Loading...
Permit CITY OF TIGARD BUILDING PERMIT .111 • COMMUNITY DEVELOPMENT Permit#: BUP2013-00237 T I G AR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/03/2014 Parcel: 2S112AB02000 Jurisdiction: Tigard Site address: 14344 SW MILTON CT Project: Bonita Water Pump Station Subdivision: BONITA INDUSTRIAL PARK Lot: 2 Project Description: Construction of a new water pump station Contractor: PACIFIC EXCAVATION INC Owner: CITY OF TIGARD 79 N DANEBO AVE 13125 SW HALL BLVD EUGENE, OR 97402 TIGARD, OR 97223 PHONE: 541-726-7380 PHONE: 503-639-4171 FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: IIB DC Provision Review,COM New-Bldg 05/28/2014 $139.00 Occupancy Grp: U Occupancy Load: DC Provision Review,COM New-Ping 05/28/2014 $139.00 Dwelling Units: 0 DC Provision Review,COM New-LRP 05/28/2014 $41.00 Permit Fee-COM-New Construction 05/28/2014 $13,830.42 Stories: 1 Height: 0 ft 12%State Surcharge-Building 05/28/2014 $1,659.65 Bedrooms: 0 Bathrooms: 0 Plan Review 05/28/2014 $8,989.77 Value: $3,000,000 Info Process/Archiving-Lg$2.00(over 05/28/2014 $240.00 11x17) Info Process/Archiving-Sm$0.50(up to 05/28/2014 $350.00 Floor Areas: 11x17) Metro Const.Excise Tax-Commercial 05/28/2014 $3,600.00 Total Area: 2922 Use Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $28,988.84 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain es or direct questions to OUNC by calling 503.232.1987 or1.800.332.2344. Issued By: Permittee Signature: (Az 3.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. t Building Permit Application Commercial REa . toll UI I It I til 11\1 1 City of Tigard �� na�eia �Ay �� �r, PermitNo.: ,ti P�/3cb D(37 13125 SW Hall Blvd.,Tigard,OR 97223. elan Revie 27 • 4 .rte Phone: 503-718-2439 Fax: 503 598-1960 2 4 2013 Date/By: �-/(( �1 ='her Permit: orlTa01 3'G�OC��•S Inspection Line: 503-639 4175 CI Date Ready/By. luris: ® see Page 2 for 1 t�' it i TY TIGARD Notified/Method: r / 'fry supplemental Information Internet: www.tigard-or.gov Qt+ c� ter/ pP BUILD[N.DIVJ NJ+;-- '` 13. TYPE OF WORK j V1� REQUIRED DATA:1-AND 2-FAMILY DWELLING b` gew construction 0 Demolition Permit fees*are based on the value of the work performed. V Indicate the value(minded to the nearest dollar)of all ❑Addition/alteration replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ Number of bedrooms: V% ❑Accessory building ❑Multi-family r ❑Master builder [ ticer:P LL C ()I-, I. J-, Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: J . �i-� s M�l r ( S .-- New dwelling area: square feet City/State/ZIP: 1/i J U J q 7 Garage/carport area: square feet NS Suite/bldg./apt.no.: JProject name: / r �c.„.(27tv‘ G r Covered porch area square feet Cross street/direcxions to job site: ,rte G n 4 �, Deck area: square feet O 1 � N Gjv \r Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST 1 Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: rc. (3 2 S I 1 A i30 2 too equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this applicat.i. ,, CO r crx, rr pp rr ( Valuation: $ L `1 Fr \ The 1 J I Existing building area quare fee S/cam Tz c.rin s ,/ r r/c�.C' t.+Td C r, New building area: 2 q 2.2 square feet [3 PROPERTY OWNER I ❑ TENANT Number ofstories: /, Name: a r-' , Type of construction: �j l T A • Address: -_ ll f v 9 `r Occupancy groups: 1 City/State/ZIP: f i' cs. 0,R d)7�Z� ' Existing: Phone:(��) -71$ 2�$ Fax:( ) � New: �- ,. �f 4.4 ❑ APPLICANT i ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: ( (Please ptof«u� e) �t l�/ h l r c-�� Structural plan review fee(or deposit): Contact name: n\ f d , S O r / ! / f � L FLS plan review fee(if applicable): Address: /64 L11 elm ft5(, 6 Jv ci City/State/ZIP: � ` Total fees due upon application: G,(CC �wu/ ���� r 9 703J Amount received: 1 g Phone: 3) '7J * , ,,,26 ....r---- v Fax::( ) E-mail: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* ~ ���� �'��� _�i v Commercial and residential prescriptive installation of `Z:),"/ COMRA roof-top mounted PhotoVoltaic Solar Panel System. Submit two(2)sets of roof plan with connection details Business name: Pkr,12,.L ' ,mil tG" IOC.. and fire department access,along with the 2010 Oregon C' Address: —)' r�lo0 V& Solar Installation Specialty Code checklist. City/State/ZIP: E Q 1Z cl)yv Z. Permit fee(includes plan review $180.00 and administrative fees): Phone:(S./()7 a,(0, 3 g Q hi-- Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.: 1 3 So 8 7r Total fee due upon appication: $201.60 Authorized signature: / 1� c� This permit application expires if a permit is not obtained /� within 180 days after it has been accepted as complete. Print name: R A� Al Date:C: _a y -a2U/ * Fee methodology set by Tri-County Building Industry O [ i V di t S G h Service Board I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012 4404613T(11/02/COM/WEB) ■ Building Division .11,1 Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (1) Accessible drinking fountains:and, $ _ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012 11111 ■ Building Division Plan Submittal Requirements _T_I C A R h Commercial&Multi-Family- New,Additions or Alterations I.. SITE PLAN (fully dimensional,drawn to scale) labeled with: A. El map&tax lot# ❑ project name ❑ site address ❑ suite number El zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I:\Building\Permits\BUP_COM_PernritApp.doc Rev.12/11/2012 I III I ■ Building Division Plan Submittal Requirement Matrix T I G A R D Commercial& Multi-Family-New,Additions or Alterations Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 3 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire & Rescue),if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/11/2012 J fa ' v i II 1111 UPI Building Division Development Code Provision Review T 1 G ° Commercial Projects - With Approved Land Use Building Permit No.: / LP c9C! 3 - OD 37 Land Use Case F ile No.: od72 ao i 3 -cocoa Sea S 1- .1013-O061v/ Project Name: ---?jo,v,T>.9t L)f TE_a— Pei H P £r -17j Site Address: I it `f I/ 4/-3 Hi L r-o, CT , Suite/Bldg #: Plans Routed: /15 Original Plan Submittal Date: 719—/ 3 Routed By:C/D.,49 1" Revision Submittal Date: Routed By: 2rid Revision Submittal Date: Routed By: To the Applicant: Each review type must be approved. If the plan is not approved, please revise and resubmit three (3) copies to the Building Division. Only checked (✓) items are approved. Items not approved and those listed in the notes must be revised prior to re-submittal. For questions please contact the appropriate staff person(s) listed above each section. STAFF: please only mark those items on the left side that are approved. Planning Review(contact Cher(' C a.1 a e f at (503) 718-014 37 or G'le rii( G @tigard- or.gov) Land Use Approval Building Plans Match Approved Plan: Yes No ❑ Maximum Building Height del ' S U r,w,p o if ci rvt 0.y4 ;S e(rj Conditions Met Street Trees A'Protected Trees ff•• (� Notes:( P4ec COnd:-h�.t i .. 4 i 4$4 alt 4—v- a p C.z ctnd h[.v-t 14- inv-tc.ldc1 x'121 -f��.L pru ed- k, -ia-1. .Sto-brvg4- Q.rboris+'s re,e0/4. r '&1-to L.J -�v-ct. et-,ilc,Twn +-tnc'�` 0n si-televad:ni Piq✓IS. — (�L 1b nur c/Il4 Shu�,i Original Plan: Approved .'i J 'Not Approved PtL Date: I/ 7!J q Revision 1: Approved �❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: I. -.__._I_ __..-..comi.ms—= 1* 1" ► L "�.' �`r"` (Review Continues on Page 2) ...e e■;10,.•`•m•■., --- - Page 1 of 2 1:\CURPLN\Masters\Development Code Provision Review`,DCPR_COM_WithLandUse.doc Rev.01/16/13 l `1 ' •4 Engineering Review(contact Mike White at(503)718-2464 or MikeW @tigard-or.gov) ❑ Actual Slope: ❑ PFI Permit# .—e7\-- O Conditions Met Notes: t Original Plan: Approved Not Approved ❑ Date: /7// i. Revision 1: Approved ❑ Not Approved ❑ Date: Revision 2: Approved ❑ Not Approved ❑ Date: Permit Coordinator Review(contact Albert Shields at(503) 718-2426 or albert@tigard-or.gov) Planning Okay to Issue Permit Arborist Okay to Issue Permit j/ Engineering Okay to Issue Permit - 54... o�.' e�t-td �{�,� Notes: Co— i, SI►444 -iw r•-■ M.i(C& m c--Ct� ) Original Plan: Date Sent to Applicant: Revision 1: Date Sent to Applicant Revision 2: Date Sent to Applicant, g- 1 ^ 1 -- �n PaQRa_>*klberI- .3 a.bse u . Okay to Issue Permit: Yes xi No i �41 Date Routed to Building: C' IS" Page 2 of 2 1:\CURPLN\Masters\Development Code Provision Review\DCPR_COM_WithLandUse.doc Rev.01/16/13 J t- , w 7 / RESPONSE TO THE CONDITIONS 4 ,,, V ASSOCIATED WITH CASE# SLR2013-0001 , , TIGARD e SECTION I. APPLICATION SUMMARY FILE NAME: BONITA PUMP STATION CASE NOS.: Sensitive Lands Review SLR2013-00001 Site Development Review SDR2013-00008 PROPOSAL: Construct a new water pump station as part of the Lake Oswego-Tigard Water Partnership. The proposed building is 2,922 square feet. A new access and public sidewalk are proposed within a portion of the 100-year floodplain and wetland buffer. An emergency generator is also proposed for periods of power loss or heavy power usage. APPLICANT/ OWNER: City of Tigard Attn:Rob Murchison 13125 SW Hall Blvd. Tigard,OR 97223 COMPREHENSIVE PLAN/ZONE DESIGNATIONS: I-L: Light Industrial District. The I-L zoning district provides appropriate locations for general industrial uses including industrial service, manufacturing and production, research and development, warehousing and 't ' ' freight movement, and wholesale sales activities with few, if any, nuisance characteristics such as noise,glare, odor, and vibration. 4: LOCATION: 14344 SW Milton Court; Washington County Tax Map 2S112AB, Tax Lot 2000. APPLICABLE APPROVAL CRITERIA: Community Development Code Chapters 18.775.070.B and 18.360.090. C4to/N y I -Ty' e S,y, ed of( S — q #4,,d I Z l 'y e c liakwd c-1-41-‘,4) of /0/ 1/, rrd / 1 0 Coy I %nU""1 . ON -to ' St.(e bu; kilo, 0418 S;to per-0,11 /1174 ft SLR2013-00001/SDR2013-00008 BONITA PUMP STATION PAGE 1 OF 5 4 ROGERS ENGINEERING Structural Engineering•Building Design•Code Consulting•Inspection Services 558 S.E.Jackson St Roseburg,Oregon 97470 Ph: (541)672-0315 Far: (541)672-1787 ro2ers1' rosenetnet January 27,2014 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Attention: Mark VanDomelen Building Official Rogers Engineering: Structural Review Project: Bonita Pump Station Rogers Engineering has completed a structural plan review for Bonita Pump Station on behalf of the City of Tigard. Rogers Engineering recommends approval of the associated construction documents. Approval is based on revised structural calculations and structural drawings Sl-S12 and SD1- SD4 dated December 2013. Should you have questions or need additional information,please do not hesitate to contact me at (541)672-0312. Respectfully Submitted, J/� /iv ii� Tom Rogers, P.E.,CBO OFFICE COPY ROGERS ENGINEERING Structural Engineering•Building Design•Code Consulting•Inspection Services 558 S.E Jackson St. Roseburg,Oregon 97470 Ph: (541) 672-0315 Fax: (541)672-1787 roRerstC rosenet net January 27, 2014 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Attention: Mark VanDomelen Building Official Rogers Engineering: Structural Review Project: Bonita Pump Station Rogers Engineering has completed a structural plan review for Bonita Pump Station on behalf of the City of Tigard. Rogers Engineering recommends approval of the associated construction documents. Approval is based on revised structural calculations and structural drawings S1-S12 and SD1- SD4 dated December 2013. Should you have questions or need additional information,please do not hesitate to contact me at (541)672-0312. Respectfully Submitted, Tom Rogers, P.E.,CBO ROGERS ENGINEERING Structural Engineering•Building Design•Code Consulting•Inspection Services 558 S.E.Jackson SL Roseburg,Oregon 97470 Ph: (541)672-0315 Fax: (541)672-1787 rogersfii rosenet net January 27,2014 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Attention: Mark VanDomelen Building Official Rogers Engineering: Structural Review Project: Bonita Pump Station Rogers Engineering has completed a structural plan review for Bonita Pump Station on behalf of the City of Tigard. Rogers Engineering recommends approval of the associated construction documents. Approval is based on revised structural calculations and structural drawings S I-S 12 and SD 1- SD4 dated December 2013. Should you have questions or need additional information,please do not hesitate to contact me at (541)672-0312. Respectfully Submitted, Tom Rogers, P.E.,CBO ROGERS ENGINEERING Structural Engineering•Building Design•Code Consulting•Inspection Services 558 S.E.Jackson St Roseburg,Oregon 97470 Ph: (541) 672-0315 Fax: (541)672-1787 rooerstaa)rosenet net January 27,2014 City of Tigard 13125 SW Hall Blvd. Tigard,OR 97223 Attention: Mark VanDomelen Building Official Rogers Engineering: Structural Review Project: Bonita Pump Station Rogers Engineering has completed a structural plan review for Bonita Pump Station on behalf of the City of Tigard. Rogers Engineering recommends approval of the associated construction documents. Approval is based on revised structural calculations and structural drawings S1-S12 and SD 1- SD4 dated December 2013. Should you have questions or need additional information,please do not hesitate to contact me at (541) 672-0312. Respectfully Submitted, Tom Rogers, P.E., CBO OFFICE COPY s December 16, 2013 Black &Veatch Attn: Jeff McMullen, P.E. 5885 Meadows Road, Suite 700 Lake Oswego, OR 97305 RE: Bonita Pump Station, Tigard, OR Project No. 175069 Dear Mr. McMullen, A structural review of the plans for the above noted project has been completed. Additional information or clarification is needed for the following items in order to complete the review. 1. Sheet S1 specifies a snow load(Pf) of 25 psf, whereas the calculations use 20 psf. Provide clarification. OSSC Sec. 1608 2. The calculations do not appear to add the 5 psf rain-on-snow to the minimum 20 psf roof snow. OSSC Sec. 1608.1 3. Snow drift calculations appear to use a length (lu) of 20 feet. Note that if lu is less than 25 feet, lu=25 is to be used in the computations. ASCE 7-05 Figure 7-9 4. Snow load calculations (SL& SU) appear to use pf as opposed to the minimum roof load of 20 psf. Provide clarification. OSSC Sec. 1608 5. Calculations for the masonry walls use f m=1900,whereas specifications on sheet S1 indicate 1500 psi. Provide clarification. OSSC Sec. 2101 6. Wall to diaphragm connection calculations reference ASCE 7, Eqn. 12.11-1. This does not appear to coincide with ASCE 7-05 Section 12.11.2.1. Provide clarification. 7. Clarify how the end wall to roof diaphragm connection meets the requirements of ASCE 7-05, Sec. 12.11.2.2.4. 8. Structural calculations indicate#6 vertical reinforcing 16"o.c. for the tapered walls. Where is this specified in the plans? OSSC Sec. 107.1 9. Provide calculations for the canopy angle brace end connections. OSSC Sec. 1604.2 10. Clarify where reinforcing is specified for the footings shown on sheet SD 1. OSSC Sec. 1901.4 11. Detail references on sheet S5 are incomplete. OSSC Sec. 107.1 In order to expedite the review, please provide a written response indicating how each item is addressed and which sheet, detail, or calculation contains the information. Should you have questions or need additional information, please contact me at your convenience. ICI