Loading...
Permit CITY OF TIGARD SITE WORK PERMIT • COMMUNITY DEVELOPMENT Permit#: SIT2014-00010 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 05/12/2014 Parcel: 1S 134 BC00200 Jurisdiction: Tigard Site address: 12100 SW SCHOLLS FERRY RD Project: Greenway Town Center-East Subdivision: GREENWOOD TERRACE CONDO Lot: 17 Project Description: New ADA parking stalls and curb ramp,replace damaged concrete curbs. This permit covers(3)buildings, addresses are: 12100, 12120, 12122,12180, 12160, 12162,12164, 12184, 12186, 12190, 12192, 12194, 12196& 12198. Contractor: WESTERN CONSTRUCTION SERVICES INC Owner: ATLAS GREENWAY LLC 2300 E 3RD LOOP SUITE 110 333 NW NINTH AVE, STE 1009 VANCOUVER,WA 98661 PORTLAND, OR 97209 PHONE: 360-699-5317 PHONE: FAX: 360-694-7818 FEES Description Date Amount Specifics: Permit Fee-Site Work 05/12/2014 $338.92 Plan Review 05/12/2014 $220.30 Type of Use: COM 12%State Surcharge-Building 05/12/2014 $40.67 Class of Work: ALT Project Valuation: $25,000.00 Site Specifics: Excavation Volume: cu.yd. Fill Volume: cu.yd. Impervious Surface: sq.ft. Engineered Fill: No Soil Report Required: No Paving: Grading: No Landscaping: Yes Site Prep: No Storn Drains: Retaining Wall: No Fire Underground: No Accessible Parking: Yes Fence: No Total $599.89 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to O NC b calling 503.232.1987 or 1.800.332.2344. Issued By: yoZ.4i mir Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Appllcatlo Site Work �� ��p FOR OFFICE USE ONLY City of Tigard Received /�/ PR 2 4 2014 Dates : Y® Permit No ,rTo`by(1 UC�le) 13125 SW Hall Blvd.,Tigard,OR 972234 Plan Review �1 IISEI©� 7 ..:• Phone: 503.718.2439 Fax: 503.598.19 DateB : .4.1��, _ Other Permit ���' �� TIC AR17 Inspection Line: 503.639.4175 CIyp�IIGARD Date Ready/By: iI / lures ® See Page 2 for Internet: www.tigard-or.gov 9UIWING WIMP M�' Notified/Method: ,© ��, Supplemental Information I f►- I' ❑New construction ❑Demolition Permit fees'are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the Z work indicated on this application. Z ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: S ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: Total number of floors: i Job site address: 12100,12400&12600 SW Scholls Ferry Rd. New dwelling area: square feet City/State/ZIP:Tigard,OR Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Greenway Town Center East Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet Subdivision: I Lot no.: Permit fees'are based on the value of the work performed. I Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the ('• work indicated on this application. New ADA parking stalls and curb ramp Valuation: SS25,000.00 Replace damamged concrete curbs Existing building area: square feet New building area: square feet ON Number of stories: 1 Z. Name:Atlas Investments Type of construction: VB (� Address:333 NW 91h Ave,Suite 1009 Occupancy groups: City/State/ZIP:Portland,OR 97209 Existing: Retail (N Phone:(503)709-9918 Fax:( ) New: 'r• 4' Business name:Western Design Group All contractors and subcontractors are required to be QiiN Contact name:David Hardister licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:2300 East 3r1 Loop,Suite 110 jurisdiction in which work is being performed.If the City/State/ZIP:Vancouver,WA 98661 applicant is exempt from licensing,the following reasons apply: Phone:(360)600-3284 Fax: :( 1 E-mail:dhardister @westerndesigngroup.net IIIWCONTRACTOR Business name:Western Construction Services Address:2300 East 3rd Loop,Suite 110 Structural plan review fee(or deposit): City/State/ZIP:Vancouver,WA 98661 Phone:(360-)699-5317 Fax:( ) FLS plan review fee(if applicable): CCB lie.:OR63717 Total fees due upon application: Amount received: Authorized signature. This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:David Hardister Date:4.24.14 * Fee methodology set by Tn-County Building Industry Service Board. I1Building\Permits\SIT-PemntAppdoe 10/01/09 440-4613T(I1/02/COM/WEB) Building Permit Number: 31 raO /4/-060/0 111111111 P . " Building Permit Review Commercial Projects with Approved Land Use TIGARD Site Address: 12.100 &IAJ ho I IS F9neti I2.rl J'Verify site address is valid. Project Name : GjreoVJe[q -Tawvl ('ii--or (tom-) Plapning Review Land Use Case Number: M a 2VWp0(7O4 Plana Match Approved Land Use : [ Site Plan Cl Landscape Plan ❑ Urban Forestry Plan Cl Elevation Plan ❑ Building Height: Maximum Height Actual Height Conditions Met: ���❑ Prior to Permit Submittal I=1 Prior to Permit Issuance Approved by: C��,iii4 Date: U it2.4 .1 iv Notes: Revisions (after Building Submittal only) Reviewer Date Revision 1 Approved ❑ Not Approved El Revision 2 Approved ❑ Not Approved ❑ Revision 3 Approved ❑ Not Approved ❑ Building Permit Submittal CID.0- Original Plan Submittal: Date: i ePfS y By: Site Plans: # Building Plans: Create Case Record#: Enter case# above for Building Permit Number. Workflow Routing: a Planning Et Engineering [Permit Coordinator a'Building Workflow Sign-off: Sign-off for Planning staff,including notes from planning review(page 1) Route Application Documents: Engineering: (1) copy of permit application, (1) site plan, (1) building plan and original plan review routing form. Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Reviewed By: ��, A Date: f/A7(V Notes: I:\Building\Forms\BldgPerm itRvw_COM_W ithLandUse_123013.docx 4, Engineering Review— reviewed by: ❑ Actual Slope: ❑ PFI Permit# ❑ Conditions Met Notes: Approved by: Date: 1 vy Revisions (after Building bmittal only) Reviewer Date Revision 1 Approved Not Approved ❑ Revision 2 Approve ❑ Not Approved El Revision 3 Approved ❑ Not Approved ❑ Permit Coordinator Review ❑ Conditions Met-Prior to Issuance of Building Permit Notes: Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant Revision Notice 3: Date Sent to Ap• ' t Okay to Issue Permit- d. Date: '/?"/ 1:\Building\Forms\B1dgPermitRvw_COM_W ithLandUse_123013.docx