the proposed building. It is within the purview of the commission to stipulate building height envelopes as well as setback envelopes if an impact nexus can be shown. -Open Space Amenities In addition to passive use recreational trails, the commission may require a program of interpretive signage to be installed if deemed relevant and sensible. The purpose of this signage would be to educate users about either how the development was responsive to the natural features and constraints on the site, or aspects of the environment and ecosystem present on the site. The commission may require final review and approval of the sign design templates and proposed locations. - Transit and Pedestrian Networks For larger scale developments, an integrated system of off street pedestrian trails should connect various points both within and adjacent to the development. Opportunities for future trail extensions (similar to the future streets plan) should be explored as well. Also, transit amenities should be incorporated where relevant(i.e. where bus service is available or planned in the Transportation System Plan). Other considerations for school bus transport (such as rain shelters)could be provided, but should be in a highly visible location and designed to thwart vandalism and other criminal acts. - Intensity of Density The amount of density above the minimum should be correlated to the level of added amenities the applicant is proposing. The commission should feel that on the whole, the project is going above and beyond the minimum level and quality of improvements. - Other Amenities The developer may propose other types of amenities that make a project unique. These can include public art or sculptures, fountains, artificial water features, or professionally designed landscape theme (for lots or common tracts). - Public Facility Design Features • Retaining walls should be constructed or faced with natural or natural appearance materials. Large mass retaining walls should be discouraged, unless forming a public space. Generally, walls should not exceed 4 feet in height. r • Sidewalks should be allowed to step off the beaten path: .a • The shortest distance may be a strai t line,but that is not always a good thing. ii t • Fixtures should be distinctive: • O en S aces should be invitin • Innovative and/or unique building materials should be used, such as brick or other modular avers, reen roofs, een streets, PLANNING BASICS' Plan Layout Type. In small projects, the specific layout may not be apparent, but this may help to identify what the greater neighborhood plan is, and whether the proposal is consistent with the general pattern around it. Orthogonal Grid Grid with Diagonals Diagonal Grid t "A K-=L71 < 0;4�I "VANNAN W A SHINGTON.D.0 MAR#KMQMT ADVANTAGES ADVANTAGES ADVANTAGES fittoemem dro" 4 i Strowl twwarckv ttttdi doWnsis for thm,.,jj��vfr� stowt Kwswc#,Y—�$40."M I.,M,0.0h trotfi� 3=my 2 Ever,dWW%4J of traffic through the 0,4 FOW'Jospe,"of 6thw=y wrh end blocks f<,t+rvvol(Wfl 3Diago—f—ogtondlothe te"Mift M&Wsds -str.ft Gap&mp~*t ta�w thro.0%t4 and 4 049wa-,S �Pt Mwotfty 04 the W-d 4 fi tbot I~6.1'a'"Ce Mp" DISADVANTAGES 5 Id,W-406"01~6".W02 1 11 Eff-om dmb1&4o.,j—g-A DISADVANTAGES 2 Ho r,,,� %4bw of&. kvwd W shop" I Dop"41spebboo,"x 4oli." I k6w4le""�16"porNKIMMOV—enwod 3 Dk**.a weriscma"sf6t po%a1v 4 dewd DISADVANTAGES 10.09 14t 60001-0104t0*"­`o— �twal W Li" *4, 'etwe'.0 to steepa Organic Curvilinear Discontinuous at )r ar M003 T r 61!J I r T r�q41P A C0M--,-a49 4� -A oil I rr NAn IT G-CKY ADVANTAGES ADVANTAGCS ADVANTAGES Str Itie—et V—fh i-0 1.,0-9.trenr, 1 WI—IN—.krto by d~-9 I d—ol,network E..Ay—rodw.—r.ewmew141 —,V"t td..&.r d WA. I I—­tefi,-.1"by 0-11ic 3 HwhM-it;ton—to titr,— ......."...—rol 4 E—diyrsM o1 tropic 0—Me.0-..—.A 4 IIiOf.ty—p—&—r.p— -1-rupi—t. 01SADVANTAGCS DISADVANTAGES 1—i—d versa I LM10 d—boftotr~rtal.aw • cr—&—.—M trMrr.hV tw­.—.4 DISADVANTAGES 2 U.—I—N.W.--W.f W. 2 T—d— 'All diagrams and text information excerpted from"Site,Community,and Urban Planning"by G. Greenan,A.Duany,E.Plater-Zyberk,K.Zaharin, 1. Shafie;The Cintas Foundation. Block Types: The disposition of blocks has distinct socioeconomic implications. The Square Block This type was an early model for planned settlements in America, particularly Spanish colonies. It was sometimes associated with _ agricultural communities,providing four large lots per block,each lot with a house at its center. When the growth of the community P q P produced additional subdivision,replatting created irregular lots (Fig.1). While this may provide a useful variety,it is more often IL regarded as a nuisance by a society accustomed to standardized r products. A further disadvantage is that discontinuous rear lot lines a make alleys and rear access utilities impractical. Despite these short r —M comings,the square block is useful as a specialized type. When is 1 platted only at its perimeter,it can accommodate the high parking requirement of certain buildings. The open center,well insulated _ from traffic may also be used as a common garden or playground (Fig.2) t.aQUARC BLOCK a.aQUARC BLOCK The Organic Block This type is characterized by its irregularity,its variations are Z1.31 unlimited. The original organic block was the subdivision of residual land between well worn paths(Fig.3).It was later rationalized bylips1 Frederick Law Olmstead to achieve a controllable,picturesque effect 'A and to negotiate sloping terrain gracefully. The naturalistic block, P despite its variety, g p ty,generates certain recurring conditions that must be resolved by sophisticated platting. At shallow curves it is desirable to Q ! r have the facades follow the frontage smoothly. This is achieved by keeping the side lot lines perpendicular to the frontage line(Fig.4). At the same time it is important for the rear lot line to be wide enough to permit vehicular access. At sharper curves,it is desirable to have \� the axis of a single lot bisect the acute angle. In the event of J excessive block depth,it is possible to colonize the interior of the block by means of a close. >f.OwiA1NC IMrOCIt s.OwaANIC noCrc The Elongated Block The elongated block overcomes some of the drawbacks of the square block. More efficient and more standardized,elongated blocks J-i — provide economical double loaded alleys,with short utility nuns,to eliminate the uncontrollable variable of lot depth and maintain the option of altering lot width. By adjusting the block length,it is possible to reduce cross streets toward rural edges or to add them at % urban centers. This adjustment alters the pedestrian permeability of the grid and controls the ration of street parking to building capacity. The elongated block can"bend:somewhat along its length,giving it Ali a limited ability to shape space and negotiate slopes(Fig.6) Unlike the square block,the elongated block provides two distinct i types of frontage(Fig.5). Residential Buildings are placed on wider A lots on the quieter side of the block. Commercial buildings can be set on the short end of the block,platted to face the busy street;the _ L ac amount of parking behind these properties is controlled by the variable depth. S.cLowawrco BLOCK B.aLONawrcta aLocK �f rw�tr•) (� �r ww �r [� �f e yre oeo o , Mal e Las •v , 0 i it r�Twwi fm— i� w�■i ri Www wwr fi w■ww��j �w wr ��j�wwr rw wi r�www�r r_, 77 ■ �� ,� ■ ■ ,� �� ti .,,, '' ■ .; ■ as is �� 1�1 �ra� ' � � 0 0 0 0 ■ a }o�a ,s_a► � q� raga wwr (�Tw it wiw�ww■i �i T—I E� b y � OEM u■■u■ �, ,, %� � ��� oo , oo ��� e ; � „ e oT a �► rw �• y y, �.�� C , �` �' ?�� OHO d►O ;<� !�'/��i, �O� O O BOO U�� S �'G' � ■ i■% Opo eie �/ y r�'///j/, FOO O X01 r;� �.� O ■ O �� ! w`%Ji, a �.� .. %% ' ,� COOO.O.00,P Open Space Types (continued). MARKET PLAZA .r %uaf we public spaces that are pr.msrdy petered rathar Than Ween,They can sustain vary intense use try crowds and even by vehicles.Parking Inns should be designed as I ®� dL"Ll"Vin,pMitt a7as that happen to have uMstMthan ta On tm,rr an asn sYl _ glo-pumose areas A smaMrshopping canter can be itans- formed n=a town center A it has been designed so rt Can beseamlesWonaehedto'he block system and datasodas , 1 �. Ise' CIVIC PLAZA +� Crvic buildogs are often no larger than the private ones ? that surround Mem,and thew legibility as mora nmponant ltd Sill buidirrga cannot depend solely on architectural evpree Sion Thew steno wnth•n the block system roust cormrrnmF cats thew elevated status. Sites on squares or at the ter mrnations of avenues are ideal but not allays avaaable r tt•.usthe most dependableic buildings to plates. and do- [..I r rad the perking areas of civic buildings es d,zaa. GREEN . . . . . . The preen is an urban,naturafHbc open space.LAO the square-it is small•civic.end surrounded by buildings Un r n like the square,it is mfonnalty planted and msy have an it- regular topography.Greens are usually landscaped with Trees at the edges and sunny lawns at the anter.Greens MARKET PLAZA CIVIC PLAZA should Contain no strictures other then benches,pawl ions.and memorials.psAhs ere optional PARK Parka are naturalistic open paces,like greens.but Tiger and less tended They are most successful when creaked from yfrgvh woodland Parka have grassy,areas only pero6 icaM A knoll ora ry pond can be used as an nponent org nit�ng teeture.Perks tans within tM urban labnc M large ages,but Thee mhem-T size usually puts them of The edges of tarns and villspes Parks may be edged by public drives ut by houses on wry large lots.as long as Connections to public paths occur at every block BUFFER • The buffer has the base elements of•green,with the add ed purpose of buffeing the imow of traffic from s high- Way or a Wiss,rd Shown is i small lot angdevelopment fronwhich a green Oil oo opposer ace are larger r lots on ay r, which houses are pler!o further nique beck Irom the roadway edge a.another M,Ner!eChnigw GREEN AAJ J6 666666 "Co., Do o PARK BUFFER Building Types GENERAL Ths radrbo o incrsms h,lot'ts tad lots in North Amsnca O a a has gasp Ale fi4it widtR T1+n shAdrhnsion dirrhens•nn was .Nicuant lot many ye&M creating 25h rwwhoh" and shopurom lots.ss wed as 56.7S,and 10041 fon SWAN@ � +or nous.s However.the slept d g s sutomoGla added / �1 a wt of dimensional oonstrants bat required now pis" standards_Tho Soh width is weatelul.since the basic im dement of efficient narkino is the double row at 64 R Me sat nn:rem.nt when divided a four.provides the afar- gouts--tin rohvhouea lot of 16 k which allows one car to be patted with additional room for pedestrian P119- sage etsage The mina ,m aide yard lot■32 ft The inmrmum 1te- -vmaiw yard lot hs 48 ft The 644t lot sffrdently provides for ;he high parting requirement of ahopfronto,apartments and nff,ce buldmoo rho plattmg modulo of 16 h corresponds to the traditional meafweoI'Mrod pla!ting.nrootwiNoutknowing what twdding hypes ilia occupy the lots,mwnta ns flax-bility and A • C D ensuresmaxenum density through pariung Oliicit". 4ROOS 3MM 2RODS 2ROM Bout budding types accommodate the common residan- COURTYARD BUILDING tial mail and workplace areas of urban life.Some build- I ono., however, cannot be caogontsd typologically. y. dedicated o manufactunnp and vaneporiation may ba distoned by largesturle mechanical trojecorlss i Crvhc buildnngt which must ettprose the npi.sbons of 00 1 institutions they embody,should also be exempt from the discid�ne of type COURTYARD BUILDING ! This type of buildmg occupies as or most of the edges of its tot and defmts one or mere private spaces intsmalty.This I1J ie the most urban of types as it is abie to-ompletaly shield mm the private realm from the public realm.It is coon in hot osmates.butes attribute*are area/cal ewrywhers.BecauseI i ! of its ebhliry rn to scoomodate incompatibleet aivities in workshops.close prommiry,it is recommended for ork hops.hotels and schoole The high security the boundary provides e i useful for reeolonWng cnnwV"o.+ryan cores SIDE YARD BUILDING Thin type of luddieq oxvpss oris erAe of this lot wish 6he 1RAODl aRpDB 2 wCDO� 2 RD primary 008 mary open spew on he ether view of sods The of the side yard on Ale(beet front makes this budding type appear 40E YARD BUILDING freestanding.to it " be imerspersed with perinstar and buildings n lata urberh locations I the adjacent build• r..» ng is also a rade yard%po wnh•blank party wail the open I space can be ging private.This type pemhitssystematiccls maty:irientatnon.whlh rhe long side yard elevation facing I 'he sun or the Mee:a i REAR YARD BUILDING This hype of budding occupies the front of as lot,full width. iemnng the rear portion as a private space This e a role, trieh urban type appropnate for ne.ghborhood and town centers The building facade defines the edge of the public space.while the rear elevation may effect different luno tonal purposes In its residential h.,,n. this type is nprr sent* by the roNhpuse with a rear portion and outbuilding.in its commercial loin.the depth of the roar yard-son contain substantial oaA.m4 to,retail and oNiw uses PERIMETER YARD BUILDING The building sande ins on its lot with substantial front and rear yards and smaner aids Verde,k is the Mast urban ♦BOOB 28006 1.SfI1DO• 1 f CO of do type&son is'Mussy reigned to save away from neighborhood and town contem This building type is usu- REAR YARD•ALOING say residential,but when parking in contained within the Ne yard it lends naelf to limited office and boarding uses. Me pow veto cion be secured for privacy by fences and a well-placed outbu4cl ng The front yard is intand•d to be .. _... vir—public end visually continuous with the yards of�eioh- burs The rsuteon of continuity is usually degraded when Osman fronts are aligned with ft facades,as ears whom ale in beyond the driveway. To aid a landscape of 1 j osrkad urs-perigee should be setback s minimum of ole car's length from the facade or entered sidewaye through a walled toreceuR A • Q O 411QM 301100111 3000$ S IIDOS PERIMercR YARD•ulLCING Spatial Definition GENERAL r B,rldmg delineate$public spec in an urban setting.Stec --- __- j ._ _. _ _ _ -__ _ _ _ ._ _. _IK - -- :eulul%petal definition is achieved when bounding bu16 ♦ j� I l ` reps are abgned in a disciplined manner and the defined \♦ // / •'� 1 a I ♦a so+ca alis not exceed•ce�ein height+owdthietro � I ,, 1 I 4Lgnnn�t xcure when building facades cooperate 10 d► uneata The public spare.as walls form a room.Urban bulb .ng articulation takes dace pnmw*v in the vMscal plana or /f al •�1 fauda Nappendages ices poreMa beleonies.beevnn :lows,and loggias do net obliterate the W erterY surface Of the facade Mev do not Oesooy alignment. RATIO 1:I RATIO s:7 the ha ghltowidth rebo of the apace generates spatial an- 'bosun.which■relstec!o me physio"of the human eye If rM width of a pubi c apace is such that the cone of ----- -r------F------F --- - c------IC-----� vision encompasses less street wale than sky opening the ♦ l ♦ I 1\ I 1 I ♦ I a degree of"tie,andos ire is slight The ratio of 1 acre- \ 1 r a mant of height to 6 of width a the absolute minimum.with \ t a 1 I 1 a I a I to 3 being an effective minimum d a sense of spatial an, ♦a ! \a l `♦a I `�� 1 `a f ♦\ down is to result As a general rule.the tighter the ratio. 1 ♦ { I ♦ I ♦ l the stronger the sense of plan►and.often.the higher on \a real estate value.Spatial enclosure is particularty impo, t I I141 tent for aMppno sveets that must cornpate with shopping 1 math which provide vary affective"list dahlin on In the ♦ a a ♦ \ absence of%What definition by facades.daaohnod tree plbnting-a an alternative.Trees aligned for spatial anclo RATIO 1:6 sura are necasswv on thoroughfares that naw substantial Loin wards PROPORTIONS OF BUILDING HEIGHT TO PUBLIC SPACE NOMENCLATURE THE FRONTAGE LINE The wt boundary fiat ooncdes­nth a pubic thoroughfare or oublic space.The kon•age line may x designed inde- pendently of the thoroughfare,to create a spedGc Hep of pi-A FACADELJ -----The wrlcal surfaceof a huddmg set along a IronUga Ins.The elevalwn is the wrical sufece set along any other e. arboundary InFacades e subject to control by buildingMight setbacklines,recess fines,and transition lines EI►vatlons are onN reject to buddingMight sad setbacklies a 1 N SETBACK The mandatory datan e,between a frontage Ins and a fa- cade or a tit line end an elevation BY FACADE By RBCRBB LMu BUILDING HEIGHT Me dined lend to the vertical extent of a buildno Th* - oudding Might should be stated as a number of stones. t -odw man a prey l dmansion This prevents the co- I I a 1 pression of mtemal ceding heights.In tell buildings.the I as 1 a I height may be determined by denary and view and not by 1 ♦ 1 ♦ I the repuiremanta of spatial di inibon.whi-h are addressed I by the remes lira. 1 1 I ♦ \ ♦ E 1 RECESS LINE I A line prescribed(w the tuft width Of the f6md0,46WO ♦%I \ which the facade is am beck TM receseline effectively+► (fines CM enclosure of public apes.Its katavon a dater- wd by the desired heighlrowsdfi ratio of that aped. .�ompatbrlrry trvilh the average height of existing buildings x prevision for doykghtino at rho street level. BY LAfIOBCAFMs6 TRANSITION LINE TECHNIQUES OF DELINEATING PUBLIC SPACE A Ins proscribed for the fwl width of the laude.sapressed bv a variation of matenal or by a Imaed projection such as FRONTAGE LINE cornice or a balcony.Tho transition Ina divides the(w % ----- -ado.permvng shop(ron-a and signage to very over time BUILt7IN5HEGW woheut dastroy,no rhe overall composition FACADE RECESSLINE TRM+fII MMM UNE i 131iL" LOT LICE SECTION ►LAM DEFINITIONS Frontage Types GENERAL 8-1,1"hp rypa ahnds pendent of lrontapa ttrpe sor.asmple. �j j �//�". / a coor n d budM ding may have arcade.a ahopltont s / stoop, r a porch ds frontage riga..Fn•.gss can be / ranked from wort urban to mon rwN. ARCADEMe / slont IV me.sf cads oawafully absorbed the pedesvarlopli Me sidewalk while the truu n but � whan4 h not bypass the cobnnade.M•ss•m•rt for public use of / private ortfo"is roW+W .— ARCAO! Ste OPFRONT ff+a facade is aIgned directly on the'rootage iv+a,with the entrance at grade.This type a oonvenoonat lot sidewalk / retail k isohen equipped wth an swning or a aoionnads A transition line should separate the$Wage from the Is i :sde above The absence of a setback mitigates against sale :vse on the b ground for,although.r n epPrMh^ j T11e facade,s aligned directly on the frontage line.with[he "vet flow elevated to achieve some privacy for the win. lows This ryWbwnsdefor residential users wdtaarovr SHOPFRONT noas•s and apartment buildings.wthe nc easement may d necetaary a aocommod ve dth encroac eit stoop This / 'YW shay t>•interspersed with the ehoDfrnnr l FORECOURT The laude . trot back and huscred W a Mw wlel t the frontage fine. ,d foreman Mus vested a adingia fw par / denA vMitwl+r dropoHs.andworkshop�oadng and std ages k shOald be used ty.^nYr end In jxnrynction with // eM fhnpirpnt and stoop ND•a as a mmnuous blend wsN a Mmlrg and unsafe for pedestrians.Tres orrsoou l should overhang the vdeivelk s.vi[Mn DOORYARO :TOOP The ae sat beciifrom frontage Imo, an de voted garden or terropbetween.This NW can offaeuvsh j bsrNer r-s deniml quarters from the sidewalk,while romov inp the yard from public use.Tte Wreace,when roofed,a suitable for restaurants and cafes,as the eye level of the sit ter N Wel withof pass ? \ / TORCH ANDD FENCEE / / r bock subnankrally from the' porch.With— nc,oachirgi habitable rontagefine.Thepordh should be w•thin a conversational distance of the sidewalk A lance at rhe fro ntege 6"marts the boundary of the Ynd FOReCOURT FRONT LAWN The locod t is wt beck substantially from the frontage line The front Own this e.eet•e should M unlen tied end vistrs4 h continuous with adposent yards.The ideal is w sknulate ouddergs sitting in a twal landscape A front porchb usua4 h not appropriate.since no social interaction with the street.%possible as such a distance The large setback can / m time*found nbouWa boulevards traffic >D this type rs some- DOORYARO PORCH AND FENC[ j - FRONT LAWN Landscape Types GENERAL Theurban landscape�s a set of mtsraepand—I elements rho creates•comic led sense d piece. h includes the,- oughfaro type.CuWing type,frontage type,and the form sed disposition of landscape Public andauPi^g Wavematry roles above and to" nd Q p O,hot of ornaman4tion 1 To correct inedegw.c»s of spatial dition efincaused by buddng frontage,planting steedy rows of trees et the edges usually reduces the hetghFtowidth ratio of the srrsat spewn used.Grids of tress ato fill gaps left by un- built lots and surface parkins i Z.To adjust the microc:mste by providing the appropriate O levet of,[hada a con fes.6ueding.end sidrvalks For then ( Q Q oughlaras running eas/west this may involve the use of aeymm.vical planting 1/^�� Ord 3.To suppon the intended urban or rural character of the public space.Selecting appropriate specie,and varying VVV the specie planted as well as the regularity of their wspo- .tion,can cher the I—clacaps significandy. 4.To create a plessrng visual composition,teeing careful to mask the eas theiic failure of chain buildings as well as to reveal Ane succol Consider seasonal changes of seen species RURAL ROAD RESIDENTIAL ROAD 5.To cnxe a harmoniousydtola of spaoiRe character by coordinating public and private plantings,Selection should vary,to ensue nsistsne*to pests,but not result in an into _. heron[collection of specimen&Native species should pry ,t // domnae to reduce montenenee,with M emphasis on species that Wppon WICIfife compatible with human set- RURAL•I.mMC / RURAL ROAD Thai type�s appropriate for buWggs at the edges of the eiphborhood end along parts and graenbeha There is no public planting Ina.The p Tye treeeies should W sp-..de. but in coherent Nuveri There are no curb[IM drainage ' ———- -—————— —————— ai by open swat.Bayde paths may be paved n aephaft ___——— RESIDENTIAL ROAD This type is appropnete for house,outside of neighbor, i hood canter,Since the nonage may belly cite wide a cots ' stantial setback,the pes urnopy may he quid wadi The I neral aspect maybe supported by planting several species I n irnpiRect alignment Sdewalks may meander and boon ate side d the road only Roads are detailed with open 1 swalei and.when poseida.drainage is through Pircola- 1 •iOn f RESIDENTIAL STREET I • 1 T1116 type-s appropriate fur residenrul buildings st eign- I boyhood and town canters.Tries are in continuous Want- { / ng strips.tine*the sidewalk does not require unusual wish.Plant a single species of tree in steady alignment A thin,vertical canopy is nsoaeeary to ovo d nearby building RESIOENTIAL fTREET COMMERCIAL STREtT facilities This type is dmsnsionally interchangeable with :he commercialstreet type and may sho-ate in con- spondMw to the building laude Streets are detailed with •siesd se curbs and Nod storm drainage 1 1 1 1 COMMERCIAL STREET I t f 1 I 1 I 1 Thra type-s approu rri pryfor oomerc.al burWungi at neigh { f l f bodtood and town canters,Trees are confined by mdivldw 1 1 ( 1 al planting areae creating a aidew.lk of masanum uiiM1 wdh areas exomniodabrg street furniture.Plant a single species of vee in steady alignment Clear trunks and high unoprs we necessary to rnW interference with shop- _ front sgnage and awnings Sts, is are detailed with raised — curbs wrath closed storm drainage AVENUE rMT- The type n appropnat.for ppooches to civic butWings I I 1 I T>.genera{principle ai a thoroughfare cal limited IMgth. I I 1 1 with a substantial planted median At town centers,the 1 h I 1 nredis maybe wide enough q hold monumentsand even I ( 1 a buadrng,In refrdentul ares,the median may be Dimmed I 1 ( 1 naturalistically to trmms a parkway or green 1 1 1 1 BOULEVARD 1 1 I I 1 1 1 i Thai type ai eppropruta for hghcapacrty thoroughfares at 1 1 1 neighborhood edges The ds ing ai similar to that of s 1 1 1 { commercial street The effect of the medians is to seers- 1 I pato the slower trafric and parking activity.at the edge& 1 1 from through tnffie at the anter AVENUE OOULEVARD Thoroughfare Nomenclature 7 GENERAL �/. Thoaroghfales er•er•dowod with rwro onekyles.capac.ry l and chralme Cap"retire to the nwnhar of wArelaf /f �'✓�) ` that can n owe safely througrr a m prnent nreAin•given trine Nis physicals monifested by the number of Ones and thee wMu and by the n1 the P e radwf,Ch Cub radius. ane the peps Novation al tea pavement,Character voles to a fho'�Qhfmro'a swtabAryfor pedestrian s end avM,eOf building typal Chiarsc[erisphyslikallyfkWqAest• ad by ate thoroughfares associated building,frontage. and endseaw types and sidevgR width ,✓ '1 � � I foevMtanal peTiC ertpneernp grasses uW i.mts wch t se'eoYsctoi arq'wtwuK'which dr+ae seal capaa+y This is too srMPIiMc and[ends to cram to on arm ro ono t rt• rj �_. %asprtable for pedaevyns The foliow eg no cAmurs �+ i �.Y ewers edepuataly domortbes dta combination of ompmRv �,l �1 end ehaner nwrsw to es.es ter urbanism_ - ;A � NOMENCLATURE '•`� � HIGHWAY,. A konpdiaterca.ntadwm speed wehrcirw �'— conidar the twwrses on ooumry.A highway dmuid be 7 1 rsiwirNs It"of intaneetioriL drivrwWA sped a4aeent � l �1/ buildings:otherwrae it beonrrtes a No*whkdt with traffic flow. ,. EXPRESSWAY: A high spasdNowtay with rttorsaa li , tiensmp4esd by tirade seperwjpm. HIGHWAYS SOULEVAIMS PARKWAY;A highway dsagmedwops eartralme lana• r------ -- scadw$parsply soomm—odemed within a wide and wrtr r_ BOULEVARD.Ab*t aacias,ntedirm _ 1 is uvea hcusar ) - ottnidar that tretrertes M arhemiae0 area.11 4 uwaEy lined by penllal periling,wide sidiff"O A W side medians pts ntr ad wiper«sRutlamptundoff yinstheedger AVENUE. A dtorl-dwamme,nietGrn speed esmwna ® that srararra on urban wee LVAw•boulevard its osis rs maybe a* -1 a sine buK6nv a twsnurmrK ai avenue - � rnedtormisoN"warmiswetusfysknprtedagwn.fA• / latadtarm is aw die but do"ts�yt11ri" h/_ [ signed en shher side 6si!devoid d bttBdinga asoept at tM / 1 S,] S, 1 1' i terreinw l f DRlVE:AdriysdaRnrtlradM WlwaMt.n ut C r f . VVVIII mtwal eendipen, usuaRtr steep s wwaterfront. pand a waterfront. park or � � � ptireraMortr Dns side et ttlre iters h«eM urban eMrael er 4 wMh aidavwlk and bui6rgs.whJa the orf. L_V7 *Or=aitias o s par'Mrq,with neara4stie planar••p ij rl STREET A srrwtl& .4. pow speed weal owmecior t Soeeq Deride frontage for hiavdenaAy bufifga sttWi as I j now*wAssis A altrose.Mow.apartment bdimim end T wealiwbenndwacw.wideraisdmwb&dowddmi �--� WR weds sidewalks.pwMl PpearU%t06 tease it wadwidual oweVes olomw4we"and buikingeof riedanwhim mademaks ROAD:A ewta$eeala lee speed oomeww.Rise&pro. -_ __.�— weds IPerNega 10f law'daasRl btidinge vette•IlaaNae.A I mod Irk M be rwelit dye rvvith ogee awbs,spoor. fs 1*42padbamobwreus iUw41kL narrow al,curlmt and ` 1 bw7d*Ya vee wsAl baalt The nn.k road h.s no ewM arid sea fhad ty PWVWWL irregular'r«planuna.and un000rd� j �� � 'yy r eared 6uidkp Mtbadta i'� ., � 0 (/ ALLEY:A narrow access route aernp the ed ar burette mo an a street Alleys hew sea sidewalks.landscoomM at buildltg Ntbadta.Alloys are used by trucks and mum ac r cwmlee"o dumPows They are usually paved to their r , •' ! adgss,widt center dreina a via an irrwned cr.— LANE- ® 1 g LAe* A narrow chmoccess loop h a mar hawses on•road. f i iU Lane*ire rural in chracrar.with a narrow stop be paving � at the peter or no parrnp.While Owes may not M necae• 1 1 i eery walls Iront-loaded garages.fty we still useful for ao- 1 owwm o"mo ut ly runs.enhenging the p wavy of•eor 1 'L Yards,and providing day weas for children PASSAGE:A very narrow pedesarartortyeonnaetorctef! I { . deg betw«n bui4&tps ►.aeagea Davide sktorteeu ' through long Meeks or connect raw panting erase with abaethontapse.PsMapeamW 6eraoNdawersnd feeds %�. I i Mapftonta PATH:A very narrow pedsetrien and taisyeN connector erowerehp a perk or the open omwwy. Paths should ROAD$.LANES.PATH$ unerys from the sidewak rtaremork BKycle puham nso- STREETS,ALLEY$.PA$$ACEa MMY atoag Nghw aq btlt see not mw-*W to supplement bouWwards,streets,and roads,vyk+ate dower traWm allows MORE RURAL sMmo of the Vehicular lanes, MORE URRAN~��� Thoroughfare Types GENERAL Capac+ry nd fJteractw we pom0•..aA enn edlutud eo aNtune a owltpNle awes of Wahl thorouphlare types The swims w bat m9wded r ps-Leepsp the rQhI-I way wsRh consunt,eseh P&iustrstea ons type sut, sbloM twowgm onefw arelwtiNy nral cont end— ' i othw swa0l/for a more urban coadi ro 2LA►ES 2LIwF5 P LLANESL?p P 11"EVARO HIGHWAY 2wMP" DESIGN SPEED^ >5d6 MM1' L "�'-- V go IT MIN.CENTERLINE RADIUS 1664M FT r 'V • s 3tMPl s a 20' 2f a 2O'MI1 2r vARlrs 24' mMK twII0W 16FT CURB RETURN RADMS SS FT IWPA LR0W BOULINARD 90WC PEDESTRIAN CROSS TIME N/A _ 141ONWAY ALWAYS ONFSTREET PARKING NEVER R2.0 0 — DRAINAGE OPEN MAN STREET AV ZNM P 2LANES► 2016 MPH DESIGN SPEED 2535 WN2P t L P f 90FT MIN.CENTFRLNERADM6 I"FT 4t L ___J� 16 fT CURB RETURN RADIUS 25 FE w d0'ML 20r 12 EEC PEDESTRIAN CROSS TVA 1S SEC IF 70r 10' 20r w 6b'MNPIOWSD'ROW ALWAYS ON4TREETPARKING ALWAYS! MAN f6Tng= A V W1K CLOSED ORANAGE I OPEW I105M STREET ROAD ► 2LANES► M26 MPH DESIGN SPEED "WIN 2 SGPT MIN.CEMFRLI EERAORl6 165 IT IS" CURB RETURN RADIUS 26 Fr T'T"T� TT 10' 4f7 a 12SEC PEDESTRIAN CROSS TWA 6 5 SEC v sr 32' w S wFlow ALWAYS ON-STREEfPARKINO USUALLY* WROW STRSitT CLOSED DRAINAGE OP6W ROAD CLOSM MRJOR STREET RURAL ROAD 20.26 MFH DESIGN SPEW 2636 MPH ►uN2E5► w 6o PT MIN.CENTERLINE RADMJ{ 166 Ff I 2LANES 1 16 FT CURB RETURN RAO" 20 FT 6 6 SEC PEDESTRIAN CROSS TIME 13 SEC 44 � -4- b' w 10< ALWAYS' ONFSTTEETPAWING NEViR S is ir'MN is wRDW — S0'RIDw CLOSED DRANMGE OItPI MINORtIT11Qf - - ._..__ RNRALMAD ALLEY LAW WA T DESKSKM WA WA a CURE CENTERLINE RADIUS 5 FT M TLNW RADIUS 20 0 FF SEC FEDESTTUAX CROSS TIME 7.6 SEC^ x.illow USUALLY' OWST$WFARING USUALLY ao9R� DRAINAGE om rc- twRCw ALLY LARi ►ANAM MATH WA DESIGN SPEED WA WA MN CENTERLINE RADMS 60 R WA CUM RETURNSS TV S R d 5 SEC PEDESTRIAN CROSS TIRE 1.5 SEC lib" OKSTREET MRKINO NEVdt f 12'ROW g ROW PASSA" CLOSEDDRANAG6 OFEN ►ATH Na MORE URBAN ' t nrpsd MORC RURAL Transit Oriented Development Concepts INTRODUCTION 1"Ise ...ghbohood dry lopm..t JTWO)orb 'a,"produces compact.mixed-ves,pedestrian fineridiv communities If can be ftecifirporremd A munic-pial zlonStq crrdino.ces"0n owdsy or as a sopiweto diowt.It is in, PImL ended to an..,*the folk—g co-siii,ioris Track alneiGhbodiocidis share the foi1owngchsrwto(v* F-0 -1 CIVIC hes C00,04EFICIAL % 1.The neighborhoods was,is limited to-him can be we- seemed Ina 10-minute walk HIGHFIF-SO)VIMAL 2 ReffidencoiL shops.wootoloces,wW cMc boldogs are "radio close prolumov- I A hierarchy at strosts serves the podestinan and the So- EcInnobile equitably Plivsca0v defined swsmv and paft prxrvsde places for W0WPLACg \\r"I' formal soc*&vnnry and recreation. S linfietv,bu,kl-gs for- a --fear edge,dolme"ng the Ormst specri 6 Chic buildings reinforce the identify of the neighbor- hood.providing places of assoffibAv for social cultuiet and roligoori activities. Traditional novhbohoods pursue certain Social objao Was: I To prwds the siderty and the youngwith,ndeprfricferve of m<nmm*nt by locating most daily sonrities virkwo distance 2 To mirfl us fleffic congestion and limit food construc- tion by mclucing the number and length of automobile trips 3 To trualto public transit a notgo altomativor to the outorno- bile by organizing appropriate bu"ng donsAtiss 4 To help citizens come to know each other and to watch such @a firmals and squads S.To integrate age and*c ofrnic classes and form the Al bonds of On authentic community by providing a full range of hoe sing types and virowtpJaces 6 To encourage communal wostmes and support the bal- anced evolution of Society by picnxiling suitable c4fir. b"Adinge SPECIAL DEFINITIONS • TO,usad in a TND onclin..0 may differ in-waning from ,he.-*in—etitional zoning oirdinsirices, ARTISANAL USE Premises used for the manufacture and "Is of hams that am made employing only ha.dw-t and/of tablemounted electrical tools and creattnq no ad. vend impoct,=d its lot BLOCK:The 490"to of lots and alloys circurnwbed by o,iblic use vaim 0"reer amets 13ULDING HEIGHT.,The height measured.fiwies Attics I F-1[771 and raisebasainventedo not count against building height imitations. CITIZENS ASSOCIATIM The orqwrficrshof+of rwrion of .ors and buildings associated under articles The wtic4s TND LAND ALLOCATION shall reference On approved master plan.set slamdardsfor c,widi-ti;4ocletw.ocifistructon.and rnaintor,once:prowls for m&mt*nonc4 on public tract&and proirode,for the con- sq It per 4walkng,or'300*q It whichavat,is greater as by mwo than user,resujt�q in a 26%reduction of r1mcnon of new onric buildings by an ongo-ng iooc.al as tin required Spaces sassmonl WICH"HOOO PROPER.The buM-jp area of a TNID,w, cludma blocks.streets.and squares but excluding grow SQUARE-A public tract""IV defined by surrounding FACADE The building w*4 parallel to a fmr,rag*.,a -40- b-ldmgs.with frornaga,on gfroato on&I fossil two SKUs. fxrmmarctal uses shall be permitted an all suff"nifing FRONTAGE LINE The lot One that orrincv,joi with a street OUTBUILDING A separate building,ofickisinal to a pnfncr I.!& ,,set pal Wid-ng•ocintiguoos with the maw lot fine,having or mon two stories and a maximum hobtablif Awes*1460 Of; STORY A habitable lo"l-thn a building no more then Is GREEN EDGE.A continuous open area surrounding rho It.Outbu4clic"may be residential rotad units.Ovtbu46 it�n height from floor to coding, 14-Ghboftlood proper,The art@ than be Dissolved in Qmr- mgs Sri*exempt from buildlinji;coiner,rosinctrons w unit VefLfity SO&MS1UfSI S1Q&Poll OOUM,Of Qownfil of playwtQ counts STREET LAMPS-A bgN slairiclard between 10 and!0 It in fields.or R shall be subdivided Mtn house Mrs no wnAlMr -.vht*quppedvvkh an wworidscorit or motathelide light Iron 20 6r1O1.61h. PARK A public tract fraturairstamliv WirtchicapeA not more -uCd than 10%paved,and surrounded by late on no more then LIMITED LODGING: Residential promises p,*,,.di,,g no soillifflaspatimatin. STREET TREE:A deeduciiiatree thelt rostoce mat pressure n,offs rho.sigh,-00111 for'horl-tarm Writing and food so, PROHMMO USES Uses not permitted in the standard and is of proven visbie*,in"region with no it"than 4- ."a before—only lonov wdifrancxt.as was as automatic food.drioll.mod in caliper and$41 clear tnA*of the brine of planting LIMITED OFFICE Residential promises used fir business newspaper vending machines and any ociminercuil use STREETVISM ThavOiniff,fronjodbylbuddlinli*I&.&term- or professional servicat ampkr#vVno more itian four lulF that encourages potions to amain in their Mulomobaes notion of the axis of a thoroughfare. firroo employees one of whom must be the.w"W whila'*comeig goods or sorvicas(except sonime staficinsl- TRACT'A Separately plartaid genion of land held in cam LOT,A sept/crony plativid rvorfMn of land haki pwaiah, SHARED PARKING A pwk,ng place where day/night air mon.such#*a thirefoughforo,a square,or a perk vineakdair/hohday ethsdurlrf%allow the of*of parbrig Spec, MEETIN(j HAL L A building closignod W p,,biw assornfitv. :*Ala-r,g at Wali odaoorn with or,area artuaaWnl ro 10 GUIDEL)NES FOR TRADITIONAL NE:IGHBORH000 DESIGN LAND USE LAND ALLOCATION LOTS AND BUILDINGS Y STREETS AND PARKING AI.GEhERAL (s)The TNO shell be eved. 61.GENERAL(a)$imilw land use categoras l Cl GENERAL(e)Altbta share front*""with 01 GENERAL '&I All streets terminate at other , able as an ohrarlev option Iw land dev4 face woes streets:dissimilar categories astreet or square. (b)The main entrances of streets.(b)Sties prghts are provided along as - opnent in all land use and toning abut at tear lot lines. (b)The averega pe- all buildings accept outbuildings are on a thoroughfares at 3S.to 60-ft intervals. (c.) eategoriasexcept mduetral (b)A TWO rimeter of all blocks within this neighbor- street or square.($)Stoops,open colonnades On-street parking is allowed on all local raouxes s minimum parcel of 40 contig- hood does not exceed 1300 It.For block and open porches mW enccfath into the front streets.(d)Parking lotsarc located behind w uous stns and a maximum of 200 faros longer than Sib ft,an allay or pedow setback (d)The sides of budding$at comer beside WV4ng facades.(a)Parking lots and ores.Larger pwc*W sham W developed Man path Provides through occas lots are similar to then fronts - garages are not ediacent to street tntwsec- as mukipletssiphbwhoods with each w done.club use lots.or squares and do not o0 ckiduaay subiaes is the provisions of 1 $inlay Iota that terminate a visa. M Shared the TND. Parking reduces local parking refou"mants. A2.Pl1BUC- (a)Includes streets.squares. 82.PLALIC:(N A minimum of 6%of the neigh- CLPL LIC (a)balconies and open colonnaJes 02.I0IJOI.IC:(a)Parking shared between public parks,playgrounds.and the like.(b)Civ- boyhood was or 3 acres(wh Khever is we permitted to encroach up to S flint*thor- and whale uses is sefcouragad rc use lots may be placed wnhtn tracts grater)is permanently allocated to public nughfares and other tracts S—h encroach- devgnated for public use. (c)Largo- use. (b)Each neighborhood xntmn$of ments shall be protected W si—r+nenta scale recreational uses such as golf least one square,not feta than one acre In courses. sehoogrsrdo. and multiple site,dose to the center.Ic)No portion of game fields are bated only of the edge the neighborhood is mom than 2000 h tel the neighborhood from the squen. (d)At leem Koff the pa- rimeter of squares,parks and waterfronts face streets. (e)At loam a quarter of the perimeter of waterfronts. poll courtaL gnenbeha. and other natural amenities lap strap Al CMC (a)Conlanscom unitybukf 83-CNE:(a)Amhnenumof2%of the neigh- MOVLC(a)Cwdcbuddingshave noheViaorSaa 03.CMC:(s)Themsjaity11tN1)ofboNMrwt ngs such as meeting halls, libraries. borhood aree is reserved for civic use.(til back limitations. oaf M for civio structure is behind the post offices.schows.child care contain Civic late are within or adjacent to purse btamwloa zlubhouse& religious budd.ngs. recta- and Parks or on a lot terminating a sweet atlonal facilities,museum&cultural so- vista. (c)Each neighborhood has a mini :roues. visual and Performance arts mum of one moving hall and one child buildings,municipal buildings,and the pin facility. like A4.COMMERCIAL.: (a)Contains buddings 84.COMMERCIAL(a)A minimum of 2%and •C4 COMMERCIAL(a)Buildings gra built out to a 04 COMMERCIAL• (a) Lob front streets no pnmariy for business use&such as re- o mommum of 30%or the neighborhood i minimum of Will,of their fmnuge at the front- more than four lanes vide.parasol parking ,ad.entertainment.restaurant,cl•hb.o(- ansa rsdeshgnatedfor commercial use (b) age line. (b)Buildings have�c rsquired set- and sidewalks minimum 15 It wide.(bi Roar ',ca. nsdentiol, kbdgng. an{anal, Commercial lots have a maximum front- I back from the side lot lines. (c,8uritfngs iso lot Ines caneide with an allay. (e)Streets —d.cal,vin (b)At lean 26%of the ege of 32 If (c)A maximum of four tib not exceed fwr stomas in height and we no have curbs vines a radius at intersections of 5 w.W,ng gra n designated for resident• may be consolidated to construct a single lose Man two stones in height Whon fronting i to IS k(d)Street trees are aligned an both -•vl use iwrlding a square,bwldxhge see no leu than three sto- sides of the street at 35.to 5041:rim eels. nes in Might (d)6.4ding coh•e'age does not when open colonnades ars pmvnded, no exceed 70%of the lot area. street trees are necessary.iv The mefomy (76%)of the off�treet puk;ng is behind the buildings AS HIGH RESIDENTIAL(a)CoMansbulb IM HIGHRESMENML (a)Amnanumof CS HIGH RESIOEWTIAL•(a)6uidngeanoWOout 06 MGH RESIDENTIALt(a)Lots bontaureate tq nos for residential use,landed offrp 20%and a maximum of W%of the nefg& to a minimum of 70%of their frontage,at a mon than three tones wide.with parasol use,cafes.retail.lodging and artisans! borhotsd area n hsrgrated for high res► continuous elrgnrnant no further then 10 h perking and sidewalks minimum 1S h wide uses.(b)AN or the buRdng area Wove dental use.lb)High residennal Mb haw a Iron the frontage&ne (b)8u4Ahngs haw no (b)Street trees are aligned both odes of the ground now m designated for rasi maximum frontage of 16 h (c)A maxim requred setback from ode lot'i is (c)8u46 I streets at 35-to Sort ntervata (c)Rear lot dentist use.(c)Outbuildings gra permit- mum of eight curs may be consoi-dated for sings do not exoaad four mores n Might and. 4fnee coincide with an alley ?d)All off-street bed the purpose of const--ting•single txild- when fronting a t w—.are no less than three paling is beh-ted who bwld,ng& Ino containing one of More residential stories in heigi-L ;d)Building coverage does units not exceed SO%of the lot nee A6 LOW RESIDENTOL M Contains build- 86 LOW RESIDENTIAL (a)A ma- um of C6 LOW RESIOENTIAL-(a)Bu4dngs are bust out D6 LOW RESIDENTIAL (al Las front roads no ngs for residential uses irKkading art 60%of the neighborhood area is destgnat- i to amnrmurn of 40%o(therr frontage at a con mon than two lanes—Iff wnh optional par scudo&rimmed offices.limited lodging, od forlow—dennal use (b1 Lints haws unuous algnmrint ni further Khan 30 If from east parking and sidewalks minimum 6 n and The hate (b)All of the bu46ng was maximum frontage of 64 h. (c)A mui the frontage Pane ,bl Side Both—is re no less wills. (b)Street trees are installed on both above the ground flow a designated for mum of two bb may be conwidatad lot ?vin 10 h an aggnsgoto and may be allocated aides of the$treat at no more Nan 5041 ntw- residential use.(e)Outbuildings are pan the purpose M consinueting a sngM build- to one side Buiidinos are set bwk no less than vale (t)Rea lot Ines may coeschde with an mrtted no 20 It from the mar lot line Outbuildings have alley-id)All ad-strew parking.s to the side sir no required setback (c)Butlorngs do not fire. rear of the budding Whore accesses through cried three stones in height.(d)Bufldinq coven dse frontage,garages or rarporb are located ape does not exceed 50%of the lot areaa minimum of 20 It behind the facade A7 WORKPLACE fel Contain$brldngsfom 87 WORKPLACE (o)AmmimumoI2%ands 'C7 WORKPLACE. (a)8uddings are butlt out to a 07 WORKPLACE ;&)Lots front streets as wide uses such as corporate offitce light int► maximum of 30%of the neighborhood 1 minimum of 70%of Nair frontage at aeontim as necessary to accommodate truck traffic dushry.wrisenal warehtxnhng automa was is desgnated for workplace use. (b) imus alignment no further than 10 h from 1h- (b)Street trees we ahigmd on both sides of tive,and the Eke Lou have a maximum frontage of 64 ft frontage line. ;bl guhldi gs have no setback* the street at 35 to SO4i ntwvsk(c)Racer lot (c)A maximum of four lots may be consoi i from side or ter lot Ines Ie)Buildings do trot Ines coincide with an alley (d)AN off-street tooted for the purpose of constructing a -coed three stories n height (d)Building peAing is to the side or rear of tie building sego building owarage does not ex*eod 7016 of the lot area- le)Lots are seorated from other use types at tM side and mar lot linea by a all of between 3 and 8 ft hroh OTHER IDEAS: •Standard subdivision only allowed for projects meeting minimum density. All other projects must go through a PD process. This provides the much needed incentive to direct projects to the PD review, while still allowing an owner to pursue an administrative approval. This also balances the higher density impacts with a higher degree of oversight. Lower density projects have not been as controversial, and are generally less impacting on natural resources and adjoining neighbors. • Purpose validation: The developer/applicant should address how their project achieved the following principles: Housing stock diversity? Architectural Detail and Diversity? Pedestrian Amenities? Improved Public Safety? Accommodates Children and/or seniors? Sustainable Development? Preservation of significant natural resources? Integration with the existing neighborhood? Project Photo Album (in progress) This is where, as other projects are identified by the commission, they are added to the portfolio. This should include plat maps if available, and specific photos of innovative design principles. These are samples of developments that are" ood" I i r iiir` j . {' =�_ l 1 Ilk ct i r I r � I Ommittee Name ;D1) (WL &U40 �05- VOLUNTEER SIGN-IN SHEET Date Volunteer Name HOURS Comments SA o -z16-o M R1C1400 1D �.. o! r c - E WE Rs FO _lsusank\smarttr.doc • Completeness Review for Boards, • � r Commissions and Committee Records CITY OF TIGARD Planned Unit Development Committee Name of Board. Commission or Committee November 2005-NO MEETING Date of Meeting No meeting records available. The assumption is no meeting took place during this month. I have confirmed with Downtown Redevelopment Project Manager Sean Farrelly that there were several months when the committee did not meet. C.L.Wiley Print Name Signature 1/30/2013 Date CITY OF TIGARD OREGON — COMMUNITY DEVELOPMENT — CURRENT PLANNING DIVISION umn PLANNED DEVELOPMENT REVIEW COMMITTEE MEETING . MMECNESDAY - NOVEMBER 16, 200 7:00 - 9:00 PM iG .RD PERMIT CENTER CONFERENCE RO 1. ROLL CALL 2. DISCUSSION: PROPOSED CODE CHANGES Review/discussion of staff analysis of Option as satisfying (or not satisfying)the PD Committees' goals dated 5-4-05 Review/discussion of Option 2 revisions to move Planned Development Overlay Zone approval to the end of the PD process J. ADDITIONAL AGENDA ITEMS Choose a method of making a recommendation to the City Council (majority/minority reports, staff recommendations,or?) Choose a date for the next PD Committee meeting (decision time) 14. ADJOURNMENT x Page 1 of 1