Loading...
Permit � CITY OF TIGARD MECHANICAL PERMIT 11111 ' COMMUNITY DEVELOPMENT Permit#: MEC2014-00202 T f G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/22/2014 Parcel: 1S 126CA01000 Jurisdiction: Tigard Site address: 9009 SW HALL BLVD 145 Project: Bambuza Vietnam Kitchen Subdivision: FAIRVIEW PLACE CONDO Lot: 20 Project Description: Installation of a new 13 ft.type I hood,exhaust fan,and 16 ft.of gas line. Contractor: HM&V CONTRACTORS Owner: CAFARO NORTHWEST PARTNERSHIP PO BOX 1231 PO BOX 422 CLACKAMAS,OR 97015 FLORHAM PARK, NJ 07932 PHONE: 503-734-4490 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 05/22/2014 $558.53 Class of Work: ALT Type of Const: VB Plan Review 05/22/2014 $139.63 Occupancy Grp: A-2 Occupancy Load: 12%State Surcharge-Mechanical 05/22/2014 $67.02 Stories: Info Process/Archiving-Sm$0.50(up to 05/22/2014 $20.00 11x17) Project Valuation: $18,300.00 Fuel Air Handlers Fuel Types: Units<10000 cfm: 1 Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>=100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $785.18 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to folk the rules adopted by the Oregon Utility Notification n er. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. o ay obtain a copy of the rules or direct que ns to OU by = • 503.232.1987 or 1.800.332.2344. -4 Issued Permittee Signature: y Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application FOR OFFICE USE ONLY City of Tigard Date/By: 11 (I{ r Permit Ho r,/� y- O�j ricr 13125 SW Hall Blvd.,Tigard,OR Plan ReJiew Phone: 503.718.2439 Fax: 8. � w Date/By: ( Other 6/fD�LU_ �q ati Jl�y f vw TI G A R D Inspection Line: 503.639.41 ^ Date Ready y: Juris: ® See Page 2 for Internet: www.tigard-or.gov Q ION Notified/Method:J/� iy QO,l.Y'I,�`y Supplemental Information id/Ce- TYPE OF • ;I 'c1 _,^w� COMMERCIAL FEE* SCHEDULE - USE CHECKLIST_ ((��� �'` Mechanical permit fees*are based on the value of the work ❑New construction Addition/alk cement performed.Indicate the value(rounded to the nearest dollar)of all mechanical materials,equipment,labor,overhead,aid profit ❑ Demolition ❑Other: °� p Value:$ 749,3 )`" CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling ❑Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family ❑Master builder ❑Other: Description Qty. I Ea. 1 Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 Job site address: 70 d 7 5G) /47// 2/ur/ Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: 757.017 �J y,-�!� _ q 7 f 2'0 3 Furnace 100,000+BTU(ducts/vents) 54.91 y v !� Heat pump 61.06 Suite/bldgJapt.no.: /t/ Project name: o0.l,t b U za U(G/jet t.-f t Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or _hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: 1 Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater _ 23.32 DESCRIPTION OF WORK Gas fireplace/insert _ 3 3.39 Flue vent for water heater or gas f4/s /*lit 4f� i7.4.4., l3 �C - rV/G Z- z fireplace 23.32 1 40 // / Log lighter(gas) 23.32 INS 14 ii +,1 O t we(� ei°X19 / 14114 Oli Ihrfr;-rr 0%Y Wood/pellet stove 33.39 o5 A/C am//v / Fr Wood fireplace/insert 23.32 !//7 / Chimney/liner/flue/vent 23.32 ❑ PROPERTY OWNER I ❑ TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 ❑ APPLICANT ❑ CONTACT PERSON Other: _ _ 23.32 Fuel piping: Business name: j/J V CallaLhr S $14.15 for first four;$4.03 for each additional Contact name: (9,v 4,p:!2: Furnace,etc. Gas heat pump Address: PO. Al( /23/ Wall/suspended/unit heater City/State/ZIP: c/, ka Lu&5 D/. ', fs- Water heater Phone:(�J3) 73#' Fax: :( ) Fireplace Range E-mail: )7 P1 ti r,OiAIL lc/seii,q,m,,/i.cvi >i Barbecue . CONTRACTOR Clothes dryer(gas) Other: Business name: 5,9-A-7�✓ MECHANICAL PERMIT FEES" Address: Subtotal City/State/ZIP: Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:( ) Fax:( ) State surcharge(12%of permit fee) CCB lic.: /6 /8 /2..4-//y TOTAL PERMIT FEE ` This permit application expires if a permit is not obtained within 180 -5:7 days after it has been accepted as complete. Authorized signature: " Fee methodology set by Tri-County Building Industry Service Board Print name: CE V /Oyc-2- Date: .31-a)/L/ 1:1BuildinglPermihllEC_PennitApp_040I 13.doc 440-4617r(1 I/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. _ $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\Building\Permits\MEC_PermitApp_040113.doc 2