Resolution No. 02-06 CITY OF TIGARD, OREGON
RESOLUTION NO. 02- CAL
A RESOLUTION ADOPTING A CITYWIDE FEES AND CHARGES SCHEDULE AND APPROVE
ANNUAL PARD SYSTEM DEVELOPMENT CHARGE ADJUSTMENT,
WHEREAS, Tigard Municipal Code (TMC) 3.32.050 requires that City Council review fees and charges
annually; and
WHEREAS, the Tigard Council adopted Ordinance No. 02-_removing references to fees and charges that
had been cited in several sections of the TMC; and
WHEREAS, the City Council desires to streamline the review process; and
WHEREAS, City staff has compiled a citywide fees and charges schedule; and
WHEREAS,the Park System Development Charge shall be adjusted annually on January 1't.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION I The fees and charges for the City of Tigard are enumerated in the attached schedule
(Exhibit A).
SECTION 2 This resolution is effective February 7, 2002.
1 �al
PASSED: This day of 2002.
4 AA A I& I
yor-City ofigar
ATTEST:
City Recorder- City of Tigard
RESOLUTION NO. 02-C(r)
Pagel
EXHIBIT A
CITY OF TIGARD
FEES AND CHARGES SCHEDULE
JANUARY 2002
EXHIBIT A
TABLE OF CONTENTS
CITYWIDE......................................................................................................................................................................................................1
Audiotapes..................................................................................................................................................................................................1
Computerdisk or Compact disk....................................................................................................................................................................1
Faxes .........................................................................................................................................................................................................1
Photocopies ................................................................................................................................................................................................1
ResearchFee..............................................................................................................................................................................................1
CITYADMINISTRATION................................................................................................................................................................................2
AmplifiedSound Event Permit......................................................................................................................................................................2
ClaimsApplication Fee.................................................................................................................................................................................2
CompleteCode (Titles 1-18).........................................................................................................................................................................2
PublicAssembly..........................................................................................................................................................................................2
TigardMunicipal Code (Titles 1-17)...............................................................................................................................................................2
COMMUNITYDEVELOPMENT.......................................................................................................................................................................3
Building—Tigard & Urban Services
BuildingPermit Fees ................................................................................................................................................................................3
BuildingPlan Review Fee.........................................................................................................................................................................3
ElectricalFees .........................................................................................................................................................................................4
ErosionControl Permit Fee.......................................................................................................................................................................5
ErosionControl Plan Check Fee...............................................................................................................................................................5
Feein Lieu of Sewer.................................................................................................................................................................................5
FireLife Safety Plan Review.....................................................................................................................................................................5
MechanicalFees......................................................................................................................................................................................5
MechanicalPermit Fees ...........................................................................................................................................................................7
PlumbingFees.........................................................................................................................................................................................7
RestrictedEnergy.....................................................................................................................................................................................9
SanitarySewer Connection Fee................................................................................................................................................................9
SanitarySewer Inspection Fee..................................................................................................................................................................9
TreeReplacement Fee.............................................................................................................................................................................9
WaterQuality Facility Fee.........................................................................................................................................................................9
WaterQuantity Facility Fee.......................................................................................................................................................................9
MiscellaneousFees................................................................................................................................................................................10
i
EXHIBIT A
Planning —Tigard
AccessoryResidential Units....................................................................................................................................................................11
Annexation............................................................................................................................................................................................11
Appeal...................................................................................................................................................................................................11
ApprovalExtension ................................................................................................................................................................................11
BlastingPermit.......................................................................................................................................................................................11
ConditionalUse (CUP)...........................................................................................................................................................................11
Design Evaluation Team (DET) Recommendation (deposit)......................................................................................................................11
DevelopmentCode Provision Review......................................................................................................................................................11
ExpeditedReview..................................................................................................................................................................................11
HearingPostponement...........................................................................................................................................................................11
HistoricOverlay/Review District (HD).......................................................................................................................................................12
HomeOccupation Permit (HOP).............................................................................................................................................................12
Interpretation of the Community Development Code.................................................................................................................................12
JointApplication Planning Fee ................................................................................................................................................................12
LandPartition (MLP)...............................................................................................................................................................................12
LotLine Adjustment (MIS).......................................................................................................................................................................12
MinorModification to Approved Plan........................................................................................................................................................12
Non-Conforming Use Confirmation..........................................................................................................................................................12
PlannedDevelopment (PD).....................................................................................................................................................................12
Pre-Application Conference....................................................................................................................................................................12
SensitiveLands Review (SLR)................................................................................................................................................................13
SignPermit............................................................................................................................................................................................13
SiteDevelopment Review (SDR).............................................................................................................................................................13
Subdivision (SUB)..................................................................................................................................................................................13
TemporaryUse (TUP)............................................................................................................................................................................13
TreeRemoval........................................................................................................................................................................................13
Vacation................................................................................................................................................................................................14
Variance/Adjustment ..............................................................................................................................................................................14
WaterResource Overlay (WR)................................................................................................................................................................15
Zoning Map/Text Amendment (CPA/ZOA/ZON).......................................................................................................................................15
ZoningAnalysis (Detailed)......................................................................................................................................................................15
ZoningInquiry Letter(Simple).................................................................................................................................................................15
Planning— Urban Services
AccessoryResidential Unit.....................................................................................................................................................................15
Appeals.................................................................................................................................................................................................15
ApprovalExtension ................................................................................................................................................................................15
BlastingPermit.......................................................................................................................................................................................15
ConditionalUse (CUP)...........................................................................................................................................................................15
DevelopmentCode Provision Review......................................................................................................................................................16
ii
EXHIBIT A
ExpeditedReview..................................................................................................................................................................................16
HearingPostponement...........................................................................................................................................................................16
HistoricOverlay/Review District (HD).......................................................................................................................................................16
HomeOccupation Permit (HOP).............................................................................................................................................................16
Interpretation of the Community Development Code.................................................................................................................................16
JointApplication Planning Fee ................................................................................................................................................................16
LandPartition (MLP)...............................................................................................................................................................................16
LotLine Adjustment (MIS).......................................................................................................................................................................16
MinorModification to Approved Plan........................................................................................................................................................17
Natural Resource Designation (Surcharge)..............................................................................................................................................17
Non-Conforming Use..............................................................................................................................................................................17
PlannedDevelopment (PD).....................................................................................................................................................................17
Pre-Application Conference....................................................................................................................................................................17
SensitiveLands Review (SLR)................................................................................................................................................................17
SignCode Exception (SCE)....................................................................................................................................................................17
SignPermit (SGN)..................................................................................................................................................................................17
SiteDevelopment Review (SDR).............................................................................................................................................................17
Subdivision (SUB)..................................................................................................................................................................................19
TemporaryUse (TUP)............................................................................................................................................................................19
TreeRemoval........................................................................................................................................................................................19
Vacation................................................................................................................................................................................................20
Variance/Adjustment ..............................................................................................................................................................................20
WaterResource Overlay (WR)................................................................................................................................................................21
ZoningAnalysis (Detailed)......................................................................................................................................................................21
ZoningInquiry Letter(Simple).................................................................................................................................................................21
Community Development- Miscellaneous Fees & Charges..........................................................................................................................21
ENGINEERING.............................................................................................................................................................................................24
Engineering Fees—Tigard
AddressingAssignment Fee...................................................................................................................................................................24
ComplianceAgreement Permit (CAP) Fee...............................................................................................................................................24
Engineering Public Improvement Design Standards .................................................................................................................................24
Feein Lieu of Undergrounding................................................................................................................................................................24
LocalImprovement District Assessments ................................................................................................................................................24
ReimbursementDistrict Application Fee...................................................................................................................................................24
ReimbursementDistrict Fee....................................................................................................................................................................24
StreetOpening Permit............................................................................................................................................................................25
StreetlightEnergy & Maintenance Fee.....................................................................................................................................................25
Traffic/Pedestrian Signs..........................................................................................................................................................................25
TrafficControl Devices ...........................................................................................................................................................................25
iii
EXHIBIT
EnghneehngFeea— UrbanSemicea
AddressingAssignment Fee...................................................................................................................................................................25
ComplianceAgreement Permit (C�\P) Fee...............................................................................................................................................25
StreetOpening Permit............................................................................................................................................................................20
FINANCE.....................................................................................................................................................................................................27
AssessmentAssumption............................................................................................................................................................................27
Budget Document ------------------------------------------------------------27
BusinessTax.............................................................................................................................................................................................27
ComprehensiveAnnual Financial Report.....................................................................................................................................................28
FranchiseFee...........................................................................................................................................................................................28
LienSearch Fee........................................................................................................................................................................................28
Meeting Room Reservation Fees & Deposit................................................................................................................................................28
MunicipalCourt Fees.................................................................................................................................................................................20
RecordsFees............................................................................................................................................................................................30
ReturnedCheck Fee..................................................................................................................................................................................30
SolidWaste Compactor Permit...................................................................................................................................................................30
LIBRARY.....................................................................................................................................................................................................31
Disk (Bbmk ...............................................................................................................................................................................................31
LostItems.................................................................................................................................................................................................31
OverdueItems (4on-vdeo)........................................................................................................................................................................31
OverdueItems (Video)...............................................................................................................................................................................31
PublicCopier Charges...............................................................................................................................................................................31
POLICE.......................................................................................................................................................................................................32
AlarmPermits............................................................................................................................................................................................32
BicycleLicense.........................................................................................................................................................................................32
LiquorLicense...........................................................................................................................................................................................32
PoliceServices Fees .................................................................................................................................................................................32
PropertyForfeiture for Criminal Activity.......................................................................................................................................................32
Second Hand Dealers and Transient Merchant License...............................................................................................................................32
VehicleRelease Fee..................................................................................................................................................................................32
PUBLICWORKS..........................................................................................................................................................................................33
CityofDurham Contracting ........................................................................................................................................................................33
EncroachmentPermit................................................................................................................................................................................33
EXHIBIT A
PUBLICWORKS -WATER...........................................................................................................................................................................34
BoosterPump Charge................................................................................................................................................................................34
CustomerCharge ......................................................................................................................................................................................34
Fire Hydrant and Meter Usage— Illegal Usage.............................................................................................................................................34
FireHydrant Usage— Temporary................................................................................................................................................................34
FireRates (Sprinklers)...............................................................................................................................................................................34
FireService Connection.............................................................................................................................................................................34
MeterDisconnection..................................................................................................................................................................................34
MeterInstallation Fees...............................................................................................................................................................................34
SanitarySewer Service..............................................................................................................................................................................35
Stormand Surface Water...........................................................................................................................................................................35
Water Disconnection Charge for Non-payment............................................................................................................................................35
WaterLine Construction — New Development..............................................................................................................................................35
WaterUsage Charges................................................................................................................................................................................35
SYSTEM DEVELOPMENT CHARGE............................................................................................................................................................36
ParkSDC..................................................................................................................................................................................................36
TrafficImpact Fee......................................................................................................................................................................................38
WaterSDC................................................................................................................................................................................................39
APPENDIX...................................................................................................................................................................................................40
Methodologyto Calculate Park SDC...........................................................................................................................................................40
Methodology to Calculate Traffic Impact Fee...............................................................................................................................................42
Methodologyto Calculate Water SDC.........................................................................................................................................................44
v
City cf Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
CITYWIDE
Audiotapes $7.00 02/07/2002
Computer disk or Compsct disk 5.00 02/07/2002
Faxes 5.00 for first page and 1.00 2001
per page thereafter
Photocopies up to 11 x 17 0.25/page 02/07/2002
Research Fee Staff cost plus materials 02/07/2002
1
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Scurce Fee or Charge Effective Date
CITY ADMINISTRATION
Amplified Sound Event Permit $0.0c 05/11/1981
Claims Application Fee 1,000.00/depos1* 11/28/2000
*Application fee shall be actual cost incurred by the City to process application. Any funds
remaining from the deposit after the application has been processed will be rEfunded
to the applicant, and applicant shall be responsible for any additional costs incurred.
Complete Code(Titles 1 - 18) 75.00 02/07/2002
Putlic Assembly 08/25/1970
Application Fee
Persons Reasonably Anticipated
1,000 to 2,499 100.00
2,500 to 4,999 150.00
5,000 to 9,999 500.00
10,000 to 49,999 1,000.00
50,000 and over 1,500.00
Tigard Municipal Code (Titles 1 - 17) 50.00 02/07/2002
2
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-BUILDING -Tigard & Urban Services Area
Building Permit Fees 09/26/2000-
(Commercial,
9/26/2000(Commercial, Multi-family and Single-family) 05/13/1997
Total Valuation:
$1 -2,000 Minimum $62,50
2,001 -25,000 $62.50 for the first$2,000 and $9.60
for each additional $1,000 or fraction
thereof, to and including $25,000.
25,001 - 50,000 $283.30 for the first $25,000 and $7.50
for each additional $1,000 or fraction
thereof, to and including$50,000.
50,C01 - 100.000 $470.80 for the first$50,000 and $5.47
for each additional $1,000 or fraction
thereof, to and including $100,000.
100,001-250,000 $744.30 for the first$100,000 and $3.90
for each additional $1,000 or fraction
thereof, to and including $100,000.
250,001 -600,000 $1,329.30 for the first$250,000 and $3.85
for each additional $1,000 or fraction
thereof, to and including $600,000.
600,001 - 1,200,000 $2,676.80 for the first$600,000 and $3.51
for each additional $1,000 or fraction
thereof, to and including $1,200,000.
1,200,001 -2,000,000 $4,782.80 for the first$1,200,000 and$2.72
for each additional $1,000 or fraction
thereof, to and including $2,000,000.
2,000,001 and up $6,966,80 for the first$2,000,000 and $2.72
for each additional $1,000 or fraction thereof
Building Plan ReVew Fee 65%of base building permit fee 1)9/26/2000
05/13/1997*
*Urban Services Area to have
same fees as Tigard
3
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Electrical Fees 06/27/2000
New residential, singie or multi-family per dwelling unit; service included:
1000 square feet or less 145.15
Each additional 500 square
feet or portion thereof 33.40
Limited energy 75.00
Each manufactured home or
modular dwelling service or
feeder 90.9C
Services or feeders; installation, alterations or relocation:
200 amps or less 80.3C
201 amps to 400 amps 106.85
401 amps to 600 amps 160.6C
601 amps to 1000 amps 240.60
Over'000 amps or volts 454.65
Reconnect only 66.85
Temporary services or feeders installaton, alteration or relocation:
200 amps or less 66.85
201 amps to 4C0 amps 100.30
401 apps to 600 amps 133.75
Over 600 amps to 100 volts (see 2 above)
Branch circuits; new, alteration or extension per panel:
With purchase of service or
feeder-each branch circuit 6.65
Without purchase of service
orfeeder
First Branch Circuit 46.58
Each addit. Branch circuit 6.65
Miscellaneous (service or feeder not incl.rded):
Each pimp or irrigation circuit 53.40
Each sign or outline lighting 53.40
Signal circuit(s)or a limited
energy panel,alteration or
extension 75.00
4
City Df Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Each additional inspection over
the allowable in any of the
above (min 1 hr)
Per Inspection 62.53
Per Hour 62.5D
Industrial Plart Inspection 73.75/hr (rrin 1 hour)
Elect-ical permit plan review fee 25% of the elec*rical permit fee
Erosion Control Permit Fee 06/06/2000
(City receives none of this fee)
Less than 50,000.00 26.00
50,000.00 to 100,000.00 40.00
More than 100,000.00 40.00 +24.00 fcr each additional 100,000.00
orfra;tion thereof
Erosion Control Plan Check Fee 65% of inspecticn fee 06/06/2000
(City receives 50% of fee)
Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998
(Commercial Only) if sewer was available
Fire Life Safety Plan Review 40% of base building permit fee 09/26/2000
(Commercial Only) 05/13/1997*
*Urban Services Area to have
same fees as Tigard
Mechanical Fees 06/27/2000
Description:
Furnace to 100,000 BTU including
ducts&vents 14.00
Furnace to 100,000 BTU+ including
ducts &vents 17.90
Floor Furnace including vent 14.00
5
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Suspended heater,wall heater or
floor mounted heater 14.00
Vent not included in appliance permit 6,8Ci
<3HP; absorb unit to 100K BTU 14.00
3-15HP; absorb unit to 100K to 500K BTU 25.60
15-30HP; absorb unit.5 - 1 mil BTU 35.00
30-50HP; absorb unit 1 - 1.75 mil BTU 52.20
>50HP; absorb unit>1.75 mil BTU 87,2C
Air handling unit to 10,000 CFM" 10.0C
'Note:This fee does not apply to an airhandling Lnit which is a portion of a factory-assembled appliance,cooling unit,
evaporative cooler or absorption unit for which a permit is required elseNhere in tha Mechanical Code.
Air handling unit to 10000 CFM+ 17.20
Non-portable evaporate cooler 10.00
Vent fan connected to a single duct 6.80
Ventilation system not included in
appliance permit 10.00
Hood served by mechanical ex-iaust 10.00
Domestic incinerators 17.40
Commercial or industral type incinerator 69.95
Repair units 12.15
Wood stove 10.00
Clothes dryer, etc. 10.00
Other units 10.00
Gas piping one to four outlets 5.40
More than 4 -per outlet (each) 1.00
For each appliance or 3iece of
equipment regulated by the Mechanical
Code, but not classed in other
appliance categories or for wl-ich no
other fee is listed in the table 10.00
Minimum Permit Fee 72.00
Plan Review 20% of Permit Fee
6
City of Tigard EX-iIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Other Inspections and Fees:
Inspections outside of normal business
hours (minimum charge -2 hours) 72.50/hour
Inspections for which no fee is specifically
indicated (minimum charge-one-half hour) 72.50 each
Additional plan review required by changes,
additions or revisions to plars (minimum
charge-oie-half hour) 72.50/hour
Mechanical Permit Fees 09/26/2000
(Commercial and Multi-family) 05/13/1997*
*Urban Services Area to I-ave
Total /aluati n• same fees as Tigard
$1 -5,000 Minimum $72.50
5,001 - 10,000 $72.50-or the first$5,000 and $1.52
for earl- additional $100 or fraction thereof,
to and including $10,000.
10,001 -25,C00 $148.5C for the first$10,000 and $1.54
for each additional $100 or fraction thereof,
to and including $25,000.
25,001 - 50,000 $379.50 for the first$25,000 and $1.45
for each additional $100 or fraction thereof,
to and including S50,000.
50,000 and up $742.00 for the first$50,000 and $1.20
for each additional $100 or fraction thereof.
Plumbing Fees 06/27/2000
Description:
New Single-Family
1 Bath S249.20
2 Bath 350.00
3 Bath 399.00
7
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Da`.e
Fixtures (Individual)
Sink 16.60
Lavatory 16.60
Tub cr Tub/Shower Comb. 16.60
Shower Only 16.60
Water Closet 16.60
Dishwasher 16.60
Garbage Disposal 16.60
Washing Machine 16.60
Floor Drain/Floor Sink 2" 16.60
Floor Drain/Floor Sink 3" 16.60
Floor Drain/Floor Sink 4" 16.60
Water Heater 16.60
Laundry Room Tray 16.60
Urinal 16.60
Other Fixtures 16.60
Sewer- 1 st 100' 55.00
Sewer- each additional 100' 46.40
Water Service- 1 st 100' 55.00
Water Service -each additional 100' 46.40
Storm & Rain Drain - 1st 100' 55.00
Storm & Rain Drain -ea. additnl 100' 46.40
Commercial Backflow Prevention
Device or Anti-Pollution Device 46.40
Residential Backflow Prevention Device 27.55
Any Trap or Waste Not Connected
to a Fixture 16.60
Catch Basin 16.60
Inspection of Existing Plumbing 72.50/hr
Specially Requested Inspections 72.50/hr
Rain Drain, single family dwelling 65.25
Grease Traps 16.6
Hose Bibs 16.6
Drinking Fountain 16.6
8
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Roof Drains 16.6
Minimum Permit Fee 72.5
Minimum Permit Fee Residential
Backflow 36.25
Plan Review 25% of Permit Fee
Restricted Energy 06/27/2000
Residential Energy Use 75.00
Commercial Energy Use 75.00
Sanitary Sewer Connection Fee 2,300.00/dwelling unit 06/06/2000
Sanitary Sewer Inspection Fee 06/06/2000
Residential 35.00
Commercial 45.00
Industrial 75.OG
Tree Replacement Fee 125.00/caliber incl- 09/01/2001
Water Quality Facility Fee 06/06/2000
(City receives 100% of fees collected)
Residential Single Family 225.00/unit
Commercial & Multi-family 225.00/2,640 sq.ft of additional impervious surface
Water Quantity Facility Fee 06/06/2000
(City receives 100%of fees collected)
Residential Single Family 275.00/unit
Commercial & Multi-family 275.00/2,640 sq.ft of additional impervious surface
9
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Cherge Effective Dale
Miscellaneous Fees 06/27/2000
� Re-inspection
Building 72.50
Mechanical 72.50
Plumbing 72.50
Electrical 72.50
Temporary Occupancy 90.00-
Phased Occupancy 200.00
Permit or Plan Review Extension 72.50
Address Change 65.00
Research on non-current permits 45.00/hr(min 1 hour, charged in 1 hour increments)
Fee paid inspections for residential structures
pursuant to Title 14,Chapter 16
Single&Two Family Dwellings 100.00
Apartment Houses &Social
Care Facilitie3 160.00, plus $7 for each cwelling unit in excess of 3
Hotels 160.00, plus $5 for each dwelling unit in excess of 5
10
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effectve Date
COMMUNITY DEVELOPMENT-PLANNING -Tigard
Accessory Residential Units S100.00 1C/27/1998
Annexation 1,160.00 1 C/27/1998
Appeal
Director's Decision (Type II)to Planning
Commission 250.00 1 C/27/1998
Expedited Review(Deposit) 300.00 1C/27/1998
Hearings Referee 500.00 1 C/27/1998
Planning Commission/Hearing's Officer to
City rCuiC•i ,*7nrnn T.BnSCrIt 41in1mn7/11998v11v . 11-0 VVaL
Approval Extension 150.00 .10/27/1998
Blas ing Permit 145,00 10/27/1998
Conditional Use (CUP) 10/27/1998
Initial 1 615.00
Major Modification 1 615.00
Minor Modification 100.00
Design Evaluation Team (DET) Recommendation(deposif) 1.000.00 10127/1998
Development Code Provision Review 10/27/1998
Single-Family Building Plan 40.00
Commercial/Industrial/Institution 250.00
Expedited Review 10(27/1998
Land Partition 1,280.00
Subdivision 2,625.00 + 10.00/L:)t
Subdivision with Planned Development (Add 20%PD Fee)
Hearing Postponement 115.00 10,!27/1998
11
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Historic Overlay/Review District(HD) 10/27/1998
Historic Overlay Designation 2,190.00
Removal -listoric Overlay Designation 2,190.00
Exterior Alteration In Historic Overlay District 545.00
New Construction n Historic Overlay District 545.00
Demolition in Historic Overlay District 545.00
Home Occupation Permit(HOP) 10/27/1998
Type I 30.00
Type II 545.00
Interpretation of the Community Development Cone 340.00 10/27/1998
Joint Applicaton P/anring Fee 100% of Highest Planning 10/27/1998
Fee +20% of all Additional
Fees Related to the Proposal.
Lana Partitior (MLP) 10/27/1998
Residential and Non-Residential 780.00
Expedited 1,280.00
Lot Line Adjustment(MIS) 100.00 10/27/199E
Mincr Modification to Approved Plan 100.00 10/27/199E
Non-Conforming Use Confirmation 100.00 10/27/1996
Planned Development(PD) 10/27/1996
Conceptual Plan Review 2,170.00
Detailed Plan Review Applicable SDR Fee
Pre-Application Conference 240.00 10/27/1998
12
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Sensitive Lands Review(SLR) 10/27/1998
Within the 100-Year Flood Plain
Type II 0.00
Type III 1,240.00
With Excessive Slopes
Type II 745.00
Type III 1,240.00
With Drainage Ways
Type II 745.00
Type III 1,240.00
With Wetlands
Type !! ,'45.00
Type III 1,240.00
Sign Permit 10/27/1998
Existing and Modification of Existing Sign 50.00
Temporary Sign 15.00/sign
Site Development Review(SDR) &Major Modification 10/2711998
Under 100,000.00 800.00
100,000.00-999,999.00 1 600.00
1 Million/Over 1,780.00 - 5.00/10,000.00
Minor Modification 100.00
Subdivision (SUB) 10127/1998
Preliminary Plat without Planned Development 2,125.00 +10.00/lot
Preliminary Plat with Planned Development Add 20% PD Fee
Final Plat 295.00
Temporary Use(TUP) 10;27/1998
Director's Decision 100.00
Special Exemption/Non-Profit 0.00
Tree Removal 160.00 10;27/1998
13
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Vacation 10/27/1998
Streets and Public Access 1,530,00 Deposit +
Actual Costs
Variance/Adjustment(VAR) 10/27/1998
Administrative Variance 545.00
Development Adjustment 100.00
Special Adjustments
Adjustment to a Subdivision 100.00
Reduction of Minimum
Residential Density 100.00
Access/Egress Standards
Adjustment 545.0-0-
Landscaping
45.00Landscaping Adjustments
-Existing/New Street Trees 100.00
Parking Adjustments
-Reduction in Minimum
Parking Ratio 545.00
-Reduction in New Development/
Transit Improvement 545.00
-Reduction in Existing Develop/
Transit Inprovement 545.00
-Iicrease 'n Maximum
Parking Ratio 545.00
-Reduction in Bicycle Parking 545.00
-Alternativa Parking Garage
Layout 100.00
-Reduction in Stacking Lane
Length 545.00
Sign Code Adjustment 545.00
Tree Removal Adjustment 100.00
Wireless Communication Facility Adjustments
-Setback from Nearby Residence 545.00
-Distance-rom Another Tower 100.00
Street Improvement Adjustment 545.00
14
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Water Resource Overlay(WR) 10/27/1998
Type 1 150.00
Type II 745.00
Type III 1,240.00
Zoning Map/Text Amendment(CPA/ZCA/ZON) 10/27/1998
Legislative-Comprehensive Plan (CPA) 405.00
Legislative- Development Plan (ZCA) 1,415.00
Quasi-Judicial (ZON) 1,505.00
Zoning Analysis(Detailed) 150.00 10/27/1998
Zoning Inquiry Letter(Simple) 50.00 10/27/1998
COMMUNITY DEVELOPMENT-PLANNING - Urban Services
Accessory Residential Unit 100.00 10/27/1998
Appeals
Director's Decision to Planning Commission 250.00 10/27/1998
Expedited Review (Deposit) 300.00 10/27/1998
Hearings Referee 500.00 10/27/1998
Planning Commission/Hearing's Officer to City
Council ',745.00 +Transc-ipt 10/27/1998
Approval Extension 1,063.00 10/27/1998
Blasting Permit 150.00 10/27/1998
Conditional Use Review(CUP) 10/27/1998
Major Modificatior 2,126.00
Minor Modificatior 100.00
5
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Development Code Provision Review 10/27,11998
Under 25000.00 36.00
25,000.00 -250,000.00 180.00
Over 250 000.00 252.00
Expedited Review 10/27/1998
Land Partition/Subdivision See Subdivision Units +
1,300.00
Hearing Postponement 211.00 10/2711998
l-li.�fnrir_. nvarlPv/Revia y,/Di.strirI 0n( ) 10/27/1998
Historic Cverlay Designation 2,190.00
Removal Historic Overlay Designation 2,190.00
Exterior Alteration in Historic Overlav District 545.00
New Construction In Historic Overlay District 545.00
Demolition in Historic Overlay District 545.00
Home Occupation Permit(HOP) 10/2711998
Type 1 175.00
Type II 883.00
Interpretation of the Community Development Code 340.00 10/2711998
Joint Application Planning Fee 100% of Highest Planning 10/27/1998
Fee+50%of the Application
Fee for each Subsequent Process.
Land Partition (MLP) 10127/1998
Application 2,480.00
Final 354,00
Lot Line Adjustment(MIS) 236.00 10/27/1998
16
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Cnarge Effective Date
Minor Modification to Approved Plan 236.00 10/27/1998
Natural Resource Designation (Surcharge) 106.00 10/27/1998
Non-Conforming Use (County Code Section 440) 10/27/1998
Type 11 1,535.00
Type III 2,136.00
Planned Development(PD) 10/27il998
Conceptual Plan Review SDR/SUB Fee +25%
Detailed Plan Review Final SDR/SUB Fee
Pre-Application Conference 240.00 10/2711998
Sensitive Lands Review(SLR) 10/27)1998
Administrative (Type II) 745.00
Hearings Officer(Type 111) 1,535.00
Sign Code Exception (SCE) 690.00 10/27/1998
Sign Permit(SGN) 10/27/1998
Regular Sign 50.00
Temporary Sign 15.00/sign
Site Development Review(SDR) 10/27/1998
(Commercial, Industrial, Institutional)
Based on valuation of the project
0.00- 50,000.00 2,008.00
50,001.00 -200,000.00 2,598.00
200,001.00- 500,000.00 3,189.00
500,001.00- 1,000,000.00 4134.00
1,000,001.00 -2,500,000.00 5.079.00
2,500,001.00 - 5,000,000.00 6496.00
5,000,001.00 - 10,000,000.00 8,627.00
17
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
10,000,001.00-25,000,000.00 10,039.00
25,000,001.00- 50,000,000.00 12,992.00
50,000,001.00- 100,D00,000.00 17,716.00
100,000,000.00+ 23,621.00
Site Development Review(SDR) 10/27/1998
(Multi-family)
Number of Dwelling Units
2-3 Preliminary 2,480.00
Final 354.00
4-10 Preliminary 3,543.00
Final 590,00
11-25 Preliminary 4,134.00
Final 709.00
26-50 Preliminary 5,315.00
Final 827.00
51-75 Preliminary 7,086.00
Final 945.00
76-100 Preliminary 8.858.00
Final 1 181.00
101-150 Preliminary 10629.00
Final 1299.00
151-200 Preliminary 12.992.00
Final 1535.00
201-300 Preliminary 15.944.00
Final 1.951.00
301-450 Preliminary 21259.00
Final 2.362.00
451-650 Preliminary 27164.00
Final 2.953.00
651-900 Preliminary 34250.00
Final 3543.00
900+ Preliminary 41 337.00
Final 4134.00
18
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Subdwision (SUB) 10/27/1998
Number or Lots
2-3 Pre iminary 2,480.00
Final 354.00
4-10 Pre iminary 3,543.00
Final 590.00
11-25 Pre iminary 4,134.00
Final 709.00
26-50 Preliminary 5,315.00
Final 827.00
51-75 Preliminary 7,086.00
Final 945.00
76.100 Preliminary 8,858.00
Final 1,181.00
101.150 Preliminary 10,629.00
Final 1,299.00
151-200 Preliminary 12,992.00
Final 1,535.00
201-300 Preliminary 15,944.00
Final 1,951.00
301.450 Preliminary 21,259.00
Final 2,362.00
451.650 Preliminary 27,164.00
Final 2,953.00
651-900 Preliminary 34,250.00
Final 3,543.00
900+ Preliminary 41,337.00
Final 4,134.00
Temporary Use(TUP) 10;27/1998
Director's Decision 118.00
Special Exemption/Non-Prcfit 0.00
Tree Removal 160.00 10;27/1998
19
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Vacations
Streets and Public Access Washingtoi County collects fee for Urban Ser
Variance/Adjustment(VAR) 10/27/1998
Administrative Variance 545.00
Development Adjustment 100.00
Special Adjustments
Adjustment to a Subdivision 100.00
Reduction of Minimurn
Residential Density 100.00
Access/Egress Standards
Adjustment 545.00
Landscapinc Adjustments
-Existing/New Street Trees 100.00
Paring Adjustments
Reductior in Minimum
Parking Ratio 545.00
-Reduction in New Development/
Transit Improvement 545.00
-Reductior in Existing Develop/
Transit Improvement 545.00
-Increase in Maximum
Parking Ratio 545.00
-Reduction in Bicycle Parking 545.00
Alternative Parking Garage
Layout 100.00
-Reduction in Stacking Lane
Length 545.00
Sign Code Adjustment 545.00
Tree Removal Adjustment 100.00
Wireless Communication Facility Adjustments
-Setback from Nearby Resicence 545.00
-Distance rom Another Tower 100.00
Street Improvement Adjustment 545.00
20
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Khater Resources Overlay(WR) 0/27/1998
Type 1 150.00
Type II 745.00
Type 111 1,535.00
Zoning Analysis (Detailed) 150.0C 10/27/1998
Zoning Inquiry Letter(Simple) 50.00 10/27/1998
COMMUNITY DEVELOPMENT- Miscellaneous Fees & Charges
Community Development Code C2/07/2002
Complete (Title 18) 50.00
CD Rom 10.00
Comprehensive Plan - volumes 9 & 2 77.00 1997
GIS Maps
0
8.5"x 11" 2/07/2002
Black and White 0.00
Color 1.50
11"x 17"
Black and JVhite 1.50
Color 2.50
17"x 22"
Black and White 2.50
Color 5.00
22"x 32"
Black and.White 5.00
Color 7.50
34"x 44"
Black and White 7.50
Color 10.00
21
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Maps 02/07/2002
Address Maps by Section 2.50/plot
Annexation & Road Jurisdiction 10.00/plot
As-Built Drawings 2.50/copy or plot
Assessor's Tax Map 2.50/copy or plot
Bike Path Plan 6.00/plot
Buildable Lands Inventory 10.00/plot
;,omprehensive Plan and Zoning Map 10.00/plot
Drthophotographs 5.00/copy
Stream Corridor& Wetlancs Map 10.00/plot
Street Index Map 10.00/plot
Subdivision Map 10.00/plot
Subdivision Plat Map 2.50/copy
Topographic Maps 5,00/copy
Transportation Plan Map 10.00/plot
Vertical Bench Mark Control Map 6.00/copy
Zoning Map 10.00/plot
Neighborhood Meeting Signs(Landuse) 2.00 1997
Ove,-size Load Permit 10.00 0521/1990
Planimetric Maps 03110/1986
Blueline print-quarter section 5.00
Mylar-quarter section 150.00 + reproduction cost
Tigard Transportation System Plan 15.00 2000
Washington Square Regional Center 1999
Task Force Recommendations 10.00
Master Plan Map (Zoning/Flan) 2.50
22
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Reverue Source Fee or Charge Effective Date
ENGINEERING -Tigard
Addressing Assignment Fee $30.00 02/09/1999
Compfience Agreement Permit(CAP) Fee 02/09/1999
Estimated Cost of Public Improve hent Deposit*
$0 - 10,0010 1,200.00
10,001 -20,000 1,200.00+ 10%over 10,000
20,001 -50,000 2,200.00 +8.0% over 20,000
50,001 -80,000 4,600.00+6.0% over 50,000
80,001 - 100,000 6,400.00 +4.0% over 80,000
100,001 -300,000 7,200.00 + 2.0% over 10),000
300,001 -500,000 11,200.00 + 1.0% over 300,000
500,001 and Up 13,200.00 + .5% over 50),000
"Deposit to be paid as follows:
Upon submittal of plans One-third (1/3)of deposit due
Upon issuance of Approved Plans Remaining balance of deposit due
Upon Project Completion Refund or final payment of any deficit, based
upon actual City Staff costs.
Engineering Public Improvement Design Standards 5.01 07/15/1998
Fee in lieu of Undergrounding 27.50/lineal feet of frontage Prior to 1996
Local Improvement District Assessments Actual Cost 07/24/1996
I
Reimbursement District Application Fee 300.00 01/27/1998
Reimbursement District Fee Not to Exceed 6,000.00 unless 07/10/2001
reimbursement fee exceeds 15,000.00
Any amount over 15,000.00 shall be
reimbursed by the owner. 6,000.00 limit
valid for only 3 years from Council approval
of district cost.
24
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Street Opening Permit 02/09/1999
Fee $150.00 (non-refundable)+deposit to cover
processing &inspection. Final fee is based
upon actual time spent by Staff on project.
Bond
Work outside traveled way 250.00 + 2.50/lineal foot cf right-of-way
Work inside traveled way 250.00 + 50.00/square foot of road area
Streetlight Energy& Maintenance Fee Based upon PGE Sch #91 Opt, "B' 2000
for the first two years ccsts
TrafficiPedestrian Signs Cost of materials and labor 02/07/2002
Traffic Control Devices
Speed Hump Program 50% of cost 05/01/1995
ENGINEERING -Urban Services
Address Assignment Fee 30.00 10/13/1998
Compfance Agreement Permit(CAP) 10/13/1998
Estimated Cost of Public Improvenent Deposit*
$0- 10,000 1,200.00
10,001 -20,000 1,200.00 + 10% over 10,000
20,001 -50,000 2,200.00 +8.0% over 20,000
50,001 -80,000 4,600.00 +6.0% over 50,000
80,001 - 100,000 6,400.00 +4.0%over 80,000
100,001 -300,000 7,200.00 +2.0% over 100,000
300,001 -500,000 11,200.00 + 1.0% over 300,000
500,001 and Up 13,200.00+ .5% over 500,000
`Deposit to be paid as follows:
Upon submittal of Engineering plans One-third (1/3)of deposit due
Upon issuance of Permit/Approved
Plans Remaining balance of deposit due
25
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue-Sour-le Fee or Charge Effective Date
Street Opening Permit 10/13/1998
Fee $150.00 minimum +deposit to cover
processing & inspection.
Bond
Work outside traveled way 250.00 +2.50/lineal foot of right-of-way
Work inside traveled way 250.00 + 50.00/square foot of road area
26
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
FINANCE
Assessment Assumption $50.00 04/22/1985
Budget Dociment 0.00 02/07/2002
Business Tax 05/16/1988
Annual Fee
0- 10 employees 55.00
11 - 50 employees 110.00
51 or more employees 220.00
Prorated Fee
for the initial month when issued on or before the 15th of the month
0- 10 employees 4.58
11 - 50 employees 9.17
51 or more employees 18.33
for the initial month when issued after the 15th of the month
0- 10 employees 2.25
11 - 50 employees 4.55
51 or more employees 9.17
for the each month after the initial month until the next annual biling
cycle begins (January 1)
0- 10 employees 4.58
11 - 50 employees 9.17
51 or more employees 18.33
Comprehensive Annual Financial Report O.Oc 02/07/2002
27
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Scurce Fee or Charge Effective Date
Franchise Fee
Cable TV 5%of gross revenue 01/26/1999
Electricity 3% of gross revenue 04/24/2001
Natural Gas 3% of gross revenue 10/26/1993
Telecommunication 12/19/2000
Telecommunication utilities 7,500.00 or 5%of gross
revenue, whichever is greater
Long distance prov ders and 7,500.00 or 2.90/linear foot
private networks of installation in right of way,
whichever is greater
Competitive access providers and 7,500.00 or 5%of gross
all franchisees revenue, whiciever is greater
Telecommunication Franchise Application Fee 2,000.00 01/23/2001
Solid Waste Disposal 3% of gross revenue 10/09/1978
Lien Search Fee 25.00 06/12/2001
Meeting Room Reservation Fees& Deposits
Cleaning Deposit (Non-Senior Center) 09/26/1995
Groups of 80 or less 150.00
Groups of more than 80 250.00
Cleaning Deposit (Senior Center) 09/26/1995
Groups of 80 or less-no food/bev 50.00
Groups of 80 or less-food/bev 150.00
Groups of more than 80 - no food/bev 100.00
Groups of more than 80 -food/bev 250.00
Red Rock Creek Conference Room 09/26/1995
Class 1 and 2 0.00
Class 3 10.00/hr
Class 4 15.00/hr
Richard M, Brown Auditorium 09/26/1995
Class 1 and 2 0.00
Class 3 30.001hr
Class 4 35.00/hr
28
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue So.irce Fee or Charge Efective Date
Senior Center Activity Room 09/26/1995
Class 1 and 2 0.00
Class 3 10.00/hr
Class 4 20.00/hr
Class 5 25.00/hr
Senior Center Classroom or Craft Room 09/26/1995
Class 1 an9 2 0.00
Class 3 5.00/hr
Class 4 10.00/hr
Class 5 15.00/hr
Town Hall 09/26/1995
Class 1 and 2 0.00
Class 3 20.00/hr
Class 4 25.00/hr
Water Lobby Conference Room 09/26/1995
Class 1 and 2 0.00
Class 3 10.00/hr
Class 4 15.00/hr
Municipal Court Fees 06/06/2001
Civil Compromise 150.00
Copies (over 10 pages) 0.25/page
Diversion
Criminal 150.00
Traffic School 45.00
Seat Belt Safety Class 20.00
Traffic School Setover 20.00
License Reinstatement 15.00
Overdue Payment Letter 10.00
Show Cause Hearings-Court Costs
Non-compliance 25.00
Non-payment-fees paid prior to
hearing No Fee
Warrant Fee 50.00
29
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Records fees
Photocopies up to 11 x 17 paper 0.25/page 1999
Microfiche/film copies 1999
8 112 x 11 0.25/page
11 x 14 0,50/page
11 x 17 1,00/page
Microprints 0.25/page 2000
Photographs Actual Cost 1999
Audio tapes 5.75/tape 2000
Fax Charge 5.00 for first page and 1.00 2001
per page thereafter
Recording of Documents Actual Cost 1999
Research/Labor 1 st hour- no charge 1999
staff hourly wage + benefts
Attorney time Attorney billing rate 1999
Returned Check Fee 20.00 10/09/2001
Solid Waste Compactor Permit 100.00 12/17/1991
30
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
LIBRARY
Disk(Blank) $1.00 02/07/2002
Lost items replacement cost+ 1987
2.50 processinc fee
Overdue Items (Non-video) 1987
Daily Charge 0.10/item
Maximum Charge 2.50/item
Overdue Items (Video) 1987
Daily Charge 1.00/video
Maximum Charge 5.00/item
Public Copier Charges 0.10/page 2001
31
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
POLICE
Alain Permits 06/28/1982
Burglary or Robbery $15.00
;.ombination- Burglary and Robbery 25.00
Bicycle License 0.00 12/18/1967
Failure to Obtain or Renew Alarm Perm�t Fee 25.00 06/28/1982
False Alarm Charge 12121/1987
1 -4 false alarms 25.00/false alarm
5-6 false alarms 50.00/false alarm
7-8 false alarms 75.00/false alarm
9 or more false alarms 150.00/false alarm
Liquor License 25.00 07/10/2001
Police Services Fees 03/12/1984
Police Report Copies 5.00 for the first 10 pages
and 0.25/page thereafter
Police Photograph Copies 2.00/print
Finger Prints 5.00/set (both hands)
Property Forfeiture for Criminal Activity varies 05/25/1999
Second Hand Dealers and Transient Merchant License 10.00 05/23/1983
VehUe Release Fee 15.00 Prior to 1995
32
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS
City of Durham Contracting 02/07/2002
Mowing $ 5.00/hr
Street Sign Maintenance/Repair time+ materials
Encroachment Permit None has been cet yet 12/07/1999
Park Reservation Fee 12/08/1992
Application Fee 10.00
Covered Picnic Area Rental
Tigard Based Rental Rate
Groups up to 50 6,00/hour
51 to 100 8,00/hour
101 to 150 15.00/hour
151 to 200 20.00/hour
201 to 250 25,00/hour
Non-Tigard Based Rental Rale
Groups up to 50 12.00/hour
51 to 100 16.00/hour
101 to 150 30.00/hour
151 to 200 40.00/hour
201 to 250 50.00/hour
Soccer/Ballfields
Tigard Based Rental Rate 4.00/hour
Non-Tigard Based Rental Rale 8.00/hour
33
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS -WATER
Booster Pumo Charge $3.54/bimonthly 02/27/2001
Cusiomer Charge 4.00/bimonthly 02/27/2001
(Basic fee ciarged to customers to have the Ci.y deliver water.)
Fire Hydrant Jsage- Temporary 02/27/2001
Hook-up service 50.00
Continued use 50.00/month
Consumption 1.81/ccf used
Fire Rates ;Sprinklers, 02;27;2001
6"or smaller 17.00/month
8" or larger 22.50/month
Fire Service Connection 1,400.00 + 12%fee based 02/27/2001
on construction costs.
Meter Discon7ection Actual labor and material 01/2311993
costs
Meter Installation Fees
5/8"x 3/4'' Meter 325.00 02/27/2001
1" Meter 500.00
1 1/2" Meter 850.00
2" Meter 1,000.00
or more Meter Actual Cost 05/23/2000
34
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Sanitary Sewer Service 06/06/2000
(City receives 21.4%of fees collected)
Ease Charge 15.58/dwelling unit/month
Use Charge 1.08/100 cubic feet/month
for individual customer
winter average
Storm and Surface Water 06/06/2000
(City receives 75%of fees collected)
Service Charge 4.00/ESU/month
Water Disconnection Charge for Non-payment 02127/2001
During business hours 50.00
After hours, holidays and weekends 100.00
Wafer Line Construction-New Development 12% of Actual Cost 02/27/2001
Water Usage Charges 02/27/2001
Residential 1.56/100 cubic feet of water
Multi-Family 1.54/100 cubic feet of water
Commercial 1.81/100 cubic feet of water
lidustrial 1.50/100 cubic feet of water
I-rigation 1.93/100 cubic feet of water
25
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT • PLANNING 84A W2091
Park System Development Charge(SDC)"' 02/07/2002
Single Family Unit $1,648.00 $1.679.00
Attached Single Family Unil
(Row house, Townhouse) 4,038-00 1,054.00
Apartment Unit, including CDndominiums 859.80 87_0.00
Spaces in a manufactured home park 1,460.00 1177.44
Commercial/industrial (per amployee) i 6.00 119.00
*See Append x for methodology used to calculate the charges.
Park SDC Annual Adjustment 04/10/2001
Parks SDC fees shall be adjusted annually on January 1 st of each year
beginning in 2002. The new fee will be determined by multiplying the
existing fees by the averaga of two indices, one reflecting changes in
develop men t/construction costs and one reflecting changes in land
acquisition costs. The average of these two Indices is a reasonable
approach because the Parks SDC fee is roughly split 50% between land
acquisition and land development components.
The index for the Land Acquisition component will be the base cost for
residential tract land in Tigard, as determinec by the Washington County
Appraiser. The average cost for residential tract land was selected because
it is readily identified and is the lowest priced of the buildable lands in Tigard.
Changes in this base cost can be calculated in terms of a percentage
increase, to create the level of change to the original index, and projected
to the overall acquisition cost. In accordance with Measure 5,the
Washington County Appraiser's office will determine appraised values on
July 1 of each year.
The index for the Land De\:elopment component of the Parks SDC will be the
Construction Cost Index fo-the City of Seattle as published in the December
issue of the Engineering News Record (ENR). The Seattle cost index will
be used because the city is the geographically closest to Tigard of twenty
metropolitan areas for which the ENR maintains cost data. This index is
36
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
adjusted monthly, quarterly,and annually. The annual index for each year
will be selected beginning with the index for December 2002. The annual
index will be used because it is available in December and most closely
coincides with the January 1 st implementation of Park SDC fee adjustments.
Park SDC Annual Adjustment(cont.)
Calculation Definitions:
SDC (2000)= Current SDC fee
L(2000) = Average cost of residential tract land 2000
L(2001) = Average cost of residential tract land 2001
L(2xxx) = Average cost of residential tract land 2xxx
C(2000) = Construction cost index of 2000
C (2001) = Construction cost index of 2001
C (2xxx) = Construction cost index of 2xxx
LCI = Land Cost Index: chp-nge frorr the current year from previous year
CCI = Construction Cost Index: change from the current year from previous year
ACI = Average cost index change of LCI + CCI
Formula:
L(2001)/ L(2000) = LCI
and
C (2001)/ C (2000) = CCI
therefore
LCI +CCI 12 =ACI
then
SDC (2001)X ACI = SDC (2002)
Each year subsequent to 2J02,the costs shall be revised using the current
year and previous year's data. Not Nithstancing the foregoing,all calculations
shall be carried out to the thousandth place. A final product ending in .49 or
less shall be rounded down to the nearest dollar, .50 or more LID to the next
dollar. Community Development staff will perform the adjustment calculation
and prepare the resolution each year.
37
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
ENGINEERING
Traffic Impact Fee " 07/01/2001
Trip Rate
Residential Use $226.CO/averace weekday trip
Business & Commercial Use 57.00/average weekday trip
Office Use 207.00/average weekday trip
Industrial Use 217.00/average weekday trip
Institutional Use 94.00/average weekday trip
Transit Rate 17.00/average daily trip
*See Appendix for methodology used tc calculate the charges.
The Traffic Impact Fee progran is governed by`Washington County. All fees and
procedures are set by the County.
38
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS -WATER
Water System Development Charge (SDC)* 11/28/2000
5/8"x 3/4" Meter
410 Service Area $2,041.00
Bull Mountain System 2,763.00
1" Meter
410 Service Area 5,103.00
Bull Mountain System 6,908.00
1 1/2" Meter
410 Service Area 7,348.00
Bull Mountain System 9,947.00
2" Meter
410 Service Area 16,328.00
Bull Mountain System 22,104.00
3" Meter
410 Service Area 30,615.00
Bull Mountain System 41,445.00
4" Meter
410 Service Area 51,025.00
Bull Mountain System 69,075.00
5" Meter
410 Service Area 102,050.00
Bull Mountain System 138,150.00
8" Meter
410 Service Area 163,280.00
Bull Mountain System 221,040.00
10" Meter
410 Service Area 293,496.00
Bull Mountain System 397,319.00
12" Meter
410 Service Area 775,907.00
Bull Mountain System 1,050,382.00
`See Appendix for methodology used to calculate the cha-ges.
19
EXHIBIT A
APPENDIX
Methodology to Calculate Park SDC
Methodology to Calculate Traffic Impact Fee
Methodology to Calculate Water SDC
EXHBIT A
METHODOLOGY TO CALCULATE PARK SDC'
The Park system development charges are assessed to new developments for the acquisition and development of parks,
greenways and paved trails. The SDC is a fee to recover the cost of building additional parks for new residents and
employees at the same level as currently exists in the City or Urban Services Area. The SDC varies with the average
number of people or employees expected from a development.
The City relies on level of service (LOS) standards to determine facility needs. The LOS standards are expressed in
terms of the number of park acres per 1,000 residents living and 1,000 employees working in the City and the Urban
Services Area. The LOS standards used to calculate facility needs are based on the City and Urban Service Area's
existing parks inventory. The LOS standards are then applied to projected population and employment to determine
future facility needs for the City and the City and Urban Services Area combined. SDC funded requirements are
calculated based on the estimated unit cost applied to the needed facilities. The total financial requirements associated
with future park needs are then assigned to employees and residents and apportioned to each 1,000 residents and 1,000
employees to derive the SDCs for the City and the City and Urban Services Area combined.
Economic Resource Associates, Inc. completed an extensive analysis of the City's current park inventory and population.
They then used a multitude of factors and costs to determine cost per capita by resident and employee for future park
costs. The tables below show their final analysis:
Unit Costs City of Tigard
(Existing Service Level
Standard
(Acres/1000) Cost per Capita Cost per Employee
Park Type Capita Employee Developed Land Total Developed Land Total
Total Parks 4.101 0.305 $195,846 $281,759 $477,605 $13,578 $20,588 $34,166
Greenways 3.052 2.002 $64 $118,426 $118,490 $42 $77,669 $77,711
Paved Trails 0.032 0.021 $4,599 $0 $4,599 $3,016 $0 $3,016
Total All City Recreation $200,509 $400,185 $600,694 $16,636 $98,257 $114,893
Cost of Master Planning $5,772 $1,104
Cost Per Capita $606 $116
40
EXHIBIT A
The per capita amount for cost per capita is then multiplied by the average number of people who will live in the various
types of dwellings. This information was obtained from the 1990 U.S Census of Population and Housing. Those numbers
are as follows:
Persons per Residential Unit
City of Tigard, 1998
Residential Unit Household Size
Single Family 2.70
Multi-Family 1.70
Apartments 1.40
Manufactured Homes 1.90
For commercial development, per capita for cost per employee amount is multiplied by expected amount of employees
anticipated to work within the space.
For Example:
The calculation for the SDC for a single-family unit in Tigard is:
$606.00 (cost per capita) x 2.70 (household size) = $1,636.20 *
*This amount has been rounded up to $1,640.00 in the final resolution that set the SDC fees.
41
EXHBIT A
METHODOLOGY TO CALCULATE TRAFFIC IMPACT FEE
The countywide Traffic Impact Fee (TIF) is assessed to new development for the development's projected impact on the
transportation system. Developing properties will be required to pay based on the number of trips they are projected to
generate (fee per trip basis). TIF revenue will be used to fund off-site highway and transit capital improvements, which
provide additional capacity to the major transportation system. The TIF does not fund existing needs such as minor
reconstruction or maintenance projects.
The first step in calculating the TIF for a developing project is to determine the most appropriate Land Use Category. The
categories are Residential Use, Business & Commercial Use, Office Use, Industrial Use and Institutional Use. Once the
land use category has been determined, the values needed for the calculation are looked up on a table provided by
Washington County. The table contains the land use category, basis for trip determination (units), weekday average trip
rate and weekend average trip rate.
The TIF is calculated using the following formula:
Weekday Average Trips x Units x Trip Rate = TIF
Where
Weekday Average Trips is a value representing an average of the number of trips per unit for each land use type. This
value is set by the County TIF ordinance for most land uses. This value is listed in the table provided by Washington
County.
Units value is determined by the developing project's size. The type of units is set for each land use in the table and is
typically expressed as Thousand Gross Square Feet (TGSF), number of units (for apartments, condos, etc), number of
employees, etc.
Trip rate value is set by the TIF Ordinance and may be adjusted on a yearly basis. The current rates that were adjusted
on July 1, 2001 are:
Residential Use $226.00 per average weekday trip
Business and Commercial Use $57.00 per average weekday trip
Office Use $207.00 per average weekday trip
Industrial Use $217.00 per average weekday trip
Institutional Use $94.00 per weighted average daily trip
Transit Rate $17.00
42
EXHBIT A
For Example:
A 20,400 square foot office building's TIF would be calculated as follows:
20.400 (TGSF) x 16.31 (Weekday Average trips) x 207.00 = $68,874 Total TIF
Then
To determine the Mass Transit portion of the TIF
20.400 x 16.31 = 333 (Trip Generation)
Then
Trip Generation x Transit Rate = Transit Amount
333 x 17 = $5,661
Then
Total TIF —Transit Amount = Road Amount
68,874.00 —5,661.00 = 63,213.00
This is how a basic TIF is calculated. TIF calculations can become more complex as other factors are included in the
calculation. Those factors could be credits and offsets, weighted averages or uses not listed in the table provided by
Washington County Ordinance.
43
EXHBIT A
METHODOLOGY TO CALCULATE WATER SDC"
The Water System Development Charge (SDC) is comprised of a reimbursement fee and improvement fee. The
reimbursement fee is intended to recover the costs associated with the growth-related (or available) capacity in the
existing system, and the improvement fee is based on the costs of capacity-increasing future improvements needed to
meet the demands of growth.
Reimbursement Fee:
The general methodology used to develop the reimbursement fee includes the following four steps:
1. Determine the value of growth-related capacity"'
2. Define system capacity
3. Calculate the unit cost of growth — related capacity
4. Develop reimbursement fee per EDU (Estimated Dwelling Unit)
In 2000, the City of Tigard hired CH2M Hill to a complete a System Development Charge Update for the Tigard water
system. The firm performed an extensive analysis and calculated the following information:
Meter Size Meter Equivalent Factor
5/8 — 3/4 inch 1
1 inch 2.5
1 '/2 inch 3.6
2 inch 8
3 inch 15
4 inch 25
6 inch 50
8 inch 80
10 inch 140
12 inch 380
44
EXHBIT A
Net investment per gallons per day (gpd) = $0.87
Maximum Day Water Demand (gpd) (c) = 645
This data is used to calculate the reimbursement portion of the SDC. The calculation is:
Net investment per gpd (0.87) x Maximum Day Water Demand (645) = Reimbursement SDC per EDU
Current Reimbursement SDC per EDU = $561.00
Then
Reimbursement SDC per EDU x Meter Equivalent Factor = Reimbursement SDC for each meter size
For Example:
561.00 x 2.5 (meter equivalent for 1 inch meter) = $1,402.50
Improvement Fee:
The general methodology used to develop the improvement fee is similar to that for the reimbursement fee, and includes
the following four steps:
1. Determine the costs of growth-related improvements'v
2. Calculate the unit cost of additional capacity
3. Calculate debit service credit
4. Develop improvement fee per EDU
CH2M Hill calculated the improvement fees per EDU to be:
Water Supply Improvement Fee = $880.00
Distribution System Improvement Fee 410 Zone = $600.00
Distribution System Improvement Fee Bull Mountain = $1,322.00
These figures are then used to calculate the cost per meter size.
45
EXHBIT A
Water Supply Improvement Fee x Meter Equivalent Factor = Water Supply Improvement Fee for each meter size
For Example:
880.00 x 2.5 (meter equivalent for 1 inch meter) _ $2,200.00
Distribution System Improvement Fee 410 Zone x Meter Equivalent Factor = Water Distribution System Improvement for
each 410 Zone meter size
For Example:
600.00 x 2.5 (meter equivalent for 1 inch meter) _ $1,500.00
Distribution System Improvement Fee Bull Mountain x Meter Equivalent Factor = Water Distribution System Improvement
for each Bull Mountain meter size
For Example:
1,322.00 x 2.5 (meter equivalent for 1 inch meter) _ $3,305.00
Final SDC Charge:
The totals listed above are added together to get the total Water SDC charge per meter size.
Reimbursement SDC for each meter size + Water Supply Improvement Fee for each meter size + Water Distribution
System Improvement for each 410 Zone meter size
= Total Water SDC charge per meter size for 410 Zone
For Example:
1,402.50 + 2,200.00+1,500.00 = $5,102.50 rounds to $5,103.00
Or
46
EXHIBIT A
Reimbursement SDC for each meter size + Water Supply Improvement Fee for each meter size + Water Distribution
System Improvement for each Bull Mountain meter size
= Total Water SDC charge per meter size for Bull Mountain
For Example:
1,402.50 + 2,200.00+3,305.00= $6,907.50 rounds to $6,908.00
For more detailed information on calculating Park SDC, see Resolution No. 01-12 and the accompanying report "Park and Recreation Facilities
System Development Charges" by Economic Resource Associates, Inc., March 1, 2001.
" For more detailed information about Water SDC charges, please see Resolution No. 00-66 and its accompanying report, "Tigard Water System,
System Development Charge Update" by CH2M Hill, September 1, 2000.
"' This value is based on the system's non-contributed depreciated plant investment.
"This cost is based on anticipated future project costs.
47