Plans v Tree Protection Plan REVISED 7/27/05 SITE ADDRESS 14264 SW Alpine View Way (Lot 3 Alpine View) Follow the below listed instructions in order to provide the proper protection before, during and after construction for 18" Deodar Cedar on Lot 2 I. Before Construction: ADD. Non -App. Xi ❑ a. Identify and number the trees to be protected, verify by mapping and /or tagging and note their size in D.B.H. (Diameter at Breast Height), variety, health and structural conditions, review plans. Xi ❑ b. Check with local government agencies for tree protection ordinances. Dn ❑ c. Remove any low limbs that may be in the way of construction equipment, and prune as needed to adhere NAA standards. ❑ d. Leave a protective covering on the soil, i.e., existing groundcover or mulch. X ❑ e. Notify all other contractors that these trees are to be saved and protected. X ❑ f. Install a temporary 6' high metal no -climb fence to protect the trees and their root systems. Install tree protection sign on fence. Posts located 10' on center as a general rule. For every inch in diameter of the trunk (D.B.H.) allow up to 1 foot of radius from the trunk as the protected area. (Example: 24" D.B.H. = 24' radius of protected root system.) Ideally, we need to protect more than the drip zone. The drip zone into the trunk is the support roots that hold the tree up. The roots from that drip zone out provide nutrition, water and oxygen. Try to avoid loss of more than 30% of root on any one side. This allows some encroachment within the drip line. This should be determined on a case by case site conditions reviewed. (SEE ENCLOSED SITE PLAN) I ❑ g. Identify any insect or disease problems that may require treatment. EX ❑ h. Engineer and design proposed structures and construction to avoid root loss. Bridge type foundations can save major roots. ID4 ❑ i. Design landscape islands and planting areas large enough to accommodate trees at maturity. ❑ j. Plant the right tree in the right place. Avoid future conflicts with buildings and utilities. ❑ k. Have an experienced Arborist review landscape plan to assure the right tree is planted in the right place and proposed changes don't kill retained mature trees. ❑ 1 . Consider tree removals adjacent to trees to be saved for wind related stability concerns. App. Non -App. X ❑ m. Check for past and proposed grade and drainage changes, consider the effects. • ❑ n. Check trees for stability. Xl ❑ o. Remove all trees that would not survive the effects of change. Remove all hazardous trees. It ❑ p. Minimize environmental changes. II. During Construction: M ❑ a. Keep equipment off of the root system to avoid compaction. X ❑ b. Keep equipment away from structure to prevent damage to trunk and limbs. • ❑ c. Don't allow chemicals to be dumped on the ground near the tree, i.e., gasoline, diesel, paint, herbicide, cleaner, thinners, etc. X ❑ d. Provide means of temporary irrigation if the project runs through the summer. IX ❑ e. If roots or limbs are cut or damaged, have them inspected by an ISA Certified Arborist and repaired or treated according to his /her recommendations. Xi ❑ f. Protect the trees from excessive heat, i.e., equipment, paving and /or burning. Xi ❑ g. Avoid trenching through the root systems, boring under them or hand digging can save roots. • ❑ h. Contact the ISA Certified Arborist familiar with the site prior to and during any activity within the drip zone or tree protection fencing for consultation. III. After Construction: • ❑ a. Carefully landscape the area under the tree, being careful of the roots and structure. Use plantings that will live under the same conditions as that of the tree. IX. ❑ b. Provide insect and disease control, fertilization and pruning as needed or adhere to long -term protection plan if provided. l& ❑ c. Avoid direct irrigation spraying onto the trunk. The amount of irrigation need to keep new plantings alive can often be enough to kill mature trees. X ❑ d. Do not cover existing root systems with more than 2" of soil. The more soil you add, the greater the chances of damaging the root system. XI ❑ e. Provide irrigation and /or drainage to emulate pre- construction conditions. NOTE: This tree protection plan identifies construction protection measures to prevent unwarranted tree loss. The identified measures limit the amount of earth disturbance surrounding the trees, and limit the removal of the tree's root systems. Due to the variation of every project, it is unlikely all of the above identified measures can be practicably applied to each individual tree; nor is it likely each measure is necessary to retain each tree. Prior to the beginning of construction a meeting between a certified arborist and the necessary contractors will be held to determine the appropriate level of protection for each tree, in relation to what work needs to be completed in the tree's vicinity. On site supervision by a certified arborist will be determined and supplied as necessary. . :.. cfli . ! EROSION CONTROL FENCING _ 47'41' _4 - - • ) I 1 (.1) WATER METER • • - 1 1 - - — ---, _95.00' — - - r . • (.n . .:1 1 4,1 5 .; 1-- . : . -.... (MV —I v • .,-.. •• . , 4...., )1• d • . ';!''t : ..4, .1......., ....,. 13, . 8 SIRM M H __ ;' Z•44 ' 0 t 8$, E• ; SEWER (— LAT. I .... . .,......,. ,,.. : I ti..„ . ,.... , . . . 7/ 7 1 m 1 1 II 150 5 •I.'. 4 . ..1 4' V. ! A ' * • 1-1 M e; i: 2 - 5. • I. t :.• e• ..... . - Itir i a) Z O A ; • ,'; )...,- .;*•.' :.. 7S •‘: ,, 70 M (- Q m 0 FT DECK 03 a c) • !..: :1•;:'-li'l (C5' :.. • : ' . m C% •41 .. 4 ... m 70 Iv = V • 18 1 0 ; .... '•/.. :•'. .,, l ' .• • ; ' m 2 z 8 1 -.0.r;..1, 'F.' 1 . 1 vfi oD D Z g ) MI = (f) to A v :• - I , "'• C "" 1 2 z 0) •< m EROSION CONTROL - —x...,.. .s.• • 0 > 0 •:. i— ...,. ).,,... , FENc•IN z 1 • ' •••■ ''''' 1 21' 9" '''',• II: r5 1 I 4 , . (-- - - . ..._. 4 . _ _ _ _ - - - — t. 95 00' — 18" DEO \ ORA TREE CEDAR R EE PROTECTION (SAV ) FENCE I SEE ATTACHED ROOT PROTECTION ZONE ARBORIST' 5 BOUNDARY. ALL WORK "TREE ilk WITHIN THIS AREA PROTECTION , n_ • REQUIRES SUPERVISION BY PLAN" I.S.A. CERTIFIED ARBORIST .?.-- TREE PROTECTION PLAN DRAWN 10/01/09 SHG ALPINE VIEW Contractor is responsible to check SITUATED IN THE N.E. 114 OF SECTION 9, TOWNSHIP site plans and notify designer of any 2-SOUTH, RANGE 1-WEST OF THE WILLAMETTE MERIDIAN errors or omissions prior to start of CITY OF TIGARD, WASHINGTON COUNTY, OREGON construction. Also plans and specifications shall oes be approved or by 14264 S.W. ALPINE CREST WAY local building auth prior start of construction. 4,750 SQ. FT. LOT 3 WEST HILLS SETBACK REQUIREMENTS: (i) DEVELOPMENT, INC. REAR YARD: 15' (FROM P.L) FRONT (HOUSE): 15' (FROM P.L) FRONT (PORCH): 15' (FROM P.L) 735 SW 158th Ave. FRONT (GARAGE): 20' (FROM P.L) SCALE BEAVERTON, OR 97006 STREET SIDE: 10' (70M P.L) 1"=20' SIDE: 5' ROM P.L.) TREE PROTECTION NOTES. 1. CONTRACTOR SHALL PROVIDE TREE PROTECTION AND INSTRUCTION TO ALL EMPLOYEES AND SUBCONTRACTORS PROHIBITING EQUIPMENT, VEHICLES, MACHINERY, GRADING, DUMPING, STORAGE, BURIAL OF DEBRIS, OR ANY OTHER CONSTRUCTION- RELATED ACTIVITIES IN ANY TREE PROTECTION ZONE 2. ONLY THOSE TREES IDENTIFIED ON THE APPROVED TREE REMOVAL PLAN ARE AUTHORIZED FOR REMOVAL BY THESE PLANS. NOTWITHSTANDING ANY OTHER PROVISION OF THIS TITLE, ANY PARTY FOUND TO BE IN VIOLATION OF THIS CHAPTER [18.790] PURSUANT TO CHAPTER 1.16 DF THE TIGARD MUNICIPAL CODE SHALL BE SUBJECT TO A CIVIL PENALTY OF UP TO 8500 AND SHALL BE REQUIRED TO REMEDY ANY DAMAGE CAUSED BY THE VIOLATION. SUCH REMEDIATION SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING: 1) REPLACEMENT OF UNLAWFULLY REMOVED OR DAMAGED TREES IN ACCORDANCE WITH SECTION 18.790.080 (D) DF THE TIGARD DEVELOPMENT CODE; AND 2) PAYMENT OF AN ADDITIONAL CIVIL PENALTY REPRESENTING THE ESTIMATED VALUE OF ANY UNLAWFULLY REMOVED OR DAMAGED TREE. AS DETERMINED USING THE MOST CURRENT INTERNATIONAL SOCIETY OF ARBORICULTURE'S GUIDE FOR PLANT APPRAISAL 3. IF WORK IS REQUIRED WITHIN AN ESTABLISHED TREE PROTECTION ZONE. THE PROJECT ARBORIST SHALL PREPARE A PROPOSAL DETAILING THE CONSTRUCTION TECHNIQUES TO BE EMPLOYED AND THE LIKELY IMPACTS TO THE TREES. THE PROPOSAL SHALL BE REVIEWED AND APPROVED BY THE CITY ARBORIST BEFORE PROPOSED WORK CAN PROCEED WITHIN A TREE PROTECTION ZONE_ THE CITY ARBORIST MAY REQUIRE CHANGES PRIOR TO APPROVAL. TH.E PROJECT ARBORIST SHALL BE ON SITE WHILE WORK IS OCCURRING WITHIN THE TREE PROTECTION ZONE AND SUBMIT A SUMMARY REPORT CERTIFYING THAT THE WORK OCCURRED PER THE PROPOSAL AND WILL NOT SIGNIFICANTLY IMPACT THE HEALTH AND /OR STABILITY OF THE TREES. 4. PRIOR TO COMMENCING ANY SITE WORK OR THE ISSUANCE OF PERMIT. THE APPLICANT SHALL ESTABUSH TREE PROTECTION FENCING AS DIRECTED BY THE PROJECT ARBORIST AND CONDITIONED BY THIS DECISION TO PROTECT THE TREES TO BE RETAINED. THE APPUCANT SHALL CALL FOR AN INSPECTION AND ALLOW ACCESS BY THE CITY ARBORIST FOR THE PURPOSE OF MONITORING THE TREE PROTECTION TO VERIFY THAT THE TREE PROTECTION MEASURES ARE PERFORMING ADEQUATELY. FAILURE TO FOLLOW THE PLAN, OR MAINTAIN TREE PROTECTION FENCING IN THE DESIGNATED LOCATIONS SHALL BE GROUNDS FOR IMMEDIATE SUSPENSION OF WORK ON THE SITE UNTIL REMEDIATION MEASURES AND /OR CIVIL CITATIONS CAN BE PROCESSED. TREE TI Lo ALPINE VIEW SITUATED IN THE N.E. 1/4 OF SECTION 9, TOWNSHIP 2-SOUTH, RANGE 1 -WEST OF THE WILLAMETTE MERIDIAN CITY OF TIGARD, WASHINGTON COUNTY, OREGON 14264 S.W. ALPIN C E CREST WAY TREE CARE & LANDSCAPES UNLIMITED, INC. 4 / 50 SQ. FT. • 56110 Ruuu P.O. Rns 755-6 4 Lkc Ueusgo, o, OR Y'U35 503-635 -5165 � '. N' SETBACK REQUIREMENTS: WEST HILLS REAR YARD: 15' (FROM P.L) SCALE LILY CLOAUCNT,IF.:. FRONT (HOUSE): 15' (FROM P.L) 1 , " =20 FRONT (PORCH): 15' (FROM P.L) 735 SW 158th Ave. FRONT (GARAGE): 20' (FROM P.L.) BEAVERTON, OR 97006 STREET SIDE: 10' (FROM P.L) Sheet 2/2 SIDE: 5' (FROM P.L)