Loading...
Resolution No. 14-31 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 14-3 I A RESOLUTION ADOPTING THE CITYWIDE MASTER FEES AND CHARGES SCHEDULE WHICH REPLACES RESOLUTION NO 13-26 AND ALL SUBSEQUENT AMENDMENTS TO DATE. GLO 4�i2G�� WHEREAS,the City of Tigard has a Master Fees and Charges Schedule;and WHEREAS,city staff has reviewed fees and services provided;and WHEREAS, city staff has proposed new fees and changes to certain fees to recover costs or due to previously approved annual adjustment formulas;and WHEREAS,the city's Master Fees and Charges Schedule includes fees set by other agencies;and WHEREAS, Tigard Municipal Code (IMC) 3.32.050 requires that the City Council review fees and charges annually. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The fees and charges for the City of Tigard are enumerated and set as shown in the attached schedule(Exhibit A). SECTION 2: This resolution is effective July 1,2014. PASSED: This l0�k day of G 2014. May -City of Tigard ATTEST: City Recorder-City of Tigard RESOLUTION NO. 14- Page 1 - " City of Tigard . , Memorandum To: City Council Members From: Carissa Collins,Sr. Management Analyst Re: FY 2015 Master Fees& Charges Schedule Date: May 20,2014 Attached to the FY 2015 Master Fees and Charges Schedule is a two-page summary of all changes to the proposed schedule. You will find that each fee lists the description of the fee, the page number it is located on in the schedule, the basis for the change, the basis of authority for the change, and whether or not the fee is included in the budget. Please note the following explanation detailing whether or not the fee is included in the budget: "Y"—This indicates that the fee is included in the budget, and any changes are usually influenced by an index. This also means that the fee or charge has a measurable effect on revenues and expenditures within the budget. "N" —This indicates that the fee or charge is not included in the budget. These items typically do not occur very often, and have little measurable effect on revenues. If you have any questions or concerns,please feel free to contact me at 503-718-2643. Exhibit A City of Tigard, Oregon Master Fees & Charges Schedule Fiscal Year 2014 - 2015 Effective July 1,2014 n TIGARD Page 1 Department CITY MANAGEMENT Claims Application Fee(TMC 1.21.050&1.22,Ord.08-09) $1,000.00 /deposit* TMC 1.21.050&1.22 6/24/2008 Claim fee shall be actual cost incurred by the city to process claim. Ord.08-09 Any funds remaining from the deposit after the claim has been processed will be refunded to the claimant.Payment of any costs exceeding the amount of the deposit is required prior to issuance of a final decision by the city on the claim. ADMINISTRATIVE SERVICES Municipal Court Fees Judge Order Civil Compromise $150.00 No.01-08 8/28/2008 Traffic School and Compliance Program Fee Criminal $150.00 Rule 16-adopted 08/28/08 8/28/2008 Juvenile non-traffic $75.00 8/28/2008 Traffic School Equal to the relevant fine provided for the 8/28/2008 violation in the Violations Bureau Fine Schedule Traffic School Setover $20.00 8/28/2008 License Reinstatement $15.00 8/28/2008 Payment Agreement Administrative Fee $15.00 8/28/2008 Overdue Payment Letter $10.00 8/28/2008 Show Cause Hearings-Court Costs 8/28/2008 Non-compliance $25.00 Non-payment-fees paid prior to hearing No Fee Warrant Fee $50.00 8/28/2008 CITY MANAGEMENT Public Assembly Ord.70-35 8/25/1970 Application Fee TMC 7.48,040 Persons Reasonably Anticipated 1,000 to 2,499 5100.00 2,500 to 4,999 $150.00 5,000 to 9,999 $500.00 10,000 to 49,999 $1,000.00 50,000 and over $1,500.00 ADMINISTRATIVE SERVICES/RECORDS Tigard MuniciFal Code(TMC)(Tides 1-171 or TMC/CDC CEitles 1-18) Compact Disk(CD) $10.00 7/1/2009 Page 2 CITYWIDE Attorney Time Current attorney billing rate Dept.Policy 1999 2GB Flash Drives $11.00 each 7/1/2011 Audio/Video Tapes $6.00 7/1/2003 Computer/Compact Disks $10.00 7/1/2006 DVD/VHS $12.00 7/1/2006 Faxes for Public $2.00 /first page 7/1/2007 $1.00 /each additional page Microfiche Sheet Copies $1.00 /sheet up to 50 sheets plus 7/1/2007 staff time Microfilm/Microfiche& Photocopies 8-1/2 x 11 $0.25 /page 1999 11 x 14 $0.50 /page 1999 11 x 17 $1.00 /page 7/1/2005 17 x 24 $1.50 /page 7/1/2007 36 x 36 $2.50 /page 7/1/2007 Nomination Petition Fee $50.00 7/1/2008 Oversized Copies $2.50 /page 7/1/2011 Photographs Actual Cost Dept.Policy 1999 Recording of Documents actual Cost Dept.Policy 1999 Research Fee Staff hourly rate+Citywide Overhead 2/7/2002 Fee+Materials Staff Hourly Rate for Miscellaneous Billing Staff hourly rate+benefits +paid time off+ 7/1/2012 and Reimbursement Agreements administrative time+department overhead+citywide overhead as determined by most recent A-87 Indirect Cost Study Page 3 De arim mt FINANCIAL&INFORMATION SERVICES Assessment Assumption $50.00 4/22/]985 Budget Document (: rnpact Disk(CD) 510.110 7/1/2007 Paper s50.W Business License Cad.88-13 Annual Ice' 0-2 employees 68404 $86.00/per year 7/l/2044 2014 3-5 employees s1 42OH $115.00/per year 7/t/2043 2014 6-10 employees $368:00 $377.00/per year 7/1/ 3 2014 11-50 employees 5606:00 $621.00/per year 7/l/20+3 2014 51 or more employees $844.00/per year 7/t/2044 2014 Adjusted annually in conjunction with the Portland Consumer Price Index(CPI) Pm-Rated Fee Schedule Issued January 1-June 30 See Fee Schedule above Issued July 1-December 31 1/2 the annual fee Temporary license s250) 1/1/2008 Duplicate License/Change of Ownership Fee Change in ownership or name only $10.00 1/1/2008 Copy/replacement oflicense $10.00 1/1/2108 Delinquency Charge Whenever the business license fee is not paid on or before the delinquent date,a delinquency charge equal to ten percent(1(°o)of the original business license fee due and payable shall be added for each calendar month or fraction thereof that the fee remains unpaid. The total amount of the delinquency penalty for any business license year shall not exceed one hundred percent(100%)of the business license fee due and payable for such vear. Comprchcn,kc Annual Financial Rept $00) Dept.Policy 2/7/2002 Page 4 ary;e Franchise Fee/Right of Way Usage Fee(See TMC 15,06) lilectncity (Provide service to customers within Tigard) 5"/of gross o) Res.01-16 as updated by Ord.08-21A,Ord.12-14&Ord.1406 07,101,12912 05/08/2014 in-riAitt of-%gt! whichever is greater Electneity (Provides no senice to customers within Tigard) $2.90/linear foot of installation in right-of-way* Res.01-16 as updated by Ord.OS-21A,Ord 12-04&Ord.14-06 5/8/2014 'Abd HgBinlinS1E1-lbtYr^LMfyalyd89BdlFTrvrirglire or 5111,000,whichever is greater #Mdl T(yad Natural Gas (Provide service to customers within Tigard) 5".of gross revenue or$10,0011 Ord 0406,updated by Ord 08-21 A,&Ord.1406 11,46yi 999 05/08/2014 6111 right of a ity,whichever is greater Natural Gas (Provides no service to customers within Tigard) $2.90/linear foot of installation in right-of-way* Ord.0406,updated by Ord.08-21A,&Ord.1406 5/8/2014 'ItbdxrUeinlin�/tx#tale(!%II(yOlrydVgEdh-nMrglirIE3 or$10,W0,whichever is greater #M#7 T(gad Telecom (Provide service to customers within Tigard) 5%of gross revenue or$10,000$2.90,11i tear feet-`iii4trAlittio- Ord 00-35,updated by Ord.08-21A&Ord.1406 12,46/200 05/08/2014 (lncluder telenunmmmahen&hhlte.+;long distanceprmirlers, in-tWtt efhrsy,whichever is greater private arMvwks and mwpetitirr access prmiden) Telecom (Provides no service to customers within Tigard) $2.90/linear foot of installation in right-of-way* Ord.00-35,updated by Ord 06-11,Ord 08-21A&Ord.14-M 5/8/2014 -Abd1E9'gekllllWkdr^(AtyalydHg9dfrnnftke or$10,000,whichever is greater VID-0 Toad (Inchides telecommunication nldwes,long distancr prmiders, private networks and eompe itim aarss protides) Res.01-01 Updated to all utility franchise fee application by Ord.06- Utility Franchise Application Fee $2,(N)(1.(N) 11 8/8/2006 5%of gross Solid Waste Disposal(See TMC 11.04) revenue Ord.78-64,as amended by Ord.02-05 and Ord.03-08 Res.13-18 7/1/2013 Cable TV(See TMC 5.12) 5"'o of gross revenue Res.99-04 1/26/1999 Application filed with MACC(email macc@maccor.org) Lien Search Fee $350) Res.01-31 2/1/2004 Overhead Fee Added to charges for property damage/repair 10%of total charge Passport Execution Fee $25.00 2/]/2008 Passport PhotogLanhs Fee $10.00 4/1/2007 Returned Check Fee $20.0 Res.01-55 10/9/2001 Sewer Reimbursement District 1.an Interest Rate Applicable Federal Rate(AFR),Table,Long-term,semiannual for the month the loan is approved Sptent Develnnment Chargee Financing(other than Sewer Reimbursement District L.)ansl Application I-ec $2501 Interest Rate Prime rate as published in the Wall Street Joumal as of the date of the application plus 4"b Page 5 Department , LIBRARY Collection Agency Fee $10.00 WCCM 7/1/2007 Disk or CD(Blank $1.00 Dept.Policy 2/7/2002 Flash Drives $5.00 each Dept.Policy 7/1/2013 Headphones 100$2.50 Dept.Policy 7/1/ 32014 Library Card Fee (non-residents only) $105.00 per year WCCLS 7/1/2014 Lost Items Replacement cost+$5.00 processing fee WCCLS 7/1/2003 Overdue Cultural Passes $10.00 per day WCCLS 7/1/2013 Overdue Items WCCLS Daily Charge(All Items except DVDs&Blu-Rays) $0.15 /item 7/1/2003 Daily Charge(DVDs&Blu-Rays) $1.00 /item 7/1/2005 Maximum Charge $5.00 /item 7/1/2005 E-Readers $1.00 per day up to a maximum of$5.00 Dept.Policy 7/l/204-32014 Public Copier and Printer Charges $0.10 /page for black&white Dept.Policy 2001 $0.50 /page for color 7/1/2011 Replacement Library Card Fee $1.00 7/1/2007 Page 6 POLICE Alarm Permit Fee(Residential&Commercial) (Goejemmeni agencies,disabled residents or over the age of 60 are exempt) S25.00 Ord.82-32 7/l/2009 Failure to Obtain or Renew Seenr*ty Alarm Permit Fee $100.00 Ord.82-32 7/1/2013 Late Payment of Fees/Fines(After 60 days) $100.00 7/l/2013 Failure to Obtain Permit within 60 Days of Alarm Installation $100.00 7/1/2013 Reinstatement Fee,Once Revoked(After 90 days past due) $+50 $100 7/l/204-3 2014 Non-permitted or Revoked Alarm Permit $500.00 7/1/2013 Distracted Driving Diversion Program $25.00 7/1/2014 False Alarm Fines lstfalse alarrn No Charge No Char& Ord.87-73 7/1/2013 2nd false alarm No Charge No Charge 7/1/2013 3rd false alarm $100.00 7/l/2013 4th false alarm $150.00 7/1/2013 5th false alarm $200.00 7/1/2013 6 or more false alarms $250.00 7/1/2013 Fingerprint Card $15.00 per card 7/1/2012 Good Conduct Background/Letter $10.00 7/1/2012 Law Enforcement Officers Safety Act Oualification Fee $25.00 7/1/2006 Liquor License $25.00 Res.01-45 7/10/2001 Police Services Fees Res.8¢17A DVD/Audio/VHS Evidence Copies $20.00 7/1/2012 Police Documents/Reports $10.00 /for the first 15 pages and 7/1/221008 $0.30 /page thereafter Police Digital Photo CD Copies $10.00 /CD 7/1/2005 Police Photograph Copies $10.00 /roll 7/1/2003 Pronerw Forfeiture for Criminal Activity Varies Ord.99-14 5/25/1999 Second Hand Dealers and Transient Merchant License Occasional $40.00 7/1/2010 Full-Time 5100.00 7/1/2010 Reporting Fomts 50.80 each 7/1/2010 Social Gaming License Annual fee due January 1st $100.00 TMC 5.22.060 1/1/2014 If a business applies on or after July 1st $50.00 7/1/2014 Vehicle Release Fee P89l1N.00 ORS 709.720 7/1/2013 COMMUNITY DEVELOPMENT-BUILDING Building Permit Fees (New Commercial) 10/1/2009 Total Valuation: $0.00 to$500.00 $51.09 /minimum $500.01 to$2,000.00 $51.09 /for the first$500 and $2.69 /for each additional$100 or fraction thereof $2,000.01 to$25,000.00 $91.44 /for the first$2,000 and $10.76 /for each additional$1,000 or fraction thereof $25,000.01 to$50,000.00 $338.92 /for the first$25,WO and $8.06 /for each additional$1,000 or fraction thereof $50,000.01 to$100,000.00 $540.42 /for the first$50,W0 and $5.38 /for each additional°31,1100 or fraction thereof $100,0110.01 and over $809.42 /for the first$1110,000 and $4.49 /for each additional$1,000 or fraction thereof (New Single Family&Multi-Family) 10/1/2009 Total Valuation: $0.00 to$2,000.00 $66.25 /minimum $2,000.01 to$25,000.00 $66.25 /for the first$2,000 and $11.48 /for each additional 51,000 or fraction thereof $25,000.01 to$50,000.00 $330.29 /for the first$25,000 and $8.75 /for each additional$1,000 or fraction thereof $50,000.01 to$100,000.00 $549.04 /for the first$50,000 and $6.25 /for each additional$1,000 or fraction thereof 5100,000.01 to$250,000.00 $861.54/for the first$100,000 and $4.46 /for each additional$1,000 or fraction thereof 5250,000.01 to$500,000.00 $1,530.54 /for the first$250,11110 and $4.42/for each additional$1,000 or fraction thereof $500,000.01 to$1,000,00U.OU $2,635.54 /for the first$500,000 and $4.10 /for each additional$1,000 or fraction thereof $1,000,000.01 to$2,000,000.00 $4,685.54 /for the first$1,000,000 and $3.33 /for each additional 41,000 or fraction thereof 52,000,000.01 and over $8,015.54 /for the first$2,000,000 and 53.18 /for each additional$1,1100 or fraction thereof Page 8 (Additions,Alterations,and Demolitions for Single Family,Multi-Family,Commercial,&Industrial) 10/1/2009 Total Valuation: S(1.(X) to$500.00 $5327 /minimum $500.01 to$2,000.00 $53.27 /for the first$500 and $3.39/for each additional$100 or fraction thereof S2,(XX).01 to$25,(X)0.00 5104.12/for the first$2,000 and $15.21 /for each additional S1,000 or fraction thereof S25,0(1(1.0I to$50,(M.(X) $453.95/for the first$25,(XH)and $11.02/for each additional$1,000 or fraction thereof $50,000.01 to$100,000.00 $729.45 /for the first$50,W)and $7.53 /for each additional$1,000 or fraction thereof 8700,000.01 to$500,000.(X) 51,105.95 /for the first 5100,000 and $6.04/for each additional$1,000 or fraction thereof $500,000.01 to$1,000,000.00 $3,521.95/for the first$500,0(()and 55.09/for each additional$1,0(X)or fraction thereof S1,0(X),(X)0.01 and over $6,066.95 /for the first$1,000,000 and $3.39/for each additional$1,(100 or fraction thereof Building Plan Review Fee 65%of base building permit fee 9/26/2000 Deferred Submittals $20(1.00 minimum fee 9/24/2002 Plan Review plus 65%of building permit fee based on valuation of the particular portion or portions of the project. Phased Permitting $200.00 9/24/2002 Plan Rc,w, plus 10%of building permit fee based on total project valuation not to exceed$1,500 for each phase Photovoltaic Solar Panel Sl stem $180.00 (includes plan review and administrative fees) 1/1/2011 plus 12%state surcharge of permit fee Page 9 Electrical Fees 10/1/2009 New residential,single or multi-family per dwelling unit;service included: 1000 square feet or less $168.54 Each additional 500 square feet or portion thereof S33.92 Limited energy,residential or multi-family $75.00 (with above sq ft) Each manufactured home or modular dwelling service or feeder 567.84 Services or feeders;installation,alterations or relocation: 200 amps or less $100.70 201 amps to 400 amps $133.56 401 amps to OM amps $20034 601 amps to 1000 amps $301.04 Over 1000 amps or volts $552.26 Reconnect only $67.84 Temporary services or feeders;installation,alteration or relocation: 200 amps or less $59.36 201 amps to 400 amps $125.08 401 amps to 6(H)amps $168.54 Branch circuits;new,alteration or extension per panel: With purchase of service or feeder-each branch circuit S7.42 Without purchase of service or feeder First Branch Circuit 556.18 Each addit.Branch circuit S7.42 Miscellaneous(service or feeder not included): Each pump or irrigation circuit $67.84 Each sign or outline lighting $67.84 Signal circuit(s)or a limited energy panel,alteration or extension 575.00 Each additional inspection over the allowable in any of the above Per Inspection 56625 /hour(min 1 hour) Per Hour $66.25 /hour(min 1 hour) Industrial Plant Inspection S78.18/hour(min 1 hour) Renewable Energy Electrical Fees: 5 kva or less $100.70 7/l/2012 5.01 to 15 kva $133.56 7/1/2012 15.01 to 25 kva $200.34 7/1/2012 Wind generation systems in excess of 25 kva: 25.01 to 50 kva 5301.04 7/1/2012 50.01 to 100 kva $552.26 7/1/2012. >100 kva the permit fee shall be calculated in accordance with OAR 918-309-004(1. Solar generation systems in excess of 25 kva: Each additional kva over 25 $7.42 7/1/2012 >100 kva no additional charge Each additional inspection over allowable in any of the above: Each additional inspection will be charged $66.25/hr 7/1/2012 at an hourly rate(1 hr minimum) Misc.fees at an hourly rate(1 hr minimum $90.00/hr 7/1/2012 Electrical permit plan review fee 25%of the electrical permit fee Page 10 Fire Protection Systems 10/1/2009 (Commercial Fire Suppression-Sprinkler,Alarm and Type I-Hood systems based on project valuation) I ,[a]Valuation: SOO) to 85110.(X) $51.09 /minimum $500.01 to$2,0)0.00 $51.09 /for the first$51X1 and $2.69 /for each additional$100 or fraction thereof $2,0)0.01 to$25,000.(X) $91.44 /for the first$2,0W and $10.76 /for each additional$1,0(X)or fraction thereof $25,000.01 to$50,(XX).(X) $338.92 /for the fust$25,11(X)and $8.06 /for each additional$1,00)or fraction thereof $50,000.01 to$1(X),(XX).00 8509.42 /for the first 350,000 and $538 /for each additional 81,(1X)or fraction thereof $100,000.01 and over $809.42 /for the fust$1(X),IXX)and $4.49 /for each additional$1,00()or fraction thereof Fire Life Safety Plan Review 40%of base building permit fee 9/26/2000 (Commercial Only,) Fire Protection Systems 10/1/2009 (Residential Fire Suppression) Stand Alone System Souarc Foota6% 1 to 2,000 $198.75 2,001 to 3,600 $246.45 3601 to 7,200 $310.05 7,201 and over $404.39 Multipurpose or Continuous Loop System S9, re Foo ane: 0 to 2,0(10 $121.90 2,001 to 3,600 $169.60 3,601 to 7,2(X) $233.20 7,201 and over $327.54 Manufactured Dwelling.Installation $305.50 9/24/2002 Dt:mufacturcd D«clling and Mobile Home Per OAR 9/24/2002 Parks,Recreation Camps,and Organizational Camps Page 11 Mechanical Fees 10/1/2009 (I&2 Family Dwellings for New,Additions,or Alterations) Heating/Cooling: Air conditioning $46.75 Furnace 100,000 BTU(ducts/vents) %46.75 Furnace 100,000+BTU(ducts/vents) $54.91 Heat pump 561.06 Duct work $23.32 Hydronic hot water system $23.32 Residential boiler(radiator or hydronic) $23.32 Unit heaters(fuel-type,not electric), in-wall,in duct,suspended,etc. 546.75 Flue/vent for any of above $23.32 Other $23.32 Other fuel appliances: Water heater $23.32 Gas fireplace $33.39 Flue/vent for water heater or gas fireplace 523.32 Log lighter(gas) $23.32 Wood/pellet stove $33.39 Wood fireplace/insert 523.32 Chimney/hner/flue/cent $23.32 Othcr $23.32 Environmental exhaust and ventilation: Range hood/other kitchen equipment $33.39 Clothes dryer exhaust $33.39 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) $23.32 Attic/erawlspace fans $23.32 Other $23.32 Fuel piping: First four $14.15 Each additional $4.03 Minimum permit fee $90.00 Mechanical plan review fee 25%of Permit Fee Mechanical Permit Fees 10/1/2009 (Commercial and Multi-family) Taal\aluation: 5O.(X)to 5500.(X) $09.06 /minimum $5(X1.01 to$5,(X)0.(9) $69.06 /for the first 5500 and 53.07 /for each additional Sl(l0 or fraction thereof S5,(XX).O1 to$10,(10(1.00 $207.21 /for the fust 55,0(X)and $2.81 /for each additional$100 or fraction thereof $10,000.01 to 550,(X)0.(X) $347.71 /for the first 510,(X)0 and $2.54 /for each additional$100 or fraction thereof $50,(90.01 to$1(K),(XX).00 $1,363.71 /for the first$50,000 and $2.49 /for each additional$I(X)or fraction thereof S100,0W.01 and over $2,608.71 /for the first$100,(XX)and 52.92 /for each additional$100 or fraction thereof Plan Review 25°u of permit fee 9/24/2002 Page 12 Plumbing Fees 10/1/2009 (Commercial,Industrial,Residential,&Multi-Family) New One&Two Family Dwellings 1 bath $312.70 2 bath $437.78 3 bath $500.32 Each additional bath/kitchen fixture $25.02 Site Utilities Catch basin or area drain $18.76 Drywell,leach line,or trench drain 518.76 Footing drain,first IMY $50.03 Each additional 100'or part thereof (footing drain) 537.52 Manufactured home utilities 550.03 Manholes 518.76 Rain drain connector 518.76 Sanitary sewer,first 100' 562.54 Storm sewer,first 100' $62.54 Water service,fust 100' 562.54 Each additional 100'or part thereof (sanitary,storm,water service) $37.52 Fixture or Item Backflow preventer $31.27 Backwater valve $12.51 Clothes washer 525.02 Dishwasher $25.02 Drinking fountain 525.02 Ejectors/sump $25.02 Expansion tank 512.51 Fixture/sewer cap $25.02 Floor drain/floor sink/hub 525.02 Garbage disposal $25.02 Hose bib $25.02 Ice maker 512.51 Interceptor/grease trap $25.02 Medical gas(value:S ) ser table Primer 512.51 Roof drain(commercial) $12.51 Sink/basin/lavatory $25.02 Solar units(potable water) 562.54 Tub/shower/shower pan $12.51 Urinal $25.02 Water closet 525.02 Water heater $37.52 Water Piping/DWV 556.29 Other: $25.02 Minimum permit fee 572.50 Plumbing plan review 25%of permit fee Page 13 Medical Gas Systems 9/24/2002 Total Valuation: $1.00 to$5,000.00 $72.50 /minimum $5,0(X).01 to$10,000.00 $72.50 /for the first$5,000 and $1.52 /for each additional$100 or fraction thereof,to and including$10,000. $10,000.01 to$25,000.00 $148.50 /for the first$10,000 and $1.54 /for each additional$100 or fraction thereof,to and including$25,000. $25,000.01 to$50,000.00 $379.50 /for the fust$25,000 and $1.45 /for each additional$100 or fraction thereof,to and including$50,1)M). $50,000.01 and over $742.00 /for the fust$50,1X10 and $1.20 /for each additional$100 or fraction thereof. Restricted Ene= 6/27/2(X)O Residential Energy Use,for all systems combined $75.00 Commercial F.ner),n,Use,for each system $75.00 Sanitary Sewer Inspection Fee 6/6/2000 Residential $35.00 Commercial $45.00 Industrial $75.00 Site Work/Grading Permit Fees 10/1/2009 I3ased on pry jag ralualion-Ser 11nilding Permit Fns(Nein Commericao. Miscellaneous Fees Address Ghange for building pettitits $50.09 Administrative fee to change issued permits,including but not limited to: Address change(minimum charge-one-half hour) $90.00 per hour Dept.Policy 7/1/2014 Contractor change(minimum charge-one-half hour) $90.00 per hour Dept.Policy 7/l/2014 Process and handling fee to mail permits with plans $5.00 Dept.Policy 7/l/2014 Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/2000 Single&Two Family Dwellings $100.00 Apartment Houses&Social Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3 Hotels $160.00 /plus$5 for each dwelling unit in excess of 5 Page 14 _Byrn Source Information Processing&Archking(IPA)Fee $2.00 /sheet larger than 11"X 17" 7/1/2010 $0.50 /sheet 1 l"X 17"and smaller Investigation Fee $90.00 per hour(average cost) 1/1/2014 (minimum chage. one-ha#boor) Phased Occupancy. $200.00 6/27/2000 Permit or Plan Review Extension $90.00 Temporary Occupancy $90.00 Other Inspections&Fees: I. Inspections outside of normal business hours 10/1/2009 (minimum charge-2 hours) $90.00 per hour 2 Reinspection fees $90.00 per hour 10/1/2009 3. Inspections for which no fee is specifically 10/1/2009 indicated(minimum charge:one-half hour) $90.00 per hour 4. Additional plan review required by changes, 10/1/2009 additions or revisions to plans(minimum charge:one-half hour) $90.110 per hour **A 12%surcharge fee as mandated by the State Building Codes Division is applied to all Buildi+eg, permit fees,investigation fees and inspection fees listed above. Page 15 Department Revenue Soug&_ ctive Da� COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING Accessory Residential Units $349.00 $343.00 7/1/2043 2014 Annexation $2,989.00 $3,217.00 7/1/2913 2014 (Ais fee was in effect,per Resolution 13-08 thmugb Fe&wg 2014) AiRpeal Director's Decision(Type II)to Hearings Officer "42.90 $292.00 7/1/2914 2014 Expedited Review(Deposit) 1374.00 $351.00 7/1/2014 2014 Hearings Referee $624.90 $585.00 7/1/2043 2014 Planning Commission/Hearing's Officer to City Council $3,906.90 $3,234.00 7/1/2043 2014 Approval Extension $349:00 $343.00 7/1/2043 2014 Colocation(of Wireless Communication Facilites) $52.00 TMC 18.798 7/1/2013 Conditional Use Initial $5,951..09 $6,404.00 7/1/2943 2014 Major Modification $5,954.00 $6,404.00 7/1/2813 2014 Minor Modification $654.00 $701.00 7/1/2043 2014 Design Evaluation Team(DET) Recommendation(deposit) $4,662.00 $1,788.00 7/1/2043 2014 Development Code Provision Review Single-Family Building Plan $80-99 $86.00 7/1/2043 2014 New/Additions/Accessory(including,but not limited to,garages,carports,porches,patios,decks, storage sheds,awnings,steps and ramps) Commercial/Industrial/Institution-New $349.00 $343.00 7/1/2043 2014 Commercial/Industrial/Institution— Tenant Improvements in Existing Development Project Valuation up to$4,999 $0.00 7/1/291-3 2014 Project Valuation$5,000-$74,999 $89.00 $86.00 7/1/291-3 2014 Project Valuation$75,000-$149,999 $290:00 $215.00 7/1/294.3 2014 Project Valuation$150,000 and more $31.9.00 $343.00 7/1/2914 2014 Downtown Review Downtown Review Compliance Letter $651-00 $701.00 7/1/204.3 2014 Downtown Design Administrative Review Under$1,000,000.00 $4,524.09 $1,639.00 +0.004 x project valuation 7/1/2913 2014 $1,000,000.00 and over(max fee$25,000.00) P$le 16 $6,318.00 +0.002 x project valuation 7/1/2043 2014 Department Revenu COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING Downtown Design Review-Design Review Board $3;099:90 $3,325.00 +applicable Type II fee 7/1/2943 2014 Hearing Postponement $363.00 $390.00 7/1/2444 2014 Historic Overlay/Review District Historic Overlay Designation $4,654.00 $5,007.00 7/1/2414 2014 Removal Historic Overlay Designation $4,65400 $5,007.00 7/1/2414 2014 Exterior Alteration in Historic Overlay District $698.09 $751.00 7/1/2$13 2014 New Construction in Historic Overlay District $698.00 $751.00 7/1/204-3 2014 Demolition in Historic Overlay District $698.00 $751.00 7/1/244 2014 Home Occupation Permit Type I 54lo.o0 $118.00 7/1/2414 2014 Type II $6�1-09 $701.00 7/1/23 2014 Interpretation of the Community Development Code Director's Interpretation 5654-00 $701.00 7/1/ 3 2014 :Appeal to City Council $3,006.09 $3,234.00 7/1/2414 2014 Land Partition Residential and Non-Residential(3 Lots) $43990 $4,634.00 7/1/ 3 2014 Residential and Non-Residential(2 Lots) $3,582.99 $3,854.00 7/1/2043 2014 Expedited $5,9255.99 $5,407.00 7/l/2044 2014 Final Plat $4;0944)0 $1,076.00 7/1/ 3 2014 Lot Line Adjustment $651.00 $701.00 7/1/2043 2014 Minor Modification to an Approved Pian $651-90 $701.00 7/1/ 3 2014 Non-Conforming Use Confirmation $651.00 $701.00 7/1/2044 2014 Planned Development Conceptual Plan Review $8,428.00 $9,068.00 7/1/2043 2014 Detailed Plan Review(Concurrent Hearing) Applicable SDR Fee or Subdivision Fee+ $407.90 $439.00 7/1/2444 2014 Detailed Plan Review(Separate Hearing) Applicable SDR Fee or Subdivision Fee+ 90 $2,706.00 7/1/2044 2014 Pre-Application Conference $654.00 $701.00 7/1/2043 2014 Sensitive Lands Review With Excessive Slopes/Within Drainage Ways/ $651.90 $701.00 7/1/2943 2014 \yv'ithin 100-Year Floodplain(Type n With Excessive Slopes/Within Drainage Ways/ $2,,859.00 $3,076.00 7/1/204-3 2014 Within Wetlands(Type II) Page 17 Department Revenue COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING With Excessive Slopes/Within Drainage Ways/ $3;089:89 $3,323.00 7/1/2613 2014 Within Wetlands/Within the 100-Year Floodplain(Type III) Sign Permit Existing and Modification to an Existing Sign (No Size Differential) $478:09 $192.00 7/1/2613 2014 Temporary Sign(Per Sign) $56.09 $61.00 7/1/2043 2014 Site Development Review&Major Modification Under$1,000,000.00 $5;854:09 $5,434.00 7/1/2913 2014 $1,000,000.00/Over $6,560.00 $7,059.00 7/1/2013 2014 (+$6.00/per each$10,000.00 over$1,000,000.00) Minor Modification $651-99 $701.00 7/1/2013 2014 Subdivision Preliminary Plat without Planned Development 0 $6,273/+$93.00 per lot 7/1/2913 2014 Preliminary Plat with Planned Development $8,069.09 $8,682.00 7/1/291-3 2014 Expedited Preliminary Plat without Planned Development $6;427.00/1+593.00p$7,191.00 7/1/2044 2014 Expedited Preliminary Plat with C,1 G.t Cou*sca Planned Development $6,684.00 $7,192.00 h�1e ccne /O, ;?OIL/ 7/1/2913 2014 Final Plat $2,016.00 $2,169.00 7/1/2613 2014 Plat Name Change $364.09 $392.00 7/1/2613 2014 Temporary Use Director's Decision $31-9.00 $343.00 7/1/2613 2014 Special Exemption/Non-Profit $0.00 7/1/2613 2014 Special Mixed Use-Central Business District Zone Rate 1st Temporary Use in a Calendar Year $34-9.09 $343.00 7/1/201-3 2014 2nd Through 5th Temporary Use With Substantially the Same Site Plan Within r1 Calendar Year $56.00 $61.00 7/1/2943 2014 Urban Forestry Type I Modification to the Urban Forestry Plan Component of an Approved Land Use Permit $62:7.00 $675.00 3 043 7/1/2014 Type III Discretionary Urban Forestry Plan Review Permit with concurrent Type III review $392.00 $422.00 3y 1{2043 7/1/2014 Type III Discretionary Urban Forestry Plan Review Permit without concurrent Type III review $2;44$09 $2,602.00 3/4¢2943 7/1/2014 Page 18 Department Revenue Source COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING Variance/Adjustment Administrative Variance $698.00 $751.00 7/l/2414 2014 Development Adjustment $349.00 $343.00 7/1/2043 2014 Special Adjustments Adjustment to a Subdivision $349.00 $343.00 7/1/2913 2014 Reduction of Minimum Residential Density $34-9.00 $343.00 7/1/2043 2014 Access/Egress Standards Adjustment $698.00 $751.00 7/1/2013 2014 Parking Adjustments Reduction in Minimum or Increase In Maximum Parking Ratio $698.00 $751.00 7/1/2013 2014 Reduction in New or Existing Development/Transit Imprvmnt $698.00 $751.00 7/1/2013 2014 Reduction in Bicycle Parking $698.00 $751.00 7/1/201-3 2014 Alternative Parking Garage Layout $698.00 $751.00 7/1/201-3 2014 Reduction in Stacking Lane Length $319.00 $343.00 7/1/2014 2014 Sign Code Adjustment $698.00 $751.00 7/1/2013 2014 Street Improvement Adjustment $695-00 $751.00 7/1/ 3 2014 Wireless Communication Facility Adjustments Setback from Nearby Residence $698.00 $751.00 7/1/2013 2014 Distance from Another Tower $34180 $343.00 7/1/2013 2014 Zoo-ingMau/Text Amendment Legislative-Comprehensive Plan $9,996:00 $10,755.00 7/1/2013 2014 Legislative-Community Development Code $4,084.00 $4,391.00 7/1/2813 2014 Quasi-judicial $3600 $4,046.00 7/1/2013 2014 Zoning Analysis(Detailed) $654.00 $701.00 7/1/2013 2014 Zoning Inquiry Letter(Simple.) $96.00 $103.00 7/1/2813 2014 "Planning Fees include 14.76%Long Range Planning Surcharge per Ord 04-99 as of 12/28/2004. COMMUNITY DEVELOPMENT- MISCELLANEOUS FEES&CHARGES Plan Copies $2.50 7/1/2007 Community Development Code CD Rom $10.00 Page 19 Department Reyawe 59w& COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING Tigard Comprehensive Plan $75.00 7/1/2011 GIS Maps* 8-1/2"x 11" Non Aerial $2.50 7/1/2011 Aerial $4.00 7/1/2011 11"x 17" Non Aerial $5.00 7/1/2011 Aerial $7.00 7/1/2011 17"x 22" Non Aerial $11.00 7/1/2011 Aerial $15.00 7/1/2011 34"x 44" Non Aerial $25.00 7/1/2011 Aerial $30.00 7/1/2011 Custom Maps Staff Hourly Rate Information Processing&Archiving(IPA)Fee Temporary Sign $5.00 7/1/2010 Type I Review $18.00 7/1/2010 Type II Review $175.00 7/1/2010 Type III Review $200.00 7/1/2010 Type IV Review $200.00 7/1/2010 Neighborhood Meeting Signs(Land Use) $2.00 1997 Oversize Load Permit $200.00 7/1/2005 Planimetric Maps Blueline print-quarter section $5.00 Mylar-quarter section $150.00 /+reproduction cost Retrieval of Materials Confiscated in ROW Lawn and A-board signs $40.00 /sign 7/1/2010 Other signs and materials(based on size and value) City Manager's Discretion 7/1/2010 (per TMC 7.61.035 Ord 10-06) Tigard Transportation System Plan $75.00 7/1/2011 Washington Square Regional Center 1999 Task Force Recommendations $10.00 Master Plan Map(Zoning/Plan) $2.50 Page 20 Department $tpue Source CONINIUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT Blasting Permit* $338.99 $364.00 7/1/20+4 2014 Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998 (Commercial Only) if sewer was available Fee in Lieu of Shared Open Space Fee in lieu is determined by multiplying TDC 18.610.030.F.2.b.(3) 7/l/2011 (MU-CBD zone only) the current Washington County Assessor-determined real market value of the land(not improvements)by 10%. Sanitary Sewer Connection Fee $4;890.99 $4,900.00 /dwelling unit 7/l/2044 2014 (Phis fee is determined by Clean Water Services. The City of Tigard receives 3.99%of fees collected.) Water Quality acility Fee ee set by Clean Water Services) 6/6/2000 (City receives 100%of fees collected) Residential Single Family $225.00 /unit Commercial&Multi-family S225.00 /2,640 sq.ft of additional impervious surface Water Quantity Facility Fee(Fee set by Clean Water Services) 6/6/2000 (City receives 100%of fees collected) Residential Single Family $275.00 /unit Commercial&Multi-family $275.00 /2,640 sq.ft of additional impervious surface Metro Construction Excise Tax 129/6 of building permits for projects 7/l/2006 (City will retain 5%for administrative expenses) with a total valuation of$100,001 or more; (Tax set by Metro,but collected by cities) not to exceed$12,000. School District Construction Excise Tax (City will retain 4%for administrative expenses) (Tax set by school districts based on ORS 320.170-189 and collected by cities) Beaverton School District 51.44 $1.17 /sq.ft.residential construction ORS 320.170-189 7/1/20+4 2014 S9.5$0.58 /sq.ft.commercial construction ORS 320.170-189 7/l/244-3 2014 Tigard-Tualatin School District S4-1-1$1.14 /sq.ft.residential construction ORS 320.170-189 1A'�943 7/1/2014 S9 SS$0.57 /sq.ft.commercial construction ORS 320.170-189 19/1,1294; 7/1/2014 f Page 21 COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT Urban Forestry I Iarard'free Dispute Resolution Fee $165.00 +$55.00 each additional tree 3/1/2013 In lieu of Planting Fees(Planting&3 Year Maintenance) Street Tree $537.00 per 1.5"caliper tree 3/1/2013 Open Grown Tree $537.00 per 1.5"caliper tree 3/l/2013 per tree 2'in height or 1 gallon Stand Grown Tree $383.00 container 3/1/2013 Tree Permit Fees(Complex) City Board or Committee 5307.00** City Manager No Charge 3/l/2013 Tree Canopy Fee $2.95 per square foot of tree canopy 3/1/2013 Urban Forest Inventory Fees Open Grown Tree S437.9 $147.00 +$28.00 each additional tree a/4/2913 7/1/2014 Stand of Trees S184.99 $195.00 +544.00 each additional stand 3,4�2043 7/1/2014 Tree Establishment Bond(Planting&Early Establishment) 1.5"Caliper Minimum Street or Open Grown Tree in Subdivisions or Minor Land Partitions 5489.00 per tree 3/1/2013 1.5"Caliper Minimum Street or Open Grown Tree in land Use Review Types other than Subdivisions or Minor Land Partitions $441.00 per tree 3/l/2013 2'in Height or 1 Gallon Container Minimum Stand Grown Tree in Subdivisions or Minor Land Partitions $367.00 per tree 3/1/2013 Tin I leight or 1 Gallon Container Minimum Stand Grown Tree in Land Use Review Types other than Subdivisions or Minor band Partitions $351.00 per tree 3/1/2013 Vacation(Streets and Public Accessi $2,444.09 $2,595.00 /deposit+actual costs 7/1/2414 2014 *Per Ord 03-59,fee it adjxrudyearly(rased on lbe ConrtnuYion Cost Index jar the City of Seau4 as pnbbshed in the April ir.we of Engineenq Nems Rernrd and per Ord 04-99 inckukr fbe 14.750-a(nrrg Range Planning Sanhage. **d307,110 per tree up m and including 10 free..1 jour 10 trees,fix appkeanl submits a deposil of$307.00jor each tree orrr 10 freer up lo a maximum o_f$5000.0().The appikant is charged actual staff time topm rfr the permil and will be refunded Ile balamr of 11x deporil if any remaiar after dx mien is eromplefe Page 22 PUBLIC WORKS Addressing Assignment Fee S5O.(X) Res.99-08 10/29/2003 Communit}Garden Plot Rental Large 54(1.(X) /year 7/1/2010 Small $2(1.(X) /year 7/1/2010 Encroachment Permit $3(Xl.(XI Ord.99-31 7/1/2011 Engineering Public Improvement Design Standards S50) For printed version only Dept.Policy 7/15/1998 Local Improvement District Assessments Actual Cost Ord.96-26 7/24/1996 Park Reservation Fees Application Fee Resident 525.00 /per event 7/1/2010 Non-Resident $500) /per event 7/1/2010 Rental Change Fee 515.(X) /per event 7/1/2011 Organized Group Event Processing Fee $500) /per event 7/1/2012 Event Monitor $15.(X) /hour 7/1/2012 Special Use/Alcohol Permit Fee 5250) /per event 7/1/2010 (Hee assessed at lime of rrsennlian) Special Event Permit Fee(First 3 hours) $75.(X) 0 to 100 people 7/1/2013 5175.00 101 to 200 people 7/1/2013 5275.00 201 to 5(1)people 7/1/2013 $475.00 501 to 2(X)O people 7/1/2013 $1,0(X1.()0 2001 and more 7/1/2013 (Each Additional Hour) $25.00 0 to 100 people 7/1/2013 $55.00 101 to 2(X)people 7/1/2013 $90.00 201 to 500 people 7/1/2013 $15501 501 to 200(1 people 7/1/2013 S330.0) 2001 and more 7/l/2013 Shelter Rental Fees(2 hour minimum) Shelter#2 Resident 535.(X) /hour 7/1/2012 Non-Resident $70.(X) /hour 7/l/2012 Shelter#1,#3,#4,Bishop/Scheckla Pavilion,&Summerlake Resident $25.00 /hour 7/1/2012 Non-Resident $50.00 /hour 7/1/2012 Soccer/Ball Field Rental Fee(2 hour minimum) Resident $10.00 /hour 7/1/2010 Non-Resident $20.00 /hour 7/1/2010 Deposit May be required for some events to mitigate Not to exceed$400 7/1/2010 possible cleanup and/or damages. Reimbursement District Application Fee $3(X).(X) 1/27/1998 Page 23 ��. Department Revenue Source _. .. Reimharscmcnt District Fcc Not to Exceed$6,0(X).00 unless Res.98-03 7/1/2001 reimbursement fee exceeds$15,((X).00 Any amount over$15,(XX).(X)shall be reimbursed by the owner. $6,00).00 limit valid for only 3 years from Council approval of district cost. Street Maintenance Fee(TMC 15.20) Monthly Residential Rate-Single and Multi-Family$5$3 $6.12 /unit 1/1/2944 2015 Monthly Non-Residential Rate 34-34 $1.38 /per nin required parking space 1/1/2944 2015 Staff Review No Charge City Council Written Appeal Filing Fee $3()().(X) Solid Waste Compactor Permit S1(X).(X) Res.91-76 Page 24 PUBLIC WORKS-DEVELOPMENT SER�RGES ENGINEERING Erosion Control Inspection Fee With Development Construction Cost Estimate SO-525,000 5:5.99 $80.70 IGA w/Clean Water Service 7/1/2042 2014 Construction Cost Estimate$25,001-$50,000 5199 $107.60 7/1/2042 2014 Construction Cost Estimate 550,001-5100,000 543000 $161.40 7/1/20+2 2014 Construction Cost Estimate over$100,000 543080 $161.40 plus$75 per$100,000 or fraction thereof 7/l/204-2 2014 exceeding the first$100,000 Without Development 0-0.99acres 5399:99 $322.80 7/1/2942 2014 lacre of greater 539090 $322.80 plus$150 per acre or fraction thereof 7/1/2942 2014 Reinspection Fee 59000 $96.84 per hour with a minimum of I hour 7/1/29}-2 2014 Plan Check included in inspection fee 7/1/291.2 2014 Plan Resubmittal Review 59099 $96.84 per hour with a minimum of 1/2 hour 7/1/291-2 2014 Fee In Lieu Of Bicycle Striping 8-inch white stripe $2-59 $2.69 /linear foot of frontage 7/1/2004 2014 Bike lane legends 54aS00 $188.30 /each 7/1/2994 2014 Directional mini-arrows sS196.99 $107.60 /each 7/1/2004 2014 Mono-directional reflective markers 54.90 $4.30 /each 7/1/2004 2014 Fee In Lieu Of Underl ro n in 535.00 /lineal feet of frontage CDC:18.180.120 10/29/2003 Public Facility Improvement Permit 2%plan review plus 7/1/2009 5%of estimated cost of public improvement with a 7/1/2005 $300 minimum Streetlight Energy&Maintenance Fee Based upon PGE Schedule "B" #95 Option"A" P(;1" 2000 for the first two years costs Traffic/Pedestrian Signs Cost of materials and labor Dept.Policy 2/7/2002 with Council Direction Page 25 PUBLIC WORKS-U'CILITIES Booster Pump Charge Metcr Size(diamety inch-) 5/8x3/4 $4.86/-mthly 1/1/2014 $5.15/monthly 1/1/3115 3/4x3/4 $7.00/monthly 1/1/2014 $7.42/-mthly 1/1/2015 1 $12.95/-thly 1/1/3114 $13.72/rtzmthl, 1/1/3115 1.5 $38.83/-thly 1/1/2014 $41.16/p thly 1/1/2015 2 $63.04/monthly 1/1/2014 $66.82/monthly i/1/2015 3 $11116/-mthly 1/1/2014 $117.83/-thly 1/1/21115 4 $227.97/-mthly 1/1/?014 $241.65/-mthly 1/1/2015 6 $242.67/-Hy 1/1/2014 $25723/-&v 1/1/2015 8 $388.27/rnonthly 1/1/2014 $411.57/monthly 1/1/2015 10 $758.59/-mthly 1/1/2014 $84.11/monthly 1/1/2015 12 $1,09236/-mthly 1/1/2014 $1,157.91/monthly 1/1/2015 /Asa:In d-ged m ni 1e !o hon dg an deh-nwec/ Meter Size(diameter inches) 5/8x3/4 $23.38/-mthly (/1/2014 $24.38/-thly 1/I/2015 3/4x3/4 $33.67/-thly 1/1/2014 $35.11/-mddy 1/t/2015 t $52.45/monthly 1/1/2014 $54.70/monthly 1/1/3115 L$ $138.51/-mthly 1/1/2014 $144.47/nzmddv 1/1/311i 2 $224.72/monthly 1/1/2014 $234.38/-mthly t/1/2015 3 $442.33/monthly 1/1/2014 $461.35/mrmthly 1/1/3115 4 $84(1.21/-mthly 1/1/2014 $87634/-mddy 1/I/2015 6 $94208/monthly 1/1/2014 $982.59/monthly 1/1/2015 8 $1,471.35/rnonthly 1/1/2014 $1534.62/rnnnthly 1/1/2015 10 $2,715.00/-mthly 1/1/3114 $2,831.75/tttonthly 1/1/2015 12 $3,841.55/montldy 1/1/3104 $4,006.74/monddy 1/1/2015 Pno 26 Final Notification Proceu Fee $3("7X,/pct insrancr 7/1/20(19 Fim Hydrant Fl -Teal $325.11(1/rest 12/9/2008 Fire Hyddran,usW-Tem 3"hydrant mem,d<7y,sn tory $650.00 9/1/1002 'Deposit is refs—dAA,-if resumed in gr.d cnnditrcm Hook-up serve. ").0() 2/27/2X11 (:,mrinued use 550.00/rrynth 2/27/2001 Cnnsumpnnn Current negation water mage rare per 100 cubic teet of—mc used F' R. are ar��`CnrinWrnr F'or smaller $17.70 /m(nth 7/1/2013 8"nr larger $23.42 /month 7/1/2013 Dire Service Connection $1,457.40 /+12%tee based 7/1/2013 Ort constracrr(111 costs. hletcr Disconnection Actual labor and material costs+10"x. 9/1/2002 Meter ImmllatioR Fee, 5/8"s 3/4"Mck-, S350.00 9/1/2011 3/4"e 3/4"Meter 547X)IN) 10/1/2171 I"Meter $550,W 9/1/21111 1 1 z"hie.ter S8500) 9/1/2011 2"Meter $1,100.(X) 9/1/2111 V nr—'rr Wren Actual IA—&materials+10% 9/1/21011 6leicr Ont-o(-Order Tesi Merer cald,camm—+actual lata n 9/1/2002 AM rruterial costs+10". Sanitary Sewer ee ret Iry Clean water Senieeal ]n n s 16306.of his adhered;! Base Charge .n�$25.85 /dwelling unit/mirth 7/1/281-3 2014 Use Charge 57,67$1.72 /100 cubic feet/month for 7/1/2843 2014 individual cu rrmtrr winter average ti.rvice Installation Fee, Single I tench-Smgie Ile•sidenrial Service $3,630.00 indudes labor&materials 10/i/2011 1 1/2"l,lrter and greater Actual labra and material costs+10% 10/1/2011 rud';,,face Waver(Fee ser hX Cl..Water Sem iceal ,r, r r erns 75".of Senxx(]targe Fees collected) Mr.of its Swdtarge fees cAlected) Service Charge 56-25 56.75 /FSU/month 7/1/280 2014 .I.Iprd Su,durge $2.00/FSU/month 7/1/2009 Way.Bac,e[juja A 0-11ty Tegrin Cost per rest 560.00 7/l/2X)8 Wamr(l:.e., a Charor for Non-p-tymeo During bu cort n,,,lb,nr,, S50.00 2/27/2001 Water line Coosurretion-New De-1,pinen, I?,.of Acmal Cost 2/27/201 Wage,M,i,Esn^_'ion Designed and installed by others 120/.of Actual Cost 9/1/2002 WaurlrU Choc... Residential Tier $3.02/100 cubic feet nfwarer 1/1/2014 Tier $4.42/0/cubic Feer ofwater 1/1/2014 Tier $5.05/100 cubic feetofwamr 1/1/2114 Tier 1 $3.15/100 cubic feet of water 1/1/2015 Tier $4.60/1(X1 cubic feet ofwarer 1/1/2115 Twr3 $5.27/1(X)cubic fmtofwawr 1/1/2015 Maki-Family Tier) 52.52/11()cubic ter,4—ter 1/1/2)14 Iter2 $367/I(X)cubic tectofw'ater 1/1/2014 Tier 3 5421 /1(9)cubic h c—f water 1/1/2014 Tier,1 $2.63/100 cubic feet of water 1/t/2015 Tier 2 $3.83/1(X)cubic fcer ni want 1/l/201S Tier $4.39/100 cubic f-t,,fwaarer 1/t/20t5 Paps 27 J 9Z Qftd Jm 9L£'£� ti u!1 in 94C£ Z+a1 in OSCI t 3411 Z{ J-St c'z— £-.L in St£$ Z-1 in 9£6 l+al.I. BI in OOZ`l— f u!J. }b 00,.''1 Z-1 JA 09t 1 3-!1 9 .Pa OSL C—.1 in OSL Z IOU in 00£ I"1 9 Jaa SOL uno £,a!y in SOL Z ia!1 in Z8Z I Ja!1 ► in tt£,ano £u!1 in ttf Z i?I in L£l l+a!I £ in 561-W t 1?1 in S61 Z*J. in 8L IJ?1 Z in oza a+o £+a!1 in 0Zl Z aal.L Jv Bt I Ja41 51 in 0t,ano J"0t Z�J. in 91 1 a.J. { in ZZ— £,al.1. JPO u. Z I-ii. in 6 l-1 ►/£x►/£ Jb SI £�!.L J"SI Z�!1 in 9 1 u!1 ►/£•9/5 -!S aaasg s.wj-1m,(N)I) P"—ql..uNwwS a,ey P-1 SIOZA/l j�� p,IBJ x9u3(M)l/(A)LS ti02/l/i zuemJu,aaJ Nq-(M)I/Os% maH uuNNn -pawl SIOZ/1/I ,a,em 4.4.j q-001/66 ti tIOZ/1/l �a,e-'nlo,aal a!qw OOT/6L'K alru�!un 1 1mP°I SUP/I/I ,a,em Jo,aaJ a!gN001/86'13 £-1 SIOZ/I/I ,a,e.m Ju,:W1 a!qm 0()I/ZZ'SS Zaa!1 S IOV I/1 ,aiemp„a.?I�rz1-10/SS'£3 l aa'1 MOZ/I/I --Jo,aaJ aq-,A)l/CESS £�!1 MVI/I ,N—j.,aal rgN)w)1/IO'SS Z-!1 tIOZ/1/I ,a,emJo,aaJ mqN UO I/tt£S Iu!1 Department Revenurce COMMt?NITN' DEVELOPMENT-DEVELOPMENT SERVICES PLANNING Park System Development Charge(SDC)* Res.01-12 Single Family Unit ,5,996..87 $6,451.34 7/l/241-3 2014 Multi-family Unit $4;79384 $5,156.28 7/1/294-3 2014 Spaces in a manufactured home park $3633.79 $3,909.18 7/1/2913 2014 Commercial/industrial(per employee) @A� $446.14 7/1/2913 2014 *See Appendix for methodology used to calculate the charges. The Park System Development Charge(Park SDC)is a City of Tigard charge that is assessed on new development to support the acquisition and development of parks,greenways,and paved trails,all of which are used by residents of Tigard and by those who work here. The Park SDC is a one-time fee charged to new development to help pay a portion of the costs associated with building additional parks and trails to meet the needs created by both residential and commercial/industrial growth. The SDC revenues can only be used on capacity-increasing capital improvements and cannot be used to repair existing park facilities. Park SDCs are assessed on new residential development on a per-unit basis and against commercial and industrial development on a per-employee basis. The amount of the charge for each land use category is adjusted each year,effective July 1st,in relation to two indices,one reflecting changes in development/construction costs and one reflecting changes in land acquisition costs. For information about Park SDCs regarding a specific project contact the City's Permits/Projects Coordinator at 503-718- 2426. For more detailed and updated information on calculating Park SDC's see"Report for Parks&Recreation System Development Charge Study,"by FCS Group,March 23,2012. Page 29 Department Revenue Sq Park SDC Annual Adjustment Res.01-13 4/10/2001 Parks SDC fees shall be adjusted annually on July 1 st of each year beginning in 2011. The new fee will be determined by multiplying the existing fees by the average of two indices,one reflecting changes in development/construction costs and one reflecting changes in land acquisition costs. The average of these two indices is a reasonable approach because the Parks SDC fee is roughly split 50%between land acquisition land development components. The index for the Land Acquisition component will be the base cost for residential tract land in Tigard,as determined by the Washington County Appraiser. The average cost for residential tract land was selected because it is readily identified and is the lowest priced of the buildable lands in Tigard. Changes in this base cost can be calculated in terms of a percentage increase,to create the level of change to the original index,and projected to the overall acquisition cost. In accordance with Measure 5,the Washington County Appraisers office will determine appraised values on July 1 of each year. The index for the Land Development component of the Parks SDC will be the Construction Cost Index for the City of Seattle as published in the May issue of the Engineering News Record(ENR). The Seattle cost index will be used because the city is the geographically closest to Tigard of twenty metropolitan areas for which the ENR maintains cost data. This index is adjusted monthly,quarterly,and annually. The annual index for each year will be selected beginning with the index for May 2012. The revised Parks SDC fees were derived from the costs of land and projects provided in the Tigard Park System Master Plan Update,adopted July 2009 and the Tigard Greenway Trails Master Plan adopted in July 2011. The costs for projects in both plans were adjusted using both the Land Acquisition and Land Development indices for the appropriate years. Park SDC Annual Adjustment(cont.) Calculation Definitions6 SDC(2012) = Current SDC fee L(2012) = Average cost of residential tract land 2012 L(2013) = Average cost of residential tract land 2013 L(2xxx) = Average cost of residential tract land 2xxx C(2012)= Construction cost index of 2012 C(2013)= Construction cost index of 2013 C(2xxx) = Construction cost index of 2xxx LCI= Land Cost Index:change from the current year from previous year CCI= Construction Cost Index:change from the current year from previous year ACI= Average cost index change of LCI+CCI Page 30 Formula: L(2014) /L(2013) =LCI and C(2014)/C(2013) =CCI therefore LCI +CCI/2 =ACI then SDC(2014)X ACI =SDC(2015) Each year subsequent to 2002,the costs shall be revised using the current year and previous years data. Not withstanding the foregoing,all calculations shall be carried out to the thousandth place. A final product ending in.49 or less shall be rounded down to the nearest dollar,.50 or more up to the next dollar. Page 31 PUBLIC WORKS-WATER Water System Development Charge(SDC)* 5/8"x 3/4"Meter 57,044 2/1/2014 $7,580 7/1/2014 3/4"x 3/4"Meter 510,144 2/1/2014 $10,916 7/1/2014 1"Meter S18,791 2/1/2014 $20,220 7/1/2014 1 1/2"Meter 556,343 2/1/2014 $60,625 7/1/2014 2"Meter $91,490 2/1/2014 $98,443 7/1/2014 3"Meter $173,599 7/1/2014 4"Meter $356,032 7/1/2014 6"Meter $378,994 7/1/2014 8"Meter $606,389 7/1/2014 Water system connections greater than 8 inch diameter,City will forecast the demands on an average-day,peak-day,and peak-hour basis to determine SDC fees. 3"Metem it id larger eliametet For conneetio is to the water systern with meters iftrger than 2 inehe4,the Gity wiH foreense the deirtands on an average daY,peak daY,and Feek hour btsis. The number of F29144 ft4saeiftttd with the demandq will be deterrriined by the following! .IiAOU fPDIDADORM. fPHI}P Delete this Formula-Redlined ' zu. z.s� — Where. 0.904 equals the pioior6on oF the Gity's water fiteilities Omitted to the mrage day ft2netif"t 'R6.4 eqtwAs the est�viftted grAlons per day on an average day basis deniftneled b!nn ED14 0.3 44 equals the proportion oF the Gity's water Fseilities ftilocated to the mage da)extra eavacity Fdneeierk 249.1 equals the estunated gallong per day on an nm day extra eaFfteity demanded by an EDU 0.254 eqtW4 the provertion oF the City's water Rbeilities ftHeeated to the rnme hatir extra eap2eity Function imposed b!large etistentem *As per ORS 223.3W(8)Res 10-76,lbe Gty gill use ENR Seauk CCI far Me month of April prior to t&budget year imposed 7%ENR Seatlk CCf for April-2014 is 7.6% based on a 12-mond)ar=Re. The mmkipker 1.076 is med for all Water SDCr eefectim 711/2014. Page 32 Department Roue Source COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES ENGINEERING Countywide Transportation Development Tax(TDT)-(Example Land Uses and Charges*) Single Family Detached $6,665.00 /per unit 7/1/2011 Apartment $4,325.00 /per unit 7/1/2011 Residential Condominium/Townhouse $3,976.00 /per unit 7/1/2011 General Office Building $6,869.00 (per TSFGFA**) 7/1/2011 Medical Office Building $23,370.00 (perTSFGFA**) 7/1/2011 Fast Food Restaurant(no drive thru) $21,133.00 (per TSFGFA**) 7/1/2011 Shopping Center $8,968.00 (per TSFGLA**) 7/1/2011 The Countywide Transportation Development Tax(TDT)is a Washington County Tax approved by the voters in November,2008,that is administered and collected by the City of Tigard. It went into effect on July 1,2009,replacing the Traffic Impact Fee(I'IF)program. Like TIF,TDT is assessed on new development to help provide funds for the increased capacity transportation improvements needed to accommodate the additional vehicle traffic and demand for transit facilities generated by that development. It provides funds for these capacity improvements to county and city arterials,certain collectors,and certain state and transit facilities as listed in the County's Capital Improvements Project List. The TDT is categorized as an Improvement Fee:revenue must be dedicated to capital improvements that expand capacity and may not be used for maintenance, repair,or other non-capital improvements. TDTs are assessed on new development on a per-unit basis. For residential uses the units are dwelling units,bedrooms,etc. For commercial and industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling positions,etc. The TDT rate for each land use category is adjusted each year,effective July 1st,and the rates for each year from July 1,2009 through June 30,2013 were established in Appendix B to Washington County Engrossed Ordinance 691,August 29,2008.The TDT rates effective 71/2010 include a 10% Temporary Discount implemented October 2009 by Washington county. If the Temporary Discount program is terminated the effective rates will revert to the original calculated rates. For information about the TDT regarding a specific project contact the City's Permits/Projects Coordinator at(503)718-2426. * For more detailed information on calculating TDT charges and a detailed list of Land Uses and TDT charges through 6/30/2013 see appendix B to Washington County Engrossed Ordinance 691,august 29,2008 and the Washington County Countywide Transportation Development Tax Manual. ** TSFGFA =thousand square feet gross floor area;TSFGL-k=thousand square feet gross leasable area. Page 33