ROW2014-00060 CITY OF TIGARD RIGHT OF WAY PERMIT
• s • COMMUNITY DEVELOPMENT Permit#: ROW2014-00060
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/05/2014
Parcel: SEG1706
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Comcast
Project Description: Adjacent to 13950 SW 72nd Avenue. Comcast proposed to trench/bore and place(1)-2"conduit a min of
36"below grade within the CIT ROW along the north side of SW 72nd Avenue,south of SW Tech Center
Drive. SEG 1706
Owner: FEES
Description Date Amount
ROW Permit Fee 06/04/2014 $300.00
PHONE
Contractor:
PHONE:
FAX:
Applicant:
SCOTT SARBER
11308 SW 68TH PARKWAY
TIGARD, OR 97223
PHONE 503-519-7538
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant t \ 1 n,^
Signature: �J 7 (`� /y
Issued By: 1
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
RECEIVED
JUN 0 4 2014
City of Tigard PLANNING/ENGINEERING
NG/ENGINEERING
Application For Work In The Right-Of-Way
TIGARD ROW Permit
Property Address/Location(s): 13950 SW 72nd Ave. Tigard, OR 97223 FOR STAFF USE ONLY
:SE4 I11Q
Right-of-Way,,/��, ���,y
Case No.: CAW v ea L frCT P0
*Applicant's Name:ComcaSt
Application Accepted: I , 1L
Address:11308 SW 68th Parkway By: xJC({�
Application Reviewed: 6' By:/ l36
City/State:Tigard, OR Zip:97223 ao
Application Fee Due: WO
Primary Contact:Scott Sarber
Applicant Notified:
Phone:(503) 519-7538 Fax: ii
Receipt No.: 1 q
Email:Scott_Sarber @Cable.comcast.com
REQUIRED SUBMITTAL
Contractor's Name:Texstar Enterprises INFORMATION
CCB#178798 Expiration: 10/10/2014
• Application form,completed and signed
Address:14122 Arndt Rd • Submit one (1) copy of scaled sketch of
City/State:Aurora, OR Zip:97002 the proposed work to be done
Phone:(503) 776-5049 Fax:(503)776-5050 • Submit one (1) copy of traffic control
Email:jimminer @texstarenterprises.com plan
Professional Engineered Plans are required
Plans By:K&B Technical Solutions for:
Address:PO Box 2529 • Street Widening
City/State:Clackamas, OR Zip:97015 • Subdivision Infrastructure
Phone:
(503) 650-6041 Fax:(503)650-7390 • Main utility line extension
Email:kbeng @att.net Rev.6/24/2013
Lcurpin\masters\land use applications\row app.docx
Description of work:Comcast proposes to trench/bore and place(1)-2"conduit a min of 36"below grade
with in the City of Tigard ROW along the North Side of SW 72nd Ave, South of SW Tech Center Dr.
Estimated value of work(within the public right-of-way): $
Is work related to a LAND-USE DECISION? YES n NO El
If so, please specify(MLP,SDR,SUB,etc.)case#:
Is the work related to a BUILDING PERMIT? YES n NO ❑
If so, please specify(BUILDING PE' T)case#:
Signature of Applicant/Permittee: . " .!A Excrf SAjZfziLDate:5/27/2014
Print Name:Justen Phillips For Scott Sarber Title:Project Manager
City of Tigard I 13125 SW Hall Blvd.,Tigard,OR 97223 I 503-718-2464 I www.tigard-or.gov
Conditions for ROW2014-00060
Type: Condition Name: Status: Severity:
ROW 01-CUSTOM CONDITION Applied Notice
<Custom Condition goes here>
ROW 02-PERMIT&PLAN REQ ON SITE Applied Notice
A copy of the permit and all attachments, and a copy of the approved construction plan and all amendments shall be
available at the work area All work shall conform to the permit terms,conditions and provisions and to the City approved
permit plans, and approved plan amendments and to the City's Standards and Specifications and to these General
Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance.
ROW 03-TRAF CTRL-SPECIF(CITY) Applied Notice
The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways",
U.S. Dept. of Transportation, F.H.A., 1988 Ed.
ROW 04-TRAF CTRL-CONTR RESPON FOR Applied Notice
Traffic control shall be provided for by the contractor in accordance with the City's standard specification and,also, in
accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be
available at the work area.
ROW 05-TRAF CTRL-ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without having first obtained written approval from the City
Engineer.The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide
Emergency Services(Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District.
ROW 06-TRAF CTRL-ADVANCE WARNING Applied Notice
Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance
notification sign at each end of the construction area 72 hours(min.)before initiation of construction work.
ROW 07-TRAF CTRL-PRIV PROP ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not,
shall be cause for work stoppage until effective access is established.
ROW 08-TRAF CTRL-DEVICES IN PLACE Applied Notice
Traffic control devices,flagpersons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
ROW 09-TRAF/NOISE CTRL-WORK HRS Applied Notice
No work will be permitted during the hours of darkness, nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor
between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m.to 9:00 a.m. Sunday.
ROW 10-TRAF CTRL-MIN LANE WIDTH Applied Notice
Minimum travel lane width shall be eleven(11)feet; pedestrian travel shall also be provided for.
ROW 11-TRAF CTRL-CITY CAN MODIFY Applied Notice
The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic
and to assure public safety.
ROW 12-INSP 24 HR NOTICE REQUIRED Applied Notice
The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at
kenny @tigard-or.gov,twenty-four(24)hours prior to commencing work,twenty-four(24)hours prior to any staged
inspection, and after completing work covered by the permit.
ROW 13-HAZARDS-CERT OF INS Applied Notice
Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach
roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate
of Insurance shall be available at the work area.
ROW 14-DEBRIS-MATERIALS Applied Notice
The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly
prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate
cleanup and stoppage of work to accomplish cleanup.
ROW 15-EROSION CTRL REQ Applied Notice
Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q.
requirements.The City may at any time order corrective action and stoppage of work to accomplish effective erosion
control.
ROW 16-REPAIRS-LIKE MATERIALS REQ Applied Notice
Property disturbed by construction activity shall be seeded with a standard grass mix;shrubs,flowers, barkdust, existing
signs, pavement markings, mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material.
ROW 17-DRAINAGE CONTROL REQ Applied Notice
Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent
private property, public property and the receiving system is not adversely impacted.The City may, at any time,order
corrective action and stoppage of work to accomplish effective drainage control.
ROW 18-UTILITIES PRELOCATION REQ Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0010 through OAR 952-001-0080.Copies of the rules may be obtained from the Center by calling(503)232-1987.
If you have questions about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders
expense.
ROW 19-UTILITY LOCATIONAL CONFLICT Applied Notice
Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the permit holders expense. Changes must be approved by the City in advance of work performance. Contractor shall
coordinate the work with affected utility agencies.
ROW 20-TRENCH-PATCH/SAFETY/LBILITY Applied Notice
A temporary hard-surface patch(Cold mix A.C. or Hot mix A.C. base paving) shall be placed on trenches within roadways
at the end of each day's work. No trench, on site or off site,shall be left at any time in an unsafe condition. The permit
holder is responsible for and is liable for hazards or damage resulting from the work.
ROW 21-REPAIRS REQ-INSPTR OPINION Applied Notice
Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, in the
City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the
permit. Corrective work shall be done at the permit holders expense.
ROW 22-AS-BUILT/ENGR CERTIF REQ Applied Notice
At the end of each year,or an a mutually agreeable yearly date, any entity making changes to its facilities in the public
right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to
the previously approved construction plans and, also, any improvement which may impact an existing public system or
facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation
compliance(form attached).
ROW 23-DAILY INSP REPORTS REQ Applied Notice
The permit holders Engineer/Inspector shall submit daily inspection reports, on a weekly basis,to the City's Inspector. (see
Developer-Engineer Agreement note#5).
ROW 24-TESTS/REPTS TO VALIDT CLMS Applied Notice
The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's
engineer or contractor to validate claims of material or construction adequacy/compliance. Such tests/reports shall be
provided at the permit holder's expense.
ROW 25-RELEASE-WAIVER REQ Applied Notice
The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership
disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction.
ROW 26-MONUMENT PROTECTION REQ Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holders
expense.
ROW 27-PROB SOLVING-RESPON PARTY Applied Notice
The permit holder shall provide to the City Inspector, in writing,the names and 24-hour emergency telephone number of two
(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of an
emergency.The permit holder shall notify the City Inspector, in writing,of any/all assignment changes.
ROW 28-CONSTR SAFETY-RESPON PARTY Applied Notice
The permit holder shall cause his contractor to provide to the City Inspector, in writing,the name and 24 hr emergency
telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA, Chap.437,
Div. 3 Construction, Subdivision P-Excavations.The contractor shall notify the City Inspector of any/all assignment
changes.
ROW 29-ESMT/RT OF ENTRY-RESPON Applied Notice
It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work.
Proof of right-of-entry, or properly executed easements, shall be provided to the City.The City shall in no way be construed
to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements.
CONSTRUCTION NOTES:
N 811II h % 1. ALL WORK AREAS TO BE
W E ATTENTIOttQl100ppwl09kM)/OY10%kW RESTORED TO LIKE OR BETTER
A000*scold W S CONDITION.
� �
cMat.Thum odes are..r•+aw w OAR ou-
001-00t010000.1132-0Dt-0000.Vow may°Mam 2. ALL OTHER UTILITIES ARE BASED
oopbod lissu syoigllowow.INot.
S labliylomMobbalbrilwitbeyer i0i" OFF EXISTING LOCATES OR UTILITY
Nillbilmeratar YFINID:04•97 or till). STRUCTURES.
3. IT IS THE CONSTRUCTION
CONTRACTORS RESPONSIBILITY
TO CALL FOR LOCATES BEFORE
DIGGING.
I
4. BORE/DRILL
5. TRENCH - — -
UNIMPROVED
� AREAS
\
I? ATE TOP SOIL IF
TOP SOIL EXISTED
PRIOR TO EXCAVATION Contact: Scott Sarber
' N,iNy,,y,.,.�,,,N Title: Fiber Construction Analyst
13950 �c:`�i<��i.``�i;`ii.`;;`. Mobile- (503) 519-7538
375' FROM SOUTH FOC OF SW TECH CENTER DR Office- (503)596-3819
s0 d ' OR ' Email - Scott_Sarber @cable.comcast.com
v GRANULAR��
s
ii NATIVE i m
o ',BACKFILL' ' i
S �'3PEAS .- s -- - --
/,OH
....... ,,• \ S/ \ HOC
ii3O,_ @OMOCIISt*
\ Ivy TRENCH TO INSTALL(1)-2" ,y.y�y�y�., 11308 SW 68th Parkway
\ \ ?/�/O \ 3rr87 CONDUIT A MIN.OF 36"BELOW `!``'`'\\/`\'.
'Q(� \
■ 0"25 GRADE.(TYPICAL) "' Tigard, OR 97223
\� ■ . 5j' DIRECTIONAL DRILL TO INSTALL
�\ j (1)-2"CONDUIT A MIN.OF 36"
\ \ BELOW GRADE.(TYPICAL) PO BOX 2529
., \ \.6„/ii• i CLACKAMAS,OR 97015
`4� \ 9' S'`\` ��.',,.,- \ Email:Justen_Phillips @ k6ma I neBy K&B(503)650-6041
�i \
`` \� �`�i,., \ EXIT CITY OF TIGARD ROW SITE ADDRESS:
40' ���..,� ,• 13950 SW 72ND Ave
` ``� S'� .� ��� 4'x6'BORE PIT(TYPICAL)
Tigard, OR 97223
��., 2S1W1DD--#\`\ �` REV. DATE DESCRIPTION APPROVED
\
\ �\ (r 40' 10' \ 1 05/20/14 CITY OF TIGARD PERMIT DRAWING JP
\ ` - 55' 30 S d •
\ /-* • �l\` ` SCALE: PROJECT NUMBER:
5' 1•=30' 40001
\\ \ SHEET NUMBER TmE:
�•.f N.
■5' . . `\ FIBER ENHANCEMENT
�� PERMIT DRAWING
\ FILE NAME:
\ \ SHEET 1 of 1 CMME-3262-2247
•
COC N
N
,„
1. ALL WORK AREAS TO BE
RESTORED NSTRU TO LI KE OR TION BETTER
W Mw adopted by mo r Nioelicat on
CONDITION.
Center.Those rubes we setLAr In OAR 952-
ootOCtO through W52-0Ot-0OID YouN,uyomav 2. ALL OTHER UTILITIES ARE BASED
copies of the rules by calling 1111010/e.+Note
S me bylirphone numberforthoORPOUlll) OFF EXISTING LOCATES OR UTILITY
Notlncabon Censor Is(503)232-118T or 8111.
STRUCTURES.
3. IT IS THE CONSTRUCTION
CONTRACTORS RESPONSIBILITY
TO CALL FOR LOCATES BEFORE '
DIGGING.
\ 4. BORE/DRILL-
----,.., • 5. TRENCH -
UNIMPROVED
AREAS
IT NATIVE TOP SOIL IF
TOP SOIL EXISTED
PRICR TO EXCAVATION Contact: Scott Sarber
Title: Fiber Construction Analyst
�.p.pppp���� Mobile - (503) 519-7538
13950 :G.c4c4c4c4<�i,:/.
375' FROM SOUTH FOC OF SW TECH CENTER DR r', ; Office (503) 596-3819
/, RANULAR'; Email- Scott_Sarber @cable.comcast.com
1 DR
i NATIVE i i
i,BACKFILL' z
I / AS 7, N
8 /'Sr. CIFIE,�
S� 2 TRENCH TO INSTALL(1)-2” 11308 SW 68th Parkway
\ CONDUIT A MIN.OF 36"BELOW �G�b��ipi��0
\ tipq�� 3ssa!25 GRADE.(TYPICAL) "��`����� Tigard, OR 97223
r DIRECTIONAL DRILL TO INSTALL
\\ y\"-, ! 5 (1)-2"CONDUIT A MIN.OF 36"fa�'\ BELOW GRADE.(TYPICAL) . CLACKAMAS,OR 97015
Design By:K&B(503)650-6041
„ • Email:Justen_Phillips@kbmail.net
i,. EXIT CITY OF TIGARD ROW SITE ADDRESS:
40' -.`•°�.,• � 13950 SW 72ND Ave
.� 4'x6'BORE PIT(TYPICAL)
Tigard, OR 97223
2S1W1DD
REV. DATE DESCRIPTION
APPROVED
• /1 0' 1 05/20/14 CITY OF TIGARD PERMIT DRAWING JP
40'
55' 30 ~
SCALE: PROJECT NUMBER:
. ''',, ./
5, 5 1^=30' 40001
SHEET NUMBER TITLE:
5'
J -. • FIBER ENHANCEMENT
PERMIT DRAWING
�•...'\ FILE NAME:
W SHEET OF
1 1 CMME-3262-2247
Page 106 2011 Edition
Diversion into a Continuous Left Turn Lane Diagram 430
Diagram 430 shows work in the travel lane(s) next to a continuous two-way
left turn lane with one direction of traffic diverted into the continuous two-way
left turn lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. When two or more travel lanes are reduced to a single lane before the
diversion, each lane shall be closed separately. Layout traffic control
according to ODOT Standard Drawing TM 852 for 5-lane sections.
4. A shifting taper(L/2) may be added in the diverted traffic direction
across the continuous two-way left turn lane (as shown). This option is
recommended when the speed is 45 mph or greater.
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75
30 _ 100
35 125
40 350 350 350 150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
2011 Edition Page 107
Diversion into a Continuous Left Turn Lane Diagram 430
ROAD
WORK A
AHEAD A
B
I Iy 1 CENTER 1 A I I
`�"E
CLOSED
A
II
•
U2 I . I
•
•
1 1 S Buffer
Protection Vehicle
w/TMA(both Optional)
•
See Chapter 4
n
r 1
Buffer
I
• •
• U2
11 •
•
•
•
•
U2 I• I A
•
1 • r
II •
lyt B
I 1 ROAD
WORK
AHEAD
December 2011 Chapter 5
%OOTOSSI
0
S£00 S
Sti0OW
I I
.gtooya
VZT
.4'
\.
STOZT
Li T
TrO TO
1'1
TOOVZT
016E1
Z9 T
LSTOO T00% a T
6at TOO
0
9STOO
95T00 TC 6S
II.
t'9100 LO £9TO 0TIG 05T00 TO
co
OLTOOT
LLTOOTO fiLTOOTO
TO
#6\1:
p
To
T TO
q'ot
LT00
SLID OTO
STOOTOSS
SD 0
10,4
39
19001
3590010
bTOOTOSS
1111 CITY OF TIGARD RECEIPT
q
$ 13125 SW Hall Blvd.,Tigard OR 97223
503.639.4171
TIGARD
Receipt Number: 196308 - 06/04/2014
CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID
R0W2014-00060 ROW Permit Fee 100-0000-43114 $300.00
Total: $300.00
PAYMENT METHOD CHECK# CC AUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT
Check 3896 AKOWACZ 06/04/2014 $300.00
Payor: Tremark, LLC
Total Payments: $300.00
Balance Due: $0.00