Loading...
Specifications Main Street Village Apartments: f ,i,, 25 , . 9 1265 'r�` �� 492 9 4` 94929492 � 94 9 479 94 794 79 eir 9451 9479 479 9451 451 700 9451945 e 9426 9407 15 9452 9452 94269426 94079407 9452945 4529426 9325 9407 AA 9325 rig 9 399 9325X25 9399 93 99 9384 9384 P •9399 ` 938493849384 9367 50 7 9 15 9655 9398 9367 9385 $ 9655 9398 9367 9385 '9815 9655 315 �g55 9655 ( 9398 9367 938593$ 9815 9655! dra 981 `'' "- 932 39 32 39323 9815 ' 9655( 9356 9339 Gt \ 9.55 55 96 55 15" '`�55 9655 93569356 9339 9339 5 ,+ 96559655 9 56 6 r 9339, 9815 9815 jir 9655 9$15 9815 9815 �'\ 9655 9356 9338 9305 9815 �• 9338 9305930.5, 9815 9338 ` 9305 9815 9815 g816-15\s t ,\ 9655 9338i 92719271 rfia 9815 9815981±5 9655 N, 1 9322 9270 9271 9815 "w9815 9271 N. 9815 9322 ` 9815 9322 f 927 9815x 9270 :, i 13155 `t 13165 t J `~" l � \ 9304 ,.' 1 :.,4" 9304 s+ } .1 ., 9304 { �\ 13 `'\ �•. 1-_; -\ 30 4 \ - _ i � r .` ` �t .......\......4iik. , Technical Data Sheet CertainTeed Landmark T^^ TL Shingles SAINT-GOBAIN PRODUCT INFORMATION: The Landmark TL shingles are constructed using three laminated layers of the industry's most durable materials, providing a dramatically thick roofing product styled with the classic appeal of wood shakes. The overall dimensions of this shingle are 13 1/4"x 40". It is designed to 171 171 r resist blow off in high wind conditions up to 110-mph with normal installation and 130-mph with special installation. Landmark TL AR (algae resistant) shingles help protect against staining or discoloration caused by algae. AR shingles are not available in California. Cc lots: Please refer to product brochure or CertainTeed website for the colors available in your region. Limitations: It is recommended to apply these shingles at slopes of 4" per foot and greater in order to achieve optimum appearance. Low slope applications (2"up to 4" per foot)require CertainTeed's WinterGuardTM Waterproofing Shingle Underlayment. or its equivalent meeting ASTM D1970,to be applied to the entire deck surface. according to application instructions provided with the product and on the shingle package. In areas where icing along the eaves can cause the back-up of water (all slopes); apply WinterGuard, or its equivalent. according to application instructions provided with the product and on the shingle package. Product Composition: Landmark TL shingles are composed of a fiber glass mat base. Ceramic-coated mineral granules are tightly embedded in carefully refined,water-resistant asphalt. Three pieces of the shingle are firmly laminated together in a special,tough asphaltic cement. All Landmark TL shingles have self-sealing adhesive strips. Applicable Standards: ASTM D3018.Type 1 UL 997 Wind Resistance ASTM D3462 NYC-MEA-120-79-M ASTM E108 Class A Fire Resistance ICC-ES Evaluation Report ESR-1389 ASTM D3161 Class F Wind Resistance CSA Standard A123.5-98 (& -05) ASTM D7158 Class H Wind Resistance Miami-Dade Product Control Approved UL 2390/ASTM D6381 Class H Wind Resistance Florida Product Approval # FL5444 UL 790 Class A Fire Resistance TDI Windstorm Resistance Technical Data: WeighUSqu are (approx.): 305 lb Dimensions (overall): 13 114"x 40" Shingles/Square: 64 Weather Exposure: 5-518' INSTALLATION The following is a general summary of the installation methods. Detailed installation instructions are supplied on each bundle of Landmark TL shingles and must be followed. Separate application sheets may also be obtained from CertainTeed. Technical Data Sheet (Continued) Landmark TL Shingles Page 2 of 3 Roof Deck Requirements: Apply shingles to minimum 3/8"thick plywood, minimum 7116"thick non- veneer (E.g. OSB), or minimum 1" thick(nominal)wood decks. The plywood or non-veneer decks must comply with the specifications of APA—The Engineered Wood Association. Ventilation: Provisions for ventilation should meet or exceed current HUD Standards.To best insure adequate ventilation, use a combination of continuous ridge ventilation (using Ridge FitterVent or Ridge Filter ShingleVent II, manufactured by Air Vent Inc,or a comparable product with an external baffle) and balanced soffit venting. Valleys: Open valley is recommended. Valley liner must be applied before shingles. It must be minimum 18"wide 16 oz. copper, or its equivalent. installed over 36"wide self-adhering CertainTeed's WinterGuard Waterproofing Shingle Underlayment(apply directly to deck), or applied over 36" wide mineral surfaced roll roofing. After WinterGuard has been applied, install the 16-oz. copper centered in the valley. For application of copper valley, use copper cleats or large head copper nails. Closed-Cut valley application is an acceptable alternate, provided the shingles are not damaged while being formed into place. Refer to the application instructions on the shingle packaging for further information. Underlayment: On slopes 4" per foot or greater, CertainTeed recommends one layer of DiamondDeckTM Synthetic Underlayment, or Roofers' Select-' High-Performance shingle underlayment, or shingle underlayment meeting ASTM D226, D4869 or ASTM D6757. Always ensure sufficient deck ventilation, and take particular care when DiamondDeck or other synthetic underlayment is installed. For UL fire rating, underlayment may be required. Corrosion-resistant drip edge is recommended and should be placed over the underlayment at the rake and beneath the underlayment at the eaves. Follow manufacturer's application instructions. On low slopes(2" up to 4" per foot), one layer of CertainTeed's WinterGuard Waterproofing Shingle Underlayment (or equivalent meeting ASTM D1970)or two layers of 36" wide felt shingle underlayment (Roofers' Select High-Performance Underlayment or product meeting ASTM D226. D4869 or ASTM D6757) lapped 19" must be applied over the entire roof, ensure sufficient deck ventilation. When DiamondDeck or other synthetic underlayment is installed, weather-lap at least 20" and ensure sufficient deck ventilation. When WinterGuard is applied to the rake area. the drip edge may be installed under or over WinterGuard. At the eave,when WinterGuard does not overlap the gutter or fascia,the drip edge should be installed under WinterGuard. When WinterGuard overlaps the fascia or gutter,the drip edge or other metal must be installed over it. Follow manufacturer's application instructions. Fastening: Four nails are required per shingle. Nails must be of sufficient length to penetrate into the deck 314"or through the thickness of the decking.whichever is less. They must be placed on the nail line marked on the shingle. Fasteners are to be located 1" and 13 1/2" in from each side of the shingles (see instructions on product wraps). Nails are to be 11 or 12 gauge, corrosion-resistant roofing nails with 318" heads. Staples are not allowed. On slopes greater than 21"per foot,fasten each shingle with six nails and apply four spots of roofing cement placed under each shingle according to application instructions provided on the shingle package. Application:The recommended application method is the'Five-Course Diagonal Method' found on each bundle of shingles. In this method, shingle course offsets are 6"and 11". Instructions also may be obtained from CertainTeed. These shingles may be used for new construction or for reroofing over shingles of 5-5/8" exposure. Technical Data Sheet (Continued) Landmark TL Shingles Page 3 of 3 Flashing: Use corrosion-resistant metal flashing. Hips and Ridges: Use CertainTeed's Shadow RidgeTM or one of CertainTeed's enhanced high profile accessory shingles (e.g., Cedar Crest or Mountain Ridge)of a like color for capping hips and ridges. MAINTENANCE Landmark TL shingles do not require maintenance when installed according to manufacturer's application instructions. However, to protect the investment, any roof should be routinely inspected at least once a year. Older roofs should be looked at more frequently. WARRANTY Landmark TL shingles carry a lifetime limited, transferable warranty against manufacturing defects. In addition, all Landmark TL shingles carry 10-year SureStart' Protection. For specific warranty details and limitations, refer to the warranty itself(available from the local supplier, roofing contractor or on-line at www.certainteed.com ). FOR MORE INFORMATION Sales Support Group: 800-233-8990 Web site: www.certainteed.com See us at our on-line specification writing tool. CertaSpec, at www.certainteed.com/certaspec. CertainTeed Roofing P.O. Box 860 Valley Forge, PA 19482 Copyright CertainTeed Corporation, 2011. CertainTeed SAINT GOBAIN All rights reserved. Updated: 12/2011 CertainTeed Shingle Applicator ' s Manual Laminated Shingles Landmark'" Series and Landmark"' TL YOUR OBJECTIVE: z90° To learn the correct procedure for installing X60°(21/12) Laminated shingles. STEEP lip Slope Application (over 21/12) LANDMARK"SERIES AND LANDMARK"TL STAN8AR0 / Slope Application Landmark shingles have the installer-friendly WideTrack QB" I (4/11 up to 21/12) feature,which provides 11/2"wide nailing area and specially for- X185°(4112) mulcted Quadra-Bond laminating adhesive —� Low Slope Application(below 4112) (See Figure 12-3). Low L 9.5°(2/12) Landmark Special is impact resistant and is specially manufac Do Not Apply Shingles Below 2/12 Slope tured with a reinforced fiberglass scrim to meet UL 2218 Class 4 ! c0°(0/12) impact resistance rating. Figure 12-1:Slope definitions. NOTE:Landmark Special must be installed over a clean deck(no roof-overs)to obtain the UL 2218 rating. It is strongly recommended THE ROOF DECK*MUST BE AT LEAST: 3/8" (9.5 mm) thick that impact resistant cap shingles made from XT 30 IR shingles be plywood,or 7/16" (11 mm)thick non-veneer,or nominal 1" (25 installed on all hips and ridges. Some insurance carriers may not mm) thick wood deck. consider the roof system as compliant to UL 2218 Class 4 without impact resistant cap shingles. COLD WEATHER CLIMATES (ALL SLOPES):Applying WinterGuard or its equivalent*is strongly recommended wherever there is a Landmark TL is unique because its patented Tri-Laminate° possibility of ice build-up. design combines three layers of material to provide a dramatically thick shingle with a wood shake style. FLASHING:Corrosion-resistant flashing must be used to help prevent With the exception of I,andmark TI.,closed-cut valleys are preferred leaks where a roof meets a wall,another roof,a chimney or other by CertainTeed when applying these shingles.Open valleys are objects that penetrate a roof. recommended when applying Landmark TI.;however closed-cut SEALING:Shingle sealing may be delayed if shingles are applied valleys are also acceptable.Woven valleys are not recommended for in cool weather and may be further delayed by airborne dust Landmark TL because the to laminated shingle can buckle and accumulation, If any shingles have not sealed after a reasonable become damaged when shaped into the valley.Nails are required as fasteners for Landmark TL,staples are not allowed. time period,hand sealing may be necessary. STANDARD OR STEEP SLOPE UNDERLAYMENI`. Shingle CAUTION:To prevent cracking,shingles must be sufficiently warm underlayment*meeting ASTM D 4869 Type I standards is suggested. to allow proper forming for hips,ridges and valleys. CertainTeed's Roofers'Select',,ShingleFelt or RoofWrap"is WARRANTY:These shingles are warranted against manufacturing preferred. defects and are covered by SureStart"protection.See the warranty LOW SLOPE UNDERLAYMENI1 One layer of WinterGuard"or its itself for specific details and limitations. equivalent*,or two layers of 36" (915 mm)wide felt shingle underlay- * meet lapped 19" (485 mm) must be applied over the entire roof. For technical Questions,information an acceptable z alternative application methods and materials, „;; 2 o IMPORTANT.When installing LandMark'It on low slopes,one or a copy of the product warranty,contact the '� E e , layer of WinterGuard or an equivalent waterproofing shingle under- layment listed below: 3 E.c layment must be applied over the entire roof.Applying two layers Your supplier or roofing applicator of felt shingle underlayment is not an acceptable alternative CertainTeed Home Institute 600-762-8717 ✓ 67— CertainTeed-R PG Technical Services 600.345-1145 ✓ ✓ ✓ to WinterGuard.One layer of shingle underlayment meeting ASTM - - D4869 applied over the required WinterGuard is also recommended. 113 �_ FASTENING LOW AND STANDARD SLOPE ' WIDETRACK QB METRIC DIMENSIONS A �� _ _ 12" 143/4., 12" Shingle z� - —--�► Root wripiim� �+-(3 05 mm)-++-(3l5 mm)-�x(305 mm)—I Deck fIaar+�rs ..L.; .- r - -*- .- t1' I -1"(25 mm) a Release Tape 1"(25 mm)-1 Proper Crooked Under- Over- 11/7' , . Nailing Driven Driven NailableT %f ye �j" 19 *■ Figure 12-2:Proper and improper nailing. Area ■'/. ■ A IMPORTANT. For decks 3/4" (19 mm) thick or thicker,nails must go at least 3/4" (19 mm) into the deck.On thinner decks,nails must go WIDETRACK QB ENGLISH DIMENSIONS at least 1/8" (3.2 mm) through the deck. 12" 12' 12" Nails must be 11-or 12-gauge roofing nails,corrosion-resistant, I—(305 mm)--.---(305 m,�)-4---(305 mm)—I with at least 3/8" (9.5 mm) heads,and at least I" (25 mm) long. LandMark TL requires nails at least 11/4"long. --- -*-1"(25 mm) 1"(25 mm)-4- } II LANDMARK TL 7Aw F 7_ / Nod Area far 131/7" 13" 131/7" Low&Standard 1--(343 mm)------(330 mml)--•-(343 mm)--) --_ Slopes Ift"(25 mm) 1"(25 mm) Nail Area for Awitl Placing Steep Sopes Nods Along F -Release Tape 7 l Figure 12-4:Ilse four nails for every full shingle. FRONT • Nailing Lines BACK -- •-• 1 + Sealant Strips UNDERSIDE Quaora-Bond OF TOP LAMINATE LAYER 5 E= �1 i Four laminating adhesive strips for a stronger bond. Figure 12-3.•WideTrack QB"features a wider nail area and extra-strong Quadra-Bond construction. 114 Chapter 12 CERTAINTEED SHINGLE APPLICATOR'S MANUAL . STEEP SLOPE ONE CLEAN-DECK APPLICATION METHOD Use six nails and four spots of asphalt roofing cement for every full FOR ENGLISH DIMENSION SHINGLES laminated shingle.See below.Asphalt roofing cement should meet ASTM D 4586 Type II.Apply 1"spots of asphalt roofing cement under FIVE-COURSE DIAGONAL METHOD ("SEVENS AND FOURTEENS") each corner and at about 12" to 13" in from each edge. WIDETRACK OB METRIC DIMENSIONS PREPARING THE DECK: • Apply underlayment as required.CertainTeed suggests that a -4--12" 143/4" 12"—.- layer of shingle underlayment be applied.For UL fire rating, (305 mm) (375 mm) (305 mm) underlayment is generally required.Apply flat and unwrinkled. 1 _ . ' • Snap horizontal and vertical chalklines to assure shingles will � .; Release Tape be correctly aligned. Expose all shingles 5" (125 mm). Nail Area ittim�A CAUTION: Use of other installation methods may result in an For Steep icI objectionable pattern. (25 mm) -• iy m. %d (25 mm) Roofing Cement WIDETRACK OB ENGLISH DIMENSIONS ti `5o aQ\ v,o,Nvz. - 12" 12" 12" S\de O (305 mm) (305 mm) (305 mm) -' IIIMM-..- tot1vSY� O Q _dAe oor ....4( n m. e • P114-% X (25 mm) �• 1=.. ' (25 mm) Me�a� �t°n`\o e Roofing Cement v�d9e 2°�S������''° IS% vc %' 2 t2�C a doe• LANDMARK TL t'�hes���2�,3�co\,��m\ F��e°Sab°o ado�� s°S¢a ._131/2" 13" 131/2" eave ased oa�\Q edge (343 mm) (330 mm) (343 mm) Figure 12-6 Standard slope underlayment and starter drip edge details 1+1"(25 mm) Mil 1"(25 mm)-1 STARTER COURSE: _ I 1 Use CertainTeed Swiftstart or Universal Starter,or use standard three- yy/y Y % tab self-sealing shingles with the lower 5"tab portions removed to t�51m !I " ,-'4ir ■'�"■,, .-1" provide starter shingles that are 7" in height(Figure 12-7). Figure 12-5:Use six nails and four spots of I 36" mm) I Ful1l 1 L Le ength asphalt roofing cement on steep slopes. CAUTION:Excessive use of roofing cement can muse shingles to blister. Starter Shingle 7"(180 mm) _ i T _ -- _ __ I II II I Remove:: these portions ' — — — -ti ti 1 Figure 12-7:Make starter shingles by removing the lower 5"tabs. 2. For the first starter,cut 7"from one side of the starter shingles. 3.Apply the 29"piece to the lower left corner of the roof. Make sure there is 1/2"overhanging the rakes and eaves if drip edge is being used. If you are not using drip edge,make the overhang 3/4". 4.Use full 36"long, 7"wide starter shingles for the rest of the course. CERTAINTEED SHINGLE APPLICATOR'S MANUAL Chapter12 115 1ST COURSE:Apply a full shingle at the lower left corner of the TWO CLEAN-DECK APPLICATION METHODS • roof. Make the lower edge and left edge lie flush with the edges of the FOR METRIC DIMENSION A N D starter course(Figure 12-8). LANDMARK TL SHINGLES 2ND THROUGH 5TH COURSES: CAUTION! Failure to follow instruction steps 1-5 below will bring it FIVE-COURSE DIAGONAL METHOD (6"AND 1 i") joints too close together and may cause unattractive patterns! FIVE-COURSE DIAGONAL METHOD(5S/a"AND 111/4") NOTE:The 6"and 11" method is shown below.The 55/e" and 1 11/4" 1,Cut 7"off the left end of the first shingle and save this piece for later method follows the same application instructions as the 6" and use.Apply the 29"long piece over and above the first-course shingle. method except the dimensions of the shingle cut-offs in the second Leave the bottom 5" tab portion of the first-course shingle exposed and third courses are 55/8" and 111/4" respectively. (Figure 12-8). CAUTION: Use of other installation methods may result in an 2.Cut 14"off the first shingle of the third course and save this for later. objectionable pattern. Install the 22"long piece over and above the second-course shingle. PREPARING THE DECK: 3.Apply the previously removed 14"long piece over and above the • Apply underlayment as required. CertainTeed suggests that a layer third-course shingle. of shingle underlayment be applied. For UL fire rating, underlay- 4.Apply the previously removed 7" long piece from the second ment is generally required.Apply flat and unwrinkled. course over and above the fourth course shingle. • Snap chalklines to assure shingles will be correctly aligned. 5. Install a full shingle against the right edge of each shingle in Expose all shingles 55/8" (143 mm). courses one through five. CONTINUING UP THE ROOF: STARTER COURSE: 1. Beginning again with a full shingle,repeat the five course pattern 1.Use CertainTeed Swiftstart Starter,or three-tab self-sealing shingles up the left rake (Figure 12-I0 see B). with the lower tab portions removed. Be sure that the starter shin- 2. Fill-in courses across the roof in a stepped diagonal fashion using gles are at least 75/8" in height.(Figure 12-9). full shingles (Figure 12-10–seeA and B).Do not run courses —I straight across. T Starter Shingle 1 75/8" IMPORTANT.Do not align joints of shingles closer than 3 t/2"from one another. T -,r- — -- ir- - -—, A.V. A� ; Removep these pinrti ons i \_ �.`I N N I N 2 9.Make starter shingles t8at are 7/8"in height.2.For the first starter, cut 6"from one side of the starter shingle. 3.Apply the remaining piece to the lower left corner of the roof. Make sure there is t/2" overhanging the rakes and eaves if drip e�t ` overhang being •,used.II you are not using drip edge,make the 4. Use full length starter shingles for the rest of the course\,:f o�Se 5t�c °�\Se G ° \se e liI 111,, _.0 4�r 3\aC ���aC'°�\S ��se ill .11IV1417,:,--".-- \eye � * ,,e. Sys 1,l.°\'' e ip'04 s'e. -\c.0Cc se 1 Figure 12 4.aPpO"nq thefrrsl 5 courses on a standard slope 1i6 Chapter12 •CERTAINTEED SHINGLE APPLICATOR'S MANUAL Figure 12-10: "Five-Course Diagonal Method"installation schematic. ' I`, AVI` ��I• For capping hip and ridge,apply CertainTeed ''�I`7'` r y1\ "Accessory"shingles of a like color. Oa" _1�/�� i wtgs coo\ .00.1*- ..040,-.11610.1■40-10....\'" ....----41 „../ ***, siolit**tNwotoollaaatiostoh 16.4). ., • **I 1**‘1 ***...I em k_*I%X****0*3 ,„/ 1,1400.,4110.16,1■10 III■ • 1111w10."111"0:0111■444 • , t I LI`1 6 1 11 ti 14 01 I 111 00 1 01 01 0 1 I I§iiik.1 I I I gli 4 0 A 0"4. . 10, ♦ s . .&11 011 -Nil Softit Provide adequate �� ,��0 .' : �',/!•` , ♦, • 4 p f llOpp. fir 11ir�.� Ie ventilation under immill i 1I1'�! 4 A 1101. 90. t �`` the root deck to prevent harmful 1111p12.111011 H �110',���I � 11 I'condensation in `��I' 1rg� / winter and heat .. build-up in ,, * summer. �\�. I Line valley by centering t 36" (915 mm) wide CertainTeed WinterGuard Waterproofing Shingle ' Underlayment or equivalent directly 1a ��AeksZ"tiA,qua\ f o deck. a aka�eiPo \aQS 5�c�\ 0 4 av'O'0,,o SS k,,, `L a0 6/ /he ey �iv7 I a//E,aS!�,4001 ed_1 pon���R�\��\e /� asoha�O Own/�des9/ei�a �� 6Va\y�en�e\�� , �� 9 ceirie�•0y ,... ..Ft 0 W_ W 04690 50 .!.'� Remove, /o„"'weo, ''''0f .� '1 9/P' * grA I 1 f....,,Ap Niti ?. (5hn9Ies 0 yak fr 0m) v �e o Dente hne Figure 12-11:Highlight of closed-cut valley details. CERTAINTEED SHINGLE APPLICATOR'S MANUAL Chapter/2 117 1511'COURSE: Apply a full shingle at the lower left corner of the CHIMNEY FLASHING roof. Make the lower edge and left edge lie flush with the edges of the starter course(Figure 12-12). 2ND THROUGH 5TH COURSES: Metal Step Flashing CAUTION! Failure to follow instruction steps 1-5 below will bring joints too close together and may cause unattractive patterns! 2"(50 mm) (180 mm) 1.Cut b"off the left end of the first shingle and save this piece for later Minimum 7 h use.Apply the 323/4' (34"for Landmark TL) long piece over and 3„(7 m) above the first-course shingle.Leave the bottom 55/s'tab portion of Minimum the first-course shingle exposed (Figure 12-12). Figure 12-13:Step flashing minimum dimensions 2.Cut I I"off the first shingle of the third course and save this for `1Y)T.E Use 75/8"or more for Metnc dimension and LandMark TL shingles. later. Install the 273/4" (29"for Landmark TL) long piece over and Fold down i above the second-course shingle. counter flashing 3.Apply the previously removed 11"long piece over and above the over step flashing third-course shingle. _ 4.Apply the previously removed b"long piece from the second course over and above the fourth-course shingle. Arior 5. Install a full shingle against the right edge of each shingle in if - courses one through five. -� Fasten CONTINUING CAP THE ROOF: ) Flashing �I To Roof 1. Beginning again with a full shingle,repeat the five-course pattern Counter _L i�� up the left rake. Flashing ,/ I /,�/ • 2. Fill-in courses across the roof in a stepped diagonal fashion using / o/ / full shingles.Do not run courses straight across. IMPORTANT Do not align joints of shingles closer than 31/2" from one another. 'foto°,`/as/,/�9 ��∎, _ - 'Illiommramili JAI" • moo\' ''k' ‘ ----'-ff 1� 11111.1111•esposollini. ,' 1111.1111111..- ow s."41111/ AraingtrAw mom Air orossii21 •\yea\ �_ ''_`��_�• �Ea�e Z sa Q ��+�__```�__� °u,\se S\s, °use 2 Figure 12-14 Flashing around a chimney. A\ C' ac,c)\ use A W.1111110.91v4- .\%\.c.,,c)\''\R,..\ .,% ,,, ...„digil‘ Sae\ - �1► .4* . vI',\%use 1 Figure 12-12:Applying the first 5 courses of Metric dimension. Note:The LandMark TL dimensions differ 118 Chapter12 CERTAINTEED SHINGLE APPLICATOR'S MANUAL 2ND THROUGH 5TH COURSES: ONE ROOF-OVER METHOD FOR ENGLISH DIMENSION SHINGLES CAUTION! Failure to follow instruction steps 1-5 below will bring joints too close together and may cause unattractive patterns! PREPARING THE ROOF SURFACE FOR REROOFING I.Cut 7"off the left end of the first shingle and save this piece for • Make the surface of the old roof as smooth as possible by replacing later use.Apply the 29" long piece over and above the first-course missing shingles. Split and nail flat all buckled,raised tabs and shingle. For this and all succeeding courses, align the top edge curling shingles. of the shingle to be applied with the bottom edge of old shingles • Its a good idea to cut old shingles back flush to the rakes in the next course. Exposure of first course only is reduced to 3". and eaves. 2. Cut 14" off the first shingle of the third course and save this for • We suggest that you apply corrosion-resistant drip edge along the later. Install the 22' long piece over and above the second- rakes and eaves,covering the edges of the old shingles.This will course shingle. provide a uniform and straight edge that will help prevent water 3.Apply the previously removed 14"long piece over and above the from seeping under the shingle edges. third-course shingle. "NESTING"COMBINED WITH THE FIVE-COURSE 4.Apply the previously removed 7" long piece from the second DIAGONAL METHOD ("SEVENS AND FOURTEENS") course over and above the fourth course shingle. NOTE: Nesting is preferred over"bridging"methods when reroofing 5. Install a full shingle against the right edge of each shingle in courses one through five. Remember that course one shingles are because nesting sheds water best and looks better.Nesting,as described below,is an easy application over square-tab asphalt strip only 10"wide. shingles with a 5"exposure.If you are covering a different type or CONTINUING UP THE ROOF: size shingle,you may need to cut back the tabs so that nesting is 1. Beginning again with a full shingle,repeat the five-course pattern possible.To do this,simply cut off the leading edge of all old shingles up the left rake. when they are lapped less than 2 t/z"by the new shingles.This permits 2. Fill-in courses across the roof in a stepped diagonal fashion using a flat nested application that avoids lifted edges and slumps. full shingles.Do not run courses straight across. - 7 — IMPORTANT`.Do not align joints of shingles closer than 3 1/2" from one another. `, ��/hCoU�- /�/dyoof TWO ROOF-OVER METHODS FOR METRIC DIMENSION AND ' �il�'a '` - LANDMARK IL SHINGLES (,'95/i7"' . c7 - - The same methods used for clean deck application of these shingles _ se ,0'%2 are used for roof-overs.Application of these shingles over English �:/ cae„ dimension shingles is not recommended—due to the high cost of �,/t6- t e workmanship and greater risk of worker error. x/77/ 8477 HIPS AND RIDGES Figure 12-15:Five-Course Diagonal,Nested. SHADOW RIDGE'ACCESSORY SHINGLES FOR HIPS AND RIDGES STARTER COURSE: 1. Remove the tabs and the top 2"from standard self-sealing Shadow Ridge shingles have an accented shadow line that is designed to shingles,leaving 5" by 36" strips. complement these shingles.Simply fold along the pre-cut lines and detach individual cap pieces.Save valuable installation time compared 2.Cut 7"off the length of the first strip,apply the 29"remaining piece to cutting 3-tab shingles. over the old first course at the lower left corner,overhanging the se and eaves t/z"if drip edge is used,or 3/q"if no drip edge is \\\\\\\\ \\\\\ used. 3. Continue with full-length starter shingles along the eaves 1ST COURSE: Figure 12-16:Shadow Ridge accessory shingles detach easily from 1.The first-course shingles are made of full I.andMark shingles with three-piece units to make 72 individual cap pieces. 2"cut off the bottom of the tabs. 2.Align the first-course strips with the left and lower edges flush with the starter course. CERTAINTEED SHINGLE APPLICATOR'S MANUAL Chapter 12 119 There are 24 three-piece units in each Shadow Ridge bundle, NOTE:Each cap has a laying/alignment notch at the top edge to . providing 72 individual caps that will cover 30 linear feet(333/4 center the piece on the ridge line,and two notches on each side linear feet,Metric) of a hip or ridge. Each English dimension cap to indicate the correct exposure and shadow-line placement piece is 12"by 12' (Metric caps are 131/4"by 97/s")and features (Figure 12-19).The side notches of the cap being applied should clipped corners on the bottom edge of the exposed portion. be aligned with the top edge of the previously applied cap. APPLICATION IS AS FOLLOWS: 12" J.Apply shingles up to the hip or ridge on both sides,then trim (305mm) - flush. --- 6" - 6' NOTE:The last course of shingles should have an exposure of (150mm) (150mm) 5" (55/8"for metric)or less when the shingle cap or ridge vent is ■ • fastened in place.Otherwise,a potential water leak could occur at t exposed shingle end joints.The figures used in this section illustrate Notch for the application of accessory shingles over a ridge vent;application Centering directly to the roof deck is very similar. 12° -\ // -—f (305mm) :2" —'{ Apply Over Notches for Alignment to 7" �� (3050r,/ /Starter Shingle the Top Edge of the Previous (18Omm) /p Cap for 5'(125mm)Exposure Starter shim English Dimension rr gpr' P . ';`fi ..:. ,. ' .. 97/g' /�/7 (250mm) —415/16' 415/16 -- (125mm) (125mm) f Figure 12-17:Apply a full cap shingle over the starter piece, Notch for flush with the bottom and side edges of the starter Centering - 2. Install caps beginning at the bottom of a hip or at either end of a 131/4" (337mm) Notches for Alignment to ridge.Apply a starter piece that has the bottom 5" (55/s"for g 75/8' metric) removed (Figure 12-18).Fasten the starter with two nails the Top Edge of the Previous 196mm located about 3"from the rake edge,and 1"in from each side Cap for 55/8"(141 mm)Exposure ( ) edge.Make sure fasteners used to apply caps penetrate at least L\ /i 3/4"into or through the decking. Metric Dimension NOTE:To assist in proper alignment when ridge vent is not used, snap a chalk line parallel to the hip or ridge along the line where Figure 12-19:Each Shadow Ridge shingle has a centering notch and the side edges of the cap shingles should be. o side-alignment notches to help ensure proper placement 3.Apply a full cap shingle over the starter(Figure 12-18),and place fasteners at 55/8" (61/4"for metric)up from the exposed bottom 12" edge and 1"in from each side. Nails must not be exposed on the 6___(3o5mm) Laying Notch , � v g finished roof_All nail heads must be driven straight and must not � ti cut into the shingle surface. /1i. 5-(1 25011) Ala, Ikii/e ri,.. . 1.:.., iiii, /*NW Figure 12-18:Install cap shingles at their correct exposure and cover all fasteners. Figure 12-20:Use laying notches to center shingles on hips and ridges,and to locate the correct exposure. 120 Chapter12 CERTAINTEEII SHINGLE APPLICATOR'S MANUAL HIP, RIDGE AND RAKE SHINGLE APPLICATION MOUNTAIN RIDGE HIGH-PROFILE Apply the primary field roofing up to the hip or ridge from both sides HIP AND RIDGE ACCESSORY of the roof and trim flush or lap over one side,not more than half the width of a Mountain Ridge shingle. Use Mountain Ridge accessory shingles to cover hips,ridges or Assure that the installed Mountain Ridge shingles properly cover hip rake edges.One box will cover 20 linear feet.To prevent damage to and ridge field shingles on both sides and the field shingles applied shingles during application,they must be sufficiently warm to allow along rake edges. For a rake edge installation,cut the field shingles proper forming. flush to the rake edge.Apply Mountain Ridge shingles ensuring they fit securely against the rake board.To assist in proper alignment, FASTENING snap a chalk line parallel to the hip,ridge or rake along the IMPORTANT`.Use two nails to fasten each shingle.Nails must be line where the side edges of the Mountain Ridge shingles minimum 13/4"(45 mm) long.For the 4" (100 mm) starter shin- should fall. gle,place fastener 1" (25 mm) in from each side edge and about 2" Prepare a 4" Starter shingle by cutting off the lower 8"color gran ule bun portion of one Mountain Ridge shingle.Apply the 4" starter (54 mm) from the rake (or save)edge,making sure the fastener piece (with sealant nearest the outer edge) over the bottom corner of goes /4"into the deck or all the way through. For each full Mountain Ridge shingle,place fasteners 85/8" (219 mm) up from its exposed the hip or rake,or on either end of the ridge,overhanging the corner butt edge and 1" (25 mm) in from each side edge. or end by approximately t/2"and bending the starter shingle along its centerline to form into place(see figures below.) Install a nail on • Sealant each side about 2"up from the starter shingle's exposed butt edge and 1"in from each side edge of the shingle.The 8"piece that was ,` cut off may be used to finish the opposite end of hip,ridge or rake. 51a Next,apply a full Mountain Ridge shingle over the installed starter _s psute/1111\ shingle,bending it along its centerline and forming into place over EXp g" the hip,ridge or rake,flush with the bottom and side edges of the Sealant starter shingle. Install a nail on each side of the shingle 85/8"up from 4 Starter the bottom edge and 1"in from each side edge. Piece 1 Continue application of the Mountain Ridge shingles along the hip, { :►�`'���� ridge or rake as shown. Expose Mountain Ridge shingles 8",covering all fasteners. Figure 12.21:Flip and ridge application. • Here's a Tip...In the winter put hip and ridge cap shingles in your truck with the heater blasting for 20 minutes so the caps don't crack when formed. (Thanks to Mark Dulz,Richmond,MI.) r C E R T A I N T E E D S H I N G L E APPLICATOR'S MANUAL Chapter 12 NOTE:Blue italics indicates new or modified information. 121 Technical Data Sheet CertainTeedEl Shadow Ridge TM Shingle Oohs*Nadi whim.Satisfartioaawarntrrd.'" (Hip and Ridge Accessory) ENGLISH METRIC PRODUCT DESCRIPTION A shingle of three-piece construction (English-size)or four-piece construction (Metric-size;West Coast on ly)that combines durability with flexibility and — _ _ _ — good looks. Available in "English"dimensions —12"x 36" overall, yielding three 12" x 12" caps, or"Metric"dimensions— 13-1/4" x 39-3/8"overall, yielding four 13-1/4" x 9-27132" caps. Availability depends on sales region. Colors: Shadow Ridge shingles are available in various colors. Color and product availability can vary by region; please check your region's product catalogue. Limitations: Use on hips 8 ridges of roofs only after application of primary roofing shingles to both intersecting roof decks.These shingles are designed to be used with CertainTeed's shingles that reference the use of "Shadow Ridge"shingles. Use"Shadow Ridge"product colors that complement the shingle colors applied to the main roof. Special hand-sealed application is required for Miami-Dade acceptance. Contact CertainTeed's Technical Service Department @ 1-800-345-1145 for details. Product Composition: Shadow Ridge shingles are composed of a fiber glass mat base. Ceramic coated mineral granules are tightly embedded in specially refined,water-resistant asphalt. The "English"version is a three-piece shingle that must be separated into individual pieces, each 12" x 12", by folding along the perforated lines. The "Metric-version is a four-piece shingle that must be separated into individual pieces. each 13-1/4"x 9-27/32". by folding along the perforated lines. Applicable Standards: ASTM D 3018,Type I ICC-ES ESR-1389 ASTM D 3462 Miami-Dade Product Control Approved" ASTM E 108 Fire Resistance: Class A UL 790 Fire Resistance: Class A ASTM D 3161,Type I Wind Resistance UL 997 Wind Resistance ASTM D 3161, Class F" Wind Resistance NYC-MEA-120-79-M "Special hand-sealed application required (Contact CertainTeed's Technical Service Department @ 1-800-345- 1145 for details), TECHNICAL DATA English Metric Weight/Bundle (approx.): 65 lb 80 lb Dimensions (overall): 12" x 36" 13-1/4" x 39-3/8" Separated into individual pieces: 12" x 12" 13-114"x 9-27/32" Weather Exposure: 5" 5-5/8" Coverage/bundle: 30 lin.ft_ 45 lin.ft. INSTALLATION Each bundle of Shadow Ridge shingles has detailed installation instructions including diagrams. Double-coursing will accent the rooflines and improve overall appearance. AVAILABILITY AND COST Availability: For the names of local distributors and dealers, please write Architectural Support, P.O. Box 860, Valley Forge, PA 19482; or call (800) 233-8990. Cost: Contact a local distributor or dealer for current price information. Technical Data Sheet (Continued) Shadow Ridge Shingle Page 2 of 2 MAINTENANCE Shadow Ridge shingles do not require maintenance when installed according to manufacturer's application instructions. However, to protect the investment, any roof should be routinely inspected at least once a year. Older roofs should be looked at more frequently. WARRANTY This product has a limited warranty against manufacturing defects concurrent with the warranty of the field shingle with which it is installed. TECHNICAL SERVICE Complete technical support and assistance is available through CertainTeed's Technical Service Department @ 1-800-345-1145,Territory Managers, and the fully staffed and equipped Research and Development facility in Blue Bell. PA. FOR MORE INFORMATION Sales Support Group: 800-233-8990 Web site:www.certainteed.com See us in Sweets printed and electronic publications CertainTeed Roofing P.O. Box 860 Valley Forge, PA 19482 Copyright CertainTeed Corporation, 2009. CertainTeed Et All rights reserved. Updated: 12/2009 i)ratity nude certain.Satisfaction Suaraxtrre" Technical Data Sheet (Continued) Shadow Ridge Shingle Page 2 of 2 MAINTENANCE Shadow Ridge shingles do not require maintenance when installed according to manufacturer's application instructions. However,to protect the investment, any roof should be routinely inspected at least once a year. Older roofs should be looked at more frequently. WARRANTY This product has a limited warranty against manufacturing defects concurrent with the warranty of the field shingle with which it is installed. TECHNICAL SERVICE Complete technical support and assistance is available through CertainTeed's Technical Service Department @ 1-800-345-1145,Territory Managers, and the fully staffed and equipped Research and Development facility in Blue Bell, PA. FOR MORE INFORMATION Sales Support Group: 800-233-8990 Web site:www.certainteed.com See us in Sweets printed and electronic publications CertainTeed Roofing P.O. Box 860 Valley Forge, PA 19482 Copyright CertainTeed Corporation, 2009. CertainTeed E4 All rights reserved. Updated: 12/2009 Quality wade certain Satisfaction guaranteed."' S H I N G L E V E N T I .s tal liar loll 1 /i .,triuc•ti ii ens ShingleVent II fits roofs with 3/12 to 16/12 pitches- See below for special conditions of steep pitch ShingleVent II-7 and 11-9 fit roofs with 3/12 to 12/12 pitches. roofs and truss type construction. 13.1 a'ISVI I) 10-3;4'(SVII-9) -- 412'(SVII-7) Thanks for choosing ShingleVent II! RIDGE BOARD RIDGE VENT FILTER CAP SHINGLES This product is engineered to provide the best.most •`•,0,11//1 efficient ventilation system available.When properly } ROOFING NAILS installed.ShingleVenl ll will: 1.1.2 _ �� AIR SLOTS • 1 kip prevent the premature deterioration of shingles and � ��� ,1• other roofing materials caused by inadequate ventilation. ,'';% ,- DRAIN SLOTS • Meet t}'pKal roof shingle warranty ventilation ttayuiroments, _-- .. �1 • Help prevent attic heat build-up and ice dams h}' '0 Ark continuously nun-inn•air along underside of roof deck. _16 Ai For best results install adequate 12 intake vents ShingleVent II is designed to exhaust moisture-laden air Corot leoserp I shlrglao,�rrLSng 3y'� "1S4• from the attic.To achieve opt ilium ventilation efficiency. etllp wait sbl RAFTER 3' RAFTER • existing roof vents.turbine vents and gable vents should be removed or plugged,and intake ventilation must he installed `, cuolisblbrevegp tor construction,leave gap br at the soffit or eau:. Products such as Air Vent's Continuous new loot corlstru tlon =. Soffit Vent.Vented Drip Edge or Uncereave Vent provide / __.the necessary intake ventilation for optimum performance I�w "_� pr '• 111114116611110 -• rn•idtd the intake net free area matches or exceeds the I'•,��=�� FELT exhaust net free area. err ShingleVent II is a snap to install! Return rootbg tit brnee,rootconOrtctbn or usecorthtous s03brt band br existing Just Ilrlktty these sunpk nstructions.It'iti have any roofcautructico questions or requite special installation assiaame,call our toll-five number from 6a.m.-5p.m.(CS.T.) Fig. 1 RIDGE BOARD TYPE CONSTRUCTION Mon.-Fri.: 1-80O-AIR-VENT(247.8368) Tools needed Ail)� - _0 O �t• CAUMN:imam pith for installation IWtpe11�D6.arrl pepper , • dram• Hammer .X1 10,, trtalliroopeor vo � a r• • Utility knife ' it I IV. / t l ��,• • Chalk line / 1 .' 1�,�:• • Roofing nails �`� / Arrord •• Tape measure --- ` , • Circular sow / i 1 .., 3r4' - —I 314' TRUSS TRUSS- ..—3' 1.17' Fig- 2 STEEP PITCH ROOF 115112) FIg. 2 TRUSS TYPE CONSTRUCTION LIMITED LIFETIME WARRANTY Limited non-prorated and transferable seem wed wb.•Gamed amid C.Hoer Lose Weee tee C..doe.or wwtno Provided met C.ring•vent hoe ben irrral•d In•toot eoovdwwe with Air Von nci tAir Vrawrioen irWJl•ton To Thin prhan sloe under Pi.warranty.Me hannwntat:onauma must nctlr Air Vnt an voting d eery inrruotiwy AY'Wool w.rmnstnot to ridg•ant.liongleiem IL eat te free born menuleturne detects during the manufacturing dad am blowing Is Ii.h prop Marne d eh•angina puma..., e P Pefr a sY.and deal eubmh will Rude notification f d deb a ehovrd•ry m.nrn.mrfng d•f.w maw.during tn.team•d C.on.ind prrdraar and w long natl.nrigw•I pun. purohae end win 1rWaradan.In air to praVN•Air Km n opportunity to Inwhgr•the clean end examine the Omer l dill hang end retains ow wean ath.pgpo,l Air Vent will provide repsesnrn mann.l for Pa pa- mrlrl.ldam.d to be detective.All nsteb.doneenen no aertd.ato:Alrvm ec.nm brew Ora Peoria 111nda an olth•produa downed to be detective tnct lnciudirp ab ut:Pe Incurred In minoring debars Vent Of lnataing e1e15.Air Volt WWI then promptly Wpm the clamed detect bolos the tumbling d any repiern.m nom is repleoement iambs) opprond and Air Vert MAIL within■rr.onebll time after appronl prwke■repleamem V•m for yenta)under the In the gum be r.pcwnent wording oath.Irma dthla mammy,tit•air a womanly aril opplytoth.rppl.or cane.orthu wan.ny.Thlawwnnty to.nedhn on nNge soot.•pegged n on der July L lute. mein mutrla and oil Pled to the beans of the original w.rmnry pried In effect et the dine the yenl proved detaeke. The lledm a 000r.p.W chi.w.nnty..utanatloaly.nda upon tit.Ile d m•property a dwelt d the Iwo d the myna canoe d the property et the tin•el ina.lbmon. Tr.litres•cor.reg•in chi.webby Le drained no cur Indirndu.l hom.arm.w only In Ma on d ridee rat purchwed W.or mewled upon proper,owned W=bombe.poornm.nttr ace'se&puma*q rata rat- glob wg oi•nora school..omd amino,ma or=opera r•houunp rren5.m.no or'baled on.penm.nt bold- 'ngarryan.r 4.P. tyw ...Mineapr......ndt...d br inea.id..l nan.r..nra..m..r.ad.w�th.w.m.n- PLEASE COMPLETE THIS FORM AND RETAIN WITH YOUR IMPORTANT PAPERS ,prod will be levees blowing Vin Inat•Iwb n alb bee vent AtgV.aewi Mon.pnaleaaea Air Vent ridge vent.rlctr produces.WI 11.11 by Regrown et Flue.,potation fa.prod of 5 Moat years,provid- •d that the ridge veil has been metaled n arra naordence with Air VOW/velum Inaalnon Intonation Under Date in:trilled maawrnntyleolunt Air Vent et no Oboe,aria resets env ridge earn found to W detect re during me Raplsmem PIu."'priori ph•Rwerofne t Plus period bob therids•ant•pplidio acwnpl.t•dl Air Vwes in album liW4ley under Nplown ern Rum aril la pun to the rernable ear Io rapee C.det•o do.ridg•v.m•Including boa Installed by 1.in.r.n,.•I.whNye A.V...'.,rein.n on w....,.,..+thin*hew ward to yew inn r..d ti id,.*...,.,..d In S H I N G L E V ENT " lns /a/fcatrail li1 .` tuuc•tion.c ShingleVent II fits roofs with 3/12 to 16/12 pitches. ShingleVent II.7 and 11-9 fit roofs with 3/12 to 12/12 pitches. IMPORTANT NOTES 1. When using standard flat 3 tab shingles, it is unnecessary to caulk under flange of the vent. 2. Caulk between low areas of shingle and flange of vent, making sure you don't plug drain holes. 3. When applying vents to shakes, fold felt as shown in drawings on other side. 4. Before fastening vent, make sure fitter is secured between shingles and vent. 5. When installing vent in cold weather, leave a 10 gap between vent sections to allow for expansion in hot weather. 6. See instructions below for cutting slot. 7. For best appearance, run ShingleVent II from end to end to give the roof a more even, attractive appearance. S. When using a nail gun to install cap shingles over ShingleVent II, special care should be taken. It is important that the roofing nails penetrate the roof deck without compressing ShingleVent II. Nails driven too deep will dimple or distort the cap shingles. Nails not driven deep enough may allow ShingleVent II fasteners to back out of the roof deck and could result in blow-offs. Al I kr'F. Ali t.... N.,..,,,t4-7:Alliki,07.1 ,7400. ..., ,-.erlbk liktr„ ._ . ,s-ro\: • NIZ"... r.. .„410,1%,. IF2,14 Fir .0 !t:,•i-4, 4. la isRmW.14.4 LI& -.4--i---• -....j11 . ..,.• r Lon csisting roof,remove cap shingks.Mark 2.Cut slot tplurnb cut.If pos ibkt.Note:Adjust 3.Center vent o+rt slot.End sltouki he 1Iu.h slot width at both ends of ridge.Use slot guides depth ofblade to avoid cutting rafters or trusses. with end of roof. Make sun: vent'.support ribs imprinted on vent and refer to drawings below. Refer to drawings below for slot dimensions. sit flat on the roof,and that filter is secure Snap chalk lux on both sides of ridge. Remove &hris from slot. between shingle t.and vent. t 11111111111111-1 \ II' i . ;-7v7 Yoll %rig 1 FIlt -t. fi,---"'ir-"-..ittirwli III • II K ' AAA _r . c! 'It \14.7.444- 1.1PA ifAw .47 el r If.jaiviiii .., . __:: riwa.k., .40. -- ........_ mr,r...,.•__ EIS I 4.Pre-fasten first section using roofing nails S.Use utility knife to cut final section to kngth. 4.Nail cap shingles in place using roofing through pre-drilled nail bosses.Cost roue to Final section shouki be oriented so that the inte- nails long enough to penetrate roof sheathing. pre-fasten remaining sections.making Sure grated end plug is flush with the end of the roof. Use nailing lints provided on vent us guide.If support ribs arc flat on the roof and fiber is Pre-fasten final se ction. using a nail gun.see#S under important notes. secure between shingles and vent. INSTRUCTIONS FOR CUTTING SLOTS indicate:sfot width indicates vent run ---...- indicates and well H 1 p Sad Gable Roofs "L" aid 'T. Shaped Roofs CM sides Cut slot 3/4" on both sides of ridge cenierlite Cut slat.as per Figure 5 and tun ShingleVent II Cut slots to within 12"of chimney.Run or from ridge hoard and to within 6" of end across long ridge.On shon ridge.cut slot to within ShingleVent 11 from end of roof to bun wall or hip intersection as illustrated in 12"of junction pons and run ShingleVent 11 front against chimney as shown in Figure 6. Figure 4. end of roof to bun against crossing ShingleVent ll, t 1 I I I I I i I Ertduvad [ t t t t h t t t t t t i a t t l ttndwell ■ 10014, ' Mill 1 I l 1 1 1 I I I 1 t h 1 1 s t 1 to lot ,�� side wt•' l 4r...u,..1-1-i-u-i-i,..i.„. IMEEMEMI — — 6' l a -— , n Run Shingle/ant ingle/ant --� [01-A Rto and d ndg• / 6. 6'from I 6'from MMii Run Shind.Wnt to T C fran- �I •M wall l •M wall 6'hom I and of ridge -t—T aM vttdl to slot to dot •MwMt to Vet am I 1 End wall -.I End wall to dd ■ ■End t , Nip end Fig.4 Gable end a Fig.5 End It Fig. 6 End wall NOTE:Air Ven/s written warranty for this product stall not apply in any trutanee in which the product was not installed in accordance with the uttn actions contained herein.