Loading...
Plans Solar Balance Point Standard Worksheet Address Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. - - First, determine which property line is the North lot line. The North lot line is the line with the smallest angle from a line drawn east -west and intersecting the northern most point of the lot. 45° tar UN N North -South Dimension for Lot: Measure the distance from the midpoint of the North lot line to the South lot line along the described line. ♦ /ia feet N FF=3Ncesssousoauetace4 Box 3 calculations: Shade point . height for your residence. Box 3: 1. Determine whether measurements will be based on the peak or eave of your Which describes structure- The orientation of the ridge is also important. your residence? 1 a: If the roof line runs North - South, measurements will (circle one) be based on the peak of the roof. c o o o a luliuu 1A 1B 1 15: If the roof line runs East -West and the roof pitch is less than 3/12, measurements will be based on the � .�. �El eave. 1 c If the roof line runs East -.Vest and the roof pitch is 5/12 cr steeper, measurements will be based on the ...IT - m peak. 2.•a +o. a+=1