Loading...
Permit CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit#: BUP2014-00061 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/25/2014 Parcel: 2S101AB03000 Jurisdiction: TIG Site address: 7150 SW DARTMOUTH ST Project: RED ROCK CENTER Subdivision: 2012-009 PARTITION PLAT Lot: 2 Project Description: Building B-New 8,148 sq.ft.shell office building. Contractor: EMMETT PHAIR CONSTRUCTION Owner: FRY, DOUGLAS 16650 FIR LANE 23077 SW NEWLAND RD LAKE OSWEGO, OR 97034 WILSONVILLE,OR 97070 PHONE: 503-572-8606 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Vg Permit Fee-Additions,Alterations, 06/17/2014 $5,003.14 Demolition Occupancy Grp: B Occupancy Load: 12%State Surcharge-Building 06/17/2014 $600.38 Dwelling Units: 0 Plan Review 03/17/2014 $3,281.82 Stories: 1 Height: 28.5 ft Plan Review-Fire Life Safety 03/17/2014 $2,019.58 Bedrooms: 0 Bathrooms: 0 Plan Review 06/17/2014 $-29.78 Value: $790,812 Plan Review-Fire Life Safety 06/17/2014 $-18.32 DC Provision Review,COM New-Bldg 06/17/2014 $139.00 DC Provision Review,COM New-Ping 06/17/2014 $139.00 Floor Areas: DC Provision Review,COM New-LRP 06/17/2014 $41.00 Total Area 8148 Info Process/Archiving-Lg$2.00(over 06/17/2014 $78.00 11x17) Accessory Struct: 0 Info Process/Archiving-Sm$0.50(up to 06/17/2014 $16.50 Basement: 0 11x17) Carport: 0 Metro Const.Excise Tax-Commercial 06/17/2014 $948.97 Covered Porch: 0 Use Deck: 0 Tig-Tual School CET-Non Residential 06/17/2014 $4,644.36 Park-Commercial and Industrial 06/17/2014 $8,294.20 Garage: 0 Mezzanine: 0 Total $25,157.85 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: 1 Special Inspection(see plans) Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: No Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a corn of thnzn les or direct questions to OUNC by callin .232.1987 or 1.800.332.2344 Issued By: .10111". —`. = Pe -:Signature: C- •' . . 175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each Inspection. Buf.klin2 Permit Application Commercial I (m ()I 11c I I ,,I ().1 City of Tigard lit(i k. D Received ;�. Permit No.: r k ,,_\ —4 , 1111 • 13125 SW Hall Blvd.,Tigard,OR 972.9k.— Plan Review t� Phone: 503-718-2439 Fax: 503-598-1960 Q + ��1� DateB : /��'!1I� ! �, �" . A / /_ Inspection Line: 503-6394175 �PP 1 A� Date Ready/13y. ��� Supplemental See P nt 2 for I 1 C.A K l) t+` A otified/Method: �2 Supplemental Information Internet: www.tigard-or.gov ��� � ���:/Jt TYPE OF WO' - REQUIRED DATA:HAND 2-FAMILY DWELLING New construction ❑Deg t - Permit fees'are based on the value of the work performed. Indicate the value(rotnded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the • ,:•,•:t. CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: 4=4Z21-9)—W-12°#. \ ❑ 1-and 2-family dwelling �Commercial/industrial ` ❑Accessory building ❑Multi-family Number of bedrooms: 4 M ❑Master builder ❑Other: Number of bathrooms: O JOB SITE INFORMATION AND LOCATION Total number of floors: ' 4 kksJob site address: •4—'l- 7 p F 71 D 6(^'�►9 otit'Tj4 r New dwelling area: square feet City/State/ZIP: 7 t e o/` Garage/carport area: square feet Suite/bldg./apt.no.: name: fR� t-PM2Ir Covered porch area square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST - Subdivision: Lot no.: Permit fees'are based on the value of the work performed. ‘• Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead, the profit f the DESCRIPTION OF WORK work indicated on this application. C6tex,-.54-�� d Valuation: rip • -$ ,�_.- r r<� Existing bui ding area square fee A ) New building area: g/ / square feet v / �_" et PROPERTY OWNER / ❑ TENANT Number of stories: R -vame: 1af9.t� F, 7...- Gr�� t t / g ,(Lt Type of construction: V L.� _...4 Address: p'O .'a, ca'k �v* Occupancy groups: A City/State/ZIP: ,wit/ 6-en 1 o ,j'7 O 5 L Existing: §,.. Phone:( ) Fax:( ) New: ■ APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: (Please refer to fee sehethttc) / Structural plan review fee(or deposit): _ll`` Contact name: 1 E/ v.t ot....., k..�4 Lf--+--� Address: /O � X, � u Jw r � /Q/ FLS plan review fee(if applicable): C - City/State/ZIP: /44_01 c� `• Cl' 7 t--1 t�L Total fees due upon application: Phone:(ro ) ///7 49—y 7(7/,,a Fax::( ) Amount received: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: �5/ , �� / @ C�. C,c S 1 . ¢- CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: , ph CL:t r S..± J j_ Submit two(2)sets of roof plan with connection details S.-m.1 and fire department access,along with the 2010 Oregon Address: , 4, ry r%1 se Solar Installation Specialty Code checklist. City/State/ZIP: (,s bci4 p (N �( b ') a� Permit fee(includes plan review $180.00 ,�p ,�,L.t;" and administrative fees): Phone:( 0 ) r��I 66s, Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Iic.: #s 7 / 7 Total fee due upon appication: $201.60 Authorized signature: l This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:E.)rj,N rE) C -€7 Date: 3/` J/y * Fee methodology set by Tri-County Building Industry ` Service Board. I:\Building\Pennits\BUP_COM_PermitApp.doc Rev.12/11/2012 4404613T(11/02/COM/WEB) f City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 71 ■ ■ Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [I] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP COM_PermitApp.doc Rev.12/02/2013 M t L — e2 ti)K --7---19-ti 0 of 6� W� /< A)Ai Building Permit Number: 45t/MP-1--Uctx,,/ F4.-A mac' Li A..) R,© L C.. c P 0 eU i A--" C. C. , 1,111 s III Building Permit Review Commercial Projects with Approved Land Use IIGARD 7150 c5w -Dti `cv tTt Site Address: .m a r `r?b tt c-Tr r ❑Verify site address is valid. Project Name : QED oc-k C Eh7'er( ?74' 5 S(-f ■ Planning Review 4E10 -a—Land Use Case Number: PDR,20/C - OCk X •T Plans Match Approved Land Use: `IN ' AN&- ite Plan • Landscape Plan s t Urban Forestry Plan -Elevation Plan _ cy' IN'' Building Height: Maximum Height Z(C eight / 0 (l-P-) Conditions Met: oimippi.0-1:::. ' ubmittal ❑ Prior to Permit Issuance Approved by: / , Date: 3-/ 7`/f Notes: Revisions after Buildi i ubmittal o k Reviewer Date Revision 1 Ap. .ved ❑ of Approved ❑ Revision 2 • pproved ❑ Not Approved ❑ Revision 3 Approve Not Approved ❑ Building Permit Submittal Original Plan Submittal: Date: / 1 By 6.T •• Site Plans: # Building Plans: Create Case Record#: case#a e for Building Permit mber. Workflow Routing: ring I� Engineering WiPermit Coordinator CYffnilding Workflow Sign-off: -off for Planning staff,including notes from planning review(page 1) Route Application Documents: LlI'Engineering: (1) copy of permit application, (1) site plan, (1) building plan and nginal plan review routing form. Ihr Building original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Reviewed By: Date: Notes: I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_123013.docx Engineering Review— reviewed by: ❑ Actual Slope: ❑ PFI Permit# W 1 K 1J ■JFs.•.) ' c32 i}-A Iv a.s,157-1•J4, ❑ Conditions Met Notes: !A.UST' (7tt'Y —1-1 FIT:b T fil--1 4371-- srtn 3 vc bF 3ue . Approved by: Date: Revisions(after Building Submittal only) 'e;ewe, Date Revision 1 Approved ❑ Not Approved _ _ y Revision 2 Approve Not Approved ❑ A � !� IM /* Revision 3 Approved ❑ Not Approved ❑ Permit Coordinator Review ❑ Conditions Met-Prior to Issuance of Building Permit Notes: Revision Notice 1: Date Sent to Applicant: /9 l<{ 5/5///49 Revision Notice 2: Date Sent to Applicant ' Revision Notice 3: Date Sent to Ap/•• ant Okay to Issue Permit- . Date: 69/1/41 I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_123013.docx Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 7150 SW DARTMOUTH ST, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - C of O BUP2014-00061 Jeff Grove Violation Summary: Inspector Contractor Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 7150 SW DARTMOUTH ST, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - No C of O BUP2014-00061 Jeff Grove Previously passed with incorrect result No C of O issued for the shell. C of O will be issued for the tenant when complete Violation Summary: Inspector Contractor