Permit CITY OF TIGARD BUILDING PERMIT
• COMMUNITY DEVELOPMENT Permit#: BUP2014-00145
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/19/2014
Parcel: 1 S 135BA00102
Jurisdiction: TIGARD
Site address: 10250 SW WASHINGTON SQUARE RD
Project: Spec Space Subdivision: Lot: 9
Project Description: Demo interior space and add new demising wall.
Contractor: GREENBERRY CONSTRUCTION LLC Owner: PPR SQUARE TOO LLC
2273 NW PROFESSIONAL DR STE 200 PO BOX 847
CORVALLIS, OR 97330 CARLSBAD,CA 92018
PHONE: 541-752-0381 PHONE:
FAX: 541-752-0472
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIIB DC Provision Review,COM TI-Ping 06/19/2014 $174.00
Occupancy Grp: Occupancy Load: DC Provision Review,COM TI-LRP 06/19/2014 $26.00
Dwelling Units: 0 Permit Fee-Additions,Alterations, 06/19/2014 $1,105.95
Demolition
Stories: 1 Height: 0 ft 12%State Surcharge-Building 06/19/2014 $132.71
Bedrooms: 0 Bathrooms: 0 Plan Review 06/19/2014 $718.87
Value: $100,000 Plan Review-Fire Life Safety 06/19/2014 $442.38
Info Process/Archiving-Sm$0.50(up to 06/19/2014 $0.50
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,600.41
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Thos- rules -re set forth in OAR
952-001-0010 - •u• • z 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.19:7 or 1.807' 32.23 j.
Issue, By: / AgrAiiiiittad Permittee Signature:
AL
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completi• of the project.
Approved plans are required on the job site at the time of each inspection.
,
' Building Permit Application
Commercial ECEIVE FOR OFFICE USE ON I.1 Received
City of Tigard Date/B ff, ..I9 Pei mitNo.: /y I J/ ��/V3
1,11 1 " 13125 SW Hall Blvd.,Tigard,OR 97223 J U N 1 9 2014 Plan Revie p s Related Permit:
"kW
Phone: 503-718-2439 Fax: 503-598-1960 Date/B
TIGAR I) Inspection Line: 503-639-4175 CITY( F`G RD Date Ready tuns HI See Page 2 for
Internet: www.tigard-or.gov V Vf vrl Notified/Method: Supplemental Information
7)III nFlll r„P,;i t r!).t
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction El Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
ID 1-and 2-family dwelling ill Commercial/industrial Valuation: $
CI Accessory building ID Multi-family Number of bedrooms:
ID Master builder ID Other:
Number of bathrooms:
/O 951) JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: j _ &. 4.) l••04' -1/t '' 7Z»>-) New dwelling area: square feet
City/State/ZIP: 77 Garage/carport area: square feet
Suite/bldg./apt.#: (Project name: )sxj..._ 24442dz,02-1) 1/444 Covered porch area square feet
Cross street/directions to job site: 4446/4-1-446 raw/ 6/544 4,..k-- 7-0.-/_, Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials ea,c1,and the profit o
DESCRIPTION OF WORK work indicated o is application.
p - - Valuation: $ 710 AO
7
E/P901/ 7/pA/ 1.T �K1 the) 4XrL�/' /".e4, dt�rSt 1 ,
L+/db// Existing buil ' area square feet
New building area: square feet
or PROPERTY OWNER ❑ TENANT Number of stories:
Name: 14 4L,e-g le j Type of construction: 6-
Address: Yas7/ G//L51ji1 vt, Occupancy groups:
City/State/ZIP: 59/1/1► /Vo/J L / c A 9O41b' Existing:
Phone:(310 ) F95 _ t;GG - Fax:( ) New:
APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
Business name: G4i�.r�is /s fgf/ f 'e r/1•L✓ review refer(or deposit):osit):schedule)
y Structural plan review fee(or deposit):
Contact name: 6,2EljE- FLS plan review fee(if applicable):
Address: 2273 /Vk/ ff i 'AI.4L 14 >#$Zaz
City/State/ZIP: �,Qps/$(j L/1/ 733o
Total fees due upon application:
Amount received:
Phone:(Sa/) -752-0381 Fax: :($y/ ) 752-Oy77
E-mail: t'��n Lem) PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
le �'f LO.vSTiCliGT)V Al- Levi Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name: G'7 4/ 4�R v 4,, /5 (,e r/ j Submit t (2)sets of roof plan with connection d :its
and fire de.• ent access,along with the 21 : I regon
Address: 2'273 Nk/ /IaffSS/u v4 t, [b,L 4:).Zaw Solar Installatt. .eclalty Code ch- .
City/State/ZIP: 4p¢f/,QL L/S O,e_ 9'73_3 v Permit fee(inc ,• eview $180.00
/ and ad t.• tr.; • fees):
Phone:(Slj) ) 757- et 3 4/ Fax:(5W ) 7S2-0Y7 Z- State su .: :e(12%ofpermit fee . $21.60
CCB Lic.: /4.44,/Z
Tota •,' . •r 01.60
Authorized signature: This permit application expires if a permit is not obtained Z/°17Z/ / within 180 days after it has been accepted as complete.
Print name: /.., _,- ,Q/q., -, Date: G////11.7 * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
I. 4
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
" Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
T I G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) 'When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2]of Valuation Computation): $
I:\Building\Permits\BUP_COM_PemvtApp.doc Rev.04/21/2014
r
a
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
III " Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
T 1 G A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map& tax lot# ❑ project name ❑ site address ❑ suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations, plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit- based on valuation of project.
4. ADDITIONAL INFORMATION AS FOLLOWS:
A. Fire Department Building Survey with (1) additional full set of architecture
drawings.
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014
•
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1111 " Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
TI G A R l7 13125 SW Hall Blvd. •Tigard,Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new,additions and alterations.) Required at
Submittal
Demolition Permit 3
(site plan required showing location and square
footage of all buildings to be demolished)
Site Work 3
(must include location of all accessible parking)
Plumbing(site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Permits\BUP_COM PetnitApp.doc Rev.04/21/2014
City of Tigard
1111 A COMMUNITY DEVELOPMENT DEPARTMENT
■
T[G A R D Building Permit Review — Commercial - No Land Use
Building Permit #: 0-' ,...p 9.0!4- co (4c-3
Site Address: llayer—: fj) h,/7� 61 fed. Suite/Bldg#:
Project Name: *G GjG�
(Na e of co mercial business occupying the space. If vacant,enter Spec Space.)
Planning Review ,
Proposal: 01 d ein/S i/oi ow t 'z 4 /lend f°�1W 'rd C R -
Verify site address/suite#exists and active in permit system.
Zoning: LL C/
�ermitted User ❑ Yes ❑ No _pec Space
Land Use Required: ❑ Yes )2"-No Type Required
Notes: !it, //J id e1"17 ' /i_!■&L%L_? L/- ' -.; i / e• 1 L:
Approved by Planning: 41 / Date: 6Q/i9//G/
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 60 l q�iy1
Site Plans: #
Building Plans: # 3
Building Permit#: Enter building permit#above.
Workflow Routing: ing ❑–Eagitieering—'CI r na Building
Workflow Sign-off: off for Planning(include notes from planning review)
Route Application Documents: ding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: ep /g�fC
I:\Bui Iding\Forms\BldgPermitRvw_COM_NoLandUse_042914.docx
Qe
VU 1
s.,—) • • �E1 v FD
____,_
1T: i Demo the entire interior of the C01 WVI AC E R I C H
® JUN 19 20;4
space shown, including flooring down
Float the entire floor with a 'l;l �[MAHb
to exposed slab, all interior walls, ,
U a, q8• thin layer of ardex or similar �'` ►�10�
(CS to deliver smooth, level floor ceiling, wall finishes and gyp board ILDIN�7rt1,
0 back to exposed studs/CMU wall, all —
Cl- 'This portion of the space does f
Cr) not exist today. We will be •� utility lines back to the source, all WASHINGTON
( '� y. plumbing to under slab and patched,
C f-- N expanding the corner of the �� all roof top RTUs and curbs (include
building, but that is not part of roof patches) SQUARE TOO
a this scope. I r~
lc.,
o < ,� �� SPACE: C01
S.F.: 8015
DATE: 03.06.14
w SCALE: 1"- 20'
*
O / ti _
V VERIFY J
w COLUMNS
V
Ow* jr On the interior of all
PT* R existing exterior walls from COI a '
O slab to underside of deck DXL 4
above install new 5/8" LEASE
r Type'X' gyp board finished (PROPOSED) stub two 2"electrical LINE
to paint ready. Provide 8015 S.F. conduits with pull string KEY PLAN
2.5" clear from back face from above the Landlord's
of gyp board to concrete electrical switchgear in the z NORTH
;block walls. electrical room stubbed
into CO1 and one 3/4" PROPOSED
the bathroom at the end of telephone conduit with pull SPACE
the hall is to be part of the string from the demarc to include installation of a
demo and included as part a the Premises new 4'-0"x7'-0" hollow core--
of the new C01 space P metal door with tamper Required doors and frames shall
proof hinges on back wall and installed by each tenant(any
/ c r -final location TBD in snly
/ final determination plans is by are tenant)sugge.ted It s orequired;
24� ■ that the tenant,contractor,architect or
y # representative must visit the site and
• familiarize and verify all dimensions and
1S� • �ocatipn a sizes of major items such as structural
ft.?7„ etec a� Of Dash elements,electrical runs,plumbing locations
•r--, d teie, and items not covered by this drawing. This
Construct new metal stud demising shall be done at Tenants expense. When
g 4) exit passageways are present to provide a
walls (shown in red lines)(6", 20 GA, �1(9. 24• A Include in your bid any ry p
secondary exit from a Tenants space, doors
16" OC) from slab to deck above. required drawings and city shall be one-hour fire doors. Such doors
x. submittals to obtain the shall be self-closing and be so maintained or
Perform demo as needed to install
Z3• shall be automatic dosing by smoke detector
Install 5/8" gyp board finished to '4 • required permits. Permit fee
the new wall. Patch back of finishes actuation. Prior to finalizing terms and
paint ready condition on both does not need to be conditions,Leasing and Center Management
or ceiling is not required. e0;gif.
sides of new demising walls from included. must resolve exiting per applicable codes.
Slab to deck and fire caulk. Service area,empty electrical conduit,
3',e. /
La.
Prepared by
sewer,water, and empty telephone conduit
located within the lease line.Tenant must
field verify all dimensions and conditions.
Aaron Pratt Drawn by:G2 T.C.:AP
�Macerich
3-11-14
ELLICE
IVED E\,5 0\5 z
MAy192014
BO Y�FTIG
DINCDIVISR�
E N
N
• 1.6 iT
u)
Y ,...
ff I OL.33
ie u
G,.
I
s
L
I ( u 1
N u --- .. u ti
t\^RY
10 5o al r NEW `
T EXISTING PATIO_ I O
HOUSE
C....) ...
IN.
cr-. •
N I twsTIN.
1- oRNt 5.�•
?iCTDALK
i - ■ 4.
�I 51 >t a K_� - -
0
H
a—
z
SITE PLAN tNN Q
W z
Q Q
CITY OF TIGARD cZ
Q
Approved by Planning s
Date: S . I9• I`f Date ;.,o.l>
Initials: C4K- -..':,'
Drawn: CEB
Job, CD+3°
Skxei:
Iof 3 Sheets
13 ? `I ■ I3Paict - C.4- .
Location:
Record Type:
Inspection Type:
Result:
Comments:
Inspection Date:
Record ID:
Inspector:
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
10250 SW WASHINGTON SQUARE RD,
TIGARD, OR, 97223
Commercial - Building
299 Final inspection
PASS - No C of O
July 24, 2014 at 12:37:30 PM
BUP2014-00145
Chip Barnett
Violation Summary:
Inspector Contractor