Loading...
ROW2014-00022 ErCity of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT \J 0 1 Request for Permit Action cvs45- 441 TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 • www.tigard-or.gov TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits @tigard-or.gov FROM: ❑ Owner ❑ Applicant ❑ Contractor [City Staff r Check(1)one r V j/RE OR Name: INV T 0. (Business or Individual) �0Q •�` / AA- f e . Mailing Address: / 0 3 L/� `,� c, A) s+vr 3 Li c Tv - 'FI City/State/Zip: Co &42_,P, O' °7 7 Z Z 3 0. • l 3•00008 / Phone No.: 50 3 ' � 9 5 ' U ) 1 Z PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (1): /CANCEL/VOID PERMIT APPLICATION. ❑ REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). ❑ REMOVE/REPLACE CONTRACTOR ON PERMIT (do not cancel permit). Permit#: ' R0J 7Q1 ' 0V0Zz Site Address or Parcel#: G7,(2_.to „, ,t/,4/C., ,E C,,l -D e Project Name: / Subdivision Name: Lot#: EXPLANATION: 50 t, 7 -A- )r, .r • Evi Ls/()A S 4- INA'6D F-0 g Ai L.) FF7 C— C>/7--/0Ai4 Signature: ..,...`._ Date: / , / . ,//7,‘ Print Name: ,=A./ ti f s 0 N Refund Policy 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. FOR OFFICE USE ON1.l Route to S s Admin: Date B, Route to Records: Date . AJIL' of j- Refund Processed: Date N ' 133, Invoice Processed: Date By Permit Canceled: Date v2 .S145 By ,I;7;. Parcel Tag Added: Date By I:\Building\Forms\RcgPermitAction_I 2314.doc Zen Dutson To: Dianna Howse Subject: ROW2014-00022 Attachments: Zen Dutson.vcf Dianna, Please close this permit, as the scope & vault location changed. Also, we wanted to use the new PFI conditions. As you found, there are no funds to transfer. Thanks, Zen 2-6-14 The w o az K { S o N k'do ittr-D 5 r L CITY OF TIGARD RIGHT OF WAY PERMIT s COMMUNITY DEVELOPMENT Permit#: ROW2014-00022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 05/07/2014 Parcel: SEG285 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Teleport Communications of America, LLC Project Description: Adjacent to SW North Dakota Street, SW Greenburg Road, SW Oak Street, and SW Tiedeman Street. Enter ROW beginning on north side of SW North Dakota St just west of the RR crossing will be installing UG fiber optic network connection heading east across SW Tiedeman Ave to SW corner of SW Tiedeman&SW Greenburg Rd,tie in to existing fiber conduit.Then again from westside of SW Owner: FEES Description Date Amount ROW Permit Fee 05/06/2014 $300.00 PHONE: Contractor: PHONE: FAX: Applicant: SHAWN DALBEC 10340 SW NIMBUS TIGARD, OR 97223 PHONE: 503-495-0112 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant 01' Cr-CWit Signature: E _ oi Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for ROW2014-00022 Type: Condition Name: Status: Severity: ROW 01-CUSTOM CONDITION Applied Notice Permit covers work completed in a continuous operation. Work remaining following an interruption of work between sites will require a separate permit. ROW 02-PERMIT&PLAN REQ ON SITE Applied Notice A copy of the permit and all attachments,and a copy of the approved construction plan and all amendments shall be available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's Standards and Specifications and to these General Conditions. Changes to any of the aforesaid must be approved by the City, in advance of work performance. ROW 03-TRAF CTRL-SPECIF(CITY) Applied Notice The City's standard specification for traffic control is"Manual on Uniform Traffic Control Devices for Streets and Highways", U.S. Dept. of Transportation, F.H.A., 1988 Ed. ROW 04-TRAF CTRL-CONTR RESPON FOR Applied Notice Traffic control shall be provided for by the contractor in accordance with the City's standard specification and, also, in accordance with a City(job specific)approved traffic control plan.A copy of the approved traffic control plan shall be available at the work area. ROW 05-TRAF CTRL-ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without having first obtained written approval from the City Engineer. The permit holder is responsible for provision of timely notification of traffic flow disruptions to area wide Emergency Services(Tigard Police Dept.,Tualatin Fire&Rescue)and to Tri-Met and Tigard School District. ROW 06-TRAF CTRL-ADVANCE WARNING Applied Notice Advance warning of imminent traffic disruption shall be provided to the general motoring public by placement of an advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. ROW 07-TRAF CTRL-PRIV PROP ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service and if not, shall be cause for work stoppage until effective access is established. ROW 08-TRAF CTRL-DEVICES IN PLACE Applied Notice Traffic control devices,flagpersons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. ROW 09-TRAF/NOISE CTRL-WORK HRS Applied Notice No work will be permitted during the hours of darkness,nor between 9:00 p.m.to 7:00 a.m. Monday through Friday, nor between 9:00 p.m.to 8:00 a.m. Saturday, nor between 9:00 p.m.to 9:00 a.m. Sunday. ROW 10-TRAF CTRL-MIN LANE WIDTH Applied Notice Minimum travel lane width shall be eleven(11)feet; pedestrian travel shall also be provided for. ROW 11-TRAF CTRL-CITY CAN MODIFY Applied Notice The City reserves the right to add to or modify traffic control requirements as may be necessary to effectively control traffic and to assure public safety. ROW 12-INSP 24 HR NOTICE REQUIRED Applied Notice The permit holder or his contractor shall notify the City's inspector Kenny Fisher at 503-816-6146 or email at kenny @tigard-or.gov,twenty-four(24)hours prior to commencing work,twenty-four(24)hours prior to any staged inspection, and after completing work covered by the permit. ROW 13-HAZARDS-CERT OF INS Applied Notice Maintenance of the work area and approach roads is the responsibility of the permit holder.The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards.A copy of the permit holders Certificate of Insurance shall be available at the work area. ROW 14-DEBRIS-MATERIALS Applied Notice The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit.The City may at any time order immediate cleanup and stoppage of work to accomplish cleanup. ROW 15-EROSION CTRL REQ Applied Notice Effective erosion control is required. Erosion control devices must be installed and maintained meeting D.E.Q. requirements.The City may at any time order corrective action and stoppage of work to accomplish effective erosion control. ROW 16-REPAIRS-LIKE MATERIALS REQ Applied Notice Property disturbed by construction activity shall be seeded with a standard grass mix;shrubs,flowers,barkdust,existing signs, pavement markings, mailboxes,etc., shall be reestablished, reinstalled or replaced,with like kind and material. ROW 17-DRAINAGE CONTROL REQ Applied Notice Effective drainage control is required. Drainage shall be controlled within the work site and shall be so routed that adjacent private property, public property and the receiving system is not adversely impacted. The City may, at any time, order corrective action and stoppage of work to accomplish effective drainage control. ROW 18-UTILITIES PRELOCATION REQ Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0010 through OAR 952-001-0080. Copies of the rules may be obtained from the Center by calling(503)232-1987. If you have questions about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holders expense. ROW 19-UTILITY LOCATIONAL CONFLICT Applied Notice Contractor must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the permit holders expense.Changes must be approved by the City in advance of work performance.Contractor shall coordinate the work with affected utility agencies. ROW 20-TRENCH-PATCH/SAFETY/LBILITY Applied Notice A temporary hard-surface patch(Cold mix A.C.or Hot mix A.C. base paving) shall be placed on trenches within roadways at the end of each day's work. No trench, on site or off site, shall be left at any time in an unsafe condition.The permit holder is responsible for and is liable for hazards or damage resulting from the work. ROW 21-REPAIRS REQ-INSPTR OPINION Applied Notice Work provided for under the permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, in the City Inspectors opinion,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the permit holders expense. ROW 22-AS-BUILT/ENGR CERTIF REQ Applied Notice At the end of each year, or an a mutually agreeable yearly date, any entity making changes to its facilities in the public right-of-way shall submit complete"as-built"drawings showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineers certification of installation compliance(form attached). ROW 23-DAILY INSP REPORTS REQ Applied Notice The permit holders Engineer/Inspector shall submit daily inspection reports,on a weekly basis,to the City's Inspector. (see Developer-Engineer Agreement note#5). ROW 24-TESTS/REPTS TO VALIDT CLMS Applied Notice The City's Inspector may, at their discretion, require provision of tests and or reports from the permit holder, permit holder's engineer or contractor to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the permit holder's expense. ROW 25-RELEASE-WAIVER REQ Applied Notice The permit holder shall provide a copy of a properly executed Release&Waiver document to the City for each ownership disturbed by construction activity, as evidence of disturbance resolution and owner satisfaction. ROW 26-MONUMENT PROTECTION REQ Applied Notice Existing monuments,property corners,and survey markers shall be protected. Replacement shall be at the permit holders expense. ROW 27-PROB SOLVING-RESPON PARTY Applied Notice The permit holder shall provide to the City Inspector, in writing,the names and 24-hour emergency telephone number of two (2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of an emergency. The permit holder shall notify the City Inspector, in writing, of any/all assignment changes. ROW 28-CONSTR SAFETY-RESPON PARTY Applied Notice The permit holder shall cause his contractor to provide to the City Inspector, in writing,the name and 24 hr emergency telephone number of a designated"Competent Person"responsible for construction safety as per OR-OSHA, Chap.437, Div. 3 Construction, Subdivision P-Excavations.The contractor shall notify the City Inspector of any/all assignment changes. ROW 29-ESMT/RT OF ENTRY-RESPON Applied Notice It is the sole responsibility of the permit holder to provide for proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry, or properly executed easements,shall be provided to the City.The City shall in no way be construed to be liable for the permit holder's failure to obtain or provide for proof of right-of-entry or easements. 1E V CITY OF TIGARD RECEIPT ;R 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 TIGARD Receipt Number: 195898 - 05/06/2014 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID R0W2014-00022 ROW Permit Fee 100-0000-43114 $300.00 Total: $300.00 PAYMENT METHOD CHECK# CC AUTH.CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Check 3317532863 BGALICIA 05/06/2014 $300.00 Payor: AT&T Total Payments: $300.00 Balance Due: $0.00 • Page 1 of 1 RECEIVED FEB 2 7 2014 City of Tigard CITY OF TIGARD Application For Work In The Rig '"l '`' r TIGARD ROW Permit Property Address/Location(s): SE--6 226/ 5140 FOR STAFF USE ONLY SW North Dakota.SW Ticdman.SW Grccnburg Rd.,&SW Oak St.(Sec Plan etail)Srl (c5{ ( Right-of-Way l( .2 Case No.:_ k2 i 4` ?.—Z *Applicant's Name: Teleport Communications of America,LLC t J Application Accepted:3131i A By: Address: 10340 SW Nimbus Application Reviewed:3.C./4 By ( City/State: Tigard,Oregon Zip: 97223 Application Fee Due:�/1DI V 1 C Primary Contact: Shawn Dalbec,Outside Plant Manager Applicant Notified:ci No.:i �y K t Phone: 503-495-0112 Fax: Receipt 1 5 a 1� Email: dalbecs @att.com REQUIRED SUBMITTAL INFORMATION Contractor's Name: TBD • Application form,completed and signed CCB# Expiration: • Submit one (1) copy of scaled sketch of the proposed work to be done Address: • Submit one (1) copy of traffic control City/State: Zip: plan Phone: Fax: Professional Engineered Plans are required Email: for: • Street Widening Plans By: Commstructure Consulting,LLC • Subdivision Infrastructure Address: 811 Railroad Avenue • Main utility line extension Deliver application to rowpermits a.tigard-or.gov or to City/State: Oregon City,Oregon Zip: 97045 City of Tigard Planning/l?nginecring,13125 SW Ilan Phone: 505-343-4134 Fax: Blvd.Tigard,OR 97223. Email: annette(ccommstructureconsulting.com R 12/1(1/2013 I:\CIRPI.N\Masters\land Use-\pp]c.s ,.\Right-of-wa) Permit Apphcatton.docx Description of work Enter ROW beginning on Northside of SW North Dakota St just west of RR Xing will be installing UG Fiber Optic Network Connection heading east across SW Tiedeman Ave to SW corner of SW Tiedeman and Greenbrug Rd.,tie-in to existing fiber conduit.Then again from Westside of SW Greenburg Rd.just south of SW Cascade Ave.install UG FOC heading north to the intersection Greenburg Rd and Cascade Ave.and tie-in to existing fiber. Set new utility vault along SW Oak St. Estimated value of work(within the public right-of-way): $ Is work related to a LAND-USE DECISION? YES n NO II If so, please specify(MLP,SDR,SUB,etc.)case#: Is the work related to a BUILDING PERMIT? YES n NO p9 If so, please specify(BUILDING PERMIT)case#: Signature of Applicant/Permittee: Date: Print Name: Title: City of Tigard I 13125 SW Ball Blvd.,Tigard, OR 97223 I 503-718-2464 I www.tigard-or.gov Letter of Transmittal COMM`S RE C NSkLT Nc,.LLa Date: February 27,2014 To: From: City of Tigard Commstructure Consulting,LLC 13125 SW Hall Blvd. 811 Railroad Ave. Tigard,OR 97223 Oregon City,OR 97045 Attn:Annette Dexter Re:Utility Permits Utility Coordinator/ Permit Specialist This Application for Permits to occupy and perform operations within City of Tigard Rights of Way is being submitted on behalf of: Permitee: Contact: Teleport Communications America,LLC Shawn Dalbec(503)495-0112 10340 SW Nimbus dalbecs @att.com Tigard,OR 97223 Project Description: This project will create new underground Fiber Optic Network connections in the Tigard area of Washington Co.,OR to add diversity to the existing Fiber Network. Scope: The proposed underground fiber optic network route runs along the north side of SW North Dakota Street east to SW Tiedeman Ave.and around the corner to SW Greenburg where it then ties into existing fiber conduit.Another section of fiber will be installed just south of SW Cascade Ave along SW Greenburg Rd.and run north approx.230 feet where it then ties into existing fiber via new vault placement within city Rights of Way. Additionally,a new 644LA Vault will be set along a section of SW Oak Street. (see plan detail) Enclosed: -City of Tigard ROW Permit Application -Detail Drawings If you have any further questions please contact me at(971)266-4433 or annette@commstructureconsulting.com.I appreciate your assistance with this request. Sincerely, Annette Dexter Commstructure Consulting,LLC Planning I Design I Implementation 811 Railroad Ave. I Oregon City, OR 97045 I (503) 343-4134 www . commstructureconsulting .com r TIGARD BACKBONE OVERBUILD: SOUTH CONNECTION TO SW GREENBURG ROAD MM #2013POR07-1429 CITY OF TIGARD,OREGON,WASHINGTON COUNTY TOWNSHIP 1 SOUTH,RANGE 1 WEST,SECTION 35 FEBRUARY 2014 �- ( •� SHEET INDEX OWNER/APPLICANT J•- `\` Ja + ,✓ T I •,4 i _, '°— sHEE)NAVE DESCRIPTION -' liM'j e„ 10340 ST NIMBUS AMERICA, 1G N 97 1n fOI10$W NaA9US AIENLE, iM•ARD,OREGON 97127 >/'Pry. R COV£R T PLA OPTICL 307.19RAWCA �yf �f e r CONDUIT FLAN. SW NORTN DAKOTA STREET COVTACT.7 SNA NN DALBEC OUTSIDE PLANT MANAGER 'J •f 2.o CONDUIT PUN:SW NORM DAKOTA STREET/SW T/EDMAN AVENUE E-MAIL:DALBECSOATT.COW - •e ♦ J.a CONDUIT PLAN:SW GREENBURG ROAD/SW CASCADE AVENUE 1.0 CONDUIT PUN, SW OAK SMUT JOHN GROIN I PRMEC7 MANAGER 1 305799.9103 E-MAIL: JGROTNIIeMSN.COM • DESIGN CONSULTANTS ` �•/ I 1 N cowSTRUCRTNE CONSULTING,lLt + � _ ` » / �® MA RAILROAD AVENUE I OREGON CITY,OREGON 97013 I`� 1 tLLacae�Jl MAIN AILROA AMAX.1 OR �, ERR(ORTpI I PRESIDENT I DIRECT. 971.266.1410 E-MAIL ERIKOCOI.ISTRUCTURECONSULTNGCOI ma� — 'a L" ON L RKDc RAPPE I PROJECT MANAGER I DIRECT: 971.266.!122 CT � � � . 1� * E-MAIL R1d cOCDMN37RUC7URECON9ULTMIG.COM a `* 1 �.' r Pal •N��' -'� i_1:1 t�I a � � 'iitf i '1'"(''l • 4.1-kt.,4-J .-leta :(1k . --::- . .7;] 6,-)J1 LOCATION y1 L NJ ,7 -iii: , _ A / '_; 1 SCALt 1'�NT.S CSOf TOTAL TRANSMISSION POLES___ CETMI er R.RAMS CHEMED AT t MICR TIGARD BACKBONE OVERBUILD: FIELDED 9r R.ROPE ORAWI SE A.110.64 D.*WRY SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES___ 811111111 TOTAL NEW STRAND—___---__ DATE: BY RCMSIOII- et 01/1)/11 APY POW TOTAL AERIAL PUNT______ TELZPORT COMMUNICATIONS Tc.IA ram S.W.A7MBU5 TOTAL U.C. PLANT_ �� _ Knout what's below. .1....4......N., �a�CA. LLC l (�jl T/uRD OR a9sss 1 TOTAL SLACK •• Call before —r COMM -i PERMIT PLOT DATE: SCALE: FILENAME & SHEET NAME you dig. _ � •� 02/27/14 2/27/2014 N.T.S. CSOI TA COLE "SEE SCOPE AI 114.....1 m L 410 • TO CA.or O SW REDMAN AVENUE G O 1 7,. '\ 1 111-FBMI V• __ SANT 1 T O O mNT i �� `� _ b ACUTE AlkLE �/����®— - 'OGLI,vc EOP. / _ O - 10133421' 8 SW NORTH DAKOTA STREET(C.452) & I >< t I m tit% Ii17 -"'; _8 8 8 m _ -Ia.@— i.�--- -- ---- - m _______________ _ . __milk % __iiiiimm .,_ __ _......7.....LL. .-_----.....—.... . RAILROAD PERMIT REQUIRED � � � '-- b W RAILROAD m ` 1 ��1 MILEPOST WIRELINEE FOLDER• _ CONDUIT PLAN SW NORTH DAKOTA STREET Q a SCALE,•.S0• + 33 CONSTRUCTION NOTES OPGE Pa(X5020 SW NORTH DAKOTA VI P 1017 STREET 4Q) PAX MAP/CI 1-35C —E(W 451J/1971/0. 411 JU MAKE READY REQUIRED; SEE NNS PT 11049482 PL NEW PUP,ARM•24•-10' P.O.A.-ATTACH 10 NEW PUP,ARM F m PL NEW p IERRCAL GRO(RR)MRE ON POLE(AS REQUIRED). '-a V.• Bow WIRE TO AKIN ON PONE(SEE LOCATE IRRE/GROUND PLAN-91T 0066 I). xN PL ONE(I)NEW 4'GRCRISER. ∎_ y��� Eft/THREE(3)1.25'SOR11 HOPE EINERDUCTS a/12 ARC LOCATE MIRE PL ONE(I)NEW FIBER CABLE IN NEW AVNERDICT O PL THREE(3)NEW I.25'SDP,I HOPE CONDUITS et 112 AMC LOCATE PRE. e PL ONE(1)NEW FIBER CABLE II NEW IHNERDUCT. O PL NEW 444LA UTILITY VAULT IN ASPHALT AREA MTH TRAFFIC RATED LID MD1 MANHOLE COVET. TERMINATE NEW CONDUITS M NEW VAULT. COMMUNION RE-SEAL OPE)*4G WITH CONDUIT SEAL OR EQUIVALENT. LEA1£SLAP(N NEW FABER CABLE CO/LED M VAULT AS REQUIRED. All MEN OUCIS ro rz nw¢(3)50811 1.25'NODE NNEMOUCR(MISS RESTORE AREA TO QTY/COUNTY SPECIFlCA TIONS ' MICRON*000 )•A COPPER LOCA7P0 RIPE ALL 00400UC7S ASE TO AF COURTED 757)1 PILL-RWE SC MICE TAPE AND RU OED/.170 NOON PLUGS OR EOLIYA1;MT. 2.A WOW 9PMAIIAE OF M•SNOW)OE MANTAIC PEN)MICR 01RII70S UNLESS 011071•42*TOM. MUTTON IRON MS 1N.MRAI vARATLN ON 1170 PLAN AS LAO OUT REOURS AUTMONZA11a1 OM OMEN 1 NR74 700591.0"It YAWL AT 118 THE a CORS1RUC7WI AS NOT OMAyEN1 970)15 r TARa As ro 77c unux,AIO 1170 8701.87 - SIPARATON FROM 1170 PLANT•00774 Or COVEN 00174 FAWNS. 4 All 20T1S OF MOAT OR WEST MOM 0x000)01 PLAa)R111 M1 NE AECDE=AT 7170 0170 OE CONS7774(7 . • 4 PLACE man N 10G11OR 940.1 o1'PRN15*177 LIRBRAI 0 7)77 a 3) OM P070K INGIT-OF-MAY MO J!•dl PNVAIE PROPERTY. LUMINAIRE JBOX ►1 SPLICE 0E9ax er.R.RAIL 0x404(0 or L SCION TIOARD BACKBONE OVERBUILD: •TOTAL TRANSMISSION POLES__—• IRRIGATION VALVE m DRAM er w WINS m CATCH BASIN 0 FIBER SYMBOL rxaO rOR, MY SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES___P. SIGN WATER METER 0 FIBER SYMBOL TOTAL NEW STRAND- - to GAS VALVE in POWER VAULT CABLE OAT: BY RERSIOV AMIL ♦ LUMINAIRE CABLE 02/27/14 APM PERMIT \ • S TOTAL AERIAL PLANT__---—..N PIMISTAL TILSPORT COMMUNICATIONS 7OJb S.W.NIMBUS ~• _ WATER VALVE — — CONDUITA TTC.ULD OF 87;13 TOTAL U.C. PLANT_ -a FIRE HYDRANT ���• I e SEWER MANHOLE — ■— CONDO!? PERMIT ', TOTAL SUCK_ - COMM - + f PLOT DATE: SCALE: FILENAME & SHEET NAME 0 EXISTING COST. VAULT e STORAGE «•• �•, 02/27/14 NEW VAULT 1m.. n,">11A 11 1.0 - TOTAL CABLE - S LOCATE WIRE 4crrsc POINT STORAGa yA - �( 2/2 7/2014 -30' , / I TYI I O w, I I I ' I o J vE /-- // ¢" , I /'- �� I 3 W� Ci it 1W�ST 20 y-4.,...1, I ‘144 ----'-'--/___ "'Av..' -_________.--_-_,,,-....A.w.'"'Age% ./......." -.Ng I T , 1 IIl1111 _000- ■,‘„ 1 1 _r . f �9 i. Z I�`e. --- cf. / - 0 f,..:.) 111. i I I I�►� t N N o OM -1 � - Jf' CONDUIT PLAN J ' 3NN'GYf111 OAK 0TA STIR ITE RNAVESIVGREENBUNG NO ��. SCALE'1•-JD' ®i / CONSTRUCTION NOTES �� -' O Pt TNEEE(5)W NEW Fi 1.25-WRIT NNE CONDUITS&/I2 ANC LOCATE MIRE PL ONE(I)NEW FIBER CABLE IN NEW INNERDUCT. / 0 FIELD BEND - MAINTAIN 36-MINIMUM RADIUS / - Q ENTSTINC TEA ONE(I)QUAD-DUCT(I.25-PVC R a). TWO(2)VACANT 1.25-PVC CONDUITS. awsrnNDnw MOT* PL ONE NEW(1)FIBER CARE M EMSTING VACANT 1.25-PVC CONDUIT. ,.ALL MEW DUCTS TO fir RRU(I)SIMI,AT MOW rmrRI Vns(LA[Ss O Pt oi![RrSE SPEOECD)A A QYR'Ot lOCAMD REEF. ALL..ARDI,rTS APE NEW 26tTA URUTY VAULT OVEN E705TMG TCA q/AD-OUCi(1.23-5 4). roe[tu.s�rnl PLU-RaPE aR RIAt TAPE ANp nucaa w/,uor RELOVE SECTION OF E705TMG PVC CONDIAi TOT FAOUTATE CABLE PLACEMENT. M Nues a CQIVAIENT. TERMINATE NEW 1.25-WOE CONDUITS M NEW VAULT. 2 A IrrRel svuArNr a x'v+CLED e[uArrArcD IR�w DncR ununrs uAE[ss DrIRR,RSt axdam. PMArR.w rRaN nIS IrNRlillr SLFARATpV ae RESEAL OPENING NEW F CONDUIT SEAL OR IN VALHI A tK PLw As LAO an R[ares ADTIOIDDADW rRaN oIRCR. LEAVE SLACK M NEW FRIER CABLE COILED IN VAULT AS REQUIRED. a DOC goswC DRn Umnrs Ar n�[nr rr n":0“.UCACT L: : ,.., RESTORE AREA TO CITY/COUNTY SPECK/GAMINS DDaRew*sMM sE rAREN As ro nc unur.AAO M Ac,uAL SVARARrI MOW M%WIT A DAM or COIQ DON N rACREVEs A Air.OOINS W CC OUr OR DPI,WAD Am mIICT f ARIpIT r4 BE MOWED AT M AC Or CCIISAICMIl 5..PIACL CE�pIT r LOCATMA MOM[w PRrATS PIN IrrEr(0451 Ci AC _ ON PU9/C SPAT-ar-wr Aw SC Ov Hnwl[PWPV In. • LUYINAIRd✓BOX -4 SPLICE MS.er.R.RAPE oraxn ee E.MOP TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES___• IRRIGATION VALVE MOLD eY.R RAPPE GRAM ev:A.MOP m WATER BASIN 0 FIBER SYMBOL D arNmv SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES_=_a SIGN AATBR METER 0 FIBER SYMBOL TOTAL Nil TRAND_____ n CAIVd —m PAS OIR'VR VAUZT CABLE � TOTAL AERIAL PLANT —__—-r LUMINAIRB CABLE Dzh/,A AesrN PEWIT _ • PEDESTAL TELIPORT COMMUNICATIONS A /03 40 s.�NIYBOS TOTAL U.C.PfJ1YT_ - MATER YALVI — — CONDUIT —� - F - FIRE HYDRANT \ AY61ZlCA, LLC t`1 rrcARO OR arrrs _ SELLER MANHOLE — ■ CONDUIT —' PERMIT TOTAL SLACK COMM. ■ :.E PLOT DATE: SCALE: FILENAME & SHEET NAME R 0 EXISTING GUST. VAULT e STORAGE _ 'u'A"•• Z 02/27/14 2 27 2014 2r0 >n11L caw - ® NEW VAULT rl STORAGE _-aIIRR"'4i..�iPARAN =17 / / 1"=30' IW LOCATE WIRE ACCESS POINT -q�m A„� non • \ ` \ `\ \ ■ W-W-230' ` , a N p. m te __I_ R\ 4 O 1 1� 4 ,--t_ � � r-GRASS-y ' �� �t'40�5-O A.. limm A: 0 •G S3 9 __-55 0 �� SW GREENBURG ROAD I - —. -_ (CR2043) 8 I .6., yI I �� 8 8 R ....r _ --- ice. a-. -____ i - , CURB =E RNA ._- Bow_ R • CONDUIT PLAN SW GREENBURG ROAD sCA¢,r_w' 3.0 CONSTRUCTION NOTES O EXISTING TCA ONE(1)QUAD-DUCT(1.25•PVC A 4). O EXISTING TCA 011NED I.5'PVC CONVUIT LOCATED IN LEVEL 3 QUAD DUCT CONDUIT AUGMENT. TWO(2)VACANT 1.23'PVC CONDUITS ICA CONDIRT IS DESIGNATED AS THE ORANGE I.3'CONDUIT LOCATED ON THE TOP OUTSIDE OF- PL OE NEW(1)FIBER CABLE M EXISTING VACANT 1.25'PVC CONDUIT. THE LEVEL 3 DUCT BANK. p PL NEW 2BITA U7UTY VAULT OVER EXISTING TCA QUAD-DUCT(1.25'X 4). O PL NEW 4OJTA UNUTT VAULT IN ROAD AREA NM TRAFFIC RATED LID NTH MANHOLE COVER. REMOVE SECTION OF EXISTING PVC CONDUIT TO FACUTATE CABLE PLACEMENT. TERMINATE NEW CONDUITS N NEW VAU.T. TERMINATE NEW 1.23'HPDE CONOIATS RI NEW VAULT. RE-SEAL OPENING BATH CODURT SEAL OR EQUIVALENT. WISTINCIIAI NORM RE-SEAL OPENING WIN CONDUIT SEAL ON EQUIVALENT LEAVE SLACK M NEW FIBER CABLE COILED N VALET AS REQUIRED. LEAVE 9„AD(M NEW FIBER CARE COOED N VAULT AS REQUIRED. RESTORE AREA ro Orr/COUNTY SPELTN7CARO/S I Au NM Own 10 L TIwa(3)SERI,I.2S•WPC RREROW'S(MUMS OMRRDE 9[OED)•A COP EI LOCATING.RE ALL R.EICTCTS AR TV AREA CITY/COUNTY SPECIFICATIONS W BE WOWED INN PULL-WIT OR NAI TAPE Am PLOD=IV JCS O PL NEW T.5'PVC CONOm ROIL RUGS CR EOMVAIMNM O PL THREE(3)PEW 1.23'SORI1 HOPE CONDUITS&112 AMC LOCATE MIRE. INTERCEPT AND CONVECT TV L73S77 NG TCA CONDUIT IN LEVEL 3 AUDNMENT. 2.•-Iry SEPARATION Or x•SwuD BE RANTANW PICT OTMR TWITS SHEEP NEW CONDUIT OUT OF MAIN TRENCH AL) 4W5NT NTH 43 DECREE BENDS AS REQUIRED- M«onnens<WOMB. OENAlION MY RRS RRrR R BEV.pA,o,OF PL ONE(1)NEW FIBER CABLE M NEW MNEROIICT AND EXTEND TO NEW TCA VAULT LOCATION. M RAN AS LAID WS MUSICS A TWIRIZATOR PICT OMEN N't.NEW 1.5'SPLIT DUCT AND CONDUIT AS REQUIRED TO REPAIR CONDUIT OPENING. i"'�arossrlD OTIER urUncs AT INC IRE a cnNSIIRCII.l As BURT FIELD BEND- MAINTAIN JI'MINIMUM RADIUS DOGLRENT WOULD DC MINA AS 10 M UTILITY.ND M ACIVAL RESTORE AREA TO CITY/COUNTY SPECIFICATIONS SEPARATION PICT M RANT•Or.IN OR co.El Rom rAOU1Es •ALL WRITS Cr LWOW OR DIRECT BURR NNIMOOCT RACQENI mu W RECORDED AT M TAT W CONSTRW710N 3 Raa CORYT w[OCAIOM WOwl Dl MM15 RIM RRAUL CO.ER K . • _ dI PUIIIC RIUIIT-Or-RYY AID!B OM REVILE IROOERTY. LUMINAIRE!BOX 11,4 SPLICE DESIGN B.p pAppr accxm sr E amw 1'IGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION PONS___• IRRIGATION VALVE 0 FIBER SYMO PElDEO B .RRPr CRAW Br A YEWS CATCH BASIN O RAY SOUTH CONNECTION TO SW GREENBURG ROAD TOTAL DISTRIBUTION POLES___° SIGN WATER METER (,1., FIBER SYMBOL TOTAL NEW STRAND-___- m PO m GAS AWEVR VALVE ULT CABLE DAZE: ET REVISION AIR} t_ TOTAL AERIAL PLANT_____ * PEDESTAL —_ CABLE oz c7F A APT REmRT ESLITPORT COMMUNICATIONS 10910 S.R.MICROS PEDESTAL TOTAL U.C. PLANT_ WATER VALVE — —CONDUIT ;�� AMERICA. LLC TCA TIGARD OR 97223 a FIRE HYDRANT CONDUIT P PERMIT N, TOTAL SLACK - Q 13 SEWER NACUE?. �® COMM I'�'► -E 02/27/14 PLOT DATE: SCALE: FILENAME & SHEET NAME EXISTING GUST. VAULT STORAGE �cr....�.,�r yI foTAL CABLX_ ® NEW VAULT C- STORAGE ;VV.A.... *OR. 2/27/2014 1"=30' 3.0 •_LOCATE WIRE ACCESS POINT m'R"______ " • 250.1 TO C/L OF 311'± TO C/1.OF SW GREENBURG AVENUE SW 951N AVENUE . O O a .s / .< •PR J CI. „LOCATION Tats `.�i► ��y ,;y 1 -a 0— a■ ,, ;� ---.--), MITI If s ..4111 i L ....._,1 .........__ c3 • g N E__IL.___, ______ SW OAK STREET. '�s---s----1 3 3 3 ' -- lK DRIVEWAY- �, Sw'SMDY'{CI• —pow • e� .D°��. I 4... ------7/ ..\ . CONDUIT PLAN -- ti.j. •I� SW OAK STREET SITE MAP 2 u.0 -ro 4.0 = •' 4.0• CONSTRUCTION NOTES 0 EXISTING TCA DUNNED L5 PVC CONDUIT LOCATED IN LEVEL 3 QUAD DUCT CONDUIT AUGMENT. TCA CONDUIT IS DESIGNATED AS THE ORANGE 1.5'CONDUIT LOCATED ON THE TOP OUTSIDE OF- THE LEVEL J DUCT BANK. p EXISTING LEVEL 3 VAULT 10723-0390. O PL NEW 814LA UTIUTY VAULT IN ROAD AREA WTH TRAFFIC RATED UD WTM MANHOLE COVER. TERMINATE NEW MOMS IN NEW VAULT. RE-SEAL OPENING WIN CONDUIT SEA.OR EQUIVALENT. LEAVE SUCK IN NEW ETHER CABLE COILED IN VAULT AS REQUIRED. RESTORE AREA TO CITY/COUNTY SPECIFICATIONS Ot PL NEW I.3•PVC CONDUIT. INTERCEPT AND CCRTECT TO EXISTING TCA CONDUIT IN LEVEL 3 AUGNMENT. SWEEP MONS,RUCOaW ARIES NEW CONDUIT OUT OF MAIN TRENCH ALIGWENT CNTH 43 DEGREE BENDS AS REQUIRED- AND EXTEND TO NEW TCA VAULT LOCATION. PL NEW 1.5'SPUT DUCT AND CONDUIT AS REQUIRED TO REPAIR CONDUIT OPENING. I.ALL PEW OIOTS TO IC lI (1)SRRNI LEES'NWT roEMOCTS 00.15 RESTORE AREA TO CITY/COUNTY SPECIFTCATTCNS. OROVIRx mCCSEO) A crnPex auONC rA'. Au.wE.V AAe m eRPasom IRIM PLLL-MMPC 0„,l q.TAPE AAO PCUC®w/r•ar CNOCw aCUCS Oe rouvAUze S PL THREE(3)NEW 1.23'SDRf}HOPE CONDUITS&LOCATE RIPE VAULT TO POLE. 2 A ClCRrRC sePAMATAON Gf,y'SHOULD K YAOTABI[R/ICON OTnn UTILISES Alums MTAS LAO SPTAMM CRWAmG MOON MS ANUM SEPARATE*OR EXISTING POTTER POLE. Sc PLAN RS IAn tW AEUARES AMONMMISO N MOM MOOT. PL MINE(I)NEW t'CRC 90'BEND-(JIPX5t). 1 WTI GROS MM 0"MAW RASAN Sc IRO inn UC333NU WU EA!THREE(3)1.25'SORT/HOPE INNERDUCTS&LOCATE HIRE. SEPARATION PMOW R¢PLANT•ORIN OP COTER ROM FACOTES. CONTRACTOR TO 511199 AND CAP{'CRC AT BASE OF POLE. ..ALL ROWS or MOW OR MCC,BLEED PREMOUCT PLACESENT ELL RE RECCE=AT M Riff Or CORSI/30MM. "Cr"CODNT w TOCAIIOV SMOMW OM PNWIS SIN--4-COKR a SI I StOiC OWl-Re-WIT MO M'OM PmVA1F PRM[FTV. LUMINA1Rd!BOX ►AI SPLICE Revs Sr a RAMC MEMO rr.L anaW TIGARD BACKBONE OVERBUILD: TOTAL TRANSMISSION POLES___. IRRIGATION VALVE rEtREO IT"w-6---' -', OMAN n>A.IRIMIs - CATCH BASIN © FIBER SYMBOL SOUTH CONNECTION t0 SW GREENBURG ROAD TOTAL DISTRIBUTION POLES___ SIGN CC��.. HATER METER 4 TIBER SYMBOL TOTAL NEW STRAND____---_ GAS VALT L CABLE-. POAER VAULT DATE: M MICRON APPS — • PEDESTAL OEhTM APR ovBRT THLIPORT COMMUNICATIONS ros:O s.•NIMBUS TOTAL AERIAL PLANT_—____ LUMINAIRE -. CABLE WATER VALVE — — CONDUIT ...1 AMERICA. LLC "-IMAM OR 97A23 . TOTAL U.T. PLANT_ - FIRE HYDRANT CONDUIT PERMIT �, TOTAL SLACK 0 SEWERNMACUSS.. VAULT STORACd ` PLOT DATE SCALE FILENAME& SHEET NAME ® COMM.�� -E 02/27/14 A.O NEW VAULT .... .Or nods TnrAt am ® LOCArX WIRE Accass POINT STORAGE r ",g1;`, 2/27/2014 1"=30'