Loading...
Permit CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit#: BUP2014-00145 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/19/2014 Parcel: 1 S 135BA00102 Jurisdiction: TIGARD Site address: 10250 SW WASHINGTON SQUARE RD Project: Spec Space Subdivision: Lot: 9 Project Description: Demo interior space and add new demising wall. Contractor: GREENBERRY CONSTRUCTION LLC Owner: PPR SQUARE TOO LLC 2273 NW PROFESSIONAL DR STE 200 PO BOX 847 CORVALLIS, OR 97330 CARLSBAD,CA 92018 PHONE: 541-752-0381 PHONE: FAX: 541-752-0472 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIIB DC Provision Review,COM TI-Ping 06/19/2014 $174.00 Occupancy Grp: Occupancy Load: DC Provision Review,COM TI-LRP 06/19/2014 $26.00 Dwelling Units: 0 Permit Fee-Additions,Alterations, 06/19/2014 $1,105.95 Demolition Stories: 1 Height: 0 ft 12%State Surcharge-Building 06/19/2014 $132.71 Bedrooms: 0 Bathrooms: 0 Plan Review 06/19/2014 $718.87 Value: $100,000 Plan Review-Fire Life Safety 06/19/2014 $442.38 Info Process/Archiving-Sm$0.50(up to 06/19/2014 $0.50 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,600.41 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Thos- rules -re set forth in OAR 952-001-0010 - •u• • z 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19:7 or 1.807' 32.23 j. Issue, By: / AgrAiiiiittad Permittee Signature: AL Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completi• of the project. Approved plans are required on the job site at the time of each inspection. , ' Building Permit Application Commercial ECEIVE FOR OFFICE USE ON I.1 Received City of Tigard Date/B ff, ..I9 Pei mitNo.: /y I J/ ��/V3 1,11 1 " 13125 SW Hall Blvd.,Tigard,OR 97223 J U N 1 9 2014 Plan Revie p s Related Permit: "kW Phone: 503-718-2439 Fax: 503-598-1960 Date/B TIGAR I) Inspection Line: 503-639-4175 CITY( F`G RD Date Ready tuns HI See Page 2 for Internet: www.tigard-or.gov V Vf vrl Notified/Method: Supplemental Information 7)III nFlll r„P,;i t r!).t TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction El Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ID 1-and 2-family dwelling ill Commercial/industrial Valuation: $ CI Accessory building ID Multi-family Number of bedrooms: ID Master builder ID Other: Number of bathrooms: /O 951) JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: j _ &. 4.) l••04' -1/t '' 7Z»>-) New dwelling area: square feet City/State/ZIP: 77 Garage/carport area: square feet Suite/bldg./apt.#: (Project name: )sxj..._ 24442dz,02-1) 1/444 Covered porch area square feet Cross street/directions to job site: 4446/4-1-446 raw/ 6/544 4,..k-- 7-0.-/_, Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials ea,c1,and the profit o DESCRIPTION OF WORK work indicated o is application. p - - Valuation: $ 710 AO 7 E/P901/ 7/pA/ 1.T �K1 the) 4XrL�/' /".e4, dt�rSt 1 , L+/db// Existing buil ' area square feet New building area: square feet or PROPERTY OWNER ❑ TENANT Number of stories: Name: 14 4L,e-g le j Type of construction: 6- Address: Yas7/ G//L51ji1 vt, Occupancy groups: City/State/ZIP: 59/1/1► /Vo/J L / c A 9O41b' Existing: Phone:(310 ) F95 _ t;GG - Fax:( ) New: APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: G4i�.r�is /s fgf/ f 'e r/1•L✓ review refer(or deposit):osit):schedule) y Structural plan review fee(or deposit): Contact name: 6,2EljE- FLS plan review fee(if applicable): Address: 2273 /Vk/ ff i 'AI.4L 14 >#$Zaz City/State/ZIP: �,Qps/$(j L/1/ 733o Total fees due upon application: Amount received: Phone:(Sa/) -752-0381 Fax: :($y/ ) 752-Oy77 E-mail: t'��n Lem) PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* le �'f LO.vSTiCliGT)V Al- Levi Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: G'7 4/ 4�R v 4,, /5 (,e r/ j Submit t (2)sets of roof plan with connection d :its and fire de.• ent access,along with the 21 : I regon Address: 2'273 Nk/ /IaffSS/u v4 t, [b,L 4:).Zaw Solar Installatt. .eclalty Code ch- . City/State/ZIP: 4p¢f/,QL L/S O,e_ 9'73_3 v Permit fee(inc ,• eview $180.00 / and ad t.• tr.; • fees): Phone:(Slj) ) 757- et 3 4/ Fax:(5W ) 7S2-0Y7 Z- State su .: :e(12%ofpermit fee . $21.60 CCB Lic.: /4.44,/Z Tota •,' . •r 01.60 Authorized signature: This permit application expires if a permit is not obtained Z/°17Z/ / within 180 days after it has been accepted as complete. Print name: /.., _,- ,Q/q., -, Date: G////11.7 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) I. 4 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) 'When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2]of Valuation Computation): $ I:\Building\Permits\BUP_COM_PemvtApp.doc Rev.04/21/2014 r a City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT III " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations T 1 G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map& tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. 4. ADDITIONAL INFORMATION AS FOLLOWS: A. Fire Department Building Survey with (1) additional full set of architecture drawings. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1111 " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TI G A R l7 13125 SW Hall Blvd. •Tigard,Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 3 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County,and Tualatin Valley Fire&Rescue),if applicable. I:\Building\Permits\BUP_COM PetnitApp.doc Rev.04/21/2014 City of Tigard 1111 A COMMUNITY DEVELOPMENT DEPARTMENT ■ T[G A R D Building Permit Review — Commercial - No Land Use Building Permit #: 0-' ,...p 9.0!4- co (4c-3 Site Address: llayer—: fj) h,/7� 61 fed. Suite/Bldg#: Project Name: *G GjG� (Na e of co mercial business occupying the space. If vacant,enter Spec Space.) Planning Review , Proposal: 01 d ein/S i/oi ow t 'z 4 /lend f°�1W 'rd C R - Verify site address/suite#exists and active in permit system. Zoning: LL C/ �ermitted User ❑ Yes ❑ No _pec Space Land Use Required: ❑ Yes )2"-No Type Required Notes: !it, //J id e1"17 ' /i_!■&L%L_? L/- ' -.; i / e• 1 L: Approved by Planning: 41 / Date: 6Q/i9//G/ Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 60 l q�iy1 Site Plans: # Building Plans: # 3 Building Permit#: Enter building permit#above. Workflow Routing: ing ❑–Eagitieering—'CI r na Building Workflow Sign-off: off for Planning(include notes from planning review) Route Application Documents: ding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: ep /g�fC I:\Bui Iding\Forms\BldgPermitRvw_COM_NoLandUse_042914.docx Qe VU 1 s.,—) • • �E1 v FD ____,_ 1T: i Demo the entire interior of the C01 WVI AC E R I C H ® JUN 19 20;4 space shown, including flooring down Float the entire floor with a 'l;l �[MAHb to exposed slab, all interior walls, , U a, q8• thin layer of ardex or similar �'` ►�10� (CS to deliver smooth, level floor ceiling, wall finishes and gyp board ILDIN�7rt1, 0 back to exposed studs/CMU wall, all — Cl- 'This portion of the space does f Cr) not exist today. We will be •� utility lines back to the source, all WASHINGTON ( '� y. plumbing to under slab and patched, C f-- N expanding the corner of the �� all roof top RTUs and curbs (include building, but that is not part of roof patches) SQUARE TOO a this scope. I r~ lc., o < ,� �� SPACE: C01 S.F.: 8015 DATE: 03.06.14 w SCALE: 1"- 20' * O / ti _ V VERIFY J w COLUMNS V Ow* jr On the interior of all PT* R existing exterior walls from COI a ' O slab to underside of deck DXL 4 above install new 5/8" LEASE r Type'X' gyp board finished (PROPOSED) stub two 2"electrical LINE to paint ready. Provide 8015 S.F. conduits with pull string KEY PLAN 2.5" clear from back face from above the Landlord's of gyp board to concrete electrical switchgear in the z NORTH ;block walls. electrical room stubbed into CO1 and one 3/4" PROPOSED the bathroom at the end of telephone conduit with pull SPACE the hall is to be part of the string from the demarc to include installation of a demo and included as part a the Premises new 4'-0"x7'-0" hollow core-- of the new C01 space P metal door with tamper Required doors and frames shall proof hinges on back wall and installed by each tenant(any / c r -final location TBD in snly / final determination plans is by are tenant)sugge.ted It s orequired; 24� ■ that the tenant,contractor,architect or y # representative must visit the site and • familiarize and verify all dimensions and 1S� • �ocatipn a sizes of major items such as structural ft.?7„ etec a� Of Dash elements,electrical runs,plumbing locations •r--, d teie, and items not covered by this drawing. This Construct new metal stud demising shall be done at Tenants expense. When g 4) exit passageways are present to provide a walls (shown in red lines)(6", 20 GA, �1(9. 24• A Include in your bid any ry p secondary exit from a Tenants space, doors 16" OC) from slab to deck above. required drawings and city shall be one-hour fire doors. Such doors x. submittals to obtain the shall be self-closing and be so maintained or Perform demo as needed to install Z3• shall be automatic dosing by smoke detector Install 5/8" gyp board finished to '4 • required permits. Permit fee the new wall. Patch back of finishes actuation. Prior to finalizing terms and paint ready condition on both does not need to be conditions,Leasing and Center Management or ceiling is not required. e0;gif. sides of new demising walls from included. must resolve exiting per applicable codes. Slab to deck and fire caulk. Service area,empty electrical conduit, 3',e. / La. Prepared by sewer,water, and empty telephone conduit located within the lease line.Tenant must field verify all dimensions and conditions. Aaron Pratt Drawn by:G2 T.C.:AP �Macerich 3-11-14 ELLICE IVED E\,5 0\5 z MAy192014 BO Y�FTIG DINCDIVISR� E N N • 1.6 iT u) Y ,... ff I OL.33 ie u G,. I s L I ( u 1 N u --- .. u ti t\^RY 10 5o al r NEW ` T EXISTING PATIO_ I O HOUSE C....) ... IN. cr-. • N I twsTIN. 1- oRNt 5.�• ?iCTDALK i - ■ 4. �I 51 >t a K_� - - 0 H a— z SITE PLAN tNN Q W z Q Q CITY OF TIGARD cZ Q Approved by Planning s Date: S . I9• I`f Date ;.,o.l> Initials: C4K- -..':,' Drawn: CEB Job, CD+3° Skxei: Iof 3 Sheets 13 ? `I ■ I3Paict - C.4- . Location: Record Type: Inspection Type: Result: Comments: Inspection Date: Record ID: Inspector: City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 10250 SW WASHINGTON SQUARE RD, TIGARD, OR, 97223 Commercial - Building 299 Final inspection PASS - No C of O July 24, 2014 at 12:37:30 PM BUP2014-00145 Chip Barnett Violation Summary: Inspector Contractor