Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT ;. COMMUNITY DEVELOPMENT Permit#: MEC2014-00156 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/21/2014 Parcel: 251018801500 Jurisdiction: Tigard Site address: 12242 SW GARDEN PL, BLDG#1 Project: Chester Labs Subdivision: CROW PARK 217 Lot: 3 Project Description: Replace 3-ton RTU with 5-ton RTU,add new ducting and(2)bathroom exhaust fans. Contractor: OREGON AIRE INC Owner: WALTON CWOR PARK BC 8 LLC 7715 NE 33RD DR STE A BY EQUITY OFFICE MANAGEMENT LLC PORTLAND, OR 97211 PO BOX A-3879 CHICAGO, IL 60690 PHONE: 503-335-2222 PHONE: FAX: 360-423-1978 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 04/21/2014 $378.19 Class of Work: ALT Type of Const: Vg Plan Review 04/21/2014 $94 55 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 04/21/2014 $45.38 Stories: Info Process/Archiving-Sm$0.50(up to 04/21/2014 $12.50 11x17) Project Valuation: $11,200.00 Fuel Air Handlers Fuel Types: Natural Gas Units<10000 cfm: Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: 2 Vent Systems: Total $530.62 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 1 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 95 - You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 32.2344. • Issued By: / , ermittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Annli n rc)li c)rrlc 1. I til: c)\1.l �,EIVEI lig City of Tigard Received 4/ /) ''/ Permit No.:M /1„/(/ /3 /5 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Re: l Y f O'G I Phone: 503.718.2439 Fax: 503.590 Plan Revtew �`7 l 'her Permit: u,P 03`J 9 2014 Date Re my l` l col T 1 c;A K n Inspection Line: 503.639.4175 Date Ready y: Juris ® See Page 2 for Internet: www.tigard-or.gov Notified/Method: q/�/4 .# Supplemental Information CITY OF TIGARD�T 111 «I TYJ L 1 I( DIVISION lids 9-'COMMERCIAL FEE* SCHEDULE - USE CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction liej Addition/alteration/replacement —I performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,31d.profit. Value:$ / // a 6 U r CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family Master builder ❑Other: Description I Qty. I Ea. I Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 Job site address: a ii 0.. 5 � �� Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: "1"--; , ✓ D Q Furnace 100,000+BTU(ducts/vents) 54.91 f t sj LABS Heat pump 61.06 (Suite/bldg./apt.no.: Project name: /� Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 Flue vent for water heater or gas Rep % fireplace 23.32 A n_w �l � Log lighter(gas) 23.32 -A n 4'e- `��4 17 4:, _77-45 i `'- Wood/pellet stove 33.39 1 s-1 .' Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 ❑ PROPERTY OWNER I ❑ TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) Fax:( ) Attic/crawlspace fans 23.32 ❑ APPLICANT ❑ CONTACT PERSON Other: 23.32 Business name: �� Fuel piping: ��oy] - lt�)Q-1� �' $14.15 for first four;$4.03 for each additional Contact name: t . k�AL L Furnace,etc. Address: 7 ‘c K) 3 9 D,' , Gas heat pump Wall/suspended/unit heater City/State/ZIP: 6 f D 650- l 7a- � / Water heater Phone:(563) 3s_ .�a°�/ Fax::( -4,),3) 3 3 7� Fireplace - ! / Range E-mail: Barbecue CONTRACTOR Clothes dryer(gas) Business name: Other: MECHANICAL PERMIT FEES* Address: r Subtotal City/State/ZIP: ( Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:( ) Fax:( ) State surcharge(12%of permit fee) CCB lie.: („!)r) 3 �\1 TOTAL PERMIT FEE `' ` This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authori d signatu * Fee methodology set by Tri-County Building Industry Service Board Print name: Date:l,. R J 1:\Building\Permits\MEC_PermitApp_040113.doc 4404617r(11/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. C\Building\Permits\MEC_PermitApp_040113.doc 2