Loading...
11/07/2012 - Packet m Completeness Review for Boards, Commissions and Committee Records CITY OF TIGARD Name of Board, Commission or Committee hu Date of Meeting I have verified these documents are a complete copy of the official record. C.L. Wiley Print Name Signature c � Date City of Tigard Transportation Advisory Committee Agenda MEETING DATE/TIME: November 7, 2012, 6:30 to 8:00 p.m. MEETING LOCATION: Tigard Library, 2nd Floor Conference Room 13500 SW Hall Boulevard,Tigard 1) Call to order Steve 6:30 2) Roll Call Chris 3) Consider summary of September 5, 2012 meeting Chris 4) Visitor comments Steve 5) Southwest Corridor Update* Judith 6:45 6) CIP Update/Project Descriptions* Carissa/Mike 7:00 7) Input on Council Goals Judith/All 8:00 8) Project Updates Mike/All 8:15 9) Adjourn 8:30 Supporting materials/handouts September 5 meeting summary—draft Southwest Corridor news articles 2012 Council Goals; 2011 TTAC input on Council Goals *Materials will be provided at the meeting or by supplemental email TRANSPORTATION ADVISORY COMMITTEE AGENDA— November 7, 2012 City of Tigard 1 13125 SW Hall Blvd.,Tigard,OR 97223 1 503-639-4171 1 www.tigard-or.gov I Page 1 of 1 TTAC Tentative Future Agenda Items NOVEMBER 2012 Input on Council Goals Tentative Budgeting/Project Priorities SW Corridor Update DECEMBER 2012 Budgeting/Project Priorities 99W/McDonald-Gaarde design review 92nd Avenue sidewalk design review JANUARY 2013 New TTAC officer elections Update bylaws FEBRUARY 2013 MARCH 2013 PARKING LOT • Transit service improvements; coordinate w TriMet (expected 2013) • Incremental project improvements / Funding strategies n Tigard Transportation Advisory Committee [TTAC] Summary Wednesday, November 07, 2012, 6:30 PM—8:30 PM Library,2"' Floor Conference Room, 13500 SW Hall Blvd, Tigard, Oregon MEMBERS PRESENT (6): Steve Bass (Chair), Karen Hughart (Vice-Chair),Basil Christopher,Evelyn Murphy,Don Schmidt (arrived 6:53 pm), Mark Bogert, alternate. MEMBERS ABSENT (5): Christopher Warren, Dennis Mitchell,Jennifer Stanfield, Mike Stevenson, and Shane Brown, alternate. STAFF PRESENT (4): Judith Gray, Sr. Transportation Planner; Michael McCarthy, Sr. Project Engineer; Carissa Collins, Sr. Management Analyst; Chris Wiley, Sr. Administrative Specialist. 1. Call to Order—Chair Steve Bass called the meeting to order at 6:36 p.m. 2. Roll Call—Chris Wiley recorded the roll. A quorum was present. 3. Consider summary of September 5 2012 meeting. The meeting summary was approved. 4. Visitor Comments—No visitors attended. 5. Southwest Corridor Update Judith updated the members on recent Steering Committee decisions for the Southwest Corridor Plan and what the Steering Committee directed staff to consider in further transit alternatives analysis. Members were given a copy of the SW Corridor Plan Fall 2012 Stakeholder Engagement calendar (Attachment 1 to this summary). Judith encouraged the members to attend the Community Planning Forum schedule to take place at the Tualatin Police Department Training Room on December 3, from 6 to 8 p.m. A recent article from the Portland Tribune (Attachment 2), and a handout highlighting features of bus rapid transit (Attachment 3),were also distributed. 6. CIP Update/Project Description a. Carissa explained the process and the timelines. She said the city had a good response from citizens who submitted suggestions for capital improvement projects. Capital I:\Transportation Advisory Committee\2012\11-07-12 CD ADM includes CIP Rating Docs\TTAC_11-7-12_Meeting Summary SIGNATURE COPY.doca Page 1 of 3 Improvements make up 25% of the city's budget. The city is just beginning to work on the FY 14 budget. The city CIP team includes representatives from Finance, Public Works and Community Development who are ranking the projects. They present the financial forecast to executive staff on November 20`h.A list of projects will go forward to the City Manager by the end of December. b. Mike distributed the DRAFT 2013-18 CIP Candidate Project Descriptions (Attachment 4). There are 18 projects. Committee members should pick their top 10 and then prioritize them, awarding 10 points to their first choice, 9 to their second choice and so on. Members should eliminate any projects they feel the simply can't support at all. Many projects that were on last year's list were funded in the CIP last year. Once they are funded (ex: Walnut Street; Gaarde/Pacific Highway intersection, etc.), they aren't carried forward on the list. Projects that didn't get funded in the last year are included with the 18 presented here. Projects that aren't scored below 10 last year (all of which received 0 TTAC votes)were dropped. Copies of this document will be mailed out to the TTAC member who weren't able to make it to tonight's meeting. If you aren't able to make the December meeting,please complete your rankings and send them in. c. Subsequent to the meeting,Mike's rating process instructions (Attachment 5) and Carissa's rating sheet (Attachment 6) and were mailed out to the members on November 13. Carissa said the current 5 year CIP is on the city website. She also offered to send paper copies of the 5 year CIP to members if they want. d. Staff will also take this information to the ped/bike subcommittee (post-meeting update: the ped/bike subcommittee rated each project on a 0 to 10 scale, and those ratings are included on the updated project descriptions.) e. Mike said he would send the committee members an updated version of Attachment 4 in about two weeks. For now, the members have the list of projects and can start considering how they would rank them. 7. Input on Council Goals (Attachments 7 and 8) Judith told the members Council sets their goals in late December and would especially like to have input from the Boards and Committees. In order to meet Council's deadline,=TAC will need to send in their input before TTAC's next regularly scheduled meeting, therefore there won't be an opportunity for a group discussion. Judith provided a copy of the 2012 council goals and a copy of TTAC input from a previous year for reference. Please send Judith any input by the end of next week,Thursday, November 15. 8. Project Updates Mike reported design has started for the Walnut Street signal or roundabout at the Walnut and 135`h intersection. This project is county funded. a. Construction for street improvements on 92"d Avenue at Cook Park will begin this summer. b. There will be a sidewalk addition near the 72"'and Dartmouth intersection. I:\Transportation Advisory Committee\2012\11-07-12 CD ADM includes CIP Rating Docs\TTAC_11-7-12_Meeting Summary SIGNATURE COPY.docs Page 2 of 3 9. Other Notes a. January's TTAC meeting has been moved to January 9' and will be held in the Town Hall. Staff will send out a reminder about the change when meeting time gets closer. b. Staff recruited for the 2013 TTAC membership. A couple of new members are being recommended for appointment. Staff will update TTAC at the next meeting, after the new appointees have been notified and accepted. 10. Adjourn The meeting was adjourned at 8:27 pm. Chas U ey, TTAC Se e ry ATTEST: Steven Ass,Chairman The next TTAC meeting will be held on Wednesday, December 05, 2012 at the Library, 2nd Floor Conference Room, 13500 SW Hall Blvd from 6:30pm - 8.30pm. I:\Transportation Advisory Committee\2012\11-07-12 CD ADM includes CIP Rating Docs\TTAC_11-7-12_Meeting Summaq SIGNATURE COPY.docx Page 3 of 3 Shape Southwest Economic Summit Community Planning Steering Committee Forum Workshop Audience Audience Audience Audience General public and other stakeholders, Employers including large People active and engaged in local Steering committee members and both new to the process and those organizations,small business owners, planning efforts and their communities. newly elected officials that will become previously involved nonprofits and others active in Anticipate 40 participants. steering committee members. economic development in the corridor. Purpose Anticipate 40 to 50 participants. Purpose Purpose Engage,share information and receive Instill ownership of plan/process with Building from community land use feedback on benefits and tradeoffs of Purpose community stakeholders.Solicit input vision,prioritize focus areas and define the potential types and levels of Share Hovee Economic Development that can inform the steering committee. types of public investment for those investments.The interactive website work.Discuss existing investment Prompt sharing of SWCP information areas. will introduce the concept of the choices opportunities to leverage economic with other people. to be made in creating a shared growth. Coordination investment strategy and gather public Coordination Standard coordination procedures for input on those choices. Coordination Metro is promoting through email to the steering committee. Metro is coordinating with Westside interested parties and newsfeeds; Coordination Economic Alliance to host this event, project partners are promoting through Event Metro is promoting through email to with area chambers to identify and appropriate local communication Dec.12, 1:30 to 4 p.m. interested parties,newsfeeds and invite participants.PTL members have channels. Tigard Public Library invitations to participate through also provided suggestions for corridor employers and service participants to invite. Event Outcomes organizations;project partners are Dec.3,6 to 8 p.m. Development of a list of prioritized DZ promoting through appropriate local Event Tualatin Police Department training focus areas and related economic q p communication channels. Nov.14,7:30 to 9:30 a.m. room development goals to be reflected in the D < Tigard Public Library development of shared investment 0 4 Event Outcomes strategies. PQ Nov.13 through Dec.31 Outcomes Understanding of and feedback on how ZN www.swcorridorplan.org Agreement on potential investments to create shared investment strategies. that support economic development. AOutcomes Encourage ad hoc or on-going n Feedback on creating shared coordination for economic development investment strategies.Increased public in the corridor. frl awareness of and interest in the MSouthwest Corridor Plan. Z G) to C XSOUTHWEST CORRIDOR PLAN < Fall 2012 stakeholder engagement Portland Tribune and Community Newspapers -Cities,planners narrow focus on SW Cor... Pagel of 2 Cities, planners narrow focus on SW Corridor transit options Created on Monday,October 22,2012 1 Written by Nick Christensen I The transit element of Metro's Southwest Corridor study is coming into focus,after a steering committee of local leaders asked for studies of several transit options. Members of the Southwest Corridor Plan Steering Committee unanimously agreed Monday to study bus improvements and light rail for the area,which is roughly a wedge from downtown Portland to Tigard,King City, Tualatin and Sherwood. Metro and the cities have worked for about a year to develop a list of transit projects that could be studied as part of a comprehensive look at transportation,zoning and economic development in the southwest part of the city. But answers to zoning and economic development questions in the study are dependent on what transit options are considered for the area. METRO NEWS Stories Nick Christensen writes for Metro are not edited or altered by the regional agency or the Metro Council.Christensen is a Metro employee,butprovides independent reporting on the agency.Metro news is committed to transparency,fairness and accuracy. This month,planners from Metro gave steering committee members a list of possible transit projects to study and others to consider later.Several bus rapid transit options were suggested for further study;planners suggested dropping off ideas like streetcar or running transit on lanes of Interstate 5. Staffers recommended that some other options,like building a light-rail line to Sherwood,be put on the shelf. Planners left it to the steering committee to decide whether to study light rail to Tigard or Tualatin,or whether to also put that on the back burner. Portland's steering committee representative,planner Joe Zehnder,asked that light rail be part of the study.He said including light rail in a study with bus rapid transit would help local community members and businesses understand the difference between the two options. And,he said,it would offer a cost comparison between bus rapid transit and light rail in areas where rights of way would have to be purchased. Tualatin Mayor Lou Ogden said a study of light rail would help the discussion about transit in the area. "I've got people in Tualatin who've told me,`No way,light rail in Tualatin,'and I respect their opinion,"Ogden said."I don't know if it's a good idea or a bad idea.I think it's important to not throw out any idea as a bad idea or to herald any ideas as good ideas"until a study is done. Bus rapid transit ideas The committee decided to study bus rapid transit from Portland to Tualatin and Sherwood,and light rail to Tigard and Tualatin.It also said local bus improvements should be considered immediately. The bus rapid transit option sparked some intrigue at the table,in part because of its flexibility in the corridor,and in part because it's a relatively new concept in the Portland region. Bus rapid transit systems can operate in existing lanes or in their own lanes or roads,and can have other upgrades from regular buses.The goal would be to have a rapid transit line that runs on rubber wheels instead of rails,but still acts like a train,in a sense,making stops at stations along the way and moving even when other vehicle traffic is jammed. Such lines are generally much cheaper than light rail.A bus rapid transit line that launched this year in Las Vegas cost$3.75 million per mile.The first four miles of Eugene's Emerald Express bus line cost$6.25 million a mile. Factoring out the costs of the new bridge,the Milwaukie MAX line is forecast to cost more than$t8o million per mile. TriMet planner Alan Lehto described an idea where a bus rapid transit system could run from Portland to Tigard, then have"a starburst of connections"out to other parts of the area,like Sherwood,Tualatin and Washington Square. But Washington County Commissioner Roy Rogers questioned whether TriMet could afford to run such a system. NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 2 (2 pgs) http://portlandtiibune.com/ttt/89-news/121623-cities-planners-narrow-focus-on-sw-corrid... 10/31/2012 Portland Tribune and Community Newspapers- Cities,planners narrow focus on SW Cor... Page 2 of 2 "We really like TriMet but we have limited funds,"Rogers said."Everyone's trying to figure out solutions.What I see is a very expensive system being proposed here,and at some point we're going to have to say,how do we make it work?" Planners will start studying the costs and impacts of a possible transit system in the area.The study won't single out any transit line as a preferred option,but will look at how much various transit projects would cost,how they would affect the communities of the area and how many people are likely to use them. The study,which could be complete by next summer,would also look at how any potential transit project would impact the economy of the region,and how the transit options would affect growth plans in the southwest region's cities. t' Add a rom meat.,. '. P - Comment using... Pacebook social Plug.n http://portlandtiibune.com/ttt/89-news/121623-cities-planners-narrow-focus-on-sw-corTid... 10/31/2012 GREAT PLACES e l What is bus rapid transit? BI ipid transit service uses high capacity buses in their own guideway or mixed in with traffic, with limited stops and a range of transit priority treatments to provide speed, frequency and comfort to users. Most stations have significant and easily identifiable passenger infrastructure, including waiting areas that are weather protected.Additional station amenities may include real-time schedule information, trip planning kiosks, ticket machines, special lighting, benches and bicycle parking. Building a Better Bus Seattle uwages its raDltl-transn How some cities are tricking out their rapid-transit systems r "' bus sees In nd lL Mostr ,Il ;e-- • ,. Their bright system mid-bansilthr FJectr system l Somebusesindu& ,.r„•,r: ” ^,i! colors are systems.rsperial9Ythose hybrid systems rows ofseatsthal -ff I` ns y*._ designed to thmalloxdderstopayat cutemissions fxetheaisleeatha W stand out from the Imstop,outfit their and noise. thanilolfront f ,, J regular,Ili { buseswithdrmorfour prnvidingmmeleg I ,, - buses. dinumforguickerlooding roomandwideraisles. andunloadingof passengers. NLd AMensllorq(county ar/ t Rdpid•hMSilbpaea amLhdSlhmX in LosAnnorles include hike oedi ��;•s ��'; thefrontofmonbuses,whlPebusts `-' hLasVegssindudegrks Fxprtssbusesin Sanlose, // fnzgietostowbhasan board. LAW..,offer overhead R ogee lreeWi-FI T „/• those in5a " farriders. 1 nn Caandthe KanK�aiea offer seatswith high IS� hacks forcomfort. a -- Stopson rapid-transit 1T�.MAX rapid-transit busesin Kam bus system are farther haw largmwindowsthanitsregular local-servicebuses.The MAX apartthanregular �- _ local-servi[ebus routes, '� dy-, passenger seatsaseset higher to give fiders a better v". cu[tinq commute times , v., byhalftermore. ` a Kansas Qt fapvddramit busesoffe 13 lerhesofleg roomasopposeelto 1P inchesmn regular buses.Buses in San Jose,Calif.,induce footrests. Ofr-hoard r5t0 tieketingallpws• �A Somesystemz usestgml NN astomepay at t p lontytransmitters to hold machines at each bus t. o green llgbtbngenough for stop.Without rweding � bustogetthmugh the @' to pay the driver,riders �: � A intersection,Tlrctransmitters can i <anbDardthebus - '„oe changeared light to green more 0 moreguieklythmugh guicklyasabusappmerhes. any of several doors. - + v 5- s include emanated naval Curb-level boarding eraures the Most bus rapid-transit systems Dedicated lanes are set <awred bus stops that height of the curbat the bus stop feature a slightlyaerodemmie ashespecifirallyfor fast-service es,..wk the number of minutes until o. � matches the bus floor so that riders sleekexterior design to mimic buseeonportionsoftheinoutes, the nerd rapid-transit bus arrives don't need to scale staim a train,with a sloped from end. freeing the works from traffic. Smwcer.lransyortatlon distrilt"Wall SUMJUreal rLsmna iln 14X1 Street Journal The Wall Street Journal, "The Commute of the Future,"Sept. 27, 2012 NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 3 1 pg, 11 x17 booklet format) Vehicles Bus rapid transit vehicles often have a larger passenger capacity than conventional buses and utilize modern designs and special branding to differentiate bus rapid transit from standard local bus service. They often have level-platform boarding and multiple doors to make entering and exiting the vehicles easier and faster. Many bus rapid transit systems use vehicles with alternative fuels and pollutant emissions controls. E „r— Cleveland vehicle(Matt Johnson, GGV9 Y I � " Eugene vehicle ;,� 111►I Vehicle interior Stops and stations Bus rapid transit stations are generally spaced r further apart than standard service stops in order to improve travel time for riders. Stations are typically designed similarly to light rail stations, with features that enhance the passenger experience. These may include enhanced shelters, improved ,�, � T accessibility, improved security elements, and real-time arrival information. Stations contribute to the branding of bus rapid transit systems that distinguish them from standard bus service. YnYY 1Yq YY YY Y YYYIgggq A .s •gYlnnY<.Y Y F lnnBgbq }r Y nnq YYYq: - ♦.�� vngngYY 6F �^ nnngrY r'�• ii=Mppnn/ PNU- �q r A �. Now Eugene station and crosswalk Cleveland's HealthLine(Institute for Transportation and Development Policy, Urban Indy) Dedicated lanes Business access and transit lanes Bus rapid transit can operate in mixed traffic, in transit priority Transit priority lanes might include Ian r in dedicated transitways. Dedicated transitways operate business access and transit (BAT) much like light rail tracks, providing the bus rapid transit with lanes, in which buses share the lane exclusive use of a transit guideway that greatly improves speed with autos turning right at the next and reliability. Transitways could be constructed over long intersection or into business access. distances or over shorter distances in targeted areas, and could Such lanes might operate as BAT lanes operate in one or both directions. all-day or only in peak periods BAT r Eugene dedicated lanes provide auto access to businesses _ i < lane and station along the alignment while allowing I�T bus rapid transit vehicles to bypass congestion on the main roadway. i, � y Eugene double track median guideway Eugene single track median guideway I with landscaping and station MUST IWIp IF16N) ONLY nar nus ao knee F Off-board ticketing Some bus rapid transit systems include off-board ticketing similar to light rail. Off-board ticketing minimizes dwell times and NO PARKING expedites boardings since passengers can board through either 4-6 PM door, contributing to improved travel times and reliability. TOW-AWAY � lONF IJI ONLY pp PM Bus m s+ L F .r r Seattle Department of Transportation nu Eugene fare machine with Cleveland fare machine(Marvin emergency call button Fong, The Plain Dealer) Bus rapid transit in other cities Boston, Mass. The Massachusetts Bay Transit Authority's (MBTA) Silver Line in Boston is an example of bus rapid transit in an urban corridor. The Silver Line operates using dedicated transit lines as well as in mixed traffic. In addition, the Silver Line has a 1.5 mile underground segment which includes three underground stations. Eugene, Ore. The Eugene Emerald Express (EmX) operates using both separate running ways and in dedicated lanes alongside mixed traffic. The separate running ways account for about 60 percent of the route and consist of exclusive single and dual bus lanes. The remaining 40 percent of the route is dedicated bus lanes,which are at a grade and separated from general traffic by yellow bus lane marking. When operating alongside traffic, the EmX utilizes traffic -.. signal prioritization and queue jump lanes. Cleveland, Ohio The HealthLine operates in Cleveland in dedicated bus lanes and uses traffic signal prioritization. In downtown Cleveland,buses run along exclusive s lanes in the center of the street. - 1 Las Vegas,Nev. The Metro Area Express (MAX) in Las Vegas has 4.5 miles of dedicated lanes (out of a total route of 7.5 miles). These dedicated lanes are aligned at the curb and shared with right turning traffic. The Strip Downtown Express (SDX) includes the same elements as the MAX plus a central median and dedicated right of way for 2.25 miles. Los Angeles,Calif. The Orange Line operated by the Los Angeles County Metropolitan Transit Authority (Metro) is a two lane, fourteen mile dedicated busway. The Orange Line operates using signal prioritization, dedicated bus lanes and uses an existing railroad right of way. Kansas City, Mo. The Metro Area Express (MAX)runs on a 6-mile linear route in Kansas City. The MAX operates using bus only curb lanes during peak hours and full time bus only lanes in downtown Kansas City. The MAX is also given signal priority during peak hours. October 2012 DRAFT 2013-18 CIP Candidate Project Descriptions 72nd Ave (Hwy 217 to Elmhurst St) Widening and Sidewalks Description: Widen 72"d Avenue to 5 lanes and construct sidewalks, bike lanes, and some landscaped planter strips from Hwy 217 to Elmhurst St (just south of the 72"d/Dartmouth intersection). The extra capacity would be necessary to accommodate future growth in the Tigard Triangle. Note:A 2013 project is planned to signalize the 72"d/Dartmouth intersection, extend a five-lane section south to Elmhurst St, and fill the sidewalk gap from Dartmouth St to the existing sidewalk north of Beveland St. Reasons to Construct: 72nd Avenue carries a high volume and speed of traffic. This Arterial is the main access route from the south to the Tigard Triangle. Anticipated development will add a significant amount of traffic. Traffic congestion and poor walking and biking conditions are anticipated. Daily Traffic Volume: 12,000 Functional Class: Arterial Project Area Crashes (2007-10): Total: 6 Injury: 0 Ped: 0 Project Cost: $5 million Length: 1,800 feet Other Factors: This does not include improvements to the 72"d Ave / Hwy 217 interchange,which is likely to be a significant congestion area. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 10 (but try to scale back so less $) r 30 11/'/201210:08 AM NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 4 (18 pps) 72nd Ave Sidewalks (Hwy 99W to South City Limits) — Citizen Request Description:This project would fill in the gaps and complete sidewalks along 72"d Avenue from Pacific Hwy 99W to the southern city limits. Reasons to Construct: 72"d Ave carries a high volume of traffic. Pieces of sidewalk exist in this section, but neither side of the street provides a continuous connection. There are few nearby pedestrian alternatives to this route. Daily Traffic Volume: 17,000 Functional Class:Arterial Project Area Crashes (2007-10): Total: 137 (65 near 217 intchg) Injury: 53 Ped: 0 Project Cost: $10 million Length: 16,000 feet Subsections: From To Length (ft) Cost Notes Hwy 99W Dartmouth St 2,400 $5 million Si 'ficant widening needed Dartmouth St Hwy 217 See above Hwy 217 Bonita 4,400 $2.2 million Bonita Upper Boones 3,600 $1.8 million Upper Boones City Limits 2,600 $1.3 million Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): Not yet rated 12165 Ave (Walnut to Gaarde) Complete Street Description: Construct sidewalks,bike lanes, and some landscaped planter strips along 121"Avenue from Whistler Lane to Tippitt Street,which would complete the sidewalks and bike lanes from Walnut Street to Gaarde Street. We would anticipate this being a context-sensitive design to minimize community impact, with no center turn lane to save space, and the planter strip narrowing in spots with physical constraints. Reasons to Construct: 121'`Ave carries a relatively high volume and speed of traffic. Pedestrians and cyclists currently have no sidewalk, no bike lane, and in many areas,no place to walk outside the busy travel lanes of this Collector that is the main access route for a significant area of Tigard. The lack of space to walk and high volume and speed of traffic results in significant accident potential. Daily Traffic Volume: 5,000 Functional Class: Collector Project Area Crashes (2007 - 10): Total: 3 Injury: 1 Ped: 0 Community Interest: This is one of the most-requested projects in the City,behind Walnut St Project Cost: $3 million Length: 2,500 feet Prospective Funding Partners:Various bike/ped and active transportation funding programs Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 10 Ash Avenue Crossing of the Portland & Western Railroad (and WES) Description: Connect Ash Avenue from Commercial St across the railroad tracks to Burnham St. This would be an at-grade crossing. A Bridge over or tunnel under the tracks would not be feasible due to grade, community impact, cost, drainage,and/or flood plain issues. Reasons to Construct: The existing rail line is a barrier to mobility in and around downtown Tigard. This crossing would enhance circulation options for people, especially pedestrians and cyclists,in the downtown area. It would reduce potential traffic congestion on Hall Blvd and Main St,and would provide a closer alternate to the Hall Blvd crossing. Daily Traffic Volume: New Street Functional Class: Collector Project Cost: $3,000,000 to $12,000,000 depending on regulatory requirements to get a new crossing Complicating Factors: Regulatory authorities,based on state law, do not allow new at-grade rail crossings unless a jurisdiction is willing to close an existing `meaningful' crossing. One option would be to reconfigure Tiedeman and/or North Dakota so that one meets the other west of the tracks, and a crossing can be closed. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 2 . �•'�� II f �4 40. Or S V � F �r:' ` i Bull Mountain / Benchview / 1391' Roundabout — Citizen Request Description: Construct a roundabout at the intersection of Bull Mountain Road with Benchview Terrace and 139 h Avenue. Reasons to Construct: Some drivers find it difficult to pull out from Benchview and 139`h. Daily Traffic Volume: 8,000 (Bull Mountain Road); 2,000 (Benchview); 300 (139th) Project Area Crashes (2007-10): Total: 4 Injury: 2 Ped: 0 Functional Classification: Collector (Bull Mountain Road); Neighborhood Route (Benchview); Local (139`h) Project Cost: $2,000,000 (includes buying at least one house) Jurisdiction: Bull Mountain Road is currently a County Road,but in the process of being transferred to City jurisdiction. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): Not yet rated 3900 J. BULL��d`OUN�TAINIR� i197n _ es Asa Commercial Street (Lincoln to Main) Sidewalk Description: Construct a sidewalk along one side of Commercial Street under the 99W viaduct to connect the adjacent neighborhood to downtown Tigard. Reasons to Construct: High pedestrian volumes despite lack of facilities. The existing neighborhood has hundreds of houses within easy walking distance of downtown Tigard's businesses and attractions,but lack of sidewalk under the bridge is a major impediment to walking. High accident potential Daily Traffic Volume: 1,300 Functional Class: Neighborhood Route Project Area Crashes (2007-10): Total: 3 (Likely on 99W on bridge) Injury: 2 Ped: 0 Project Cost: $700,000 Length: 800 feet Likely City Share: $700,000 Prospective Funding Partners:Various bike/ped and active transportation funding programs Complicating Factors: The property south and west of Commercial is owned by the railroad;rail safety goals include keeping pedestrians far away from rail lines. To the northeast of Commercial,it would be somewhat difficult and expensive to get a sidewalk around the bridge supports and fill slope. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 7 _ r SPEED 25 Durham Road School 20 When Flashing Description: Install `School 20 When Flashing' signs on Durham Road and the other streets around Tigard High School and Durham Elementary School. 11 signs would be necessary to cover both zones. Reasons to Construct: Improve safety by more clearly defining when the school speed 20 is in effect and when students are to be expected in the area. Improve consistency with other school zones on major streets in Tigard. Improve traffic flow by allowing drivers to proceed at normal speed when students are not expected. This would allow normal speeds about 8 more hours per day for the elementary school and about 4 more hours per day for the high school. Functional Class:Arterial (Durham Rd), Neighborhood Route, and Local Project Area Crashes (2007-10): Total: 60 Injury: 34 Ped: 0 Project Cost: $150,000 Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): scHool 14 Existing SPEED _ LIMIT 20 . ....... .,. : WHEN FLASHING beacon Fowler •• School Greenfield Drive Completion — Citizen Request Description: Connect Greenfield Drive across the ravine from Ridgefield Drive to Chirp Street making a complete connection from Gaarde Street to Bull Mountain Road. Reasons to Construct: Significant lack of connectivity in this area; there is no direct Gaarde to Bull Mountain Road connection between Benchview (to the west) and 114`" (to the east). Complicating Factors: Due to steep topography, a significant bridge would be necessary to cross the ravine. Functional Class: Neighborhood Route Project Cost: $8 million Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): Not yet rated r-t+ w e IL f i LI 1 , x r p J6rw�e� _ ._ � . kv a �: •� �: s,. it �' �� Hall / McDonald Intersection Improvement Description: Construct capacity improvements at the intersection of Hall Blvd and McDonald St. This would include a second southbound through lane, and a second northbound left turn lane and the corresponding receiving lane on McDonald. Reasons to Construct: Congestion; Significant delays are observed at this intersection,particularly in the afternoon peak hour. Daily Traffic Volume: 17,500 (Hall South); 14,000 (Hall North); 11,000 (McDonald) Project Area Crashes (2007-10): Total: 19 Injury: 7 Ped: 0 Functional Classification:Arterials Project Cost: $5 million Jurisdiction: Hall Blvd is a State Highway; it is not Tigard's responsibility to maintain Hall Blvd. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): Not yet rated l ]65 Hall Blvd (McDonald to South of Bonita) Sidewalks — Citizen Request Description:This project would fill in the gaps and complete sidewalks along Hall Blvd from McDonald St to Bonita Road. It could be continued south of Bonita to Murdock to meet the otherwise relatively complete sidewalks along Hall. Reasons to Construct: This section of Hall Blvd carries a very high volume of traffic. Pieces of sidewalk exist in this section,but neither side of the street provides a continuous connection. There are few nearby pedestrian alternatives to this route. Daily Traffic Volume: 17,000 Functional Class:Arterial Project Area Crashes (2007-10): Total: 30 Injury: 14 Ped: 1 Jurisdiction: This project is on a State Highway;it is not Tigard's responsibility to maintain Hall Blvd. Project Cost: $700,000 Length: 1,800 feet missing sidewalk Prospective Funding Partners: ODOT, especially their bike/ped program. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 8 Hall Blvd (Bonita to Durham) Sidewalks — Citizen Request Description:This project would fill in the gaps and complete sidewalks along Hall Blvd from Bonita Road to Durham Road. Reasons to Construct: Hall Blvd carries a high volume of traffic. Pieces of sidewalk exist in this section, but neither side of the street provides a continuous connection. Daily Traffic Volume: 13,000 Functional Class:Arterial Project Area Crashes (2007-10): Total: 48 Injury: 26 Ped: 2 Jurisdiction: This project is on a State Highway;it is not Tigard's responsibility to maintain Hall Blvd. Project Cost: $1,000,000 Length: 2,800 feet missing sidewalk Prospective Funding Partners: ODOT, especially their bike/ped program. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): Not yet rated 1 North Dakota Street Bridge Replacement Description: The existing North Dakota Street bridge over Fanno Creek is very narrow, lacks space for pedestrians and cyclists, and may have deteriorated to a condition in which it may be eligible for bridge replacement grant funds. This project would replace the existing bridge with a new bridge wide enough to accommodate pedestrians and cyclists along with motor vehicles. Reasons to Construct: Narrow bridge;No sidewalks;No bike lanes; Deteriorating bridge condition;Key connection across Fanno Creek Daily Traffic Volume: 4,300 Functional Class: Neighborhood Route Project Area Crashes (2007-10): Total: 0 Injury: 0 Ped: 0 Project Cost: $3 million Prospective Funding Partner: Federal Hazardous Bridge Replacement and Rehabilitation Program Likely City Share: $600,000 Complicating Issues: North Dakota / Tiedeman realignment discussions Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 10 - � d Scoffins / Hall / Hunziker Realignment Description: Reconfigure the intersection so that Scoffins and Hunziker intersect Hall directly across from each other. It appears this would be most efficiently done by moving Scoffins to the north. Reasons to Construct: The existing offset intersection significantly hampers the efficiency with which the traffic signal can operate; Some congestion in peak hours; Driver confusion could increase collision potential. Daily Traffic Volume: 12,000 (Hall); 5,000 (Hunziker);2,500 (Scoffins) Project Area Crashes (2007-10): Total: 4 Injury: 2 Ped: 0 Functional Class:Arterial (Hall); Collector (Hunziker and Scoffins) Project Cost: $6,000,000 (significant right of way acquisition) Jurisdiction: This project is on a State Highway;it is not Tigard's responsibility to maintain Hall Blvd. Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 3 I YiaS 12315 , IJ3IS11315ll315 123 i I �II137 114W .]1431 3]Obl � r Z! yQ 7 124E i� l •••"` J)11I ` i 12111 12.441 12437 4ir y o4;n Tiedeman Ave (Tigard St to Greenburg Rd) Sidewalks Description: Construct sidewalk and bike lane along the southeast side of Tiedeman Avenue for 900 feet southwest of Greenburg Road,which would complete the sidewalk from Greenburg Road to Tigard Street. Reasons to Construct: Tiedeman Ave carries a relatively high volume of traffic. Pedestrians and cyclists currently have no sidewalk or bike lane through much of this corridor that is the main connection between significant areas of Tigard. Daily Traffic Volume: 8,000 Functional Class: Collector Project Area Crashes (2007-10): Total: 20 Injury: 7 Ped: 0 Project Cost: $600,000 Length: 900 feet Prospective Funding Partners: Various bike/ped and active transportation funding programs Complicating Factors: Railroad crossing Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): Not yet rated z. i Tiedeman/Greenburg/North Dakota Intersections — Citizen Request Description: Widen Greenburg Road to include a second northbound lane from Tiedeman Avenue to Hwy 217 and add a second left turn lane from Tiedeman Avenue onto Greenburg Road. May include minor reconfiguration of the Tiedeman/North Dakota Intersection Reasons to Construct: Significant traffic congestion occurs in this area, particularly during the morning rush hour. Daily Traffic Volume: Greenburg: 20,000 (north), 11,000 (south);Tiedeman 11,000; North Dakota 4,000 Project Area Crashes (2007-10): Total: 55 Injury: 19 Ped: 1 Functional Classification: Arterial (Greenburg) Collector (Tiedeman); Neighborhood Route (North Dakota) Project Cost: $6 million. Complicating Factors: Tiedeman / North Dakota reconfiguration discussions. This project would need to include widening the Greenburg Road bridge over Ash Creek Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 1 1 Tiedeman / North Dakota Realignment Description: Reconfigure Tiedeman Ave and/or North Dakota St so that one meets the other west of the railroad tracks. Several options are possible. Reasons to Construct: This would address traffic problems at the Tiedeman/North Dakota intersection caused by its proximity to the Tiedeman/Greenburg intersection. This project would also allow closure of an at-grade rail crossing,which could be `traded' for an Ash Ave rail crossing in downtown Tigard. Daily Traffic Volume: 11,000 (Tiedeman East); 8,000 (Tiedeman West); 4,000 (North Dakota) Project Area Crashes (2007-10): Total: 34 Injury: 12 Ped: 0 Functional Classification: Collector (Tiedeman);Neighborhood Route (North Dakota) Project Cost: $5,000,000 to $10,000,000 depending on options chosen. Complicating Factors: Significant property,building, and/or environmental impact Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 10 (North Dakota Bridge) ez u 3 .►¢ - .� -..ssttt to#ssatssvxss ` ,�iuso �0 5190 n 3� t s. 117 �+ tAz �j 4 tozso t th3... iia r i *� 113sa M1 4W J L t535 s II15 1 13 ft53p I �1 5 io 1 fi Upper Boones Ferry and Durham Rd Adaptive Signal Coordination Description: Install an adaptive traffic signal control system connecting several intersections along Upper Boones Ferry Road and Durham Road from Interstate 5 to near Tigard High School. Reasons to Construct: Significant travel time savings could be realized by adjusting signals in real time to meet demand peaks of office buildings, commutes, schools, etc. Turns on main route cause difficulties for traditional coordination; Existing traffic congestion. Daily Traffic Volume: 20,000 to 28,000 Project Area Crashes (2005-08): Total: 174 Injury: 79 Ped: 0 Functional Classification:Arterial Project Cost: $65,000 (match for$600,000 Federal funds) Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 2 t` w r'1y � IIIJJJ y/ Walnut Street (Tiedeman to Pacific Hwy 99W) Complete Street Description:This project would construct a predominantly two-lane road with turn lanes where needed (such as from Watkins Ave to Hwy 99W),plus sidewalks,bike lanes,planter strips, and storm drainage along Walnut Street from Tiedeman Ave to Hwy 99W. This would include adding turn lanes to help congestion at the Walnut/Hwy 99W intersection. Reasons to Construct: No bike lanes; sidewalk only on one side; Once the 1161'-Tiedeman section is complete, this will be last remaining piece of Walnut to upgrade from a country road to an urban street. Daily Traffic Volume: 9,500 Functional Class: Arterial Project Area Crashes (2005-08): Total: 41 (most at 99W) Injury: 12 Ped: 1 Project Cost: $7 million Length: 2,400 feet Complicating Factors: Tight right-of-way (buildings close to road);Wetland crossing Pedestrian/Cyclist Subcommittee Benefit Rating (0 to 10 Scale): 8 Y l r n MEMORANDUM TO: Tigard Transportation Advisory Committee (TTAC) FROM: Mike McCarthy, Senior Project Engineer Carissa Collins, Senior Management Analyst RE: Capital Improvement Plan Project Candidate Descriptions DATE: November 8, 2012 At your December meeting, you will have the task of developing a prioritized list of capital improvement projects for transportation. This list will be TTAC's recommendation to Council on which projects should be funded, and in what order, in the fiscal years 2013-18 Capital Improvement Plan (CIP). Attached is a one-page project list followed by one-page summaries of each project including project description, reasons to construct, costs, traffic volumes, street classifications, etc., and a picture of the project area. Our goal in providing this information is to help you better understand each project, what it would look like, what it would accomplish, and what would be necessary to complete the project. We have attempted to be factual and neutral in these summaries. Please note that the cost figures are very rough at this point and should be considered preliminary estimates at best. If a project is selected for inclusion in the Capital Improvement Plan, additional design work would help clarify the design of the project, and the cost estimate for that project may increase or decrease significantly. If you have any questions about these projects, please feel free to contact Mike at 503-718- 2462 or mikem e tigard-or.gov. For questions about the project selection and CIP development process, please contact Carissa at 503-718-2643 or Carissa@tigard-or.gov. Thank you for your service to our community! Mike Carissa 1 NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 5 (1 pg) Project Voting Form — Tigard 2013-18 Capital Improvement Plan Tigard Transportation Advisory Cotmnittee November,2012 The 18 transportation projects listed below have been nominated for inclusion in the 2013-18 Capital Improvement Plan to be designed and/or constructed in the next five years. Your task is to rank these projects in terms of which would be best for the city as a whole, considering all factors, to build in the next five years. In the table below,please assign 10 points to your top priority project, 9 points to your second priority project, 8 points to your third priority, and so on down to one point for your tenth priority project. Projects that did not make your `top ten' should be left blank. Project Name Points 72nd Ave (Hwy 217 to Elmhurst St) Widening and Sidewalks 72nd Ave (Hwy 99W to South City Limits) Sidewalks 121 st Ave (Walnut to Gaarde) Complete Street Ash Avenue Crossing of the Portland & Western Railroad Bull Mountain / Benchview / 139th Roundabout I Commercial Street (Lincoln to Main) Sidewalk Durham Road School 20 When Flashing Greenfield Drive Completion Hall / McDonald Intersection Improvement Hall Blvd (McDonald to South of Bonita) Sidewalks Hall Blvd (Bonita to Durham) Sidewalks North Dakota Street Bridge Replacement Scoffins / Hall / Hunziker Realignment Tiedeman Ave (Tigard St to Greenburg Rd) Sidewalk Tiedeman/Greenburg/North Dakota Intersections Tiedeman / North Dakota Realignment Upper Boones Ferry, Durham Rd Adaptive Signal Coordination Walnut Street (Tiedeman to Pacific Hwy 99W) Complete Street NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 6 (1 pg) 2012 Tigard City Council Goals The City Council met December 6, 2011,to set goals for the coming year. While the city will accomplish much more than what is listed here, the identified goals represent items deserving special attention in the months ahead. 1. Take the Next Step on Major Projects a. Continue oversight of design, permits, rate implementation and costs for the Lake Oswego-Tigard Water Partnership. b. Implement the Comprehensive Plan through code revisions, including i. Tree code. ii. Contribute to the SW Corridor Plan by adopting Tigard's land use policies and designations and identifying priorities for high-capacity transit (HCT) station location alternatives by mid-2012. 1. Determine the economic development opportunities, development plan, city policies and regulations needed to position the Tigard Triangle as an HCT station location. c. Deliver on the promise of the voter-approved park bond by identifying all acquisition opportunities and completing the majority of park land acquisitions and improvements by the end of 2012. 2. Financial Sustainability a. Maintain the long-term financial health of the General Fund and reserves. i. Develop a long-term financial strategy by mid-2012. b. Communicate regularly to residents about the alignment of city priorities with resources. c. Evaluate the city's sustainability efforts on an ongoing basis. 3. Downtown a. Identify a geographic-opportunity area in the downtown with the greatest potential to create a catalyst for further development. Concentrate most resources there. b. Contact owners of key, structurally sound Main Street buildings with vacancies. Begin cooperative effort to secure tenants that will contribute to the vitality of downtown. 4. Annexation a. Re-evaluate the city's annexation policy. b. Develop a philosophy and approach to consider annexations, including islands. S. Recreation a. Evaluate options and resources to create a pilot recreation program: i. Inventory existing city and community recreational programs, facilities and resources. ii. Create recreational opportunities by partnering with the school district and other agencies or groups. iii. Identify funding options aligning with the recreational programming demand. 1 NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 7 (2 pgs) Five-Year Council Goals • Obtain Ash Avenue railroad crossing in downtown. • Explore Pacific Highway Urban Renewal District as part of a citywide economic development strategy. • Support the legislature to address the financial needs of Oregon state and local governments. • Identify funding and implement plan for city facility needs. • Renew intergovernmental water agreement. Long Term Goals • Continue pursuing opportunities to reduce traffic congestion. • Continue implementing Downtown Urban Renewal Plan. • Continue monitoring the Tigard/Lake Oswego Water Partnership. Tigard City Council Long Range Objectives • Basic city services provided to citizens are cost effective and are delivered without interruption. • Tigard's interests in regional and statewide issues are coordinated with appropriate agencies and jurisdictions. • Tigard citizens are involved in the community and participate effectively. • Programs and activities are available in the community to meet the needs of a diverse population. • External and internal city assets are well managed and utilized. MEMORANDUM TO: Craig Prosser FROM: Judith Gray, Mike McCarthy and Toby LaFrance RE: Tigared Transportation Advisory Committee input on Council Goals DATE: December 13, 2010 On December 1, 2010 TTAC met and discussed priorities they would like to have Council consider for the next year. The priorities that were recommended are as follows: 1. Develop a strategy for implementation of the Downtown Circulation Plan. 2. Communicate more clearly on how bond and fee funds are getting used. (This could be part of the Council's communication plan: "Your tax dollars at work".) 3. Work with Oregon Department of Transportation to reduce traffic congestion on Pacific Highway. 4. Improve routes and safety for Tigard children going to and from school. 5. Improve pedestrian and cycling connectivity within the City of Tigard. 6. Implement Downtown Urban Renewal and initiate developer and business outreach and recruitment. Following the meeting, a TTAC member who was unable to attend the December 1 meeting submitted the following suggestion via email: 7. Work with Metro and TriMet to improve bus service,including coordination with WES and service to underserved areas (e.g., Bull Mountain,Walnut, Gaarde). Thank you for considering these recommended goals. NOV 7, 2012 TTAC MEETING SUMMARY ATTACHMENT 8 (1 pg)